This document provides instructions for removing and installing a unit injector hydraulic pump on Caterpillar C9 engines. The removal procedure involves disconnecting tubes, hoses and harnesses from the pump before removing mounting bolts and the pump. For installation, the process is reversed - mounting bolts are installed and all connections reattached. Proper cleaning and use of new seals is emphasized to prevent contamination.
Caterpillar Cat 336D2 L Excavator (Prefix ELR) Service Repair Manual (ELR0000...cnp692569
This document provides instructions for removing and installing the unit injector hydraulic pump on Caterpillar C9 engines. The removal process involves disconnecting fuel lines and electrical connections, removing mounting bolts, and taking out the O-ring seal. Installation is the reverse of removal, and includes cleaning parts, applying a new O-ring seal, reconnecting lines and bolts, and filling fluids to the proper levels. Procedures are provided for pumps with both non-dual and dual tapered roller bearings.
The document provides instructions for removing and installing the unit injector hydraulic pump on Caterpillar C9 engines. The removal procedure involves disconnecting fuel lines and electrical connections, removing mounting bolts, and taking out the pump. The installation procedure specifies cleaning parts, applying a new O-ring seal, positioning the pump, and securing it with bolts. Proper containment of fluids is emphasized during maintenance.
Caterpillar Cat 336D2 L Excavator (Prefix ELR) Service Repair Manual (ELR0000...zatao0179249295
The document provides instructions for removing and installing the unit injector hydraulic pump on Caterpillar C9 engines. The removal procedure involves disconnecting fuel lines and electrical connections, removing mounting bolts, and taking out the pump. The installation procedure specifies cleaning parts, applying a new O-ring seal, positioning the pump, and securing it with bolts. Proper containment of fluids is emphasized during maintenance.
This document provides instructions for removing and installing the unit injector hydraulic pump on Caterpillar C9 engines. The removal process involves disconnecting fuel lines and electrical connections, removing mounting bolts, and taking out the O-ring seal. Installation is the reverse, applying a new O-ring seal and grease, positioning the pump, and reconnecting all lines and bolts. Proper cleaning and containment of fluids is emphasized to prevent contamination.
Caterpillar Cat 336D2 L Excavator (Prefix ELR) Service Repair Manual (ELR0000...kesi7153062
This document provides instructions for removing and installing the unit injector hydraulic pump on Caterpillar C9 engines. The removal process involves disconnecting fuel lines and electrical connections, removing mounting bolts, and taking out the pump. Installation is the reverse, applying a new O-ring seal and reconnecting all lines. Proper cleaning and containment of fluids is emphasized. The document outlines procedures for both non-dual and dual tapered roller bearing pump types.
This document provides instructions for removing and installing the unit injector hydraulic pump on Caterpillar C9 engines. The removal process involves disconnecting fuel lines and electrical connections, removing mounting bolts, and taking out the pump. Installation is the reverse, applying a new O-ring seal and reconnecting all lines. Proper cleaning and containment of fluids is emphasized. Both non-dual and dual tapered roller bearing pump types are covered.
Caterpillar Cat 323D L Excavator (Prefix GTF) Service Repair Manual (GTF00001...8ufjsekddm8u
- The document provides instructions for removing and installing inlet and exhaust valves, valve guides, and valve seat inserts on a C6.4 engine.
- It describes the required tools and gives step-by-step procedures for removal and disassembly and installation and assembly.
- Safety notices are included to handle parts and fluids properly and avoid injury when working with compressed springs.
Caterpillar Cat 323D L Excavator (Prefix YSD) Service Repair Manual (YSD00001...8ufjsekddm8u
The document provides instructions for removing and installing the flywheel housing on a Caterpillar C6.4 engine. It outlines the required tools and steps to remove the flywheel, electric starting motor, bolts securing the housing, and oil seal from the housing. It then describes how to install a new oil seal, gasket, and reattach the housing using bolts, and reinstall the flywheel and electric starting motor.
Caterpillar Cat 336D2 L Excavator (Prefix ELR) Service Repair Manual (ELR0000...cnp692569
This document provides instructions for removing and installing the unit injector hydraulic pump on Caterpillar C9 engines. The removal process involves disconnecting fuel lines and electrical connections, removing mounting bolts, and taking out the O-ring seal. Installation is the reverse of removal, and includes cleaning parts, applying a new O-ring seal, reconnecting lines and bolts, and filling fluids to the proper levels. Procedures are provided for pumps with both non-dual and dual tapered roller bearings.
