TIME TO INVEST
INSIDE:
ALSO INSIDE
Preview of the Middle East
Concrete 2015 and PMV
Live 2015. Interviews,
exhibitor news and
conference programnmne.
From P80
ACCREDITED SEMINARS
Interview with speakers
at our biggest ever series
of free professional
development workshops.
Full programme from P50
EXHIBITOR NEWS
Previews of more than 100
of this year’s exhibitors
MOBILE
APP
O F F I C I A L N E W S P U B L I C AT I O N O F T H E B I G 5
DUBAI WORLD TRADE CENTRE NOVEMBER 23-26 2015
BROUGHT TO YOU BY THE
SHOW ORGANISER
PREVIEW
Major economies in the Middle East are investing heavily in diversification as The Big 5 attracts
professionals from all sectors of the construction industry to Dubai for its biggest ever show
I
nvestment in the GCC
construction sector is set
to soar over the next three
years as member states focus
on economic diversification,
according to a new report. The
report by Alpen Capital says:
“Favourable macroeconomics,
positive demographics, and
rising tourism plus increasing
populations and a demand
for infrastructure have given
governments initiative to
start diversifying, and start
building...big.”
Massive investment in building
and infrastructure across the
GCC guarantees growth despite
falling oil prices, according to
a Ventures Onsite report GCC
Construction Industry Trends &
Challenges 2015.
It was commissioned for The
Big 5 and says the UAE, Saudi
Arabia and Qatar are the region’s
leaders but the UAE offers top
investment opportunities thanks
to sophisticated infrastructure
and regulated real estate markets.
By Jumana Abdel-Razzaq
SHOW DAILY SPONSOR
CONTINUED ON PAGE 3 u
GCC investment is at an all time high from both government and the private sector.
This is The Palm Gateway by Nakheel, one of this year’s most discussed projects.
See more Dubai megaprojects revealed in 2015 on page 8
Discover
more with
our Free
mobile app
DOWNLOAD
DETAILS ON P18
NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 03
CONTENTS
But the report
highlights Saudi Arabia’s
construction sector as
it registered the highest
non-oil GDP growth rate
at 6.7 per cent in 2014.
The kingdom’s 2015
reflects its diversification
plan with major spending
on construction in key
government segments.
GCC population is set
to grow from 35 million to
60.2m by 2050, increasing
the need for more housing,
especially affordable
housing, reflected in one
of the strongest trends of
2015 so far.
Population growth has
seen strong investment in
infrastructure, education
and healthcare, according
to the report.
The Big 5 2015 is the
largest meeting place for
construction professionals
in the Middle East. For
more than 35 years, it has
earned its place, reflecting
the changing demands of
the region and bringing
the finest building and
construction products from
around the world.
“There is no bigger event
than The Big 5 Dubai and
this year there has been
huge support for the new
event,” said Event Director
Josine Heijmans.
Last year saw more
than 2,800 exhibitors from
more than 60 countries at
The World Trade Centre
which attracted 81,000
participants making it a
record breaking year with a
a sell-out show.
The GCC construction
sector is set to register
strong performance as
billions of dollars are being
invested on building and
infrastructure projects
and mega events such as
Dubai Expo 2020, Qatar
2019 Athletics World
Championship and Qatar
FIFA World Cup 2022.
And with contract awards
in all GCC countries likely
to remain strong, growth
and expansion remains
positive over the next five
years and beyond. g
Gary Wright
GaryWright@dmgeventsme.com
CONTINUED FROM PAGE 1 u
See you there
The Big 5 Event Director Josine
Heijmans looks forward to this
year’s show and offers advice
on getting the very best from
your visit
Sponsors & Partners
Those who help make it happen
UAE Construction news
Exhibitor news
Digilock, HP, Poloplast
Speaker interview
Baharash Bagherian’s
Designing the next generation of
sustainable cities
Exhibitor news
SEP Società Europea, Vironline,
Slezak
Pre-Registration
Sign up now and attend for free
Exhibitor news
Alumil Middle East, Calflex
Exhibitor news
RAKTherm, Elmark, Emirates
Steel
Speaker interview
Liz Kentish, who will present
Developing leadership skills
Exhibitor news
Salice Paolo, Vifra, Technoform,
Unnati
How to Trade in the UAE
Half-day seminar on day two of
the show, helping you succeed in
the region
04
06
08
10
12
14
16
18
20-21
22
24
26
Exhibitor news
Flir, Birco and Bronx International
Travelling to The Big 5
First visit to Dubai? Take a look
at our top travel tips
Exhibitors news
Jorns HG
Development Focus
Dubai South - a new city of a
million people
The Big 5 Platinum Club
Plus exhibitor news Dunham-
Bush, Elleci
Exhibitor news
G&G Engineering, Franklin
Electric, Ferreo Legno, Gamma
Meccanica
Speaker interview
Andy Butterfield’s Construction
testing standards seminar
Exhibitor News
De Boer Waterproofing, Elite
Decor, Ariston, Bellota
Speaker Interview
Beatrice Hunt presents Managing
a culturally diverse workforce
Exhibitor News
Coopers Fire, The Bisan
Group, NCT
Exhibitor News
Hoermann Group, Isa Idrosanitaria,
ISIL Muhendislik, Interway Tarp
Show map
Layout of the region’s biggest
construction show. Download
our app to save time
28-29
30
32
33
34
36-37
38
40-41
42
44
46-47
48-49
The Design Summit
Day 2. The region’s only free-to-
attend summit for architects
and designers
Sustainability Theatre Agenda
Four days of CPD accredited
workshops
Business & Market Intelligence
Theatre Agenda
Four days of CPD accredited
workshops
Design & Architecture Theatre
Agenda
Four days of CPD accredited
workshops
Exhibitor News
Özcelik Makina, Poliran, Tebo,
Sanvi Enterprise
Affordable Housing &
Sustainable Communities
Theatre Agenda
Four days of CPD accredited
workshops
Exhibitor news
Sanha Group, Rivit, Pinnacle,
WithUs Tape
Technology in Construction
Theatre Agenda
Four days of CPD accredited
workshops
Exhibitor news
Alfanar, Basys, Seeley
International, Matrix, Hurner,
Kottman
Gaia Awards 2015
Celebrating the finest green
construction products &
equipment
Exhibitor news
Ferramenta, SPI insulating,
Kingspan Group, SSAB
Exhibitor news
Bin Tamman ME, Aspen
Exhibitor Profile
Al Muqarram is stretching its
business far and wide
Exhibitor news
Laticrete, Xpedeon, Das
International
Exhibitor news
Peglar, IBL, Steel Color, Polycon
Gulf
Speaker interview
William Whistler, who will explain
improving airtightness and
constructing greener buildings
MIDDLE EAST CONCRETE
2015 & PMV LIVE 2015
Exhibitor News
Middle East Concrete &
PMV Live Educational Agenda
Speaker interview
Dr Abu Saleh, presenting Service
life of concrete structures
Exhibitor News
Top Global Parts, Gulf Elevators,
Industrial Trade, VIP Delta
Exhibitor News
Futuretech, World Shotcrete
Group, IMKO, BFS GmbH
50
52
54
55
56
59
60
62
64-65
66
68
70-71
72
74-75
76-77
78
80
82
84
86
88
92
Editor’s Note
Last year was a record-breaking
show… this year will be bigger.
Nowhere in the world can
compare with the projects in this
region and The Big 5 2015 brings
together the greatest gathering
of construction professionals
anywhere. Enjoy this Preview and
I look forward to meeting many of
your during the show.
04 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
INTERVIEW: JOSINE HEIJMANS
By Gary Wright
Josine Heijmans
F
or the construction
industry in the Middle
East there is no bigger
event than The Big 5 and I’m
excited to be part of it,” says
Josine Heijmans, the new event
director for The Big 5 Dubai.
Heijmans took the helm
of the show earlier this year
and promises exhibitors and
visitors that this year will be
something special, building on
last year’s incredible success.
In 2014, 80,178 participants
gathered at the World Trade
Centre during the four days,
which was an increase of 9 per
cent on the previous year – and
this year is set to be bigger,
says Heijmans.
“The response in terms of
business and participants
has been excellent with huge
support for new features at
The Big 5.”
This is a big event and the
new event director, who brings
a wealth of experience in
the event industry to the role,
reveals a genuine enthusiasm
for the construction sector.
“The Big 5 is the main event
of the year for all construction
professionals. Nowhere else
offers the opportunity to meet
and network with so many
people as well as the chance
to view literally thousands of
products across all sectors.
“We have a great team and a
track record of success from
which we can continue to grow
for the benefit of the sector.”
Heijmans believes however
that no show can stand still
and this year there are an
estimated 36,000 products and
the exhibitors are expected to
top 3,000.
But she says that The Big
5 is more than that: “The
whole team is focused on a
great visitor experience with an
expected 63 countries exhibiting.
“Planning is the key to get
the most out of your event
visit,” says the event director.
“Firstly, download The Big 5
app on your smartphone. It’s
easy and makes your visit
to the World Trade Centre
more efficient.
“Next, get a feel for the
layout of the show: see where
the sections that interest
you are located, check the
individual companies, network
with industry peers and look
through the programme of
workshops and talks. Decide
what interests you and start
planning your event visit well
in advance. Also make sure to
benefit from the print at home
badge after pre-registering
your visit to the show to avoid
the queues onsite.
“The Big 5 covers the whole
exhibition centre, it may need
a couple of days to ensure
you get to see everything that
interests you. Remember this
is the sole event of its type that
offers so much in one place
and everyone I’ve spoken to
The Big 5 event director Josine Heijmans looks forward to this
year’s event and offers advice on getting the very best from your
visit to the Middle East’s biggest construction and build show.
who visited last year agreed
pre-planning was the answer.
Decide how many hours you
feel you’ll need there – then
double it. There’s so much
to see.”
She said: “The enhanced
educational programme has
grown to more than 75 CPD
workshops this year.”
Also, this year there is
extra attention for the role of
distributors at the show.
“One of the difficulties for
distributors was to meet with
new manufacturers, they
come to the show where they
are promoting their existing
products and may not get the
opportunity to take on new
lines,” says Heijmans.
“This year we have addressed
that directly and on the
third day of the show we
have an event specifically
for key distributors to meet
international manufacturers
with products new to the region.”
The Big 5 is the largest
construction event in the region
and for thousands of people it
is the chance to meet, exchange
ideas and do business.
“But it is also about
entertainment and this year’s
The Big 5 2015 will
be the biggest ever
DOWNLOAD THE APP
Make it easy to find what interests you.
PLAN AHEAD
The Big 5 covers a huge space. Prepare in advance and allow plenty of
time, there are lots of other attractions
ALLOW AN EXTRA DAY
For many visitors one day is not enough. Take time out of your diary to
immerse yourself in the region’s biggest construction show.
