This document provides instructions for disassembling the final drive of a 330D MH EXCAVATOR C5K excavator. It outlines 31 steps to fully disassemble the final drive assembly, including removing gears, carriers, shafts, seals, and housings. Various tools are required, and safety precautions are noted. Detailed illustrations accompany each step to show how to properly disassemble the components.
An introduction to the cryptocurrency investment platform Binance Savings.Any kyc Account
Learn how to use Binance Savings to expand your bitcoin holdings. Discover how to maximize your earnings on one of the most reliable cryptocurrency exchange platforms, as well as how to earn interest on your cryptocurrency holdings and the various savings choices available.
Recruiting in the Digital Age: A Social Media MasterclassLuanWise
In this masterclass, presented at the Global HR Summit on 5th June 2024, Luan Wise explored the essential features of social media platforms that support talent acquisition, including LinkedIn, Facebook, Instagram, X (formerly Twitter) and TikTok.
VAT Registration Outlined In UAE: Benefits and Requirementsuae taxgpt
Vat Registration is a legal obligation for businesses meeting the threshold requirement, helping companies avoid fines and ramifications. Contact now!
https://viralsocialtrends.com/vat-registration-outlined-in-uae/
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
B2B payments are rapidly changing. Find out the 5 key questions you need to be asking yourself to be sure you are mastering B2B payments today. Learn more at www.BlueSnap.com.
[Note: This is a partial preview. To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
Sustainability has become an increasingly critical topic as the world recognizes the need to protect our planet and its resources for future generations. Sustainability means meeting our current needs without compromising the ability of future generations to meet theirs. It involves long-term planning and consideration of the consequences of our actions. The goal is to create strategies that ensure the long-term viability of People, Planet, and Profit.
Leading companies such as Nike, Toyota, and Siemens are prioritizing sustainable innovation in their business models, setting an example for others to follow. In this Sustainability training presentation, you will learn key concepts, principles, and practices of sustainability applicable across industries. This training aims to create awareness and educate employees, senior executives, consultants, and other key stakeholders, including investors, policymakers, and supply chain partners, on the importance and implementation of sustainability.
LEARNING OBJECTIVES
1. Develop a comprehensive understanding of the fundamental principles and concepts that form the foundation of sustainability within corporate environments.
2. Explore the sustainability implementation model, focusing on effective measures and reporting strategies to track and communicate sustainability efforts.
3. Identify and define best practices and critical success factors essential for achieving sustainability goals within organizations.
CONTENTS
1. Introduction and Key Concepts of Sustainability
2. Principles and Practices of Sustainability
3. Measures and Reporting in Sustainability
4. Sustainability Implementation & Best Practices
To download the complete presentation, visit: https://www.oeconsulting.com.sg/training-presentations
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. You’ll also learn
• Four (4) workplace discipline methods you should consider
• The best and most practical approach to implementing workplace discipline.
• Three (3) key tips to maintain a disciplined workplace.
Company Valuation webinar series - Tuesday, 4 June 2024FelixPerez547899
This session provided an update as to the latest valuation data in the UK and then delved into a discussion on the upcoming election and the impacts on valuation. We finished, as always with a Q&A
Digital Transformation and IT Strategy Toolkit and TemplatesAurelien Domont, MBA
This Digital Transformation and IT Strategy Toolkit was created by ex-McKinsey, Deloitte and BCG Management Consultants, after more than 5,000 hours of work. It is considered the world's best & most comprehensive Digital Transformation and IT Strategy Toolkit. It includes all the Frameworks, Best Practices & Templates required to successfully undertake the Digital Transformation of your organization and define a robust IT Strategy.
Editable Toolkit to help you reuse our content: 700 Powerpoint slides | 35 Excel sheets | 84 minutes of Video training
This PowerPoint presentation is only a small preview of our Toolkits. For more details, visit www.domontconsulting.com
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 330D MH EXCAVATOR C5K
Configuration: 330D Material Handler (HCR & FCR) C5K00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
330D Excavator Machine Systems
Media Number -KENR5993-02 Publication Date -01/02/2017 Date Updated -20/02/2017
i02770233
Final Drive - Disassemble
SMCS - 4050-015
S/N - C5K1-222
S/N - LEM1-187
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
C 1P-1863 Retaining Ring Pliers 1
D 194-3878 Spanner Socket 1
E 138-7574 Link Bracket 2
F
5F-7366 Forcing Screw 1
1P-5546 Crossblock 1
1U-9889 Crossblock 1
1P-0520 Driver Group 1
6V-7888 Puller Leg 2
1H-3112 Puller Assembly 1
1P-5551 Adjustable Screw Assembly 1
1/12(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
3. G
1U-7600 Slide Hammer Puller Gp 1
8T-0266 Bolt 1
Start By:
a. Remove the final drive and the travel motor. Refer to Disassembly and Assembly, "Final
Drive and Travel Motor - Remove".
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat®
products.
Dispose of all fluids according to local regulations and mandates.
