1. The document provides instructions for removing and installing various components of the 518 Wheel Skidder's power train, including tires and rims, wheels and wheel spindles, axles, front wheel brakes, and final drives.
2. The procedures include removing nuts and bolts, draining fluids, using specialty tools to press components out or install seals, and specifying torque specifications for reinstallation.
3. Technicians are advised to inspect seals for damage and replace as needed, apply anti-seize compound, and bleed brake lines after reassembly of braking components.
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...Import Motorworks
Learn how to respond when the red temperature light flashes in your VW with this presentation. From checking coolant levels to seeking professional help, follow these steps promptly to prevent engine damage and ensure safety on the road.
Things to remember while upgrading the brakes of your carjennifermiller8137
Upgrading the brakes of your car? Keep these things in mind before doing so. Additionally, start using an OBD 2 GPS tracker so that you never miss a vehicle maintenance appointment. On top of this, a car GPS tracker will also let you master good driving habits that will let you increase the operational life of your car’s brakes.
How To Fix The Key Not Detected Issue In Mercedes CarsIntegrity Motorcar
Experiencing a "Key Not Detected" problem in your Mercedes? Don’t take it for granted. Go through this presentation to find out the exact nature of the issue you are dealing with. Have your vehicle checked by a certified professional if necessary.
𝘼𝙣𝙩𝙞𝙦𝙪𝙚 𝙋𝙡𝙖𝙨𝙩𝙞𝙘 𝙏𝙧𝙖𝙙𝙚𝙧𝙨 𝙞𝙨 𝙫𝙚𝙧𝙮 𝙛𝙖𝙢𝙤𝙪𝙨 𝙛𝙤𝙧 𝙢𝙖𝙣𝙪𝙛𝙖𝙘𝙩𝙪𝙧𝙞𝙣𝙜 𝙩𝙝𝙚𝙞𝙧 𝙥𝙧𝙤𝙙𝙪𝙘𝙩𝙨. 𝙒𝙚 𝙝𝙖𝙫𝙚 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙥𝙡𝙖𝙨𝙩𝙞𝙘 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙪𝙨𝙚𝙙 𝙞𝙣 𝙖𝙪𝙩𝙤𝙢𝙤𝙩𝙞𝙫𝙚 𝙖𝙣𝙙 𝙖𝙪𝙩𝙤 𝙥𝙖𝙧𝙩𝙨 𝙖𝙣𝙙 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙛𝙖𝙢𝙤𝙪𝙨 𝙘𝙤𝙢𝙥𝙖𝙣𝙞𝙚𝙨 𝙗𝙪𝙮 𝙩𝙝𝙚 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙛𝙧𝙤𝙢 𝙪𝙨.
Over the 10 years, we have gained a strong foothold in the market due to our range's high quality, competitive prices, and time-lined delivery schedules.
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
Learn why monitoring your Mercedes' Exhaust Back Pressure (EBP) sensor is crucial. Understand its role in engine performance and emission reduction. Discover five warning signs of EBP sensor failure, from loss of power to increased emissions. Take action promptly to avoid costly repairs and maintain your Mercedes' reliability and efficiency.
The Octavia range embodies the design trend of the Škoda brand: a fusion of
aesthetics, safety and practicality. Whether you see the car as a whole or step
closer and explore its unique features, the Octavia range radiates with the
harmony of functionality and emotion
What Could Cause The Headlights On Your Porsche 911 To Stop WorkingLancer Service
Discover why your Porsche 911 headlights might flicker out unexpectedly. From aging bulbs to electrical gremlins and moisture mishaps, we're delving into the reasons behind the blackout. Stay tuned to illuminate the road ahead and ensure your lights shine bright for safer journeys.
Your VW's camshaft position sensor is crucial for engine performance. Signs of failure include engine misfires, difficulty starting, stalling at low speeds, reduced fuel efficiency, and the check engine light. Prompt inspection and replacement can prevent further damage and keep your VW running smoothly.
Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
2. Shutdown SIS
Previous Screen
Product: WHEEL SKIDDER
Model: 518 WHEEL SKIDDER 95U
Configuration: 518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3304 ENGINE
Disassembly and Assembly
518 SERIES II LOG SKIDDER AND GRAPPLE SKIDDER POWER TRAIN
Media Number -SENR5248-01 Publication Date -01/10/2004 Date Updated -24/05/2005
SENR52480002
Tires & Rims
SMCS - 4202-011; 4202-012
Remove Tires & Rims
1. Lift the tire of the floor with a cable and hoist. Put tooling (A) and wooden blocks in position as
shown under the axle housing.
1/2518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. 2. Remove mounting nuts (2) from wheel assembly. Remove the tire and rim (1). The weight of
the tire and rim assembly is 640 lb (290 kg).
Install Tires & Rims
1. Put the tire and rim in position on the wheel studs with a cable and hoist.
2. Install stud nuts and tighten to a torque of 350 ± 35 lb ft (475 ± 45 Nm).
3. Lift the tire high enough to remove the wooden blocks and tooling (A) from under vehicle.
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sat Sep 28 07:34:44 UTC+0800 2019
2/2518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Shutdown SIS
Previous Screen
Product: WHEEL SKIDDER
Model: 518 WHEEL SKIDDER 95U
Configuration: 518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3304 ENGINE
Disassembly and Assembly
518 SERIES II LOG SKIDDER AND GRAPPLE SKIDDER POWER TRAIN
Media Number -SENR5248-01 Publication Date -01/10/2004 Date Updated -24/05/2005
SENR52480003
Wheels & Wheel Spindles
SMCS - 4205-011; 4205-012; 4208
Remove Wheel & Wheel Spindles
Start By:
a. remove tires and rims
b. remove final drives
1. Remove four bolts (1) and lock nut (2) from hub assembly (3).
1/7518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. 2. Use tool (A) to remove nut from spindle. Install tooling (B) on wheel assembly (4) and remove
gear assembly (5) from wheel assembly.
3. Remove retaining ring (6) from hub assembly (7) and remove ring gear (8).
4. Remove roller cone bearing (9) if necessary from hub assembly (3) with tooling (D).
5. Remove wheel assembly from spindle.
6. Remove bearing cup (10) from wheel assembly with tooling (C).
2/7518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. 7. Remove duo-cone cone seal (11) from wheel housing. Remove bearing cup (12) from housing
with tooling (C).
8. Remove bearing cone (13) cup and duo-cone seal (14) from spindle. Remove spindle bolts (15)
and spindle (16) from axle housing.
9. Remove O-ring seal (17) from spindle.
Install Wheels & Wheel Spindles
3/7518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. 1. Inspect O-ring seal for damage and make a replacement if necessary. Install seal (1) on spindle.
2. Put spindle (2) in place with oil holes in the vertical position and install the bolts to fasten it to
the axle housing. Tighten bolts to a torque of 220 ± 25 lb ft (300 ± 34 N·m)
3. Install bearing cone (3) in position on spindle.
4. Install the Duo-Cone seal in the wheel with tool (A).
NOTE: The rubber seals and all surfaces that make contact with the seals must be clean and dry.
After installation of the seals, put SAE 30 oil on the contact surfaces of the metal seals.
5. Install bearing cup in wheel assembly (4) with tooling (B).
4/7518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. 6. Turn the wheel assembly over and install the Duo-Cone seal with tool (A).
7. Install tool (D) on the wheel assembly (4) and put it in position on the wheel spindle. Inspect O-
ring seal and make a replacement if necessary. Install seal (5).
8. Install bushing in hub (6) with tooling (C).
9. Install bearing cone (7) on hub assembly.
5/7518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. 10. Install retaining ring (8) on back side of gear (9) to lock hub assembly (10) and gear together.
11. Install gear assembly (11) in position in the wheel assembly (11) in position in the wheel
assembly and on the spindle.
12. Install nut loosely on spindle with tool (E).
13. Install nut (12) from the rim and tire on wheel stud as show.
6/7518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. 14. To preload wheel bearings tighten nut (13) against hub with tool (E) while the wheel is turned
to put bearings in correct position. Check the wheel rotating torque with a 9S7354 Torque
Wrench. The turning torque must be 76 ± 27 lb in. (8.6 ± 3.0 N·m) from the wheel stud. Turn nut
(13) to the next bolt hole and install bolts (14).
