Fort Yukon Wood Energy
Program: Wood Boiler
Deployment
Department of Energy
Tribal Program Review
Golden, Colorado
March 26, 2014
Presented by:
Kelda Britton
CATG
Department of
Natural
Resources
Please contact
me for a full
list of citations.
kelda@catg.org
CATG is a consortium of 10 Gwich'in and
Koyukon Athabascan tribes located
throughout the Yukon Flats. Arctic Village,
Beaver, Birch Creek, Canyon Village,
Chalkyitsik, Circle, Fort Yukon, Rampart,
Stevens Village and Venetie are the remote
villages comprising CATG. The Yukon
River and its tributaries, including the
Porcupine, Chandalar, Birch Creek and
Black Rivers, tie the people of the Yukon
Flats villages together.
The Village of Fort Yukon is
located 8 miles North of the
Arctic Circle.
Only accessible by boat during the summer, snow
machine during winter, and plane. The FYU
Biomass Project will be the first off grid, off road
system biomass CHP in the world.
Power Costs In Alaska Are Among
The Highest The Nation
Gasoline = Ranges from $7.50- $8.50 per
gallon . No 1 Diesel = $7.00 per gallon .
Average house hold cost for oil = $3,500
per year . Oil cost per year for school =
$210,000 Fuel cost for electrical generation
= $1.4 M Cord Wood = $275 – $300 per cord
Kwh = $0.51 (rate increase coming)
Propane = $193 per 100 lbs tank
First off grid, off road system biomass
CHP in the world
New Power House (CHP ) Facility
construction
Wood Chip Boiler
District Heating loop providing heat to
commercial buildings
I.e. School, AC, Radio Station, Water
Plant, etc.
 Sustainable Forest Management
program
 Create a for profit in-village
wood energy utility to displace
diesel energy
 Support training needs for field
forestry technicians and
supports workshops for
education on key biomass
issues for Fort Yukon and the
Yukon Flats Villages.
Council of Athabascan Tribal
Governments (CATG)
Gwitchyaa Zhee Corporation (GZ Corp)
Alaska Village Initiatives (AVI)
Department of Energy (DOE)
Denali Commission
Alaska Energy Authority (AEA)
State of Alaska Division of Forestry (DOF)
This Project has multiple funding source (9.8million secured)
Planning/Trainings/Permitting (3 Million)
Final Design and Construction (6.8 million)
Construction Funding
Rural Utility Services (RUS $3.5 million)
AEA Rural Energy Fund $2.3 Million
DOE Tribal Energy Fund 990,000
 Site Development
Summer 2014
 CHP Plant Foundation/
Building Construction
Summer 2015
 Clinic Distributor Chip-
Fed Boiler
Summer/Fall 2016
*These timelines are subject to change based upon
seasonal and unforeseen obstacles.
Forestry Technician Training
 September 23-27th, 2013.
 Measure portion of Harvest Area 1 near Ylotta Slough
Involvement
 Fort Yukon tribal members and Salish Kootenai Tribal College
 basic forest skills - DBH tree measurement, GPS, and data collection.
Why:
•Develop forest
technician work force.
•Apply field data
collection, and best
practices
•Maintain sustainable
harvest
Harvest Equipment Operator
and Safety Training
November 4th – 7th : Classroom
instruction, field time instruction,
and FRPA training.
Selections based on:
Previous experience
Attentiveness
Safety Awareness
Work Ethic
Comradery
Common Sense
Overall Objectives:
Operational Safety
Operational efficiency
Regulatory compliance Gerald James pictured above (Fig 5) operating the Kubota
Pictured below (Fig 6), Cynthia James training on the New Holland.
Fig 1: William Wall, Alaska Village Initiatives, introduction and
history of project to FYU equipment operator class.
Fig 2: Devany Plentovich, Alaska Energy Authority and Stuart
Marquardt, Equipment and safety instructor.
Fig 3: Don Ryan, owner of Ryan's Equipment
Pictured L-R Fig 4:
James Durst AK Dept. Fish and Game, Bill Wall, Devany Plentovich, Don Ryan,
Stuardt Marquardt, Shawn Shampagne Tok equipment operator, Mike Reggear, AK
Division of Forestry
Classroom Instruction
and Equipment
Analysis
Special thank you to all
of the agency
representatives who
joined us in Fort
Yukon!
AEA
AVI
DOF
GZ Corporation
Don Ryan
Stuart Marquardt
Shawn Champagne
Equipment Training
New Holland Tractor and Kubota
Kubota Training:
 Cutting and Loading Capabilities
 Maintenance
 Falling Debris
 Proper timber cutting layout
Fig 7: New Holland TV 6070 mounted with 3 point hitch Tractor Mounted Crane (Nokka 4472)
New Holland Training:
 Safety
 Maintenance
 Proper functions, in the woods and around
other machinery and hazards.
 Proper log skidding techniques.
Fig 8: Kubota KX080-3 with Ryan’s Equipment 12” Feller Bunching
 Harvest Equipment Operator and Safety Training
 November 4th – 7th :
 3 days of classroom instruction, field time instruction, and FRPA training.
 23 people trained
 Overall objectives
 Operational Safety
 Operational efficiency
 Regulatory compliance
Pictured left to right, Cynthia James and Gerald James during operator training.
Outcomes:
Train people
Start harvest
Data collection
Document the
process
Activities Associated with Biomass
Harvesting, piling, drying, transporting, and
chipping
Weather Conditions
Harvest Sites
Transportation
Safety
Now What?
Once a program has been established in Fort
Yukon, it is the intent of CATG Natural Resource
Department in collaboration with the Village
Tribes, Native Corporations and Private Lands to
support the installation of programs in each of the
villages in the Yukon Flats Region. The model
program being developed in Fort Yukon will serve
as the basis for all projects in interior Alaska.
Conclusion
There is no right or wrong.
Establishing key individuals
in your community.
Learn by doing-there will
always be room for
improvement.
“Indigenize It”
Department of Energy (DOE)
Alaska Energy Authority (AEA)
Denali Commission
Alaska Village Initiatives (AVI)
Jeff Graham Stewardship Coordinator State
of Alaska Division of Forestry (DOF)
Gwitchya Zhee Corporation (GZ Corp)
We greatly appreciate contributions and partnerships
from the above agencies!

