This document provides instructions for disassembling and assembling the travel motor on 349E and 349E L excavator models. The disassembly process involves 24 steps to remove components like the head assembly, brake housing, barrel assembly, pistons, and bearings. The assembly process reverses this with 13 steps like installing seals, springs, pins and bearings onto components before lowering the rotating group into the motor housing. Precautions and torque specifications are provided for correct reassembly.
This document provides instructions for disassembling and assembling the travel motor on a 349E excavator. The disassembly process includes 27 steps to remove components like the head assembly, brake housing, rotating group, barrel assembly and more. The assembly process reverses the disassembly with 13 steps like installing seals, springs, pistons and plates in the proper order and orientation. Precise torques and specifications are provided to ensure correct reassembly.
Caterpillar Cat 349E and 349E L Excavator (Prefix RGH) Service Repair Manual ...f89siekkmdmm2w
This document provides instructions for disassembling and assembling the travel motor on 349E and 349E L excavator models. The disassembly process involves 27 steps to remove components from the motor housing, head assembly, rotating group, and barrel assembly. The assembly process describes 13 steps and specifications to reinstall components in the reverse order, ensuring proper torque values and lubrication of parts. Key components include the motor housing, head assembly, shaft assembly, barrel assembly, pistons, bearings, seals, springs, and related hardware.
Caterpillar Cat 349E L Excavator (Prefix RGH) Service Repair Manual (RGH00001...jdksmmdmdd
This document provides instructions for disassembling and assembling the travel motor on a 349E excavator. The disassembly process includes 27 steps to remove components like the head assembly, brake housing, rotating group, barrel assembly and more. The assembly process reverses the disassembly with 13 steps like installing seals, springs, pistons and plates in the proper order and orientation. Torque specifications and lubrication requirements are provided for many components.
Caterpillar Cat 349E and 349E L Excavator (Prefix RGH) Service Repair Manual ...f8uejkdkdmm3e
This document provides instructions for disassembling and assembling the travel motor on 349E and 349E L excavator models. It describes in detail the 27 steps to disassemble the motor, removing components like the head assembly, brake housing, rotating group, barrel assembly, and more. It then lists the required tools and specifications and describes the 25 steps to reassemble the motor, providing illustrations to show how to install components like the actuator piston, seals, bearing races, barrel assembly, pistons, and more.
This document provides instructions for disassembling and assembling the travel motor on 349E and 349E L excavator models. It includes 27 steps for disassembly, removing components like the head assembly, brake housing, rotating group and individual parts within these assemblies. The assembly section includes 13 steps and specifications for reinstalling components and torquing fasteners, ensuring parts like seals and springs meet specifications. The goal is to properly disassemble and reassemble the travel motor while following all safety precautions.
Caterpillar cat 349 e l excavator (prefix rgh) service repair manual (rgh0000...hhfjksekmm
This document provides instructions for disassembling and assembling the travel motor on 349E and 349E L excavator models. The disassembly process involves 27 steps to remove components from the motor housing, head assembly, rotating group, and barrel assembly. The assembly process describes 13 steps and specifications to reinstall components in the reverse order, ensuring proper torque values and lubrication of parts. Key components include the motor housing, head assembly, shaft assembly, barrel assembly, pistons, bearings, seals, springs, and related hardware.
Caterpillar cat 349 e excavator (prefix rgh) service repair manual (rgh00001 ...fjskekxcddmmme
This document provides instructions for disassembling and assembling the travel motor on a 349E excavator. The disassembly process includes 27 steps to remove components like the head assembly, brake housing, rotating group, barrel assembly and more. The assembly process reverses the disassembly with 13 steps like installing seals, springs, pistons and plates in the proper order and orientation. Torque specifications and lubrication requirements are provided for many components.
Caterpillar cat 349 e l excavator (prefix rgh) service repair manual (rgh0000...fjskekxcddmmme
This document provides instructions for disassembling and assembling the travel motor on a 349E excavator. The disassembly process includes 27 steps to remove components like the head assembly, brake housing, rotating group, barrel assembly and more. The assembly process reverses the disassembly with 13 steps like installing seals, springs, pistons and plates in the proper order and orientation. Torque specifications and lubrication requirements are provided for many components.
This document provides instructions for disassembling and assembling the travel motor on a 349E excavator. The disassembly process includes 27 steps to remove components like the head assembly, brake housing, rotating group, barrel assembly and more. The assembly process reverses the disassembly with 13 steps like installing seals, springs, pistons and plates in the proper order and orientation. Precise torques and specifications are provided to ensure correct reassembly.
