Embed presentation
Download as PDF, PPTX

This document outlines the stages of work for several construction projects from 2003-2016. It lists the project definition, preparation and briefing, concept design, developed design, technical design, construction, handover and close out, and in-use stages. It also lists the firms involved in each project stage for APM Krasnogorsk from 2003-2009, Tkachenko Studio in 2005, Tchoban-Shaliavsky from 2005-2006, Pringle Brandon in 2010, WATG from 2010-2013, Benoy from 2013-2014, HKS from 2014-2015, and TPBennett from 2015-2016.