This document provides instructions for removing and installing the fuel injection pump on a Caterpillar 3054 engine. It includes:
1) A list of required tools for removing and installing Type 2 engines and 7BJ engines, which includes timing pins and tamper resistant tools.
2) Steps for removing the fuel injection pump, which involve loosening a locking screw, aligning holes in the timing gear and pump, and removing bolts and nuts.
3) Steps for installing the fuel injection pump, which involve checking the O-ring seal, installing the pump and tightening flange nuts, positioning the timing gear, using timing pins to check alignment, and tightening bolts after removing backlash.
Caterpillar cat 428 c backhoe loader (prefix 2cr) service repair manual (2cr1...ufdjjsekkmdme
This document provides instructions for removing and installing the fuel injection pump on a Caterpillar 3054 engine. It includes:
1) A list of required tools for removing and installing Type 2 engines and 7BJ engines, which includes timing pins and tamper resistant tools.
2) Steps for removing the fuel injection pump, which involve loosening a locking screw, aligning holes in the timing gear and pump, and removing bolts and nuts.
3) Steps for installing the fuel injection pump, which involve checking the O-ring seal, installing the pump and tightening flange nuts, positioning the timing gear, using timing pins to check alignment, and tightening bolts after removing backlash.
Caterpillar cat 438 c backhoe loader (prefix 1jr) service repair manual (1jr0...ujdfjjkskkmmde
This document provides instructions for removing and installing the fuel injection pump on a Caterpillar 3054 engine. It describes:
1) The required tools including timing pins and tamper resistant tools.
2) The steps to remove the fuel injection pump which include loosening a locking screw, inserting a timing pin, and removing bolts and nuts.
3) The steps to install the fuel injection pump which include checking the O-ring seal, inserting the pump and timing gear, and inserting a timing pin to set the timing.
Caterpillar cat 428 c backhoe loader (prefix 2cr) service repair manual (2cr0...uuudfjjfjkkskm
This document provides instructions for removing and installing fuel injection nozzles and fuel injection pumps on a Caterpillar 3054 engine. The instructions include removing fuel lines, loosening nuts, removing nozzles and pumps, cleaning parts, and installing nozzles and pumps following specific tightening procedures and torque specifications. Safety notices are also provided to keep parts clean and contain fluids properly during the repair process.
Caterpillar cat 436 c backhoe loader (prefix 2ar) service repair manual (2ar0...fusjejfskekfmsme
This document provides instructions for removing and installing a fuel injection pump and turbocharger on a Caterpillar 3054 engine.
The fuel injection pump removal instructions include removing covers, disconnecting lines, and removing nuts and bolts. Tools including a bolt remover and crankshaft turning tool are required. For installation, the instructions specify cleaning and lubricating seals, aligning marks, installing bolts and nuts while ensuring proper timing.
The turbocharger removal involves loosening clamps and hoses, removing bolts and nuts. Plugging openings is important after removal. Installation is not described in the provided document.
This document provides instructions for removing and installing the fuel injection pump on a 307 excavator with a 3054 engine. It describes the required tools and begins by having the technician remove the water pump and fuel lines. For removal, the technician must rotate the crankshaft to align holes for a timing pin, then remove bolts and nuts to take off the pump. For installation, the technician checks the O-ring, installs it on the new pump, and mounts the pump while ensuring proper timing by aligning holes with a pin.
Caterpillar cat 312 b excavator (prefix 8jr) service repair manual (8jr00001 ...fjsekksmemm
The documents provide instructions for servicing components of the engine in a 312B L excavator. It describes how to disassemble, inspect, and reassemble the water pump. The instructions include removing the water pump from the engine, disassembling it into individual parts like the impeller and shaft, inspecting parts for wear, replacing the seal if needed, and reassembling the water pump using the appropriate tools and specifications. Proper cleanup and installation procedures are emphasized to prevent contamination.
Caterpillar cat 436 c backhoe loader (prefix 9jn) service repair manual (9jn0...ufjjdkfkksmme
The document provides instructions for removing and installing the fuel injection pump on a Caterpillar 3054 engine. It describes:
1) The required tools and safety precautions for the job.
2) The step-by-step process for removing the fuel injection pump, which involves removing bolts, nuts, and covers to access the pump.
3) The step-by-step process for installing the new fuel injection pump, which involves cleaning and lubricating seals, aligning marks, and tightening bolts to specified torques.
Caterpillar cat 428 c backhoe loader (prefix 8rn) service repair manual (8rn0...ufdjjsekkmdme
This document provides instructions for removing and installing fuel injection nozzles and fuel injection pumps on a Caterpillar 3054 engine. It describes the required tools and safety precautions. The procedures include removing fuel lines, loosening nuts and bolts, and using alignment pins to ensure proper timing when removing and installing components.
Caterpillar cat 428 c backhoe loader (prefix 2cr) service repair manual (2cr1...ufdjjsekkmdme
This document provides instructions for removing and installing the fuel injection pump on a Caterpillar 3054 engine. It includes:
1) A list of required tools for removing and installing Type 2 engines and 7BJ engines, which includes timing pins and tamper resistant tools.
2) Steps for removing the fuel injection pump, which involve loosening a locking screw, aligning holes in the timing gear and pump, and removing bolts and nuts.
3) Steps for installing the fuel injection pump, which involve checking the O-ring seal, installing the pump and tightening flange nuts, positioning the timing gear, using timing pins to check alignment, and tightening bolts after removing backlash.
Caterpillar cat 438 c backhoe loader (prefix 1jr) service repair manual (1jr0...ujdfjjkskkmmde
This document provides instructions for removing and installing the fuel injection pump on a Caterpillar 3054 engine. It describes:
1) The required tools including timing pins and tamper resistant tools.
2) The steps to remove the fuel injection pump which include loosening a locking screw, inserting a timing pin, and removing bolts and nuts.
3) The steps to install the fuel injection pump which include checking the O-ring seal, inserting the pump and timing gear, and inserting a timing pin to set the timing.
Caterpillar cat 428 c backhoe loader (prefix 2cr) service repair manual (2cr0...uuudfjjfjkkskm
This document provides instructions for removing and installing fuel injection nozzles and fuel injection pumps on a Caterpillar 3054 engine. The instructions include removing fuel lines, loosening nuts, removing nozzles and pumps, cleaning parts, and installing nozzles and pumps following specific tightening procedures and torque specifications. Safety notices are also provided to keep parts clean and contain fluids properly during the repair process.
