1st PIG (INTELLIGENT PIG) 2nd PIG (BI-DIRECTIONAL) 3rd PIG (BI-DIRECTIONAL)
BTJT-A PLATFORM
(Receiving Location)
ORF ONSHORE
(Launching Location)
PIGGING DIRECTION
Pict 1. BULK DEWATERING
Hydrostatic Test
Water
Chemically Filtered
Fresh Water (2% of
Pipeline Lenght)*
Chemically Filtered
Fresh Water (2% of
Pipeline Lenght)*
Compressed
Air
Note (*) : Total Volume 8000 M3; 2% x 110 Km = 2,2 Km
Or Equal with 160 M3

Bulk dewatering

  • 1.
    1st PIG (INTELLIGENTPIG) 2nd PIG (BI-DIRECTIONAL) 3rd PIG (BI-DIRECTIONAL) BTJT-A PLATFORM (Receiving Location) ORF ONSHORE (Launching Location) PIGGING DIRECTION Pict 1. BULK DEWATERING Hydrostatic Test Water Chemically Filtered Fresh Water (2% of Pipeline Lenght)* Chemically Filtered Fresh Water (2% of Pipeline Lenght)* Compressed Air Note (*) : Total Volume 8000 M3; 2% x 110 Km = 2,2 Km Or Equal with 160 M3