Breaking
Bad
In tegration
Pr ojects
Past
10 yrs
How to avoid
this list in
2016
Large IT Modernization Projects Often Fail
What goes wrong?
According to
the 2011 Institute
for Defense Analysis report
business transformation
projects are routinely “over
budget, behind schedule, &
have not met performance
expectations.”
Large IT Modernization Projects Often Fail
What goes wrong?
Why?Analysts point to:
 Large projects are complex, both
technologically and financially
 Reporting negative findings is
perceived as weakness; obstacles are
therefore not removed
 Focus is often on technology instead
of business needs
 Difficult for smaller, more agile
companies to access government
projects
 Lack of incentives that encourage
completion versus stretching the
project (cost plus arrangement)
Overcoming Government IT Failure
According to
PMI
(May, 2015)
The annual cost of
failed U.S. government
IT projects is estimated
to be as high as
US$20 billion.
!
Overcoming Government IT Failure
To overcome
challenges:
 Make it easier for smaller
companies to bid
 Reduce project size – if it takes
too long, it may be obsolete
before completed
 Provide training so the teams are
skilled at what they do – both
technologically and financially
Complexity Makes Large Legacy Modernization Projects Risky
"There is going
to be so much more
complexity and unperceived
risk associated with larger
projects as compared to smaller
ones . . . and they are more
likely to fail.“
Niam Yaraghi, a fellow at the Brookings
Institution's Center for Technology
Innovation
There are many examples of Failed IT projects over the last decade
HP has had
trouble with large
projects. Losing
over $266M
U.S. Air Force
Spends $1 Billion
on Failed ECSS
project (pdf)
Avantor Sues IBM
– $13M project
California’s DMV IT
Project Cancelled
($134M)
Healthcare has
many similar
examples
HP has had trouble with large projects
 HP - Department of Motor Vehicles projects cancelled,
Michigan State ($49M), Rhode Island ($16M+), California
($135M), Minnesota ($48M), Vermont ($18.5M), New Jersey,
and more
 Lengthy timelines as well.
Michigan State cancelled project lasted over 10 years!!!
U.S. Air Force Spends $1 Billion on Failed ECSS project
According to Spectrum, between 2004-11 the US Air
Force failed to complete an ambitious and risky effort
to replace 240 outdated Air Force computer systems
with a single integrated system.
8 years!!!
Avantor Sues IBM – 13M$ project
 According to Reuters:
 IBM – SAP’s solution did not meet needs, as promised
 Avantor is claiming disastrous damages, including:
 Lack of crucial functionality that Avantor needed to run its core
business processes
 Errors ranging from failure to track or process orders correctly
to directing "that dangerous chemicals be stored in
inappropriate locations".
California’s DMV IT Project Cancelled ($134M)
According to Spectrum, the project’s dashboard status
was “yellow” (meaning that the project is slipping) right
up until the day it was cancelled. As far as I can tell it
never reached “red,” meaning “a project that is in need
of immediate intervention.”
There is evidence from Canada too
 An $80M laboratory information
system that costs at least $15M
annually to operate has languished
largely unused for years
 A $46M diabetes information system
that was intended to serve as the
centerpiece of a $150M chronic
disease registry has proven impossible
to build.
 Progress is dependent on the
implementation of health information
plans
In Ontario,
for example
Invested Time and Money May Not Yet Be Paying Off in Ontario
According to the Globe and Mail:
 Projects were centered first on constructing massive
provincial databases rather than on the basic need
to connect physicians to each other and to patients.
 New technologies, like using tablets to enable
patients to do their own data entry, are waiting,
despite being proven effective.
Time and Money Costs
From these case
studies, it is difficult to
know exactly how much
longer or how much
more expensive the
projects actually were
They share
 multiple attempts
 at multiple-year
projects
 with budgets ranging
from millions to
hundreds-of-millions
and billions of dollars.
Today’s solutions
7% Average schedule overrun, out
of that 33% for software projects
45% of IT projects
go over budget
Projects deliver 56% less
value then predicted
Source: McKinsey/Oxford study on reference class forecasting for IT projects
http://www.mckinsey.com/insights/business_technology/delivering_large-scale_it_projects_on_time_on_budget_and_on_value
17 percent of large IT projects go so badly that
they can threaten the very existence of the company
“ “
RiskyTake forever Costly
Benefits
OpenLegacy makes it easy and fast
IN DAYS INSTEAD OF MONTHS
Rapid
Days instead
of months
Risk Free
No changes to
existing
applications
Out of the Box
content-aware
Security and API
management
Workload/
MIPS
Reduction
(“Deep caching”)
Effortless
Scalability
automatically
deploys to
Docker cloud
containers
Leverages
existing assets:
presentation,
business, data
or service
Fully
customizable,
rule based,
completely
open standards
Secure
APIOne-click model Generation
One-click Deployment
But exactly how do we compare to the competition
Given today’s
technology
advances there are
many companies
providing various
solutions but before
deciding on any one
vendor you should
consider the
following differences
between each type
of vendor.
Traditional ESBs
Provide integration
and governance
Cloud Based ESBs
& Multi-tenants
Provide integration
and cloud deployment
API platforms
Provide API
management,
analytics, security
 Some API interface,
no API architecture
 Hard to migrate
 Standard security
 No automation
 Black-box design
 Not cloud ready
 Vendor locked and
Cloud-platform locked
 API interface, no API
architecture
 Hard to migrate
 Standard security
 No automation
 Black-box design
 No integration
 No delivery
 Existing governance
investment not used
Provides automated
integration and
multi-tenant delivery
 Content and context aware security
 Platform agnostic
 Out-of-the-box API management
 Deep caching can reduce existing /
future workloads
 Automatically deploys to Docker
based cloud containers or on premise
 No changes to your applications
 Leverage your existing assets:
presentation, business or data
 Open source based, completely open
standards
 Fully customizable, rules based
How to Avoid Failure in 2016
Focus on current
business needs
not technology
Reduce complexity
by scoping smaller,
shorter term, less
expensive projects
Encourage
discussion of
obstacles, not
covering them up
Engage small,
agile companies
Align the
incentives with
achievement of
the needs on time
Provide training to
the relevant
teams
Integrate your Backend Systems faster with OpenLegacy
We help you:
Remove all obstacles for innovation and allow the business to set the pace
Request
a demo
Try us
out free for
90 days
OR
Thank You