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of
the component should be thoroughly cleaned. This will prevent dirt from entering the
internal mechanism.
Note: Some of the images that are in this procedure do not show the sprocket assembly that
is attached to the final drive housing. If necessary, the weights that are given include the
weight of the sprocket assembly.
1. Put an alignment mark across the sections of the final drive for assembly purposes. The
parts must be reinstalled to the original locations.
Illustration 1 g00708089
2/12(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
4. 2. Fasten the final drive to Tooling (A). The weight of the final drive assembly is
approximately 544 kg (1200 lb).
3. Remove bolts (1) that hold the cover in position.
Illustration 2 g00708090
4. Remove the setscrews from the cover. Fasten Tooling (B) and a suitable lifting device to
cover (2). Remove the cover. The weight of the cover is approximately 32 kg (70 lb).
Illustration 3 g00879362
5. Remove bolts (3). Remove gear (5). Check plate (6). Replace plate (6) if wear is shown.
Remove plugs (4) from cover (2).
3/12(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
5. Illustration 4 g00879365
6. Remove O-ring seal (7) from plugs (4).
Illustration 5 g00780428
7. Remove gear (8). Remove spacer (9).
Illustration 6 g00780432
8. Use Tooling (C) to remove retaining ring (10). Remove washer (11). Remove gear (12).
Remove bearing assembly (13). Remove second washer (11).
9. Repeat Step 8 for the remaining two gear assemblies.
4/12(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
6. Illustration 7 g00781401
10. Remove retaining ring (14).
Illustration 8 g00781407
11. Remove carrier assembly (15).
Illustration 9 g01389593
12. Use a suitable press to remove the shafts from carrier assembly (15).
5/12(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
7. Illustration 10 g00781412
13. Remove gear (16). Remove spacer (17).
Illustration 11 g00781466
14. Remove retaining ring (18).
15. Remove carrier assembly (19).
Illustration 12 g00879368
16. Disassemble carrier assembly (19), as follows.
a. Drive spring pin (20) into planetary shaft (21) with a hammer and a punch.
6/12(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
8. Illustration 13 g00781476
b. Remove planetary shaft (21).
c. Remove spring pin (20) from planetary shaft (21) with a hammer and a punch.
Illustration 14 g00781516
d. Remove thrust washers (22) and planetary gear (24) from the carrier assembly.
e. Remove bearing (23) from planetary gear (24).
17. Repeat Steps 16.a through 16.e for the other two planetary.
7/12(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
9. Illustration 15 g00781529
18. Remove gear (25). Remove spacer (26).
Illustration 16 g00781559
19. Remove carrier assembly (27).
20. Use two people to remove carrier assembly (27). The weight of the carrier assembly is
approximately 38 kg (85 lb).
21. Disassemble carrier assembly (27), as follows.
Illustration 17 g00781719
a. Drive spring pin (29) into planetary shaft (28) with a hammer and a punch.
8/12(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
10. Illustration 18 g00781601
b. Remove planetary shaft (28).
c. Remove spring pin (29) from planetary shaft (28) with a hammer and a punch.
Illustration 19 g00781607
d. Remove thrust washers (30) and planetary gear (32) from the carrier assembly.
e. Remove two bearings (31) from the planetary gear.
22. Repeat Steps 21.a through 21.e for the other two planetary gears.
Illustration 20 g00781730
9/12(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
11. 23. Use two people to remove gear (33). The weight of gear is approximately 41 kg (90 lb).
Illustration 21 g00781807
24. Remove O-ring seal (34).
Illustration 22 g01147650
25. Remove bolts (35A) and plates (35B).
Illustration 23 g01147651
26. Use Tooling (G) to remove dowel (37) from stopper plate assembly (35).
10/12(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
12. Illustration 24 g01147759
27. Secure Tooling (D) to stopper plate assembly (35). Use Tooling (D) to remove stopper plate
assembly (35).
Illustration 25 g01147930
28. Use Tooling (E) and a suitable lifting device to remove housing (36). The weight of housing
(36) is approximately 100 kg (220 lb).
Illustration 26 g01147951
29. Remove Duo-Cone seal (39A) from housing (38).
11/12(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
13. Illustration 27 g01147975
Illustration 28 g01147934
30. Remove Duo-Cone seal (39B) from housing (36).
31. Use Tooling (F) in order to remove bearings (40) and (41) from housing (36).
32. If necessary, remove the final drive sprocket from the sprocket housing. Refer to
Disassembly and Assembly, "Final Drive Sprocket - Remove and Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon Jul 27 13:51:52 UTC+0800 2020
12/12(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
14. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 330D MH EXCAVATOR C5K
Configuration: 330D Material Handler (HCR & FCR) C5K00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
330D Excavator Machine Systems
Media Number -KENR5993-02 Publication Date -01/02/2017 Date Updated -20/02/2017
i05331848
Final Drive - Disassemble
SMCS - 4050-015
S/N - C5K223-UP
S/N - LEM188-UP
S/N - PEL1-UP
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
C 1P-1863 Retaining Ring Pliers 1
D 138-7575 Link Bracket 3
E 4C-8359 Eyebolt 2
F 138-7574 Link Bracket 2
G 138-7576 Link Bracket 2
H 154-6183 Forcing Bolts 3
Start By:
A. Start by removing the final drive and the travel motor. Refer to Disassembly and Assembly,
"Final Drive and Travel Motor - Remove".