“ The response in terms of business
and participants has been excellent
with huge support for new features
at The Big 5”
live demonstrations promise
to be a key attraction,” says
Heijmans.
“We want there to be a fun
element too and if that includes
an element of education, that’s
even better.”
Last year’s show was a
sell out, with no exhibition
space unfilled. This year the
addition of The Big 5 Focus
has increased the capacity of
the event.
Heijmans said: “The
Big 5 Focus is almost a
show within a show with
even more international
exhibitors, free CPD certified
educational sessions on project
management and construction
technology, as well as prize
giveaways and the CPD
certificate collection point.
Focus will be a must-visit
section at the show.”
It is also in the Big 5 Focus
Hall – in the Technology in
Construction Theatre - that
the prize winner of the Gaia
awards will be announced on
the second show day, with
the chance to win $50,000 on
marketing exposure for the
winning sustainable product. g
JOSINE HEIJMANS 5 TOP TIPS
DON’T MISS
The Big 5 attracts some of the key names in the business
to speak. Take a look at the seminars, live demos and
host of attractions
MAKE TIME TO NETWORK
Nowhere else attracts so many construction
professionals under one roof at one time.
06 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
SPONSORS
THE BIG 5 WOULD LIKE TO THANK ALL OF OUR
SPONSORS AND PARTNERS
ADHESIVES AND SEALANT
PARTNER
BATHROOM SOLUTIONS
PARTNER
PLATINUM SPONSOR
PLATINUM SPONSOR
FREEZONE PARTNER HOTEL CONTRACTING
PARTNER
SHOW DAILY SPONSOR
CONSTRUCTION SOLUTIONS
PARTNER
INVERTER EXPERT LIVE DEMONSTRATION
SPONSOR
EXPOTIM INTERNATIONAL
FAIR ORGANIZATIONS INC.
Expotim International Fair
Organizations INC. located in
Istanbul, Turkey, is the organiser
of leading international sector
specific fairs at different
business hubs of the world. The
company was established by
an experienced team of sector
professionals in 2003.
EXPOTIM, which is authorised
by the Ministry of Economy
has an A-Class license to
organise exhibitions abroad and
provide national participation to
international exhibitions as well.
EXPOTIM has continuously held
the A-Class license between
2005 - 2012
The Saudi economic
indicators exhibit tangible
and spectacular success
in which the private sector
actively participated.
This sector includes
companies, institutions,
and businessmen with
various names, sizes, and
capital.
The roles of other
sectors in the state
should not be overlooked;
neither is their quest
for reinforcing our
national economy
and achieving positive
results in economic and
development fields.
Ideal Standard MENA, the
leading provider of innovative
Total Bathroom Solutions,
across Middle East and Africa
region.
EXPOTIM has different sector-
specific groups of building,
food & agriculture, household,
machinery, fashion as well as an
overseas sales group in order to
organize international fairs. The
company essentially focuses on
developing countries with the
goal of finding new alternative
markets for exporting companies.
It has more than 10 years’
experience and has enjoyed
continual growth. Expotim’s
organisations are distinctive in
terms of customer satisfaction
and its quality-focused profile.
By the end of 2012, EXPOTIM
was the organiser of 253
exhibitions in 34 different
countries with participation of
more than 8,000 exhibitors and
185,000 sqm. stand area since its
foundation. In addition, EXPOTIM
has been organising international
fairs abroad for the last three
years as a main organiser.
The company’s sector-specific
structure is supported with
specialised service departments,
thereby creating a customer-
centered system contributing to
both customer satisfaction and
development of Turkey.
With more than 70 employees
at EXPOTIM, it organises all
logistics support and services
ranging from transportation to
customs, tourism, and stand
designing with utmost customer
satisfaction in mind.
For more information, contact info@expotim.com
Jebel Ali Free Zone (Jafza) is
one of the world’s leading free
zones. Established in 1985,
Jafza is today home to over
7,300 companies, including
more than 120 of the Global
Fortune 500 enterprises from
across the world. It is a leading
driver of the burgeoning UAE
economy.
Art Line is a renowned interior
contracting company founded
in 1999, running operations in
the Middle East, North Africa
(MENA) and gulf region through
several branches; in Jordan,
Lebanon, Qatar, UAE, China, UK,
KSA, Spain and Algeria.
Classified “Class 1”, our strength
lies in the field of appealing
and cost effective construction
projects, which we can
support with the high degree
of knowledge and expertise
that is available within our
organisation.”
Al Muqarram Industry – The
leading manufacturer of silicone
sealants, adhesive tapes, aerosol
spray paints and lubricants.
LATICRETE is a world-wide
manufacturer and marketer of
globally proven construction
solutions used in residential,
commercial and industrial
applications.
Hisense is a $16bn global
conglomerate with a presence in
over 16 countries across North
America, Europe, Australia,
Africa, the Middle East and
Southeast Asia.
ZABEEL A111 & A121
CONCOURSE 510
SHEIKH RASHID C191 CONCOURSE 620 CONCOURSE 148
8E361 FOCUS A50 CONCOURSE 837
OPEN
THE
RIGHT
ONEwww.internodoors.com
08 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
UAE CONSTRUCTION NEWS
The Roads and Transport Authority
(RTA) is starting the tendering of the
Union Oasis project to developers
and investors from the private
sector this month in an invitation
to complete the prequalification
requirements.
The project will focus on
RTA to begin qualifications
for Union Oasis project
developing the Union Square in
Dubai’s Deira area by providing
residential units, offices, vital
utilities, retail outlets, among others.
Work is currently underway in
revising the Project Manual along
with the bidding conditions for
selecting the best partners to align
them with the Law No (22) for
2015 governing the Public Private
Dubai, UAE
A mixed-use community of more
than 1,500 villas and serviced
residences at Nad al Sheba gets
the go ahead with a multi-million
contract signing.
Dubai developer Nakheel signed
three new contracts worth $650m
(AED2.4bn) for construction work
at its new mixed-use community
of more than 1,500 villas and
serviced residences at Nad al
Sheba.
The community is expected to
be completed in early 2018 with
contracts for 1,439 residential villas.
There are three contract awards:
Package 1: $226m (AED830m)
contract awarded to Trojan for main
community infrastructure work and
the construction of 489 villas.
Package 2: $214m (AED789m)
to UNEC for 482 villas and
infrastructure work.
Package 3: $212m (AED781m)
to Metac for 468 villas and
infrastructure.
Spanning 232,000 sqm,
Nakheel’s Nad Al Sheba
community includes 1,439 three to
five-bedroom homes and around
100 serviced villas. g
Nakheel signs three new deals worth $650m
Dubai, UAE
Partnership in the Emirate of Dubai.
The RTA will also follow the
global Public-Private Partnership
(PPP) model, which will contribute
to invigorating Deira.
The Union Oasis Project will
be the first Transit-Oriented
Development (TOD) concept in the
region to attract Dubai’s residents
and visitors. g
10 Dubai projects
revealed in 2015
1. MEYDAN ONE
Meydan One features a 711m-high tower, a huge
new mall, the world’s largest indoor ski slope,
a 25,000 sqm indoor sports facility, the biggest
dancing fountains in the world, a beach and
a civic plaza capable of hosting up to 60,000
people. It is also to contain a 100-berth marina.
Phase 1 to be completed by 2020.
2. BURJ 2020 DISTRICT
At more than one million sqm, the Burj 2020
District’s built up area will be the size of
approximately one-third of the existing JLT
area and nearly twice the size of New York’s
Rockefeller Centre. A world-class retail offering
totalling over 100,000 sqm will serve a captive
market in the DMCC Free Zone, JLT and the
surrounding areas.
3. SWAROVSKI SPARKLE TOWERS
Dubai-based property developer Tebyan has
signed an agreement with Austrian crystal giant
Swarovski at its headquarters in Wattens, Austria,
to create crystal-inspired ‘Sparkle Towers at
Dubai Marina’.
The project consists of two towers: the first
offers views of Dubai Marina from three sides
while the second overlooks Jumeirah Beach
Residence with partial views of the marina and the
sea. A residential podium connects the two towers.
4. ETTORE 971 BUGATTI VILLAS
The world’s first homes designed around the
Bugatti sports car will be built within Damac’s
Akoya Oxygen project on the Umm Sequeim Road
on the outskirts of Dubai.
Not only will the homes be built to mirror the
curved Bugatti Veyron design, but each home
will include an indoor vehicle display area where
owners can admire their cars from their sofa.
Villas overlook the Tiger Woods-designed, Trump
World Golf Club... they’ll cost $9.8m.
5. SHARJAH WATERFRONT CITY
Spread across 36km of coastline with a
total area of 5.6m sqm providing a fully
advanced residential, commercial, and tourism
development project in the region. Dusit will
begin constructionb hotels in 2016 and expected
to open to public in 2019.
6. THE PALM GATEWAY
Nakheel has also announced The Palm
Gateway, a three-tower waterfront living and
leisure complex located at the entrance to Palm
Jumeirah.
7. AL NOOR ISLAND
The 45,470-square metre project is expected
to be handed over at the end of 2015.With a
central butterfly design theme, the development
will feature a butterfly habitat housing over 500
species, a 3,500 metre walkway and floating
bridge serving as an entrance to the island, a
literature pavilion, children›s playground, and an
egg-shaped art sculpture.
8. MIDTOWN BY DEYAAR
Deyaar has unveiled the masterplan of its 5.5
million square upscale development Midtown by
Deyaar, which will include a total of 27 buildings.
9. CREEKSIDE 18
Emaar Properties has launched its latest
residential project at Dubai Creek Harbour at The
Lagoons. Extending in to the heart of the creek,
Creekside 18 comprises two towers 37 storeys
high with 480 apartments. Dubai Creek Harbour
at The Lagoons is a brand new city, almost three
times larger than Downtown Dubai.
10. MEYDAN AVENUE
Construction has begun on the newly branded
Meydan Avenue – previously known as Diamond
Business Park – which sits in the shadows of The
Meydan Hotel, Racecourse and Grandstand.
10 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 appEXHIBITOR NEWS
HP has introduced a new
portfolio of HP PageWide XL
Printers, offering the fastest
large-format production
printing available in colour
and black-and-white.
HP PageWide XL Printers
do the job of two printers in
one single device, providing
monochrome and colour
prints at breakthrough speeds
up to 60 per cent faster than
the fastest monochrome light-
emitting diode (LED) printer.
HP PageWide XL Printers
are the first products
introduced under the new
HP PageWide sub-brand.
Based on proven HP
PageWide Technology, which
currently powers HP Inkjet
Web Presses, HP business
printers and will be scaled
for upcoming HP 3D Multi
Jet Fusion printers, the
new portfolio delivers on
the announcement made
last year, providing low
operation costs driven by
life-long printheads, high
ink efficiency and cloud-
based support.
