    Sourcing Pipeline and Savings
    Clarity of spend is key to the management of any
    profitable business. Many companies are forced to be
    reactive due to lack of visibility across their spend
    dynamics. In this session we will explore different
    scenarios in which spend visibility became challenged,
    the root causes for these issues, and the most
    effective solutions.




2   © 2012 Ariba, Inc. All rights reserved.
Our Speakers




    Greg Keeling, MA, MBA, FICB                   Eric Walsworth,            Jim Lawton
      Senior Manager, Strategic                Director, Procurement    President and General
              Planning &                         Programs & Tools             Manager
    Infrastructure, Procurement &
          Strategic Sourcing                      Reed Elsevier        D&B Supply Management
                                                                             Solutions
         BMO Financial Group




3    © 2012 Ariba, Inc. All rights reserved.
Efficient Spend
B                                         Analytics to Drive
                                          Sourcing Pipeline
                                          and Savings
                                          The Spend Trend:
                                          Ariba Spend Visibility @ BMO Financial Group
                                          Gregory Keeling
                                          Sr. Manager, Strategic Planning & Infrastructure
                                          Procurement & Strategic Sourcing
                                          BMO Financial Group




© 2012 Ariba, Inc. All rights reserved.
BMO Financial Group Disclaimer

    BMO Financial Group (BMO) does not make any representation that the
    results included in this presentation can be expected or obtained in any
    implementation of any such products and services.

    The information in this document is provided "as is" without any
    warranty, either expressed or implied, for your private use only on the
    understanding that BMO Financial Group does not have any liability to
    you for providing this information whether or not you rely on it.




5    © 2012 Ariba, Inc. All rights reserved.
BMO Financial Group

    •       Established in 1817, BMO Financial Group is a highly diversified North American
            financial services organization.
    •       With total assets of $538 billion as of January 31, 2012 and more than 47,000
            employees, BMO serves more than 12 million personal, commercial, corporate
            and institutional customers in North America and internationally.
    •       We serve Canadian clients through BMO Bank of Montreal®, our personal and
            commercial banking business, BMO Nesbitt Burns®, one of Canada’s leading
            wealth management firms, and BMO Capital MarketsTM, our North American
            investment and corporate banking division.
    •       In the United States, clients are served through BMO Harris Bank, a major U.S.
            Midwest personal and commercial bank, Harris Private Bank, with wealth
            management offices across the United States, and BMO Capital MarketsTM.


6       © 2012 Ariba, Inc. All rights reserved.
BMO’s North American Footprint




7   © 2012 Ariba, Inc. All rights reserved.
BMO’s History with Ariba
                                                                                 1,500+ Enterprise Users
    •       Sourcing                                                            100 core users (+ growing)

                      2008 piloted eSourcing with 3 - 4 RFPs                      3,300+ Supplier Users
                      2009 almost 100% RFPs issued via Ariba

    •       Spend Visibility
                      2009 inaugurated spend analysis, launched with 2008 data for level set
                      Monthly enrichment of accounts payable data

    •       Electronic Invoicing
                      2011 design, build and launch
                      2012 deployment: goal 2,100 suppliers, eliminate 150,000 paper invoices
                      2013 complete deployment

    •       Contract Management
                      2011 design, build and launch
                      2012 full deployment and migration of 12,500 contracts


8       © 2012 Ariba, Inc. All rights reserved.
Ariba Sourcing

    •       Used for all sourcing events, including Opportunities
            Assessments, RFx and Reverse Auctions
    •       Used for Workload Planning and managing sourcing projects
    •       Unified Sourcing Process template based on methodology;
            incorporates conditional user tasks and workflows
    •       Approvals integrated into sourcing events
    •       Multiple dashboards for easy-access reporting
    •       Savings Form used to monitor project savings
    •       Leveraging tool for non-Sourcing project management


9       © 2012 Ariba, Inc. All rights reserved.
Ariba Invoice Pro

     •       Launched late 2011; broad supplier enablement in 2012
     •       E-Invoicing will:
                    Reduce number of paper invoices (currently 51% of total)
                    Reduce number of cheque remittances (currently 59% of total)
                    Reduce number of supplier inquires regarding payment
                    Reduce work effort to receive and manage invoices
                                                          and
                    Increase cash optimization – payment based on contract terms
                    Increase savings due to active discount management capability
                    Increase spend compliance by matching invoices to contracts
                    Increase visibility into invoice spend prior to data enrichment


10       © 2012 Ariba, Inc. All rights reserved.
Ariba Contract Management

     •       Migrate contracts from stand-alone
             legacy system
                       ~12,500 contracts

     •       Next areas of work
                       Contract compliant invoicing (non-PO invoices)
                       Contract authoring
                       Customized templates (contract workspaces
                       from Sourcing events)