More Related Content

Viewers also liked

Writing an Email
Writing an EmailWriting an Email
Writing an EmailSawsan Ali
 
Zach Cargnino - Business Management
Zach Cargnino - Business ManagementZach Cargnino - Business Management
Zach Cargnino - Business ManagementZach Cargnino
 
Apoup E-commerce Social Network Introduction
Apoup E-commerce Social Network IntroductionApoup E-commerce Social Network Introduction
Apoup E-commerce Social Network IntroductionHungkaka Nguyen
 
Second presentation
Second presentationSecond presentation
Second presentationDiancaso
 
Conectores
ConectoresConectores
ConectoresDiancaso
 
ASUG - Creating a Succesful BI Super User Community
ASUG - Creating a Succesful BI Super User Community ASUG - Creating a Succesful BI Super User Community
ASUG - Creating a Succesful BI Super User Community Orlando Ledezma
 
Press Release Template
Press Release TemplatePress Release Template
Press Release TemplateNextBee Media
 
Pazarlama konferansları Şubat-Mart-Nisan 2016
Pazarlama konferansları Şubat-Mart-Nisan 2016Pazarlama konferansları Şubat-Mart-Nisan 2016
Pazarlama konferansları Şubat-Mart-Nisan 2016Roy+Teddy
 
Avaliação Heurística de um Ambiente Virtual para Análise de Rotas de Execução...
Avaliação Heurística de um Ambiente Virtual para Análise de Rotas de Execução...Avaliação Heurística de um Ambiente Virtual para Análise de Rotas de Execução...
Avaliação Heurística de um Ambiente Virtual para Análise de Rotas de Execução...Ronildo Oliveira
 
