The document provides instructions for disassembling and assembling the final drive carriers, hubs, and brakes of the rear axle of a M315D2 Wheeled Excavator. It lists the required tools and presents 23 steps for disassembly that include removing bolts, gears, seals, and bearings. It then lists the 27 steps for assembly, which involve cleaning, inspecting, and replacing components like seals, bearings, gears, and housings before refilling the final drives with oil.
This document provides instructions for disassembling and assembling the final drive carriers, hubs, and brakes of the rear axle of a Caterpillar M315D2 wheeled excavator. The 23-step disassembly procedure describes how to remove components like the carrier housing, planetary gears, brake discs, and hub. The 27-step assembly procedure explains how to install these parts in reverse order and adjust clearances for the brake discs. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
This document provides instructions for disassembling and assembling the rear axle of a M315D2 wheeled excavator. It lists required tools and gives step-by-step instructions for removing and installing various components of the final drive carriers, hubs, and brakes. This includes removing retaining rings, planetary gears, thrust washers, bearings, pistons, seals, and other parts. Precautions are provided regarding contained fluids, spring forces, and torque specifications for reassembly.
This document provides instructions for disassembling and assembling the rear axle of a M315D2 wheeled excavator. It lists 23 steps for disassembly, which include removing bolts, carriers, gears, seals, and bearings. It then lists 18 steps for assembly, which include cleaning parts, applying lubricants, pressing in seals, installing bearings and gears, and tightening bolts to specified torques. Clearances for brake discs are also checked during assembly.
This document provides instructions for disassembling and assembling the rear axle of a M315D2 wheeled excavator. It lists required tools and gives step-by-step instructions for removing and installing various components of the final drive carriers, hubs, and brakes. This includes removing retaining rings, planetary gears, thrust washers, bearings, pistons, seals, and other parts. Precautions are provided regarding contained fluids, spring forces, and torque specifications for reassembly.
This document provides instructions for disassembling and assembling the final drive carriers, hubs, and brakes of the rear axle of a Caterpillar M315D2 wheeled excavator. The 23-step disassembly procedure describes how to remove components like the carrier housing, planetary gears, brake discs, and hub. The 27-step assembly procedure explains how to install these parts in reverse order and adjust clearances for the brake discs. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
This document provides instructions for disassembling and assembling the rear axle carrier, hubs, and brakes of a M318D wheeled excavator. The disassembly procedure involves removing 23 components including carrier housing, planetary gears, thrust washers, retaining rings, and brake discs. The assembly procedure instructs installing these 23 components in reverse order and adjusting brake disc clearance. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches. Safety notices are provided to contain fluids and release spring forces safely.
This document provides instructions for disassembling and assembling the rear axle of a M318D wheeled excavator. The disassembly procedure involves removing components like the carrier housing, planetary gears, retaining rings, and brake discs. The assembly procedure outlines installing these components in reverse order and adjusting clearances for the brake discs. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
This document provides instructions for disassembling and assembling the rear axle of a M318D wheeled excavator. The disassembly procedure involves removing 23 components including the carrier housing, planetary gears, thrust washers, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and adjusting clearances and end play as specified. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
This document provides instructions for disassembling and assembling the final drive carriers, hubs, and brakes of the rear axle of a Caterpillar M315D2 wheeled excavator. The 23-step disassembly procedure describes how to remove components like the carrier housing, planetary gears, brake discs, and hub. The 27-step assembly procedure explains how to install these parts in reverse order and adjust clearances for the brake discs. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
This document provides instructions for disassembling and assembling the rear axle of a M315D2 wheeled excavator. It lists required tools and gives step-by-step instructions for removing and installing various components of the final drive carriers, hubs, and brakes. This includes removing retaining rings, planetary gears, thrust washers, bearings, pistons, seals, and other parts. Precautions are provided regarding contained fluids, spring forces, and torque specifications for reassembly.
This document provides instructions for disassembling and assembling the rear axle of a M315D2 wheeled excavator. It lists 23 steps for disassembly, which include removing bolts, carriers, gears, seals, and bearings. It then lists 18 steps for assembly, which include cleaning parts, applying lubricants, pressing in seals, installing bearings and gears, and tightening bolts to specified torques. Clearances for brake discs are also checked during assembly.
This document provides instructions for disassembling and assembling the rear axle of a M315D2 wheeled excavator. It lists required tools and gives step-by-step instructions for removing and installing various components of the final drive carriers, hubs, and brakes. This includes removing retaining rings, planetary gears, thrust washers, bearings, pistons, seals, and other parts. Precautions are provided regarding contained fluids, spring forces, and torque specifications for reassembly.