End By:
a. install tires and rims
b. install final drives
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sat Sep 28 07:35:33 UTC+0800 2019
7/7518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Shutdown SIS
Previous Screen
Product: WHEEL SKIDDER
Model: 518 WHEEL SKIDDER 95U
Configuration: 518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3304 ENGINE
Disassembly and Assembly
518 SERIES II LOG SKIDDER AND GRAPPLE SKIDDER POWER TRAIN
Media Number -SENR5248-01 Publication Date -01/10/2004 Date Updated -24/05/2005
SENR52480004
Axles
SMCS - 3259-010
Remove & Install Axles
1. Remove plug (1) to drain oil from differential carrier.
2. Remove bolts (2) and cover assembly (3) from carrier.
3. Remove O-ring seal (4) from cover.
1/2518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. 4. Remove axle shaft assembly (5) from housing.
5. Remove ring (8) from shaft with tool (A)
6. Remove gear (7) and washer (6) from shaft.
NOTE: Inspect O-ring seals for damage and make a replacement if necessary. Install O-ring seal
in cover.
NOTE: If the cover does not fit up against the final drive without force, remove the cover and
turn the flat sides of the three shafts as shown to give clearance for counterbore in cover.
NOTE: Install in the reverse order.
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sat Sep 28 07:36:22 UTC+0800 2019
2/2518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Shutdown SIS
Previous Screen
Product: WHEEL SKIDDER
Model: 518 WHEEL SKIDDER 95U
Configuration: 518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3304 ENGINE
Disassembly and Assembly
518 SERIES II LOG SKIDDER AND GRAPPLE SKIDDER POWER TRAIN
Media Number -SENR5248-01 Publication Date -01/10/2004 Date Updated -24/05/2005
SENR52480005
Front Wheel Brake
SMCS - 4256-010; 4256-015; 4256-016
Remove & Install Wheel Brakes
Start By
a. remove tire and rim
1. Lift machine and install tooling (A).
2. Remove two bolts (1), and bolts (2) and cover (3).
3. Install tool (B) and hoist on caliper (4).
1/6518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. 4. Disconnect brake line (5). Remove bolts (6), spacers and caliper from vehicle. Weight of caliper
is 95 lb (43 kg).
NOTE: The following notes should be taken when installing.
NOTE: Put 2P2506 Anti-Seize Compound on bolts and the face of spacers and install in position
to hold the caliper to the spindle. Tighten bolts to a torque of 120 ± 30 lb ft (160 ± 40 N·m).
Tighten bolt an additional 1/2 turn.
NOTE: Remove (bleed) the air from the brake system. See System Operation Testing And
Adjusting Manual.
NOTE: The clearance between pin (7) and the brake disc must not be less than .010 in. (0.25
mm). If the clearance is less than .010 in. (0.25 mm), turn bolt (8) counterclockwise one turn.
Slide pin (7) to get .010 in. (0.25 mm) clearance and tighten bolt (8) to a torque of 33 ± 5 lb ft (45
± 7 N·m).
Disassemble Wheel Brake Assembly
Start By:
a. remove brake head assemblies
2/6518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. 1. Remove four bolts (3) from the brake head assemblies.
2. Remove two pins (1) and brake carrier (2) from the brake head assembly.
3. Install tooling (A) on the brake head and the brake carrier (plate side) as shown.
4. Install block (4) so the maximum travel distance between block (4) and pistons (5) is not more
than 35 mm (1.378 in)
5. Put air free of water under a pressure of 690 to 1030 kPa (100 to 150 psi) into the brake head
assembly to make force to move out pistons (5).
6. Remove the block tooling (A), the pins and brake carrier from the brake head assembly.
7. Remove pistons (5) from the brake head.
3/6518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. 8. Remove bolts, (6) and plate (7) from the brake head.
9. Remove plugs (8) from the brake head.
10. Remove seals (9) from the brake head.
11. Remove pistons (10) from the brake head.
12. Remove boots (11) and seals (12) from both sides of the brake head.
Assemble Wheel Brake Assemblies
4/6518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. 1. Install seals (1) in the brake head.