Caterpillar cat 436 c backhoe loader (prefix 2ar) service repair manual (2ar0...fusjejfskekfmsme
This document provides instructions for removing and installing a fuel injection pump and turbocharger on a Caterpillar 3054 engine.
The fuel injection pump removal instructions include removing covers, disconnecting lines, and removing nuts and bolts. Tools including a bolt remover and crankshaft turning tool are required. For installation, the instructions specify cleaning and lubricating seals, aligning marks, installing bolts and nuts while ensuring proper timing.
The turbocharger removal involves loosening clamps and hoses, removing bolts and nuts. Plugging openings is important after removal. Installation is not described in the provided document.
This document provides instructions for removing and installing the fuel injection pump on a 307 excavator with a 3054 engine. It describes the required tools and begins by having the technician remove the water pump and fuel lines. For removal, the technician must rotate the crankshaft to align holes for a timing pin, then remove bolts and nuts to take off the pump. For installation, the technician checks the O-ring, installs it on the new pump, and mounts the pump while ensuring proper timing by aligning holes with a pin.
Caterpillar cat 312 b excavator (prefix 8jr) service repair manual (8jr00001 ...fjsekksmemm
The documents provide instructions for servicing components of the engine in a 312B L excavator. It describes how to disassemble, inspect, and reassemble the water pump. The instructions include removing the water pump from the engine, disassembling it into individual parts like the impeller and shaft, inspecting parts for wear, replacing the seal if needed, and reassembling the water pump using the appropriate tools and specifications. Proper cleanup and installation procedures are emphasized to prevent contamination.
Caterpillar cat 436 c backhoe loader (prefix 9jn) service repair manual (9jn0...ufjjdkfkksmme
The document provides instructions for removing and installing the fuel injection pump on a Caterpillar 3054 engine. It describes:
1) The required tools and safety precautions for the job.
2) The step-by-step process for removing the fuel injection pump, which involves removing bolts, nuts, and covers to access the pump.
3) The step-by-step process for installing the new fuel injection pump, which involves cleaning and lubricating seals, aligning marks, and tightening bolts to specified torques.
Caterpillar cat 428 c backhoe loader (prefix 8rn) service repair manual (8rn0...ufdjjsekkmdme
This document provides instructions for removing and installing fuel injection nozzles and fuel injection pumps on a Caterpillar 3054 engine. It describes the required tools and safety precautions. The procedures include removing fuel lines, loosening nuts and bolts, and using alignment pins to ensure proper timing when removing and installing components.
1. The document outlines the required tools and safety precautions for the job.
2. The removal procedure involves draining fluids, loosening bolts, and removing the fuel injection pump from the engine.
3. The installation procedure describes cleaning and lubricating parts, aligning the pump timing, and torquing bolts to specifications. Following installation, reattaching fluid lines and other components is specified.
This document provides instructions for removing and installing a fuel injection pump on a Caterpillar 3054 engine. It describes:
- Required tools including timing pins for aligning the pump.
- Preparation steps like removing lines and ensuring cleanliness.
- The removal process which involves loosening a locking spacer, aligning holes using a timing pin, and removing bolts and the pump.
- The installation process which involves checking the O-ring seal, lubricating it, and installing the pump temporarily to rotate the crankshaft into position before final installation.
1. The document outlines the required tools and safety precautions for the job.
2. The removal procedure involves draining fluids, loosening locking screws, aligning holes using timing pins, and removing mounting bolts and nuts.
3. The installation procedure describes inspecting seals, mounting the pump, aligning holes using timing pins, tightening bolts, and checking timing.
1. The document outlines the required tools and safety precautions for the job.
2. The removal procedure involves draining fluids, loosening bolts, and removing the fuel injection pump from the engine.
3. The installation procedure describes cleaning and lubricating parts, aligning the pump timing, and torquing bolts to specifications. Following installation, the document instructs reinstalling other components.
This document provides instructions for removing and installing a fuel injection pump on a Caterpillar 3054 engine. It describes:
- Required tools including timing pins for aligning the pump.
- Preparation steps like removing lines and ensuring cleanliness.
- The removal process which involves loosening a locking spacer, aligning holes using a timing pin, and removing bolts and the pump.
- The installation process which involves checking the O-ring seal, lubricating it, installing the pump, and using a timing pin to align holes before tightening bolts.
1. The document outlines the required tools and safety precautions for the job.
2. The removal procedure involves removing other components to access the pump, loosening a locking screw, aligning holes using a timing pin, and removing bolts to take off the pump.
3. The installation procedure describes inspecting and lubricating an O-ring, positioning the pump and timing gear, using a timing pin to set timing, and tightening bolts to complete installation.
1. The document outlines the required tools and safety precautions for the job.
2. The removal procedure involves draining fluids, loosening bolts, and removing the fuel injection pump from the engine.
3. The installation procedure describes cleaning and lubricating parts, aligning the pump timing, and torquing bolts to specifications. Following installation, reattaching fluid lines and other components is outlined.
1. The document outlines the required tools and safety precautions for the job.
2. The removal procedure involves draining fluids, loosening bolts, and removing the fuel injection pump from the engine.
3. The installation procedure describes cleaning and lubricating parts, aligning the pump timing, and torquing bolts to specifications. Following installation, reattaching fluid lines and other components is described.
This document provides instructions for removing and installing a fuel injection pump on a Caterpillar 3054 engine. It describes:
- Required tools including timing pins for aligning the pump.
- Preparation steps like removing lines and ensuring cleanliness.
- The removal process which involves loosening a locking spacer, aligning holes using a timing pin, and removing bolts and the pump.
- The installation process which involves checking the O-ring seal, lubricating it, installing the pump, and using a timing pin to align holes before tightening bolts.
This document provides instructions for removing and installing a fuel injection pump on a Caterpillar 3054 engine. It describes:
- Required tools including timing pins for aligning the pump.
- Preparation steps like removing lines and ensuring cleanliness.
- The removal process which involves loosening a locking spacer, aligning holes using a timing pin, and removing bolts and the pump.
- The installation process which involves checking the O-ring seal, lubricating it, installing the pump, and using a timing pin to align holes before tightening bolts.
This document provides instructions for removing and installing a fuel injection pump on a Caterpillar 3054 engine. It describes:
- Required tools including timing pins for aligning the pump.
- Preparation steps like removing fuel lines and the water pump.
- The removal process which involves loosening a locking spacer, aligning holes using a timing pin, and removing bolts and the pump.
- The installation process which involves checking the O-ring seal, lubricating it, installing the pump, and using a timing pin to align holes for bolting the pump into place.