11       © 2012 Ariba, Inc. All rights reserved.
Ariba Spend Visibility @ BMO

     •       Analysis of enterprise supplier and employee spend
     •       Consolidated data combines accounts payable data from all legal entities
             (7 GLs) through a single UI for efficient analysis
     •       Centralized reporting group manages tool and data
     •       Data Enrichment: Oracle A/P is source of truth for spend data
     •       Top 90%+ of “sourceable” spend is enriched monthly
     •       Utilized for monthly cost management C-Level reporting
     •       Supports Strategic Sourcing decision-making
     •       Provides Sourcing category managers visibility into spend details
     •       Offers detailed reports for group Spend Efficiency Teams


12       © 2012 Ariba, Inc. All rights reserved.
Spend Analysis Maturity

     Strategic Sourcing launched November 1996
     •       1997 – 2003 (Manual Classification)
                       AP data extracted and manipulated in Excel or Access (50% of spend)
                       Basic information: Supplier Name, GL, Cost Centre and Spend
     •       2003 – 2008 (Spend Cube – Standard Classification Library)
                       Formalized categorization of spend, only at summary level (not invoice)
                       Required significant MS Access skills to generate reports
     •       2009 – present (Ariba Spend Visibility)
                       Increased sophistication of reporting and ease of use
                       Enriched spend data, supplier parentage
                       Business rules to focus on “sourceable” spend vs. payments



13       © 2012 Ariba, Inc. All rights reserved.
BMO Spend Tree

     •     AP data organized into areas of spend, providing
           insight into 128 categories of products and services
           at the segment level
     •     Category (5)
               Subcategory (31)
                – Segment (128)
                      » Classification (647)
     •     Based on Ariba Classification Taxonomy (ACT)
           which is based on the UNSPSC (United Nations
           Standard Products and Services Code)
     •     UNSPSC has many irrelevant categories for us.
           Some relevant categories are often not semantically
           convenient; needed to “BMOized”



14       © 2012 Ariba, Inc. All rights reserved.
Value of Data Enrichment

     •       Invoice line-item data enriched monthly
                       Informed by: supplier, invoice description, GL coding, business rules, ERP
                       commodity code
                       90%+ of invoice data enriched

     •       Non-sourceable spend not enriched
     •       Supplier parentage enriched using D&B information to provide Ultimate
             Global Parent
     •       Enrichment provides:
                       Spend in a category
                       # of suppliers in a category
                       # of invoices / supplier

     •       Employee expenses rationalized based on enrichment


15       © 2012 Ariba, Inc. All rights reserved.
Use of Spend Visibility Data
     •       Dashboards
                       Enterprise spend statistics
                           – Sourceable spend (# of suppliers, invoice spend)
                           – Sourceable employee spend (# of supplies, invoice spend)

                       Spend overview for five main categories + category breakdowns
                       Organizational overview of spend
                       Top 15 Sourceable Suppliers
                       Trending charts
                       Value: # of active and completed projects (by category, by organizational
                       group; project status; estimated/actual savings
     •       Spend Reports
                       Reviewed monthly by Cost Management Committee (CFOs + SVP of Strategic
                       Sourcing) and Spend Efficiency teams


16       © 2012 Ariba, Inc. All rights reserved.
Spend Visibility Challenges

     •       Inadequate or incomplete or inaccurate data
                       May provide erroneous view of suppliers or spend in a category
                       May be impossible for data to be meaningfully enriched
                       May cause inconsistent enrichment practices
                       May result in inappropriate conclusions

     •       Examples of challenging spend to enrich
                       Value-Added Resellers (understanding the “real” spend)
                       Professional Services (understanding rates and other charges)
                       Telecommunications (specialized solution for wireless spend)
                       Travel (spending categories can be mixed)



17       © 2012 Ariba, Inc. All rights reserved.
The Future of Spend Analysis

     •       Increased use of electronic invoicing
                       Greater transparency into spend, reducing time to access details and increasing
                       data accuracy
                       Linking POs and e-invoices
                           –    Easier tracking of PO status
                       Linking contracts and e-invoices
                           –    Reduced reconciliation efforts; more granular analysis of supplier spend
     •       Demand management and supplier rationalization
                       Identification of business area spend outliers
                       Identification of non-compliant spend
                       Identification of spend categories for demand management
                       Identification of categories for supplier rationalization



18       © 2012 Ariba, Inc. All rights reserved.
B                                         Efficient Spend
                                          Analytics to Drive
                                          Sourcing Pipeline
                                          and Savings
                                          Eric Walsworth
                                          Reed Elsevier
                                          Global Procurement, Director of Programs & Tools




© 2012 Ariba, Inc. All rights reserved.
Reed Elsevier (“RE”)
              Leading provider of professional information solutions including
              Health, Science, Legal, Risk, Business Content, and Tradeshows

              Customers use our products to enable better decisions, evaluate
              risk, forge business relationships and gain business insight




20   © 2012 Ariba, Inc. All rights reserved
• Science & Technology
                                                                                      £2.1bn*
                                                • Health Sciences

                                                • Legal & Professional                £1.6bn*
                                                • Risk Solutions                      £0.9bn*
                                                • Data Services
                                                                                      £0.7bn*
                                                • Online marketing solutions
                                                • Magazine brands and websites

                                                • Trade exhibitions and conferences   £0.7bn*

     * Annual revenues FY 2011




21     © 2012 Ariba, Inc. All rights reserved
Ariba Solutions Deployed

     •       Sourcing Pro
                      Use Discovery to find new suppliers and for quick bids