Realidade Virtual e Realidade Aumentada em Jogos
Realidade Virtual e Realidade Aumentada em JogosRealidade Virtual e Realidade Aumentada em Jogos
Realidade Virtual e Realidade Aumentada em JogosRonildo Oliveira
 

Viewers also liked (18)

Writing an Email
Writing an EmailWriting an Email
Writing an Email
 
Los aztecas
Los aztecasLos aztecas
Los aztecas
 
STVRES1.DOC
STVRES1.DOCSTVRES1.DOC
STVRES1.DOC
 
Zach Cargnino - Business Management
Zach Cargnino - Business ManagementZach Cargnino - Business Management
Zach Cargnino - Business Management
 
Apoup E-commerce Social Network Introduction
Apoup E-commerce Social Network IntroductionApoup E-commerce Social Network Introduction
Apoup E-commerce Social Network Introduction
 
bt mobile
bt mobilebt mobile
bt mobile
 
Second presentation
Second presentationSecond presentation
Second presentation
 
Conectores
ConectoresConectores
Conectores
 
ASUG - Creating a Succesful BI Super User Community
ASUG - Creating a Succesful BI Super User Community ASUG - Creating a Succesful BI Super User Community
ASUG - Creating a Succesful BI Super User Community
 
Archivio33
Archivio33Archivio33
Archivio33
 
write_up
write_upwrite_up
write_up
 
las 7 inteligencias de garne
las 7 inteligencias de garnelas 7 inteligencias de garne
las 7 inteligencias de garne
 
Press Release Template
Press Release TemplatePress Release Template
Press Release Template
 
Ecommerce Solutions
Ecommerce SolutionsEcommerce Solutions
Ecommerce Solutions
 
Pazarlama konferansları Şubat-Mart-Nisan 2016
Pazarlama konferansları Şubat-Mart-Nisan 2016Pazarlama konferansları Şubat-Mart-Nisan 2016
Pazarlama konferansları Şubat-Mart-Nisan 2016
 
Archivio 27
Archivio 27Archivio 27
Archivio 27
 
Avaliação Heurística de um Ambiente Virtual para Análise de Rotas de Execução...
Avaliação Heurística de um Ambiente Virtual para Análise de Rotas de Execução...Avaliação Heurística de um Ambiente Virtual para Análise de Rotas de Execução...
Avaliação Heurística de um Ambiente Virtual para Análise de Rotas de Execução...
 
Realidade Virtual e Realidade Aumentada em Jogos
Realidade Virtual e Realidade Aumentada em JogosRealidade Virtual e Realidade Aumentada em Jogos
Realidade Virtual e Realidade Aumentada em Jogos
 

Similar to DOE.tribal.energy.presentation2014

Renewable Energy in Canada
Renewable Energy in Canada Renewable Energy in Canada
Renewable Energy in Canada Serene Zawaydeh
 
Changing Local and Institutional Cultures for Sustainable Development: Update...
Changing Local and Institutional Cultures for Sustainable Development: Update...Changing Local and Institutional Cultures for Sustainable Development: Update...
Changing Local and Institutional Cultures for Sustainable Development: Update...ESD UNU-IAS
 
Kuching | Jan-15 | Energy For Off-grid Villages In Thailand
Kuching | Jan-15 | Energy For Off-grid Villages In ThailandKuching | Jan-15 | Energy For Off-grid Villages In Thailand
Kuching | Jan-15 | Energy For Off-grid Villages In ThailandSmart Villages
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in IndiaDaya Kherwar
 
What is Driving Energy Storage Deployment?
What is Driving Energy Storage Deployment?What is Driving Energy Storage Deployment?
What is Driving Energy Storage Deployment?Cedric Christensen
 
Energy Storage Procurement in California - APR2014
Energy Storage Procurement in California - APR2014Energy Storage Procurement in California - APR2014
Energy Storage Procurement in California - APR2014Cedric Christensen
 
Jeremy kasper-energy-research-in-alaska
Jeremy kasper-energy-research-in-alaskaJeremy kasper-energy-research-in-alaska
Jeremy kasper-energy-research-in-alaskajames hamilton
 
