Established - 1986
WELCOME
moladi
DISRUPTIVE TECHNOLOGY
 Disruptive technology
 Disruptive innovation
moladi
CHANGE AGENT
• Disruptive Construction Technology
• Low cost construction system
• Low cost housing
• Affordable housing
• Construction technology
• Plastic formwork
• Formwork
• Building system
The Change Agent - the leader who brings about change
moladi
INNOVATION
“Our age of anxiety is, in
great part, the result of trying
to do today’s jobs with
yesterday’s tools”.
moladi
YESTERDAY…
moladi
TODAY…
moladi
INNOVATION
“Don't find a fault, find a remedy.”
Henry Ford
moladi
moladi
moladi
DISRUPTIVE INNOVATION
moladi
RAFT FOUNDATION FORMER
moladi
RAFT FOUNDATION - COMPACT
moladi
RAFT FOUNDATION-TRENCHING
moladi
RAFT FOUNDATION-TRENCHING
moladi
RAFT FOUNDATION-TRENCHING
moladi
RAFT FOUNDATION-REINFORCING
moladi
RAFT FOUNDATION-CONCRETE
moladi
RAFT FOUNDATION-LEVEL
moladi
POWER FLOAT SLAB
moladi
ERECT moladi FORMWORK
4 Hours
moladi
moladi
PLUMBING
moladi
moladi
REINFORCING
moladi
moladi
moladi
moladi
moladi
moladi
moladi
 moladi structures are
monolithic structures which
are resistant to
earthquakes.
 All the water and electrical
piping is positioned inside
the formwork cavity and
cast in the walls.
 No chasing required.
 No plastering required.
REINFORCING
moladi
 1800kg or 0.720m³ of local
decomposed granite/ river sand.
 250kg of ordinary portland
cement: (OPC).
 5 litres of moladiCHEM
 200 litres of water.
* This is a generic mix for example purposes only
MORTAR MIX
moladi
River Sand+Cement+Water+moladiCHEM
2 Hours
FILL
moladi
moladi
2 Hours
STRIP
moladi
moladi
moladi
moladi
moladi
moladi
moladi
moladi
moladi
moladi
moladi
moladi
5 Days
moladi
MORTAR – NOT CONCRETE
moladi
40 M²
moladi
40 M²
moladi
52 M²
moladi
60 M²
moladi
68 M²
moladi
moladi 75m Unit
75 M²
moladi
1987
FIRST moladi UNIT
moladi
2013
FIRST moladi UNIT
moladi
Bonded by Standard Bank since 1993
110 M²
moladi
120 M²
moladi
120 M²
moladi
WALK UP
moladi
SEMI DETACHED
moladi
CLASSROOM
moladi
CLASSROOM
moladi
CLINIC
moladi
ABLUTION BLOCK
moladi
STEEL PORTAL APPLICATION
moladi
STEEL PORTAL APPLICATION
moladi
SECURITY WALLING
moladi
DOUBLE STOREY
moladi
SUSPENDED SLAB SYSTEM
moladi
STAIRCASE
moladi
LATICE BEAM SYSTEM
moladi
LOUVRE WINDOW SYSTEM
moladi
CLADDING SYSTEM
moladi
CLADDING SYSTEM
moladi
FUTURE DEVELOPMENTS
moladi
moladi
moladi
moladi
 Constant supply = constant delivery
 Known cost
 Unskilled operators
 Next to no waste
 Increased productivity
 Reduced cost
 Consistent quality
 Predictable cash flow
moladi CONSTRUCTION CYCLE
moladi
 Reduce unemployment: Job creation
 Community upliftment
 Supply chain
 Environment
 Education
 Health
 Crime
 Social development
 Carbon footprint
BENEFITS
moladi
 Train and employ local unskilled labour
 Utilize local materials
 Re-useable
 Reduced transport cost
 Low construction cost
 Rapid construction time
 Practicable designs
 Quality approved materials
 Variety of finishing details
 Low maintenance cost
BENEFITS
moladi
 Speed without compromising quality
 No need to plaster
 No need to chase
 No beam filling
 Waterproof
 Reinforced
 Waste reduction
 Logistics
 Alterations and additions
BENEFITS
moladi
 A structure with a shower can be termed
 “Low Cost”
 A structure with a bath can be termed
 “Affordable”
 A structure with a Jacuzzi can be termed
 “High Income”
o The finishes of a structure determines the value
o No quality disparity between “High Income”
structures and “Low Cost” structures
A WALL IS A WALL IS A WALL
moladi
 Social acceptance
 Durability
 Quality
 Variety
 Increase in value
 Re-sale ability
 Minimise risk - Insurance/Professional
Indemnity
 Certified
 Bondable/Financed
FINANCIAL INSTITUTIONS
moladi
One structure in
One day with
One moladi mould
More structures in
One day with
More moladi moulds
PRODUCTION
moladi
ALTERNATIVE PRODUCTS
moladi
CONCLUSION – STATUS QUO
moladi
SUPERFICIAL CHANGE
moladi
RADICAL CHANGE
Hennie Botes – www.moladi.net
THANKYOU

Disruptive technology - construction