DMAIC : Design Phase
Six Sigma Master Black Belt
DMAIC
Define
The Problem
Measure
Quantify Problem
Analyze
Identify Root Causes
Improve
Implement &
Validate Solution
Control
Maintain Solution
Phase 1: Define
In this phase the project team creates a Project Charter, a high-level map of the process and begins to
understand the needs of the customers of the process.
Steps
• Define the Problem
• Define the Goal
• Define the Process
• Define Customer & their Requirements
• Communication Channel on Project
Progress
Tools
• Project Charter
• SIPOC
• Value Stream Map
• Voice of Customer (VoC)
• Stakeholder Analysis
Application of Six Sigma for GoT
Back-Ground:
• The Citizens of Westeros need Dragon–Glass based
weapons to survive the attack from the Night-King
and his undead army.
• Dragon-Glass is only available on Dragonstone
island and it needs hours of skillful labor to convert
into weaponry.
But,… Khaleesi Knows Six-Sigma:
• Daenerys identifies the importance of Dragon-Glass
for her mission to capture the Iron-Throne and
wants to apply Six-Sigma Methodology for the
production of Dragon-Glass Weapons
Champion
Master Black Belt
Black Belt
Green Belt
White & Yellow
Belts
Project Charter : Improve Turn-Around Time and Quality of Weapons Production
Problem Statement
The existing process is not scalable and need to have
a efficient process for rapid manufacture of highly
robust dragon-glass weaponry to tackle the undead
uprising.
Goal Statement
The Goal is to reduce the weapon production time
from 4 weeks to 2 weeks and increase the weapon
strength 2 fold in the next 3 months before the
winter arrives
Scope / Constraints / Assumptions
Constraints : Limits on Dragon-Glass Extraction is 100
Kgs / week
Dragons cannot replace hearth furnace (use of
Dracarys is void)
Team Members
Position Person Bandwidth
Champion Daenerys 5 hrs/ week
MBB Jon Snow 12 hrs/ week
BB Sir Jorah 25 hrs /week
BB Tyrion 23 hrs/ week
Mile-Stones
Phase Plan Date Actual Date
Define 16/4/2019 16/4/2019
Measure 23/5/2019 --
Analyze 16/6/2019 --
Improve 01/7/2019 --
Control 16/7/2019 --
Voice of Customer Translation Matrix
Customer Comment Gather More Understanding Customer Requirement
Arya Stark : Valar Morghulis Every Man must be able to wield
the weapons
Make the Dragon-Glass Weapons
40% lighter by changing the
handle to Valeriyan steel
Brienne of Tarth : My weapon
should cut through like a knife
through butter
The weapons should be sleak and
must have sharp edges
Use ancient fire-fly ash recepie to
reduce the blade thickness to
10mm
The Hound : I need something
which I can pound my enemies
head with
The weapon needs stability at the
grip and a good balance
Have resin - coated grips on the
handle which will improve the
stability by 20%
…… …… ……
…… …… ……
SIPOC Mapping
S I P O C
Crude Dragon-
Glass from Dragon-
Stone
Ancient Fly – Ash
Supplier
Gold : The Iron
Bank of Braavos
Dotheraki ,
Unsullied Armies
Skilled Miners
Skilled Armorers
Iron-Fleet Armada
Dragon- Glass
Weaponry
The armies of
Westeros
Extract Dragon-
Glass
Ship Raw Materials
to Winterfell
Forge Weaponry
Supply to Soldiers
Value Stream Mapping
Dragon-Glass
Ore
Westeros
Armies
Crude Dragon-
Glass
Extraction
Purification
Export to
Winterfell
Armoury
Forged
Weaponry
5 Days
4 Days 3 Days 10 Days
6 Days
Stakeholder Analysis
Communication Plan :
Employ a fleet of Ravens for the disseminating the project updates to the key stakeholders
Stakeholder Analysis :
Analyze the stakeholder positions for the project success (Open to Floor)
Disclaimer : I don’t claim rights to the Iron Throne or any of the registered trade-marks of HBOs Game of Thrones television
series. I don’t Intend to use this presentation for any business or commercial purpose. This creative piece is only meant to
gamify Six Sigma Terminology and to be considered as a tribute to the creator’s of Game of Thrones.