The HP PageWide XL
Printer portfolio includes
The HP PageWide XL 8000
Printer offering high-end
production printing at
revolutionary speeds up to 30
D/A1-size prints per minute
as well as two 775 milliliter
ink cartridges per colour with
automatic switching and up to
six rolls -- more than 3,900 feet
(1,200 meters) -- of media for
sustained productivity.. g
www.hprint.in
CONCOURSE, 102
Providing secure personal
storage for a growing mobile
workforce is essential.
American company Digilock
has launched Numeris, a
simplified security solution
designed for file cabinets,
storage, and case goods.
With assigned and shared
use functionalities, Numeris
enables storage options with
ZABEEL HALL, S116
the flexibility to adapt to the
evolving workspace.
In the GCC, Digilock has
a large customer base among
many four and five-star hotels
and fitness clubs but Digilock
also supplies their locks to
airports, furniture companies
and golf courses.
Digilock plans to expand
their operations in Dubai by
2015-end. g
www.digilock.com
Digilock’s
new offerings
POLOPLAST is pleased to
present the systems POLO-
ECOSAN and POLO-
POLYMUTAN from its
Installation Systems division.
These two installation
systems – comprised of a
selection of pipes designed
for a range of applications
– ensure the flawless supply
of the most precious of all
foodstuffs: drinking water.
The premium-quality
polypropylene installation
pipes POLO-ECOSAN and
POLO-POLYMUTAN and
the multilayer fibre composite
pipes used as pipelines in
building services engineering
Interior installations
guarantee a safe, long-lasting
and flawless supply.
The POLO-ECOSAN
ML5 and POLO-
POLYMUTAN ML5 pipes
represent a milestone in
PP-R development. 5-layer
fibre pipes made of glass-
fibre-reinforced PP-R and
PP-RCT. Experience in
multilayer technology proved
particularly beneficial in
developing this novel type
of pipe, along with the in-
house polymer-compound
development. The sandwich
design combines the
advantages of PP-RCT and
those of glass-fibre-reinforced
PP-R in one product. g
www.poloplast.com
Fastest printer
on market
Our daily newspapers keeps exhibitors and visitors
informed of the show highlights plus all the key events
during the four days of The Big 5 2015.
It is the only publication allowed to be distributed
during the show and the sole point of print contact
with participants.
And you can be part of it.
Contact The Big 5 sales and promotional team to find
out how to get your business in front of more than
20,000 people every day.
Victoria James
Sponsorship & Publishing
Email: Victoriajames@dmgeventsme.com
Mobile: +971 56 174 7510
PROMOTIONAL OPPORTUNITIES
FOR THE BIG 5 2015
ZABEEL HALL, Q110
12 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
SPEAKER INTERVIEW
Ultimately, it will be the people and
their quality of green lifestyle that
will be the real measurement to the
success of sustainable cities.
Why residents are just as
important as design in
the cities of the future
We talk with Baharash Bagherian, founder and
designer of Baharash Architecture, an award-winning
studio in London, which is the lead designer for phase
2 of Dubai’s first sustainable city.
I
work with fully trained
and professional teams,
all committed to design
excellence and the delivery of
high-quality architecture.
Prior to establishing
Baharash Architecture, I worked
in senior positions for some
of the world’s most renowned
architects working on high-
profile international projects.
“I believe great architecture
is more than buildings, it’s
about creating sustainable
destinations that make people
feel healthy to live in, inspired
to work in and want to visit.
“Although there are various
aspects that influence the
quality of life - such as
crime rates, health statistics,
unemployment, income
growth, cost of living etc - the
built environment, and the
way a city is designed, has a
great influence on the quality
of life, as well as helping to
minimise people’s impact on
the environment.
“A sustainable city is one
that provides the highest
quality of life together with
the lowest environmental
footprint, whilst ensuring the
needs of future generations
are not compromised.
“At a neighbourhood
scale, Hammarby Sjostad in
Stockholm has been widely
studied as a good example of
sustainable development.
“At the very early stages
of the project, a ‘closed loop’
infrastructure strategy was
drawn up for the project,
including new public transport
routes, district heating and
cooling and an underground
waste collection system for the
development as a whole.
Although the project adopted
various passive and active
strategies, I believe that the
best models of sustainable
cities should focus more
on passive solutions, since
these provide the biggest
environmental gains with the
least financial investment for
the project.
“One of the key successes
of this project was the
collaborative process between
municipal authorities,
urban planners, developers,
architects, landscape architects,
engineers, and energy &
water companies.
“This holistic approach to
master planning created a
special place for Stockholm, a
place that is vibrant, healthy
and sustainable.
“The other key success was
the participation and education
model created for the district’s
residents. It is believed that
water consumption and
pollutants can be reduced
by 50 per cent by increasing
environmental awareness.”
For the future he says: “First,
let’s look at the big picture.
Over the next decade, there
will be a significant increase
in population and urbanisation,
which will have severe impacts
on our cities’ infrastructures
and resources, as well as the
health and wellbeing of its
inhabitants.
To mitigate these effects
and provide a higher quality of
life, we need to look at holistic
solutions at various scales.
“Fostering a bottom-up
entrepreneurial spirit in
sustainable development is
a passive way to achieve
this. This inward investment
in people, businesses and
organisations that are
passionate about improving
their own city is in my opinion
the most passive way of
creating more green jobs and
will most likely result in a
new way of thinking about
sustainable cities.
“Ecotourism will also be
another area for development.
The UAE is expected
to welcome 30 million
international tourists a year
by 2021. The country has
some of the most beautiful
natural landscapes in the
region, a perfect destination
for eco resorts. There are
also great economic, socio-
cultural and environmental
benefits for developing eco
resorts. Eco resorts help create
job opportunities for locals,
creating a more diversified
economy. They also help
preserve the region’s heritage
and provide greater interaction
with native people.
“Another area of development
will be inclusivity. There
is a significant demand for
affordable housing. Any
development, which claims
to be sustainable but does not
integrate affordable housing into
the heart of neighbourhoods
is, in my opinion, a failed
concept of a sustainable city.”
The best models of sustainable
cities wwill provide housing
for all types of people, without
segregation or excuse about land
prices.
“An inclusive city also values
the needs of all people equally,
including the workers who are
contributing to their legacy.
“Today, there are many
countries that do not see
the long term social and
economic benefits migrant
workers bring to their cities,
thus they fail at meeting
the very basic needs to their
livelihoods such as health
and safety.” g
Date: Tuesday November 24
Time: 2:45pm
Where: Design Summit
Who should attend?
Developers, architects, engineers, landscape designers, government officials or anyone with a
passion to improve their city is welcome to attend the presentation.
- Baharash Bagherian
DESIGNING THE NEXT GENERATION OF SUSTAINABLE CITIES
See page 50 for The Design Summit agenda
14 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 appEXHIBITOR NEWS
Established in 1971, VIR’s
principal activity is the
production and distribution
of ball valves, balancing
valves, gate valves and
butterfly valves in brass,
bronze, polypropylene and
cast-iron for the distribution
of water and gas to be
applied in
HALL 2, E87
Releasing the pressure
Italy’s SEP Società Europea
Plastica is a leader in the
thermoplastic market with
the SepLux high quality
100% polycarbonate
honeycomb panels of varying
thicknesses . The patented
joint and excellent technical
characteristics make these
Panels for perfect buildings
PAVILION B13
Established in 2001, Slezák
RAV is a famous is producer
of water taps in Czech
Republic. It produces special
water taps for baths, pool -
showers, sensor taps and
mixers for water heaters.
Additionally, they make
taps in chromium, gold, old-
brass and newly in colour
surfacing schemes black/
white and chromium.
The company prides
itself on a high-quality
drafting department, CNC
programmers and team of
high-skilled workers. The
cartridge for its products
comes from Hungarian
company Kerox. All types
of our water taps can be
delivered with economic
cartridge. g
www.slezak-rav.cz
Wonder water taps
ZABEEL HALL, S160
panels the perfect solution
for industrial buildings,
particularly, given the infinite
array of applications, for
transparent architectural
projects.
Forty years of continuous
technological research in
manufacturing innovative
and market oriented products
together with the efficiency
in the logistics organization,
through a flexible and dynamic
company structure, has driven
SEP into leadership on the
domestic market and made
them a growing presence
internationally.
SEP polycarbonate panels
are lightweight, which makes
their use and installation
easy and practical, as well
as reducing transportation
costs. The panels’ 78 per cent
transparency results in high
light transmittance. These
are suitable for inclined roofs,
vertical closures, industrial
windows, sheds, vertical
façade and green houses.
The special cellular
structure offers high strength
and resistance to impact,
cracking and loads. The
product offers 10 years
guarantee against UV and
hail damage, high resistance
to fire and UV radiation and
temperature-range from -40°
to 120°C. The patented UNI
for Seplux 40 – 40 5px – 40
9P – system ensure perfect and
constant watertight seal. g
www.sepitalia.com
plumbing, conditioning,
industrial and irrigation
installations.
The Company has a highly
qualified team of technicians,
dedicated to the development,
research and study of new
products; since 1992 VIR
has held a quality system
certification according to UNI
EN ISO 9001:2008 standards,
and innumerable international
specific product certifications.
The quality of the products
is attained by means of
constant investment
in innovation and
the care given to
manufacturing
from the
very first
productive
stages.
It is rare
to find in the
sector, but VIR has
its own internal
foundry, and
itself provides the
design and construction of the
machines necessary for the
assembly and packaging of the
products, in order to guarantee
a constant qualitative control.
The latest addition to
its range is the VIR 9700
series Pressure Independent
Control Valves (PICV) which
implement high quality
technical features with a
compact design. It offers
simplified presetting without
the need for complicated
diagrams. The analogical
rotational index clearly
indicates the maximum flow of
the valve and the preset flow
(that will be kept independently
from the pressure in the line)
is expressed as a percentage of
this value.
It has the capability to
modulate the flow always
using the whole valve stroke
independently from the preset.
And its test points (optional)
placed on inlet and outlet of
the valve allow measuring the
generated head-loss. g
www.vironline.com
So much more than
tile and stone
installation materials
LATICRETE Middle East LLC..
P.O. Box : 86028, Ras Al Khaimah, United Arab Emirates.
Tel.: + 971 7 244 6396, + 971 7 244 5119.
Fax: +971 7 244 5915
E-mail : enquiry@laticrete.me | www.laticrete.me
2015 LATICRETE International, Inc. All trademarks shown are the intellectual properties of their respective owners
OUR STAND AT HALL # 8, STAND 8E 361
SUPERCAP DEMO AT OUTDOOR AREA - OS 71
So much more than
tile and stone
installation materials
LATICRETE Middle East LLC..
P.O. Box : 86028, Ras Al Khaimah, United Arab Emirates.
Tel.: + 971 7 244 6396, + 971 7 244 5119.