Caterpillar Cat 349E and 349E L Excavator (Prefix RGH) Service Repair Manual ...f89siekkmdmm2w
This document provides instructions for disassembling and assembling the travel motor on 349E and 349E L excavator models. The disassembly process involves 27 steps to remove components from the motor housing, head assembly, rotating group, and barrel assembly. The assembly process describes 13 steps and specifications to reinstall components in the reverse order, ensuring proper torque values and lubrication of parts. Key components include the motor housing, head assembly, shaft assembly, barrel assembly, pistons, bearings, seals, springs, and related hardware.
Caterpillar Cat 349E L Excavator (Prefix RGH) Service Repair Manual (RGH00001...jdksmmdmdd
This document provides instructions for disassembling and assembling the travel motor on a 349E excavator. The disassembly process includes 27 steps to remove components like the head assembly, brake housing, rotating group, barrel assembly and more. The assembly process reverses the disassembly with 13 steps like installing seals, springs, pistons and plates in the proper order and orientation. Torque specifications and lubrication requirements are provided for many components.
Caterpillar Cat 349E and 349E L Excavator (Prefix RGH) Service Repair Manual ...f8uejkdkdmm3e
This document provides instructions for disassembling and assembling the travel motor on 349E and 349E L excavator models. It describes in detail the 27 steps to disassemble the motor, removing components like the head assembly, brake housing, rotating group, barrel assembly, and more. It then lists the required tools and specifications and describes the 25 steps to reassemble the motor, providing illustrations to show how to install components like the actuator piston, seals, bearing races, barrel assembly, pistons, and more.
This document provides instructions for disassembling and assembling the travel motor on 349E and 349E L excavator models. It includes 27 steps for disassembly, removing components like the head assembly, brake housing, rotating group and individual parts within these assemblies. The assembly section includes 13 steps and specifications for reinstalling components and torquing fasteners, ensuring parts like seals and springs meet specifications. The goal is to properly disassemble and reassemble the travel motor while following all safety precautions.
Caterpillar cat 349 e l excavator (prefix rgh) service repair manual (rgh0000...hhfjksekmm
This document provides instructions for disassembling and assembling the travel motor on 349E and 349E L excavator models. The disassembly process involves 27 steps to remove components from the motor housing, head assembly, rotating group, and barrel assembly. The assembly process describes 13 steps and specifications to reinstall components in the reverse order, ensuring proper torque values and lubrication of parts. Key components include the motor housing, head assembly, shaft assembly, barrel assembly, pistons, bearings, seals, springs, and related hardware.
Caterpillar cat 349 e excavator (prefix rgh) service repair manual (rgh00001 ...fjskekxcddmmme
This document provides instructions for disassembling and assembling the travel motor on a 349E excavator. The disassembly process includes 27 steps to remove components like the head assembly, brake housing, rotating group, barrel assembly and more. The assembly process reverses the disassembly with 13 steps like installing seals, springs, pistons and plates in the proper order and orientation. Torque specifications and lubrication requirements are provided for many components.
Caterpillar cat 349 e l excavator (prefix rgh) service repair manual (rgh0000...fjskekxcddmmme
This document provides instructions for disassembling and assembling the travel motor on a 349E excavator. The disassembly process includes 27 steps to remove components like the head assembly, brake housing, rotating group, barrel assembly and more. The assembly process reverses the disassembly with 13 steps like installing seals, springs, pistons and plates in the proper order and orientation. Torque specifications and lubrication requirements are provided for many components.
The document provides instructions for disassembling a 330D2 excavator final drive. It involves 33 steps: 1) marking the final drive parts for reassembly; 2) removing the final drive cover and internal parts like gears, washers, seals and shafts; 3) disassembling the carrier assembly and planetary gears; 4) removing the ring gear and separating the motor and sprocket housings; and 5) taking out the coupling gear and shims. Cleanliness is important to prevent dirt ingress, and tools are needed to remove securing pins, rings, bolts and separate connected parts. Weights of individual parts are also provided.
Caterpillar Cat 330D L Excavator (Prefix R2D) Service Repair Manual (R2D00001...fujkse9didkke3
1. The document provides removal and installation instructions for the rear gear group, flywheel, and crankshaft rear seal of a 330D L excavator powered by a C9 engine.
2. Detailed step-by-step instructions are given, including the required tools and torque specifications. Illustrations accompany each step to show how to disassemble and reassemble the components.
3. Special attention is drawn to cleaning parts and applying threadlocker during installation to prevent contamination and ensure proper component life.
The document provides instructions for disassembling an excavator travel motor. It is a 27 step process that includes removing the motor head, brake piston, barrel assembly, cam plate, and other internal components. Special tools are required to properly support and disassemble the motor. Technicians are advised to take care to contain fluids and properly dispose of them.
