Zama Bon Odori Shuttle Bus ServiceZama Bon Odori Shuttle Bus Service
Pick UpPick Up
Drop OffDrop Off
SFHA Narita Bus StopSFHA Narita Bus Stop
toto
Camp Zama Music Theater WorkshopCamp Zama Music Theater Workshop
10 a.m.10 a.m. 4 p.m.4 p.m. 7 p.m.7 p.m.
Pick UpPick Up
Drop OffDrop Off
Sagami Depot, Bldg. 90-S10Sagami Depot, Bldg. 90-S10
toto
Camp Zama Music Theater WorkshopCamp Zama Music Theater Workshop
10 a.m.10 a.m. 4 p.m.4 p.m. 7 p.m.7 p.m.
Pick UpPick Up
Drop OffDrop Off
Camp Zama Music Theater WorkshopCamp Zama Music Theater Workshop
toto
SFHA Narita Bus StopSFHA Narita Bus Stop
10 p.m.10 p.m.
Pick UpPick Up
Drop OffDrop Off
Camp Zama Music Theater WorkshopCamp Zama Music Theater Workshop
toto
Sagami Depot, Bldg. 90-S10Sagami Depot, Bldg. 90-S10
10 p.m.10 p.m.
Town Hall Meeting for USAG-J Employees
Col. Joy Curriera will conductCol. Joy Curriera will conduct
Garrison employee town hall meetings,Garrison employee town hall meetings,
introducing herself while providing a venueintroducing herself while providing a venue
to present Garrison priorities.to present Garrison priorities.
Call the USAG-J Command Group atCall the USAG-J Command Group at
263-5339263-5339 for more information.for more information.
The location, date and time for the Kanto area is as follows:
Area Date Time LocationArea Date Time Location
DepotDepot July 12 10 a.m.July 12 10 a.m. Sagami Lounge, Bldg.Sagami Lounge, Bldg.
135-S2135-S2
to noonto noon
Town Hall Meeting for USAG-J Employees
ギャリソン従業員へのタウンホールミーティングギャリソン従業員へのタウンホールミーティング
カレラ大佐による基地管理本部従業員の為のカレラ大佐による基地管理本部従業員の為の
タウンホールミーティングが開催されます。タウンホールミーティングが開催されます。
お話の内容は、お話の内容は、
彼女の自己紹介と基地管理本部の優先事項についてです。彼女の自己紹介と基地管理本部の優先事項についてです。
この件に関するお問い合わせは、この件に関するお問い合わせは、
コマンドグループ (軍電コマンドグループ (軍電 263-5339263-5339 )まで)まで。。
関東地区での開催場所・日時は下記のとおりです。関東地区での開催場所・日時は下記のとおりです。
地区  開催日  時間   場所地区  開催日  時間   場所
相模相模     77 月月 1212 日日 1111 時時 -12-12 時   時   さがみラウンジ、さがみラウンジ、
Bldg. 135-S2Bldg. 135-S2
地区  開催日  時間   場所地区  開催日  時間   場所
相模相模     77 月月 1212 日日 1111 時時 -12-12 時   時   さがみラウンジ、さがみラウンジ、
Bldg. 135-S2Bldg. 135-S2
ギャリソン従業員へのタウンホールミーティングギャリソン従業員へのタウンホールミーティング
The Navy Federal Credit Union is offering a lineThe Navy Federal Credit Union is offering a line
for sequestration- and furlough-related assistancefor sequestration- and furlough-related assistance
to its members.to its members.
Some of the topics they can discussSome of the topics they can discuss
are reduced interest ratesare reduced interest rates
on loans and credit card payments.on loans and credit card payments.
The number is (877) 874-0042.The number is (877) 874-0042.
Sequestration, Furlough Assistance LineSequestration, Furlough Assistance Line
Sequestration, Furlough AssistanceSequestration, Furlough Assistance
LineLine
Disclaimer:Disclaimer:
This is not an endorsementThis is not an endorsement
of the Navy Federal Credit Unionof the Navy Federal Credit Union
by the U.S. Army or U.S. Army Garrisonby the U.S. Army or U.S. Army Garrison
Japan.Japan.
It is simply information on a resourceIt is simply information on a resource
availableavailable
to community members.to community members.
Residents’ ResponsibilitiesResidents’ Responsibilities
During Leave and TDYDuring Leave and TDY
All Army family housing and unaccompanied
personnel housing residents must notify
the Housing Management Division for absences
from their quarters of seven days or more.
Provide a point of contact for
a responsible sponsor or adult
to perform periodic checks to ensure
the home is safe, secure and free of incidents
and unexpected circumstances,
and maintain the yard as well, if applicable.
Residents’ ResponsibilitiesResidents’ Responsibilities
During Leave and TDYDuring Leave and TDY
In the event you do not assign
a point of contact during your absence,
the Housing Management Division
will contact your organization or agency
to request their support – especially when it comes
to keeping up your yard maintenance.
Residents’ ResponsibilitiesResidents’ Responsibilities
During Leave and TDYDuring Leave and TDY
Visit the Housing Management Division
at Bldg. 671
to request the Form for Periodic Absences.
Call the Housing Office at 263-4135, 263-4843
or 263-5859 for questions or more information.
Residents’ ResponsibilitiesResidents’ Responsibilities
During Leave and TDYDuring Leave and TDY
Limited Parking at Medical, DentalLimited Parking at Medical, Dental
ClinicsClinics
Effective July 1,
the majority of patient parking
at the BG Sams U.S. Army Health Clinic
and Dental Clinic on Camp Zama
will be blocked due to ongoing construction.
Patient and staff parking are available
at the commissary, Camp Zama Community Club,
and the Housing Office
(behind the Child Development Center).
Limited Parking at Medical, Dental ClinicsLimited Parking at Medical, Dental Clinics
Disabled parking and patient pick-up
and drop-off
are still available in front of the clinics.
Drivers are advised to use caution during this time
as personnel adjust to these changes.
Limited Parking at Medical, Dental ClinicsLimited Parking at Medical, Dental Clinics
Summer Bible Camp at Camp ZamaSummer Bible Camp at Camp Zama
is scheduled to be heldis scheduled to be held Aug. 5 through 9Aug. 5 through 9
at the Community Activity Centerat the Community Activity Center
and Religious Education Center.and Religious Education Center.
This year’s theme isThis year’s theme is
““Sonrise National Park Vacation Bible School”Sonrise National Park Vacation Bible School”
2013 Summer Bible Camp Registration2013 Summer Bible Camp Registration
2013 Summer Bible Camp Registration2013 Summer Bible Camp Registration
The camp is open to Camp ZamaThe camp is open to Camp Zama
and Naval Air Facility Atsugi studentsand Naval Air Facility Atsugi students
in grades kindergarten through sixth.in grades kindergarten through sixth.
Camp will be held from 8:45 a.m. to noon on each day,Camp will be held from 8:45 a.m. to noon on each day,
and bus services will be providedand bus services will be provided
from Sagamihara Family Housing Area and NAF Atsugi.from Sagamihara Family Housing Area and NAF Atsugi.
Those interested can register their childrenThose interested can register their children
by calling 263-4898.by calling 263-4898.
Spaces are limited,Spaces are limited,
so early registration is encouraged.so early registration is encouraged.
2013 Summer Bible Camp Registration2013 Summer Bible Camp Registration
Notification ofNotification of
On-post rOn-post residents must notifyesidents must notify
the Housing Management Divisionthe Housing Management Division
for absences from quarters extendedfor absences from quarters extended
more than seven days.more than seven days.
Absence from QuartersAbsence from Quarters
Please provide a POCPlease provide a POC
who will have responsibility for your quarterswho will have responsibility for your quarters
during your absence.during your absence.
For more information: 263-4136/3890For more information: 263-4136/3890
046-407-4136/3890046-407-4136/3890
Notification ofNotification of
Absence from QuartersAbsence from Quarters
Bon Dance lessons will be heldBon Dance lessons will be held
on the following dates in preparationon the following dates in preparation
for this year’s Bon Odori Festivalfor this year’s Bon Odori Festival
atat
Camp Zama,Camp Zama,
which will be held Aug. 3.which will be held Aug. 3.
Dates:Dates: July 16, 18, 23, 25, 30, andJuly 16, 18, 23, 25, 30, and
Aug. 1Aug. 1
Time:Time: 5 to 7 p.m.5 to 7 p.m.
Location:Location: Community Activity CenterCommunity Activity Center
No pre-No pre-
registration necessaryregistration necessary
For more information:For more information:
The Garrison Chaplain cordially invites youThe Garrison Chaplain cordially invites you
to attend the 60thto attend the 60th Rededication Service ofRededication Service of
the Camp Zama Chapelthe Camp Zama Chapel
andand
the 238th Chaplain Corps Anniversarythe 238th Chaplain Corps Anniversary
on the following date.on the following date.
Date: July 18 from 11:30 a.m.Date: July 18 from 11:30 a.m.
Location: Camp Zama ChapelLocation: Camp Zama Chapel
A complementary lunchA complementary lunch
will be provided in the chapel courtyard.will be provided in the chapel courtyard.
Contact the USAG-J Religious Support OfficeContact the USAG-J Religious Support Office
atat 263-4898263-4898 for more information.for more information.
KabukiKabuki AppreciationAppreciation
and Performance Viewingand Performance Viewing
A kabuki
appreciation class and viewing
are scheduled to be held July 26 and 27,
twice daily at 11 a.m. and 2:30 p.m.,
at the Kanagawa Prefecture Youth
Center Hall in Yokohama.
A special discount ticket fee
will be provided for
U.S. service members
and their family members.
KabukiKabuki AppreciationAppreciation
and Performance Viewingand Performance Viewing
Those interested can reserve
their tickets by calling 045-263-4475
(Japanese-language only).
KabukiKabuki AppreciationAppreciation
and Performance Viewingand Performance Viewing
For assistance with reserving tickets,
call the U.S. Army Garrison Japan
Community Relations Office
at 263-7556.
KabukiKabuki AppreciationAppreciation
and Performance Viewingand Performance Viewing
Currently, U.S. service members may incur upCurrently, U.S. service members may incur up
to a four-year active-duty service obligationto a four-year active-duty service obligation
depending on how many qualifying years of servicedepending on how many qualifying years of service
they have as of Aug. 1, 2009.they have as of Aug. 1, 2009.
Information onInformation on
Post-9/11 GI Bill TransferencePost-9/11 GI Bill Transference
Effective Aug. 1 of this year, any service memberEffective Aug. 1 of this year, any service member
who submits a Transfer of Education Benefitswho submits a Transfer of Education Benefits
request and is approved will incurrequest and is approved will incur
a four-year active-duty service obligationa four-year active-duty service obligation
from the date of their transfer request.from the date of their transfer request.
Information onInformation on
Post-9/11 GI Bill TransferencePost-9/11 GI Bill Transference
This also includes service membersThis also includes service members
with at least 20 years of servicewith at least 20 years of service
prior to Aug. 1, 2009.prior to Aug. 1, 2009.
Information onInformation on
Post-9/11 GI Bill TransferencePost-9/11 GI Bill Transference
Half-Road Closure at Highland DriveHalf-Road Closure at Highland Drive
on Camp Zamaon Camp Zama
A half-road closure is scheduledA half-road closure is scheduled
to be in effect at a portion of Highland Driveto be in effect at a portion of Highland Drive
on Camp Zama fromon Camp Zama from July 1 through Aug. 30July 1 through Aug. 30
in order to install a new power station.in order to install a new power station.
Garrison Security OfficeGarrison Security Office
The Garrison Security Office on Camp ZamaThe Garrison Security Office on Camp Zama
will be closedwill be closed from July 15 through 19from July 15 through 19..
Contact the regional security officerContact the regional security officer
at 438-1713 for assistance.at 438-1713 for assistance.
The office will reopen on July 22The office will reopen on July 22
at 8 a.m.at 8 a.m.
Full-Scale Exercise on Camp ZamaFull-Scale Exercise on Camp Zama
U.S. Army Garrison Japan is scheduled
to conduct its annual full-scale exercise
from July 16 through 18 on Camp Zama.
Full-Scale Exercise on Camp ZamaFull-Scale Exercise on Camp Zama
Possible road closures at
Chestnut Avenue and Gate 1
are expected during the exercise period.
Call 263-4182 for more information.
Central Issue Facility ClosureCentral Issue Facility Closure
The Central Issue Facility on Camp ZamaThe Central Issue Facility on Camp Zama
will be closedwill be closed from July 15 through 19from July 15 through 19
for mandatory training.for mandatory training.
The CIF will only open for emergenciesThe CIF will only open for emergencies
and turn-ins during this time.and turn-ins during this time.
Call 263-5880 or 263-7454Call 263-5880 or 263-7454
in case of emergency.in case of emergency.
The Department of Veterans Affairs
overseas military services coordinator
will be at the Camp Zama Education Center
in Bldg. 278, on July 10.
VA Overseas Coordinator VisitVA Overseas Coordinator Visit
at Camp Zamaat Camp Zama
VA Overseas Coordinator VisitVA Overseas Coordinator Visit
at Camp Zamaat Camp Zama
If you would like to schedule an appointmentIf you would like to schedule an appointment
to discuss veteran’s benefits,to discuss veteran’s benefits,
you may be entitled to, callyou may be entitled to, call 263-5311263-5311..
Don’t delay, appointments are limited!Don’t delay, appointments are limited!
Camp Zama housing residents
on MacArthur Road,
quarters 1070 through 1095,
will have a traffic change beginning
June 18.
Traffic Change on MacArthur RoadTraffic Change on MacArthur Road
Traffic Change on MacArthur RoadTraffic Change on MacArthur Road
The one-way portion of MacArthur RoadThe one-way portion of MacArthur Road
will be reversed, along with the on-streetwill be reversed, along with the on-street
parallel parking.parallel parking.
After the change, residents shouldAfter the change, residents should
be especially watchful for driversbe especially watchful for drivers
driving in the wrong direction.driving in the wrong direction.
Road, Parking ReconstructionRoad, Parking Reconstruction
on Camp Zamaon Camp Zama
The first phase of a three-phase constructionThe first phase of a three-phase construction
initiative to repair and re-pave various roadsinitiative to repair and re-pave various roads
and parking areas on Camp Zamaand parking areas on Camp Zama
is scheduled to beginis scheduled to begin
June 24 and continue through July 12.June 24 and continue through July 12.
Twenty-five parking spaces,
as well as a portion of the road past
the southern end of Bldg. 101
will be closed during this first phase.
Road, Parking ReconstructionRoad, Parking Reconstruction
on Camp Zamaon Camp Zama
Details on the second and third phases
of the construction will be released
at future dates.
Call 263-5448 for more information.