1. The document outlines the required tools and safety precautions for the job.
2. The removal procedure involves draining fluids, loosening bolts, and removing the fuel injection pump from the engine.
3. The installation procedure describes cleaning and lubricating parts, aligning the pump timing, and torquing bolts to specifications. Following installation, the document instructs reinstalling other components.
1. The document outlines the required tools and safety precautions for the job.
2. The removal procedure involves draining fluids, loosening locking screws, aligning holes using timing pins, and removing mounting bolts and nuts.
3. The installation procedure describes inspecting seals, mounting the pump, aligning holes using timing pins, tightening bolts, and checking timing.
1. The document outlines the required tools and safety precautions for the job.
2. The removal procedure involves draining fluids, loosening bolts, and removing the fuel injection pump from the engine.
3. The installation procedure describes cleaning and lubricating parts, aligning the pump timing, and torquing bolts to specifications. Following installation, the document instructs reinstalling other components.
Caterpillar cat 438 c backhoe loader (prefix 1jr) service repair manual (1jr0...fujsefkksemm
This document provides instructions for removing and installing a fuel injection pump on a Caterpillar 3054 engine. It outlines the required tools, safety notices, and step-by-step procedures. To remove the pump, the technician must first remove other components like the water pump and fuel lines. They then use timing pins to align holes on the pump, gear, and body before removing bolts. Installation involves checking the O-ring seal, lubricating it, and mounting the pump while aligning timing marks. The document ensures the work is done with care to contain fluids and maintain correct timing.
Caterpillar cat 438 c backhoe loader (prefix 1jr) service repair manual (1jr0...fjjsefkksemme
This document provides instructions for removing and installing the fuel injection pump on a Caterpillar 3054 engine. It describes:
1) The required tools including timing pins and tamper resistant tools.
2) The steps to remove the fuel injection pump which include loosening a locking screw, inserting a timing pin, and removing bolts and nuts.
3) The steps to install the fuel injection pump which include checking the O-ring seal, inserting the pump, aligning the timing gear, inserting a timing pin, and tightening bolts.
Caterpillar cat 438 c backhoe loader (prefix 1jr) service repair manual (1jr0...ujfdjjkjskkemm
This document provides instructions for removing and installing the fuel injection pump on a Caterpillar 3054 engine. It describes:
1) The required tools including timing pins and tamper resistant tools.
2) The steps to remove the fuel injection pump which include loosening a locking screw, inserting a timing pin, and removing bolts and nuts.
3) The steps to install the fuel injection pump which include checking the O-ring seal, installing the pump, inserting the timing pin, and tightening bolts while ensuring proper timing.
Caterpillar cat 438 c backhoe loader (prefix 1jr) service repair manual (1jr0...fjskefksemer
This document provides instructions for removing and installing the fuel injection pump on a Caterpillar 3054 engine. It describes:
1) The required tools including timing pins and tamper resistant tools.
2) The steps to remove the fuel injection pump which include loosening a locking screw, inserting a timing pin, and removing bolts and nuts.
3) The steps to install the fuel injection pump which include checking the O-ring seal, inserting the pump, aligning the timing gear, inserting a timing pin, and tightening bolts.
New holland l228 tier 4 b (final) north america skid steer loader service rep...fujsjfkskemm
This document provides service information for New Holland skid steer and compact track loaders with Tier 4B diesel engines, including:
- Procedures for draining engine oil and coolant, removing the engine, radiator, and other components.
- Instructions for disconnecting hoses, wiring harnesses, and other connections when removing the engine.
- Notes on safety precautions and tilting the cab prior to engine removal.
New holland l221 stage iv skid steer loader service repair manual [nem479941 ]fujsjfkskemm
This document is a service manual for CNH Industrial America LLC 200 Series skid steer loaders and compact track loaders that meet Tier 4B and Stage IV emissions standards. It contains sections covering the engine, power coupling, front and rear axle systems, hydrostatic drive, brakes and controls, hydraulic systems, frames and ballasting, wheels, tracks and track suspension, cab climate control, electrical systems, front loader and bucket, platform, cab, bodywork, and decals. The manual provides repair and maintenance instructions for qualified dealership personnel to service these machines. It stresses the importance of only using approved parts and following procedures to maintain safe and environmentally-friendly operation.
New holland cs640 combine harvesters service repair manualfujsjfkskemm
This repair manual provides technical information for repairing and servicing New Holland agricultural equipment models CS520, CS540, CS640, CS660, and CL560. The manual is divided into sections covering different machine systems. Sections include distribution systems, power production, power train, travelling, body and structure, tool positioning, and crop processing. Each section contains chapters that provide technical specifications, descriptions of how systems work, diagnostic information like fault codes, and procedures for removal and installation of components. Information is coded using ICE (Information, Classification, Equipment) to allow easy searching by location, type, and product model.
New holland cr8.80 combine harvesters service repair manualfujsjfkskemm
This document is a service manual for CNH Industrial combine harvesters and covers models CX7.80 through CR10.90. It contains over 200 sections on the various systems of the combines, including the engine, transmission, hydraulics, electrical systems, attachments and more. Safety guidelines are provided at the beginning emphasizing disengaging drives, lowering attachments and shutting off the engine before servicing.
More Related Content
Similar to Caterpillar cat 428 c backhoe loader (prefix 2cr) service repair manual (2cr16212 19309)
1. The document outlines the required tools and safety precautions for the job.
2. The removal procedure involves draining fluids, loosening bolts, and removing the fuel injection pump from the engine.
3. The installation procedure describes cleaning and lubricating parts, aligning the pump timing, and torquing bolts to specifications. Following installation, reattaching fluid lines and other components is specified.
This document provides instructions for removing and installing a fuel injection pump on a Caterpillar 3054 engine. It describes:
- Required tools including timing pins for aligning the pump.
- Preparation steps like removing lines and ensuring cleanliness.
- The removal process which involves loosening a locking spacer, aligning holes using a timing pin, and removing bolts and the pump.
- The installation process which involves checking the O-ring seal, lubricating it, and installing the pump temporarily to rotate the crankshaft into position before final installation.
1. The document outlines the required tools and safety precautions for the job.
2. The removal procedure involves draining fluids, loosening locking screws, aligning holes using timing pins, and removing mounting bolts and nuts.
3. The installation procedure describes inspecting seals, mounting the pump, aligning holes using timing pins, tightening bolts, and checking timing.