Caterpillar Cat 330D L Excavator (Prefix NBD) Service Repair Manual (NBD00001...fujkse9didkke3
This document provides disassembly instructions for a final drive on excavator models 330D and 330D L. The procedure involves 32 steps and requires various tools. Key steps include removing the final drive cover, gears, carrier assembly, planetary gear assembly, and housing components. Disassembly of the planetary gear assembly requires pressing out shafts and removing washers, bearings, and gears. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
Caterpillar Cat 330D L Excavator (Prefix GBC) Service Repair Manual (GBC00001...fujkse9didkke3
This document provides instructions for removing and installing components in the cylinder head of a Caterpillar C9 engine, including the rocker arm shaft, cylinder head, lifter group, and camshaft. The procedures describe draining coolant, removing mounting bolts and connections, and lifting components out of the engine. Torque specifications and the correct sequence for installing mounting bolts are also provided.
Caterpillar Cat 330D L Excavator (Prefix LRM) Service Repair Manual (LRM00001...fujkse9didkke3
The document provides instructions for removing and disassembling the final drive, travel motor, and swivel components of an excavator. It describes disconnecting hydraulic lines and removing mounting bolts, covers, and seals. Special tools are required to safely lift the heavy components and create a vacuum in the hydraulic system. Precautions are outlined for containing fluids and preventing contamination.
Caterpillar Cat 330D L Excavator (Prefix JLP) Service Repair Manual (JLP00001...fujkse9didkke3
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. The steps include removing covers, gears, shafts, seals, housings and other components. Special tools are required for tasks like removing retaining rings and carrier assemblies. Safety notes are included to clean parts before disassembly and have assistance when removing heavier components weighing over 30 kg.
Caterpillar Cat 330D L Excavator (Prefix ERN) Service Repair Manual (ERN00001...fujkse9didkke3
This document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key steps include removing the final drive cover, gears, carrier assemblies, planetary gear assemblies, and ring gear. Proper safety equipment and lifting devices are required due to the heavy weights involved, such as the 550 kg weight of the entire final drive assembly. Cleanliness is important to prevent dirt from entering during disassembly.
Caterpillar Cat 330D L Excavator (Prefix EDX) Service Repair Manual (EDX00001...fujkse9didkke3
1. The document provides instructions for assembling and installing the swing drive of an excavator model 330D L.
2. It describes 30 steps for assembling bearings, gears, housings and other components of the swing drive. Lubricants, tools and torque specifications are also listed.
3. The installation procedure describes 6 steps for installing the assembled swing drive into the excavator frame using lifting devices, bolts, sealants and torque wrenches.
The document provides disassembly instructions for a final drive on an excavator model 330D L. It involves removing 32 components in 31 steps, starting with removing the final drive and travel motor. Key steps include removing gears, carriers, shafts, seals and housings using various tools like link brackets, forcing bolts, and presses. Cleanliness is important to prevent dirt from entering during reassembly.
This document provides disassembly instructions for a final drive on excavator models 330D and 330D L. The procedure involves 32 steps and requires various tools. Key steps include removing the final drive cover, gears, carrier assembly, planetary gear assembly, and housing components. Disassembly of the planetary gear assembly requires pressing out shafts and removing individual parts like springs pins, washers, bearings, and gears. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
This document provides instructions for removing and installing components in the cylinder head of a Caterpillar C9 engine, including the rocker arm shaft, cylinder head, lifter group, and camshaft. The procedures describe draining coolant, removing mounting bolts and connections, and lifting components out of the engine. Torque specifications and the correct sequence for installing mounting bolts are also provided.
Caterpillar Cat 330C L Excavator (Prefix JNK) Service Repair Manual (JNK00001...fujkse9didkke3
The document provides instructions for assembling and installing a piston motor (hydraulic fan). It is a 3 page document that details 20 steps for assembly, including installing various components like bearings, seals, springs and retaining rings. It then provides 11 steps for installing the fully assembled piston motor and fan assembly onto mounting brackets on the excavator.
1. The document provides instructions for assembling and installing the swing drive of an excavator model 330D L.
2. It describes 30 steps for assembling bearings, gears, housings and other components of the swing drive. Lubricants, tools and torque specifications are also listed.
3. The installation procedure describes 6 steps for installing the assembled swing drive into the excavator frame using lifting devices, bolts, sealants and torque wrenches.
This document provides disassembly instructions for a final drive on an excavator model 330D L. It involves removing over 30 individual parts in a specific sequence, including gears, shafts, bearings, seals, and housing components. Special tools are required to remove some parts. Proper lifting equipment and safety precautions are needed due to the heavy weights involved, up to approximately 550 kg for the entire final drive assembly. Cleanliness is important to prevent dirt from entering during disassembly.