This document provides instructions for disassembling and assembling the final drive carriers, hubs, and brakes of the rear axle of a Caterpillar M315D2 wheeled excavator. The 23-step disassembly procedure describes how to remove components like the carrier housing, planetary gears, brake discs, and hub. The 27-step assembly procedure explains how to install these parts in reverse order and adjust clearances for the brake discs. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
This document provides instructions for disassembling and assembling the rear axle carrier, hubs, and brakes of a M318D wheeled excavator. The disassembly procedure involves removing 23 components including carrier housing, planetary gears, thrust washers, retaining rings, and brake discs. The assembly procedure instructs installing these 23 components in reverse order and adjusting brake disc clearance. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches. Safety notices are provided to contain fluids and release spring forces safely.
This document provides instructions for disassembling and assembling the rear axle of a M318D wheeled excavator. The disassembly procedure involves removing components like the carrier housing, planetary gears, retaining rings, and brake discs. The assembly procedure outlines installing these components in reverse order and adjusting clearances for the brake discs. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
This document provides instructions for disassembling and assembling the rear axle of a M318D wheeled excavator. The disassembly procedure involves removing 23 components including the carrier housing, planetary gears, thrust washers, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and adjusting clearances and end play as specified. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
Caterpillar cat m318 d wheeled excavator (prefix p8l) service repair manual (...ufjdjfjksekkmm
This document provides instructions for disassembling and assembling the rear axle of a M318D wheeled excavator. The disassembly procedure involves removing 23 components including the carrier housing, planetary gears, thrust washers, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and adjusting clearance between discs and setting end play between components. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
This document provides instructions for disassembling and assembling the rear axle carrier, hubs, and brakes of a M318D wheeled excavator. The disassembly procedure involves removing 23 components including carrier housing, planetary gears, thrust washers, retainers, pistons, seals, discs, gears, cones, cups, seals, and hubs. The assembly procedure instructs installing these 23 components in reverse order and adjusting brake disc clearance. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, nuts, washers, and torque multipliers.
This document provides instructions for disassembling and assembling the rear axle carrier, hubs, and brakes of a M318D wheeled excavator. The disassembly procedure involves removing 23 components including carrier housing, planetary gears, thrust washers, retaining rings, and brake discs. The assembly procedure instructs installing 23 components in reverse order and adjusting brake disc clearance. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches. Safety notices are provided to contain fluids and release spring forces safely.
This document provides instructions for disassembling and assembling the rear axle of a M318D wheeled excavator. The disassembly procedure involves removing components like the carrier housing, planetary gears, retaining rings, and brake discs. The assembly procedure outlines installing these components in reverse order and adjusting clearances for the brake discs. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
This document provides instructions for disassembling and assembling the rear axle carrier, hubs, and brakes of a M318D wheeled excavator. The disassembly procedure involves removing 23 components including carrier housing, planetary gears, thrust washers, retaining rings, and brake discs. The assembly procedure instructs installing these 23 components in reverse order and adjusting the brake disc clearance. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches. Safety notices are provided to contain fluids and release spring forces safely.
This document provides instructions for disassembling and assembling the final drive carriers, hubs, and brakes of the rear axle on an M318D Wheeled Excavator. The disassembly procedure involves removing 23 components including the carrier housing, planetary gears, thrust washers, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and adjusting brake clearance. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
This document provides instructions for disassembling and assembling the rear axle of a M318D wheeled excavator. The disassembly procedure involves removing 23 components including the carrier housing, planetary gears, thrust washers, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and adjusting clearances and end play as specified. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
Caterpillar cat m318 d wheeled excavator (prefix p8l) service repair manual (...udfjjsjekkemm
This document provides instructions for disassembling and assembling the rear axle carrier, hubs, and brakes of a M318D wheeled excavator. The disassembly procedure involves removing 23 components including carrier housing, planetary gears, thrust washers, retaining rings, and brake discs. The assembly procedure instructs installing these 23 components in reverse order and adjusting the brake disc clearance. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches. Safety notices are provided to contain fluids and release spring forces safely.
This document provides instructions for disassembling and assembling the rear axle of a M318D wheeled excavator. The disassembly procedure involves removing 23 components including the carrier housing, planetary gears, thrust washers, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and adjusting clearance between discs and setting end play between components. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
This document provides instructions for disassembling and assembling the final drive carriers, hubs, and brakes of the rear axle on a M318D Wheeled Excavator. The disassembly procedure involves removing 23 components including the carrier housing, planetary gears, thrust washers, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and adjusting brake clearance. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. It lists the required tools and gives step-by-step instructions to remove components such as the carrier housing, planetary gears, brake discs, bearings and seals. Corresponding assembly instructions are also provided, with details on cleaning, lubricating and setting clearance for components like the brake discs. The goal is to properly disassemble and reassemble the rear axle transmission and brake system.