1. The document outlines the required tools and safety precautions for the job.
2. The removal procedure involves draining fluids, loosening bolts, and removing the fuel injection pump from the engine.
3. The installation procedure describes cleaning and lubricating parts, aligning the pump timing, and torquing bolts to specifications. Following installation, the document instructs reinstalling other components.
This document provides instructions for removing and installing a fuel injection pump on a Caterpillar 3054 engine. It describes:
- Required tools including timing pins for aligning the pump.
- Preparation steps like removing lines and ensuring cleanliness.
- The removal process which involves loosening a locking spacer, aligning holes using a timing pin, and removing bolts and the pump.
- The installation process which involves checking the O-ring seal, lubricating it, installing the pump, and using a timing pin to align holes before tightening bolts.
1. The document outlines the required tools and safety precautions for the job.
2. The removal procedure involves removing other components to access the pump, loosening a locking screw, aligning holes using a timing pin, and removing bolts to take off the pump.
3. The installation procedure describes inspecting and lubricating an O-ring, positioning the pump and timing gear, using a timing pin to set timing, and tightening bolts to complete installation.
1. The document outlines the required tools and safety precautions for the job.
2. The removal procedure involves draining fluids, loosening bolts, and removing the fuel injection pump from the engine.
3. The installation procedure describes cleaning and lubricating parts, aligning the pump timing, and torquing bolts to specifications. Following installation, reattaching fluid lines and other components is outlined.
1. The document outlines the required tools and safety precautions for the job.
2. The removal procedure involves draining fluids, loosening bolts, and removing the fuel injection pump from the engine.
3. The installation procedure describes cleaning and lubricating parts, aligning the pump timing, and torquing bolts to specifications. Following installation, reattaching fluid lines and other components is described.
This document provides instructions for removing and installing a fuel injection pump on a Caterpillar 3054 engine. It describes:
- Required tools including timing pins for aligning the pump.
- Preparation steps like removing lines and ensuring cleanliness.
- The removal process which involves loosening a locking spacer, aligning holes using a timing pin, and removing bolts and the pump.
- The installation process which involves checking the O-ring seal, lubricating it, installing the pump, and using a timing pin to align holes before tightening bolts.
This document provides instructions for removing and installing a fuel injection pump on a Caterpillar 3054 engine. It describes:
- Required tools including timing pins for aligning the pump.
- Preparation steps like removing lines and ensuring cleanliness.
- The removal process which involves loosening a locking spacer, aligning holes using a timing pin, and removing bolts and the pump.
- The installation process which involves checking the O-ring seal, lubricating it, installing the pump, and using a timing pin to align holes before tightening bolts.
This document provides instructions for removing and installing a fuel injection pump on a Caterpillar 3054 engine. It describes:
- Required tools including timing pins for aligning the pump.
- Preparation steps like removing fuel lines and the water pump.
- The removal process which involves loosening a locking spacer, aligning holes using a timing pin, and removing bolts and the pump.
- The installation process which involves checking the O-ring seal, lubricating it, installing the pump, and using a timing pin to align holes for bolting the pump into place.
1. The document outlines the required tools and safety precautions for the job.
2. The removal procedure involves draining fluids, loosening bolts, and removing the fuel injection pump from the engine.
3. The installation procedure describes cleaning and lubricating parts, aligning the pump timing, and torquing bolts to specifications. Following installation, the document instructs reinstalling other components.
1. The document outlines the required tools and safety precautions for the job.
2. The removal procedure involves draining fluids, loosening locking screws, aligning holes using timing pins, and removing mounting bolts and nuts.
3. The installation procedure describes inspecting seals, mounting the pump, aligning holes using timing pins, tightening bolts, and checking timing.
1. The document outlines the required tools and safety precautions for the job.
2. The removal procedure involves draining fluids, loosening bolts, and removing the fuel injection pump from the engine.
3. The installation procedure describes cleaning and lubricating parts, aligning the pump timing, and torquing bolts to specifications. Following installation, the document instructs reinstalling other components.
Caterpillar cat 438 c backhoe loader (prefix 1jr) service repair manual (1jr0...fujsefkksemm
This document provides instructions for removing and installing a fuel injection pump on a Caterpillar 3054 engine. It outlines the required tools, safety notices, and step-by-step procedures. To remove the pump, the technician must first remove other components like the water pump and fuel lines. They then use timing pins to align holes on the pump, gear, and body before removing bolts. Installation involves checking the O-ring seal, lubricating it, and mounting the pump while aligning timing marks. The document ensures the work is done with care to contain fluids and maintain correct timing.
Caterpillar cat 438 c backhoe loader (prefix 1jr) service repair manual (1jr0...fjjsefkksemme
This document provides instructions for removing and installing the fuel injection pump on a Caterpillar 3054 engine. It describes:
1) The required tools including timing pins and tamper resistant tools.
2) The steps to remove the fuel injection pump which include loosening a locking screw, inserting a timing pin, and removing bolts and nuts.
3) The steps to install the fuel injection pump which include checking the O-ring seal, inserting the pump, aligning the timing gear, inserting a timing pin, and tightening bolts.
Caterpillar cat 438 c backhoe loader (prefix 1jr) service repair manual (1jr0...ujfdjjkjskkemm
This document provides instructions for removing and installing the fuel injection pump on a Caterpillar 3054 engine. It describes:
1) The required tools including timing pins and tamper resistant tools.
2) The steps to remove the fuel injection pump which include loosening a locking screw, inserting a timing pin, and removing bolts and nuts.
3) The steps to install the fuel injection pump which include checking the O-ring seal, installing the pump, inserting the timing pin, and tightening bolts while ensuring proper timing.
Caterpillar cat 438 c backhoe loader (prefix 1jr) service repair manual (1jr0...fjskefksemer
This document provides instructions for removing and installing the fuel injection pump on a Caterpillar 3054 engine. It describes:
1) The required tools including timing pins and tamper resistant tools.
2) The steps to remove the fuel injection pump which include loosening a locking screw, inserting a timing pin, and removing bolts and nuts.
3) The steps to install the fuel injection pump which include checking the O-ring seal, inserting the pump, aligning the timing gear, inserting a timing pin, and tightening bolts.
Similar to Caterpillar cat 428 c backhoe loader (prefix 2cr) service repair manual (2cr16212 19309) (18)
New holland l228 tier 4 b (final) north america skid steer loader service rep...fujsjfkskemm
This document provides service information for New Holland skid steer and compact track loaders with Tier 4B diesel engines, including:
- Procedures for draining engine oil and coolant, removing the engine, radiator, and other components.