Caterpillar Cat 330C L Excavator (Prefix MCA) Service Repair Manual (MCA00001...fujkse9didkke3
This document provides instructions for disassembling and assembling the travel motor on 330C and 330C L excavator models. The disassembly process involves removing 28 different components in a specific sequence. The assembly process reverses the disassembly steps and includes applying thread lock compound and lubricating components before reassembly. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 330C L Excavator (Prefix KDD) Service Repair Manual (KDD00001...fujkse9didkke3
This document provides instructions for disassembling and assembling the travel motor on 330C and 330C L excavator models. It outlines 28 steps for disassembly, removing components like the head, brake piston, plates and discs. It then outlines 13 steps for assembly, including installing seals, bearings, springs and ensuring proper placement of parts. Cleanliness is emphasized throughout the process.
Caterpillar Cat 330C L Excavator (Prefix JCD) Service Repair Manual (JCD00001...fujkse9didkke3
This document provides instructions for disassembling and assembling the travel motor on 330C and 330C L excavators. It outlines 28 steps for disassembly, removing components like the head, springs, brake piston, and bearings. It then outlines 13 steps for assembly, replacing seals and installing components in the reverse order of disassembly, taking care to mark parts and return them to their original positions. Special tools are listed that may be required for tasks like removing races and seals.
Caterpillar Cat 330C L Excavator (Prefix JAB) Service Repair Manual (JAB00001...fujkse9didkke3
1) The document provides disassembly and assembly instructions for a travel motor on 330C and 330C L excavator models.
2) It describes 28 steps to disassemble the travel motor by removing components like the head, plates, seals, and bearing races.
3) It then describes 29 steps for assembling the travel motor, providing notes on cleaning, lubrication, and proper installation of components like O-rings, pistons, seals, and bolts.
Caterpillar Cat 330C L Excavator (Prefix GKX) Service Repair Manual (GKX00001...fujkse9didkke3
This document provides instructions for disassembling and assembling the travel motor of 330C and 330C L excavator models. It outlines 28 steps to disassemble the motor by removing components like the head, port plate, springs, brake piston, plates, and bearings. It then lists 13 steps for reassembling the motor and installing components in the reverse order of disassembly while ensuring cleanliness and applying thread lock compounds as needed.
The document provides instructions for disassembling a 330D2 excavator final drive. It involves 33 steps: 1) marking the final drive parts for reassembly; 2) removing the final drive cover and internal parts like gears, washers, seals and shafts; 3) disassembling the carrier assembly and planetary gears; 4) removing the ring gear and separating the motor and sprocket housings; and 5) taking out the coupling gear and shims. Cleanliness is important to prevent dirt ingress, and tools are needed to remove securing pins, rings, bolts and separate connected parts. Weights of individual parts are also provided.
Caterpillar Cat 330D L Excavator (Prefix R2D) Service Repair Manual (R2D00001...fujkse9didkke3
1. The document provides removal and installation instructions for the rear gear group, flywheel, and crankshaft rear seal of a 330D L excavator powered by a C9 engine.
2. Detailed step-by-step instructions are given, including the required tools and torque specifications. Illustrations accompany each step to show how to disassemble and reassemble the components.
3. Special attention is drawn to cleaning parts and applying threadlocker during installation to prevent contamination and ensure proper component life.
The document provides instructions for disassembling an excavator travel motor. It is a 27 step process that includes removing the motor head, brake piston, barrel assembly, cam plate, and other internal components. Special tools are required to properly support and disassemble the motor. Technicians are advised to take care to contain fluids and properly dispose of them.
Caterpillar Cat 330D L Excavator (Prefix NBD) Service Repair Manual (NBD00001...fujkse9didkke3
This document provides disassembly instructions for a final drive on excavator models 330D and 330D L. The procedure involves 32 steps and requires various tools. Key steps include removing the final drive cover, gears, carrier assembly, planetary gear assembly, and housing components. Disassembly of the planetary gear assembly requires pressing out shafts and removing washers, bearings, and gears. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
Caterpillar Cat 330D L Excavator (Prefix GBC) Service Repair Manual (GBC00001...fujkse9didkke3
This document provides instructions for removing and installing components in the cylinder head of a Caterpillar C9 engine, including the rocker arm shaft, cylinder head, lifter group, and camshaft. The procedures describe draining coolant, removing mounting bolts and connections, and lifting components out of the engine. Torque specifications and the correct sequence for installing mounting bolts are also provided.
Caterpillar Cat 330D L Excavator (Prefix LRM) Service Repair Manual (LRM00001...fujkse9didkke3
The document provides instructions for removing and disassembling the final drive, travel motor, and swivel components of an excavator. It describes disconnecting hydraulic lines and removing mounting bolts, covers, and seals. Special tools are required to safely lift the heavy components and create a vacuum in the hydraulic system. Precautions are outlined for containing fluids and preventing contamination.