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. It lists the required tools and gives step-by-step instructions to remove components such as the carrier housing, planetary gears, brake discs, bearings and seals. Corresponding assembly instructions are also provided, with details on cleaning, lubricating and setting clearance for components like the brake discs. The goal is to properly disassemble and reassemble the rear axle transmission and brake system.
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. The disassembly procedure involves removing 23 components of the rear axle including the carrier housing, planetary gears, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and includes steps to measure clearances and install seals, bearings, and thrust washers correctly. Tools required are also listed.
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. The disassembly procedure involves removing 23 components of the rear axle including the carrier housing, planetary gears, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and includes steps to measure clearances and install seals, bearings, and thrust washers correctly. Tools required are also listed.
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. The disassembly procedure involves removing 23 components of the rear axle including the carrier housing, planetary gears, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and includes steps to measure clearances and install seals, bearings, and thrust washers correctly. Tools required are also listed.
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. The disassembly procedure involves removing 23 components of the rear axle including the carrier housing, planetary gears, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and includes steps to measure clearances and install seals, bearings, and thrust washers correctly. Tools required are also listed.
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. It lists the required tools and gives step-by-step instructions to remove components such as the carrier housing, planetary gears, brake discs, bearings and seals. Corresponding assembly instructions are also provided, with details on cleaning, lubricating and setting clearance for components like the brake discs. The goal is to properly disassemble and reassemble the rear axle transmission and brake system.
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. The disassembly procedure involves removing 23 components of the rear axle including the carrier housing, planetary gears, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and includes steps to measure clearances and install seals, bearings, and thrust washers correctly. Tools required are also listed.
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. The disassembly procedure involves removing 23 components of the rear axle including the carrier housing, planetary gears, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and includes checking brake clearance and adjusting thrust washer thickness. Tools required are also listed.
Caterpillar cat m316 c wheeled excavator (prefix h2c) service repair manual (...jfskemsemm
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. It lists the required tools and presents 23 steps for disassembly, including removing the carrier housing, planetary gears, and hub. It then lists 28 steps for reassembly, providing details on installing bearings, seals, discs, and adjusting clearances. The goal is to properly disassemble and reassemble the rear axle components while containing fluids.
The document provides disassembly instructions for a piston pump (swing) in 3 sentences:
It outlines 49 steps to fully disassemble the piston pump, including removing components like the servo valve, charge pump, head, pistons, barrel assembly, swashplate assembly, shaft assembly, piston assembly, springs, seals, and other internal parts. Special tools are required to compress springs and remove retaining rings safely. Cleanliness is important and parts should be marked for proper reinstallation.
This document provides instructions for disassembling the piston pump (swing) of a M313C wheeled excavator. It lists 19 required tools and provides 42 detailed steps to disassemble all individual components of the pump. These include removing bolts, seals, gears, plates, valves, springs, pistons, bearings, and other internal parts. Disassembly requires marking parts for reinstallation and using various tools to compress springs and remove retaining rings. Personal injury precautions are also provided due to potential spring forces.
More Related Content
Similar to Caterpillar Cat M315D2 Wheeled Excavator (Prefix CH3) Service Repair Manual Instant Download.pdf
Caterpillar cat m318 d wheeled excavator (prefix p8l) service repair manual (...ufjdjfjksekkmm
This document provides instructions for disassembling and assembling the rear axle of a M318D wheeled excavator. The disassembly procedure involves removing 23 components including the carrier housing, planetary gears, thrust washers, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and adjusting clearance between discs and setting end play between components. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
This document provides instructions for disassembling and assembling the rear axle carrier, hubs, and brakes of a M318D wheeled excavator. The disassembly procedure involves removing 23 components including carrier housing, planetary gears, thrust washers, retainers, pistons, seals, discs, gears, cones, cups, seals, and hubs. The assembly procedure instructs installing these 23 components in reverse order and adjusting brake disc clearance. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, nuts, washers, and torque multipliers.
This document provides instructions for disassembling and assembling the rear axle carrier, hubs, and brakes of a M318D wheeled excavator. The disassembly procedure involves removing 23 components including carrier housing, planetary gears, thrust washers, retaining rings, and brake discs. The assembly procedure instructs installing 23 components in reverse order and adjusting brake disc clearance. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches. Safety notices are provided to contain fluids and release spring forces safely.
This document provides instructions for disassembling and assembling the rear axle of a M318D wheeled excavator. The disassembly procedure involves removing components like the carrier housing, planetary gears, retaining rings, and brake discs. The assembly procedure outlines installing these components in reverse order and adjusting clearances for the brake discs. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
This document provides instructions for disassembling and assembling the rear axle carrier, hubs, and brakes of a M318D wheeled excavator. The disassembly procedure involves removing 23 components including carrier housing, planetary gears, thrust washers, retaining rings, and brake discs. The assembly procedure instructs installing these 23 components in reverse order and adjusting the brake disc clearance. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches. Safety notices are provided to contain fluids and release spring forces safely.