The document provides instructions for removing and installing the unit injector hydraulic pump on Caterpillar C9 engines. The removal procedure involves disconnecting fuel lines and electrical connections, removing mounting bolts, and taking out the pump. The installation procedure specifies cleaning parts, applying a new O-ring seal, positioning the pump, and securing it with bolts. Proper containment of fluids is emphasized during maintenance.
Caterpillar Cat 336D2 L Excavator (Prefix ELR) Service Repair Manual (ELR0000...zatao0179249295
The document provides instructions for removing and installing the unit injector hydraulic pump on Caterpillar C9 engines. The removal procedure involves disconnecting fuel lines and electrical connections, removing mounting bolts, and taking out the pump. The installation procedure specifies cleaning parts, applying a new O-ring seal, positioning the pump, and securing it with bolts. Proper containment of fluids is emphasized during maintenance.
This document provides instructions for removing and installing the unit injector hydraulic pump on Caterpillar C9 engines. The removal process involves disconnecting fuel lines and electrical connections, removing mounting bolts, and taking out the O-ring seal. Installation is the reverse, applying a new O-ring seal and grease, positioning the pump, and reconnecting all lines and bolts. Proper cleaning and containment of fluids is emphasized to prevent contamination.
Caterpillar Cat 336D2 L Excavator (Prefix ELR) Service Repair Manual (ELR0000...kesi7153062
This document provides instructions for removing and installing the unit injector hydraulic pump on Caterpillar C9 engines. The removal process involves disconnecting fuel lines and electrical connections, removing mounting bolts, and taking out the pump. Installation is the reverse, applying a new O-ring seal and reconnecting all lines. Proper cleaning and containment of fluids is emphasized. The document outlines procedures for both non-dual and dual tapered roller bearing pump types.
This document provides instructions for removing and installing the unit injector hydraulic pump on Caterpillar C9 engines. The removal process involves disconnecting fuel lines and electrical connections, removing mounting bolts, and taking out the pump. Installation is the reverse, applying a new O-ring seal and reconnecting all lines. Proper cleaning and containment of fluids is emphasized. Both non-dual and dual tapered roller bearing pump types are covered.
Caterpillar Cat 323D L Excavator (Prefix GTF) Service Repair Manual (GTF00001...8ufjsekddm8u
- The document provides instructions for removing and installing inlet and exhaust valves, valve guides, and valve seat inserts on a C6.4 engine.
- It describes the required tools and gives step-by-step procedures for removal and disassembly and installation and assembly.
- Safety notices are included to handle parts and fluids properly and avoid injury when working with compressed springs.
Caterpillar Cat 323D L Excavator (Prefix YSD) Service Repair Manual (YSD00001...8ufjsekddm8u
The document provides instructions for removing and installing the flywheel housing on a Caterpillar C6.4 engine. It outlines the required tools and steps to remove the flywheel, electric starting motor, bolts securing the housing, and oil seal from the housing. It then describes how to install a new oil seal, gasket, and reattach the housing using bolts, and reinstall the flywheel and electric starting motor.
Caterpillar Cat 323D L Excavator (Prefix PBE) Service Repair Manual (PBE00001...8ufjsekddm8u
This document provides instructions for removing and installing the idler gear in the front gear group of a Caterpillar C6.4 engine. The removal procedure involves using various tools to remove the idler gear, shaft, thrust plate and washer. The installation procedure specifies cleaning parts and using a press and torque wrench to reinstall these components, checking backlash and end play tolerances. Proper alignment of timing gear marks is also emphasized.
Caterpillar Cat 323D L Excavator (Prefix NZF) Service Repair Manual (NZF00001...8ufjsekddm8u
This document provides instructions for removing and installing inlet and exhaust valve springs on a Caterpillar C6.6 engine. The procedure involves using specialized tools to compress the valve springs and position the pistons at top dead center. Springs are removed in pairs from specific cylinders and must be replaced in the same order. Installation requires lubricating seals, compressing springs with a tool to insert retainers and keepers, and checking valve clearance after installation is complete. Safety precautions are outlined to prevent injury from released spring forces.
Caterpillar Cat 323D L Excavator (Prefix BYM) Service Repair Manual (BYM00001...8ufjsekddm8u
1) The document provides instructions for removing and installing various engine components on a Caterpillar 323D L Excavator, including valve seat inserts, the engine oil cooler, and the engine oil relief valve.
