SlideShare a Scribd company logo
1 of 2
Download to read offline
THE COMPANY
Energizer—
Asheboro, North Carolina
THE CHALLENGE
Finding a system to hire
skilled workers while
conforming to lean
manufacturing standards
THE SOLUTION
WorkKeys®
skills assessment,
job profiling, and training—
facilitated by Randolph
Community College and the
Employment Security
Commission
THE RESULTS
Reduced turnover, training
time, and costly errors while
increasing productivity
Energizer’s three manufacturing facilities in Asheboro consist of an
alkaline battery manufacturing facility and two packaging plants,
including a metal parts stamping operation. They are Energizer’s
largest alkaline and packaging plants, with several hundred employees
stamping and packaging millions of batteries each day.
The plants have embraced lean manufacturing principles, driving the
costs out of their products by shortening the time it takes to hire and
train new employees and eliminating wasteful processes and errors.
Adopting lean manufacturing principles changed the nature and
complexity of each job on the floor, making it more important than
ever to get the right person in the right position.
“As we’ve embraced lean manufacturing at the plants, we realize that
our future is all about doing things better than we did yesterday,” said
Bernadette Young, human resources manager at Energizer. “We don’t
have any margin for manufacturing errors or for waste in our operation
processes. Our vitality depends on a workforce that is able to adapt to
change and operate in a manufacturing environment that thrives on
lean leadership principles. It is more imperative than ever to make sure
we’re hiring the best candidates in the marketplace.”
Energizer approached Randolph Community College about
implementing the WorkKeys system in hiring processes. Senior managers
at the plant were sold on WorkKeys when they discovered that WorkKeys
could lower turnover rates and employee training time. “When an
employee goes into an anode room and realizes he or she can’t do the
job, that’s eight weeks of training lost,” Young said. “Our senior managers
realized it was time to do something in terms of testing skills. Once they
realized WorkKeys was created by ACT—a reputable organization in
testing—it made it that much easier for them to buy into the system.”
Implementation
Randolph profiled nine skilled positions to determine the skills needed
to perform them, including entry-level general production operators,
electricians, equipment mechanics, and anode room operators. In
most positions, five skills were found to be most critical—Reading for
Information, Applied Mathematics, Locating Information, Observation,
and Teamwork.
For example:
• Mix Operators must read weight information on scales, check
amounts of specialized materials in tanks, and document information,
such as changes in inventory. These tasks require the ability to work
with workplace graphics. WorkKeys defines these as Locating
Information skills.
CASE STUDY
1-800/WORKKEY
www.workkeys.com
(continued)
• Production Machine Operators—entry-level positions—must count
incoming materials, determine the number of finished products,
and count raw materials needed to run orders. These tasks require
mathematical reasoning, critical thinking, and problem-solving
techniques applied to work-related problems. WorkKeys defines
these as Applied Mathematics skills.
Energizer worked with the Employment Security Commission to screen
candidates and facilitate assessments for job applicants. The company
pays for the assessments, supplemented with grant funding. “If you want
to find the best of the best and not just make hiring decisions based on
gut feelings, this is the way to go,” Young said. “We feel it’s worth the
investment, and we see dividends with turnover reductions and other
benefits.”
Applicants who do not receive WorkKeys scores qualifying them for
hiring can take WorkKeys Skill Training, provided by Randolph
Community College through the Randolph County JobLink Career
Center in Asheboro.
Results
• In the first three months of hiring following the implementation of the
WorkKeys system, skills-related turnover went to zero.
• The plant saw significantly reduced training time among new
hires. “Once they went through the WorkKeys process, they qualified
at a quicker rate,” Young said.
• The plant saw decreased quality defects and deviations.
• Employees in critical jobs also demonstrated improved productivity.
“It comes to them easier, and there’s less of a learning curve,” Young
said.
• The company better adheres to the principles of lean
manufacturing through shortened training timeframes and
higher-skilled employees.
Energizer accepts the National Career Readiness Certificate—a
WorkKeys-powered skill credential—from job applicants. “When we
hire, we typically have 1,000 applicants for 30 positions,” Young said.
“If they pass the tests and get a certificate, they’re closer to getting
ahead in the job application process.”
Outlook
Energizer is looking to profile more jobs, including Continuous
Improvement Leaders and Quality Lab Assistants. The company has
also spread the word about WorkKeys to other plants throughout the
country. Three Energizer plants in Missouri and Vermont are adopting
the system, while the company’s international plants are also looking
into the system.
“We hold our worldwide facilities to the same level of expectation
because operations at all of our plants are basically the same,” Young
said. “We’re looking to expand our use of WorkKeys globally.”
© 2008 by ACT, Inc. All rights reserved. 1/08
10946
*0411H2080*