This document provides instructions for disassembling and assembling the final drive carriers, hubs, and brakes of the rear axle on an M318D Wheeled Excavator. The disassembly procedure involves removing 23 components including the carrier housing, planetary gears, thrust washers, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and adjusting brake clearance. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
This document provides instructions for disassembling and assembling the rear axle of a M318D wheeled excavator. The disassembly procedure involves removing 23 components including the carrier housing, planetary gears, thrust washers, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and adjusting clearances and end play as specified. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
Caterpillar cat m318 d wheeled excavator (prefix p8l) service repair manual (...udfjjsjekkemm
This document provides instructions for disassembling and assembling the rear axle carrier, hubs, and brakes of a M318D wheeled excavator. The disassembly procedure involves removing 23 components including carrier housing, planetary gears, thrust washers, retaining rings, and brake discs. The assembly procedure instructs installing these 23 components in reverse order and adjusting the brake disc clearance. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches. Safety notices are provided to contain fluids and release spring forces safely.
This document provides instructions for disassembling and assembling the rear axle of a M318D wheeled excavator. The disassembly procedure involves removing 23 components including the carrier housing, planetary gears, thrust washers, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and adjusting clearance between discs and setting end play between components. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
This document provides instructions for disassembling and assembling the final drive carriers, hubs, and brakes of the rear axle on a M318D Wheeled Excavator. The disassembly procedure involves removing 23 components including the carrier housing, planetary gears, thrust washers, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and adjusting brake clearance. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. It lists the required tools and gives step-by-step instructions to remove components such as the carrier housing, planetary gears, brake discs, bearings and seals. Corresponding assembly instructions are also provided, with details on cleaning, lubricating and setting clearance for components like the brake discs. The goal is to properly disassemble and reassemble the rear axle transmission and brake system.
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. It lists the required tools and gives step-by-step instructions to remove components such as the carrier housing, planetary gears, brake discs, bearings and seals. Corresponding assembly instructions are also provided, with details on cleaning, lubricating and setting clearance for components like the brake discs. The goal is to properly disassemble and reassemble the rear axle transmission and brake system.
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. The disassembly procedure involves removing 23 components of the rear axle including the carrier housing, planetary gears, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and includes steps to measure clearances and install seals, bearings, and thrust washers correctly. Tools required are also listed.
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. The disassembly procedure involves removing 23 components of the rear axle including the carrier housing, planetary gears, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and includes steps to measure clearances and install seals, bearings, and thrust washers correctly. Tools required are also listed.
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. The disassembly procedure involves removing 23 components of the rear axle including the carrier housing, planetary gears, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and includes steps to measure clearances and install seals, bearings, and thrust washers correctly. Tools required are also listed.
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. The disassembly procedure involves removing 23 components of the rear axle including the carrier housing, planetary gears, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and includes steps to measure clearances and install seals, bearings, and thrust washers correctly. Tools required are also listed.
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. It lists the required tools and gives step-by-step instructions to remove components such as the carrier housing, planetary gears, brake discs, bearings and seals. Corresponding assembly instructions are also provided, with details on cleaning, lubricating and setting clearance for components like the brake discs. The goal is to properly disassemble and reassemble the rear axle transmission and brake system.
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. The disassembly procedure involves removing 23 components of the rear axle including the carrier housing, planetary gears, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and includes steps to measure clearances and install seals, bearings, and thrust washers correctly. Tools required are also listed.
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. The disassembly procedure involves removing 23 components of the rear axle including the carrier housing, planetary gears, retaining rings, and hub. The assembly procedure describes installing these 23 components in reverse order and includes checking brake clearance and adjusting thrust washer thickness. Tools required are also listed.
Caterpillar cat m316 c wheeled excavator (prefix h2c) service repair manual (...jfskemsemm
This document provides instructions for disassembling and assembling the rear axle of a M316C Wheeled Excavator. It lists the required tools and presents 23 steps for disassembly, including removing the carrier housing, planetary gears, and hub. It then lists 28 steps for reassembly, providing details on installing bearings, seals, discs, and adjusting clearances. The goal is to properly disassemble and reassemble the rear axle components while containing fluids.
Similar to Caterpillar Cat M315D2 Wheeled Excavator (Prefix CH3) Service Repair Manual Instant Download.pdf (20)
The document provides disassembly instructions for a piston pump (swing) in 3 sentences:
It outlines 49 steps to fully disassemble the piston pump, including removing components like the servo valve, charge pump, head, pistons, barrel assembly, swashplate assembly, shaft assembly, piston assembly, springs, seals, and other internal parts. Special tools are required to compress springs and remove retaining rings safely. Cleanliness is important and parts should be marked for proper reinstallation.