2) The procedures include a list of required tools and step-by-step instructions describing how to remove, disassemble, and assemble each component while taking appropriate safety precautions.
3) Technicians are advised to keep all parts clean and free of contaminants to prevent damage and wear.
Caterpillar Cat 323D L Excavator (Prefix NDE) Service Repair Manual (NDE00001...8ufjsekddm8u
The document provides instructions for installing the rocker shaft and pushrods on a C6.4 engine. The procedure involves installing various components like the spring, arms, bracket and washer onto the shaft assembly. Retaining rings are then installed to secure the assembly. Finally, the pushrods and rocker shaft are positioned and tightened to specified torques to complete the installation.
Caterpillar Cat 323D L Excavator (Prefix JLG) Service Repair Manual (JLG00001...8ufjsekddm8u
This service repair manual provides instructions for removing and installing valve seat inserts, removing and disassembling the engine oil cooler, and assembling the engine oil cooler for a Caterpillar C6.4 engine powering a 323D L excavator. The document lists required tools and safety notices, and includes illustrations of the removal, disassembly, and assembly procedures.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual (LFL00001...8ufjsekddm8u
1) The document provides instructions for removing and installing the fuel injection pump on a Caterpillar C6.4 engine.
2) To remove the pump, various hoses, tubes, brackets and electrical connections must be disconnected and markings made for installation. Bolts then need to be removed to access the pump.
3) Installation involves reversing the removal process, ensuring cleanliness, replacing washers, and torquing all connections to the specified values.
Caterpillar Cat 323D L Excavator (Prefix L5Z) Service Repair Manual (L5Z00001...8ufjsekddm8u
The document provides instructions for removing and installing a flywheel housing on a Caterpillar C6.4 engine. It describes removing the electric starting motor, flywheel and ring gear before removing the flywheel housing bolts. Tools are required to lift the housing and remove the oil seal. When installing, a new gasket and oil seal are used and the housing is bolted back in place before reinstalling the flywheel and starting motor.
This document provides installation instructions for a rear power take-off (RPTO) on a 323 excavator with a C7.1 engine. It describes 20 steps to install the RPTO, including installing sleeve bearings, gears, idler hubs, adapters and bolts. Precautions are given to keep components clean and ensure proper alignment of parts. Tools required include drivers and sockets.
This document provides instructions for disassembling and assembling the travel motor of a 323D and 323D L excavator. It describes 27 steps to disassemble the travel motor by removing components like the head, brake piston, barrel assembly, and shaft assembly. It then describes 13 steps to reassemble the travel motor by installing components like the shaft assembly, cam plate, barrel assembly, and head in the reverse order of disassembly. Precautions are given to clean parts thoroughly, mark components for reinstallation, and ensure proper alignment of parts.
1) The document provides instructions for removing and installing a flywheel from a C7.1 engine that powers a 323 excavator.
2) To remove the flywheel, bolts must first be removed and guide studs installed to support the flywheel. Lifting equipment is then used to lift the flywheel off while inspecting components for wear or damage.
3) Flywheel installation requires cleaning and lifting the flywheel into place using guide studs. Bolts are tightened to the specified torque and the flywheel is inspected for proper runout.
This document provides disassembly instructions for the final drive, travel motor, and counterbalance valve of a 313D2 excavator. It lists the required tools and parts and outlines 15 steps to disassemble the final drive, 13 steps to disassemble the travel motor, and 16 steps to disassemble the counterbalance valve. Safety notices are included regarding releasing pressures and springs.
This document provides instructions for removing and installing a flywheel housing on a Caterpillar C4.2 engine. It outlines the required tools and steps to remove the flywheel, electric starting motor, and housing bolts. Instructions are given to lift the housing off the engine block using a link bracket and driver group. Reinstallation involves reversing the removal process and tightening the housing bolts to the specified torque.
This document provides instructions for removing and installing a flywheel housing on a Caterpillar C4.2 engine. It outlines the required tools and steps to remove the flywheel, electric starting motor, and housing bolts. Instructions are given to lift the housing off the engine block using a link bracket and driver group. Reinstallation involves reversing the removal process and tightening the housing bolts to the specified torque.
The document provides instructions for removing and installing various engine components on a Caterpillar C4.2 engine, including:
- Removing and installing the flywheel housing, which requires removing bolts and installing a new gasket.
- Removing the crankshaft pulley using pullers and removing the wear sleeve if needed. Installation requires heating the sleeve and tightening a nut.