Road, Parking ReconstructionRoad, Parking Reconstruction
on Camp Zamaon Camp Zama
Gas Piping Work on Camp ZamaGas Piping Work on Camp Zama
Work is scheduled to be conductedWork is scheduled to be conducted
July 1 through 31July 1 through 31
to connect gas piping to Bldgs. 332, 333 and 341to connect gas piping to Bldgs. 332, 333 and 341
for future modifications to the new boiler plantfor future modifications to the new boiler plant
On Camp Zama.On Camp Zama.
The Sagamihara Family Housing AreaThe Sagamihara Family Housing Area
commissary’s normal days of operationcommissary’s normal days of operation
will change beginning July 8will change beginning July 8
due to the furlough of employees.due to the furlough of employees.
Commissary ClosureCommissary Closure
At that time,
and for as long as furlough is in effect,
the commissary will be closed on Tuesdays
in addition to the normal Monday closure.
Commissary ClosureCommissary Closure
This schedule is subject to change,This schedule is subject to change,
and new informationand new information
will be released as it is received.will be released as it is received.
Commissary ClosureCommissary Closure
Ramadan will begin on July 9.Ramadan will begin on July 9.
During Ramadan, Muslims must fast each dayDuring Ramadan, Muslims must fast each day
from dawnfrom dawn
(approximately 1 1/2 hours before sunrise)(approximately 1 1/2 hours before sunrise)
until after sunset.until after sunset.
During these hours, a Muslim cannot consumeDuring these hours, a Muslim cannot consume
any food or liquids.any food or liquids.
The Holy Month of RamadanThe Holy Month of Ramadan
The Holy Month of RamadanThe Holy Month of Ramadan
Ramadan is followedRamadan is followed
by the celebration of Eid ul-Fitr.by the celebration of Eid ul-Fitr.
This year’s Eid ul-FitrThis year’s Eid ul-Fitr
will be observed on Aug. 8.will be observed on Aug. 8.
For more information, contact the USAG-JFor more information, contact the USAG-J
Religious Support Office at 263-4898.Religious Support Office at 263-4898.
The 2013-14 school year will begin
as scheduled on Aug. 26.
If proposed furlough dates remain in effect,If proposed furlough dates remain in effect,
Arnn Elementary and Zama American MiddleArnn Elementary and Zama American Middle
and High schoolsand High schools
will be closed on the following dates:will be closed on the following dates:
Tuesday : Sept. 3Tuesday : Sept. 3
Mondays: Sept. 9, 16, 23 and 30Mondays: Sept. 9, 16, 23 and 30
Although the schools will be closed
to students and furloughed teachers on these days,
the school and district offices will remain open,
albeit with limited staffing.
The Arnn main office will remain open all summer,
except for July 4 from 8 a.m. to 3 p.m.
General furlough updates are available here:General furlough updates are available here:
http://www.dodea.edu/Budget/index1.cfmhttp://www.dodea.edu/Budget/index1.cfm
Well Child Physicals AvailableWell Child Physicals AvailableWell Child Physicals AvailableWell Child Physicals Available
Online Nutrition Education SurveyOnline Nutrition Education Survey
An online survey coordinated
by Medical Department Activity-Japan is available
for all community members at Camp Zama.
A dietician from Fleet Activities Yokosuka
is willing to provide nutrition classes
and would like to know what topics
are of interest to the community.
The survey can be found here:The survey can be found here:
http://www.surveymonkey.com/s/36J8T7Shttp://www.surveymonkey.com/s/36J8T7S
Online Nutrition Education SurveyOnline Nutrition Education Survey
U.S. Army Garrison JapanU.S. Army Garrison Japan
is currently conductingis currently conducting
an Army Community Service Needs Assessmentan Army Community Service Needs Assessment
online survey.online survey.
The survey collects informationThe survey collects information
About services and programs at Camp ZamaAbout services and programs at Camp Zama
and a sense of how its military communityand a sense of how its military community
is supporting its members.is supporting its members.
The survey must be completed before July 15.The survey must be completed before July 15.
As summer begins, the conditions for moldAs summer begins, the conditions for mold
growth become more prevalent.growth become more prevalent.
Mold will only grow when moisture or condensationMold will only grow when moisture or condensation
is present.is present.
Even hidden areas, like closets, can grow moldEven hidden areas, like closets, can grow mold
if moisture is present.if moisture is present.
Keeping your home free of moisture is the bestKeeping your home free of moisture is the best
way to prevent mold growth.way to prevent mold growth.
Keep indoor humidity levels between 30 percentKeep indoor humidity levels between 30 percent
and 50 percent. (Humidity meters can beand 50 percent. (Humidity meters can be
purchased for as little as $10 online)purchased for as little as $10 online)
Run fans and vents while cooking or showering.Run fans and vents while cooking or showering.
(But don’t leave them running all day, as this(But don’t leave them running all day, as this
can potentially assist mold growth).can potentially assist mold growth).
Clean up moisture and condensation immediately.Clean up moisture and condensation immediately.
Use dehumidifiers to further control levels ofUse dehumidifiers to further control levels of
humidity in the home.humidity in the home.
Keep closet doors open one to two inches to allowKeep closet doors open one to two inches to allow
fresh air circulation.fresh air circulation.
If mold is present in an area of nine square feet orIf mold is present in an area of nine square feet or
less:less:
- Scrub rigorously using detergent and water- Scrub rigorously using detergent and water
- Wear a dust mask, gloves and eye protection- Wear a dust mask, gloves and eye protection
- Dry the area after completion of cleaning- Dry the area after completion of cleaning
If mold is present on a larger surface:If mold is present on a larger surface:
Contact DPW for assistance in cleaningContact DPW for assistance in cleaning
263-4274 or 263-4613263-4274 or 263-4613
If mold is on permeable surfaces (i.e., carpet orIf mold is on permeable surfaces (i.e., carpet or
ceiling tiles), consider replacement.ceiling tiles), consider replacement.
Multiple Half-Road Closures on Camp ZamaMultiple Half-Road Closures on Camp Zama
The Directorate of Public Works
is in the process of replacing domestic hot water
and chilled/hot water lines on Camp Zama.
The project began May 30 and
is scheduled to continue through November.
This project will require half-road closures
during working hours at the following locations:
Multiple Half-Road Closures on Camp ZamaMultiple Half-Road Closures on Camp Zama
Ishinomaki Avenue across from Zama Housing
Units 988 and 987
from July 22 through 26
Ishinomaki Avenue between Bldg. 691
and Dewey Park
from Aug. 26 through 30
Multiple Half-Road Closures on Camp ZamaMultiple Half-Road Closures on Camp Zama
Ishinomaki Avenue at the four-way intersection
by ZAHS
from Sept. 3 through 6
Various locations on 4th Avenue near
Bldgs. 101 and 102
from June 3 through Aug. 30
Multiple Half-Road Closures on Camp ZamaMultiple Half-Road Closures on Camp Zama
Temporary stock yard between Bldgs. 131 and 138
through Nov. 15
Army Website Provides Summer Safety TipsArmy Website Provides Summer Safety Tips
Summer is finally here, and with it comesSummer is finally here, and with it comes
hazards unique to this cherished time of year.hazards unique to this cherished time of year.
As the weather warms and Soldiers, Army civiliansAs the weather warms and Soldiers, Army civilians
and family members take to roads and waterwaysand family members take to roads and waterways
for some well-deserved down time,for some well-deserved down time,
they will be exposed to riskthey will be exposed to risk
more often than they might think.more often than they might think.
VisitVisit http://go.usa.gov/bWaehttp://go.usa.gov/bWae
for various tips on summer safety.for various tips on summer safety.
Army Website Provides Summer Safety TipsArmy Website Provides Summer Safety Tips
Most motor transportation services
at the Transportation Division on Camp Zama
are scheduled to be suspended July 11
in order to conduct a safety stand-down.
Narita Airport shuttle services will not affected
by this suspension.
All passengers needing official transportationAll passengers needing official transportation
to commercial terminalsto commercial terminals
will need to acquirewill need to acquire
commercial transportation on this day,commercial transportation on this day,
or contact the Ground Transportation Deskor contact the Ground Transportation Desk
atat 263-3772263-3772 for special instructions.for special instructions.
Intermittent Cooling Season BeginsIntermittent Cooling Season Begins
Intermittent cooling
for U.S. Army Japan installations began May 23.
Air-conditioning will be provided once
the outside temperature exceeds
78 degrees Fahrenheit or 25.6 degrees Celsius.
Call 263-3609 for more information.
Transition from Heating to Cooling SeasonTransition from Heating to Cooling Season
Intermittent heating is scheduled
until mid-April. Heating will be provided
based on following criteria:
68 degrees Fahrenheit or below (from 5 a.m. to 10 p.m.)
55 degrees Fahrenheit or below (from 10 p.m. to 5 a.m.)
Girl ScoutsGirl Scouts
Two-Day Mount Fuji Adventure ClimbTwo-Day Mount Fuji Adventure Climb
Girl ScoutsGirl Scouts
Two-Day Mount Fuji Adventure ClimbTwo-Day Mount Fuji Adventure Climb
Arnn Elementary School InformationArnn Elementary School Information
Effective June 1,Effective June 1,
the phone number for the main officethe phone number for the main office
at Arnn Elementary Schoolat Arnn Elementary School
will be changed as follows:will be changed as follows:
267-6112267-6112 oror 267-6237267-6237
Writers, actors, thinkers, videographersWriters, actors, thinkers, videographers
and creative peopleand creative people
between the ages of 12 and 18between the ages of 12 and 18
are being sought for an internship opportunityare being sought for an internship opportunity
with the Adolescent Substance Abusewith the Adolescent Substance Abuse
Counseling ServiceCounseling Service
and U.S. Army Garrison Japanand U.S. Army Garrison Japan
Public Affairs Office.Public Affairs Office.
Teen InternshipTeen Internship
with ASACS, Public Affairs Officewith ASACS, Public Affairs Office
An ASACS advisory board is being formedAn ASACS advisory board is being formed
to develop public serviceto develop public service
announcement video commercials.announcement video commercials.
Topics may include bullying prevention,Topics may include bullying prevention,
““sexting” safety andsexting” safety and
substance abuse prevention.substance abuse prevention.
Teen InternshipTeen Internship
with ASACS, Public Affairs Officewith ASACS, Public Affairs Office
The board will meet twice a weekThe board will meet twice a week
from the week of June 17 until the end of July.from the week of June 17 until the end of July.
Participants will write, research,Participants will write, research,
develop and act in PSAsdevelop and act in PSAs
to be broadcast on AFN, distributedto be broadcast on AFN, distributed
on the Internet, and offeredon the Internet, and offered
to public safety campaigns worldwide.to public safety campaigns worldwide.
Teen InternshipTeen Internship
with ASACS, Public Affairs Officewith ASACS, Public Affairs Office
Space for this team isSpace for this team is
limited to 12 participants.limited to 12 participants.
Call 263-5970Call 263-5970
to apply or for information.to apply or for information.
Teen InternshipTeen Internship
with ASACS, Public Affairs Officewith ASACS, Public Affairs Office
SHARP Hotline (English-speaking)SHARP Hotline (English-speaking)
090-9395-8909 or090-9395-8909 or
882# from a DSN phone882# from a DSN phone
Call any time to include evenings,Call any time to include evenings,
weekends and holidays.weekends and holidays.
通話料無料 ホットライン (日本語)通話料無料 ホットライン (日本語)
0120-279-3380120-279-338
電話番号をお確かめの上、おかけ下電話番号をお確かめの上、おかけ下
さい。休日祝日問わずさい。休日祝日問わず 2424 時間対応。時間対応。
Posting Ads at Front of Bldg. 102Posting Ads at Front of Bldg. 102
Not AuthorizedNot Authorized
All personnel are remindedAll personnel are reminded
not to post advertisementsnot to post advertisements
at the front entrance ofat the front entrance of
U.S. Army Garrison Japan headquarters, Bldg. 102.U.S. Army Garrison Japan headquarters, Bldg. 102.
Call 263-3829 for more information.Call 263-3829 for more information.
Household Goods PCS TipsHousehold Goods PCS Tips
 Receive PCS ordersReceive PCS orders
 Estimate your weightEstimate your weight
 Plan pickup dates with flexibilityPlan pickup dates with flexibility
 Schedule pickups earlySchedule pickups early
 Change dates as a last resortChange dates as a last resort
 Dispose of unnecessary itemsDispose of unnecessary items
 Know your shipping entitlementsKnow your shipping entitlements
Household Goods ShipmentsHousehold Goods Shipments
You can schedule a household goods pickupYou can schedule a household goods pickup
from the privacy of your living room.from the privacy of your living room.
Visit the website below to gain accessVisit the website below to gain access
to the Defense Personal Property Systemto the Defense Personal Property System
or contact the Area Transportation Office,or contact the Area Transportation Office,
Personal Property Section, at 263-3709 for details.Personal Property Section, at 263-3709 for details.
www.move.milwww.move.mil
Household Goods Weight Allowance ChangeHousehold Goods Weight Allowance Change
Effective Dec. 1, 2011,Effective Dec. 1, 2011,
weight allowance to and from Japan was reducedweight allowance to and from Japan was reduced
for all Soldiers to 2,500 pounds (net)for all Soldiers to 2,500 pounds (net)
or 25 percent (net) of full weight allowance,or 25 percent (net) of full weight allowance,
or whichever is greater.or whichever is greater.
All civilians are authorized 4,500 pounds (net).All civilians are authorized 4,500 pounds (net).
Unaccompanied baggage is inclusive.Unaccompanied baggage is inclusive.
For more information: 263-3709For more information: 263-3709
New Operation HoursNew Operation Hours
at Sagami Depot Self-Help Storeat Sagami Depot Self-Help Store
Effective June 1,
the Self-Help Store located on Sagami General Depot
Will only be open on Wednesdays and Saturdays
from 8 a.m. to noon and 1 to 5 p.m.
Call 263-5952 or 263-3441 for more information.
‘‘You Made the Grade’ ProgramYou Made the Grade’ Program
at Zama Exchangeat Zama Exchange
The Army and Air Force Exchange Service
is rewarding military students in grades one
through 12 who maintain a "B"
or better average
with the "You Made the Grade" program.
Students can receive a booklet coupon
booklet good for free products and
discounted offers by presenting a valid military ID
and proof of an overall "B" average
at the Camp Zama Exchange customer service.
‘‘You Made the Grade’ ProgramYou Made the Grade’ Program
at Zama Exchangeat Zama Exchange
Parking ReminderParking Reminder
for Family Quarters Residentsfor Family Quarters Residents
All personnel living in family quartersAll personnel living in family quarters
on Camp Zama, Sagamihara Family Housing Areaon Camp Zama, Sagamihara Family Housing Area
and Sagami General Depotand Sagami General Depot
are remindedare reminded
to park their personally owned vehiclesto park their personally owned vehicles
in their respective assigned parking areas.in their respective assigned parking areas.