This document provides instructions for disassembling the piston pump (swing) of a M313C wheeled excavator. It lists 19 required tools and provides 42 detailed steps to disassemble all individual components of the pump. These include removing bolts, seals, gears, plates, valves, springs, pistons, bearings, and other internal parts. Disassembly requires marking parts for reinstallation and using various tools to compress springs and remove retaining rings. Personal injury precautions are also provided due to potential spring forces.
This document provides instructions for disassembling and assembling the travel motor of an M318C Wheeled Excavator. It lists 48 steps to fully disassemble the travel motor by removing components like valves, springs, seals, plugs and housings. It then lists 27 steps for reassembling the components in the reverse order, making sure to clean parts thoroughly and apply proper torque to bolts. Precision tools are required and safety precautions mentioned to avoid injury from pressurized parts.
This document provides instructions for disassembling and assembling the swing drive of an M322C wheeled excavator. It begins with 28 steps to disassemble the various components of the swing drive. These include removing retaining rings, springs, discs, plates, seals, gears, and bearings. It then lists 21 steps for reassembling the swing drive components in reverse order. Proper cleaning and lubrication of parts is emphasized. Required tools are listed for tasks like pressing components and removing retaining rings.
The document provides instructions for removing and installing the front axle of a M314F wheeled excavator. It details:
1) Removing the front axle assembly from the machine and disassembling it by removing components like the differential, bearings, and seals.
2) The assembly procedure which includes measuring clearances, installing bearings and seals, and adjusting the pinion depth using shims.
3) Tightening the pinion nut to the specified torque and reinstalling the front axle assembly onto the machine.
This document provides assembly instructions for a transmission in a wheeled excavator. It lists over 50 steps to assemble various transmission components like gears, seals, bearings, pins and plates. Precise measurements and specialized tools are required at several steps to ensure proper clearance and torque specifications. Safety warnings are included to prevent injury from spring-loaded parts.
This document provides disassembly and assembly instructions for the final drive carriers, hubs, and brakes of the front and rear axles of a M313D Wheeled Excavator. The disassembly procedure involves removing 22 components from the front axle and 23 components from the rear axle. The assembly procedure instructs technicians to install components in reverse order and provides tips on using specialty tools.
This document provides instructions for disassembling and assembling the main hydraulic pump of a M313D Wheeled Excavator. It lists 36 steps for disassembly, removing components like bolts, valves, pistons, springs, and seals. It then lists 28 steps for assembly, installing components in reverse order and noting specifics like lubrication and torque specifications. The goal is to properly disassemble and reassemble the pump while keeping parts clean to prevent wear and ensuring spring forces are safely released.
The document provides instructions for removing the idler gear from a Caterpillar C4.4 engine. Key steps include:
1. Locking the crankshaft, camshaft, and fuel injection pump gear in position using timing pins to maintain proper timing.
2. Removing the idler gear plate bolts and plate, then removing the idler gear and hub assembly.
3. Inspecting the removed parts for wear or damage and replacing as needed.
This document provides instructions for disassembling and assembling the torque converter of a D9T track-type tractor. It lists over 40 steps to disassemble components such as the torque converter cover, output shaft, stator support, and rotating housing. It then lists over 30 steps for assembling these same components in reverse order, including attaching various tools and ensuring proper torque for fasteners.
This document provides instructions for disassembling and assembling the front and rear axles of a M322D wheeled excavator. It lists the required tools and gives step-by-step instructions to remove components like carrier housings, planetary gears, bearings, seals and brake discs. Safety notices are included to warn of risks like being struck by parts under spring force.
The document provides instructions for disassembling and assembling the front axle of a M322D MH Wheeled Excavator. It lists the required tools and gives step-by-step instructions to remove components such as the carrier housing, planetary gears, thrust washers, retaining rings, and bearings. Instructions are provided to remove the ring gear housing, carrier gear, piston, seals, discs, and hub. Precautions and notes are included to aid the technician.
The document provides instructions for disassembling and assembling the front and rear axles of a M322F Wheeled Excavator. It describes removing components such as carrier housings, planetary gears, thrust washers, retaining rings, bearings, seals, pistons, discs, gears, cones, cups, spacers and hubs. Detailed steps and accompanying illustrations are provided to guide the process, and required tools are listed. Safety notices advise containing fluids and wearing protective equipment when working with pressurized components.
This document provides disassembly instructions for the final drive carriers, hubs, and brakes of the front and rear axles of a M322D MH wheeled excavator. It lists the required tools and presents step-by-step instructions with accompanying illustrations to remove components such as carrier housings, planetary gears, ring gear housings, pistons, discs, seals, bearings, and flanges. Safety notices are included to properly release pressures and contain fluids.
The document provides disassembly and assembly instructions for the final drive carriers, hubs, and brakes of the rear axle on a M322C Wheeled Excavator. The disassembly procedure involves removing 27 individual parts and components of the rear axle and brake assembly using various specialized tools. The instructions include illustrations showing each step and noting any safety precautions.