Fax: +971 7 244 5915
E-mail : enquiry@laticrete.me | www.laticrete.me
2015 LATICRETE International, Inc. All trademarks shown are the intellectual properties of their respective owners
OUR STAND AT HALL # 8, STAND 8E 361
SUPERCAP DEMO AT OUTDOOR AREA - OS 71
16 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
PRE-REGISTRATION
For anyone who fails to register before November 22 an
entry fee of AED150 per person will apply to visitors who
register at the venue.
Sign up now and
attend for FREE
In six easy steps, attendees will have the advantage
of sharing their interests, recommending
colleagues and fast-tracking their badge
confirmation to make for quicker and smoother
participation at the event.
Visitors can register to attend all three events, including
our two co-located shows PMV Live and Middle East
Concrete or opt to register for The Big 5 Show only.
Visit www.thebig5.ae and get unlimited
admission to the biggest construction show in
the Middle East.
Register online for free entry until November
22 on The Big 5 official website and have
full access to all events, conferences vand
workshops for all four days of the show.
18 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 appEXHIBITOR NEWS
Wellness and Relaxation
Products are increasingly
becoming popular and the
build industry is not behind.
Italy’s Calflex is celebrating
its 30th anniversary at The
Big 5 by launching shower
solutions focused on health and
wellbeing.
New shower space
solutions integrate
hydrotherapy, chromotherapy,
aromatherapy and music
devices. The wellness
range is characterised by
regenerating cascades,
refreshing atomizers,
relaxing rain jets and a real
chromotherapy experience.
Also, thermostatic taps
make choosing water
temperature easy.
Mario Carimali, CEO and
Chairman of Calflex said:
“We designed and
developed our new
multifunctional shower
heads thinking of sensations
that everyone would
dream of daily. So, body
jets massaging your body,
chromotherapy, music
and aromatherapy devices
were integrated in a unique
solution for the complete
relaxation at the end of a busy
working day.”
The company says that
the new line will enhance
users’ psychological and
physical well-being by
creating wellness paths inside
designer shower spaces. g
RASHID HALL, B240
New wellness
concept
Designed to enhance the experience of the attendee before, during and
after the show, the app puts unlimited features and information at your
fingertips, including:
YOU CAN ALSO GET THE LATEST EXHIBITOR
INFORMATION, SCHEDULE MEETINGS AND EVEN WIN PRIZES.
The Big 5 app gives you easy access to everything you need to know
for your visit to the biggest construction event this November.
† Personalised agenda
† Exhibitor listings
† Floorplan maps
† Social networking
† Speaker listings
DOWNLOAD
THE BIG 5 APP, NOW FOR FREE
To download for
FREE today, visit:
www.thebig5.ae/
downloadapp
iPhone
Android
Visitor Portal (Desktop Web Browser)
All Other Internet-Enabled Mobile Phones *
START BY SELECTING YOUR PREFERRED PLATFORM FROM:
Alumil Middle East,
provides more than 85
varieties of architectural
aluminium systems. These
include high-performance
products matching highest
specification/performance
requirements for windows,
doors, sliding, hinged,
thermal & non thermal
break, facades, skylights,
partitions, louvres, folding
doors, balustrade, railings &
pergolas etc.
Alumil Aluminium is the
largest private extrusion
industry in Europe,
designing and producing
aluminium extrusions.
With more than 35 years
of experience, ALUMIL
Aluminium is one of the
most advanced companies
Alumil Middle East
at The Big 5
ZABEEL HALL, G121
in the design and
production of aluminium
extrusion products.
Alumil Middle East
provides high specification
architectural solutions to
building owners, architects,
project consultants,
contractors and aluminium
fabricators.
The company says: “From
our UAE regional base,
we support the aluminium
requirements of residential
& commercial projects
across the Middle East,
Near East, India, Sri Lanka,
Iraq, Iran, North and East
Africa.”
ALUMIL produces
architectural aluminium
systems, which are
designed, developed
and tested in the Group’s
Research & Development
Department and then
tested and certified by
internationally accredited
fenestration laboratories,
such as IFT ROSENHEIM,
various laboratories in
the USA, INSTITUTO
JORDANO in Italy and
EXOVA in Dubai.
At this year’s The Big
5 exhibition at the World
Trade Centre in Dubai,
Alumil will present the
Entrance doors series
ZEN of high performance
in alignment with
contemporary architectural
design and technological
evolution with the famous
PIVOT System, as well as
Smart Entrance doors.
Also, Alumil will showcase
two of its top class Supreme
sliding systems S600
and S700 with impressive
characteristics and design. g
www.alumil.com
20 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 appEXHIBITOR NEWS
British electricity company
Elmark expanded its
operations in the Middle
East by opening a factory in
Dubai last year. The brand
already has worldwide
recognition for its low
voltage electrical and
lighting products.
Georgiev, CEO of
Elmark Holding told The
Big 5 Hub: “We gained
more visibility in the Gulf
region after we set up the
factory in Dubai Silicon
Oasis. Our commercial
policy is to supply Elmark
product portfolio through
dealership, as well as
project fulfilment in the
whole Middle East region.
“I am sure that Elmark’s
market presence would
strengthen after this
exhibition.”
Elmark is exhibiting for
the first time this year at
The Big 5 Dubai 2015 to
explore new opportunities
and establish connections
with potential partners. It
will showcase a variety of
automation, monitoring and
control products, as well
as the wide range of LED
lighting products. g
www.elmarkholding.eu
Elmark expands in
Middle East
CONCOURSE, 244
The creation of
RAKTherm anti-UV fittings
came up to provide a
complete line up of piping
solutions for outdoor
installations.
RAKTherm is one of
the first manufacturers of
anti-UV fittings that have
been registered in SKZ
- the leading German
certifying body for the
plastic industry, affirming
its conformance to tvvhe
highest standard of quality.
RAKTherm will administer
a full network of anti-UV
pipeline solution under
direct and exposed sunlight
applications.
RAKTherm anti-UV pipes
and fittings is engineered
with black anti-UV
component and developed
to withstand hot and cold
RAKTherm’s anti-UV is
top level engineering
HALL 4, B177
temperatures from 5°C up
to 95°C for longer service
life; integrated with anti-
UV black technology for
lower linear expansion and
contraction rates.
RAKTherm guarantees
pipes are no longer affected
by the sun’s UV radiation.
RAKTherm utilises
its quality management
systems combined with
technical expertise in
developing the most
comprehensive piping
solutions, rendering
essential contributions
on the technological
development of the
piping industry, delivering
significant advantages and
developments on traditional
piping systems. g
www.raktherm.com
Collective Protection Personal Protection Access Solutions Service Solutions
Meet us at The BIG 5: stand MECJ 96
TAMMET Systems International GmbH
Member of TCT Tesic Group
Im Kurzen Busch 11 · D- 58640 Iserlohn · Germany
Phone: + 49 2371 21 95 5795 · Fax: +49 2371 21 95 870
E-Mail: info@tammet-systems.com
www.tammet-systems.com
Our Business Areas
Made in Germany
Making your construction site
a safer place
Collective Protection Personal Protection Access Solutions Service Solutions
Meet us at The BIG 5: stand MECJ 96
TAMMET Systems International GmbH
Member of TCT Tesic Group
Im Kurzen Busch 11 · D- 58640 Iserlohn · Germany
Phone: + 49 2371 21 95 5795 · Fax: +49 2371 21 95 870
E-Mail: info@tammet-systems.com
www.tammet-systems.com
Our Business Areas
Made in Germany
Making your construction site
a safer place
NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 21
Find every exhibitor on The Big 5 app EXHIBITOR NEWS
SAEED HALL, A151
Steeling the show
Emirates Steel, the only
integrated steel plant in the
UAE, owned by SENAAT, is
participating in The Big 5
Dubai for the fifth consecutive
year. It will showcase its steel
product range including rebar,
rebar in coil, wire rod, heavy
sections and sheet piles.
Mohammed Al Afari,
Emirates Steel VP of
Marketing said: “The Big 5
is an important event for us,
and is an excellent venue to
showcase our expertise in steel,
and enhance our presence at
local and regional market.
“To us the exhibition is an
ideal destination to showcase
our range of products, promote
Emirates Steel products to
all GCC countries in line
with the growing demand for
high quality steel products
in the regional market and to
have direct contact with end
customers. We were satisfied
with the response we received
during last year’s edition.”
Emirates Steel announced a
move into sheet piles specifically
aimed at the construction sector,
becoming the first company to
manufacture them in the Gulf.
It intends to extend its range
to include five Z-pile products
by 2017.
GCC demand for sheet pile
currently stands at around
80,000 tonnes per year
whereas Emirates Steel aims
to manufacture about 150,000
tonnes each year.
Established in 1998, Emirates
Steel grew in a relatively short
period of time from a simple
re-roller of imported steel
billets to a complex integrated
manufacturing plant, using
modern solutions to tackle
traditional industrial problems
to generate value for its
various stakeholders. g
www.emiratessteel.com
Since 1975
ONLY
GUARANTEE
YOU EVER NEED
ISO 9001 & ISO 14001
REGISTERED
FIRM
For Trade Enquiries Please visit
Stall No. 4D187 Call: 0561137793
22 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
SPEAKER INTERVIEW
Date: Part 1 November 25, Part 2 November 26
Time: 10-11am (both days)
Where: Business Intelligence Theatre
Who should attend?
People who are starting out on their management career, those looking for
a step up and those looking to polish and update their existing management
skills. It is also a great opportunity for people to learn from each other and to
network with like-minded professionals.
“Great leaders know their strengths
and weaknesses, what makes
them productive, how they best
communicate... and they know the
areas where they don’t perform well.”
Great leadership comes from
understanding yourself
We talk with Liz Kentish, managing director of Kentish & Co, and former
deputy chairman of the British Institute of Facilities Management as she
prepared for her seminars on improving your leadership skills.
W
e have worked
with a number
of construction
and facilities management
companies and teams around
the world helping them to
develop leadership skills,
improving their relationships
and boosting the performance
of their people,” says Liz
Kentish.
Liz is a qualified coach,
licensed trainer, international
conference chairman and
public speaker who has
specialised in the service
sector for more than 20 years.
She is recognised
internationally for her ability
to make a difference to the
lives of her clients and trusted
friends. Her energetic and
inspiring nature is infectious,
helping to boost business
performance and achieve
results quickly.
She is a consummate
networker and highly
regarded within both the
facilities management and
coaching industries in the
UK and Middle East – you’ve
probably already seen her on a
conference platform or met her
at a networking event.
Her track record includes
some of the biggest names
in construction and she
has helped restructure
management approach.
Liz said: “One is John Laing
Integrated Services where
we ran the UK’s Institute of
Leadership and Management
levels 3 and 5 supporting
people taking their first
steps into management and
honing the skills of those with
considerable management
experience under their belt.
“As a result the teams gained
a more rounded approach to
leadership, and individuals
took on far more personal
responsibility across the
contracts, so if they were an
operator, they would also look
at what else they could offer
the client, essentially taking on
a business development role.