- Removing the crankshaft front seal by drilling holes and pulling it out, being careful not to damage the crankshaft. Installation uses a installer tool and applying oil.
The document provides instructions for removing and installing various engine components on a Caterpillar 314D CR excavator, including:
1) Removing the idler gear from the front gear group by removing the bolt and washer securing it to the idler shaft and pulling it off using a puller tool.
2) Instructions specify ensuring timing marks are aligned before removal to maintain proper timing of gears.
3) Detailed steps and illustrations guide removal of additional components like the flywheel housing, crankshaft pulley, and crankshaft front seal. Tools and safety precautions are also listed.
Caterpillar Cat 313F L Excavator (Prefix NLG) Service Repair Manual (NLG00001...8ufjsekddm8u
This document provides instructions for removing the front housing on a C4.4 engine. The steps include:
1. Removing other components like the fan, crankshaft pulley, oil pan, accessory drive, water pump and timing gears.
2. Disconnecting wiring, cutting cable straps and removing bolts to separate the bypass tube from the housing and cylinder head.
3. Removing bolts of different lengths to detach the front housing from the cylinder block, and removing the gasket and thrust washer.
This document provides instructions for removing the front housing on a C4.4 engine. The steps include:
1. Removing other components like the fan, crankshaft pulley, oil pan, accessory drive, water pump and timing gears.
2. Disconnecting wiring, cutting cable straps and removing bolts to separate the bypass tube from the housing and cylinder head.
3. Removing bolts of different lengths to detach the front housing from the cylinder block, and removing the gasket and thrust washer.
Caterpillar Cat 312D2 L Excavator (Prefix GWN) Service Repair Manual (GWN0000...8ufjsekddm8u
This document provides instructions for disassembling components of an excavator including the final drive, travel motor, counterbalance valve, and barrel assembly. It lists required tools and outlines 16 steps to disassemble parts like the traction control valve, bearing, relief valve assemblies, piston assemblies, springs, and seals. Safety notices are included to warn of potential injuries from parts propelled by springs or pressurized hydraulic fluid.
This document provides disassembly instructions for the final drive, travel motor, and counterbalance valve of a 313D2 excavator. It lists the required tools and parts and outlines 15 steps to disassemble the final drive, 13 steps to disassemble the travel motor, and 16 steps to disassemble the counterbalance valve. Safety notices are included regarding releasing pressures and springs.
This document provides instructions for disassembling and assembling the travel motor of a 313D2 excavator. The disassembly process involves 27 steps to remove components like the motor head, brake piston, barrel assembly, springs and seals. The assembly process is outlined in 13 steps and provides details on cleaning, lubricating and installing components in the reverse order of disassembly. Special notes are provided regarding alignment marks, spring pressure hazards and orientation of parts.
Caterpillar Cat 323D L Excavator (Prefix PBE) Service Repair Manual (PBE00001...8ufjsekddm8u
This document provides instructions for removing and installing the idler gear in the front gear group of a Caterpillar C6.4 engine. The removal procedure involves using various tools to remove the idler gear, shaft, thrust plate and washer. The installation procedure specifies cleaning parts and using a press and torque wrench to reinstall these components, checking backlash and end play tolerances. Proper alignment of timing gear marks is also emphasized.
Caterpillar Cat 323D L Excavator (Prefix NZF) Service Repair Manual (NZF00001...8ufjsekddm8u
This document provides instructions for removing and installing inlet and exhaust valve springs on a Caterpillar C6.6 engine. The procedure involves using specialized tools to compress the valve springs and position the pistons at top dead center. Springs are removed in pairs from specific cylinders and must be replaced in the same order. Installation requires lubricating seals, compressing springs with a tool to insert retainers and keepers, and checking valve clearance after installation is complete. Safety precautions are outlined to prevent injury from released spring forces.
Caterpillar Cat 323D L Excavator (Prefix BYM) Service Repair Manual (BYM00001...8ufjsekddm8u
1) The document provides instructions for removing and installing various engine components on a Caterpillar 323D L Excavator, including valve seat inserts, the engine oil cooler, and the engine oil relief valve.
2) The procedures include a list of required tools and step-by-step instructions describing how to remove, disassemble, and assemble each component while taking appropriate safety precautions.
3) Technicians are advised to keep all parts clean and free of contaminants to prevent damage and wear.