This document provides instructions for disassembling and assembling the swing drive of an M322C wheeled excavator. The removal procedure involves releasing hydraulic pressure, removing hoses and bolts, and lifting out the swing drive unit. Disassembly of the swing drive further requires removing retaining rings, plates, discs, seals, gears, and bearings. Reassembly follows the reverse order, applying lubricant and ensuring proper torque specifications are followed for nuts and bolts. Tools are specified for each step to aid in removal and installation of components.
The document provides instructions for assembling and installing the swing drive on an excavator. It includes 28 steps for assembly, requiring various tools. Key steps include installing bearings and seals, adjusting preload nuts to achieve the proper torque specifications, and verifying travel dimensions meet specifications. The instructions also cover attaching the assembled swing drive and connecting hydraulic lines.
This document provides instructions for disassembling and assembling the swing drive of an M318D MH wheeled excavator. The disassembly procedure involves 28 steps to remove components like the swing brake assembly, discs, plates, piston, seals, gears, bearings and retaining rings. The assembly procedure involves 12 steps and specifies cleaning and lubricating parts, as well as tightening nuts to specified torques while checking rolling torque values during reassembly. Precautions are provided for releasing spring forces and heating/cooling bearings. Required specialty tools are listed.
This document provides instructions for disassembling and assembling the swing drive of a M318C Wheeled Excavator. It describes 28 steps to disassemble the swing drive into individual components such as gears, bearings, seals and housing. It also lists the required tools. The assembly procedure is described in reverse order and notes to clean parts and apply lubrication during reassembly.
The document provides instructions for disassembling and assembling the front and rear axles of a M318D MH wheeled excavator. It details removing components such as carrier housings, planetary gears, bearings, seals, and brake discs. Tools required are listed. Precautions are given for releasing spring forces and containing fluids. The assembly section provides instructions for installing components in reverse order.
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsSprinter Gurus
Unlock the secrets behind your Mercedes Sprinter's uphill power loss with our comprehensive presentation. From fuel filter blockages to turbocharger troubles, we uncover the culprits and empower you to reclaim your vehicle's peak performance. Conquer every ascent with confidence and ensure a thrilling journey every time.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
The Octavia range embodies the design trend of the Škoda brand: a fusion of
aesthetics, safety and practicality. Whether you see the car as a whole or step
closer and explore its unique features, the Octavia range radiates with the
harmony of functionality and emotion
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
2. Shutdown SIS
Previous Screen
Product: WHEELED EXCAVATOR
Model: M315D2 WHEELED EXCAVATOR CH3
Configuration: M315 D2 Wheeled Excavator CH300001-UP (MACHINE) POWERED BY C4.4 Engine
Disassembly and Assembly
M315D, M315D Series 2, M315D2, M317D Series 2 and M317D2 Wheeled Excavators
Power Train
Media Number -KENR6029-06 Publication Date -01/07/2015 Date Updated -30/07/2018
i06220128
Final Drive Carriers, Hubs and Brakes - Disassemble - Rear
Axle
SMCS - 4054-015; 4092-015; 4253-015; 4255-015
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-1863 Retaining Ring Pliers 1
B
1P-0510 Driver Gp 2
5F-7345 Screw 1
C 267-6564 Spanner 1
D 1U-5832 Pry Bar 1
E 1U-6410 Three Jaw Puller 1
F 1P-0510 Driver Gp 1
G 1A-1935 Full Nut 1
3H-0465 Push-Puller Plate 4
5F-7342 Adapter 2
5F-7343 Bearing Puller Gp 1
5F-7366 Forcing Screw 1
5P-8248 Hard Washer 2
1/9(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
3. 6B-6684 Full Nut 2
6V-8237 Washer 1
8B-7549 Puller Leg 2
9S-7338 Crossblock 1
Start By:
a. Remove the rear tires and rims.
b. Release the hydraulic system pressure.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat products.
Dispose of all fluids according to local regulations and mandates.
1. Drain the oil from the front final drives into a suitable container. Refer to Operation and
Maintenance Manual, "Final Drive Oil - Change".
Illustration 1 g01178408
2. Attach a suitable lifting device to carrier housing (2).
3. Remove bolts (3).
2/9(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
4. 4. Remove carrier housing (2). The weight of carrier housing (2) is approximately 31 kg
(68 lb).