- Instructions for disconnecting hoses, wiring harnesses, and other connections when removing the engine.
- Notes on safety precautions and tilting the cab prior to engine removal.
New holland l221 stage iv skid steer loader service repair manual [nem479941 ]fujsjfkskemm
This document is a service manual for CNH Industrial America LLC 200 Series skid steer loaders and compact track loaders that meet Tier 4B and Stage IV emissions standards. It contains sections covering the engine, power coupling, front and rear axle systems, hydrostatic drive, brakes and controls, hydraulic systems, frames and ballasting, wheels, tracks and track suspension, cab climate control, electrical systems, front loader and bucket, platform, cab, bodywork, and decals. The manual provides repair and maintenance instructions for qualified dealership personnel to service these machines. It stresses the importance of only using approved parts and following procedures to maintain safe and environmentally-friendly operation.
New holland cs640 combine harvesters service repair manualfujsjfkskemm
This repair manual provides technical information for repairing and servicing New Holland agricultural equipment models CS520, CS540, CS640, CS660, and CL560. The manual is divided into sections covering different machine systems. Sections include distribution systems, power production, power train, travelling, body and structure, tool positioning, and crop processing. Each section contains chapters that provide technical specifications, descriptions of how systems work, diagnostic information like fault codes, and procedures for removal and installation of components. Information is coded using ICE (Information, Classification, Equipment) to allow easy searching by location, type, and product model.
New holland cr8.80 combine harvesters service repair manualfujsjfkskemm
This document is a service manual for CNH Industrial combine harvesters and covers models CX7.80 through CR10.90. It contains over 200 sections on the various systems of the combines, including the engine, transmission, hydraulics, electrical systems, attachments and more. Safety guidelines are provided at the beginning emphasizing disengaging drives, lowering attachments and shutting off the engine before servicing.
New holland c232 tier 4 b (final) compact track loader service repair manual ...fujsjfkskemm
The document is a service manual that provides maintenance and repair instructions for CNH Industrial 200 Series skid steer loaders and compact track loaders with Tier 4B and Stage IV engines. It contains sections on the engine, power coupling, front and rear axle systems, hydrostatic drive, brakes and controls, hydraulic systems, frames and ballasting, wheels, tracks and track suspension, cab climate control, electrical systems, front loader and bucket, and the platform, cab, bodywork and decals. The manual provides detailed procedures and part numbers for repairs.
New holland c227 tier 4 b final [ndm471836 ]europe compact track loader serv...fujsjfkskemm
This document provides service information for New Holland skid steer and compact track loaders with Tier 4B diesel engines, including:
- Procedures for draining engine oil and coolant, removing the engine, radiator, and other components.
- Instructions for disconnecting hoses, wires, and other connections to fully separate the engine from the machine.
- Safety warnings and notes to properly support heavy components and avoid damage during removal and installation.
New holland b115 c backhoe loader service repair manualfujsjfkskemm
This document is a service manual that contains instructions and specifications for maintenance and repair of backhoe loaders. It includes sections on safety rules, maintenance, technical specifications, dimensions and performance data. The technical specifications section provides details on the diesel engine, transmission, axles, brakes, steering, hydraulic system, buckets and tires of the backhoe loaders. The document also has sections that provide instructions for removing and installing major components like the engine, transmission, radiator and hood.
New holland b110 ctc backhoe loader service repair manualfujsjfkskemm
This document is a service manual that contains instructions and specifications for maintenance and repair of backhoe loaders. It includes sections on safety rules, maintenance, technical specifications, dimensions and performance data. The technical specifications section provides details on the diesel engine, transmission, axles, brakes, steering, hydraulic system, buckets and tires of the backhoe loaders. The document also has sections that provide instructions for removing and installing major components like the engine, transmission, radiator and hood.
New holland cr8.90 combine harvesters service repair manualfujsjfkskemm
This document is a service manual for CNH Industrial combine harvesters and covers models CX7.80 through CR10.90. It contains over 200 sections on the various systems of the combines, including the engine, transmission, hydraulics, electrical systems, attachments and more. Safety guidelines are provided at the beginning, emphasizing disengaging drives, lowering attachments and shutting off the engine before servicing.
New holland c232 stage iv compact track loader service repair manual [nfm4021...fujsjfkskemm
This document is a service manual for CNH Industrial America LLC 200 Series skid steer loaders and compact track loaders that meet Tier 4B and Stage IV emissions standards. It contains sections covering the engine, power coupling, front and rear axle systems, hydrostatic drive, brakes and controls, hydraulic systems, frames and ballasting, wheels, tracks and track suspension, cab climate control, electrical systems, front loader and bucket, platform, cab, bodywork, and decals. The manual provides repair and maintenance instructions for qualified dealership personnel and emphasizes using approved parts and following procedures to maintain equipment and comply with emissions regulations.
Caterpillar cat 951 b track loader (prefix 86j) service repair manual (86j040...fujsjfkskemm
- The document provides instructions for disassembling and assembling starting motors for Caterpillar track loaders and excavators.
- It describes removing over a dozen parts from the 42-MT starting motor housing, including the rear housing, brushes, pinion drive, shift lever housing, and field winding coil.
- Similarly, it outlines dismantling the 37-MT and 41-MT starting motors by removing components like the solenoid, rear housing, brush holder, pinion drive housing, shift lever housing, and field winding coil.
- Reassembly involves cleaning parts and applying lubricants before reinstalling components in reverse order of removal.
Caterpillar cat 951 b track loader (prefix 86j) service repair manual (86j019...fujsjfkskemm
This document provides instructions for disassembling and assembling starting motors for Caterpillar track loaders and excavators. It describes the parts and tools needed and steps to disassemble components like the solenoid, rear housing, brush holder, pinion drive housing and shift lever housing. Cleaning and inspection steps are included. Diagrams illustrate the motor components and disassembly/assembly process.
Caterpillar cat 428 c backhoe loader (prefix 8rn) service repair manual (8rn0...fujsjfkskemm
This document provides instructions for removing and installing fuel injection nozzles on a 428C BACKHOE LOADER model. It describes removing the fuel lines, loosening the nut on the nozzle, and removing the nozzle and seat washer. For installation, it details cleaning parts, installing a new seat washer, applying anti-seize compound, inserting the nozzle, and tightening the nut. Additional sections provide similar instructions for other engine models and removing the fuel injection pump.