     •       Contracts Pro
                      Expanding use of DocuSign eSignatures

     •       Supplier Information and Performance Mgmt (SIPM)

     •       Spend Vis                                        Transitioned from another
                      With Diversity Enrichment                   analytics platform




22       © 2012 Ariba, Inc. All rights reserved
We Have Typical Spend Vis Challenges

 Multiple Payment and Account Coding             ~20 ERP/Legacy AP, Wire & Corp Card systems
              Systems                              covering 50 Division/Country combinations

     Large Supplier Count with Duplicate          110K+ ERP Suppliers  ~20% fewer Global Parents
      Names within & across Systems

                  Multiple Languages                               9 Languages

                                                       Organization Structure impacted by
      Evolving Organization Structures
                                                       Realignments and M&A/Divestments

      Adoption & Feedback Challenges                   Range of Technical/Analytical Skills

                                                Supplier data between analytics and other tools not
        360ᵒSupplier View Challenges
                                                              fully synchronized (yet)
                                                As spend analytics matures, expectations increase
       Evolving Stakeholder Demands
                                                              (this is a good thing!)


23     © 2012 Ariba, Inc. All rights reserved
Observations and Lessons Learned

     •       Spend Vis Model Design
                      Steps taken to mitigate anticipated challenges


     •       Driving Value Beyond Sourcing
                      Migration to support broader range of initiatives


     •       Looking Forward
                      Driving continuous improvement



24       © 2012 Ariba, Inc. All rights reserved
Spend Vis Model Design
     •       Leverage integrated spend and supplier enrichment

     •       Pre-transform data prior to up-loading to minimize complexity & QA

     •       Use flexible organization reference table

     •       Leverage existing in-house taxonomy

     •       Create supplier segmentations (e.g. Critical/Strategic/Preferred and Employee)

     •       Concatenate sub-details to increase visibility (e.g. Accounting Codes)

     •       Repurpose “Parts” table to capture additional Corp Card details
     •       Capture data to identify potential payment process improvements
             (e.g. Invoice workflow dates and payment method)
25       © 2012 Ariba, Inc. All rights reserved
Driving Value Beyond Sourcing
     •       Dashboards and Reporting: Focus on “simple” to drive adoption

     •       Leveraging spend with Market Intelligence to gain insights

     •       Identifying suppliers that should be shifted to P-Cards

     •       Balance of Trade: Working w/sales to understand customer/supplier relationships

     •       M&A/Divestment Support: Gained/Lost Spend Leverage Analysis

     •       Compliance & Demand Mgmt: Spend Vis data key to governance program

     •       Currency Exposure: Use original invoice currency to identify risks/opportunities

     •       Supporting other Corporate Initiatives

26       © 2012 Ariba, Inc. All rights reserved
Looking Forward

     •       Interlink enriched supplier spend data with supplier SIM profiles

     •       Improve understanding of Payment Systems

     •       Expand Market Intelligence enrichment to improve Category
             and Risk Mgmt
     •       Find ways to better analyze reseller and suppliers with
             pass-through spend
     •       Refine classification model via stakeholder relationships
             (especially in smaller non-English speaking regions and with smaller suppliers)



27       © 2012 Ariba, Inc. All rights reserved
Thank You


                                              Eric Walsworth
                Director of Procurement Programs & Tools
                    eric.walsworth@reedelsevier.com




28   © 2012 Ariba, Inc. All rights reserved
B                                         Efficient Spend
                                          Analytics to Drive
                                          Sourcing Pipeline
                                          and Savings
                                          Supplier and Spend Management – Moving
                                          Beyond the Numbers

                                          Jim Lawton, President, D&B Supply
                                          Management Solutions




© 2012 Ariba, Inc. All rights reserved.
About D&B

     •      D&B (NYSE:DNB) is the world's leading source of
            commercial information on businesses, enabling
            companies to Decide with Confidence® for over
            170 years.

     •      The D&B database has information on 206+ million
            businesses in over 190 countries.

     •      More than100,000 companies rely on D&B to help
            build strong business relationships with their
            customers, suppliers and partners.

     •      Supply management-specific data expertise
            gives the insights companies need for supply
            chain optimization.


30       © 2012 Ariba, Inc. All rights reserved.
The New Normal in Supply Management:
Expect the Unexpected
     •       Walking the fine line between
             uncertainty and opportunity

     •       Like we’ve never seen before:
                       Natural disasters, political
                       unrest, economic conditions
                       Increasing need to:
                           – Drive cost effectiveness
                           – Meet shareholder expectations
                             for growth
                           – Combat competitive pressure

     •       Challenge - crafting supply
             management strategies to survive
             and thrive at the same time


31       © 2012 Ariba, Inc. All rights reserved.
To Deal with Constant Change You Need
Deeper Insight into Your Supply Chain
     •        Spend Efficiency
                         Supplier rationalization/Spend analysis
                         Lost cost country sourcing
                         Just in time inventory

     •        Accurate Reporting
                       Internal C-level views
                       Industry standards
                       Regulatory compliance

     •       Proactive Risk Mitigation
                         Supplier improvement programs
                         Accurate forecasts
                         Alternate sources of supply



32       © 2012 Ariba, Inc. All rights reserved.
Getting Clarity Starts with Asking
     the Right Questions

     •       How can I get more detailed
             information on suppliers?
     •       How much am I spending
             with suppliers at a corporate
             family level?
     •       How diverse is my supply base?
             And how can I locate more
             diverse suppliers?
     •       Where are the greatest risks in my
             supply chain?