“There was a significant rise
in internal promotions and
productivity and performance
increased markedly. As an
external training provider, we
bring experience from working
with lots of different people, in
lots of different environments
and industries. We have a
consummate understanding of
what works and what doesn’t
and some brilliant anecdotes
to share.
“But students don’t just
learn from us. One of the most
valuable aspects of attending
a training course is that the
students learn from each other,
share experiences and create,
what can be life-long, networks.
She has become closely
associated with The Big 5
and its associated shows,
like FM EXPO, and has a
strong understanding of the
construction sector in the
Middle East.
She said: “Property
investors in the Middle East
are recognising the importance
of a strong maintenance
programme if they are
to realise their return on
investment. This is great news
for the facilities management
and construction sector. The
construction and FM sector
in Europe is accustomed to
focusing on maintenance
and operation thanks to the
legacy stock of some very old,
challenging buildings which
often require considerable
retrofitting. The Middle East
is fortunate as in many ways
it is a blank canvas. The speed
of progress is astonishing as
the countries are learning
from the mistakes (and
best practice) of the more
established markets, and will
soon be overtaking them.”
Her two-part presentation
covers ‘Developing
leadership skills for the
construction section’.
But if she had one top tip for
managers, what would it be?
“Our two-part presentation
are interactive workshops
where we help people to
understand their strengths and
weaknesses when it comes to
leadership and management.
“My key piece of advice
is to ‘know thy self›. Great
leaders know their strengths
and weaknesses; they know
what makes them productive;
they know how they best
communicate; and how they
best learn; and they know
the areas where they don’t
perform well.
“And they hire people with
complementary skills to fill
those gaps. To be a good
manager and a leader, you
need to spend time focusing
on your own skills and
understanding yourself better.” g
Liz Kentish, managing director of Kentish & Co
DEVELOPING LEADERSHIP SKILLS FOR THE CONSTRUCTION SECTOR PARTS 1 & 2
See page 54 for The Business Intelligence Theatre
24 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 appEXHIBITOR NEWS
Salice Paolo is leader in
modern and classic door handles,
bathroom accessories and
faucets, fully made of pure brass.
It was during the 1940s and
50s when Serie Classica became
famous, thanks to new young
minds from prestigious Scuola
d’Arte in Cantù.
Its wide range of products
confers elegance and style to
every room and every setting,
enriching the house with
luxurious details, such as
hinges, switchovers, door pulls,
knobs and much more
The company says: “Volterra
is an example of sober and
austere neoclassical style, in
which the handle and plaque
communicate over minor
aesthetic differences and
through different eras.
“Its dual nature makes it
suitable for environments
with pieces of mixed stylistic
extraction, while maintaining a
delicate aplomb.”
The Rococo fittings bring
something special: “It offers
the chance to play with
asymmetrical and rich shapes,
especially lively in this light
and graceful model.
“These features make it a
sophisticated and refined but
also original and versatile
suggestion. Presented at the
last Expo in Milan, it has
been high praised from both
designers and retailers.”
For the most luxurious and
glamorous settings it suggests
two new series of fittings
embellished with stones and
crystals in various shades.
While decorating with
reflections and shiny surfaces,
they are the answer to the
current trends and to desire
for exclusivity.
The series comes in two
versions: Glitter, with small
crystals, to create a true bright
texture. Drops, with larger
stones, encrusted on the handle
like a jewel. These crystal
decorations are currently
available on the model
‘Dubai’. g
www.salicepaolo.it
Fittings for beautiful homes
HALL 6 B261
Polyamide Profiles for
Thermal Break
Insulating an aluminium
profile with a material with
low thermal conductivity
installed between metal
components to retard the
passage of heat through a
window assembly, called
Thermal Break.
The principle of thermal
break and thermal bridge is a
fundamental of heat transfer
where a penetration of the
insulation layer by a highly
conductive or non-insulating
material takes place in the
separation between the interior
and exterior environments of a
building assembly.
The company said: “For
over 40 years, we have been
developing bespoke solutions
for innovative systems,
together with our customers.
“Our worldwide market
presence, with eight production
Technoform Middle East
ZABEEL HALL E116
plants on three continents
enables us to produce flexibly
and to order, ensuring
short lead-times. 22
distribution sites worldwide
ensure close customer support
at your location. Producing
over 300 million metres of
insulating profiles annually,
Technoform Bautec is the
leader in this market.”
Thermal bridging is created
when materials with high
thermal conductivity come
into contact, allowing heat to
flow through the path of least
thermal resistance.
Technoform’s TGI-Spacer is
the perfect solution to create
optimal living temperatures
within a building: minimal heat
transfer through the windows
High comfort as the room
temperature stays consistent –
neither too hot nor too cold.
Energy and cost saving on
both production of IGUs and
operating life costs Reduction
of mould and condensation
forming Technoform Glass
Insulation provides better
thermal performance
The TGI-Spacer can be bent
around the glass unit, which
has a number of advantages
such as: preventing gas leakage
(argon and krypton) through
the corners Longer and better
performance of the windows. g
www.technoform-bautec.ae
Unnati Pumps is a leading
submersible pumps and
submersible motors from India.
It says: “We offer quality
of submersible pumps and
motors from 3-inch to 10-
inch with complete state-of-
art technology on par with
the best in the world.
Incorporated 1985, Unnati
Pumps produces more than
200 differing pumps, which
can be customized to meet
clients’ individual needs.”
It has a manufacturing Unit
at “Ahmadabad” Gujarat and
a Corporate Marketing office
at Haryana, Madhya Pradesh,
Chhattisgarh, Karnataka and
Andhra Pradesh.
“We have
obtained the
ISO 9001
Certificate, ‘ISI’
marks from the
Indian Standard
Bureau and STAR
RATING from
Bureau of Energy
Efficiency.”
The company
makes and markets pump
sets and submersible open
well monosets under the
brand name of Unnati
through its own dealers
network backed up by prompt
after sales & service. The
company’s maxim is simple:
“Together we have done it,
together we will do it.” g
www.unnatipump.com
FOCUS HALL E61
VIFRA opened its first plant
in 1980 in Via Matteotti in the
province of Novara, Italy.
By 1991 success meant
it moved to Via Vedani
expanding production, and
in 2007 moved again to Via
Barro expanding even further
its plants.
The Group currently has
30 employees with an area
of 20,000 square metres, of
which 8,000 is covered. It has
a raw materials warehouse,
storage and semi-finished
products warehouse,
production warehouse and a
head office.
Its 21st century production
process allows the company
to expand into different
sectors: plumbing, cosmetics,
perfumery, precision
mechanics.
On show at The Big 5 2015
will be the Kit PLUG shut-
off hand shower available
in chromed ABS, support
bracket and flex hose in a
range of finishes.
Another of its popular
fittings is the brass column
shower set with sliding
rails set, hand shower
and showerheads. It too
is available in a range of
finishes including chrome,
gold, copper or bronze. g
www.vifra.comvvvvwv
Italian bathrooms
with a special range
of finishes
HALL 5 G210
Range of
submersibles
to suit every
need
26 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
HOW TO TRADE SEMINAR
Wednesday, November 25, 2015
08:30
9:00
09:15
09:45
10:30
10:45
11:15
11:45
12:00
REGISTRATION
Welcome
Trevor Butcher, Partner and Head of Finance & Projects, Middle
East, DLA Piper
An introduction to UAE culture and business etiquette
•	Negotiation and communication – fundamental differences
between Middle Eastern and Western styles of verbal and
non-verbal communication
•	Management styles, challenges and opportunities of working
with culturally-diverse teams
•	Understanding the unique dynamic of family businesses in the
UAE and Middle East
•	Building sustainable relationships to ensure future success
Beatrice Hunt, General Manager, BE Consultants International
Outlining the options and key considerations for businesses
interested in entering the UAE market
•	Establishing a company
- Local commercial partnerships and distribution agreements
- Appointment of a commercial representative
- Joint venture agreements
- Mergers and acquisitions as an alternative route to market
•	Overview of the new UAE Commercial Companies Law and
how it will affect newcomers to the market
•	Protecting your investment: The role of the DIFC Courts
Trevor Butcher, Partner and Head of Finance & Projects, Middle
East, DLA Piper
Networking break
UAE’s free zones: Allowing foreign companies unrestricted
import of labour and export capital
•	Highlighting the differences of free zone requirements
•	What are the benefits for foreign companies setting up in free
zones?
•	Identifying the range of free zone options available and
determining which is right for you and your business
Adil Al Zarooni, SVP – Sales, JAFZA
Introduction to product licensing and registration
•	Understanding the policies guiding technical regulations and
standards
•	Overview of certification processes, product testing and
compliance
•	What you need to know to ensure your products comply with
UAE technical regulations and approved international, regional
and national standards
Mike Luna, General Manager, Building Products, MENA, Intertek
Closing remarks and key takeaways
•	Getting started: A guide of what needs to be done and where
you need to go
•	Approximate timeframe for each step of the process
•	Important contacts
Trevor Butcher, Partner and Head of Finance & Projects,
Middle East, DLA Piper
End of workshop
HOW TO TRADE IN THE UAE SEMINAR
This half-day seminar helps you navigate the complex regulatory framework
to set up a business and win work in the UAE’s booming construction market,
and provides information on laws and effective business practices even for
established businesses within the UAE.
H
ow to Trade in the UAE is
an exclusive seminar for all
registered visitors which
gives insight on how to successfully
do business in the United Arab
Emirates.
The seminar provides information
on navigating the complex regulatory
framework to set up a business and
obtain work in the UAE’s booming
construction market.
It also provides information
on laws and effective business
practices for already established
companies in the UAE.
How to Trade begins with an
introduction on culture and business
environment for those hoping to
work in the country’s thriving cities,
including trade hubs like Dubai and
Abu Dhabi.
The programme also takes a look
at how to work with free zones, with
one workshop led by Jafza’s Senior
Vice President of Sales, Adil Zarooni
giving specific direction on options and
requirements for interested companies.
Attend this year’s seminar to learn
more about how to work in one of the
most exciting business environments
on the globe. g
The free-to-attend seminar is back at
The Big 5 for 2015
Getting down to
business:
How to Trade in
the UAE
By Jumana Abdel-Razzaq
Email:Jafza-big5@ezw.com | Tel: +971 4 801 0174 | Mob: +971 50 189 7323
To schedule a one to one meeting please contact
Construct your
business on solid
foundation with jafza
Jafza is home to over 762 global and local players from the construction and building industry — a leading sector
among the 7,000 plus business community.
We bring to you all the facilities and infrastructure that you need to optimise your business including the most efficient
modes of transportation.
Visit our stand and pavilion and our team will provide you with all the information that you may need to start up at Jafza.