More Related Content

What's hot

State of Florida Neo4J Graph Briefing - Keynote
State of Florida Neo4J Graph Briefing - KeynoteState of Florida Neo4J Graph Briefing - Keynote
State of Florida Neo4J Graph Briefing - KeynoteNeo4j
 
i2 Contact Tracing One Pager
i2 Contact Tracing One Pageri2 Contact Tracing One Pager
i2 Contact Tracing One PagerSydney Wolff
 
The Internet of Things: Exploring revenue generating use cases
The Internet of Things: Exploring revenue generating use casesThe Internet of Things: Exploring revenue generating use cases
The Internet of Things: Exploring revenue generating use casesDeloitte United States
 
The effect of io t new features on security
The effect of io t new features on securityThe effect of io t new features on security
The effect of io t new features on securityMmanan91
 

What's hot (6)

Managing Corporate Memory: The Impact of Disruptive Forces in the Workplace
Managing Corporate Memory: The Impact of Disruptive Forces in the WorkplaceManaging Corporate Memory: The Impact of Disruptive Forces in the Workplace
Managing Corporate Memory: The Impact of Disruptive Forces in the Workplace
 
State of Florida Neo4J Graph Briefing - Keynote
State of Florida Neo4J Graph Briefing - KeynoteState of Florida Neo4J Graph Briefing - Keynote
State of Florida Neo4J Graph Briefing - Keynote
 
i2 Contact Tracing One Pager
i2 Contact Tracing One Pageri2 Contact Tracing One Pager
i2 Contact Tracing One Pager
 
The Internet of Things: Exploring revenue generating use cases
The Internet of Things: Exploring revenue generating use casesThe Internet of Things: Exploring revenue generating use cases
The Internet of Things: Exploring revenue generating use cases
 
The effect of io t new features on security
The effect of io t new features on securityThe effect of io t new features on security
The effect of io t new features on security
 
CTAM Making Analytics Actionable RJA FINAL
CTAM Making Analytics Actionable RJA FINALCTAM Making Analytics Actionable RJA FINAL
CTAM Making Analytics Actionable RJA FINAL
 

Similar to Breaking Bad Integration Projects

Agency IT Trends under the Trump Administration
Agency IT Trends underthe Trump AdministrationAgency IT Trends underthe Trump Administration
Agency IT Trends under the Trump AdministrationLeanna Myers
 
EnterpriseHackathon.com Challenges
EnterpriseHackathon.com ChallengesEnterpriseHackathon.com Challenges
EnterpriseHackathon.com ChallengesSatwik Seshasai
 
DevOps for Highly Regulated Environments
DevOps for Highly Regulated EnvironmentsDevOps for Highly Regulated Environments
DevOps for Highly Regulated EnvironmentsDevOps.com
 