33       © 2012 Ariba, Inc. All rights reserved.
The First Step Is to Answer:
     “Who Are My Suppliers?”
     The Advantage
     •   Supply chain visibility with a
         consolidated, standardized view
         of suppliers
     •   Deeper supplier
         insights,             U.S. or
         foreign, public                or
         private, small or large,          to
         enable data discovery

     The Results
     •   Manage suppliers in established and
         emerging markets with more confidence
     • Quickly find and qualify new
         suppliers globally
     • Leverage the learnings most important
         to you
34    © 2012 Ariba, Inc. All rights reserved.
Then, Identify Opportunities for Cost
Savings and Risk Mitigation…
     The Advantage
     •       Gain broader awareness of suppliers
             with expanded corporate family views
     •       Identify hidden paths for cost savings
             and risk exposure management


     The Results
     •       Strategically leverage full purchasing
             clout during negotiations
     •       Find sourcing opportunities within
             existing relationships globally
     •       Mitigate amplified risk exposure across
             a supplier family



35       © 2012 Ariba, Inc. All rights reserved.
…and Capitalize on Supplier Diversity
 to Create Competitive Advantage
     The Advantage
     •       Benchmark supply base diversity levels
             and how they meet diversity goals
     •       Create more competitive and dynamic
             supply options
     •       Seek out and encourage innovation


     The Results
     •       Comply with corporate, federal, state
             and Tier 2 reporting requirements
     •       Strengthen customer loyalty and
             enhance brand image
     •       Drive faster innovation cycles
     •       Realize stronger share price



36       © 2012 Ariba, Inc. All rights reserved.
Stay Ahead of the Curve By Knowing How
Your Suppliers May Behave Tomorrow
     The Advantage
     •    Get a sense of potential supply
          interruption before it can impact the:
                     Bottom line: through stock outs
                     Top line: through idling the
                     manufacturing line
                     Brand: through damage to quality
                     and product availability


     The Results
     •    Source from financially stable suppliers
     •    Get advance notice to reduce risk and
          protect supply chain continuity
     •    Deliver consistent, objective treatment
          of suppliers

37   © 2012 Ariba, Inc. All rights reserved.
Sustain Your Success Down the
     Road with These Tips
     •      Establish a single source of truth of
            supplier information for a 360-view
     •      Apply context to supplier data
            - Make it actionable
     •      Start analysis with the categories your
            company cares about most
     •      Instill a cross-functional process including
            Procurement, Finance, Operations
     •      Approve and manage suppliers with tools
            and relevant data points connected to
            your processes
     •      Identify your company’s challenges and
            create a mitigation plan to address them


38       © 2012 Ariba, Inc. All rights reserved.
Share This Session…NOW…from
     your mobile!
     •   All presentations are posted:
                   Guidebook mobile app
                       – Search Apple or Android app store
                         for Guidebook
                       – Enter code “collabor8”
                   Or at Slideshare.net/Ariba
     •   Share via email or social media

     **Come back soon – we are syncing                       #AribaLIVE
     audio and video interviews to
     the presentations**

39   © 2012 Ariba, Inc. All rights reserved.