CallCall 263-3829263-3829 for more information.for more information.
Arnn Elementary School at SFHA is seekingArnn Elementary School at SFHA is seeking
applicants for various positions,applicants for various positions,
including the following:including the following:
Educational aides have three differentEducational aides have three different
categories:categories:
Kindergarten, Special Education, andKindergarten, Special Education, and
Sure Start Educational Aid link:Sure Start Educational Aid link:
www.usajobs.gov/GetJobwww.usajobs.gov/GetJob
We are always seeking qualifiedWe are always seeking qualified
and enthusiastic substitute teachers.and enthusiastic substitute teachers.
This link lists current vacancies in the Pacific area:This link lists current vacancies in the Pacific area:
www.dodea.edu/Pacific/offices/HR/pacVacancies.cfmwww.dodea.edu/Pacific/offices/HR/pacVacancies.cfm
Currently, lunch and recess lead monitorCurrently, lunch and recess lead monitor
and monitor positions are availableand monitor positions are available
at Arnn Elementary School.at Arnn Elementary School.
For more details:For more details:
www.usajobs.gov/GetJobwww.usajobs.gov/GetJob
Provide your input or feedback online at the
U.S. Army Garrison Japan ICE site
and enter to win a prize!
http://ice.disa.milhttp://ice.disa.mil
Good or bad, we’d like to know!Good or bad, we’d like to know!
Camp Zama Army Education CenterCamp Zama Army Education Center
The Camp Zama Army Education CenterThe Camp Zama Army Education Center
is conducting a survey to assessis conducting a survey to assess
The educational needs of the base population.The educational needs of the base population.
This survey is used to measure satisfaction, quality,This survey is used to measure satisfaction, quality,
availability, delivery and service, andavailability, delivery and service, and
to gauge the effectiveness of on-base collegeto gauge the effectiveness of on-base college
and university programs.and university programs.
SurveySurvey
Camp Zama Army Education CenterCamp Zama Army Education Center
The survey can be accessed at:The survey can be accessed at:
http://www.surveymonkey.com/s/GVJYKTLhttp://www.surveymonkey.com/s/GVJYKTL
SurveySurvey
Defense Travel Management OfficeDefense Travel Management Office
The Defense Travel Management Office isThe Defense Travel Management Office is
requesting that travelers go to their respectiverequesting that travelers go to their respective
organizational or lead defense travel administratororganizational or lead defense travel administrator
for a majority of their issues.for a majority of their issues.
They should refrain from sending trouble ticketsThey should refrain from sending trouble tickets
or inquiries directly to DTMO without goingor inquiries directly to DTMO without going
to their aforementioned administrators first.to their aforementioned administrators first.
Reminder of Pet Owners’ Responsibilities
The following list of responsibilities for pet ownersThe following list of responsibilities for pet owners
living on Camp Zama, Sagamihara Familyliving on Camp Zama, Sagamihara Family
Housing Area and Sagami Depot was releasedHousing Area and Sagami Depot was released
by the Housing Management Division:by the Housing Management Division:
- Sponsors are responsible for cleaning the areas- Sponsors are responsible for cleaning the areas
used by their pets.used by their pets.
- If kept outside, the pet’s area must be policed daily- If kept outside, the pet’s area must be policed daily
to prevent a buildup of trash and fecal material.to prevent a buildup of trash and fecal material.
Reminder of Pet Owners’ Responsibilities
- Owners must clean up waste left by their pet
during walks.
- Fecal droppings must be disposed of in sealed
plastic bags (preferably double bags) and be
placed in garbage receptacles.
- Un-bagged waste must not be placed in garbage
receptacles.
Reminder of Pet Owners’ Responsibilities
Violations can be reported to following email address:Violations can be reported to following email address:
usarmy.zama.imcom-pacific.mbx.usagj-dpw-housing-usarmy.zama.imcom-pacific.mbx.usagj-dpw-housing-
officer@mail.milofficer@mail.mil
You may also report violations by calling the Housing ManagementYou may also report violations by calling the Housing Management
Division atDivision at
263-3441 or 263-4503263-3441 or 263-4503,,
or the Family Housing and Furnishing Management Branchor the Family Housing and Furnishing Management Branch
atat 263-3527 or 263-4136263-3527 or 263-4136..
Food Handling and Preparation CourseFood Handling and Preparation Course
Private organizations that are providing or
selling food to the general public of Camp Zama
and Sagamihara Family Housing Area
are required to attend a Safe Food Handling
and Preparation Class, which lasts approximately
two hours, and includes a PowerPoint presentation
immediately followed
by a 20-question multiple-choice-format test.
Food Handling and Preparation CourseFood Handling and Preparation Course
This class is given by Preventive Medicine
every third Wednesday of the month
at 3 p.m. in Bldg. 715, Classroom B.
Call in advance to verify any changes
in the time or location.
Call 263-3748 for more information.
English-, Japanese-LanguageEnglish-, Japanese-Language
Shelf-Life TrainingShelf-Life Training
A number of training dates are scheduled
to be held, in both English- and Japanese-language
instruction, on shelf-life policy training
to explain standard practice in the management
and storage of shelf-life material at the
managing activity and depot level.
Call 263-4814 for more information.
English-, Japanese-LanguageEnglish-, Japanese-Language
Shelf-Life TrainingShelf-Life Training
Students will learn to properly apply mandatory
storage standards criteria in evaluating the condition
of shelf-life material upon receipt,
in storage, during surveillance,
upon shipment, and when test or restorative
actions are required to maintain or return stocks
to a ready-for-issue status.
Call 263-4814 for more information.
English-, Japanese-LanguageEnglish-, Japanese-Language
Shelf-Life TrainingShelf-Life Training
Yokohama North Dock (English Session)
Date: Sept. 26 (Nomination deadline: Sept. 19)
Time: 8:30 a.m. to 3 p.m.
Location: Bldg. 347, DPW Conference Room
Yokohama North Dock (Japanese Session)
Date: Sept. 27 (Nomination deadline: Sept. 19)
Time: 8:30 a.m. to 3 p.m.
Location: Bldg. 347, DPW Conference Room
Informational Telephone Services
Effective April 1, the 78th Signal Battalion's
telephone operators will no longer provide
"informational telephone services“
between the hours of 10 p.m. and 6 a.m.
Calls placed to 0, 263-1110 and 113
during these hours will be routed to the Regional Network
Operations Support Center, whose
operators have access to telephone information.
TheThe American Red CrossAmerican Red Cross providesprovides
the military community and their families with 24/7 accessthe military community and their families with 24/7 access
to an Emergency Communications Networkto an Emergency Communications Network
to keep families connected in a crisis,to keep families connected in a crisis,
provide case management services,provide case management services,
and assist with emergency financial assistance.and assist with emergency financial assistance.
Find us on FacebookFind us on Facebook
American Red Cross – Camp ZamaAmerican Red Cross – Camp Zama
Click on “Notes”Click on “Notes”
Emergency Communication MessagesEmergency Communication Messages
To start anTo start an American Red CrossAmerican Red Cross message,message,
the following information is needed:the following information is needed:
Service member’s or sponsors’ full nameService member’s or sponsors’ full name
Branch of serviceBranch of service
RankRank
Social Security Number or date of birthSocial Security Number or date of birth
Complete military unit addressComplete military unit address
Emergency Communication MessagesEmergency Communication Messages
Notice From Sams Health ClinicNotice From Sams Health Clinic
The USA MEDDAC-JapanThe USA MEDDAC-Japan
will undergo major facility renovationswill undergo major facility renovations
starting in March, 2013 and extend through 2016.starting in March, 2013 and extend through 2016.
These changes will affect the current parking layoutThese changes will affect the current parking layout
for our community,for our community,
requiring a shift of parking availabilityrequiring a shift of parking availability
to outlying areas such asto outlying areas such as
the commissary and Camp Zama Community Club.the commissary and Camp Zama Community Club.
Please watch the video for important informationPlease watch the video for important information
regarding these parking changesregarding these parking changes
and how they will affect you.and how they will affect you.
Please also visit the MEDDAC-JapanPlease also visit the MEDDAC-Japan
facebook page:facebook page:
http://facebook.com/MEDDACJhttp://facebook.com/MEDDACJ
our website:our website:
http://www.usarj.army.mil/organization/meddac/http://www.usarj.army.mil/organization/meddac/
Notice From Sams Health ClinicNotice From Sams Health Clinic
B.G. Sams Health & Dental ClinicB.G. Sams Health & Dental Clinic
Renovation Project Starting Soon.Renovation Project Starting Soon.
Starting in FebruaryStarting in February
This project will be in phases and span almostThis project will be in phases and span almost
three years.three years.
During the construction, only a small part ofDuring the construction, only a small part of
our parking lot will be availableour parking lot will be available
for special needs parking.for special needs parking.
B.G. Sams Health & Dental ClinicB.G. Sams Health & Dental Clinic
Renovation Project Starting SoonRenovation Project Starting Soon
Please be patient as we work to provide an up-to-Please be patient as we work to provide an up-to-
date, modern facility for your medical and dentaldate, modern facility for your medical and dental
care.care.
The main entrance to the clinic will not change.The main entrance to the clinic will not change.
Contact us atContact us at MEDDACJ-PAO@AMEDD.ARMY.MILMEDDACJ-PAO@AMEDD.ARMY.MIL
with any questions or concerns.with any questions or concerns.
Temp BldgTemp Bldg
Contractor Staging Area
MEDDAC
Commissary
MWR
Camp Zama Community
Club
PHCR
Off Site Parking Locations-BuildingsOff Site Parking Locations-Buildings
DPW Housing OfficeDPW Housing Office
(Staff Parking)(Staff Parking)
New Patient ParkingNew Patient Parking
(Commissary Area)(Commissary Area)
Additional Patient ParkingAdditional Patient Parking
(CZCC 48 Spots)(CZCC 48 Spots)
BG Sams Health Clinic
Bldg704Bldg704
Off Site Parking LocationsOff Site Parking Locations
Special Need ParkingSpecial Need Parking
(Current Parking Lot)(Current Parking Lot)
Driving in Japan ClassesDriving in Japan Classes
Are you a newcomer to Japan?Are you a newcomer to Japan?
Need to obtain your local drivers permit?Need to obtain your local drivers permit?
Then sign-up for the "Driving in Japan” classThen sign-up for the "Driving in Japan” class
every Tuesday 8 a.m.every Tuesday 8 a.m.
Safety classroom building 102, room A108Safety classroom building 102, room A108
on Camp Zama.on Camp Zama.
There is no sign-up or fees for theThere is no sign-up or fees for the
course.course.
Please bring a valid US drivers licensePlease bring a valid US drivers license
and your military ID card.and your military ID card.
The class is approximately 4 hours long.The class is approximately 4 hours long.
For more information,For more information,
call the Safety Office atcall the Safety Office at 263-4464263-4464
Driving in Japan ClassesDriving in Japan Classes
Remedial Drivers TrainingRemedial Drivers Training
Do you require a remedial drivers classDo you require a remedial drivers class
due to a revocation ofdue to a revocation of
your drivers privileges or an accidentyour drivers privileges or an accident
while driving a government vehicle?while driving a government vehicle?
The 4-hour class is taught QUARTERLY,The 4-hour class is taught QUARTERLY,
and held in the safety classroomand held in the safety classroom
building 102 room A108 on Camp Zama.building 102 room A108 on Camp Zama.
For more information call the Safety OfficeFor more information call the Safety Office
atat 263-8379263-8379 to sign up,to sign up,
All classes are free!All classes are free!
Remedial Drivers TrainingRemedial Drivers Training
Now is the time to plan your travel for the remainderNow is the time to plan your travel for the remainder
of Winter as well as your Spring Travel.of Winter as well as your Spring Travel.
Zama ITT has a range of travel services available for you.Zama ITT has a range of travel services available for you.
Please contact them atPlease contact them at
263-5273 or 046-254-8896263-5273 or 046-254-8896 oror travel@zamaitt.comtravel@zamaitt.com..
You can also check the web page atYou can also check the web page at http://zamaitt.comhttp://zamaitt.com..
Just a few things to consider are listed on next slide.Just a few things to consider are listed on next slide.
Camp Zama ITT Travel OfficeCamp Zama ITT Travel Office
Disneyland Discount Tickets valid until March 15Disneyland Discount Tickets valid until March 15
Snow Monkey Trips until end of MarchSnow Monkey Trips until end of March
Ski and Snowboard TripsSki and Snowboard Trips
Great Wall MarathonGreat Wall Marathon
Travel to Yap and Stay/Dive at Manta Ray Bay ResortTravel to Yap and Stay/Dive at Manta Ray Bay Resort
Princess Cruises include a special departurePrincess Cruises include a special departure
from Japan in Julyfrom Japan in July
Camp Zama ITT Travel OfficeCamp Zama ITT Travel Office
Contact:Contact: 263-5273 or 046-254-8896263-5273 or 046-254-8896 oror travel@zamaitt.comtravel@zamaitt.com..
Restroom RelocationRestroom Relocation
Temporary locationTemporary location
for customers to usefor customers to use
the restroomsthe restrooms
Feb. 1 toFeb. 1 to
~Menu~~Menu~
Miso Soup / Broccoli SoupMiso Soup / Broccoli Soup
Garlic Buttered FishGarlic Buttered Fish
Sweet & Sour Pork / Chinese 5 Spice ChickenSweet & Sour Pork / Chinese 5 Spice Chicken
Baked Potatoes / Hopping JohnBaked Potatoes / Hopping John
Buttered Pasta / Sautéed Mushroom & OnionButtered Pasta / Sautéed Mushroom & Onion
Calico Corn / Herbed Green BeansCalico Corn / Herbed Green Beans
Jul. 5, 2013Jul. 5, 2013
Price :Price :
$4.60$4.60
9 a.m. to 1 p.m9 a.m. to 1 p.m ..
~Menu~~Menu~
Miso Soup / Broccoli SoupMiso Soup / Broccoli Soup
Pork GingerPork Ginger
Beef BroccoliBeef Broccoli
Baked FishBaked Fish
Steamed Rice / Buttered PotatoesSteamed Rice / Buttered Potatoes
Seasoned CarrotsSeasoned Carrots
Seasoned Mixed CaliforniaSeasoned Mixed California
Jul. 5, 2013Jul. 5, 2013
Price :Price :
$4.60$4.60
5 p.m. to 6:305 p.m. to 6:30
p.mp.m ..
