This document outlines an MEP project with Andrew Kelly as the leader. It discusses coordination of various basement levels including the water tank, plant room, pump room, corridor area, LV room, and substation. Five DFMA modules are planned for the basement. The ground level coordination covers the core area, with 7 DFMA modules planned. Typical module layouts are shown for levels 6 and the roof, with 36 roof modules incorporating solar panels.