Efficient Spend Analytics to Drive Sourcing Pipeline and Savings

  • 1.
    B Efficient Spend Analytics to Drive Sourcing Pipeline and Savings BMO Financial Group Reed Elsevier Dun & Bradstreet © 2012 Ariba, Inc. All rights reserved.
  • 2.
    Efficient Spend Analyticsto Drive Sourcing Pipeline and Savings Clarity of spend is key to the management of any profitable business. Many companies are forced to be reactive due to lack of visibility across their spend dynamics. In this session we will explore different scenarios in which spend visibility became challenged, the root causes for these issues, and the most effective solutions. 2 © 2012 Ariba, Inc. All rights reserved.
  • 3.
    Our Speakers Greg Keeling, MA, MBA, FICB Eric Walsworth, Jim Lawton Senior Manager, Strategic Director, Procurement President and General Planning & Programs & Tools Manager Infrastructure, Procurement & Strategic Sourcing Reed Elsevier D&B Supply Management Solutions BMO Financial Group 3 © 2012 Ariba, Inc. All rights reserved.
  • 4.
    Efficient Spend B Analytics to Drive Sourcing Pipeline and Savings The Spend Trend: Ariba Spend Visibility @ BMO Financial Group Gregory Keeling Sr. Manager, Strategic Planning & Infrastructure Procurement & Strategic Sourcing BMO Financial Group © 2012 Ariba, Inc. All rights reserved.
  • 5.
    BMO Financial GroupDisclaimer BMO Financial Group (BMO) does not make any representation that the results included in this presentation can be expected or obtained in any implementation of any such products and services. The information in this document is provided "as is" without any warranty, either expressed or implied, for your private use only on the understanding that BMO Financial Group does not have any liability to you for providing this information whether or not you rely on it. 5 © 2012 Ariba, Inc. All rights reserved.
  • 6.
    BMO Financial Group • Established in 1817, BMO Financial Group is a highly diversified North American financial services organization. • With total assets of $538 billion as of January 31, 2012 and more than 47,000 employees, BMO serves more than 12 million personal, commercial, corporate and institutional customers in North America and internationally. • We serve Canadian clients through BMO Bank of Montreal®, our personal and commercial banking business, BMO Nesbitt Burns®, one of Canada’s leading wealth management firms, and BMO Capital MarketsTM, our North American investment and corporate banking division. • In the United States, clients are served through BMO Harris Bank, a major U.S. Midwest personal and commercial bank, Harris Private Bank, with wealth management offices across the United States, and BMO Capital MarketsTM. 6 © 2012 Ariba, Inc. All rights reserved.
  • 7.
    BMO’s North AmericanFootprint 7 © 2012 Ariba, Inc. All rights reserved.
  • 8.
    BMO’s History withAriba 1,500+ Enterprise Users • Sourcing 100 core users (+ growing) 2008 piloted eSourcing with 3 - 4 RFPs 3,300+ Supplier Users 2009 almost 100% RFPs issued via Ariba • Spend Visibility 2009 inaugurated spend analysis, launched with 2008 data for level set Monthly enrichment of accounts payable data • Electronic Invoicing 2011 design, build and launch 2012 deployment: goal 2,100 suppliers, eliminate 150,000 paper invoices 2013 complete deployment • Contract Management 2011 design, build and launch 2012 full deployment and migration of 12,500 contracts 8 © 2012 Ariba, Inc. All rights reserved.
  • 9.
    Ariba Sourcing • Used for all sourcing events, including Opportunities Assessments, RFx and Reverse Auctions • Used for Workload Planning and managing sourcing projects • Unified Sourcing Process template based on methodology; incorporates conditional user tasks and workflows • Approvals integrated into sourcing events • Multiple dashboards for easy-access reporting • Savings Form used to monitor project savings • Leveraging tool for non-Sourcing project management 9 © 2012 Ariba, Inc. All rights reserved.
  • 10.
    Ariba Invoice Pro • Launched late 2011; broad supplier enablement in 2012 • E-Invoicing will:  Reduce number of paper invoices (currently 51% of total)  Reduce number of cheque remittances (currently 59% of total)  Reduce number of supplier inquires regarding payment  Reduce work effort to receive and manage invoices and  Increase cash optimization – payment based on contract terms  Increase savings due to active discount management capability  Increase spend compliance by matching invoices to contracts  Increase visibility into invoice spend prior to data enrichment 10 © 2012 Ariba, Inc. All rights reserved.
  • 11.
    Ariba Contract Management • Migrate contracts from stand-alone legacy system ~12,500 contracts • Next areas of work Contract compliant invoicing (non-PO invoices) Contract authoring Customized templates (contract workspaces from Sourcing events) 11 © 2012 Ariba, Inc. All rights reserved.
  • 12.
    Ariba Spend Visibility@ BMO • Analysis of enterprise supplier and employee spend • Consolidated data combines accounts payable data from all legal entities (7 GLs) through a single UI for efficient analysis • Centralized reporting group manages tool and data • Data Enrichment: Oracle A/P is source of truth for spend data • Top 90%+ of “sourceable” spend is enriched monthly • Utilized for monthly cost management C-Level reporting • Supports Strategic Sourcing decision-making • Provides Sourcing category managers visibility into spend details • Offers detailed reports for group Spend Efficiency Teams 12 © 2012 Ariba, Inc. All rights reserved.
  • 13.
    Spend Analysis Maturity Strategic Sourcing launched November 1996 • 1997 – 2003 (Manual Classification) AP data extracted and manipulated in Excel or Access (50% of spend) Basic information: Supplier Name, GL, Cost Centre and Spend • 2003 – 2008 (Spend Cube – Standard Classification Library) Formalized categorization of spend, only at summary level (not invoice) Required significant MS Access skills to generate reports • 2009 – present (Ariba Spend Visibility) Increased sophistication of reporting and ease of use Enriched spend data, supplier parentage Business rules to focus on “sourceable” spend vs. payments 13 © 2012 Ariba, Inc. All rights reserved.