Caterpillar Cat 323D L Excavator (Prefix NDE) Service Repair Manual (NDE00001...8ufjsekddm8u
The document provides instructions for installing the rocker shaft and pushrods on a C6.4 engine. The procedure involves installing various components like the spring, arms, bracket and washer onto the shaft assembly. Retaining rings are then installed to secure the assembly. Finally, the pushrods and rocker shaft are positioned and tightened to specified torques to complete the installation.
Caterpillar Cat 323D L Excavator (Prefix JLG) Service Repair Manual (JLG00001...8ufjsekddm8u
This service repair manual provides instructions for removing and installing valve seat inserts, removing and disassembling the engine oil cooler, and assembling the engine oil cooler for a Caterpillar C6.4 engine powering a 323D L excavator. The document lists required tools and safety notices, and includes illustrations of the removal, disassembly, and assembly procedures.
Caterpillar Cat 323D L Excavator (Prefix LFL) Service Repair Manual (LFL00001...8ufjsekddm8u
1) The document provides instructions for removing and installing the fuel injection pump on a Caterpillar C6.4 engine.
2) To remove the pump, various hoses, tubes, brackets and electrical connections must be disconnected and markings made for installation. Bolts then need to be removed to access the pump.
3) Installation involves reversing the removal process, ensuring cleanliness, replacing washers, and torquing all connections to the specified values.
Caterpillar Cat 323D L Excavator (Prefix L5Z) Service Repair Manual (L5Z00001...8ufjsekddm8u
The document provides instructions for removing and installing a flywheel housing on a Caterpillar C6.4 engine. It describes removing the electric starting motor, flywheel and ring gear before removing the flywheel housing bolts. Tools are required to lift the housing and remove the oil seal. When installing, a new gasket and oil seal are used and the housing is bolted back in place before reinstalling the flywheel and starting motor.
This document provides installation instructions for a rear power take-off (RPTO) on a 323 excavator with a C7.1 engine. It describes 20 steps to install the RPTO, including installing sleeve bearings, gears, idler hubs, adapters and bolts. Precautions are given to keep components clean and ensure proper alignment of parts. Tools required include drivers and sockets.
This document provides instructions for disassembling and assembling the travel motor of a 323D and 323D L excavator. It describes 27 steps to disassemble the travel motor by removing components like the head, brake piston, barrel assembly, and shaft assembly. It then describes 13 steps to reassemble the travel motor by installing components like the shaft assembly, cam plate, barrel assembly, and head in the reverse order of disassembly. Precautions are given to clean parts thoroughly, mark components for reinstallation, and ensure proper alignment of parts.
1) The document provides instructions for removing and installing a flywheel from a C7.1 engine that powers a 323 excavator.
2) To remove the flywheel, bolts must first be removed and guide studs installed to support the flywheel. Lifting equipment is then used to lift the flywheel off while inspecting components for wear or damage.
3) Flywheel installation requires cleaning and lifting the flywheel into place using guide studs. Bolts are tightened to the specified torque and the flywheel is inspected for proper runout.
This document provides disassembly instructions for the final drive, travel motor, and counterbalance valve of a 313D2 excavator. It lists the required tools and parts and outlines 15 steps to disassemble the final drive, 13 steps to disassemble the travel motor, and 16 steps to disassemble the counterbalance valve. Safety notices are included regarding releasing pressures and springs.
This document provides instructions for removing and installing a flywheel housing on a Caterpillar C4.2 engine. It outlines the required tools and steps to remove the flywheel, electric starting motor, and housing bolts. Instructions are given to lift the housing off the engine block using a link bracket and driver group. Reinstallation involves reversing the removal process and tightening the housing bolts to the specified torque.
This document provides instructions for removing and installing a flywheel housing on a Caterpillar C4.2 engine. It outlines the required tools and steps to remove the flywheel, electric starting motor, and housing bolts. Instructions are given to lift the housing off the engine block using a link bracket and driver group. Reinstallation involves reversing the removal process and tightening the housing bolts to the specified torque.
The document provides instructions for removing and installing various engine components on a Caterpillar C4.2 engine, including:
- Removing and installing the flywheel housing, which requires removing bolts and installing a new gasket.
- Removing the crankshaft pulley using pullers and removing the wear sleeve if needed. Installation requires heating the sleeve and tightening a nut.
- Removing the crankshaft front seal by drilling holes and pulling it out, being careful not to damage the crankshaft. Installation uses a installer tool and applying oil.
