This construction management assignment involves building an extension to an existing building as shown in Figures 1-4. The student must create a sequence list of 25 activities required to complete the project, determine the manpower, equipment, and materials needed for each task, and sequence the tasks for maximum efficiency by minimizing material handling, travel, and keeping equipment constantly in motion. The student then needs to fill out a table describing the 25 activities with crew, equipment, materials, and any notes.