  • 14.
    BMO Spend Tree • AP data organized into areas of spend, providing insight into 128 categories of products and services at the segment level • Category (5) Subcategory (31) – Segment (128) » Classification (647) • Based on Ariba Classification Taxonomy (ACT) which is based on the UNSPSC (United Nations Standard Products and Services Code) • UNSPSC has many irrelevant categories for us. Some relevant categories are often not semantically convenient; needed to “BMOized” 14 © 2012 Ariba, Inc. All rights reserved.
  • 15.
    Value of DataEnrichment • Invoice line-item data enriched monthly Informed by: supplier, invoice description, GL coding, business rules, ERP commodity code 90%+ of invoice data enriched • Non-sourceable spend not enriched • Supplier parentage enriched using D&B information to provide Ultimate Global Parent • Enrichment provides: Spend in a category # of suppliers in a category # of invoices / supplier • Employee expenses rationalized based on enrichment 15 © 2012 Ariba, Inc. All rights reserved.
  • 16.
    Use of SpendVisibility Data • Dashboards Enterprise spend statistics – Sourceable spend (# of suppliers, invoice spend) – Sourceable employee spend (# of supplies, invoice spend) Spend overview for five main categories + category breakdowns Organizational overview of spend Top 15 Sourceable Suppliers Trending charts Value: # of active and completed projects (by category, by organizational group; project status; estimated/actual savings • Spend Reports Reviewed monthly by Cost Management Committee (CFOs + SVP of Strategic Sourcing) and Spend Efficiency teams 16 © 2012 Ariba, Inc. All rights reserved.
  • 17.
    Spend Visibility Challenges • Inadequate or incomplete or inaccurate data May provide erroneous view of suppliers or spend in a category May be impossible for data to be meaningfully enriched May cause inconsistent enrichment practices May result in inappropriate conclusions • Examples of challenging spend to enrich Value-Added Resellers (understanding the “real” spend) Professional Services (understanding rates and other charges) Telecommunications (specialized solution for wireless spend) Travel (spending categories can be mixed) 17 © 2012 Ariba, Inc. All rights reserved.
  • 18.
    The Future ofSpend Analysis • Increased use of electronic invoicing Greater transparency into spend, reducing time to access details and increasing data accuracy Linking POs and e-invoices – Easier tracking of PO status Linking contracts and e-invoices – Reduced reconciliation efforts; more granular analysis of supplier spend • Demand management and supplier rationalization Identification of business area spend outliers Identification of non-compliant spend Identification of spend categories for demand management Identification of categories for supplier rationalization 18 © 2012 Ariba, Inc. All rights reserved.
  • 19.
    B Efficient Spend Analytics to Drive Sourcing Pipeline and Savings Eric Walsworth Reed Elsevier Global Procurement, Director of Programs & Tools © 2012 Ariba, Inc. All rights reserved.
  • 20.
    Reed Elsevier (“RE”) Leading provider of professional information solutions including Health, Science, Legal, Risk, Business Content, and Tradeshows Customers use our products to enable better decisions, evaluate risk, forge business relationships and gain business insight 20 © 2012 Ariba, Inc. All rights reserved
  • 21.
    • Science &Technology £2.1bn* • Health Sciences • Legal & Professional £1.6bn* • Risk Solutions £0.9bn* • Data Services £0.7bn* • Online marketing solutions • Magazine brands and websites • Trade exhibitions and conferences £0.7bn* * Annual revenues FY 2011 21 © 2012 Ariba, Inc. All rights reserved
  • 22.
    Ariba Solutions Deployed • Sourcing Pro Use Discovery to find new suppliers and for quick bids • Contracts Pro Expanding use of DocuSign eSignatures • Supplier Information and Performance Mgmt (SIPM) • Spend Vis Transitioned from another With Diversity Enrichment analytics platform 22 © 2012 Ariba, Inc. All rights reserved
  • 23.
    We Have TypicalSpend Vis Challenges Multiple Payment and Account Coding ~20 ERP/Legacy AP, Wire & Corp Card systems Systems covering 50 Division/Country combinations Large Supplier Count with Duplicate 110K+ ERP Suppliers  ~20% fewer Global Parents Names within & across Systems Multiple Languages 9 Languages Organization Structure impacted by Evolving Organization Structures Realignments and M&A/Divestments Adoption & Feedback Challenges Range of Technical/Analytical Skills Supplier data between analytics and other tools not 360ᵒSupplier View Challenges fully synchronized (yet) As spend analytics matures, expectations increase Evolving Stakeholder Demands (this is a good thing!) 23 © 2012 Ariba, Inc. All rights reserved
  • 24.
    Observations and LessonsLearned • Spend Vis Model Design Steps taken to mitigate anticipated challenges • Driving Value Beyond Sourcing Migration to support broader range of initiatives • Looking Forward Driving continuous improvement 24 © 2012 Ariba, Inc. All rights reserved
  • 25.
    Spend Vis ModelDesign • Leverage integrated spend and supplier enrichment • Pre-transform data prior to up-loading to minimize complexity & QA • Use flexible organization reference table • Leverage existing in-house taxonomy • Create supplier segmentations (e.g. Critical/Strategic/Preferred and Employee) • Concatenate sub-details to increase visibility (e.g. Accounting Codes) • Repurpose “Parts” table to capture additional Corp Card details • Capture data to identify potential payment process improvements (e.g. Invoice workflow dates and payment method) 25 © 2012 Ariba, Inc. All rights reserved
  • 26.