Cloud Computing & Its Impact on Project Management
Cloud Computing & Its Impact on Project ManagementCloud Computing & Its Impact on Project Management
Cloud Computing & Its Impact on Project ManagementVSR *
 
Queens Medical Center, Nat Public Radio, Worldspan, anda Others Yo.pdf
Queens Medical Center, Nat Public Radio, Worldspan, anda Others Yo.pdfQueens Medical Center, Nat Public Radio, Worldspan, anda Others Yo.pdf
Queens Medical Center, Nat Public Radio, Worldspan, anda Others Yo.pdffms12345
 
Chapter 1(1).pptx
Chapter 1(1).pptxChapter 1(1).pptx
Chapter 1(1).pptxmegzgreat
 
Why IT Struggles With Digital Transformation and What to Do About It
Why IT Struggles With Digital Transformation and What to Do About ItWhy IT Struggles With Digital Transformation and What to Do About It
Why IT Struggles With Digital Transformation and What to Do About Itrun_frictionless
 
Agent of Change: COBOL Developer Day
Agent of Change: COBOL Developer DayAgent of Change: COBOL Developer Day
Agent of Change: COBOL Developer DayMicro Focus
 
NA Developer Day - Addressing forces of change
NA Developer Day - Addressing forces of changeNA Developer Day - Addressing forces of change
NA Developer Day - Addressing forces of changeMicro Focus
 
pm_chapter1_n_1_111111111111111111111.pptx
pm_chapter1_n_1_111111111111111111111.pptxpm_chapter1_n_1_111111111111111111111.pptx
pm_chapter1_n_1_111111111111111111111.pptxlinatalole2118
 
Software development for the diversification of Nigeria Ecomony
Software development for the diversification of Nigeria EcomonySoftware development for the diversification of Nigeria Ecomony
Software development for the diversification of Nigeria EcomonyPatrick Ogbuitepu
 
2011 summit office of the cio presentation galit
2011 summit office of the cio presentation galit2011 summit office of the cio presentation galit
2011 summit office of the cio presentation galitGalit Fein
 
DRIVERS AND IMPEDIMENTS TO DIGITAL TRANSFORMATION - THE RESEARCH
DRIVERS AND IMPEDIMENTS TO DIGITAL TRANSFORMATION - THE RESEARCHDRIVERS AND IMPEDIMENTS TO DIGITAL TRANSFORMATION - THE RESEARCH
DRIVERS AND IMPEDIMENTS TO DIGITAL TRANSFORMATION - THE RESEARCHTom Rieger
 
How Poor Or Missing Requirements Can Kill An It Project
How Poor Or Missing Requirements Can Kill An It ProjectHow Poor Or Missing Requirements Can Kill An It Project
How Poor Or Missing Requirements Can Kill An It ProjectLizLavaveshkul
 
The standish group chaos report
The standish group chaos report The standish group chaos report
The standish group chaos report Mizno Kruge
 
Schwalbe-07ProjectCost.ppt
Schwalbe-07ProjectCost.pptSchwalbe-07ProjectCost.ppt
Schwalbe-07ProjectCost.pptmanojgandhi1
 
IEEE 2013 The flaws in the traditional contract for software development
IEEE 2013 The flaws in the traditional contract for software developmentIEEE 2013 The flaws in the traditional contract for software development
IEEE 2013 The flaws in the traditional contract for software developmentSusan Atkinson
 
Connecting Above the Cloud
Connecting Above the CloudConnecting Above the Cloud
Connecting Above the CloudPeter Coffee
 

Similar to Breaking Bad Integration Projects (20)

Agency IT Trends under the Trump Administration
Agency IT Trends underthe Trump AdministrationAgency IT Trends underthe Trump Administration
Agency IT Trends under the Trump Administration
 
EnterpriseHackathon.com Challenges
EnterpriseHackathon.com ChallengesEnterpriseHackathon.com Challenges
EnterpriseHackathon.com Challenges
 
DevOps for Highly Regulated Environments
DevOps for Highly Regulated EnvironmentsDevOps for Highly Regulated Environments
DevOps for Highly Regulated Environments
 
Cloud Computing & Its Impact on Project Management
Cloud Computing & Its Impact on Project ManagementCloud Computing & Its Impact on Project Management
Cloud Computing & Its Impact on Project Management
 