Visit us at Big 5 Show
Main Concourse – Stand 620,
Opposite Hall 6
Dubai World Trade Centre
23-26 November 2015
11:00 am – 7:00 pm
Email:Jafza-big5@ezw.com | Tel: +971 4 801 0174 | Mob: +971 50 189 7323
To schedule a one to one meeting please contact
Construct your
business on solid
foundation with jafza
Jafza is home to over 762 global and local players from the construction and building industry — a leading sector
among the 7,000 plus business community.
We bring to you all the facilities and infrastructure that you need to optimise your business including the most efficient
modes of transportation.
Visit our stand and pavilion and our team will provide you with all the information that you may need to start up at Jafza.
Visit us at Big 5 Show
Main Concourse – Stand 620,
Opposite Hall 6
@jafzadubai www.jafza.ae@jafzadubaijafzadubaiJafzaDXB
Dubai World Trade Centre
23-26 November 2015
11:00 am – 7:00 pm
28 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 appEXHIBITOR NEWS
How BIRCO channel
systems transform
public spaces
HALL 2 E91
BIRCO is a German
family company in its third
generation, with headquarters
in Baden-Baden. It belongs
to the leading suppliers of
channel systems in Europe.
Products are sold through its
own sales offices in Germany,
France, Benelux and through
distributors and licensees in
17 other countries.
The company develops
balanced, holistic drainage
concepts for a varierty
of projects from initial
consultation through to final
delivery.
BIRCOlight’s attractive
range of covers can provide
a characteristic element
in urban or public space
design while add. providing
sufficient load reserves for
those times when traffic is
heavier.
BIRCOsir is its wide
variety of drainage concepts
and there are “virtually no
limits to the application
possibilities”.
BIRCOlux is its integrated
lighting technology
while BIRCOlux “opens
unimagined perspectives for
the architectural design of
building façades and open
public spaces in different
geometries and changing
colours.” g
www.birco.de
FLIR Systems will exhibit
the new FLIR T1020, also
known as the FLIR T1K, a
premium thermal camera
for use in a multitude of
industrial and building
diagnostics applications, at
The Big 5 show.
The T1K is a high
definition, handheld
instrument featuring
exceptional measurement
performance, outstanding
image clarity, and a highly-
responsive user-interface.
The T1K allows users
to find hot spots quickly,
measure them precisely
and streamline their entire
work process.
The advanced image
processing features
provide the highest quality
images available in a
compact system.
High definition imaging
requires high precision
HD thermal imaging
HALL 3 C116
optics and the T1K’s
lenses deliver best-in-class
performance. The T1K
features FLIR’s OSXTM
Precision HDIR optics,
which deliver superior
image quality and range
performance and allow
for accurate temperature
measurements from twice
as far away compared
to the industry-standard
lenses.
The T1K also features a
new focusing system that
offers continuous autofocus
as well as a dynamic
manual focus.
The T1K is now available
for purchase from selected
channel partners. g
www.flir.com
Water Saving Products Aerators Connecting Hoses Shower Hoses
NEOPERL MEA DMCC, Office No. 101, Jumeirah Bay X3 Tower, Jumeirah Lake Tower, P. O. Box 72625 Dubai, United Arab Emirates
info@neoperl.ae, www.neoperl.ae
YOU’LL FIND US AT BIG5 2015 IN DUBAI,
RASHID HALL, STAND NO
E187.
NEO_BIG5_219x145_rz.indd 1 01.10.15 08:26
NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 29
Find every exhibitor on The Big 5 app EXHIBITOR NEWS
Intumescent coatings
for fire protection.
How RENITHERM works:
In case of fire, intumescent coatings expand to form
a foam barrier which is 30-50 times thicker. Saving time for more safety!
AL GHORAIRI AND PARTNERS WLL
DOHA, avanikumar@hotmail.com
Phone: +974-4432-4959
AUDAX-Keck GmbH Germany
fire@audax.de, www.renitherm.com
I Reliable fire protection of structural steel,
wood, electrical cables
I Tested according to British Standard 476:21
I Top product quality. Made in Germany.
I Approved building projects, e.g.
- Hamad Int. Airport Hangar, Qatar
- New Taipa Ferry Terminal, Macao
BIG 5 Show,
Dubai
23 - 26 Nov 15
Zabeel N 120
Anz_Big5_219x145_AUDAX 07.10.15 11:37 Seite 1
Coil boating line solutions for steel
and aluminium companies
SAEED HALL 1, A166
Continual development
since 1940 ensures
Bronx International is
a world innovator in
design, manufacture and
technology of: colour
coating lines (coil coating
lines), galvanizing & metal
coating lines, chemical
and paint coaters, thermal
equipment (paint ovens,
oxidisers, incinerators),
surface correction mills,
tension levelling lines,
strip joiners, equipment
upgrades.
All Bronx lines offer the
following benefits to our
customers: Bronx-designed
and Europe-manufactured,
supervision of installation and
commissioning, full training
package for operators and
production personnel.
Bronx International has
recently partnered with the
Galfan Technology Centre
to become the exclusive
agent for Galfan licenses in
sheet and coil applications.
Bronx is now offering
Galfan as an option on new
lines and as an upgrade to
existing lines.
Recognising both the
market trend towards
lower coating weights and
the advantages of Galfan
coatings, Bronx will be
discussing how to reduce
costs and coating weight,
without compromising
corrosion resistance.
Why Galfan?
Galfan is an established
coating, delivering excellent
corrosion resistance and
formability, as well as
greater painted product
performance than regular
galvanised coatings. The
unique microstructure
and physical properties of
Galfan also allows lower
coating weights to be
achieved than conventional
zinc coatings.
Galfan’s unique benefits
around ductility and
corrosion resistance are
related to its characteristic
microstructure, making it
suitable for a wide range
of applications including
building, construction,
appliance, roofing and
walling, harsh winter
environments and
deep drawing. Galfan
microstructure is particularly
suited to low coating weight
applications. g
www.bronxintl.com
30 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
GETTING THERE
Travelling to the Big 5
As the gateway to the Middle East, Dubai has become a beacon for the integration of cultures from all over the
world. The city is a major business and distribution hub as well as the exhibition and conference capital of the
MENA region... and of course it’s become a top vacation destination with some of the most spectacular and
exciting architecture in the world
FLIGHTS INTO THE UAE
Dubai International Airport is the world’s busiest
with some of the finest facilities in the world.
Dubai’s flagship carrier Emirates Airlines runs one
of the youngest fleets of aircraft in the world.
Abu Dhabi International serving the the capital
of the UAE and its largest emirate is an hour car
journey from Dubai. For those traveling regionally
Sharjah Airport also offers flights and is only 20
minutes away from central Dubai.
ARRIVING BY ROAD OR RAIL
Travelling by car gives direct access from the
city’s main highway and commercial skyscraper
corridor, Sheikh Zayed Road.
Within the DWTC complex there is extensive
multi-storey parking facilities for around 5,000
cars. The DWTC is also on the main public
transport bus and metro route, with its own
dedicated metro station. Taxis are well regulated
and efficient. A 25-minute journey, covering 30km
costs around $18.
VISA REQUIREMENTS
Citizens of countries within the Gulf Cooperation
Council do not need a visa to enter the UAE and
40 other countries, including most EU countries,
Australia, New Zealand, Hong Kong and the USA,
are eligible for a 30-day visa on arrival.
For all other nationalities, a visa must be
applied for before the visitor arrives in the country
either through their embassy, a local UAE sponsor
or a local hotel.
Bon Tours is a full service destination management company offering its partners more than 220 contracted hotel rates,
a variety of excursions and leisure options and vehicles, including luxury options for transfers. Bon Tours also has its own
online visa system with Dubai Immigration allowing quick and smooth issuance of tourist visas.
Find out more at www.thebig5hub.com
OUR OFFICIAL TRAVEL PARTNER
The Big 5 2015 and its colocated shows PMV Live 2015 and MEC 2015 has
selected Bon Tours as the Official Travel Agent offering full travel services
and assistance including:
•	Transfers
•	Meet & assist
•	Vehicle & chauffeur
WELCOME!
Look at the PLUS points
Market leading range of valves
for commercial and domestic
plumbing and heating applications
Superior choice of end connection
available including Tectite, XPress
and Henco ends as well as
traditional threaded, flanged or
compression jointing
British quality, for performance and
durability you can rely on
World wide reputation for
excellence with over 100 years of
valve manufacturing experience
Robust designs providing
outstanding operation throughout
the product life cycle
Tel: +971 4 5015 929
Fax: +971 4 5015 930
email: pydubai@mailme.ae
Turn to Pegler Yorkshire for fully integrated support
Come see us at The BIG 5 International
Building and Construction Show on stand
2C90 from 23rd Nov- 26th Nov
www.pegleryorkshire.co.uk
PUTTING YOU IN CONTROL
BRITISH QUALITY
FOR RELIABILITY AND WHOLE LIFE PERFORMANCE -
CHOOSE PEGLER
Pegler
32 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 app
Jorns AG is the
manufacturer of bending
machines, double bending
machines, compact strip
cutting lines, rounding
Architectural metal for professionals
machines as well as accessories
used for processing sheet metal.
Customers of Jorns AG, who
are mainly working in the
field of roofing or architectural
sheet metal industry, have
used our machines for more
ZABEEL HALL Y153 than 40 years, allowing the
most professional and efficient
way of manufacturing their
architectural sheet metal needs.
The Jorns product line
remains a trendsetter for the next
decade. The Norma-Line, Maxi-
Line and Super-Line modules
are innovations of our existing
machine series. Stands and
arms are designed using sturdy
box-type welded construction.
Our bending machines come
with user-friendly controls
mounted on a mobile console.
You have a range of choices for
equipping your machines: from
a simple 2-axis OP3100 control
unit to the ultra-modern CP100
multi-touchscreen control unit.
With positive-negative
bending using two bending
beams, the full-automated
TwinMatic-Pro and the semi-
automated TwinBend-Pro
are more adaptable and many
times faster than conventional
bending machines. In most of
the cases, rotating or flipping
the profile during the bending
process can be avoided.
Depending on the type of
machine, the pneumatic or
hydraulic gripping fingers
allow a full automated process
to work steel sheet up to a
thickness of 2.0mm (400N/
mm²). The insertion depth is
1150/1300 mm.
All the above mentioned lines
are available in length of 3.2, 4,
6.4, 8, 10, 12.2 metres. g
www.jorns.ch
EXHIBITOR NEWS
INSPIRING GLOBAL BUSINESS
Located in Sharjah, UAE, Hamriyah Free Zone is home to more than 6,000 businesses from 155
UNPARALLELED INDUSTRIAL LANDSCAPE
Hamriyah Free Zone Authority
United Arab Emirates
NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 33
DEVELOPMENT FOCUS
I
n 25 years time around
one million people will
live and work in the new
145 sq km city called Dubai
South.
It’s a brand new name for a
master-planned development
known since 2006 as Dubai
World Central with the
emirate’s second airport at
its heart. Expo 2020 will
be in Dubai South and it
is already home to the
prestigious Dubai Airshow.