The document provides instructions for removing and installing various engine components on a Caterpillar 314D CR excavator, including:
1) Removing the idler gear from the front gear group by removing the bolt and washer securing it to the idler shaft and pulling it off using a puller tool.
2) Instructions specify ensuring timing marks are aligned before removal to maintain proper timing of gears.
3) Detailed steps and illustrations guide removal of additional components like the flywheel housing, crankshaft pulley, and crankshaft front seal. Tools and safety precautions are also listed.
Caterpillar Cat 313F L Excavator (Prefix NLG) Service Repair Manual (NLG00001...8ufjsekddm8u
This document provides instructions for removing the front housing on a C4.4 engine. The steps include:
1. Removing other components like the fan, crankshaft pulley, oil pan, accessory drive, water pump and timing gears.
2. Disconnecting wiring, cutting cable straps and removing bolts to separate the bypass tube from the housing and cylinder head.
3. Removing bolts of different lengths to detach the front housing from the cylinder block, and removing the gasket and thrust washer.
This document provides instructions for removing the front housing on a C4.4 engine. The steps include:
1. Removing other components like the fan, crankshaft pulley, oil pan, accessory drive, water pump and timing gears.
2. Disconnecting wiring, cutting cable straps and removing bolts to separate the bypass tube from the housing and cylinder head.
3. Removing bolts of different lengths to detach the front housing from the cylinder block, and removing the gasket and thrust washer.
Caterpillar Cat 312D2 L Excavator (Prefix GWN) Service Repair Manual (GWN0000...8ufjsekddm8u
This document provides instructions for disassembling components of an excavator including the final drive, travel motor, counterbalance valve, and barrel assembly. It lists required tools and outlines 16 steps to disassemble parts like the traction control valve, bearing, relief valve assemblies, piston assemblies, springs, and seals. Safety notices are included to warn of potential injuries from parts propelled by springs or pressurized hydraulic fluid.
This document provides disassembly instructions for the final drive, travel motor, and counterbalance valve of a 313D2 excavator. It lists the required tools and parts and outlines 15 steps to disassemble the final drive, 13 steps to disassemble the travel motor, and 16 steps to disassemble the counterbalance valve. Safety notices are included regarding releasing pressures and springs.
This document provides instructions for disassembling and assembling the travel motor of a 313D2 excavator. The disassembly process involves 27 steps to remove components like the motor head, brake piston, barrel assembly, springs and seals. The assembly process is outlined in 13 steps and provides details on cleaning, lubricating and installing components in the reverse order of disassembly. Special notes are provided regarding alignment marks, spring pressure hazards and orientation of parts.
The Octavia range embodies the design trend of the Škoda brand: a fusion of
aesthetics, safety and practicality. Whether you see the car as a whole or step
closer and explore its unique features, the Octavia range radiates with the
harmony of functionality and emotion
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsSprinter Gurus
Unlock the secrets behind your Mercedes Sprinter's uphill power loss with our comprehensive presentation. From fuel filter blockages to turbocharger troubles, we uncover the culprits and empower you to reclaim your vehicle's peak performance. Conquer every ascent with confidence and ensure a thrilling journey every time.
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 336D2 L EXCAVATOR ELR
Configuration: 336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
C9 Engines for Caterpillar Built Machines
Media Number -RENR9579-20 Publication Date -01/02/2015 Date Updated -15/08/2018
i06737900
Unit Injector Sleeve - Remove
SMCS - 1713-011
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-3042 Plug Tap 1
B 221-0052 Guide Sleeve 1
C
9U-6858 Bridge Plate 1
1B-2886 Bolts 2
221-9778 Puller Stud 1
4K-0367 Full Nut 1
5P-8247 Hard Washer 1
9U-6877 Thrust Bearing 1
D 221-9803 Rubber Stopper 1
Start By:
a. Remove the unit injectors. Refer to Disassembly and Assembly, "Unit Injector - Remove".
NOTICE
Keep all parts clean from contaminants.
1/3
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Contaminants may cause rapid wear and shortened component life.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat®
products.
Dispose of all fluids according to local regulations and mandates.
1. Drain the coolant from the cooling system into a suitable container for storage or disposal.
Refer to Operation and Maintenance Manual, "Refill Capacities and Recommendations".
2. Position Tooling (D) at the bottom of the unit injector sleeve.
3. Coat Tooling (A) with clean grease. Use Tooling (A) and Tooling (B) to cut threads into the
unit injector sleeve.
