The curriculum vitae outlines Colin Dickie's personal and contact information, over 25 years of experience supervising power line construction projects around the world in various roles, and his extensive formal safety and operations training relevant to the power line industry. It details his objective, capabilities, work history with numerous companies on projects in many countries, and education and qualifications.
1. Curriculum Vitae Colin Dickie
Confidential 20th
May 2015 Page 1 of 3
Name Colin Dickie
Date of Birth 25/07/61
Citizenship British
Phone No. UK +1(780) 235 8670
Phone No. Thai +66 88-4948643
Address UK 6 Churchill AVE.
Amble, Morpeth,
Northumberland,
NE 650QJ England
Address Thai 14 Village No. 12 Nong Din Jee
Phon-ngam Sub-district
Nong Han District
Udon Thani Province
41130 Thailand
Email colindickie@hotmail.com
Objective.
My aim is to continue to add value to the projects that I work on, continue to learn
and polish my expertise, and continue to work with crews to producehigh-quality
projects safely and efficiently.
Capabilities.
I am a highly motivated individual with a positive and friendly attitude and have a
proven ability to supervise and motivate the crews that I work with.
Substantial experience in the industry has provided comprehensive knowledge of all
methods of tower erection and line stringing.
2. Curriculum Vitae Colin Dickie
Confidential 20th
May 2015 Page 2 of 3
Experience
I have over 25 years experience in the overhead transmission line industry - 14 of
those years with supervisory roles and responsibilities.
I have worked safely and effectively in multi-cultural and multi-lingual
environments.
I have successfully completed contracts in various roles in many different countries
worldwide.
Company Role Timing and Experience
Forbes Bros. LTD
Powerline Construction
Canada
Erecting
Supervisor
From March 2013 to Present:
Supervising the assembling & erection of 500kV dead-end K-frame
towers and monopoles in Alberta, Canada
Celtic Power Brisbane
Australia
Supervisor From April 2012 to November 2012:
Supervisor of a 220kV wiring project at Karratha, WA.
Supervising the erection of 220kV towers at Chinchilla QLD.
ETS Emsdetten
Germany
Supervisor From November 2008 to February 2012:
Supervising the assembly & erecting 110kV to 400 kV towers in all
parts of Germany.
Balfour Beatty Utility
Solutions England
Charge-hand From October 2007 to October 2008: Supervising the installation of
GAP conductoron a 275kv line in Canterbury
Chariot Construction
England
Charge-hand From February 2004 to August 2005:
Refurbishing 400kV line in Cornwall.
K.E.C International Iraq Construction
Supervisor
From February 2003 to April 2003:
Supervising the erection & wiring of a 220kV line from Basra
power station towards Bagdad.
S.A.G Germany L.E.1 From February 2002 to June 2002:
Erecting 220kV Butterfly design towers with Derrick in Donegal
Ireland.
A.B.B Germany Stringing
Supervisor
From April 2001 to September 2001:
Constructing new 220kV line from new power station in Sahara to
Khartoum, Sudan.
Rig-out Erection
Services England
L.E.1 From March 2000 to February 2001:
Dropping, refurbishing & reinstalling aerial systemon 600ft to
800ft guyed masts for M.O.D. at Anthorn, Cumbria. Erecting with
Derrick at 1200ft full live radio communication guyed mast M.O.D.
beside Carlisle, Cumbria.
Re-stringing 11kV wood pole line in Cornwall.
Balfour Beatty England L.E.1 From February 1999 to March 2000:
Erecting 400kV towers in York & erecting 275kV towers with
Derrick in Scotland.
Horst Lumer Germany L.E.1 From October 1999 to November 1999:
Erection 380kV and 220kV towers with crane & Derrick in
Germany & Luxembourg. Erecting 2 x 660ft river crossing towers
in Belgium, & Erecting 3 free-standing radio communication masts
in Bavaria.
Reiner Strepkowski
Germany
L.E.1 From May 1998 to August 1998:
Erecting Bundesbahn towers with crane and Derrick. Reinsulating,
spacing,jumpering & dismantling with burning gear & crane
110kV, 220kV to 380kV. Replacing tower tops of rusted towers,
installing bird scarers & helicopter warning systemon earth wire of
380kV towers.
T.L.S Nottigham
Holland & Scotland
L.E.2 & L.E.1 From October 1991 to September 1992:
Spacing 380kV line, erecting 380kV towers rewiring, and
reinsulating a 132kV line.
Hawker Siddeley Power
England
Trainee From June 1991 to September 1991:
Rewiring 275kV line, erecting tower with the crane. Spacing, de-
spacing and reinsulating.
L Lovas Germany Trainee From October 1989 to December 1989:
Assembling 110kV tower tops for erection with helicopter. Erecting
5x60 ton factories from February to April 1990.
3. Curriculum Vitae Colin Dickie
Confidential 20th
May 2015 Page 3 of 3
Education / Training
Substantial global experience over 25 years in the industry has provided
comprehensive knowledge of all methods of tower erection and line stringing.
Formal Training
Date Course Provider
03/17/2013 Standard First Aid CPR/AED Level Canadian Red Cross
03/18/2013 Telehandler Operator Training Program LIFTEX
03/20/2013 Workplace I/C Protection Program COMPETENCY CERTIFICATE
03/21/2013 Pre-Access CANN//AMM
03/25/2013 Construction Safety Training System Alberta Construction Safety Association
03/272013 Utility Worker Lines/Row ALTALINK
05/13/2013 WHMIS Training RS Line Contr. Co.Ltd.
06/12/2013 Signaler/Spotter Training RS Line Contr. Co.Ltd.
07/17/2013 Basic Rigging Cranemasters
03/14/2014 Pre-Access CANN//AMM
04/2014 Project WATL SNC LAVALIN ENVIRONMENT
05/2014 Project HATD SNC LAVALIN ENVIRONMENT
2015 Safety Orientation SNC LAVALIN