More Related Content

Viewers also liked

Viewers also liked (9)

MANABENDRA BERA-naukri
MANABENDRA BERA-naukriMANABENDRA BERA-naukri
MANABENDRA BERA-naukri
 
Quizz
Quizz Quizz
Quizz
 
Legacy Telecommunications of 2014 FIFA World Cup in Brazil
Legacy Telecommunications of 2014 FIFA World Cup in Brazil Legacy Telecommunications of 2014 FIFA World Cup in Brazil
Legacy Telecommunications of 2014 FIFA World Cup in Brazil
 
Flashtennis semanario 4 enero 2016
Flashtennis semanario 4 enero 2016Flashtennis semanario 4 enero 2016
Flashtennis semanario 4 enero 2016
 
Formative assessment: an important teaching tool for any subject
Formative assessment: an important teaching tool for any subject Formative assessment: an important teaching tool for any subject
Formative assessment: an important teaching tool for any subject
 
Глобално Затопляне
Глобално ЗатоплянеГлобално Затопляне
Глобално Затопляне
 
Para el blog
Para el blogPara el blog
Para el blog
 
Proyecto nuevoooo
Proyecto nuevooooProyecto nuevoooo
Proyecto nuevoooo
 
Offre développeur Javascript Back-end
Offre développeur Javascript Back-endOffre développeur Javascript Back-end
Offre développeur Javascript Back-end
 

Similar to Energizer

ASQ 7critical-elements-major-improvements.pdf
ASQ 7critical-elements-major-improvements.pdfASQ 7critical-elements-major-improvements.pdf
ASQ 7critical-elements-major-improvements.pdfDr. Subhash Naik
 
Connecting Employers to Qualified Jobseekers
Connecting Employers to Qualified JobseekersConnecting Employers to Qualified Jobseekers
Connecting Employers to Qualified JobseekersMichael Baker
 
Ingersoll-Rand Makes Materials Management Core Competency
Ingersoll-Rand Makes Materials Management Core CompetencyIngersoll-Rand Makes Materials Management Core Competency
Ingersoll-Rand Makes Materials Management Core Competencybobtv
 
Building Sales With Certification - Retrofit Installer Technician
Building Sales With Certification - Retrofit Installer TechnicianBuilding Sales With Certification - Retrofit Installer Technician
Building Sales With Certification - Retrofit Installer TechnicianMoosehead2000
 
How Santee Cooper got their Employees to Work Safer and More Productively thr...
How Santee Cooper got their Employees to Work Safer and More Productively thr...How Santee Cooper got their Employees to Work Safer and More Productively thr...
How Santee Cooper got their Employees to Work Safer and More Productively thr...Saba Software
 
Lean human-resources-process-improvement-transformation-case-study
Lean human-resources-process-improvement-transformation-case-studyLean human-resources-process-improvement-transformation-case-study
Lean human-resources-process-improvement-transformation-case-studyThe Lab Consulting
 
Case Study: Telecom Materials Management Outsourcing
Case Study: Telecom Materials Management OutsourcingCase Study: Telecom Materials Management Outsourcing
Case Study: Telecom Materials Management OutsourcingPaul Adamson
 
William E Davis III New
William E Davis III NewWilliam E Davis III New
William E Davis III NewWilliam Davis
 
Job analysis and job description
Job analysis and job descriptionJob analysis and job description
Job analysis and job descriptionAyshathul Femitha
 