K0948387
K0948387K0948387
K0948387
 
Queens Medical Center, Nat Public Radio, Worldspan, anda Others Yo.pdf
Queens Medical Center, Nat Public Radio, Worldspan, anda Others Yo.pdfQueens Medical Center, Nat Public Radio, Worldspan, anda Others Yo.pdf
Queens Medical Center, Nat Public Radio, Worldspan, anda Others Yo.pdf
 
Chapter 1(1).pptx
Chapter 1(1).pptxChapter 1(1).pptx
Chapter 1(1).pptx
 
Pbs Erp Economy
Pbs Erp EconomyPbs Erp Economy
Pbs Erp Economy
 
Why IT Struggles With Digital Transformation and What to Do About It
Why IT Struggles With Digital Transformation and What to Do About ItWhy IT Struggles With Digital Transformation and What to Do About It
Why IT Struggles With Digital Transformation and What to Do About It
 
Agent of Change: COBOL Developer Day
Agent of Change: COBOL Developer DayAgent of Change: COBOL Developer Day
Agent of Change: COBOL Developer Day
 
NA Developer Day - Addressing forces of change
NA Developer Day - Addressing forces of changeNA Developer Day - Addressing forces of change
NA Developer Day - Addressing forces of change
 
pm_chapter1_n_1_111111111111111111111.pptx
pm_chapter1_n_1_111111111111111111111.pptxpm_chapter1_n_1_111111111111111111111.pptx
pm_chapter1_n_1_111111111111111111111.pptx
 
Software development for the diversification of Nigeria Ecomony
Software development for the diversification of Nigeria EcomonySoftware development for the diversification of Nigeria Ecomony
Software development for the diversification of Nigeria Ecomony
 
2011 summit office of the cio presentation galit
2011 summit office of the cio presentation galit2011 summit office of the cio presentation galit
2011 summit office of the cio presentation galit
 
DRIVERS AND IMPEDIMENTS TO DIGITAL TRANSFORMATION - THE RESEARCH
DRIVERS AND IMPEDIMENTS TO DIGITAL TRANSFORMATION - THE RESEARCHDRIVERS AND IMPEDIMENTS TO DIGITAL TRANSFORMATION - THE RESEARCH
DRIVERS AND IMPEDIMENTS TO DIGITAL TRANSFORMATION - THE RESEARCH
 
How Poor Or Missing Requirements Can Kill An It Project
How Poor Or Missing Requirements Can Kill An It ProjectHow Poor Or Missing Requirements Can Kill An It Project
How Poor Or Missing Requirements Can Kill An It Project
 
The standish group chaos report
The standish group chaos report The standish group chaos report
The standish group chaos report
 
Schwalbe-07ProjectCost.ppt
Schwalbe-07ProjectCost.pptSchwalbe-07ProjectCost.ppt
Schwalbe-07ProjectCost.ppt
 
IEEE 2013 The flaws in the traditional contract for software development
IEEE 2013 The flaws in the traditional contract for software developmentIEEE 2013 The flaws in the traditional contract for software development
IEEE 2013 The flaws in the traditional contract for software development
 
Connecting Above the Cloud
Connecting Above the CloudConnecting Above the Cloud
Connecting Above the Cloud
 