Caterpillar Cat 330D L Excavator (Prefix JLP) Service Repair Manual (JLP00001...fujkse9didkke3
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. The steps include removing covers, gears, shafts, seals, housings and other components. Special tools are required for tasks like removing retaining rings and carrier assemblies. Safety notes are included to clean parts before disassembly and have assistance when removing heavier components weighing over 30 kg.
Caterpillar Cat 330D L Excavator (Prefix ERN) Service Repair Manual (ERN00001...fujkse9didkke3
This document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key steps include removing the final drive cover, gears, carrier assemblies, planetary gear assemblies, and ring gear. Proper safety equipment and lifting devices are required due to the heavy weights involved, such as the 550 kg weight of the entire final drive assembly. Cleanliness is important to prevent dirt from entering during disassembly.
Caterpillar Cat 330D L Excavator (Prefix EDX) Service Repair Manual (EDX00001...fujkse9didkke3
1. The document provides instructions for assembling and installing the swing drive of an excavator model 330D L.
2. It describes 30 steps for assembling bearings, gears, housings and other components of the swing drive. Lubricants, tools and torque specifications are also listed.
3. The installation procedure describes 6 steps for installing the assembled swing drive into the excavator frame using lifting devices, bolts, sealants and torque wrenches.
The document provides disassembly instructions for a final drive on an excavator model 330D L. It involves removing 32 components in 31 steps, starting with removing the final drive and travel motor. Key steps include removing gears, carriers, shafts, seals and housings using various tools like link brackets, forcing bolts, and presses. Cleanliness is important to prevent dirt from entering during reassembly.
This document provides disassembly instructions for a final drive on excavator models 330D and 330D L. The procedure involves 32 steps and requires various tools. Key steps include removing the final drive cover, gears, carrier assembly, planetary gear assembly, and housing components. Disassembly of the planetary gear assembly requires pressing out shafts and removing individual parts like springs pins, washers, bearings, and gears. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
This document provides instructions for removing and installing components in the cylinder head of a Caterpillar C9 engine, including the rocker arm shaft, cylinder head, lifter group, and camshaft. The procedures describe draining coolant, removing mounting bolts and connections, and lifting components out of the engine. Torque specifications and the correct sequence for installing mounting bolts are also provided.
Caterpillar Cat 330C L Excavator (Prefix JNK) Service Repair Manual (JNK00001...fujkse9didkke3
The document provides instructions for assembling and installing a piston motor (hydraulic fan). It is a 3 page document that details 20 steps for assembly, including installing various components like bearings, seals, springs and retaining rings. It then provides 11 steps for installing the fully assembled piston motor and fan assembly onto mounting brackets on the excavator.
1. The document provides instructions for assembling and installing the swing drive of an excavator model 330D L.
2. It describes 30 steps for assembling bearings, gears, housings and other components of the swing drive. Lubricants, tools and torque specifications are also listed.
3. The installation procedure describes 6 steps for installing the assembled swing drive into the excavator frame using lifting devices, bolts, sealants and torque wrenches.
This document provides disassembly instructions for a final drive on an excavator model 330D L. It involves removing over 30 individual parts in a specific sequence, including gears, shafts, bearings, seals, and housing components. Special tools are required to remove some parts. Proper lifting equipment and safety precautions are needed due to the heavy weights involved, up to approximately 550 kg for the entire final drive assembly. Cleanliness is important to prevent dirt from entering during disassembly.
Caterpillar Cat 330C L Excavator (Prefix MCA) Service Repair Manual (MCA00001...fujkse9didkke3
This document provides instructions for disassembling and assembling the travel motor on 330C and 330C L excavator models. The disassembly process involves removing 28 different components in a specific sequence. The assembly process reverses the disassembly steps and includes applying thread lock compound and lubricating components before reassembly. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 330C L Excavator (Prefix KDD) Service Repair Manual (KDD00001...fujkse9didkke3
This document provides instructions for disassembling and assembling the travel motor on 330C and 330C L excavator models. It outlines 28 steps for disassembly, removing components like the head, brake piston, plates and discs. It then outlines 13 steps for assembly, including installing seals, bearings, springs and ensuring proper placement of parts. Cleanliness is emphasized throughout the process.
Caterpillar Cat 330C L Excavator (Prefix JCD) Service Repair Manual (JCD00001...fujkse9didkke3
This document provides instructions for disassembling and assembling the travel motor on 330C and 330C L excavators. It outlines 28 steps for disassembly, removing components like the head, springs, brake piston, and bearings. It then outlines 13 steps for assembly, replacing seals and installing components in the reverse order of disassembly, taking care to mark parts and return them to their original positions. Special tools are listed that may be required for tasks like removing races and seals.