PEC and Governor's Award for Environmental Excellence
PEC and Governor's Award for Environmental ExcellencePEC and Governor's Award for Environmental Excellence
PEC and Governor's Award for Environmental ExcellenceJessica Anderson
 
Day1 concurrent mac_donald
Day1 concurrent mac_donaldDay1 concurrent mac_donald
Day1 concurrent mac_donaldtoptrails
 
Climate change impacts on agriculture and rural development in the Pacific Re...
Climate change impacts on agriculture and rural development in the Pacific Re...Climate change impacts on agriculture and rural development in the Pacific Re...
Climate change impacts on agriculture and rural development in the Pacific Re...Euforic Services
 
February 2021 edition of the NSW Roadside Environment Committee newsletter
February 2021 edition of the NSW Roadside Environment Committee newsletterFebruary 2021 edition of the NSW Roadside Environment Committee newsletter
February 2021 edition of the NSW Roadside Environment Committee newsletterNeil Dufty
 
Eyre Peninsula master Plan 18th Jan 2016
Eyre Peninsula master Plan 18th Jan 2016Eyre Peninsula master Plan 18th Jan 2016
Eyre Peninsula master Plan 18th Jan 2016Liz Penfold
 
Duteau 2016. Biomass Report_final
Duteau 2016. Biomass Report_finalDuteau 2016. Biomass Report_final
Duteau 2016. Biomass Report_finalMichel Duteau
 
Ghana solar pumping_project1
Ghana solar pumping_project1Ghana solar pumping_project1
Ghana solar pumping_project1nhatsinhit
 
Restoring jamaica’s power after a natural disaster
Restoring jamaica’s power after a natural disasterRestoring jamaica’s power after a natural disaster
Restoring jamaica’s power after a natural disasterRick Case, PMP, P.E.
 
Presentation to IIEE SAFETY MONTHrev 06May2023.pptx
Presentation to IIEE SAFETY MONTHrev 06May2023.pptxPresentation to IIEE SAFETY MONTHrev 06May2023.pptx
Presentation to IIEE SAFETY MONTHrev 06May2023.pptxEnEnBelthere
 
#MP2013 Presentation of NDDC
#MP2013 Presentation of NDDC#MP2013 Presentation of NDDC
#MP2013 Presentation of NDDCFMINigeria
 

Similar to DOE.tribal.energy.presentation2014 (20)

Renewable Energy in Canada
Renewable Energy in Canada Renewable Energy in Canada
Renewable Energy in Canada
 
Changing Local and Institutional Cultures for Sustainable Development: Update...
Changing Local and Institutional Cultures for Sustainable Development: Update...Changing Local and Institutional Cultures for Sustainable Development: Update...
Changing Local and Institutional Cultures for Sustainable Development: Update...
 
Kuching | Jan-15 | Energy For Off-grid Villages In Thailand
Kuching | Jan-15 | Energy For Off-grid Villages In ThailandKuching | Jan-15 | Energy For Off-grid Villages In Thailand
Kuching | Jan-15 | Energy For Off-grid Villages In Thailand
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in India
 
What is Driving Energy Storage Deployment?
What is Driving Energy Storage Deployment?What is Driving Energy Storage Deployment?
What is Driving Energy Storage Deployment?
 
Energy Storage Procurement in California - APR2014
Energy Storage Procurement in California - APR2014Energy Storage Procurement in California - APR2014
Energy Storage Procurement in California - APR2014
 
Jeremy kasper-energy-research-in-alaska
Jeremy kasper-energy-research-in-alaskaJeremy kasper-energy-research-in-alaska
Jeremy kasper-energy-research-in-alaska
 
PEC and Governor's Award for Environmental Excellence
PEC and Governor's Award for Environmental ExcellencePEC and Governor's Award for Environmental Excellence
PEC and Governor's Award for Environmental Excellence
 
JBLM Sustainability Overview
JBLM Sustainability OverviewJBLM Sustainability Overview
JBLM Sustainability Overview
 
Day1 concurrent mac_donald
Day1 concurrent mac_donaldDay1 concurrent mac_donald
Day1 concurrent mac_donald
 
Climate change impacts on agriculture and rural development in the Pacific Re...
Climate change impacts on agriculture and rural development in the Pacific Re...Climate change impacts on agriculture and rural development in the Pacific Re...
Climate change impacts on agriculture and rural development in the Pacific Re...
 