Price :Price :
$5.25$5.25
~Menu~~Menu~
Omelet / Boiled Egg / Pancakes / BaconOmelet / Boiled Egg / Pancakes / Bacon
Hominy Grits / Biscuits / Creamed BeefHominy Grits / Biscuits / Creamed Beef
Hashed Brown PotatoesHashed Brown Potatoes
Vegetable Soup / Corn ChowderVegetable Soup / Corn Chowder
Pork Curry / Oven Baked ChickenPork Curry / Oven Baked Chicken
Grilled Swiss Steak with Sautee Onion &Grilled Swiss Steak with Sautee Onion &
Mushroom / Parsley PotatoesMushroom / Parsley Potatoes
Steamed Rice / Broccoli / Buttered CornSteamed Rice / Broccoli / Buttered Corn
Jul. 6, 2013Jul. 6, 2013 9 a.m. to 1 p.m9 a.m. to 1 p.m ..
~Menu~~Menu~
Vegetable Soup / Corn ChowderVegetable Soup / Corn Chowder
Creole Macaroni TurkeyCreole Macaroni Turkey
Buttered Baked FishButtered Baked Fish
Grilled Ham SteakGrilled Ham Steak
Mashed PotatoesMashed Potatoes
Steamed Brown RiceSteamed Brown Rice
Seasoned PeasSeasoned Peas
Glazed CarrotsGlazed Carrots
Jul. 6, 2013Jul. 6, 2013
Price :Price :
$6.45$6.45
5 p.m. to 6 p.m5 p.m. to 6 p.m ..
~Menu~~Menu~
Omelet / Boiled Egg / French Toast / BaconOmelet / Boiled Egg / French Toast / Bacon
Hominy Grits / Biscuits / Creamed BeefHominy Grits / Biscuits / Creamed Beef
Hashed Brown PotatoesHashed Brown Potatoes
Beef Rice Soup / Potato Chowder with BaconBeef Rice Soup / Potato Chowder with Bacon
Tomato Garlic Chicken / Grilled Swiss SteakTomato Garlic Chicken / Grilled Swiss Steak
Simmered Corned BeefSimmered Corned Beef
Garlic Roasted Potatoes / Steamed RiceGarlic Roasted Potatoes / Steamed Rice
Sautéed Onions & MushroomSautéed Onions & Mushroom
Green Beans CasseroleGreen Beans Casserole
Jul. 7, 2013Jul. 7, 2013
Price :Price :
$5.25$5.25
9 a.m. to 1 p.m9 a.m. to 1 p.m ..
~Menu~~Menu~
Chicken Noodle Soup / Tortilla SoupChicken Noodle Soup / Tortilla Soup
Mexican Pork Chops / Chicken FajitasMexican Pork Chops / Chicken Fajitas
Enchiladas / Refried BeansEnchiladas / Refried Beans
Mashed Potatoes / Mexican RiceMashed Potatoes / Mexican Rice
Mixed Antigua / Mexican Mixed VegetablesMixed Antigua / Mexican Mixed Vegetables
11:30 a.m. to 111:30 a.m. to 1
p.mp.m ..July 08,July 08,
20132013
Price :Price :
$4.60$4.60
July 08,July 08,
20132013
Price :Price :
$4.60$4.60
~Menu~~Menu~
Chicken Noodle Soup / Tortilla SoupChicken Noodle Soup / Tortilla Soup
Spanish Noodles and Ground BeefSpanish Noodles and Ground Beef
Creole Baked FishCreole Baked Fish
Streamed Brown RiceStreamed Brown Rice
Oven Brown PotatoesOven Brown Potatoes
Seasoned Green BeansSeasoned Green Beans
5 p.m. to 6:305 p.m. to 6:30
p.mp.m ..
~Menu~~Menu~
Minestrone Soup / Cream of Potato SoupMinestrone Soup / Cream of Potato Soup
Baked Lasagna / Spinach LasagnaBaked Lasagna / Spinach Lasagna
Spaghetti with Meat Sauce / MarinaraSpaghetti with Meat Sauce / Marinara
Szechwan ChickenSzechwan Chicken
Potato and Herbs / Steamed RicePotato and Herbs / Steamed Rice
Mixed Italian BlendMixed Italian Blend
Seasoned Succotash / Toasted Garlic BreadSeasoned Succotash / Toasted Garlic Bread
11:30 a.m. to 111:30 a.m. to 1
p.mp.m ..July 09,July 09,
20132013
Price :Price :
$4.60$4.60
July 09,July 09,
20132013
Price :Price :
$4.60$4.60
~Menu~~Menu~
Minestrone Soup / Cream of Potato SoupMinestrone Soup / Cream of Potato Soup
Pork AdoboPork Adobo
Egg Plant ParmesanEgg Plant Parmesan
Buffalo ChickenBuffalo Chicken
Steamed RiceSteamed Rice
Mashed potatoesMashed potatoes
Waxed Beans / Peas & OnionsWaxed Beans / Peas & Onions
5 p.m. to 6:305 p.m. to 6:30
p.mp.m ..
~Menu~~Menu~
French Onion Soup / Chicken Wild Rice SoupFrench Onion Soup / Chicken Wild Rice Soup
BBQ Chicken / Fried Chicken / Baked ChickenBBQ Chicken / Fried Chicken / Baked Chicken
BBQ Pork Spareribs / Southern fried CatfishBBQ Pork Spareribs / Southern fried Catfish
Baked Macaroni & Cheese / Corn MuffinBaked Macaroni & Cheese / Corn Muffin
Glazed Sweet Potatoes / Steamed RiceGlazed Sweet Potatoes / Steamed Rice
Black Eyed Peas / Okra & Tomato ComboBlack Eyed Peas / Okra & Tomato Combo
Southern Style Greens / Fried OkraSouthern Style Greens / Fried Okra
11:30 a.m. to 111:30 a.m. to 1
p.mp.m ..July 10,July 10,
20132013
Price :Price :
$4.60$4.60
July 10,July 10,
20132013
Price :Price :
$4.60$4.60
~Menu~~Menu~
French Onion Soup / Chicken Wild Rice SoupFrench Onion Soup / Chicken Wild Rice Soup
Carne Guisada- (Puerto Rican Beef Stew)Carne Guisada- (Puerto Rican Beef Stew)
Turkey TetrazziniTurkey Tetrazzini
Broccoli Egg NoodlesBroccoli Egg Noodles
Mashed Potatoes / Steamed RiceMashed Potatoes / Steamed Rice
Steamed CaliforniaSteamed California
Sautéed Onion & Green PeppersSautéed Onion & Green Peppers
5 p.m. to 6:305 p.m. to 6:30
p.mp.m ..
~Menu~~Menu~
Miso Soup / Cream of BroccoliMiso Soup / Cream of Broccoli
Beef Sukiyaki / Teriyaki ChickenBeef Sukiyaki / Teriyaki Chicken
Sautéed Pork w/ Miso Sauce (Miso Buta)Sautéed Pork w/ Miso Sauce (Miso Buta)
Egg Plant Tempura / Vegetable Tempura (Kakiage)Egg Plant Tempura / Vegetable Tempura (Kakiage)
Steamed Rice / Japanese Soy Sweet Glazed PotatoesSteamed Rice / Japanese Soy Sweet Glazed Potatoes
Mixed OrientalMixed Oriental
11:30 a.m. to 111:30 a.m. to 1
p.mp.m ..July 11,July 11,
20132013
Price :Price :
$4.60$4.60
July 11,July 11,
20132013
Price :Price :
$4.60$4.60
~Menu~~Menu~
Miso Soup / Cream of BroccoliMiso Soup / Cream of Broccoli
Chicken Rice BowlChicken Rice Bowl
Pork NikujyagaPork Nikujyaga
Mashed potatoes / Steamed RiceMashed potatoes / Steamed Rice
Mixed VegetablesMixed Vegetables
Seasoned CarrotsSeasoned Carrots
5 p.m. to 6:305 p.m. to 6:30
p.mp.m ..
~Menu~~Menu~
Egg Drop Soup / Corn ChowderEgg Drop Soup / Corn Chowder
Caribbean Fish / Fried FishCaribbean Fish / Fried Fish
Yankee Pot RoastYankee Pot Roast
Vegetarian Cabbage StewVegetarian Cabbage Stew
Steamed Brown Rice / Obrien PotatoesSteamed Brown Rice / Obrien Potatoes
Stewed Tomatoes / Seasoned CornStewed Tomatoes / Seasoned Corn
11:30 a.m. to 111:30 a.m. to 1
p.mp.m ..July 12,July 12,
20132013
Price :Price :
$4.60$4.60
July 12,July 12,
20132013
Price :Price :
$4.60$4.60
~Menu~~Menu~
Turkey ChiliTurkey Chili
Cajun Garlic Pork RoastCajun Garlic Pork Roast
Mashed potatoesMashed potatoes
Steamed RiceSteamed Rice
Sautéed SpinachSautéed Spinach
Seasoned ScandinavianSeasoned Scandinavian
5 p.m. to 6:305 p.m. to 6:30
p.mp.m ..
9 a.m. to 1 p.m9 a.m. to 1 p.m ..July 13,July 13,
20132013
Price : $5.25Price : $5.25
~Menu~~Menu~
Omelet / Boiled EggsOmelet / Boiled Eggs
Pancake / Biscuits / Hominy GritsPancake / Biscuits / Hominy Grits
Creamed Beef / Oven Baked BaconCreamed Beef / Oven Baked Bacon
Hashed Brown PotatoesHashed Brown Potatoes
Vegetable Soup / Potato Chowder w/ BaconVegetable Soup / Potato Chowder w/ Bacon
Shrimp Ebichili / Cantonese PorkShrimp Ebichili / Cantonese Pork
Mashed Potatoes / Steamed RiceMashed Potatoes / Steamed Rice
Calico Corn / Green bean CasseroleCalico Corn / Green bean Casserole
July 13,July 13,
20132013
Price :Price :
$6.45$6.45
~Menu~~Menu~
Vegetable Soup / Corn Chowder w/ BaconVegetable Soup / Corn Chowder w/ Bacon
Chicken YakitoriChicken Yakitori
Hawaiian Beef TeriyakiHawaiian Beef Teriyaki
Baked Fish w/ Sweet and Sour SauceBaked Fish w/ Sweet and Sour Sauce
Vegetarian Stir FryVegetarian Stir Fry
Franconia Potatoes / Steamed RiceFranconia Potatoes / Steamed Rice
Seasoned PeasSeasoned Peas
5 p.m. to 6 p.m5 p.m. to 6 p.m ..
9 a.m. to 1 p.m9 a.m. to 1 p.m ..July 14,July 14,
20132013
Price :Price :
$5.25$5.25
~Menu~~Menu~
Omelet / Boiled EggsOmelet / Boiled Eggs
French Toast / Biscuits / Hominy GritsFrench Toast / Biscuits / Hominy Grits
Creamed Beef / Bacon / Hash Browned PotatoesCreamed Beef / Bacon / Hash Browned Potatoes
Beef Rice Soup / Cream of Mushroom SoupBeef Rice Soup / Cream of Mushroom Soup
Baked Balsamic Chicken / Grilled SteakBaked Balsamic Chicken / Grilled Steak
Roast Garlic Potatoes / Steamed RiceRoast Garlic Potatoes / Steamed Rice
Sautéed Onion & MushroomsSautéed Onion & Mushrooms
BroccoliBroccoli
July 14,July 14,
20132013
Price :Price :
$6.45$6.45
~Menu~~Menu~
Beef Rice Soup / Cream of Mushroom SoupBeef Rice Soup / Cream of Mushroom Soup
Scalloped Ham and PotatoesScalloped Ham and Potatoes
Hungarian GoulashHungarian Goulash
Herbed Baked ChickenHerbed Baked Chicken
Steamed RiceSteamed Rice
Mash PotatoesMash Potatoes
Brussels SproutsBrussels Sprouts
Creamed PeasCreamed Peas
5 p.m. to 6 p.m5 p.m. to 6 p.m ..
~Menu~~Menu~
Beef Rice Soup / Potato Chowder with BaconBeef Rice Soup / Potato Chowder with Bacon
Hawaiian Beef Stir FryHawaiian Beef Stir Fry
Hawaiian Roast PorkHawaiian Roast Pork
Vegetable Stir FryVegetable Stir Fry
Mashed PotatoesMashed Potatoes
Steamed RiceSteamed Rice
Wax BeansWax Beans
Mixed Scandinavian MixMixed Scandinavian Mix
Jul. 7, 2013Jul. 7, 2013
Price :Price :
$6.45$6.45
5 p.m. to 6 p.m5 p.m. to 6 p.m ..
Effective Date:Effective Date: Jan. 31, 2013Jan. 31, 2013
Every Thursday’s Breakfast HoursEvery Thursday’s Breakfast Hours
will change from:will change from: 6 to 8 a.m.6 to 8 a.m.
to the new hoursto the new hours:: 7 to 9 a.m.7 to 9 a.m.
What is Ready Army?
Ready Army is the Army Emergency Management
Program’s proactive campaign to increase the
resilience of the Army community by informing of
relevant hazards and encouraging Soldiers,
their Families, Army Civilians and contractors to,
“Get a Kit. Make a Plan. Be Informed.”
What is Ready Army?
Through outreach and education Ready Army calls
our Army community to action and aims to create a
culture of preparedness that will save lives and
strengthen the nation.
Get a Kit
When disaster strikes, emergency responders
address the most critical needs and may not
even be able to get to an area until it is deemed
safe. While they work on behalf of the entire
community, it is your responsibility to ensure
your family’s well-being during times of crisis.
Emergency kits to sustain for 72 hours are an
essential tool for meeting that challenge.
Make a Plan
• Ensure everyone understands the plan, and practices.
• How to communicate during an emergency.
• Consider what to do, where to go, what to take.
• Plan for members with disabilities or special needs.
• Include pets in family plan.
• Report status through ADPAAS.
• Identify a continental U.S. contact.
Be informed
• Chain of Command
• www.ready.army.mil
• www.usarj.army.mil (Local Conditions Page)
•www.facebook.com/usagj
•Mass Notification System
• Command Channel 13
• Eagle 810 radio
• Family Assistance Center
Emergency Supply Kit
• Food supply for all family members for five days (ready to
eat; no preparation required)
• Bottled water
• Protective mask
• 30-day supply of prescription medication
• Over-the-counter medications
• Baby toiletries (diapers, etc.) (five-day supply)
• Toiletry articles (toothbrush, etc.)
• Feminine hygiene articles
Emergency Supply Kit
• Baby articles
• First-Aid kit
• Flashlight with extra batteries
• Portable radio with extra batteries
• Can opener
• Backpack / luggage
• Extra clothing (keep in mind baggage limits)
• Blankets (seasonal)
• $100 cash
• Pet carrier (dog or cat only) with 10-day supply of pet
foods

Command Channel Slides Week Between July 5 to 11, 2013

  • 1.