Caterpillar Cat 330C L Excavator (Prefix JAB) Service Repair Manual (JAB00001...fujkse9didkke3
1) The document provides disassembly and assembly instructions for a travel motor on 330C and 330C L excavator models.
2) It describes 28 steps to disassemble the travel motor by removing components like the head, plates, seals, and bearing races.
3) It then describes 29 steps for assembling the travel motor, providing notes on cleaning, lubrication, and proper installation of components like O-rings, pistons, seals, and bolts.
Caterpillar Cat 330C L Excavator (Prefix GKX) Service Repair Manual (GKX00001...fujkse9didkke3
This document provides instructions for disassembling and assembling the travel motor of 330C and 330C L excavator models. It outlines 28 steps to disassemble the motor by removing components like the head, port plate, springs, brake piston, plates, and bearings. It then lists 13 steps for reassembling the motor and installing components in the reverse order of disassembly while ensuring cleanliness and applying thread lock compounds as needed.
A Guide to a Winning Interview June 2024Bruce Bennett
This webinar is an in-depth review of the interview process. Preparation is a key element to acing an interview. Learn the best approaches from the initial phone screen to the face-to-face meeting with the hiring manager. You will hear great answers to several standard questions, including the dreaded “Tell Me About Yourself”.
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...dsnow9802
Jill Pizzola's tenure as Senior Talent Acquisition Partner at THOMSON REUTERS in Marlton, New Jersey, from 2018 to 2023, was marked by innovation and excellence.
Job Finding Apps Everything You Need to Know in 2024SnapJob
SnapJob is revolutionizing the way people connect with work opportunities and find talented professionals for their projects. Find your dream job with ease using the best job finding apps. Discover top-rated apps that connect you with employers, provide personalized job recommendations, and streamline the application process. Explore features, ratings, and reviews to find the app that suits your needs and helps you land your next opportunity.
5 Common Mistakes to Avoid During the Job Application Process.pdfAlliance Jobs
The journey toward landing your dream job can be both exhilarating and nerve-wracking. As you navigate through the intricate web of job applications, interviews, and follow-ups, it’s crucial to steer clear of common pitfalls that could hinder your chances. Let’s delve into some of the most frequent mistakes applicants make during the job application process and explore how you can sidestep them. Plus, we’ll highlight how Alliance Job Search can enhance your local job hunt.
Resumes, Cover Letters, and Applying OnlineBruce Bennett
This webinar showcases resume styles and the elements that go into building your resume. Every job application requires unique skills, and this session will show you how to improve your resume to match the jobs to which you are applying. Additionally, we will discuss cover letters and learn about ideas to include. Every job application requires unique skills so learn ways to give you the best chance of success when applying for a new position. Learn how to take advantage of all the features when uploading a job application to a company’s applicant tracking system.
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 349E L EXCAVATOR SPG
Configuration: 349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine
Disassembly and Assembly
349E Excavator Machine Systems
Media Number -KENR9848-04 Publication Date -01/10/2012 Date Updated -23/10/2012
i04243909
Travel Motor - Disassemble
SMCS - 4351-015
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 138-7574 Link Bracket 1
B - Bolt M4 x 0.7 1
C 6V-3010 Puller Gp 1
D 3E-3879 Eyebolt 1
E 9S-9152 Bearing Puller Gp 1
Start By:
a. Remove the travel motor.
1. Drain the travel motor.
1/10
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine(...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Illustration 1 g02419258
2. Remove O-ring seal (1) from motor housing (2).
Illustration 2 g02419296
Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
3. Attach Tooling (A) onto head assembly (3). Remove bolts (4). Use Tooling (A) and a
suitable lifting device to remove head (3). The weight of head assembly (3) is
approximately 40 kg (90 lb).
2/10
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine(...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Illustration 3 g02419358
4. Remove plate (5) from head (3).
Illustration 4 g02419359
5. Remove bearing (6) from head assembly (3).
6. Remove orifice (7), spring (8), and ball (9).
7. Remove O-ring seal (10) from head assembly (3).
Illustration 5 g02419416
3/10
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine(...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
8. Remove adapter (11), spool (12), and spring (13) from head assembly (3).
Illustration 6 g02419439
9. Use Tooling (B) in order to remove retainers (14) from head assembly (3).
10. Remove O-ring seals (16) and backup rings (15) from adapters (14).
11. Remove balls (17) from head assembly (3).
Illustration 7 g02419577
12. Remove springs (18) from brake housing (20).
4/10
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine(...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. 13. Remove O-ring seals (19) from motor housing (2).