February 2021 edition of the NSW Roadside Environment Committee newsletter
February 2021 edition of the NSW Roadside Environment Committee newsletterFebruary 2021 edition of the NSW Roadside Environment Committee newsletter
February 2021 edition of the NSW Roadside Environment Committee newsletter
 
Eyre Peninsula master Plan 18th Jan 2016
Eyre Peninsula master Plan 18th Jan 2016Eyre Peninsula master Plan 18th Jan 2016
Eyre Peninsula master Plan 18th Jan 2016
 
Duteau 2016. Biomass Report_final
Duteau 2016. Biomass Report_finalDuteau 2016. Biomass Report_final
Duteau 2016. Biomass Report_final
 
Ghana solar pumping_project1
Ghana solar pumping_project1Ghana solar pumping_project1
Ghana solar pumping_project1
 
GridlineSpring08
GridlineSpring08GridlineSpring08
GridlineSpring08
 
2012 team 2
2012 team 22012 team 2
2012 team 2
 
Restoring jamaica’s power after a natural disaster
Restoring jamaica’s power after a natural disasterRestoring jamaica’s power after a natural disaster
Restoring jamaica’s power after a natural disaster
 
Presentation to IIEE SAFETY MONTHrev 06May2023.pptx
Presentation to IIEE SAFETY MONTHrev 06May2023.pptxPresentation to IIEE SAFETY MONTHrev 06May2023.pptx
Presentation to IIEE SAFETY MONTHrev 06May2023.pptx
 
#MP2013 Presentation of NDDC
#MP2013 Presentation of NDDC#MP2013 Presentation of NDDC
#MP2013 Presentation of NDDC
 