    Driving Value BeyondSourcing • Dashboards and Reporting: Focus on “simple” to drive adoption • Leveraging spend with Market Intelligence to gain insights • Identifying suppliers that should be shifted to P-Cards • Balance of Trade: Working w/sales to understand customer/supplier relationships • M&A/Divestment Support: Gained/Lost Spend Leverage Analysis • Compliance & Demand Mgmt: Spend Vis data key to governance program • Currency Exposure: Use original invoice currency to identify risks/opportunities • Supporting other Corporate Initiatives 26 © 2012 Ariba, Inc. All rights reserved
  • 27.
    Looking Forward • Interlink enriched supplier spend data with supplier SIM profiles • Improve understanding of Payment Systems • Expand Market Intelligence enrichment to improve Category and Risk Mgmt • Find ways to better analyze reseller and suppliers with pass-through spend • Refine classification model via stakeholder relationships (especially in smaller non-English speaking regions and with smaller suppliers) 27 © 2012 Ariba, Inc. All rights reserved
  • 28.
    Thank You Eric Walsworth Director of Procurement Programs & Tools eric.walsworth@reedelsevier.com 28 © 2012 Ariba, Inc. All rights reserved
  • 29.
    B Efficient Spend Analytics to Drive Sourcing Pipeline and Savings Supplier and Spend Management – Moving Beyond the Numbers Jim Lawton, President, D&B Supply Management Solutions © 2012 Ariba, Inc. All rights reserved.
  • 30.
    About D&B • D&B (NYSE:DNB) is the world's leading source of commercial information on businesses, enabling companies to Decide with Confidence® for over 170 years. • The D&B database has information on 206+ million businesses in over 190 countries. • More than100,000 companies rely on D&B to help build strong business relationships with their customers, suppliers and partners. • Supply management-specific data expertise gives the insights companies need for supply chain optimization. 30 © 2012 Ariba, Inc. All rights reserved.
  • 31.
    The New Normalin Supply Management: Expect the Unexpected • Walking the fine line between uncertainty and opportunity • Like we’ve never seen before: Natural disasters, political unrest, economic conditions Increasing need to: – Drive cost effectiveness – Meet shareholder expectations for growth – Combat competitive pressure • Challenge - crafting supply management strategies to survive and thrive at the same time 31 © 2012 Ariba, Inc. All rights reserved.
  • 32.
    To Deal withConstant Change You Need Deeper Insight into Your Supply Chain • Spend Efficiency Supplier rationalization/Spend analysis Lost cost country sourcing Just in time inventory • Accurate Reporting Internal C-level views Industry standards Regulatory compliance • Proactive Risk Mitigation Supplier improvement programs Accurate forecasts Alternate sources of supply 32 © 2012 Ariba, Inc. All rights reserved.
  • 33.
    Getting Clarity Startswith Asking the Right Questions • How can I get more detailed information on suppliers? • How much am I spending with suppliers at a corporate family level? • How diverse is my supply base? And how can I locate more diverse suppliers? • Where are the greatest risks in my supply chain? 33 © 2012 Ariba, Inc. All rights reserved.
  • 34.
    The First StepIs to Answer: “Who Are My Suppliers?” The Advantage • Supply chain visibility with a consolidated, standardized view of suppliers • Deeper supplier insights, U.S. or foreign, public or private, small or large, to enable data discovery The Results • Manage suppliers in established and emerging markets with more confidence • Quickly find and qualify new suppliers globally • Leverage the learnings most important to you 34 © 2012 Ariba, Inc. All rights reserved.
  • 35.
    Then, Identify Opportunitiesfor Cost Savings and Risk Mitigation… The Advantage • Gain broader awareness of suppliers with expanded corporate family views • Identify hidden paths for cost savings and risk exposure management The Results • Strategically leverage full purchasing clout during negotiations • Find sourcing opportunities within existing relationships globally • Mitigate amplified risk exposure across a supplier family 35 © 2012 Ariba, Inc. All rights reserved.
  • 36.
    …and Capitalize onSupplier Diversity to Create Competitive Advantage The Advantage • Benchmark supply base diversity levels and how they meet diversity goals • Create more competitive and dynamic supply options • Seek out and encourage innovation The Results • Comply with corporate, federal, state and Tier 2 reporting requirements • Strengthen customer loyalty and enhance brand image • Drive faster innovation cycles • Realize stronger share price 36 © 2012 Ariba, Inc. All rights reserved.
  • 37.
    Stay Ahead ofthe Curve By Knowing How Your Suppliers May Behave Tomorrow The Advantage • Get a sense of potential supply interruption before it can impact the: Bottom line: through stock outs Top line: through idling the manufacturing line Brand: through damage to quality and product availability The Results • Source from financially stable suppliers • Get advance notice to reduce risk and protect supply chain continuity • Deliver consistent, objective treatment of suppliers 37 © 2012 Ariba, Inc. All rights reserved.
  • 38.
    Sustain Your SuccessDown the Road with These Tips • Establish a single source of truth of supplier information for a 360-view • Apply context to supplier data - Make it actionable • Start analysis with the categories your company cares about most • Instill a cross-functional process including Procurement, Finance, Operations • Approve and manage suppliers with tools and relevant data points connected to your processes • Identify your company’s challenges and create a mitigation plan to address them 38 © 2012 Ariba, Inc. All rights reserved.
  • 39.
    Share This Session…NOW…from your mobile! • All presentations are posted: Guidebook mobile app – Search Apple or Android app store for Guidebook – Enter code “collabor8” Or at Slideshare.net/Ariba • Share via email or social media **Come back soon – we are syncing #AribaLIVE audio and video interviews to the presentations** 39 © 2012 Ariba, Inc. All rights reserved.