DMAIC (Master Black Belt)

  • 1.
    Ravi Vogeti https://www.linkedin.com/in/ravivogeti/ DMAIC :Design Phase Six Sigma Master Black Belt
  • 2.
    DMAIC Define The Problem Measure Quantify Problem Analyze IdentifyRoot Causes Improve Implement & Validate Solution Control Maintain Solution
  • 3.
    Phase 1: Define Inthis phase the project team creates a Project Charter, a high-level map of the process and begins to understand the needs of the customers of the process. Steps • Define the Problem • Define the Goal • Define the Process • Define Customer & their Requirements • Communication Channel on Project Progress Tools • Project Charter • SIPOC • Value Stream Map • Voice of Customer (VoC) • Stakeholder Analysis
  • 4.
    Application of SixSigma for GoT
  • 5.
    Back-Ground: • The Citizensof Westeros need Dragon–Glass based weapons to survive the attack from the Night-King and his undead army. • Dragon-Glass is only available on Dragonstone island and it needs hours of skillful labor to convert into weaponry. But,… Khaleesi Knows Six-Sigma: • Daenerys identifies the importance of Dragon-Glass for her mission to capture the Iron-Throne and wants to apply Six-Sigma Methodology for the production of Dragon-Glass Weapons
  • 6.
    Champion Master Black Belt BlackBelt Green Belt White & Yellow Belts
  • 7.
    Project Charter :Improve Turn-Around Time and Quality of Weapons Production Problem Statement The existing process is not scalable and need to have a efficient process for rapid manufacture of highly robust dragon-glass weaponry to tackle the undead uprising. Goal Statement The Goal is to reduce the weapon production time from 4 weeks to 2 weeks and increase the weapon strength 2 fold in the next 3 months before the winter arrives Scope / Constraints / Assumptions Constraints : Limits on Dragon-Glass Extraction is 100 Kgs / week Dragons cannot replace hearth furnace (use of Dracarys is void) Team Members Position Person Bandwidth Champion Daenerys 5 hrs/ week MBB Jon Snow 12 hrs/ week BB Sir Jorah 25 hrs /week BB Tyrion 23 hrs/ week Mile-Stones Phase Plan Date Actual Date Define 16/4/2019 16/4/2019 Measure 23/5/2019 -- Analyze 16/6/2019 -- Improve 01/7/2019 -- Control 16/7/2019 --
  • 8.
    Voice of CustomerTranslation Matrix Customer Comment Gather More Understanding Customer Requirement Arya Stark : Valar Morghulis Every Man must be able to wield the weapons Make the Dragon-Glass Weapons 40% lighter by changing the handle to Valeriyan steel Brienne of Tarth : My weapon should cut through like a knife through butter The weapons should be sleak and must have sharp edges Use ancient fire-fly ash recepie to reduce the blade thickness to 10mm The Hound : I need something which I can pound my enemies head with The weapon needs stability at the grip and a good balance Have resin - coated grips on the handle which will improve the stability by 20% …… …… …… …… …… ……
  • 9.
    SIPOC Mapping S IP O C Crude Dragon- Glass from Dragon- Stone Ancient Fly – Ash Supplier Gold : The Iron Bank of Braavos Dotheraki , Unsullied Armies Skilled Miners Skilled Armorers Iron-Fleet Armada Dragon- Glass Weaponry The armies of Westeros Extract Dragon- Glass Ship Raw Materials to Winterfell Forge Weaponry Supply to Soldiers
  • 10.
    Value Stream Mapping Dragon-Glass Ore Westeros Armies CrudeDragon- Glass Extraction Purification Export to Winterfell Armoury Forged Weaponry 5 Days 4 Days 3 Days 10 Days 6 Days
  • 11.
    Stakeholder Analysis Communication Plan: Employ a fleet of Ravens for the disseminating the project updates to the key stakeholders Stakeholder Analysis : Analyze the stakeholder positions for the project success (Open to Floor) Disclaimer : I don’t claim rights to the Iron Throne or any of the registered trade-marks of HBOs Game of Thrones television series. I don’t Intend to use this presentation for any business or commercial purpose. This creative piece is only meant to gamify Six Sigma Terminology and to be considered as a tribute to the creator’s of Game of Thrones.