Kaufman Hall Axiom Software - Emory Case Study
Kaufman Hall Axiom Software - Emory Case StudyKaufman Hall Axiom Software - Emory Case Study
Kaufman Hall Axiom Software - Emory Case StudyIdeba
 
Duncan Merritt CV Oct 2015
Duncan Merritt CV Oct 2015Duncan Merritt CV Oct 2015
Duncan Merritt CV Oct 2015Duncan Merritt
 
Article on performance appraisal
Article on performance appraisalArticle on performance appraisal
Article on performance appraisaldbell3034
 
Human resource development
Human resource developmentHuman resource development
Human resource developmentLouie Medinaceli
 
PPT on summer internship project report
PPT on summer internship project reportPPT on summer internship project report
PPT on summer internship project reportAnushree Mukherjee
 

Similar to Energizer (20)

Product
ProductProduct
Product
 
HR - Job Analysis
HR - Job AnalysisHR - Job Analysis
HR - Job Analysis
 
ASQ 7critical-elements-major-improvements.pdf
ASQ 7critical-elements-major-improvements.pdfASQ 7critical-elements-major-improvements.pdf
ASQ 7critical-elements-major-improvements.pdf
 
3- Job Analysis.pdf
3- Job Analysis.pdf3- Job Analysis.pdf
3- Job Analysis.pdf
 
Connecting Employers to Qualified Jobseekers
Connecting Employers to Qualified JobseekersConnecting Employers to Qualified Jobseekers
Connecting Employers to Qualified Jobseekers
 
Act Workkeys Presentation 2010
Act Workkeys Presentation 2010Act Workkeys Presentation 2010
Act Workkeys Presentation 2010
 
Ingersoll-Rand Makes Materials Management Core Competency
Ingersoll-Rand Makes Materials Management Core CompetencyIngersoll-Rand Makes Materials Management Core Competency
Ingersoll-Rand Makes Materials Management Core Competency
 
Building Sales With Certification - Retrofit Installer Technician
Building Sales With Certification - Retrofit Installer TechnicianBuilding Sales With Certification - Retrofit Installer Technician
Building Sales With Certification - Retrofit Installer Technician
 
How Santee Cooper got their Employees to Work Safer and More Productively thr...
How Santee Cooper got their Employees to Work Safer and More Productively thr...How Santee Cooper got their Employees to Work Safer and More Productively thr...
How Santee Cooper got their Employees to Work Safer and More Productively thr...
 
Lean human-resources-process-improvement-transformation-case-study
Lean human-resources-process-improvement-transformation-case-studyLean human-resources-process-improvement-transformation-case-study
Lean human-resources-process-improvement-transformation-case-study
 
Dow Chemical
Dow ChemicalDow Chemical
Dow Chemical
 
Case Study: Telecom Materials Management Outsourcing
Case Study: Telecom Materials Management OutsourcingCase Study: Telecom Materials Management Outsourcing
Case Study: Telecom Materials Management Outsourcing
 
Topic 3 - PERSONNEL MGMT 1.pdf
Topic 3 - PERSONNEL MGMT 1.pdfTopic 3 - PERSONNEL MGMT 1.pdf
Topic 3 - PERSONNEL MGMT 1.pdf
 
William E Davis III New
William E Davis III NewWilliam E Davis III New
William E Davis III New
 
Job analysis and job description
Job analysis and job descriptionJob analysis and job description
Job analysis and job description
 
Kaufman Hall Axiom Software - Emory Case Study
Kaufman Hall Axiom Software - Emory Case StudyKaufman Hall Axiom Software - Emory Case Study
Kaufman Hall Axiom Software - Emory Case Study
 
Duncan Merritt CV Oct 2015
Duncan Merritt CV Oct 2015Duncan Merritt CV Oct 2015
Duncan Merritt CV Oct 2015
 
Article on performance appraisal
Article on performance appraisalArticle on performance appraisal
Article on performance appraisal
 
Human resource development
Human resource developmentHuman resource development
Human resource development
 