Caterpillar cat e70 b excavator (prefix 5tg) service repair manual (5tg00001 ...fujsjfkskemm
This document provides service information for the travel drive and motor of an E70B excavator. It includes:
- An overview of the travel drive and motor system, which converts hydraulic pressure into rotational force to power tracks. It consists of an axial plunger motor, counter-balance valve, parking brake, and reduction gears.
- Detailed descriptions and diagrams of how the motor, counter-balance valve, and parking brake function during starting, stopping, reversing, and overspeed conditions. The counter-balance valve controls oil flow to regulate motor speed.
- Specifications for the travel motor, gears, and brake valve that make up the travel drive and motor assembly.
The document provides instructions for properly installing Duo-Cone seals. It describes the components of a Duo-Cone seal and the assembly process. Critical steps include cleaning and inspecting the seal ring, rubber toric, and housing to ensure they are free of contamination or damage before installation. The seal ring and toric must be aligned and installed within specified tolerances to prevent leaks.
Caterpillar cat d6 r track tractor (prefix 7gr) service repair manual (7gr000...fujsjfkskemm
This document provides instructions for removing and installing the right final drive, planetary, and brake assembly of a D6R track-type tractor. The main steps include:
1. Draining the oil from the transmission, bevel gear case, and final drive.
2. Using tooling and a hoist, removing the outer axle, final drive assembly, planetary assembly, and brake as a single unit.
3. Disassembling the planetary and brake assembly by removing gears, discs, seals, and other components.
4. Reassembling the planetary and brake assembly by installing components in the reverse order of removal.
Caterpillar cat 428 c backhoe loader (prefix 2cr) service repair manual (2cr1...fujsjfkskemm
This document provides instructions for removing a fuel transfer pump on a Caterpillar 3054 engine. It begins by noting the importance of cleanliness and containing fluids. The steps then describe:
1) Disconnecting the fuel supply and return lines from the pump
2) Removing two bolts to release the pump
3) Cleaning the pump mounting surfaces before installing a new pump
Caterpillar cat d5 htsk ii track skidder (prefix 7eg) service repair manual (...fujsjfkskemm
The document provides instructions for removing and installing various engine components on a Caterpillar D5H Track-Type Skidder, including:
- Removing and installing valves, valve guides, valve seat inserts, and water directors
- Removing and installing pistons, connecting rods, and piston rings
- Disassembling and assembling pistons and connecting rods
The instructions include detailed steps and notes about identification marks, tooling used, torque specifications, and clearance checks.
Caterpillar cat d5 b track tractor (prefix 46x) service repair manual (46x000...fujsjfkskemm
This service repair manual provides instructions for repairing D5B track tractors with 3306 engines. It describes removing and installing various engine components like the front housing, valve mechanism cover, and gear group in the front of the engine. The procedures provide details on required tools, cleaning parts, applying sealants, and proper torque specifications for reinstallation.
Caterpillar cat d4 htsk iii track skidder (prefix 7pk) service repair manual ...fujsjfkskemm
This document provides instructions for servicing the cylinder head assembly of a Caterpillar 3304 engine. It describes removing and installing the cylinder head assembly in 31 steps, including draining coolant, removing bolts and various components, loosening belts, and installing push rods and valves. It also describes separately removing and installing the spacer plate and valve lifters. The overall document provides detailed disassembly and reassembly instructions for servicing the cylinder head.
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsSprinter Gurus
Unlock the secrets behind your Mercedes Sprinter's uphill power loss with our comprehensive presentation. From fuel filter blockages to turbocharger troubles, we uncover the culprits and empower you to reclaim your vehicle's peak performance. Conquer every ascent with confidence and ensure a thrilling journey every time.
EV Charging at MFH Properties by Whitaker JamiesonForth
Whitaker Jamieson, Senior Specialist at Forth, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Understanding Catalytic Converter Theft:
What is a Catalytic Converter?: Learn about the function of catalytic converters in vehicles and why they are targeted by thieves.
Why are They Stolen?: Discover the valuable metals inside catalytic converters (such as platinum, palladium, and rhodium) that make them attractive to criminals.
Steps to Prevent Catalytic Converter Theft:
Parking Strategies: Tips on where and how to park your vehicle to reduce the risk of theft, such as parking in well-lit areas or secure garages.
Protective Devices: Overview of various anti-theft devices available, including catalytic converter locks, shields, and alarms.
Etching and Marking: The benefits of etching your vehicle’s VIN on the catalytic converter or using a catalytic converter marking kit to make it traceable and less appealing to thieves.
Surveillance and Monitoring: Recommendations for using security cameras and motion-sensor lights to deter thieves.
Statistics and Insights:
Theft Rates by Borough: Analysis of data to determine which borough in NYC experiences the highest rate of catalytic converter thefts.
Recent Trends: Current trends and patterns in catalytic converter thefts to help you stay aware of emerging hotspots and tactics used by thieves.
Benefits of This Presentation:
Awareness: Increase your awareness about catalytic converter theft and its impact on vehicle owners.
Practical Tips: Gain actionable insights and tips to effectively prevent catalytic converter theft.
Local Insights: Understand the specific risks in different NYC boroughs, helping you take targeted preventive measures.
This presentation aims to equip you with the knowledge and tools needed to protect your vehicle from catalytic converter theft, ensuring you are prepared and proactive in safeguarding your property.
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitForth
Vanessa Warheit, Co-Founder of EV Charging for All, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
2. Shutdown SIS
Previous Screen
Product: BACKHOE LOADER
Model: 428C BACKHOE LOADER 2CR
Configuration: 428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWERED BY 3054 Engine
Disassembly and Assembly
3054 Engine for Caterpillar Built Machines
Media Number -SENR6241-13 Publication Date -01/08/2008 Date Updated -04/08/2008
i02105278
Fuel Injection Pump - Remove - Type 2 Engines and 7BJ
Engines
SMCS - 1251-011
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
150-3992 Timing Pin (1)
1
150-3993 Timing Pin (2)
1
B
171-1085
or
173-9774
Tamper Resistant Tool Gp 1
( 1 )
Tool (A) is required in order to remove Bosch fuel injection pumps.
( 2 )
Tool (A) is required in order to remove Delphi (Lucas) and Stanadyne fuel injection pumps.
Start By:
A. Remove the water pump. Refer to Disassembly and Assembly, "Water Pump - Remove".
B. Remove the fuel injection lines. Refer to Disassembly and Assembly, "Fuel Injection Lines
- Remove and Install".
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1/4428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop
Products Guide" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
Dispose of all fluids according to local regulations and mandates.