1/13(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
15. Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of
the component should be thoroughly cleaned. This will prevent dirt from entering the
internal mechanism.
1. Put an alignment mark across the sections of the final drive for assembly purposes. The
parts must be reinstalled to the original locations.
Illustration 1 g00892878
2. Use Tooling (G) and a suitable lifting device to position the final drive assembly onto
Tooling (A) . The weight of the final drive assembly is approximately 550 kg (1200 lb).
3. Remove bolts (1) .
Illustration 2 g00892883
4. Use Tooling (B) and a suitable lifting device to remove cover (2) . The weight of cover (2)
is approximately 32 kg (70 lb).
2/13(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
16. Illustration 3 g00892888
5. Remove bolts (3) and gear (4) . Check plate (6) . Replace plate (6) if plate (6) is worn.
Remove plugs (5) from cover (2) .
Illustration 4 g00892906
6. Remove O-ring seals (7) from plugs (5) .
Illustration 5 g00892930
3/13(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
17. 7. Remove gear (8) and spacer (9) .
Illustration 6 g00892965
8. Use Tooling (C) to remove retaining ring (10) . Remove washer (11) and gear (12) .
Remove bearing assembly (13) and washer (14) .
9. Repeat Step 8 for the other two gear assemblies.
Illustration 7 g00892968
10. Remove retaining ring (15) .
4/13(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
18. Illustration 8 g00892975
11. Remove carrier assembly (16) .
Illustration 9 g01389804
12. Use a suitable press to remove the shafts from carrier assembly (16) .
5/13(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
19. Illustration 10 g00892977
13. Remove gear (17) and spacer (18) .
Illustration 11 g00892997
14. Use Tooling (D) and a suitable lifting device to remove planetary carrier (19) . The weight
of planetary carrier (19) is approximately 48 kg (105 lb).
Illustration 12 g00893019
6/13(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
20. 15. Remove retainer ring (21) . Lift planetary carrier (19) off sun gear (20) .
Illustration 13 g00896860
16. Drive spring pin (23) into planetary shaft (22) .
Illustration 14 g00893043
17. Remove planetary shaft (22) . Use a suitable punch to remove spring pin (23) from
planetary shaft (22) .
7/13(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
21. Illustration 15 g00896863
18. Remove washers (24) and bearing (25) from planetary gear (26) .
19. Repeat Steps 16 through 18 for the other two planetary gears.
Illustration 16 g00897431
20. Remove spacer (27) .
21. Use two people to remove carrier assembly (28) . The weight of carrier assembly (28) is
approximately 38 kg (85 lb).
8/13(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
22. Illustration 17 g00893652
22. Drive spring pin (30) into shaft (29) .
Illustration 18 g00893658
23. Remove shaft (29) . Use a suitable punch to remove spring pin (30) from shaft (29) .
Illustration 19 g00893674
24. Remove washers (31) and bearings (32) from planetary gear (33) .
9/13(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
23. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
24. 25. Repeat Steps 22 through 24 for the other three planetary gears.
Illustration 20 g01208300
26. Fasten Tooling (E) and a suitable lifting device to ring gear (34) , as shown. Remove ring
gear (34) from sprocket housing (35) . The weight of ring gear (34) is approximately 66 kg
(146 lb).
Illustration 21 g01208542
27. Remove O-ring seal (36) from sprocket housing (35) .
10/13(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
25. Illustration 22 g01208553
28. Remove bolts (37) from coupling gear (38) .
Illustration 23 g01898713
Note: Mark the orientation of coupling gear (38) for assembly purposes.
29. Install Tooling (H) in coupling gear (38) . Tighten Tooling (H) evenly in order to loosen
coupling gear (38) . Remove the coupling gear from the motor housing.
11/13(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
26. Illustration 24 g01208578
Illustration 25 g01208625
30. Remove shims (40) from the motor housing.
Note: Inner cones and outer bearing cones (42) are a slip fit on the motor housing. While
you remove sprocket housing (35) from the motor housing, inner bearing cone (42) may
stay with the sprocket housing or the inner bearing cone may stay on the motor housing.
31. Fasten Tooling (F) and a suitable lifting device to sprocket housing (35) . Separate the
sprocket housing from the motor housing. The weight of sprocket housing (35) is 109 kg
(240 lb).
Illustration 26 g01208626
32. Remove the locating pins from the motor housing.
33. Remove Duo-Cone seal (41) from the motor housing.
34. If inner bearing cone (42) remained on the motor housing, then remove the inner bearing
cone.
12/13(W)
w
2020/7/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...