    Zama Bon OdoriShuttle Bus ServiceZama Bon Odori Shuttle Bus Service Pick UpPick Up Drop OffDrop Off SFHA Narita Bus StopSFHA Narita Bus Stop toto Camp Zama Music Theater WorkshopCamp Zama Music Theater Workshop 10 a.m.10 a.m. 4 p.m.4 p.m. 7 p.m.7 p.m. Pick UpPick Up Drop OffDrop Off Sagami Depot, Bldg. 90-S10Sagami Depot, Bldg. 90-S10 toto Camp Zama Music Theater WorkshopCamp Zama Music Theater Workshop 10 a.m.10 a.m. 4 p.m.4 p.m. 7 p.m.7 p.m. Pick UpPick Up Drop OffDrop Off Camp Zama Music Theater WorkshopCamp Zama Music Theater Workshop toto SFHA Narita Bus StopSFHA Narita Bus Stop 10 p.m.10 p.m. Pick UpPick Up Drop OffDrop Off Camp Zama Music Theater WorkshopCamp Zama Music Theater Workshop toto Sagami Depot, Bldg. 90-S10Sagami Depot, Bldg. 90-S10 10 p.m.10 p.m.
  • 2.
    Town Hall Meetingfor USAG-J Employees Col. Joy Curriera will conductCol. Joy Curriera will conduct Garrison employee town hall meetings,Garrison employee town hall meetings, introducing herself while providing a venueintroducing herself while providing a venue to present Garrison priorities.to present Garrison priorities. Call the USAG-J Command Group atCall the USAG-J Command Group at 263-5339263-5339 for more information.for more information.
  • 3.
    The location, dateand time for the Kanto area is as follows: Area Date Time LocationArea Date Time Location DepotDepot July 12 10 a.m.July 12 10 a.m. Sagami Lounge, Bldg.Sagami Lounge, Bldg. 135-S2135-S2 to noonto noon Town Hall Meeting for USAG-J Employees
  • 4.
  • 5.
    関東地区での開催場所・日時は下記のとおりです。関東地区での開催場所・日時は下記のとおりです。 地区  開催日  時間   場所地区  開催日 時間   場所 相模相模     77 月月 1212 日日 1111 時時 -12-12 時   時   さがみラウンジ、さがみラウンジ、 Bldg. 135-S2Bldg. 135-S2 地区  開催日  時間   場所地区  開催日  時間   場所 相模相模     77 月月 1212 日日 1111 時時 -12-12 時   時   さがみラウンジ、さがみラウンジ、 Bldg. 135-S2Bldg. 135-S2 ギャリソン従業員へのタウンホールミーティングギャリソン従業員へのタウンホールミーティング
  • 6.
    The Navy FederalCredit Union is offering a lineThe Navy Federal Credit Union is offering a line for sequestration- and furlough-related assistancefor sequestration- and furlough-related assistance to its members.to its members. Some of the topics they can discussSome of the topics they can discuss are reduced interest ratesare reduced interest rates on loans and credit card payments.on loans and credit card payments. The number is (877) 874-0042.The number is (877) 874-0042. Sequestration, Furlough Assistance LineSequestration, Furlough Assistance Line
  • 7.
    Sequestration, Furlough AssistanceSequestration,Furlough Assistance LineLine Disclaimer:Disclaimer: This is not an endorsementThis is not an endorsement of the Navy Federal Credit Unionof the Navy Federal Credit Union by the U.S. Army or U.S. Army Garrisonby the U.S. Army or U.S. Army Garrison Japan.Japan. It is simply information on a resourceIt is simply information on a resource availableavailable to community members.to community members.
  • 8.
    Residents’ ResponsibilitiesResidents’ Responsibilities DuringLeave and TDYDuring Leave and TDY All Army family housing and unaccompanied personnel housing residents must notify the Housing Management Division for absences from their quarters of seven days or more.
  • 9.
    Provide a pointof contact for a responsible sponsor or adult to perform periodic checks to ensure the home is safe, secure and free of incidents and unexpected circumstances, and maintain the yard as well, if applicable. Residents’ ResponsibilitiesResidents’ Responsibilities During Leave and TDYDuring Leave and TDY
  • 10.
    In the eventyou do not assign a point of contact during your absence, the Housing Management Division will contact your organization or agency to request their support – especially when it comes to keeping up your yard maintenance. Residents’ ResponsibilitiesResidents’ Responsibilities During Leave and TDYDuring Leave and TDY
  • 11.
    Visit the HousingManagement Division at Bldg. 671 to request the Form for Periodic Absences. Call the Housing Office at 263-4135, 263-4843 or 263-5859 for questions or more information. Residents’ ResponsibilitiesResidents’ Responsibilities During Leave and TDYDuring Leave and TDY
  • 12.
    Limited Parking atMedical, DentalLimited Parking at Medical, Dental ClinicsClinics Effective July 1, the majority of patient parking at the BG Sams U.S. Army Health Clinic and Dental Clinic on Camp Zama will be blocked due to ongoing construction.
  • 13.
    Patient and staffparking are available at the commissary, Camp Zama Community Club, and the Housing Office (behind the Child Development Center). Limited Parking at Medical, Dental ClinicsLimited Parking at Medical, Dental Clinics
  • 14.
    Disabled parking andpatient pick-up and drop-off are still available in front of the clinics. Drivers are advised to use caution during this time as personnel adjust to these changes. Limited Parking at Medical, Dental ClinicsLimited Parking at Medical, Dental Clinics
  • 15.
    Summer Bible Campat Camp ZamaSummer Bible Camp at Camp Zama is scheduled to be heldis scheduled to be held Aug. 5 through 9Aug. 5 through 9 at the Community Activity Centerat the Community Activity Center and Religious Education Center.and Religious Education Center. This year’s theme isThis year’s theme is ““Sonrise National Park Vacation Bible School”Sonrise National Park Vacation Bible School” 2013 Summer Bible Camp Registration2013 Summer Bible Camp Registration
  • 16.
    2013 Summer BibleCamp Registration2013 Summer Bible Camp Registration The camp is open to Camp ZamaThe camp is open to Camp Zama and Naval Air Facility Atsugi studentsand Naval Air Facility Atsugi students in grades kindergarten through sixth.in grades kindergarten through sixth. Camp will be held from 8:45 a.m. to noon on each day,Camp will be held from 8:45 a.m. to noon on each day, and bus services will be providedand bus services will be provided from Sagamihara Family Housing Area and NAF Atsugi.from Sagamihara Family Housing Area and NAF Atsugi.
  • 17.
    Those interested canregister their childrenThose interested can register their children by calling 263-4898.by calling 263-4898. Spaces are limited,Spaces are limited, so early registration is encouraged.so early registration is encouraged. 2013 Summer Bible Camp Registration2013 Summer Bible Camp Registration
  • 18.
    Notification ofNotification of On-postrOn-post residents must notifyesidents must notify the Housing Management Divisionthe Housing Management Division for absences from quarters extendedfor absences from quarters extended more than seven days.more than seven days. Absence from QuartersAbsence from Quarters
  • 19.
    Please provide aPOCPlease provide a POC who will have responsibility for your quarterswho will have responsibility for your quarters during your absence.during your absence. For more information: 263-4136/3890For more information: 263-4136/3890 046-407-4136/3890046-407-4136/3890 Notification ofNotification of Absence from QuartersAbsence from Quarters
  • 20.
    Bon Dance lessonswill be heldBon Dance lessons will be held on the following dates in preparationon the following dates in preparation for this year’s Bon Odori Festivalfor this year’s Bon Odori Festival atat Camp Zama,Camp Zama, which will be held Aug. 3.which will be held Aug. 3.
  • 21.
    Dates:Dates: July 16,18, 23, 25, 30, andJuly 16, 18, 23, 25, 30, and Aug. 1Aug. 1 Time:Time: 5 to 7 p.m.5 to 7 p.m. Location:Location: Community Activity CenterCommunity Activity Center No pre-No pre- registration necessaryregistration necessary For more information:For more information:
  • 22.
    The Garrison Chaplaincordially invites youThe Garrison Chaplain cordially invites you to attend the 60thto attend the 60th Rededication Service ofRededication Service of the Camp Zama Chapelthe Camp Zama Chapel andand the 238th Chaplain Corps Anniversarythe 238th Chaplain Corps Anniversary on the following date.on the following date. Date: July 18 from 11:30 a.m.Date: July 18 from 11:30 a.m. Location: Camp Zama ChapelLocation: Camp Zama Chapel
  • 23.
    A complementary lunchAcomplementary lunch will be provided in the chapel courtyard.will be provided in the chapel courtyard. Contact the USAG-J Religious Support OfficeContact the USAG-J Religious Support Office atat 263-4898263-4898 for more information.for more information.
  • 24.
    KabukiKabuki AppreciationAppreciation and PerformanceViewingand Performance Viewing A kabuki appreciation class and viewing are scheduled to be held July 26 and 27, twice daily at 11 a.m. and 2:30 p.m., at the Kanagawa Prefecture Youth Center Hall in Yokohama.
  • 25.
    A special discountticket fee will be provided for U.S. service members and their family members. KabukiKabuki AppreciationAppreciation and Performance Viewingand Performance Viewing
  • 26.
    Those interested canreserve their tickets by calling 045-263-4475 (Japanese-language only). KabukiKabuki AppreciationAppreciation and Performance Viewingand Performance Viewing
  • 27.
    For assistance withreserving tickets, call the U.S. Army Garrison Japan Community Relations Office at 263-7556. KabukiKabuki AppreciationAppreciation and Performance Viewingand Performance Viewing
  • 28.
    Currently, U.S. servicemembers may incur upCurrently, U.S. service members may incur up to a four-year active-duty service obligationto a four-year active-duty service obligation depending on how many qualifying years of servicedepending on how many qualifying years of service they have as of Aug. 1, 2009.they have as of Aug. 1, 2009. Information onInformation on Post-9/11 GI Bill TransferencePost-9/11 GI Bill Transference
  • 29.
    Effective Aug. 1of this year, any service memberEffective Aug. 1 of this year, any service member who submits a Transfer of Education Benefitswho submits a Transfer of Education Benefits request and is approved will incurrequest and is approved will incur a four-year active-duty service obligationa four-year active-duty service obligation from the date of their transfer request.from the date of their transfer request. Information onInformation on Post-9/11 GI Bill TransferencePost-9/11 GI Bill Transference
  • 30.
    This also includesservice membersThis also includes service members with at least 20 years of servicewith at least 20 years of service prior to Aug. 1, 2009.prior to Aug. 1, 2009. Information onInformation on Post-9/11 GI Bill TransferencePost-9/11 GI Bill Transference
  • 31.
    Half-Road Closure atHighland DriveHalf-Road Closure at Highland Drive on Camp Zamaon Camp Zama A half-road closure is scheduledA half-road closure is scheduled to be in effect at a portion of Highland Driveto be in effect at a portion of Highland Drive on Camp Zama fromon Camp Zama from July 1 through Aug. 30July 1 through Aug. 30 in order to install a new power station.in order to install a new power station.
  • 32.
    Garrison Security OfficeGarrisonSecurity Office The Garrison Security Office on Camp ZamaThe Garrison Security Office on Camp Zama will be closedwill be closed from July 15 through 19from July 15 through 19.. Contact the regional security officerContact the regional security officer at 438-1713 for assistance.at 438-1713 for assistance. The office will reopen on July 22The office will reopen on July 22 at 8 a.m.at 8 a.m.
  • 33.
    Full-Scale Exercise onCamp ZamaFull-Scale Exercise on Camp Zama U.S. Army Garrison Japan is scheduled to conduct its annual full-scale exercise from July 16 through 18 on Camp Zama.
  • 34.
    Full-Scale Exercise onCamp ZamaFull-Scale Exercise on Camp Zama Possible road closures at Chestnut Avenue and Gate 1 are expected during the exercise period. Call 263-4182 for more information.
  • 35.
    Central Issue FacilityClosureCentral Issue Facility Closure The Central Issue Facility on Camp ZamaThe Central Issue Facility on Camp Zama will be closedwill be closed from July 15 through 19from July 15 through 19 for mandatory training.for mandatory training. The CIF will only open for emergenciesThe CIF will only open for emergencies and turn-ins during this time.and turn-ins during this time. Call 263-5880 or 263-7454Call 263-5880 or 263-7454 in case of emergency.in case of emergency.
  • 36.
    The Department ofVeterans Affairs overseas military services coordinator will be at the Camp Zama Education Center in Bldg. 278, on July 10. VA Overseas Coordinator VisitVA Overseas Coordinator Visit at Camp Zamaat Camp Zama
  • 37.
    VA Overseas CoordinatorVisitVA Overseas Coordinator Visit at Camp Zamaat Camp Zama If you would like to schedule an appointmentIf you would like to schedule an appointment to discuss veteran’s benefits,to discuss veteran’s benefits, you may be entitled to, callyou may be entitled to, call 263-5311263-5311.. Don’t delay, appointments are limited!Don’t delay, appointments are limited!
  • 38.
    Camp Zama housingresidents on MacArthur Road, quarters 1070 through 1095, will have a traffic change beginning June 18. Traffic Change on MacArthur RoadTraffic Change on MacArthur Road
  • 39.
    Traffic Change onMacArthur RoadTraffic Change on MacArthur Road The one-way portion of MacArthur RoadThe one-way portion of MacArthur Road will be reversed, along with the on-streetwill be reversed, along with the on-street parallel parking.parallel parking. After the change, residents shouldAfter the change, residents should be especially watchful for driversbe especially watchful for drivers driving in the wrong direction.driving in the wrong direction.
  • 40.
    Road, Parking ReconstructionRoad,Parking Reconstruction on Camp Zamaon Camp Zama The first phase of a three-phase constructionThe first phase of a three-phase construction initiative to repair and re-pave various roadsinitiative to repair and re-pave various roads and parking areas on Camp Zamaand parking areas on Camp Zama is scheduled to beginis scheduled to begin June 24 and continue through July 12.June 24 and continue through July 12.
  • 41.
    Twenty-five parking spaces, aswell as a portion of the road past the southern end of Bldg. 101 will be closed during this first phase. Road, Parking ReconstructionRoad, Parking Reconstruction on Camp Zamaon Camp Zama
  • 42.
    Details on thesecond and third phases of the construction will be released at future dates. Call 263-5448 for more information. Road, Parking ReconstructionRoad, Parking Reconstruction on Camp Zamaon Camp Zama
  • 43.