1. Ensure that the No. 1 cylinder is at the top center position on the compression stroke. Refer
to the Testing and Adjusting, "Fuel System" topic for additional information.
Illustration 1 g00808245
2. Loosen locking screw (2) (if equipped) until locking spacer (1) moves freely. Move locking
spacer (1) into position (B). Tighten locking screw (2) to a torque of 10 N·m (7 lb ft).
2/4428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Illustration 2 g00808370
Typical example
Note: Do not remove hub nut (4) from the shaft of the fuel injection pump. The hub of the
fuel injection pump is installed in the correct position from the factory in order to ensure
proper timing. If hub nut (4) is removed and the hub is removed, the hub will need to be
accurately installed on the shaft of the fuel injection pump by the use of special equipment.
Refer to your Caterpillar Dealer for more information.
Note: Do not release Torx screws (5) (if equipped). If the Torx screws are released and the
timing plate is moved, the timing position that is set at the factory will be lost. If the Torx
screws are released, the No. 1 cylinder must be set to the top center position on the
compression stroke before the Torx screws are tightened.
3. Slowly rotate the crankshaft until hole (6) in the timing gear and hole (7) in the hub are in
alignment with hole (8) in the fuel injection pump body.
Note: The location of Tool (A) for Bosch fuel injection pumps will be located toward the
top of the fuel injection pump. The location of Tool (A) for Delphi (Lucas) and Stanadyne
fuel injection pumps will be located toward the bottom of the fuel injection pump.
4. Install Tool (A) through hole (6) in the timing gear and hole (7) in the hub. Push Tool (A)
into position in hole (8) in the fuel injection pump body. If Tool (A) can be fully seated, the
fuel injection pump timing is correct. No resistance should be felt when the timing pin is
inserted into hole (8) of the fuel injection pump body.
3/4428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Note: Some fuel injection pumps are installed with tamper proof bolts. Tool (B) may be
necessary in order to remove the tamper proof bolts.
5. Remove four bolts (3) that fasten the fuel injection pump gear to the fuel injection pump.
Timing gear (9) should be free from the fuel injection pump shaft.
Illustration 3 g00808376
Typical example
6. Remove three flange nuts (10) and fuel injection pump (11) from the engine.
Illustration 4 g01059878
Typical example
7. Remove O-ring seal (12) from fuel injection pump (11) .
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Oct 16 15:28:17 UTC+0800 2019
4/4428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Shutdown SIS
Previous Screen
Product: BACKHOE LOADER
Model: 428C BACKHOE LOADER 2CR
Configuration: 428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWERED BY 3054 Engine
Disassembly and Assembly
3054 Engine for Caterpillar Built Machines
Media Number -SENR6241-13 Publication Date -01/08/2008 Date Updated -04/08/2008
i01083652
Fuel Injection Pump - Remove - Type 1 Engines and 9RM
Engines
SMCS - 1251-011
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 173-9774 Bolt Remover (1)
1
B 9U-6198 Crankshaft Turning Tool 1
C
8S-2264 Puller Group 1
8S-4712 Bolt 2
( 1 )
The bolt remover is required in order to remove the tamper proof bolts on the access cover for the fuel injection
pump.
Start By:
A. Remove the water pump. Refer to Disassembly and Assembly, "Water Pump - Remove".
B. Remove the fuel injection lines. Refer to Disassembly and Assembly, "Fuel Injection Lines
- Remove and Install".
Note: For a complete description of Type 1 and Type 2 engines, refer to the Disassembly and
Assembly, "Engine Design" topic.
NOTICE
Keep all parts clean from contaminants.
1/4428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Contaminants may cause rapid wear and shortened component life.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop
Products Guide" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
Dispose of all fluids according to local regulations and mandates.
Illustration 1 g00545256
1. Remove four bolts (1) .
Note: Some engines may have four tamper proof bolts (1). Use Tool (A) in order to remove
the tamper proof bolts bolts.
2. Remove cover (2) .
2/4428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 2 g00545258
3. Remove nut (3) and the lockwasher.
Illustration 3 g00571370
4. Use Tool (B) to rotate the crankshaft until keyway (X) is at 30 degrees from the vertical
centerline.
Illustration 4 g00571373
3/4428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. 5. Install Tool (C) .
6. Disengage the gear from the fuel injection pump.
Illustration 5 g00545262
7. Disconnect hose (7) from the fuel injection pump.
8. Remove three nuts (6) that hold fuel injection pump (5) in position.
9. Remove fuel injection pump (5) and the gasket.
Note: Ensure that you do not lose the key when the fuel injection pump is removed. Also
notice the position of marks (4) in order to ensure proper alignment of fuel injection pump
(5) during installation.
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Oct 16 15:29:13 UTC+0800 2019
4/4428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Shutdown SIS
Previous Screen
Product: BACKHOE LOADER
Model: 428C BACKHOE LOADER 2CR
Configuration: 428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWERED BY 3054 Engine
Disassembly and Assembly
3054 Engine for Caterpillar Built Machines
Media Number -SENR6241-13 Publication Date -01/08/2008 Date Updated -04/08/2008
i02046409
Fuel Injection Pump - Install - Type 2 Engines and 7BJ
Engines
SMCS - 1251-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
150-3992 Timing Pin (1)
1
150-3993 Timing Pin (2)
1
B
171-1085
or
173-9774
Tamper Resistant Tool Gp 1
( 1 )
Tooling (A) is required in order to install Bosch fuel injection pumps.
( 2 )
Tooling (A) is required in order to install Dephi (Lucas) and Stanadyne fuel injection pumps.
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1/5428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 1 g01059878
Typical example
1. Check the condition of O-ring seal (13) on fuel injection pump (12). If the seal is worn or
damaged, replace the seal.
2. Lightly lubricate O-ring seal (13) with clean engine oil. Install O-ring seal (13) on fuel
injection pump (12) .
NOTICE
The No. 1 cylinder must be at the top center position on the
compression stroke before the fuel injection pump is installed. If the
crankshaft needs to be rotated, the fuel injection pump must be
mounted temporarily or the loose gear could cause damage to the front
housing.
Illustration 2 g00808376
Typical example
2/5428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. 3. Put fuel injection pump (12) in position on the engine. Ensure that the timing gear is aligned
with the hub of fuel injection pump (12). Install three flange nuts (11) and tighten the flange
nuts to a torque of 28 N·m (21 lb ft).
