The document summarizes container terminal projects at Cai Mep area in southern Vietnam including location, draft, operation time, and capacity details. It lists 11 terminal projects from north to south along with their expected operation start dates ranging from 2009 to 2015. It also provides distances from Cai Mep to major industrial zones and details on the two-phase development of the first terminal project including area, berth length, equipment, vessel capacity, and annual throughput.