A contractor must excavate the
site shown in the following
sketch to a final elevation of
6.0’. Based on the site layout
and elevations given, the total
amount of excavation or backfill
would be ____cy.
N
Calculate elevation at 100’ & 200’
22.0’




Δ = +14.0’ – (-8.0’) = 22.0’
Δ/lf = 22’/400’ = 0.055’
Δ/lf = 22’/400’ = 0.055’

Δ@100’ = 100’ x 0.055’ = 5.5’

El100 = 14.0’ – 5.5’ = 8.5’

El200 = 14.0’ – (200’ x 0.055) = 3.0’
EL 8.5’


EL 3.0’
EL 8.5’


EL 3.0’
C       B

                      EL 8.5’
              A

EL 3.0’
Area A

  Finish El 6.0’




Ex El = {2(+14.0’) + 2(-8.0’)} / 4
Ex El = 12.0’ / 4 = 3.0’
Area A

  Finish El 6.0’




Depth Excav = Ex El – Finish El
D = 3.0’ – 6.0’ = -3.0’
B’fill = (125’ x 400’ x 3’) / 27
B’fill = 5,555.6 cy
Area B


    Finish El 6.0’




                                    EL 8.5’


Ex El = {2(+14.0’) + 2(8.5’)} / 4
Ex El = 45.0’ / 4 = 11.25’
Area B


    Finish El 6.0’



                                     EL 8.5’


Depth Excav = Ex El – Finish El
D = 11.25’ – 6.0’ = +5.25’
Excav = (150’ x 100’ x 5.25’) / 27
Excav = 2,916.7 cy
Area C

Ex El = {2(+14.0’) + 2(3.0’)} / 4
Ex El = 34.0’ / 4 = 8.5’

Depth Excav = Ex El – Finish El
D = 8.5’ – 6.0’ = +2.5’
Excav = (125’ x 200’ x 2.5’) / 27
Excav = 2,314.8 cy
Vol = Area A + Area B + Area C
Area A Backfill
Area B & C Excavation

V = (-5,555.6) + 2,916.7 + 2,314.8
V = -324.1 cy

Or you need 324.1 cy of additional backfill

More Related Content

Viewers also liked (12)

11º2 alejandra munera gps
11º2 alejandra munera gps11º2 alejandra munera gps
11º2 alejandra munera gps
 
Καβάφης-Ποιήματα-Άπαντα
Καβάφης-Ποιήματα-ΆπανταΚαβάφης-Ποιήματα-Άπαντα
Καβάφης-Ποιήματα-Άπαντα
 
Basic lesson plan نسخه%e2%80%ab%e2%80%ac0909
Basic lesson plan نسخه%e2%80%ab%e2%80%ac0909Basic lesson plan نسخه%e2%80%ab%e2%80%ac0909
Basic lesson plan نسخه%e2%80%ab%e2%80%ac0909
 
LA PLAYA DE LA MALAGUETA, PRIMERA EN EL MUNDO EN CONTAR CON EL PUNTO NARANJA,...
LA PLAYA DE LA MALAGUETA, PRIMERA EN EL MUNDO EN CONTAR CON EL PUNTO NARANJA,...LA PLAYA DE LA MALAGUETA, PRIMERA EN EL MUNDO EN CONTAR CON EL PUNTO NARANJA,...
LA PLAYA DE LA MALAGUETA, PRIMERA EN EL MUNDO EN CONTAR CON EL PUNTO NARANJA,...
 
Recetas con sandía
Recetas con sandíaRecetas con sandía
Recetas con sandía
 
The globe mire i judit
The globe mire i juditThe globe mire i judit
The globe mire i judit
 
Path testing
Path testingPath testing
Path testing
 
Strategies to Collect Past–due Patient Accounts
Strategies to Collect Past–due Patient AccountsStrategies to Collect Past–due Patient Accounts
Strategies to Collect Past–due Patient Accounts
 
Katalog cme
Katalog cmeKatalog cme
Katalog cme
 
Establishing an Online Presence
Establishing an Online Presence Establishing an Online Presence
Establishing an Online Presence
 
I diavoli dell’inferno
I diavoli dell’infernoI diavoli dell’inferno
I diavoli dell’inferno
 
Liverpool vs swansea
Liverpool vs swanseaLiverpool vs swansea
Liverpool vs swansea
 

Excav

  • 1. A contractor must excavate the site shown in the following sketch to a final elevation of 6.0’. Based on the site layout and elevations given, the total amount of excavation or backfill would be ____cy.
  • 2. N
  • 3.
  • 4. Calculate elevation at 100’ & 200’
  • 5. 22.0’ Δ = +14.0’ – (-8.0’) = 22.0’ Δ/lf = 22’/400’ = 0.055’
  • 6. Δ/lf = 22’/400’ = 0.055’ Δ@100’ = 100’ x 0.055’ = 5.5’ El100 = 14.0’ – 5.5’ = 8.5’ El200 = 14.0’ – (200’ x 0.055) = 3.0’
  • 9. C B EL 8.5’ A EL 3.0’
  • 10. Area A Finish El 6.0’ Ex El = {2(+14.0’) + 2(-8.0’)} / 4 Ex El = 12.0’ / 4 = 3.0’
  • 11. Area A Finish El 6.0’ Depth Excav = Ex El – Finish El D = 3.0’ – 6.0’ = -3.0’ B’fill = (125’ x 400’ x 3’) / 27 B’fill = 5,555.6 cy
  • 12. Area B Finish El 6.0’ EL 8.5’ Ex El = {2(+14.0’) + 2(8.5’)} / 4 Ex El = 45.0’ / 4 = 11.25’
  • 13. Area B Finish El 6.0’ EL 8.5’ Depth Excav = Ex El – Finish El D = 11.25’ – 6.0’ = +5.25’ Excav = (150’ x 100’ x 5.25’) / 27 Excav = 2,916.7 cy
  • 14. Area C Ex El = {2(+14.0’) + 2(3.0’)} / 4 Ex El = 34.0’ / 4 = 8.5’ Depth Excav = Ex El – Finish El D = 8.5’ – 6.0’ = +2.5’ Excav = (125’ x 200’ x 2.5’) / 27 Excav = 2,314.8 cy
  • 15. Vol = Area A + Area B + Area C Area A Backfill Area B & C Excavation V = (-5,555.6) + 2,916.7 + 2,314.8 V = -324.1 cy Or you need 324.1 cy of additional backfill