2/3
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Illustration 1 g01137445
4. Install Tooling (C) in unit injector sleeve (1).
5. Remove unit injector sleeve (1). Remove the O-ring seals.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Tue May 26 16:53:29 UTC+0800 2020
3/3
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 336D2 L EXCAVATOR ELR
Configuration: 336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
C9 Engines for Caterpillar Built Machines
Media Number -RENR9579-20 Publication Date -01/02/2015 Date Updated -15/08/2018
i03742983
Unit Injector Sleeve - Install
SMCS - 1713-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
E 221-9777 Sleeve Installer 1
F 4C-5552 Large Bore Brush 1
G 4C-9507 Retaining Compound 1
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1. Thoroughly clean the unit injector sleeves and the bores for the unit injectors with Tooling
(F) .
1/2
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Illustration 1 g02021929
2. Apply clean engine oil to O-ring seals (2) . Install O-ring seals (2) on unit injector sleeve
(1) .
3. Position unit injector sleeve (1) on Tooling (E) .
4. Apply a thin coating of Tooling (G) around the outer circumference of unit injector sleeve
(1) at Area (C) .
5. Position unit injector sleeve (1) in the cylinder head. Use a hammer to install unit injector
sleeve (1) in the cylinder head.
Note: Allow Tooling (G) to cure for two hours at 21 °C (70 °F) before filling the engine
with fuel or coolant. Longer curing time is required for lower temperatures.
6. Fill the cooling system with coolant to the correct level. Refer to Operation and
Maintenance Manual, "Refill Capacities and Recommendations".
End By: Install the unit injectors. Refer to Disassembly and Assembly, "Unit Injector - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Tue May 26 16:54:25 UTC+0800 2020
2/2
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 336D2 L EXCAVATOR ELR
Configuration: 336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
C9 Engines for Caterpillar Built Machines
Media Number -RENR9579-20 Publication Date -01/02/2015 Date Updated -15/08/2018
i05701078
Unit Injector Hydraulic Pump - Remove
SMCS - 1714-011
Removal Procedure for Non-Dual Tapered Roller Bearing
HEUI Pump
Start By:
A. Remove fuel filter base, if necessary.
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat products.
Dispose of all fluids according to local regulations and mandates.
1/8
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 1 g03601539
Non-Dual Taper Roller Bearing HEUI pump
Illustration 2 g03601540
Dual Taper Roller Bearing HEUI pump
Note: Refer to Illustrations 1 and 2 in order to identify each unit injection hydraulic pump.
2/8
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 3 g03614617
1. Disconnect tube assemblies (3) , (4) , (5) , and (6) .
2. Disconnect hose assembly (7) .
3. Disconnect harness assembly (2) from unit injector hydraulic pump (1) .
3/8
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 4 g03614660
4. Support unit injector hydraulic pump (1) by hand and remove bolts (8) . Remove unit
injector hydraulic pump (1) .
4/8
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 5 g03614696
5. Remove O-ring seal (9) .
Removal Procedure for Dual Tapered Roller Bearing HEUI
Pump
Start By:
A. Remove fuel filter base, if necessary.
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
5/8
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat products.
Dispose of all fluids according to local regulations and mandates.
Illustration 6 g03615086
1. Disconnect harness assembly (1) . Disconnect hose assemblies (4) and tube assembly (3) .
Remove tube assembly (2) and tube assembly (5) .
6/8
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Illustration 7 g03615089
2. Support unit injector hydraulic pump (7) and remove bolts (6) .
Illustration 8 g03615416
3. Rotate counterclockwise as shown, then remove unit injector hydraulic pump (7) .
7/8
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Illustration 9 g03615091
4. Remove O-ring seal (8) .
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Tue May 26 16:55:21 UTC+0800 2020
8/8
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 336D2 L EXCAVATOR ELR
Configuration: 336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
C9 Engines for Caterpillar Built Machines
Media Number -RENR9579-20 Publication Date -01/02/2015 Date Updated -15/08/2018
i05701091
Unit Injector Hydraulic Pump - Install
SMCS - 1714-012
Installation Procedure for Non-Dual Taper Roller Bearing
HEUI Pump
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat products.
Dispose of all fluids according to local regulations and mandates.
1/9
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 1 g03601539
Non-Dual Taper Roller Bearing HEUI pump
Illustration 2 g03601540
Dual Taper Roller Bearing HEUI pump
Note: Refer to Illustrations 1 and 2 in order to identify each unit injection hydraulic pump.