Breaking Bad Integration Projects

  • 1. Breaking Bad In tegration Pr ojects Past 10 yrs How to avoid this list in 2016
  • 2. Large IT Modernization Projects Often Fail What goes wrong? According to the 2011 Institute for Defense Analysis report business transformation projects are routinely “over budget, behind schedule, & have not met performance expectations.”
  • 3. Large IT Modernization Projects Often Fail What goes wrong? Why?Analysts point to:  Large projects are complex, both technologically and financially  Reporting negative findings is perceived as weakness; obstacles are therefore not removed  Focus is often on technology instead of business needs  Difficult for smaller, more agile companies to access government projects  Lack of incentives that encourage completion versus stretching the project (cost plus arrangement)
  • 4. Overcoming Government IT Failure According to PMI (May, 2015) The annual cost of failed U.S. government IT projects is estimated to be as high as US$20 billion. !
  • 5. Overcoming Government IT Failure To overcome challenges:  Make it easier for smaller companies to bid  Reduce project size – if it takes too long, it may be obsolete before completed  Provide training so the teams are skilled at what they do – both technologically and financially
  • 6. Complexity Makes Large Legacy Modernization Projects Risky "There is going to be so much more complexity and unperceived risk associated with larger projects as compared to smaller ones . . . and they are more likely to fail.“ Niam Yaraghi, a fellow at the Brookings Institution's Center for Technology Innovation
  • 7. There are many examples of Failed IT projects over the last decade HP has had trouble with large projects. Losing over $266M U.S. Air Force Spends $1 Billion on Failed ECSS project (pdf) Avantor Sues IBM – $13M project California’s DMV IT Project Cancelled ($134M) Healthcare has many similar examples
  • 8. HP has had trouble with large projects  HP - Department of Motor Vehicles projects cancelled, Michigan State ($49M), Rhode Island ($16M+), California ($135M), Minnesota ($48M), Vermont ($18.5M), New Jersey, and more  Lengthy timelines as well. Michigan State cancelled project lasted over 10 years!!!
  • 9. U.S. Air Force Spends $1 Billion on Failed ECSS project According to Spectrum, between 2004-11 the US Air Force failed to complete an ambitious and risky effort to replace 240 outdated Air Force computer systems with a single integrated system. 8 years!!!
  • 10. Avantor Sues IBM – 13M$ project  According to Reuters:  IBM – SAP’s solution did not meet needs, as promised  Avantor is claiming disastrous damages, including:  Lack of crucial functionality that Avantor needed to run its core business processes  Errors ranging from failure to track or process orders correctly to directing "that dangerous chemicals be stored in inappropriate locations".
  • 11. California’s DMV IT Project Cancelled ($134M) According to Spectrum, the project’s dashboard status was “yellow” (meaning that the project is slipping) right up until the day it was cancelled. As far as I can tell it never reached “red,” meaning “a project that is in need of immediate intervention.”
  • 12. There is evidence from Canada too  An $80M laboratory information system that costs at least $15M annually to operate has languished largely unused for years  A $46M diabetes information system that was intended to serve as the centerpiece of a $150M chronic disease registry has proven impossible to build.  Progress is dependent on the implementation of health information plans In Ontario, for example
  • 13. Invested Time and Money May Not Yet Be Paying Off in Ontario According to the Globe and Mail:  Projects were centered first on constructing massive provincial databases rather than on the basic need to connect physicians to each other and to patients.  New technologies, like using tablets to enable patients to do their own data entry, are waiting, despite being proven effective.
  • 14. Time and Money Costs From these case studies, it is difficult to know exactly how much longer or how much more expensive the projects actually were They share  multiple attempts  at multiple-year projects  with budgets ranging from millions to hundreds-of-millions and billions of dollars.
  • 15. Today’s solutions 7% Average schedule overrun, out of that 33% for software projects 45% of IT projects go over budget Projects deliver 56% less value then predicted Source: McKinsey/Oxford study on reference class forecasting for IT projects http://www.mckinsey.com/insights/business_technology/delivering_large-scale_it_projects_on_time_on_budget_and_on_value 17 percent of large IT projects go so badly that they can threaten the very existence of the company “ “ RiskyTake forever Costly
  • 16. Benefits OpenLegacy makes it easy and fast IN DAYS INSTEAD OF MONTHS Rapid Days instead of months Risk Free No changes to existing applications Out of the Box content-aware Security and API management Workload/ MIPS Reduction (“Deep caching”) Effortless Scalability automatically deploys to Docker cloud containers Leverages existing assets: presentation, business, data or service Fully customizable, rule based, completely open standards Secure APIOne-click model Generation One-click Deployment
  • 17. But exactly how do we compare to the competition Given today’s technology advances there are many companies providing various solutions but before deciding on any one vendor you should consider the following differences between each type of vendor. Traditional ESBs Provide integration and governance Cloud Based ESBs & Multi-tenants Provide integration and cloud deployment API platforms Provide API management, analytics, security  Some API interface, no API architecture  Hard to migrate  Standard security  No automation  Black-box design  Not cloud ready  Vendor locked and Cloud-platform locked  API interface, no API architecture  Hard to migrate  Standard security  No automation  Black-box design  No integration  No delivery  Existing governance investment not used Provides automated integration and multi-tenant delivery  Content and context aware security  Platform agnostic  Out-of-the-box API management  Deep caching can reduce existing / future workloads  Automatically deploys to Docker based cloud containers or on premise  No changes to your applications  Leverage your existing assets: presentation, business or data  Open source based, completely open standards  Fully customizable, rules based
  • 18. How to Avoid Failure in 2016 Focus on current business needs not technology Reduce complexity by scoping smaller, shorter term, less expensive projects Encourage discussion of obstacles, not covering them up Engage small, agile companies Align the incentives with achievement of the needs on time Provide training to the relevant teams
  • 19. Integrate your Backend Systems faster with OpenLegacy We help you: Remove all obstacles for innovation and allow the business to set the pace Request a demo Try us out free for 90 days OR