PPT on summer internship project report
PPT on summer internship project reportPPT on summer internship project report
PPT on summer internship project report
 

More from Will Valet

Northrop Grumman
Northrop GrummanNorthrop Grumman
Northrop GrummanWill Valet
 
Deere ROI Case Study
Deere ROI Case StudyDeere ROI Case Study
Deere ROI Case StudyWill Valet
 
Chicago Public-IL
Chicago Public-ILChicago Public-IL
Chicago Public-ILWill Valet
 
Should I Retake
Should I RetakeShould I Retake
Should I RetakeWill Valet
 
5979 AFTER THE ACT-LaserPrint
5979 AFTER THE ACT-LaserPrint5979 AFTER THE ACT-LaserPrint
5979 AFTER THE ACT-LaserPrintWill Valet
 
5978 Preparing for the ACT-LaserPrint
5978 Preparing for the ACT-LaserPrint5978 Preparing for the ACT-LaserPrint
5978 Preparing for the ACT-LaserPrintWill Valet
 
Condition 2014 Infographic
Condition 2014 InfographicCondition 2014 Infographic
Condition 2014 InfographicWill Valet
 
STEM National 2015
STEM National 2015STEM National 2015
STEM National 2015Will Valet
 
Condition National 2015
Condition National 2015Condition National 2015
Condition National 2015Will Valet
 
5621 ACT Engage Case Study UofM Roch_Web
5621 ACT Engage Case Study UofM Roch_Web5621 ACT Engage Case Study UofM Roch_Web
5621 ACT Engage Case Study UofM Roch_WebWill Valet
 
5852 7 Reasons that ACT-Web
5852 7 Reasons that ACT-Web5852 7 Reasons that ACT-Web
5852 7 Reasons that ACT-WebWill Valet
 
Engage Envision 2016
Engage Envision 2016Engage Envision 2016
Engage Envision 2016Will Valet
 

More from Will Valet (14)

Northrop Grumman
Northrop GrummanNorthrop Grumman
Northrop Grumman
 
Owensboro
OwensboroOwensboro
Owensboro
 
Deere ROI Case Study
Deere ROI Case StudyDeere ROI Case Study
Deere ROI Case Study
 
Chicago Public-IL
Chicago Public-ILChicago Public-IL
Chicago Public-IL
 
Should I Retake
Should I RetakeShould I Retake
Should I Retake
 
5979 AFTER THE ACT-LaserPrint
5979 AFTER THE ACT-LaserPrint5979 AFTER THE ACT-LaserPrint
5979 AFTER THE ACT-LaserPrint
 
5978 Preparing for the ACT-LaserPrint
5978 Preparing for the ACT-LaserPrint5978 Preparing for the ACT-LaserPrint
5978 Preparing for the ACT-LaserPrint
 
Condition 2014 Infographic
Condition 2014 InfographicCondition 2014 Infographic
Condition 2014 Infographic
 
20871 prelim2
20871 prelim220871 prelim2
20871 prelim2
 
STEM National 2015
STEM National 2015STEM National 2015
STEM National 2015
 
Condition National 2015
Condition National 2015Condition National 2015
Condition National 2015
 
5621 ACT Engage Case Study UofM Roch_Web
5621 ACT Engage Case Study UofM Roch_Web5621 ACT Engage Case Study UofM Roch_Web
5621 ACT Engage Case Study UofM Roch_Web
 
5852 7 Reasons that ACT-Web
5852 7 Reasons that ACT-Web5852 7 Reasons that ACT-Web
5852 7 Reasons that ACT-Web
 
Engage Envision 2016
Engage Envision 2016Engage Envision 2016
Engage Envision 2016
 