Illustration 8 g02420880
14. Use Tooling (C) in order to remove brake housing (20) from motor housing (2).
Illustration 9 g02419659
15. Remove backup ring (21) and O-ring seal (22) from brake piston (20).
16. Remove O-ring seal (23) and backup ring (24) from brake piston (20).
5/10
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine(...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 10 g02419858
17. Attach Tooling (D) to shaft assembly (25).
18. Use Tooling (D) and a suitable lifting device in order to lift the rotating group from motor
housing (2). The weight of the rotating group is approximately 30 kg (65 lb).
Illustration 11 g02420501
19. Remove plates (26) and friction disks (27) from barrel assembly (28).
6/10
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine(...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 12 g02420544
20. Remove barrel assembly (28) and swashplate (29) from shaft assembly (25).
Illustration 13 g02420578
21. Remove plate (31) and pistons (30) from barrel assembly (28).
7/10
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine(...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 14 g02420596
22. Remove bearing (32), thin shim (33), Belleville washers (34), and barrel spacer (35) from
barrel assembly (28).
Illustration 15 g02420937
23. Use a suitable press in order to remove bearing (36) from shaft assembly (25).
8/10
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine(...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 16 g02421036
24. Use Tooling (E) and a suitable press in order to remove inner race (37) from shaft assembly
(25).
Illustration 17 g02420998
Illustration 18 g02421000
9/10
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine(...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. 25. Remove keys (38) and pins (39) from motor housing (2).
Illustration 19 g02421056
26. Remove plug (40) and the O-ring seal. Remove actuator piston (41).
27. Remove retaining ring (42) and seal (43) from motor housing (2).
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Sep 18 01:33:47 UTC+0800 2020
10/10
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engi...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 349E L EXCAVATOR SPG
Configuration: 349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine
Disassembly and Assembly
349E Excavator Machine Systems
Media Number -KENR9848-04 Publication Date -01/10/2012 Date Updated -23/10/2012
i06563923
Travel Motor - Assemble
SMCS - 4351-016
Specifications
Illustration 1 g03845362
NOTICE
To prevent damage to the motor, the case must be filled with clean
hydraulic oil at least to the fill port before operation.
1/13
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine(...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Table 1
Specification for 390-1088 Travel Motor Gp
Item Qty Part Specification Description
1 1 5P-7684 Plug Torque to 430 ± 40 N·m (317 ± 30 lb ft).
2 1
6K-6307 O-
Ring Seal
Lubricate with 1U-6396 O-Ring Assembly Compound.
- - -
Before assembly, lubricate the sliding surfaces of the cam plate
(3), the hold-down (4), the pistons (5), the barrel (6) and the shaft
(8) lightly with clean hydraulic oil.
7 20
124-1561 Brake
Spring
Length under test force is 19.0 mm (0.75 inch).
Test force is 425 ± 43 N (96 ± 10 lb).
Free length after test is 22.06 mm (0.869 inch).
9 1
6V-3382 Lip
Type Seal
Apply blue Loctite 243 to the outside diameter.
10 1
118-5805
Special Race
Bearing
Install the snap ring of the special race bearing toward the shaft
flange.
11 2
9S-4185 O-
Ring Plug
Torque to 82 ± 8 N·m (60 ± 6 lb ft).
12 6 8T-4187 Bolt Torque to 530 ± 70 N·m (391 ± 52 lb ft).
13 2
9S-4183 O-
Ring Plug
Torque to 190 ± 20 N·m (140 ± 15 lb ft).
Illustration 2 g03845364
Section A-A
Table 2
2/13
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine(...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Item Qty Part Specification Description
14 2
1T-0936 Pipe
Plug
Install in the orifice toward the head surface or below the head
surface.
15 1 124-1554 Spring
Length under test force is 15 mm (0.6 inch).
Test force is 15.0 ± 2.0 N (3.4 ± 0.4 lb).
Free length after test is 16.15 mm (0.636 inch).
D - -
Depth from the head and interface of the port plate is
20.0 ± 0.2 mm (0.79 ± 0.01 inch).
16 1
195-4456 Orifice
Plug
Torque to 7 ± 1 N·m (62 ± 9 lb in).
Illustration 3 g03845365
Section C-C
Table 3
Item Qty Part Specification Description
17 1 230-5483 Spring
Length under test force is 25 mm (1.0 inch).
Test force is 60.0 ± 8.0 N (13.5 ± 1.8 lb).
Free length after test is 35 mm (1.4 inch).
18 1 087-4786 Adapter Torque to 115 ± 10 N·m (85 ± 7 lb ft).
Assembly Procedure
Table 4
Required Tools
Tool Part Number Part Description Qty
A 138-7573 Link Bracket 1
D 3E-3879 Eyebolt 1
3/13
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine(...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. F 1U-6396 O-Ring Assembly Compound 1
G - Loctite 242 -
H 1P-0510 Driver Gp 1
J 6V-2055 Grease 1
K 128-5049 Guide Stud 2
Illustration 4 g02421056
1. Lubricate actuator piston (41) with the oil that is being used. Install actuator piston (41) into
housing (2). Apply Tooling (F) onto O-ring seal of plug (40). Install plug (40) into motor
housing (2).Tighten plug (42) to a torque of 430 ± 40 N·m (315 ± 30 lb ft).