The announcement was
made following a new
law issued by HH Sheikh
Mohammad Bin Rashid Al
Maktoum, Vice-President
and Prime Minister of the
UAE, in his capacity as
Ruler of Dubai.
The city is forecast to
generate over half a million
jobs and sustain a total
population twice that number.
Dubai South is home to
Al Maktoum International
Airport – already operational
- which will become the
world’s largest once complete.
The airport will have
capacity to fly 220 million
passengers and 16 million
tonnes of cargo a year. g
Newly named Dubai South will be a city of a
million people and new focus for the emirate
The largest rooftop
free-standing frame
manufacturer in
the world!
Simply a better way
Big Foot Systems combine experience, quality, innovation
and forward thinking to bring you the very best products
enquiry@bigfootsupport.com
+44 (0)1323 844 355bigfootsupport.com
@bigfootsystems
BIG 5 Dubai
Visit us Hall 2, Stand 2B61
34 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 app
Where past meets future
6B240
For over 23 years Elleci has
been committed to achieve,
what has always been
considered the technological
expression and the key point
between past and future:
innovation.
It will show a range
of products including its
new kitchen fitment range,
Elleci describes itself as a
“washing area expert with
great attention to the colour
matching in the kitchen
environment’.
On its stand take a look at
the new Fox 360: a versatile
sink that perfectly fits each
available space on the kitchen
top. It can be equipped with
For more information please visit:
www.thebig5.ae/features/platinum-club
OR Contact:
thebig5platinumclub@dmgeventsme.com
JOIN THE KEY BUYERS’
CLUB AT THE BIG 5
Platinum Club members get their own lounge, fast track services and
many more special benefits during the show
WHAT YOU GET WITH A MEMBERSHIP:
•	 Dedicated badge collection point for Platinum
Club Members to avoid queues and save time
•	 Platinum Club badge recognised by exhibitors
and Members for easy networking
•	 Access to the Platinum Club Lounge,
featuring:
•	 Complimentary Wi-Fi
•	 Refreshments served throughout the show
days
•	 Comfortable lounge seating area and private
meeting rooms
•	 Dedicated lounge hostess offering
personalised exhibitor and workshop
information
•	 Priority access to all CPD certified workshops
to ensure entry and preferential seating
•	 Automatic access to attend the exclusive
Design Summit
•	 Complimentary parking pass*
The exclusive members-only
Big 5 Platinum Club is back,
bringing the most influential
regional buyers in the
construction industry together
during The Big 5 show.
Offering first class services
and benefits, Platinum Club
members are given direct
access to a full range of
opportunities provided only
for industry professionals
who influence the purchasing
of products and services for
projects valued at more than
$100 Million.
Individuals working for
architectural firms, contractors,
engineering consultancies,
project management, property
development or government
agencies are all eligible to apply
for membership.
The Platinum
Club mainly aims to
provide a platform
to connect buyers
with suppliers and
manufacturers within
the industry, offering
a huge advantage for
generating business and
sustainable prospects.
Members will also
be able to enjoy VIP services
and complete entry to selected
show features and events. In
fact, member status stretches
across all The Big 5 shows
including Saudi Arabia, Kuwait,
Indonesia, India and the new
East Africa show.
Platinum Club applications
are evaluated by a team of
industry experts according to
stringent membership criteria.
This selection process
ensures each member’s
suitability and reinforces the
Club’s prestige and integrity.
Key decision makers on high-
budget projects are eligible to
apply online.
For more information
please visit www.thebig5.
ae/platinumclub or contact
thebig5platinumclub@
dmgeventsme.com
MEMBERSHIP CRITERIA:
•	 Platinum Club Members must be directly
involved in the specifying or purchasing
of products and services for construction
projects valued at $100+ million, and work for
one of the following types of companies:
•	 Architectural Firm
•	 Interior Design Firm
•	 Consultant
•	 Engineering Firm
•	 Property Developer
•	 Contractor - Main
& Sub
•	 Government
Agency
PLATINUM
CLUB
Dunham-Bush is one of the
world’s top commercial air
conditioning manufacturers.
For more than 100 years
it has been committed to
offering creative solutions for
the customers requirements
in the heating, ventilation,
air-conditioning and
refrigeration (HVAC/R)
sector.
Dunham-Bush offers a
complete range of HVAC/R
products including large
chillers, heat pumps,
thermal energy storage,
packaged, airside system
and unitary to residences,
commercial buildings &
industrial facilities.
Its display at The Big 5 2015
will include: DB Centrifugal
Chiller, DB Rooftop
Packaged, DB Fan Coil Unit,
D B Aire Unit and the DB
Compressor Unit. g
www.dunham-bush.com
FOCUS C66
100-years of
history makesDB
and HVAC leader
many accessories.
And its Quadra minimal
sinks collection succeeds
in highlighting its modern
and clean shapes. The new
smart composite sink with
flat aesthetic that see the
installation of the innovative
compact draining system
S.I.R. Smart. g
www.elleci.com
EXHIBITION NEWS
Visit us at
Zabeel Hall
Main entrance
Maktoum Hall
Main entrance
Sponsored by saudiexports.sa
Largst SAUDI Products Participation
Visit us at
Zabeel Hall
Main entrance
Maktoum Hall
Main entrance
Sponsored by saudiexports.sa
@SaudiExports
Largest SAUDI Products Participation
36 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 appEXHIBITOR NEWS
HALL 6 B242
G&G Engineering
colour samples for kitchen
tops, exhibition material,
objects for events and displays,
2D prototypes. g
www.ggengineering.net
Studio: the steps
transforming
an idea into an
industrial plan are
the most concrete
elements of a
successful project.
Waterjet: stainless
steel tank, ball
screw transmission,
Window based
PC Control Panel,
automatic greasing
system, high
pressure pump,
VMS system
T.S.C. system is
a machine that
allows the mould
a composite
for bathrooms
mosaics, kitchen
back, living room
wall coating, elegant and
stylish bi-dimensional objects
for decoration, mirrors and
trays. It can also be used in
advertising objects, banners,
Franklin Electric
is a global leader in
the production and
marketing of systems
and components for
the movement of water
and automotive fuels.
Recognised as
a technical leader
in its specialties,
Franklin Electric serves
customers around the world
in residential, commercial,
agricultural, industrial,
municipal, and fueling
applications.
Founded in 1944, Franklin
Electric has grown from a
small motor manufacturing
company into a leading global
provider of complete water
systems and fueling systems.
Franklin Electric’s
principal markets include
clean water systems,
water transfer and grey
water systems, and fueling
systems. Headquartered
in Fort Wayne, Indiana,
Franklin serves all corners
of the world with more
than 14 manufacturing and
distribution facilities. g
www.franklin-electric.com
Franklin Electric
Submersible
Motors
HALL 2 D81
General construction
G&G Engineering says its
main goal has always been
to create high-innovative
industrial factories in order
to offer to its clientele a
competitive and technological
advantage.
Founded in June 2000
with a precise aim: planning
production plants suitable for
the moulding of composite
materials.
“Our Team consists of skilled
staff able to better analyse
the needs of the customers,
implement and start a new
production bearing in mind
the final costs. Furthermore,
our Team provides a service
always quick to resolve any
doubt and easily evaluate new
requests.”
Its engineers use “the best
desktop 3D printer on the
market” to render clients’
prototypes. These are the
three steps:
Roof with living plants & solar panels
Roof with living plants & solar panels
NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 37
Find every exhibitor on The Big 5 app EXHIBITOR NEWS
This is the second time that
FerreroLegno has exhibited at
The Big 5 and its reasons are
simple: “We have had several
requests from the Middle
East about our products and
we think it is very interesting
market for our products.
This year will see the launch
Clever Italian cupboard
space will impress
HALL 6 A240
of its new Skema closure
system, ideal for kitchen
rooms, walk-in wardrobes,
utility rooms, niches, under-stair
storage closets or control panels.
Its customisable comes in a
variety of designs. It’s made-
to-measure, and is available
with book closure. swing and
folding. “Skema provides
absolute continuity in the wall,
Established in 1977 in Italy,
Gamma Meccanica Spa
comprises three divisions,
each one focused on a
specific sector:
Insulation division designs
and produces lines for
the production of mineral
wools. The plastics division
is specialised in lines for
recycling of plastic material
The extruded polystyrene
division is dedicated to the
creation of systems for the
production of XPS panels.
Constant technological and
applicative research by the
highly-qualified staff make
Gamma Meccanica SpA one
of the leading players on
the international market in
these fields.
At The Big 5 2015, find out
more about the centrifuge
for stone wool. “In the stone
wool production, the lava is
converted into thin fiber by
means of a centrifugation
process.” g
www.gamma-meccanica.it
Insulation...
the Italian way
HALL 7 F305
optimising spaces and making
each opening an integral part,”
says the company.
The Italian company is
concentrating on this region
in the medium term, knowing
that it where expansion is
most likely compared with the
“difficult” market in its home
country and Europe. g
www.ferrerolegno.com
38 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
SPEAKER INTERVIEW
Date: Part 1 November 23, Part 2 November 24
Time: 10-11am (both days)
Where: Business Intelligence Theatre
Who should attend?
Manufacturers supplying to the construction, electrical/gas, fire and PPE sectors. This includes
QA managers but also marketing and sales professionals who wish to understand how BSI can
help with creating commercial advantage.
Construction organisations will be interested in our new Kitemark for BIM and the presentation
will include a case study to explain the relationship between standards and certification.
“Gaining a competitive edge is
critical to construction product
manufacturers as its becoming
increasingly important for companies
to not only meet their legal obligations
but also remain competitive in the
global market place.”
- Andy Butterfield
We talk with Andy Butterfield, the Global Head
of Construction for BSI, who will present for
two days in The Business Intelligence Theatre.
A
ndy Butterfield
oversees British
Standards Institution’s
(BSI’s) network of regional
offices in 74 countries around
the world. BSI’s Product
Certification construction
sector services includes;
Kitemark Certification, CE
marking, Keymark, Watermark
and Benchmark.
He has 30 years of
experience in quality
assurance, testing and
certification, and is a qualified
Mechanical Engineer and ISO
9001:2000 Lead Assessor.
He explained his two-part
seminar will cover testing and
certification for two distinct
areas; product manufacturing
for the construction sector
(products which are supplied
to the construction sector
such as windows, doors, pipes,
fittings, concrete, cement) and
will also be discussing a new
area which is a certification of
processes and organizations
for digital technology in
construction such as BIM
(Building Information
Modeling).
He said: “The presentation
will focus upon the need
for effective standards and
assurance solutions which
support implementation and
adoption of standards – I
will also focus upon global
market access.”
He says being aware of the
standards and understanding
the benefits is vital across the
construction sector and he offers
a look back to the beginning
of the last century for a simple
explanation of why:
“The need for standards has
been an issue for well over
100 years and is perfectly
illustrated through the
formation of BSI,” he said.