DOE.tribal.energy.presentation2014

  • 1. Fort Yukon Wood Energy Program: Wood Boiler Deployment Department of Energy Tribal Program Review Golden, Colorado March 26, 2014 Presented by: Kelda Britton CATG Department of Natural Resources Please contact me for a full list of citations. kelda@catg.org
  • 2. CATG is a consortium of 10 Gwich'in and Koyukon Athabascan tribes located throughout the Yukon Flats. Arctic Village, Beaver, Birch Creek, Canyon Village, Chalkyitsik, Circle, Fort Yukon, Rampart, Stevens Village and Venetie are the remote villages comprising CATG. The Yukon River and its tributaries, including the Porcupine, Chandalar, Birch Creek and Black Rivers, tie the people of the Yukon Flats villages together.
  • 3. The Village of Fort Yukon is located 8 miles North of the Arctic Circle. Only accessible by boat during the summer, snow machine during winter, and plane. The FYU Biomass Project will be the first off grid, off road system biomass CHP in the world.
  • 4. Power Costs In Alaska Are Among The Highest The Nation Gasoline = Ranges from $7.50- $8.50 per gallon . No 1 Diesel = $7.00 per gallon . Average house hold cost for oil = $3,500 per year . Oil cost per year for school = $210,000 Fuel cost for electrical generation = $1.4 M Cord Wood = $275 – $300 per cord Kwh = $0.51 (rate increase coming) Propane = $193 per 100 lbs tank
  • 5. First off grid, off road system biomass CHP in the world New Power House (CHP ) Facility construction Wood Chip Boiler District Heating loop providing heat to commercial buildings I.e. School, AC, Radio Station, Water Plant, etc.  Sustainable Forest Management program  Create a for profit in-village wood energy utility to displace diesel energy  Support training needs for field forestry technicians and supports workshops for education on key biomass issues for Fort Yukon and the Yukon Flats Villages.
  • 6. Council of Athabascan Tribal Governments (CATG) Gwitchyaa Zhee Corporation (GZ Corp) Alaska Village Initiatives (AVI) Department of Energy (DOE) Denali Commission Alaska Energy Authority (AEA) State of Alaska Division of Forestry (DOF)
  • 7. This Project has multiple funding source (9.8million secured) Planning/Trainings/Permitting (3 Million) Final Design and Construction (6.8 million) Construction Funding Rural Utility Services (RUS $3.5 million) AEA Rural Energy Fund $2.3 Million DOE Tribal Energy Fund 990,000
  • 8.
  • 9.
  • 10.  Site Development Summer 2014  CHP Plant Foundation/ Building Construction Summer 2015  Clinic Distributor Chip- Fed Boiler Summer/Fall 2016 *These timelines are subject to change based upon seasonal and unforeseen obstacles.
  • 11. Forestry Technician Training  September 23-27th, 2013.  Measure portion of Harvest Area 1 near Ylotta Slough Involvement  Fort Yukon tribal members and Salish Kootenai Tribal College  basic forest skills - DBH tree measurement, GPS, and data collection.
  • 12. Why: •Develop forest technician work force. •Apply field data collection, and best practices •Maintain sustainable harvest
  • 13. Harvest Equipment Operator and Safety Training November 4th – 7th : Classroom instruction, field time instruction, and FRPA training. Selections based on: Previous experience Attentiveness Safety Awareness Work Ethic Comradery Common Sense Overall Objectives: Operational Safety Operational efficiency Regulatory compliance Gerald James pictured above (Fig 5) operating the Kubota Pictured below (Fig 6), Cynthia James training on the New Holland.
  • 14. Fig 1: William Wall, Alaska Village Initiatives, introduction and history of project to FYU equipment operator class. Fig 2: Devany Plentovich, Alaska Energy Authority and Stuart Marquardt, Equipment and safety instructor. Fig 3: Don Ryan, owner of Ryan's Equipment Pictured L-R Fig 4: James Durst AK Dept. Fish and Game, Bill Wall, Devany Plentovich, Don Ryan, Stuardt Marquardt, Shawn Shampagne Tok equipment operator, Mike Reggear, AK Division of Forestry Classroom Instruction and Equipment Analysis Special thank you to all of the agency representatives who joined us in Fort Yukon! AEA AVI DOF GZ Corporation Don Ryan Stuart Marquardt Shawn Champagne
  • 15. Equipment Training New Holland Tractor and Kubota Kubota Training:  Cutting and Loading Capabilities  Maintenance  Falling Debris  Proper timber cutting layout Fig 7: New Holland TV 6070 mounted with 3 point hitch Tractor Mounted Crane (Nokka 4472) New Holland Training:  Safety  Maintenance  Proper functions, in the woods and around other machinery and hazards.  Proper log skidding techniques. Fig 8: Kubota KX080-3 with Ryan’s Equipment 12” Feller Bunching
  • 16.  Harvest Equipment Operator and Safety Training  November 4th – 7th :  3 days of classroom instruction, field time instruction, and FRPA training.  23 people trained  Overall objectives  Operational Safety  Operational efficiency  Regulatory compliance Pictured left to right, Cynthia James and Gerald James during operator training.
  • 17. Outcomes: Train people Start harvest Data collection Document the process Activities Associated with Biomass Harvesting, piling, drying, transporting, and chipping Weather Conditions Harvest Sites Transportation Safety
  • 18.
  • 19. Now What? Once a program has been established in Fort Yukon, it is the intent of CATG Natural Resource Department in collaboration with the Village Tribes, Native Corporations and Private Lands to support the installation of programs in each of the villages in the Yukon Flats Region. The model program being developed in Fort Yukon will serve as the basis for all projects in interior Alaska.
  • 20. Conclusion There is no right or wrong. Establishing key individuals in your community. Learn by doing-there will always be room for improvement. “Indigenize It”
  • 21. Department of Energy (DOE) Alaska Energy Authority (AEA) Denali Commission Alaska Village Initiatives (AVI) Jeff Graham Stewardship Coordinator State of Alaska Division of Forestry (DOF) Gwitchya Zhee Corporation (GZ Corp) We greatly appreciate contributions and partnerships from the above agencies!