Editor's Notes

  • #7 BMO Financial Group named one of the World’s 50 Safest Banks: April 2012 by Global Finance http://www.gfmag.com/tools/best-banks/11661-worlds-50-safest-banks-april-2012.html#ixzz1oMpqiNjE The World Economic Forum has ranked Canada’s banking system as the most sound in the world, four years in a row.(World Economic Forum, Global Competitiveness Report, 2008, 2009, 2010 & 2011)By 2017, Toronto will surpass London to become the world's financial centre, according to Moody's Analytics. Canada currently employs 320,000 in its banking sector, while London employs 400,000. 
  • #8 BMO operates internationally in major financial markets in Canada, the US and 23 other jurisdictionsBMO Strategic AgendaOur Vision: To be the bank that defines great customer experience.Our StrategyDirect our full energy to the pursuit of our vision.Leadin N. America and maintain a strong and growing presence in select global markets where our customers do business.Leverage the strength and visibility of the BMO brand across every business and customer segment.Compete on value and lasting relationships. We are a relationship bank. Make money make sense: Give our customers confidence by helping them control their spending, grow their savings, borrow smartly and invest wisely.Ensure our strength in risk management is recognized as a defining characteristic of the bank.Our Priorities Drive quality earnings growth across all N. American personal and commercial banking businesses by focusing on industry-leading customer experience and enhancing operating and sales force productivity. Accelerate the growth of our wealth management businesses by helping our broad range of clients meet all their wealth management needs and by continuing to invest in our N. American and global operations. Build deeper client relationships in our capital markets businesses to deliver growth in net income and strong ROE, while maintaining an appropriate risk/return profile. Develop our business in select global markets to grow with our clients, expand our capabilities and reach new customers. Sustain a culture that focuses on customers, high performance and our people.
  • #24 Coding based on Op procerss rather than what was bought – Temp labor, Counting, Contractors, etc.. anther bad exampleToday’s focus on some of the ways we’ve address these challenges and driven beyond savings through better leveraged
  • #26 Pre-transform data prior to up-loading to minimize complexity & QA Use flexible organization reference tableCan realign Business Units as needed to account for organization changesInclude Finance Contacts provide users with a business contactIncorporate both Legal and Operational Org data into ModelLeverage existing in-house taxonomyCross walking custom taxonomy to UNSPSC/Ariba ACT taxonomy created flexibilityTag taxonomy with Addressability: e.g. Addressable, Not Addressable, Out-of-ScopeCreate supplier segmentations (e.g. Critical/Strategic/Preferred and Employee)Concatenate sub-details to increase visibility (e.g. Accounting Codes)Repurpose “Parts” table to capture additional Corp Card detailsCapture information to identify potential payment process improvements (e.g. Invoice workflow dates and payment method)
  • #27 Importance of finding advocates in business & regions to QA data and establishing simple user feedback processesDashboards & ReportingPower in getting “on the same page”Focus on “simple” to drive adoptionLeveraging spend with Market Intelligence to gain insights Parent Child Relationships (e.g. Unleveraged spend & Intercompany allocations)Diversity ReportingUsing both Enriched & Original data (e.g. locations, bankruptcy) to gain risk insightsIdentifying suppliers that should be shifted to P-CardsBalance of Trade: Working with sales to understand customer/supplier relationshipsM&A/Divestment Support: Gained/Lost Spend Leverage AnalysisCompliance & Demand Management: Spend Vis data key to governance programCurrency Exposure: Use original invoice currency to identify risks / opportunitiesSupporting other Corporate InitiativesSocial Responsibility (e.g. Environmental Impact: Carbon Footprint)Tax optimization
  • #28 Interlink enriched supplier spend data with supplier SIM profilesGoal is to have sustainable way to conduct 360 degree supplier reportsPotentially expand enrichment to sales data to better assess Supplier/Customer relationshipsImprove understanding of Payment SystemsSegment GL codes as Capital vs. Expense to better identify spend patternsRefine Account Coding usage with Finance (e.g. Temps, Independent Contractors vs. Consulting)Continue working with AP & T&E systems to improve identification of EmployeesExpand Market Intelligence enrichment to improve Category & Risk Mgmte.g. Tag suppliers with D&B DUNS and LN Dossier Numbers enabling broader enrichmentContinue identifying un-enriched suppliers that need to be grouped under Global ParentsFind ways to better analyze reseller and suppliers with pass-through spendContinue refining classification model through stakeholder relationships (especially in smaller non-English speaking regions and with smaller suppliers)
  • #30 Need to add Speaker’s Notes for Jim’s welcome.