The document summarizes container terminal projects at Cai Mep area including details about draft, operation timelines, and capacities. It lists 14 proposed terminals, their expected draft depths, and planned operation times. It also provides distances from Cai Mep to major industrial zones and details on the two phases of the I Container Terminal Project including area, berth length, equipment, vessel capacity, annual throughput, and operation models.