2. Install boots (2) in the brake head.
3. Put pistons (3) into position in the brake head.
4. Install seals (4) (plate side) in the brake head as shown.
5/6518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
19. 5. Install plugs (5) in the brake head as shown.
6. Install plate (6) on the brake head.
7. Put brake carriers (7) into position in the brake head. Install pins (9) that hold the carriers in
place.
8. Install bolts (8) that hold the pins in place. Tighten the bolts to a torque of 45 ± 7 N·m (33 ± 5
lb ft).
End By:
a. install wheel brake assembly
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sat Sep 28 07:37:11 UTC+0800 2019
6/6518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Shutdown SIS
Previous Screen
Product: WHEEL SKIDDER
Model: 518 WHEEL SKIDDER 95U
Configuration: 518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3304 ENGINE
Disassembly and Assembly
518 SERIES II LOG SKIDDER AND GRAPPLE SKIDDER POWER TRAIN
Media Number -SENR5248-01 Publication Date -01/10/2004 Date Updated -24/05/2005
SENR52480006
Final Drives
SMCS - 4050-015; 4050-016; 4050-010
Remove & Install Final Drives
Start By:
a. remove drive axles
1. Install tooling (A) and a hoist to the final drive carrier.
2. Install two 1/2 "-13 NC forcing screws in carrier. Remove mounting bolts (1) and final drive
(2) from wheel. The weight of the final drive is 75 lb (34 kg).
3. The following steps are for the installation of the final drive.
4. Install tooling (A) and a hoist on the final drive carrier.
5. Put the final drive in the wheel assembly and install mounting bolts. Tighten bolts to a torque of
190 ± 18 lb ft (260 ± 24 N·m)
1/3518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. End By:
a. remove final drives
Disassemble Final Drives
Start By:
a. remove final drives
1. Remove pin (1) using punch and a hammer and remove gear (2) and two washers (3) from the
carrier.
2. Remove bearing from gear.
3. Remove shaft (1), gear (2), two washers (3) (one on top and bottom) and bearing (4).
Assemble Final Drive
2/3518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. 1. Install bearing (4) in gear (2).
2. Put gears (2) into positions in the carrier of the final drive. Install one steel washer and one
bronze washer on both sides of each gear.
NOTE: Install the steel washer against the gear and the bronze washer against the carrier of the
final drive.
3. Install pin (1) with the part that is cut away to the outside.
End By:
a. install final drives
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sat Sep 28 07:38:01 UTC+0800 2019
3/3518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Shutdown SIS
Previous Screen
Product: WHEEL SKIDDER
Model: 518 WHEEL SKIDDER 95U
Configuration: 518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3304 ENGINE
Disassembly and Assembly
518 SERIES II LOG SKIDDER AND GRAPPLE SKIDDER POWER TRAIN
Media Number -SENR5248-01 Publication Date -01/10/2004 Date Updated -24/05/2005
SENR52480007
Front Differential
SMCS - 3258-012; 3258-011
Remove Front Differential
Start By:
a. remove front axles
b. remove supplemental steering pump drive group (if equipped) *
*
This operation is in the Vehicle Systems Disassembly and Assembly Section.
1. Drain oil from the front axle housing.
2. Remove twenty-four bolts and cover.
3. Remove four bolts (1), two straps (2) and the front differential drive shaft (3).
1/4518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. 4. Disconnect tube assembly (4) from tee assembly. Remove bolt (5) (hidden) and spacer that
fastens tee to axle housing.
5. Remove plates (6) and brake line tube assemblies (7) as a unit from each side of axle housing.
standard housing
supplemental steering pump housing
6. Install two 1/2 "-13 NC forcing screws (8) in the carrier assembly. Install tooling (A) in
position on differential as shown.
7. Remove mounting bolts and differential assembly from housing. Weight of the differential is
190 lb (86 kg).
2/4518 GRAPPLE SKIDDER--SERIES II 95U03200-UP (MACHINE) POWERED BY 3...
2019/9/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...