BMcNulty.Work Sample.Wind GIS and PD Analysis
- 4. Project Capacity
(MW)
Annual
Genera@on
(GWh)
Capacity
Factor
Avg Wind
Speed of
Op@mal
Sites
(m/s)
Avg Depth of
Op@mal
Sites (m)
Avg Array
Cable Length
of Op@mal
Sites (m)
Project Costs
(USD,
millions)
Cape Wind 468 2,084.4 50.8% 9.09 7.7 3,065 $2,624
Deepwater ONE 1,205.4 4,807.4 45.5% 9.43 39.1 3,722 $7,700
Bay State Wind 996.3 4,114.1 47.1% 9.66 44.5 12,153 $6,508
OffshoreMW/
Vineyard Power
996.3 4,125.5 47.3% 9.68 47.5 8,542 $6,466
NJ US Wind 2,226.3 8,069.2 41.4% 8.82 22.9 10,164 $14,180
NJ DONG Energy 1,943.4 6,864.9 40.3% 8.67 22.0 9,585 $11,387
LINYC 701.1 2,687.8 43.8% 9.17 28.3 4,927 $3,935