This document summarizes several engineering projects from April 2016 to date to improve production efficiency. Four nozzle fillers were made locally to replace one, increasing output by 66%. A Turkish machine was installed for braid spray, increasing productivity 275%. A perfume sealer was redesigned to reduce breakdowns. A tube filler line was completed with an automatic shrinking tunnel and no work in progress. Turkish machines were installed for lotion filling, increasing outputs by 69-125%. An automatic capper was added, and labeling and conveyor belt systems were implemented, reducing waste and improving utilization. Projects are ongoing to redesign filling nozzles and machines.