2/9
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 3 g03614696
1. Install new O-ring seal (9) .
3/9
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 4 g03614660
2. Position unit injector hydraulic pump (1) in the front housing.
3. Support unit injector hydraulic pump (1) and install bolts (8) .
4/9
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Illustration 5 g03614617
4. Connect hose assembly (7) .
5. Connect tube assemblies (3) , (4) , (5) , and (6) .
6. Connect harness assembly (2) to unit injector hydraulic pump (1) .
Installation Procedure for Dual Tapered Roller Bearing
HEUI Pump
Table 1
Required Tools
Tool Part Number Part Description Qty
A 129-1967 Multipurpose Grease -
Note: If replacing a non-dual tapered roller bearing HEUI pump with a dual tapered roller bearing
HEUI pump, refer to Special Instruction, REHS7902 for rework and installation procedures.
5/9
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 6 g03601539
Non-Dual Taper Roller Bearing HEUI pump
Illustration 7 g03601540
Dual Taper Roller Bearing HEUI pump
Note: Refer to Illustrations 6 and 7 in order to identify each unit injection hydraulic pump.
Note: If a dowel pin is installed in the mounting flange of the unit injector hydraulic pump
or in the front housing at the unit injector hydraulic pump mounting location, remove the
dowel pin before installing the unit injector hydraulic pump.
6/9
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 8 g03615091
1. Install O-ring seal (8) . Apply Tooling (A) to O-ring seal (8) , the mounting flange of the
unit injector hydraulic pump, and the back of the front housing at the mounting location of
the unit injector hydraulic pump.
Illustration 9 g03615798
2. Position unit injector hydraulic pump (7) as shown, then rotate clockwise to final
installation orientation.
7/9
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 10 g03615089
3. Install bolts (6) hand-tight.
Note: Do not fully tighten bolts (6) until all of the hoses and the tubes are connected to unit
injection hydraulic pump (7) .
Illustration 11 g03615086
4. Install tube assembly (5) hand-tight.
5. Connect hose assemblies (4) . Install tube assembly (3) and tube assembly (2) hand-tight.
6. Tighten bolts (6) to a torque of 55 ± 10 N·m (41 ± 7 lb ft).
8/9
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. 7. Tighten tube assemblies (2) , (3) , (5) and hose assemblies (4) .
8. Connect harness assembly (1) .
End By: Install fuel filter base, if necessary.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Tue May 26 16:56:17 UTC+0800 2020
9/9
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 336D2 L EXCAVATOR ELR
Configuration: 336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
C9 Engines for Caterpillar Built Machines
Media Number -RENR9579-20 Publication Date -01/02/2015 Date Updated -15/08/2018
i02297056
Turbocharger - Remove
SMCS - 1052-011
Removal Procedure
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat®
products.
Dispose of all fluids according to local regulations and mandates.
1/2
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
26. Illustration 1 g01150421
1. Disconnect hose assembly (1).
2. Remove bolts (4) and tube assembly (5).
3. Attach a suitable lifting device onto turbocharger (2). The weight of turbocharger (2) is
approximately 27 kg (60 lb). Remove nuts (3). Remove turbocharger (2) and the gasket.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Tue May 26 16:57:13 UTC+0800 2020
2/2
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
27. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 336D2 L EXCAVATOR ELR
Configuration: 336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
C9 Engines for Caterpillar Built Machines
Media Number -RENR9579-20 Publication Date -01/02/2015 Date Updated -15/08/2018
i04000968
Turbocharger - Install
SMCS - 1052-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 5P-3931 Anti-Seize Compound -
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1. Apply Tooling (A) to the turbocharger mounting studs on the exhaust manifold.
1/2
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
28. Illustration 1 g01150421
2. Attach a suitable lifting device to turbocharger (2). The weight of turbocharger (2) is
approximately 27 kg (60 lb). Position the gasket and turbocharger (2) on the exhaust
manifold.
Note: Discard the nuts after use. Use new nuts for installation.
3. Install nuts (3). Tighten nuts (3) to a torque of 54 ± 5 N·m (40 ± 4 lb ft).
4. Position tube assembly (5) and install bolts (4).
5. Connect hose assembly (1).
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Tue May 26 16:58:08 UTC+0800 2020
2/2
336D2 & 336D2 L Excavators ELR00001-UP (MACHINE) POWERED BY C9 Engin...
2020/5/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...