    Gas Piping Workon Camp ZamaGas Piping Work on Camp Zama Work is scheduled to be conductedWork is scheduled to be conducted July 1 through 31July 1 through 31 to connect gas piping to Bldgs. 332, 333 and 341to connect gas piping to Bldgs. 332, 333 and 341 for future modifications to the new boiler plantfor future modifications to the new boiler plant On Camp Zama.On Camp Zama.
  • 44.
    The Sagamihara FamilyHousing AreaThe Sagamihara Family Housing Area commissary’s normal days of operationcommissary’s normal days of operation will change beginning July 8will change beginning July 8 due to the furlough of employees.due to the furlough of employees. Commissary ClosureCommissary Closure
  • 45.
    At that time, andfor as long as furlough is in effect, the commissary will be closed on Tuesdays in addition to the normal Monday closure. Commissary ClosureCommissary Closure
  • 46.
    This schedule issubject to change,This schedule is subject to change, and new informationand new information will be released as it is received.will be released as it is received. Commissary ClosureCommissary Closure
  • 47.
    Ramadan will beginon July 9.Ramadan will begin on July 9. During Ramadan, Muslims must fast each dayDuring Ramadan, Muslims must fast each day from dawnfrom dawn (approximately 1 1/2 hours before sunrise)(approximately 1 1/2 hours before sunrise) until after sunset.until after sunset. During these hours, a Muslim cannot consumeDuring these hours, a Muslim cannot consume any food or liquids.any food or liquids. The Holy Month of RamadanThe Holy Month of Ramadan
  • 48.
    The Holy Monthof RamadanThe Holy Month of Ramadan Ramadan is followedRamadan is followed by the celebration of Eid ul-Fitr.by the celebration of Eid ul-Fitr. This year’s Eid ul-FitrThis year’s Eid ul-Fitr will be observed on Aug. 8.will be observed on Aug. 8. For more information, contact the USAG-JFor more information, contact the USAG-J Religious Support Office at 263-4898.Religious Support Office at 263-4898.
  • 49.
    The 2013-14 schoolyear will begin as scheduled on Aug. 26.
  • 50.
    If proposed furloughdates remain in effect,If proposed furlough dates remain in effect, Arnn Elementary and Zama American MiddleArnn Elementary and Zama American Middle and High schoolsand High schools will be closed on the following dates:will be closed on the following dates: Tuesday : Sept. 3Tuesday : Sept. 3 Mondays: Sept. 9, 16, 23 and 30Mondays: Sept. 9, 16, 23 and 30
  • 51.
    Although the schoolswill be closed to students and furloughed teachers on these days, the school and district offices will remain open, albeit with limited staffing. The Arnn main office will remain open all summer, except for July 4 from 8 a.m. to 3 p.m.
  • 52.
    General furlough updatesare available here:General furlough updates are available here: http://www.dodea.edu/Budget/index1.cfmhttp://www.dodea.edu/Budget/index1.cfm
  • 53.
    Well Child PhysicalsAvailableWell Child Physicals AvailableWell Child Physicals AvailableWell Child Physicals Available
  • 54.
    Online Nutrition EducationSurveyOnline Nutrition Education Survey An online survey coordinated by Medical Department Activity-Japan is available for all community members at Camp Zama. A dietician from Fleet Activities Yokosuka is willing to provide nutrition classes and would like to know what topics are of interest to the community.
  • 55.
    The survey canbe found here:The survey can be found here: http://www.surveymonkey.com/s/36J8T7Shttp://www.surveymonkey.com/s/36J8T7S Online Nutrition Education SurveyOnline Nutrition Education Survey
  • 56.
    U.S. Army GarrisonJapanU.S. Army Garrison Japan is currently conductingis currently conducting an Army Community Service Needs Assessmentan Army Community Service Needs Assessment online survey.online survey.
  • 57.
    The survey collectsinformationThe survey collects information About services and programs at Camp ZamaAbout services and programs at Camp Zama and a sense of how its military communityand a sense of how its military community is supporting its members.is supporting its members. The survey must be completed before July 15.The survey must be completed before July 15.
  • 59.
    As summer begins,the conditions for moldAs summer begins, the conditions for mold growth become more prevalent.growth become more prevalent. Mold will only grow when moisture or condensationMold will only grow when moisture or condensation is present.is present. Even hidden areas, like closets, can grow moldEven hidden areas, like closets, can grow mold if moisture is present.if moisture is present.
  • 60.
    Keeping your homefree of moisture is the bestKeeping your home free of moisture is the best way to prevent mold growth.way to prevent mold growth. Keep indoor humidity levels between 30 percentKeep indoor humidity levels between 30 percent and 50 percent. (Humidity meters can beand 50 percent. (Humidity meters can be purchased for as little as $10 online)purchased for as little as $10 online)
  • 61.
    Run fans andvents while cooking or showering.Run fans and vents while cooking or showering. (But don’t leave them running all day, as this(But don’t leave them running all day, as this can potentially assist mold growth).can potentially assist mold growth). Clean up moisture and condensation immediately.Clean up moisture and condensation immediately. Use dehumidifiers to further control levels ofUse dehumidifiers to further control levels of humidity in the home.humidity in the home.
  • 62.
    Keep closet doorsopen one to two inches to allowKeep closet doors open one to two inches to allow fresh air circulation.fresh air circulation. If mold is present in an area of nine square feet orIf mold is present in an area of nine square feet or less:less: - Scrub rigorously using detergent and water- Scrub rigorously using detergent and water - Wear a dust mask, gloves and eye protection- Wear a dust mask, gloves and eye protection - Dry the area after completion of cleaning- Dry the area after completion of cleaning
  • 63.
    If mold ispresent on a larger surface:If mold is present on a larger surface: Contact DPW for assistance in cleaningContact DPW for assistance in cleaning 263-4274 or 263-4613263-4274 or 263-4613 If mold is on permeable surfaces (i.e., carpet orIf mold is on permeable surfaces (i.e., carpet or ceiling tiles), consider replacement.ceiling tiles), consider replacement.
  • 64.
    Multiple Half-Road Closureson Camp ZamaMultiple Half-Road Closures on Camp Zama The Directorate of Public Works is in the process of replacing domestic hot water and chilled/hot water lines on Camp Zama. The project began May 30 and is scheduled to continue through November. This project will require half-road closures during working hours at the following locations:
  • 65.
    Multiple Half-Road Closureson Camp ZamaMultiple Half-Road Closures on Camp Zama Ishinomaki Avenue across from Zama Housing Units 988 and 987 from July 22 through 26 Ishinomaki Avenue between Bldg. 691 and Dewey Park from Aug. 26 through 30
  • 66.
    Multiple Half-Road Closureson Camp ZamaMultiple Half-Road Closures on Camp Zama Ishinomaki Avenue at the four-way intersection by ZAHS from Sept. 3 through 6 Various locations on 4th Avenue near Bldgs. 101 and 102 from June 3 through Aug. 30
  • 67.
    Multiple Half-Road Closureson Camp ZamaMultiple Half-Road Closures on Camp Zama Temporary stock yard between Bldgs. 131 and 138 through Nov. 15
  • 68.
    Army Website ProvidesSummer Safety TipsArmy Website Provides Summer Safety Tips Summer is finally here, and with it comesSummer is finally here, and with it comes hazards unique to this cherished time of year.hazards unique to this cherished time of year. As the weather warms and Soldiers, Army civiliansAs the weather warms and Soldiers, Army civilians and family members take to roads and waterwaysand family members take to roads and waterways for some well-deserved down time,for some well-deserved down time, they will be exposed to riskthey will be exposed to risk more often than they might think.more often than they might think.
  • 69.
    VisitVisit http://go.usa.gov/bWaehttp://go.usa.gov/bWae for varioustips on summer safety.for various tips on summer safety. Army Website Provides Summer Safety TipsArmy Website Provides Summer Safety Tips
  • 70.
    Most motor transportationservices at the Transportation Division on Camp Zama are scheduled to be suspended July 11 in order to conduct a safety stand-down. Narita Airport shuttle services will not affected by this suspension.
  • 71.
    All passengers needingofficial transportationAll passengers needing official transportation to commercial terminalsto commercial terminals will need to acquirewill need to acquire commercial transportation on this day,commercial transportation on this day, or contact the Ground Transportation Deskor contact the Ground Transportation Desk atat 263-3772263-3772 for special instructions.for special instructions.
  • 72.
    Intermittent Cooling SeasonBeginsIntermittent Cooling Season Begins Intermittent cooling for U.S. Army Japan installations began May 23. Air-conditioning will be provided once the outside temperature exceeds 78 degrees Fahrenheit or 25.6 degrees Celsius. Call 263-3609 for more information.
  • 73.
    Transition from Heatingto Cooling SeasonTransition from Heating to Cooling Season Intermittent heating is scheduled until mid-April. Heating will be provided based on following criteria: 68 degrees Fahrenheit or below (from 5 a.m. to 10 p.m.) 55 degrees Fahrenheit or below (from 10 p.m. to 5 a.m.)
  • 74.
    Girl ScoutsGirl Scouts Two-DayMount Fuji Adventure ClimbTwo-Day Mount Fuji Adventure Climb
  • 75.
    Girl ScoutsGirl Scouts Two-DayMount Fuji Adventure ClimbTwo-Day Mount Fuji Adventure Climb
  • 76.
    Arnn Elementary SchoolInformationArnn Elementary School Information Effective June 1,Effective June 1, the phone number for the main officethe phone number for the main office at Arnn Elementary Schoolat Arnn Elementary School will be changed as follows:will be changed as follows: 267-6112267-6112 oror 267-6237267-6237
  • 77.
    Writers, actors, thinkers,videographersWriters, actors, thinkers, videographers and creative peopleand creative people between the ages of 12 and 18between the ages of 12 and 18 are being sought for an internship opportunityare being sought for an internship opportunity with the Adolescent Substance Abusewith the Adolescent Substance Abuse Counseling ServiceCounseling Service and U.S. Army Garrison Japanand U.S. Army Garrison Japan Public Affairs Office.Public Affairs Office. Teen InternshipTeen Internship with ASACS, Public Affairs Officewith ASACS, Public Affairs Office
  • 78.
    An ASACS advisoryboard is being formedAn ASACS advisory board is being formed to develop public serviceto develop public service announcement video commercials.announcement video commercials. Topics may include bullying prevention,Topics may include bullying prevention, ““sexting” safety andsexting” safety and substance abuse prevention.substance abuse prevention. Teen InternshipTeen Internship with ASACS, Public Affairs Officewith ASACS, Public Affairs Office
  • 79.
    The board willmeet twice a weekThe board will meet twice a week from the week of June 17 until the end of July.from the week of June 17 until the end of July. Participants will write, research,Participants will write, research, develop and act in PSAsdevelop and act in PSAs to be broadcast on AFN, distributedto be broadcast on AFN, distributed on the Internet, and offeredon the Internet, and offered to public safety campaigns worldwide.to public safety campaigns worldwide. Teen InternshipTeen Internship with ASACS, Public Affairs Officewith ASACS, Public Affairs Office
  • 80.
    Space for thisteam isSpace for this team is limited to 12 participants.limited to 12 participants. Call 263-5970Call 263-5970 to apply or for information.to apply or for information. Teen InternshipTeen Internship with ASACS, Public Affairs Officewith ASACS, Public Affairs Office
  • 81.
    SHARP Hotline (English-speaking)SHARPHotline (English-speaking) 090-9395-8909 or090-9395-8909 or 882# from a DSN phone882# from a DSN phone Call any time to include evenings,Call any time to include evenings, weekends and holidays.weekends and holidays.
  • 82.
  • 86.
    Posting Ads atFront of Bldg. 102Posting Ads at Front of Bldg. 102 Not AuthorizedNot Authorized All personnel are remindedAll personnel are reminded not to post advertisementsnot to post advertisements at the front entrance ofat the front entrance of U.S. Army Garrison Japan headquarters, Bldg. 102.U.S. Army Garrison Japan headquarters, Bldg. 102. Call 263-3829 for more information.Call 263-3829 for more information.
  • 87.
    Household Goods PCSTipsHousehold Goods PCS Tips  Receive PCS ordersReceive PCS orders  Estimate your weightEstimate your weight  Plan pickup dates with flexibilityPlan pickup dates with flexibility  Schedule pickups earlySchedule pickups early  Change dates as a last resortChange dates as a last resort  Dispose of unnecessary itemsDispose of unnecessary items  Know your shipping entitlementsKnow your shipping entitlements
  • 88.
    Household Goods ShipmentsHouseholdGoods Shipments You can schedule a household goods pickupYou can schedule a household goods pickup from the privacy of your living room.from the privacy of your living room. Visit the website below to gain accessVisit the website below to gain access to the Defense Personal Property Systemto the Defense Personal Property System or contact the Area Transportation Office,or contact the Area Transportation Office, Personal Property Section, at 263-3709 for details.Personal Property Section, at 263-3709 for details. www.move.milwww.move.mil
  • 89.
    Household Goods WeightAllowance ChangeHousehold Goods Weight Allowance Change Effective Dec. 1, 2011,Effective Dec. 1, 2011, weight allowance to and from Japan was reducedweight allowance to and from Japan was reduced for all Soldiers to 2,500 pounds (net)for all Soldiers to 2,500 pounds (net) or 25 percent (net) of full weight allowance,or 25 percent (net) of full weight allowance, or whichever is greater.or whichever is greater. All civilians are authorized 4,500 pounds (net).All civilians are authorized 4,500 pounds (net). Unaccompanied baggage is inclusive.Unaccompanied baggage is inclusive. For more information: 263-3709For more information: 263-3709
  • 90.
    New Operation HoursNewOperation Hours at Sagami Depot Self-Help Storeat Sagami Depot Self-Help Store Effective June 1, the Self-Help Store located on Sagami General Depot Will only be open on Wednesdays and Saturdays from 8 a.m. to noon and 1 to 5 p.m. Call 263-5952 or 263-3441 for more information.
  • 91.
    ‘‘You Made theGrade’ ProgramYou Made the Grade’ Program at Zama Exchangeat Zama Exchange The Army and Air Force Exchange Service is rewarding military students in grades one through 12 who maintain a "B" or better average with the "You Made the Grade" program.
  • 92.
    Students can receivea booklet coupon booklet good for free products and discounted offers by presenting a valid military ID and proof of an overall "B" average at the Camp Zama Exchange customer service. ‘‘You Made the Grade’ ProgramYou Made the Grade’ Program at Zama Exchangeat Zama Exchange
  • 93.
    Parking ReminderParking Reminder forFamily Quarters Residentsfor Family Quarters Residents All personnel living in family quartersAll personnel living in family quarters on Camp Zama, Sagamihara Family Housing Areaon Camp Zama, Sagamihara Family Housing Area and Sagami General Depotand Sagami General Depot are remindedare reminded to park their personally owned vehiclesto park their personally owned vehicles in their respective assigned parking areas.in their respective assigned parking areas. CallCall 263-3829263-3829 for more information.for more information.