2. Apply Tooling (G) onto outside diameter of seal (43). Use Tooling (H) to install seal (43).
Install retaining ring (42).
Illustration 5 g02421000
4/13
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine(...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 6 g02420998
3. Install pins (39) and keys (38) into motor housing (2).
Illustration 7 g02421876
Illustration 8 g02421958
4. Use a suitable press to install bearing (36) and bearing (37) onto shaft assembly (25). Bearing
(36) must be installed with Retaining Clip (X) toward the barrel assembly.
5/13
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine(...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Illustration 13 g02423621
8. Use Tooling (D) and a suitable lifting device to install the rotating group into motor housing
(2). The weight of the rotating group is approximately 30 kg (65 lb).
Note: Align the notches of swashplate (29) with the keys in the motor housing (2).
Note: Protect shaft seal (43) from damage by covering the splines on shaft assembly (25) with
heat shrink tubing.
Illustration 14 g02423738
8/13
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine(...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 15 g02423742
9. Install plates (26) and friction discs (27). Start with plate (26). Alternate between plates (26)
and friction discs (27) with plates (26) on the top and the bottom.
Illustration 16 g02419659
10. Install backup ring (21) and O-ring seal (22) onto brake piston (20).
11. Install backup ring (24) and O-ring seal (23) onto brake piston (20).
Illustration 17 g02419577
12. Install O-ring seals (19) onto motor housing (2). Install springs (18) onto brake piston (20).
9/13
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine(...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 18 g02419439
13. Install balls (17), backup rings (15), O-ring seals (16), and retainers (14) into head assembly
(3).
Illustration 19 g02419416
Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
14. Install spring (13), spool (12), and adapter (11). Tighten adapter (11) to a torque of
115 ± 10 N·m (85 ± 7 lb ft).
10/13
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engi...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 20 g02419359
15. Install ball (9), spring (8), and orifice (7). Tighten orifice (7) to a torque of 7 ± 1 N·m
(62 ± 9 lb in).
16. Install bearing (6) and O-ring seal (10) onto head assembly (3).
Illustration 21 g02001974
Illustration 22 g02419358
17. Apply Tooling (K) to the back side of plate (5) to hold plate (5) in place during assembly.
Install plate (5) to head assembly (3).
11/13
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engi...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Illustration 23 g02424459
Illustration 24 g02419296
Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
18. Install Tooling (K) onto motor housing (2). Use Tooling (A) and a suitable lifting device to
install head assembly (3) onto motor housing (2).The weight of the head (3) is approximately
40 kg (90 lb). Remove Tooling (A) and Tooling (D). Install bolts (4). Tighten bolts (4) to a
torque of 530 ± 70 N·m (390 ± 50 lb ft).
12/13
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engi...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
25. Illustration 25 g02419258
19. Install O-ring seal (1) onto motor housing (2).
End By:
a. Install the travel motor.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Sep 18 01:34:43 UTC+0800 2020
13/13
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engi...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
26. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 349E L EXCAVATOR SPG
Configuration: 349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine
Disassembly and Assembly
349E Excavator Machine Systems
Media Number -KENR9848-04 Publication Date -01/10/2012 Date Updated -23/10/2012
i07186913
Final Drive and Travel Motor - Remove and Install
SMCS - 4050; 4351
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1U-9200 Lever Puller Hoist 1
B 439-3941 Link Brackets 2
C - Loctite 243 -
Personal injury can result from hydraulic oil pressure and hot oil.
Hydraulic oil pressure can remain in the hydraulic system after the
engine has been stopped. Serious injury can be caused if this pressure is
not released before any service is done on the hydraulic system.
Make sure all of the work tools have been lowered to the ground, and
the oil is cool before removing any components or lines. Remove the oil
filler cap only when the engine is stopped, and the filler cap is cool
enough to touch with your bare hand.
1. Refer to Operation and Maintenance Manual, "Final Drive Oil - Change" for the correct
draining and filling procedures.
1/4
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine(...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
27. Illustration 1 g02415557
2. Release the track tension. Refer to Operation and Maintenance Manual, "Track Adjustment
- Adjust".
3. Start the machine. Position track roller (1) on suitable cribbing. Position pin to separate the
track above the final drive.
4. Separate the track.
5. Remove the counterbalance valve.
Illustration 2 g02417799
2/4
349E & 349E L Excavators SPG00001-UP (MACHINE) POWERED BY C13 Engine(...
2020/9/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...