5. Disconnect hose assembly (1).
Illustration 2 g01136274
6. Use Tooling (A) in order to remove retaining rings (4).
Illustration 3 g01136278
7. Use Tooling (B) in order to remove planetary gears (5) from carrier housing (2).
8. Remove thrust washer (6).
3/9(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
5. Illustration 4 g01136281
9. Remove retaining ring (7), washer (8), and roller bearing (9).
Illustration 5 g01178409
Illustration 6 g01178410
10. Remove bolt (10). Use Tooling (C) in order to remove nut (11).
4/9(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
6. Illustration 7 g01178411
11. Remove O-ring seal (12). Remove stub shaft (13).
Illustration 8 g01178413
Note: Note the location of the alignment marks on ring gear housing (14) and the hub for
assembly purposes.
12. Use Tooling (D) to remove ring gear housing (14).
Illustration 9 g01178412
5/9(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
7. Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
13. Remove the bolts, the springs, and retainers (15). Remove piston (16).
Illustration 10 g01178414
14. Remove O-ring seal (17), ring (18), O-ring seal (19), and ring (20).
Illustration 11 g01178415
6/9(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
8. 15. Remove brake discs (21).
Illustration 12 g01178416
16. Remove O-ring seal (23). Use Tooling (D) in order to remove carrier gear (22).
Illustration 13 g01178429
17. Remove O-ring seal (24).
7/9(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
9. Illustration 14 g01178417
18. Use a suitable lifting device, Tooling (E), and Tooling (F) in order to remove bearing cone
(25).
19. Use two people in order to remove flange (26). The weight of flange (26) is approximately
38 kg (83 lb).
Illustration 15 g01178430
20. Remove lip seal (27). Remove bearing cups (28).
Illustration 16 g01178418
21. Remove spacer (29).
8/9(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
10. Illustration 17 g01178431
22. Use Tooling (F) and Tooling (G) in order to remove bearing cone (30).
Illustration 18 g01178432
23. Attach a suitable lifting device to hub (31). The weight of hub (31) is approximately 29 kg
(65 lb). Remove bolts (32) and hub (31).
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Thu Apr 16 08:46:13 UTC+0800 2020
9/9(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
11. Shutdown SIS
Previous Screen
Product: WHEELED EXCAVATOR
Model: M315D2 WHEELED EXCAVATOR CH3
Configuration: M315 D2 Wheeled Excavator CH300001-UP (MACHINE) POWERED BY C4.4 Engine
Disassembly and Assembly
M315D, M315D Series 2, M315D2, M317D Series 2 and M317D2 Wheeled Excavators
Power Train
Media Number -KENR6029-06 Publication Date -01/07/2015 Date Updated -30/07/2018
i06220146
Final Drive Carriers, Hubs and Brakes - Assemble - Front
Axle
SMCS - 4054-016; 4092-016; 4253-016; 4255-016
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-1863 Retaining Ring Pliers 1
C 267-6564 Spanner 1
J - Loctite Graphite 50 Anti-Seize Lubricant -
K 6V-6080 Torque Multiplier Gp 1
L 269-7627 Seal Installer 1
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat products.
1/11(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
12. Dispose of all fluids according to local regulations and mandates.
Illustration 1 g01136417
1. Raise the temperature of bearing cone (32) and install bearing cone (32).
Illustration 2 g01136418
2. Lower the temperature of bearing cups (30) and install bearing cups (30).
Illustration 3 g01136425
2/11(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
13. 3. Use Tooling (L) and a suitable press in order to install seal (29).
Illustration 4 g01136427
4. Attach a suitable lifting device to flange (28) and install flange (28). The weight of flange
(28) is approximately 38 kg (83 lb). Raise the temperature of bearing cone (27) and install
bearing cone (27).
Illustration 5 g01136302
5. Install O-ring seal (19), ring (20), O-ring seal (21), and ring (22).
Illustration 6 g01136296
3/11(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
14. Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
6. Position piston (18). Install bolts (17), the springs, and the retainers. Tighten bolts (17) to a
torque of 11 N·m (97 lb in).
Illustration 7 g01136430
7. Install ring gear housing (16).
Illustration 8 g01136432
8. Apply Tooling (J) to nut (14) and install nut (14). Use Tooling (C) and Tooling (K) in order
to tighten nut (14). Tighten nut (14) to a torque of 1400 + 200 - 0 N·m (103 + 14 - 0 lb ft).
4/11(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
15. 9. Rotate flange (28) in both directions several times in order to seat the bearings. Remove nut
(14) and remove ring gear housing (16).
Illustration 9 g01136323
10. Install O-ring seal (26).
Illustration 10 g01136428
11. Install carrier gear (25) and O-ring seal (24).
Illustration 11 g01136448
12. Install clutch discs (23). Alternate the friction discs and the drive plates during installation.
5/11(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
16. Illustration 12 g01136430
Illustration 13 g01136294
13. Install ring gear housing (16). Install O-ring seal (15) onto ring gear housing (16).
Illustration 14 g01136432
14. Apply Tooling (J) to nut (14) and install nut (14). Use Tooling (C) and Tooling (K) in order
to tighten nut (14). Tighten nut (14) to a torque of 1400 N·m (1033 lb ft).