  • 94.
    Arnn Elementary Schoolat SFHA is seekingArnn Elementary School at SFHA is seeking applicants for various positions,applicants for various positions, including the following:including the following: Educational aides have three differentEducational aides have three different categories:categories: Kindergarten, Special Education, andKindergarten, Special Education, and Sure Start Educational Aid link:Sure Start Educational Aid link: www.usajobs.gov/GetJobwww.usajobs.gov/GetJob
  • 95.
    We are alwaysseeking qualifiedWe are always seeking qualified and enthusiastic substitute teachers.and enthusiastic substitute teachers. This link lists current vacancies in the Pacific area:This link lists current vacancies in the Pacific area: www.dodea.edu/Pacific/offices/HR/pacVacancies.cfmwww.dodea.edu/Pacific/offices/HR/pacVacancies.cfm
  • 96.
    Currently, lunch andrecess lead monitorCurrently, lunch and recess lead monitor and monitor positions are availableand monitor positions are available at Arnn Elementary School.at Arnn Elementary School. For more details:For more details: www.usajobs.gov/GetJobwww.usajobs.gov/GetJob
  • 97.
    Provide your inputor feedback online at the U.S. Army Garrison Japan ICE site and enter to win a prize! http://ice.disa.milhttp://ice.disa.mil Good or bad, we’d like to know!Good or bad, we’d like to know!
  • 98.
    Camp Zama ArmyEducation CenterCamp Zama Army Education Center The Camp Zama Army Education CenterThe Camp Zama Army Education Center is conducting a survey to assessis conducting a survey to assess The educational needs of the base population.The educational needs of the base population. This survey is used to measure satisfaction, quality,This survey is used to measure satisfaction, quality, availability, delivery and service, andavailability, delivery and service, and to gauge the effectiveness of on-base collegeto gauge the effectiveness of on-base college and university programs.and university programs. SurveySurvey
  • 99.
    Camp Zama ArmyEducation CenterCamp Zama Army Education Center The survey can be accessed at:The survey can be accessed at: http://www.surveymonkey.com/s/GVJYKTLhttp://www.surveymonkey.com/s/GVJYKTL SurveySurvey
  • 100.
    Defense Travel ManagementOfficeDefense Travel Management Office The Defense Travel Management Office isThe Defense Travel Management Office is requesting that travelers go to their respectiverequesting that travelers go to their respective organizational or lead defense travel administratororganizational or lead defense travel administrator for a majority of their issues.for a majority of their issues. They should refrain from sending trouble ticketsThey should refrain from sending trouble tickets or inquiries directly to DTMO without goingor inquiries directly to DTMO without going to their aforementioned administrators first.to their aforementioned administrators first.
  • 101.
    Reminder of PetOwners’ Responsibilities The following list of responsibilities for pet ownersThe following list of responsibilities for pet owners living on Camp Zama, Sagamihara Familyliving on Camp Zama, Sagamihara Family Housing Area and Sagami Depot was releasedHousing Area and Sagami Depot was released by the Housing Management Division:by the Housing Management Division: - Sponsors are responsible for cleaning the areas- Sponsors are responsible for cleaning the areas used by their pets.used by their pets. - If kept outside, the pet’s area must be policed daily- If kept outside, the pet’s area must be policed daily to prevent a buildup of trash and fecal material.to prevent a buildup of trash and fecal material.
  • 102.
    Reminder of PetOwners’ Responsibilities - Owners must clean up waste left by their pet during walks. - Fecal droppings must be disposed of in sealed plastic bags (preferably double bags) and be placed in garbage receptacles. - Un-bagged waste must not be placed in garbage receptacles.
  • 103.
    Reminder of PetOwners’ Responsibilities Violations can be reported to following email address:Violations can be reported to following email address: usarmy.zama.imcom-pacific.mbx.usagj-dpw-housing-usarmy.zama.imcom-pacific.mbx.usagj-dpw-housing- officer@mail.milofficer@mail.mil You may also report violations by calling the Housing ManagementYou may also report violations by calling the Housing Management Division atDivision at 263-3441 or 263-4503263-3441 or 263-4503,, or the Family Housing and Furnishing Management Branchor the Family Housing and Furnishing Management Branch atat 263-3527 or 263-4136263-3527 or 263-4136..
  • 104.
    Food Handling andPreparation CourseFood Handling and Preparation Course Private organizations that are providing or selling food to the general public of Camp Zama and Sagamihara Family Housing Area are required to attend a Safe Food Handling and Preparation Class, which lasts approximately two hours, and includes a PowerPoint presentation immediately followed by a 20-question multiple-choice-format test.
  • 105.
    Food Handling andPreparation CourseFood Handling and Preparation Course This class is given by Preventive Medicine every third Wednesday of the month at 3 p.m. in Bldg. 715, Classroom B. Call in advance to verify any changes in the time or location. Call 263-3748 for more information.
  • 106.
    English-, Japanese-LanguageEnglish-, Japanese-Language Shelf-LifeTrainingShelf-Life Training A number of training dates are scheduled to be held, in both English- and Japanese-language instruction, on shelf-life policy training to explain standard practice in the management and storage of shelf-life material at the managing activity and depot level. Call 263-4814 for more information.
  • 107.
    English-, Japanese-LanguageEnglish-, Japanese-Language Shelf-LifeTrainingShelf-Life Training Students will learn to properly apply mandatory storage standards criteria in evaluating the condition of shelf-life material upon receipt, in storage, during surveillance, upon shipment, and when test or restorative actions are required to maintain or return stocks to a ready-for-issue status. Call 263-4814 for more information.
  • 108.
    English-, Japanese-LanguageEnglish-, Japanese-Language Shelf-LifeTrainingShelf-Life Training Yokohama North Dock (English Session) Date: Sept. 26 (Nomination deadline: Sept. 19) Time: 8:30 a.m. to 3 p.m. Location: Bldg. 347, DPW Conference Room Yokohama North Dock (Japanese Session) Date: Sept. 27 (Nomination deadline: Sept. 19) Time: 8:30 a.m. to 3 p.m. Location: Bldg. 347, DPW Conference Room
  • 109.
    Informational Telephone Services EffectiveApril 1, the 78th Signal Battalion's telephone operators will no longer provide "informational telephone services“ between the hours of 10 p.m. and 6 a.m. Calls placed to 0, 263-1110 and 113 during these hours will be routed to the Regional Network Operations Support Center, whose operators have access to telephone information.
  • 110.
    TheThe American RedCrossAmerican Red Cross providesprovides the military community and their families with 24/7 accessthe military community and their families with 24/7 access to an Emergency Communications Networkto an Emergency Communications Network to keep families connected in a crisis,to keep families connected in a crisis, provide case management services,provide case management services, and assist with emergency financial assistance.and assist with emergency financial assistance. Find us on FacebookFind us on Facebook American Red Cross – Camp ZamaAmerican Red Cross – Camp Zama Click on “Notes”Click on “Notes” Emergency Communication MessagesEmergency Communication Messages
  • 111.
    To start anTostart an American Red CrossAmerican Red Cross message,message, the following information is needed:the following information is needed: Service member’s or sponsors’ full nameService member’s or sponsors’ full name Branch of serviceBranch of service RankRank Social Security Number or date of birthSocial Security Number or date of birth Complete military unit addressComplete military unit address Emergency Communication MessagesEmergency Communication Messages
  • 112.
    Notice From SamsHealth ClinicNotice From Sams Health Clinic The USA MEDDAC-JapanThe USA MEDDAC-Japan will undergo major facility renovationswill undergo major facility renovations starting in March, 2013 and extend through 2016.starting in March, 2013 and extend through 2016. These changes will affect the current parking layoutThese changes will affect the current parking layout for our community,for our community, requiring a shift of parking availabilityrequiring a shift of parking availability to outlying areas such asto outlying areas such as the commissary and Camp Zama Community Club.the commissary and Camp Zama Community Club.
  • 113.
    Please watch thevideo for important informationPlease watch the video for important information regarding these parking changesregarding these parking changes and how they will affect you.and how they will affect you. Please also visit the MEDDAC-JapanPlease also visit the MEDDAC-Japan facebook page:facebook page: http://facebook.com/MEDDACJhttp://facebook.com/MEDDACJ our website:our website: http://www.usarj.army.mil/organization/meddac/http://www.usarj.army.mil/organization/meddac/ Notice From Sams Health ClinicNotice From Sams Health Clinic
  • 114.
    B.G. Sams Health& Dental ClinicB.G. Sams Health & Dental Clinic Renovation Project Starting Soon.Renovation Project Starting Soon. Starting in FebruaryStarting in February This project will be in phases and span almostThis project will be in phases and span almost three years.three years. During the construction, only a small part ofDuring the construction, only a small part of our parking lot will be availableour parking lot will be available for special needs parking.for special needs parking.
  • 115.
    B.G. Sams Health& Dental ClinicB.G. Sams Health & Dental Clinic Renovation Project Starting SoonRenovation Project Starting Soon Please be patient as we work to provide an up-to-Please be patient as we work to provide an up-to- date, modern facility for your medical and dentaldate, modern facility for your medical and dental care.care. The main entrance to the clinic will not change.The main entrance to the clinic will not change. Contact us atContact us at MEDDACJ-PAO@AMEDD.ARMY.MILMEDDACJ-PAO@AMEDD.ARMY.MIL with any questions or concerns.with any questions or concerns.
  • 116.
    Temp BldgTemp Bldg ContractorStaging Area MEDDAC Commissary MWR Camp Zama Community Club PHCR Off Site Parking Locations-BuildingsOff Site Parking Locations-Buildings
  • 117.
    DPW Housing OfficeDPWHousing Office (Staff Parking)(Staff Parking) New Patient ParkingNew Patient Parking (Commissary Area)(Commissary Area) Additional Patient ParkingAdditional Patient Parking (CZCC 48 Spots)(CZCC 48 Spots) BG Sams Health Clinic Bldg704Bldg704 Off Site Parking LocationsOff Site Parking Locations Special Need ParkingSpecial Need Parking (Current Parking Lot)(Current Parking Lot)
  • 118.
    Driving in JapanClassesDriving in Japan Classes Are you a newcomer to Japan?Are you a newcomer to Japan? Need to obtain your local drivers permit?Need to obtain your local drivers permit? Then sign-up for the "Driving in Japan” classThen sign-up for the "Driving in Japan” class every Tuesday 8 a.m.every Tuesday 8 a.m. Safety classroom building 102, room A108Safety classroom building 102, room A108 on Camp Zama.on Camp Zama.
  • 119.
    There is nosign-up or fees for theThere is no sign-up or fees for the course.course. Please bring a valid US drivers licensePlease bring a valid US drivers license and your military ID card.and your military ID card. The class is approximately 4 hours long.The class is approximately 4 hours long. For more information,For more information, call the Safety Office atcall the Safety Office at 263-4464263-4464 Driving in Japan ClassesDriving in Japan Classes
  • 120.
    Remedial Drivers TrainingRemedialDrivers Training Do you require a remedial drivers classDo you require a remedial drivers class due to a revocation ofdue to a revocation of your drivers privileges or an accidentyour drivers privileges or an accident while driving a government vehicle?while driving a government vehicle?
  • 121.
    The 4-hour classis taught QUARTERLY,The 4-hour class is taught QUARTERLY, and held in the safety classroomand held in the safety classroom building 102 room A108 on Camp Zama.building 102 room A108 on Camp Zama. For more information call the Safety OfficeFor more information call the Safety Office atat 263-8379263-8379 to sign up,to sign up, All classes are free!All classes are free! Remedial Drivers TrainingRemedial Drivers Training
  • 122.
    Now is thetime to plan your travel for the remainderNow is the time to plan your travel for the remainder of Winter as well as your Spring Travel.of Winter as well as your Spring Travel. Zama ITT has a range of travel services available for you.Zama ITT has a range of travel services available for you. Please contact them atPlease contact them at 263-5273 or 046-254-8896263-5273 or 046-254-8896 oror travel@zamaitt.comtravel@zamaitt.com.. You can also check the web page atYou can also check the web page at http://zamaitt.comhttp://zamaitt.com.. Just a few things to consider are listed on next slide.Just a few things to consider are listed on next slide. Camp Zama ITT Travel OfficeCamp Zama ITT Travel Office
  • 123.
    Disneyland Discount Ticketsvalid until March 15Disneyland Discount Tickets valid until March 15 Snow Monkey Trips until end of MarchSnow Monkey Trips until end of March Ski and Snowboard TripsSki and Snowboard Trips Great Wall MarathonGreat Wall Marathon Travel to Yap and Stay/Dive at Manta Ray Bay ResortTravel to Yap and Stay/Dive at Manta Ray Bay Resort Princess Cruises include a special departurePrincess Cruises include a special departure from Japan in Julyfrom Japan in July Camp Zama ITT Travel OfficeCamp Zama ITT Travel Office Contact:Contact: 263-5273 or 046-254-8896263-5273 or 046-254-8896 oror travel@zamaitt.comtravel@zamaitt.com..
  • 126.
    Restroom RelocationRestroom Relocation TemporarylocationTemporary location for customers to usefor customers to use the restroomsthe restrooms Feb. 1 toFeb. 1 to
  • 127.
    ~Menu~~Menu~ Miso Soup /Broccoli SoupMiso Soup / Broccoli Soup Garlic Buttered FishGarlic Buttered Fish Sweet & Sour Pork / Chinese 5 Spice ChickenSweet & Sour Pork / Chinese 5 Spice Chicken Baked Potatoes / Hopping JohnBaked Potatoes / Hopping John Buttered Pasta / Sautéed Mushroom & OnionButtered Pasta / Sautéed Mushroom & Onion Calico Corn / Herbed Green BeansCalico Corn / Herbed Green Beans Jul. 5, 2013Jul. 5, 2013 Price :Price : $4.60$4.60 9 a.m. to 1 p.m9 a.m. to 1 p.m ..
  • 128.
    ~Menu~~Menu~ Miso Soup /Broccoli SoupMiso Soup / Broccoli Soup Pork GingerPork Ginger Beef BroccoliBeef Broccoli Baked FishBaked Fish Steamed Rice / Buttered PotatoesSteamed Rice / Buttered Potatoes Seasoned CarrotsSeasoned Carrots Seasoned Mixed CaliforniaSeasoned Mixed California Jul. 5, 2013Jul. 5, 2013 Price :Price : $4.60$4.60 5 p.m. to 6:305 p.m. to 6:30 p.mp.m ..
  • 129.