Illustration 3 g00808370
Typical example
4. Position gear (9) on the shaft of the fuel injection pump.
Note: Some fuel injection pumps are installed with tamper proof bolts. Tooling (B) may be
necessary in order to install the tamper proof bolts.
5. Put the timing gear plate in position and install four bolts (3). Tighten the four bolts finger
tight.
Note: The fuel injection pump gear will only fit in one position. Install the gear with the
letters "C" and "M" facing away from the engine.
3/5428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Illustration 4 g00808245
Typical example
6. Loosen locking screw (2) (if equipped) until locking spacer (1) moves freely. Move locking
spacer (1) into position (A). Tighten locking screw (2) to a torque of 10 N·m (7 lb ft).
Note: The location of Tooling (A) for Bosch fuel injection pumps will be located toward the
top of the fuel injection pump. The location of Tooling (A) for Dephi (Lucas) and
Stanadyne fuel injection pumps will be located toward the bottom of the fuel injection
pump.
7. Install Tooling (A) through hole (6) in the timing gear and hole (7) in the hub. Push Tooling
(A) into position in hole (8) in the fuel injection pump body. If Tooling (A) can be fully
seated, the fuel injection pump timing is correct. No resistance should be felt when the
timing pin is inserted into hole (8) of the fuel injection pump body.
NOTICE
The fuel injection pump may be supplied with the fuel injection pump
shaft in the locked position. The drive shaft of the fuel injection pump
must not be rotated without the spacer in position under the locking
screw. Damage to the drive shaft of the fuel injection pump will result.
8. When the timing plate is installed, rotate gear (9) by hand in a counterclockwise direction in
order to remove the backlash between gear (9) and the idler gear. Do not rotate the
crankshaft or the fuel injection pump shaft. Tighten bolts (3) to a torque of 28 N·m (21 lb
ft).
9. Remove Tooling (A) from the fuel injection pump gear.
4/5428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. End By:
a. Install the fuel injection lines. Refer to Disassembly and Assembly, "Fuel Injection Lines -
Remove and Install".
b. Install the water pump. Refer to Disassembly and Assembly, "Water Pump - Install".
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Oct 16 15:30:10 UTC+0800 2019
5/5428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Shutdown SIS
Previous Screen
Product: BACKHOE LOADER
Model: 428C BACKHOE LOADER 2CR
Configuration: 428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWERED BY 3054 Engine
Disassembly and Assembly
3054 Engine for Caterpillar Built Machines
Media Number -SENR6241-13 Publication Date -01/08/2008 Date Updated -04/08/2008
i01083913
Fuel Injection Pump - Install - Type 1 Engines and 9RM
Engines
SMCS - 1251-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 173-9774 Bolt Remover (1)
1
( 1 )
The bolt remover is required in order to install the tamper proof bolts on the access cover for the fuel injection
pump.
Note: For a complete description of Type 1 and Type 2 Engines, refer to the Disassembly and
Assembly, "Engine Design" topic.
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1. Inspect the condition of the gasket for the fuel injection pump. Replace the gasket, if
necessary.
1/3428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 1 g00545262
2. Install the gasket and fuel injection pump (5) .
Note: Align marks (4) that are on fuel injection pump (5) and the timing gear cover.
3. Install the key.
4. Install three nuts (6) that hold fuel injection pump (5) in position.
5. Connect hose (7) to fuel injection pump (5) .
6. Engage the gear with the fuel injection pump.
Illustration 2 g00545258
7. Install the lockwasher and nut (3) .
2/3428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 3 g00545256
8. Install cover (2) and four bolts (1) .
Note: Some engines have four tamper proof bolts (1). Use Tool (A) in order to install the
four bolts.
9. Set the timing of the fuel injection pump. Refer to the Testing and Adjusting Module for the
correct procedure.
End By:
a. Install the fuel injection lines. Refer to Disassembly and Assembly, "Fuel Injection Lines -
Install".
b. Install the water pump. Refer to Disassembly and Assembly, "Water Pump - Install".
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Oct 16 15:31:07 UTC+0800 2019
3/3428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Shutdown SIS
Previous Screen
Product: BACKHOE LOADER
Model: 428C BACKHOE LOADER 2CR
Configuration: 428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWERED BY 3054 Engine
Disassembly and Assembly
3054 Engine for Caterpillar Built Machines
Media Number -SENR6241-13 Publication Date -01/08/2008 Date Updated -04/08/2008
i01051839
Turbocharger - Remove
SMCS - 1052-011
Removal Procedure
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop
Products Guide" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
Dispose of all fluids according to local regulations and mandates.
1/3428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
20. Illustration 1 g00545445
Typical example
1. Loosen two clamps (1) .
2. Slide hose (2) away from turbocharger (3) .
3. Remove two bolts (4) and the gasket.
4. Disconnect oil return line (6) from the cylinder block and remove the gasket.
5. Remove nuts (5) .
Illustration 2 g00545446
Typical example
6. Remove three bolts (7) .
2/3428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. 7. Remove turbocharger (3) and the gaskets.
8. Plug all openings immediately.
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Oct 16 15:32:04 UTC+0800 2019
3/3428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Shutdown SIS
Previous Screen
Product: BACKHOE LOADER
Model: 428C BACKHOE LOADER 2CR
Configuration: 428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWERED BY 3054 Engine
Disassembly and Assembly
3054 Engine for Caterpillar Built Machines
Media Number -SENR6241-13 Publication Date -01/08/2008 Date Updated -04/08/2008
i01051906
Turbocharger - Disassemble
SMCS - 1052-015
Disassembly Procedure
Start By:
A. Remove the turbocharger. Refer to Disassembly and Assembly, "Turbocharger - Remove".
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop
Products Guide" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
Dispose of all fluids according to local regulations and mandates.
1/3428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. 1. Place an index mark on all of the components for the assembly procedure.
Illustration 1 g00545460
Typical example
2. Remove elbow (1) and the O-ring seal.
3. Remove two bolts (2) .
4. Remove hose assembly (3) and the gasket.
Illustration 2 g00545463
Typical example
5. Remove six bolts (4) .
6. Remove three clamps (5) .
7. Separate compressor housing (6) from cartridge (7) .
2/3428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Illustration 3 g00545464
Typical example
Illustration 4 g00545505
Typical example
8. Remove six bolts (8) .
9. Remove three clamps (9) .
10. Separate cartridge (7) from turbine housing (10) .
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Oct 16 15:33:00 UTC+0800 2019
3/3428C Backhoe Loader Side Shift, Parallel Lift 2CR16212-19309 (MACHINE) POWE...
2019/10/16https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...