6/11(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
18. Illustration 17 g01136707
15. Apply 9997 kPa (1450 psi) of pressure to the brakes. Measure the distance from the surface
of ring gear housing (16) to the surface of piston (18). Record the dimension as Dimension
(A).
16. Release the pressure from the brakes. Measure the distance from the surface of ring gear
housing (16) to the surface of piston (18). Record the dimension as Dimension (B). Subtract
Dimension (B) from Dimension (A) in order to determine Clearance (X) for the discs.
Clearance (X) for the discs should measure 1.2 mm (0.05 inch) to 1.8 mm (0.07 inch). Use
different discs until this clearance is reached.
Illustration 18 g01136724
17. Install bolt (13). Tighten bolt (13) to a torque of 32 N·m (283 lb in).
Illustration 19 g01136734
18. Measure the distance from the surface of carrier housing (2) to the surface of the seat for the
thrust washer. Record the dimension as Dimension (C).
8/11(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
19. Illustration 20 g01136743
Illustration 21 g01136746
19. Measure the distance from the surface of the sun gear to the mounting face of flange (28).
Record the dimension as Dimension (D).
20. Subtract Dimension (D) from Dimension (C). The resulting dimension is the thickness that
is needed for the thrust washer.
21. Use a suitable press in order to install the thrust washer.
Illustration 22 g01138776
9/11(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
20. 22. Raise the temperature of planetary gears (5) and install planetary gears (5).
Illustration 23 g01136274
23. Use Tooling (A) in order to install retaining rings (4).
Illustration 24 g00894124
24. Connect hose assembly (3).
Illustration 25 g00894123
25. Attach a suitable lifting device to carrier housing (2) and position carrier housing (2). The
weight of carrier housing (2) is approximately 31 kg (68 lb).
10/11(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
21. 26. Install bolts (1). Tighten bolts (1) to a torque of 55 N·m (41 lb ft).
27. Fill the front final drives with oil. Refer to Operation and Maintenance Manual, "Final Drive
Oil - Change".
End By:
a. Install the front tires and rims.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Thu Apr 16 08:47:09 UTC+0800 2020
11/11(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
22. Shutdown SIS
Previous Screen
Product: WHEELED EXCAVATOR
Model: M315D2 WHEELED EXCAVATOR CH3
Configuration: M315 D2 Wheeled Excavator CH300001-UP (MACHINE) POWERED BY C4.4 Engine
Disassembly and Assembly
M315D, M315D Series 2, M315D2, M317D Series 2 and M317D2 Wheeled Excavators
Power Train
Media Number -KENR6029-06 Publication Date -01/07/2015 Date Updated -30/07/2018
i06220167
Final Drive Carriers, Hubs and Brakes - Assemble - Rear
Axle
SMCS - 4054-016; 4092-016; 4253-016; 4255-016
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-1863 Retaining Ring Pliers 1
C 267-6564 Spanner 1
J - Loctite Graphite 50 Anti-Seize Lubricant -
K 6V-6080 Torque Multiplier Gp 1
L 269-7627 Seal Installer 1
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat products.
1/12(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
23. Dispose of all fluids according to local regulations and mandates.
Illustration 1 g01178432
1. Attach a suitable lifting device to hub (31). The weight of hub (31) is approximately 29 kg
(65 lb). Position hub (31) and install bolts (32). Tighten bolts (32) to a torque of 280 N·m
(207 lb ft).
Illustration 2 g01178643
2. Raise the temperature of bearing cone (30) and install bearing cone (30).
2/12(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
24. Illustration 3 g01178418
3. Install spacer (29).
Illustration 4 g01178644
4. Lower the temperature of bearing cups (28) and install bearing cups (28).
Illustration 5 g01184452
5. Use Tooling (L) and a suitable press in order to install lip seal (27) to a depth of
6.0 + 0.2 - 0 mm (0.24 + 0.01 - 0 inch) below the face of flange (26).
3/12(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
25. Illustration 6 g01184454
6. Attach a suitable lifting device to flange (26) and install flange (26). The weight of flange
(26) is approximately 38 kg (83 lb). Raise the temperature of bearing cone (25) and install
bearing cone (25).
Illustration 7 g01178414
7. Install O-ring seal (17), ring (18), O-ring seal (19), and ring (20).
Illustration 8 g01178412
4/12(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
26. Suggest:
If the above button click is invalid.
Please download this document
first, and then click the above link
to download the complete manual.
Thank you so much for reading
27. Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
8. Position piston (16). Install the bolts, the springs, and retainers (15). Tighten the bolts to a
torque of 11 N·m (97 lb in).
Illustration 9 g01185479
9. Install ring gear housing (14) and stub shaft (13).
Illustration 10 g01184499
5/12(W)
w
2020/4/16
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...