    Price :Price : $5.25$5.25 ~Menu~~Menu~ Omelet/ Boiled Egg / Pancakes / BaconOmelet / Boiled Egg / Pancakes / Bacon Hominy Grits / Biscuits / Creamed BeefHominy Grits / Biscuits / Creamed Beef Hashed Brown PotatoesHashed Brown Potatoes Vegetable Soup / Corn ChowderVegetable Soup / Corn Chowder Pork Curry / Oven Baked ChickenPork Curry / Oven Baked Chicken Grilled Swiss Steak with Sautee Onion &Grilled Swiss Steak with Sautee Onion & Mushroom / Parsley PotatoesMushroom / Parsley Potatoes Steamed Rice / Broccoli / Buttered CornSteamed Rice / Broccoli / Buttered Corn Jul. 6, 2013Jul. 6, 2013 9 a.m. to 1 p.m9 a.m. to 1 p.m ..
  • 130.
    ~Menu~~Menu~ Vegetable Soup /Corn ChowderVegetable Soup / Corn Chowder Creole Macaroni TurkeyCreole Macaroni Turkey Buttered Baked FishButtered Baked Fish Grilled Ham SteakGrilled Ham Steak Mashed PotatoesMashed Potatoes Steamed Brown RiceSteamed Brown Rice Seasoned PeasSeasoned Peas Glazed CarrotsGlazed Carrots Jul. 6, 2013Jul. 6, 2013 Price :Price : $6.45$6.45 5 p.m. to 6 p.m5 p.m. to 6 p.m ..
  • 131.
    ~Menu~~Menu~ Omelet / BoiledEgg / French Toast / BaconOmelet / Boiled Egg / French Toast / Bacon Hominy Grits / Biscuits / Creamed BeefHominy Grits / Biscuits / Creamed Beef Hashed Brown PotatoesHashed Brown Potatoes Beef Rice Soup / Potato Chowder with BaconBeef Rice Soup / Potato Chowder with Bacon Tomato Garlic Chicken / Grilled Swiss SteakTomato Garlic Chicken / Grilled Swiss Steak Simmered Corned BeefSimmered Corned Beef Garlic Roasted Potatoes / Steamed RiceGarlic Roasted Potatoes / Steamed Rice Sautéed Onions & MushroomSautéed Onions & Mushroom Green Beans CasseroleGreen Beans Casserole Jul. 7, 2013Jul. 7, 2013 Price :Price : $5.25$5.25 9 a.m. to 1 p.m9 a.m. to 1 p.m ..
  • 132.
    ~Menu~~Menu~ Chicken Noodle Soup/ Tortilla SoupChicken Noodle Soup / Tortilla Soup Mexican Pork Chops / Chicken FajitasMexican Pork Chops / Chicken Fajitas Enchiladas / Refried BeansEnchiladas / Refried Beans Mashed Potatoes / Mexican RiceMashed Potatoes / Mexican Rice Mixed Antigua / Mexican Mixed VegetablesMixed Antigua / Mexican Mixed Vegetables 11:30 a.m. to 111:30 a.m. to 1 p.mp.m ..July 08,July 08, 20132013 Price :Price : $4.60$4.60
  • 133.
    July 08,July 08, 20132013 Price:Price : $4.60$4.60 ~Menu~~Menu~ Chicken Noodle Soup / Tortilla SoupChicken Noodle Soup / Tortilla Soup Spanish Noodles and Ground BeefSpanish Noodles and Ground Beef Creole Baked FishCreole Baked Fish Streamed Brown RiceStreamed Brown Rice Oven Brown PotatoesOven Brown Potatoes Seasoned Green BeansSeasoned Green Beans 5 p.m. to 6:305 p.m. to 6:30 p.mp.m ..
  • 134.
    ~Menu~~Menu~ Minestrone Soup /Cream of Potato SoupMinestrone Soup / Cream of Potato Soup Baked Lasagna / Spinach LasagnaBaked Lasagna / Spinach Lasagna Spaghetti with Meat Sauce / MarinaraSpaghetti with Meat Sauce / Marinara Szechwan ChickenSzechwan Chicken Potato and Herbs / Steamed RicePotato and Herbs / Steamed Rice Mixed Italian BlendMixed Italian Blend Seasoned Succotash / Toasted Garlic BreadSeasoned Succotash / Toasted Garlic Bread 11:30 a.m. to 111:30 a.m. to 1 p.mp.m ..July 09,July 09, 20132013 Price :Price : $4.60$4.60
  • 135.
    July 09,July 09, 20132013 Price:Price : $4.60$4.60 ~Menu~~Menu~ Minestrone Soup / Cream of Potato SoupMinestrone Soup / Cream of Potato Soup Pork AdoboPork Adobo Egg Plant ParmesanEgg Plant Parmesan Buffalo ChickenBuffalo Chicken Steamed RiceSteamed Rice Mashed potatoesMashed potatoes Waxed Beans / Peas & OnionsWaxed Beans / Peas & Onions 5 p.m. to 6:305 p.m. to 6:30 p.mp.m ..
  • 136.
    ~Menu~~Menu~ French Onion Soup/ Chicken Wild Rice SoupFrench Onion Soup / Chicken Wild Rice Soup BBQ Chicken / Fried Chicken / Baked ChickenBBQ Chicken / Fried Chicken / Baked Chicken BBQ Pork Spareribs / Southern fried CatfishBBQ Pork Spareribs / Southern fried Catfish Baked Macaroni & Cheese / Corn MuffinBaked Macaroni & Cheese / Corn Muffin Glazed Sweet Potatoes / Steamed RiceGlazed Sweet Potatoes / Steamed Rice Black Eyed Peas / Okra & Tomato ComboBlack Eyed Peas / Okra & Tomato Combo Southern Style Greens / Fried OkraSouthern Style Greens / Fried Okra 11:30 a.m. to 111:30 a.m. to 1 p.mp.m ..July 10,July 10, 20132013 Price :Price : $4.60$4.60
  • 137.
    July 10,July 10, 20132013 Price:Price : $4.60$4.60 ~Menu~~Menu~ French Onion Soup / Chicken Wild Rice SoupFrench Onion Soup / Chicken Wild Rice Soup Carne Guisada- (Puerto Rican Beef Stew)Carne Guisada- (Puerto Rican Beef Stew) Turkey TetrazziniTurkey Tetrazzini Broccoli Egg NoodlesBroccoli Egg Noodles Mashed Potatoes / Steamed RiceMashed Potatoes / Steamed Rice Steamed CaliforniaSteamed California Sautéed Onion & Green PeppersSautéed Onion & Green Peppers 5 p.m. to 6:305 p.m. to 6:30 p.mp.m ..
  • 138.
    ~Menu~~Menu~ Miso Soup /Cream of BroccoliMiso Soup / Cream of Broccoli Beef Sukiyaki / Teriyaki ChickenBeef Sukiyaki / Teriyaki Chicken Sautéed Pork w/ Miso Sauce (Miso Buta)Sautéed Pork w/ Miso Sauce (Miso Buta) Egg Plant Tempura / Vegetable Tempura (Kakiage)Egg Plant Tempura / Vegetable Tempura (Kakiage) Steamed Rice / Japanese Soy Sweet Glazed PotatoesSteamed Rice / Japanese Soy Sweet Glazed Potatoes Mixed OrientalMixed Oriental 11:30 a.m. to 111:30 a.m. to 1 p.mp.m ..July 11,July 11, 20132013 Price :Price : $4.60$4.60
  • 139.
    July 11,July 11, 20132013 Price:Price : $4.60$4.60 ~Menu~~Menu~ Miso Soup / Cream of BroccoliMiso Soup / Cream of Broccoli Chicken Rice BowlChicken Rice Bowl Pork NikujyagaPork Nikujyaga Mashed potatoes / Steamed RiceMashed potatoes / Steamed Rice Mixed VegetablesMixed Vegetables Seasoned CarrotsSeasoned Carrots 5 p.m. to 6:305 p.m. to 6:30 p.mp.m ..
  • 140.
    ~Menu~~Menu~ Egg Drop Soup/ Corn ChowderEgg Drop Soup / Corn Chowder Caribbean Fish / Fried FishCaribbean Fish / Fried Fish Yankee Pot RoastYankee Pot Roast Vegetarian Cabbage StewVegetarian Cabbage Stew Steamed Brown Rice / Obrien PotatoesSteamed Brown Rice / Obrien Potatoes Stewed Tomatoes / Seasoned CornStewed Tomatoes / Seasoned Corn 11:30 a.m. to 111:30 a.m. to 1 p.mp.m ..July 12,July 12, 20132013 Price :Price : $4.60$4.60
  • 141.
    July 12,July 12, 20132013 Price:Price : $4.60$4.60 ~Menu~~Menu~ Turkey ChiliTurkey Chili Cajun Garlic Pork RoastCajun Garlic Pork Roast Mashed potatoesMashed potatoes Steamed RiceSteamed Rice Sautéed SpinachSautéed Spinach Seasoned ScandinavianSeasoned Scandinavian 5 p.m. to 6:305 p.m. to 6:30 p.mp.m ..
  • 142.
    9 a.m. to1 p.m9 a.m. to 1 p.m ..July 13,July 13, 20132013 Price : $5.25Price : $5.25 ~Menu~~Menu~ Omelet / Boiled EggsOmelet / Boiled Eggs Pancake / Biscuits / Hominy GritsPancake / Biscuits / Hominy Grits Creamed Beef / Oven Baked BaconCreamed Beef / Oven Baked Bacon Hashed Brown PotatoesHashed Brown Potatoes Vegetable Soup / Potato Chowder w/ BaconVegetable Soup / Potato Chowder w/ Bacon Shrimp Ebichili / Cantonese PorkShrimp Ebichili / Cantonese Pork Mashed Potatoes / Steamed RiceMashed Potatoes / Steamed Rice Calico Corn / Green bean CasseroleCalico Corn / Green bean Casserole
  • 143.
    July 13,July 13, 20132013 Price:Price : $6.45$6.45 ~Menu~~Menu~ Vegetable Soup / Corn Chowder w/ BaconVegetable Soup / Corn Chowder w/ Bacon Chicken YakitoriChicken Yakitori Hawaiian Beef TeriyakiHawaiian Beef Teriyaki Baked Fish w/ Sweet and Sour SauceBaked Fish w/ Sweet and Sour Sauce Vegetarian Stir FryVegetarian Stir Fry Franconia Potatoes / Steamed RiceFranconia Potatoes / Steamed Rice Seasoned PeasSeasoned Peas 5 p.m. to 6 p.m5 p.m. to 6 p.m ..
  • 144.
    9 a.m. to1 p.m9 a.m. to 1 p.m ..July 14,July 14, 20132013 Price :Price : $5.25$5.25 ~Menu~~Menu~ Omelet / Boiled EggsOmelet / Boiled Eggs French Toast / Biscuits / Hominy GritsFrench Toast / Biscuits / Hominy Grits Creamed Beef / Bacon / Hash Browned PotatoesCreamed Beef / Bacon / Hash Browned Potatoes Beef Rice Soup / Cream of Mushroom SoupBeef Rice Soup / Cream of Mushroom Soup Baked Balsamic Chicken / Grilled SteakBaked Balsamic Chicken / Grilled Steak Roast Garlic Potatoes / Steamed RiceRoast Garlic Potatoes / Steamed Rice Sautéed Onion & MushroomsSautéed Onion & Mushrooms BroccoliBroccoli
  • 145.
    July 14,July 14, 20132013 Price:Price : $6.45$6.45 ~Menu~~Menu~ Beef Rice Soup / Cream of Mushroom SoupBeef Rice Soup / Cream of Mushroom Soup Scalloped Ham and PotatoesScalloped Ham and Potatoes Hungarian GoulashHungarian Goulash Herbed Baked ChickenHerbed Baked Chicken Steamed RiceSteamed Rice Mash PotatoesMash Potatoes Brussels SproutsBrussels Sprouts Creamed PeasCreamed Peas 5 p.m. to 6 p.m5 p.m. to 6 p.m ..
  • 146.
    ~Menu~~Menu~ Beef Rice Soup/ Potato Chowder with BaconBeef Rice Soup / Potato Chowder with Bacon Hawaiian Beef Stir FryHawaiian Beef Stir Fry Hawaiian Roast PorkHawaiian Roast Pork Vegetable Stir FryVegetable Stir Fry Mashed PotatoesMashed Potatoes Steamed RiceSteamed Rice Wax BeansWax Beans Mixed Scandinavian MixMixed Scandinavian Mix Jul. 7, 2013Jul. 7, 2013 Price :Price : $6.45$6.45 5 p.m. to 6 p.m5 p.m. to 6 p.m ..
  • 147.
    Effective Date:Effective Date:Jan. 31, 2013Jan. 31, 2013 Every Thursday’s Breakfast HoursEvery Thursday’s Breakfast Hours will change from:will change from: 6 to 8 a.m.6 to 8 a.m. to the new hoursto the new hours:: 7 to 9 a.m.7 to 9 a.m.
  • 150.
    What is ReadyArmy? Ready Army is the Army Emergency Management Program’s proactive campaign to increase the resilience of the Army community by informing of relevant hazards and encouraging Soldiers, their Families, Army Civilians and contractors to, “Get a Kit. Make a Plan. Be Informed.”
  • 151.
    What is ReadyArmy? Through outreach and education Ready Army calls our Army community to action and aims to create a culture of preparedness that will save lives and strengthen the nation.
  • 152.
    Get a Kit Whendisaster strikes, emergency responders address the most critical needs and may not even be able to get to an area until it is deemed safe. While they work on behalf of the entire community, it is your responsibility to ensure your family’s well-being during times of crisis. Emergency kits to sustain for 72 hours are an essential tool for meeting that challenge.
  • 153.
    Make a Plan •Ensure everyone understands the plan, and practices. • How to communicate during an emergency. • Consider what to do, where to go, what to take. • Plan for members with disabilities or special needs. • Include pets in family plan. • Report status through ADPAAS. • Identify a continental U.S. contact.
  • 154.
    Be informed • Chainof Command • www.ready.army.mil • www.usarj.army.mil (Local Conditions Page) •www.facebook.com/usagj •Mass Notification System • Command Channel 13 • Eagle 810 radio • Family Assistance Center
  • 155.
    Emergency Supply Kit •Food supply for all family members for five days (ready to eat; no preparation required) • Bottled water • Protective mask • 30-day supply of prescription medication • Over-the-counter medications • Baby toiletries (diapers, etc.) (five-day supply) • Toiletry articles (toothbrush, etc.) • Feminine hygiene articles
  • 156.
    Emergency Supply Kit •Baby articles • First-Aid kit • Flashlight with extra batteries • Portable radio with extra batteries • Can opener • Backpack / luggage • Extra clothing (keep in mind baggage limits) • Blankets (seasonal) • $100 cash • Pet carrier (dog or cat only) with 10-day supply of pet foods