Energizer

  • 1. THE COMPANY Energizer— Asheboro, North Carolina THE CHALLENGE Finding a system to hire skilled workers while conforming to lean manufacturing standards THE SOLUTION WorkKeys® skills assessment, job profiling, and training— facilitated by Randolph Community College and the Employment Security Commission THE RESULTS Reduced turnover, training time, and costly errors while increasing productivity Energizer’s three manufacturing facilities in Asheboro consist of an alkaline battery manufacturing facility and two packaging plants, including a metal parts stamping operation. They are Energizer’s largest alkaline and packaging plants, with several hundred employees stamping and packaging millions of batteries each day. The plants have embraced lean manufacturing principles, driving the costs out of their products by shortening the time it takes to hire and train new employees and eliminating wasteful processes and errors. Adopting lean manufacturing principles changed the nature and complexity of each job on the floor, making it more important than ever to get the right person in the right position. “As we’ve embraced lean manufacturing at the plants, we realize that our future is all about doing things better than we did yesterday,” said Bernadette Young, human resources manager at Energizer. “We don’t have any margin for manufacturing errors or for waste in our operation processes. Our vitality depends on a workforce that is able to adapt to change and operate in a manufacturing environment that thrives on lean leadership principles. It is more imperative than ever to make sure we’re hiring the best candidates in the marketplace.” Energizer approached Randolph Community College about implementing the WorkKeys system in hiring processes. Senior managers at the plant were sold on WorkKeys when they discovered that WorkKeys could lower turnover rates and employee training time. “When an employee goes into an anode room and realizes he or she can’t do the job, that’s eight weeks of training lost,” Young said. “Our senior managers realized it was time to do something in terms of testing skills. Once they realized WorkKeys was created by ACT—a reputable organization in testing—it made it that much easier for them to buy into the system.” Implementation Randolph profiled nine skilled positions to determine the skills needed to perform them, including entry-level general production operators, electricians, equipment mechanics, and anode room operators. In most positions, five skills were found to be most critical—Reading for Information, Applied Mathematics, Locating Information, Observation, and Teamwork. For example: • Mix Operators must read weight information on scales, check amounts of specialized materials in tanks, and document information, such as changes in inventory. These tasks require the ability to work with workplace graphics. WorkKeys defines these as Locating Information skills. CASE STUDY 1-800/WORKKEY www.workkeys.com (continued)
  • 2. • Production Machine Operators—entry-level positions—must count incoming materials, determine the number of finished products, and count raw materials needed to run orders. These tasks require mathematical reasoning, critical thinking, and problem-solving techniques applied to work-related problems. WorkKeys defines these as Applied Mathematics skills. Energizer worked with the Employment Security Commission to screen candidates and facilitate assessments for job applicants. The company pays for the assessments, supplemented with grant funding. “If you want to find the best of the best and not just make hiring decisions based on gut feelings, this is the way to go,” Young said. “We feel it’s worth the investment, and we see dividends with turnover reductions and other benefits.” Applicants who do not receive WorkKeys scores qualifying them for hiring can take WorkKeys Skill Training, provided by Randolph Community College through the Randolph County JobLink Career Center in Asheboro. Results • In the first three months of hiring following the implementation of the WorkKeys system, skills-related turnover went to zero. • The plant saw significantly reduced training time among new hires. “Once they went through the WorkKeys process, they qualified at a quicker rate,” Young said. • The plant saw decreased quality defects and deviations. • Employees in critical jobs also demonstrated improved productivity. “It comes to them easier, and there’s less of a learning curve,” Young said. • The company better adheres to the principles of lean manufacturing through shortened training timeframes and higher-skilled employees. Energizer accepts the National Career Readiness Certificate—a WorkKeys-powered skill credential—from job applicants. “When we hire, we typically have 1,000 applicants for 30 positions,” Young said. “If they pass the tests and get a certificate, they’re closer to getting ahead in the job application process.” Outlook Energizer is looking to profile more jobs, including Continuous Improvement Leaders and Quality Lab Assistants. The company has also spread the word about WorkKeys to other plants throughout the country. Three Energizer plants in Missouri and Vermont are adopting the system, while the company’s international plants are also looking into the system. “We hold our worldwide facilities to the same level of expectation because operations at all of our plants are basically the same,” Young said. “We’re looking to expand our use of WorkKeys globally.” © 2008 by ACT, Inc. All rights reserved. 1/08 10946 *0411H2080*