“In 1901 the transport
sector was struggling with
a big problem with the
differing sections of steel
being manufactured for tram
lines. There were no standards
in place at the time and the
result was that there were in
excess of 75 different sizes of
steel section, which made the
construction of projects almost
impossible, as you can imagine
the waste in terms of time,
labour and materials would
have been significant.”
The solution came in
the form of Sir John Wolfe
Barry developing the very
first British Standards for
steel sections for tram
lines, and so the British
Standards Institution was
born. The result was truly
transformational effectively
reducing the number of steel
section types from 75 to
just six. The six makes the
process of construction far
easier, cost effective and
efficient.
“People face the same
challenges in today’s world,
whilst the processes and
Why understanding construction
material standards is vital…and
profitable
materials may have changed,
the same need for standards
is as relevant today and it was
back in 1901,” said Butterfield.
He explained that the BSI
Kitemark evolved within
two years, which enabled
organisations to demonstrate
that they met both product and
process standards and enabled
them to demonstrate this to
industry stakeholders and
supply chain partners.
Kitemark schemes are
available for many different
type of standards ranging
from British (BS), European
(EN), International (ISO) and
American (ASTM) standards
to standards which have been
specifically created where
there is no existing standard in
the market, known as Publically
Available Standards (PAS). BSI
is therefore able to help local
markets, such as the GCC
region, by creating Kitemark
certification schemes which are
relevant to the local issues.
“We actively assist
manufacturers in the
region to demonstrate their
commitment to quality and best
practice in order to secure a
commercial advantage through
differentiating their products
and services,” said Butterfield.
“I will structure my
presentation to include an
overview of what the BSI
Group does and how we
are structured to help with
global market access. I will
include pictures and a couple
of case studies as examples
of where we have helped in
the ME region. I will also be
explaining how standards are
helping to shape solutions for
current issues related to the
construction sector.” g
Andy Butterfield
STANDARDS & CERTIFICATIONS: WHAT YOU NEED TO KNOW ABOUT CONSTRUCTION PRODUCT TESTING PART 1 & 2
See page 54 for The business Intelligence Theatre
40 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 app
HALL 1 F21
De Boer Waterproofing
Solutions is a manufacturer
of waterproofing membranes
since 1922.
It said: “We focus on
innovative systems and cherish
long-term client relations. Our
passion is to produce high
quality waterproofing systems
for a multitude of applications
such as flat roofs, podium
decks, green roofs, tanking
and infrastructure projects.
“Through innovation, we
have continuously upgraded
our Duo High Tech
waterproofing membrane
range. This state of the art
waterproofing membrane
combines TPO-modified
bitumen with SBS-modified
bitumen in one layer. Duo
membranes have been
installed worldwide since
1989 and have a proven
durability in various
climate zones.” De Boer
Waterproofing Solutions will
be showing a wide selection of
waterproof membranes for a
variety of applications.
Duotherm warm roof
systems by De Boer. These
flat roof systems provide you
waterproofing and thermal
insulation in one system. The
roof built-up is designed
Guaranteed waterproof
wherever you need it
tailor-made to the building’s
requirements.
A great solution for
buildings that need a durable
waterproofing system with
energy cost saving features
in one. Available in different
colors and the top Duo
membrane can be left exposed
in different climate types. g
www.deboer.be
FOCUS C106
Traditional architectural
additions with 21st
century manufacture
Elite Décor Industry
produces a variety of
polyurethane stucco decor
collections by its own
designers and specifically to
meet customers’ orders.
Its most famous collections
of architectural decorative
mouldings made of
polyurethane are GRAND
DECOR and HARMONY,
which include more than
1,200 items: crown mouldings,
cornices, moldings, ceiling
roses, medallions, ceiling tiles,
and similar.
This product is free of
CFC, cyanides and asbestos
and boast a density of 250-
400 kg/m³ with the lowest
indoor VOC emissions.
It also produces fibreglass
columns, capitals, bases,
pedestals, domes and niches
from Elite Decor Industry
are satisfying combination
of modern-day technology
and low maintenance care.
Quality materials, excellent
workmanship and aesthetic
appeal make Elite Decor
products an exceptional value.
Elite Décor Industry
produces faux wood beams
based on polyurethane
structural foam. This is
a light and firm material
with excellent decorative
and consumer properties,
high rates of safety and
sustainability.
Prestige Decor exterior
architectural mouldings
(facade decoration) are made
of coated polystyrene. The
product does not contain
harmful substances. g
www.elitedecor.ua
DiTOIL® MIDDLE EAST FZE
PO Box 120435, Saif-Zone, Sharjah, UAE.
T +971 6531 2557 E info@ditoil.ae www.ditoilmefze.ae
EXHIBITOR NEWS
NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 41
Find every exhibitor on The Big 5 app
Italian company Ariston
Group, a world leader in
water heating solutions,
aims to achieve 80 per
cent of revenues from
renewable/energy efficient
products by 2020.
Ariston Thermo Group
will present its latest
sustainable technologies
at The Big 5 Dubai 2015.
Visitors to its stand can learn
about products and solutions
designed specifically for the
Middle East markets, with
a focus on performances
and energy saving. These
include heat pumps, solar
water heaters, electric water
heaters and gas boilers.
In addition to electric
water heaters for domestic
and industrial applications,
Ariston personnel will let
customers try the new range
of heat pump water heaters.
The latter guarantees an
energy saving of 75 per cent
compared to a traditional
electric water heater.
Solar water heaters will
have a special focus on
the Ariston stand, with
opportunities to discuss
the product with its design
manager so visitors can make
the most out of their visit. g
www.ariston.com
The future of
water heating
HALL 7 C290-C291
Spain’s Bellota
manufactured its first tool
more than 106 years ago.
Today, it is an international
group offering 18,000
products in 120 countries for
agricultural, gardening and
building sectors.
The company owns ten
ZABEEL HALL, Y181
manufacturing plants in
countries including Spain,
Denmark, USA, Mexico,
Colombia, Brazil and India. It
is going to launch a new TECH
Tile Cutter for large formats (up
to 42.2 inch) at this year’s show.
Visitors to its stand also
have access to cutting products
(tile cutters, scoring wheels,
tapes, pliers and diamond
discs), laying products (spacers,
rubber trowels, floats, spatulas,
mixers and levels) and cleaning
products (sponges, sponge
trowels and complements).
In addition, Bellota will
present more than 40 different
varieties of its safety footwear
lines including the latest TRAIL
and EXPLORE ranges. g
www.bellota.com
Agricultural
components
and tools
FEXIBILITY, TECHNOLOGY AND QUALITY MADE BY JORNS The new bending
tool geometry, hardenable to 55 HRC (1800 N/mm2
), leaves nothing to be desired.
Our range includes machines in lengths from 3 to 12,2 m and the bending capacity of
1,25 to 3 mm in steel (400 N/mm2
). Available with hydraulic material thickness adjustment,
SUPER HIGH SPEED and hem pretension with which the material spring back of an open hem
can be compensated in the middle of the sheet. The required protective devices according to
the EC Machinery Directive 2006/42/EC are a standard with us since 2010.
JornsAG CH-4932Lotzwil/Switzerland Phone+41(0)629198050 info@jorns.ch www.jorns.ch
We exhibit on the Big 5 in Dubai:
Swiss Pavillion
Zabeel Y153
We are also looking for local distribution
partners in different areas.
275°
EXHIBITOR NEWS
42 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
SPEAKER INTERVIEW
Multi-cultural management made
simple and successful
Date: Wednesday November 25, 2015
Time: 2:30pm
Where: The Business Intelligence Theatre
Who should attend?
Mid and senior level managers and executives who are tasked with managing an intercultural team in
a regional or multi-national market environment.
“Differences in
managementvary
from the person
who leads a team
and also, often
subconsciously,
the cultural
background of a
leader.”
- Beatrice Hunt
We speak to Beatrice Hunt, GM of BE Consultants International as she prepares for
her seminar on managing staff from a variety of backgrounds.
T
he wide diversity of
the workforce requires
skill, tact, and discreet
flexing of communication
styles to not increase the
barriers and walls that already
exist and that actually impact
clear communication,” says
Beatrice Hunt.
Her career has seen
her involved with people
from differing cultures and
backgrounds through her
work with NGOs. She has
lived in Dubai, Saudi Arabia
and Kuwait during the past
14 years.
She said: “I perceived that
there are many challenges
an executive has to cope and
contend with.
“Differences in management
vary from the person who
leads a team and also, often
subconsciously, the cultural
background of a leader can
influence the way he leads
a team. In the Middle East
region each company and
office is literally a hybrid of
many different nationalities,
languages, and cultures.
“Having everyone work
together and in harmony-
building consensus and esprit
de corps requires mastery
of intercultural competence,
emotional intelligence, and
conflict management.”
The MENA region
presents its own set of unique
challenges, says Hunt: “The
wide diversity of the work
force requires skill, tact,
and discreet flexing of
communication styles to not
increase the barriers and
walls that already exist and
that actually impact clear
communication.”
And her seminar will focus
on ensuring the best possible
management of those staff
aided by a new tool, she says.
“Our sister company Institute
for Leadership Development in
Berlin’s has a new tool, which
is called ‘4Cs of Leadership’
– it’s a diagnostic tool for
leadership and management
developed by the respected
Eckert business school in
Florida, USA.”
Hunt believes there are huge
benefits: “How a culturally
diverse workforce is more
efficient, I will explain in my
workshop.
“Diversity also brings
different areas of thoughts,
ideas, experiences on how to
accomplish things. It is always
good to also receive real
feedback to ensure keeping
everything on track to reach
whatever goal is being sought.”
And finally, she believes
that the Gulf offers real
opportunity for the right
businesses.
She said: “The GCC market
and the construction industry
is currently undergoing change.
The global oil spot price
might not recover to higher
levels, and that means public
spending will slow. It will be a
growing private sector that will
eventually win the day.
“Having a strong foundation
on cultural awareness, good
interpersonal communication
skills, empathy, and strong
emotional intelligence
will allow you to cherish,
profit, and learn from your
experiences in the Gulf.” g
Beatrice Hunt
MANAGING A CULTURALLY DIVERSE BACKGROUND TO OPTIMISE ORGANISATIONAL PERFORMANCE
See page 54 for The Business Intelligence Theatre programme
isinvolvedin:
•	 Electrical,	Electromechanical	and	Civil	
	 Engineering	Construction
•	 Manufacturing	and	Marketing	Electrical	
	 Construction	Products	
•	 Allied	Engineering	Services
Tel. : + 966-92-000-6111
www.alfanar.com
Headquartered	in	Riyadh,	Saudi	Arabia,	we	operate	construction	and	
manufacturing	businesses,	design	&	development	centers	and	a	host	
of	facilities	in	the	Middle	East	and	other	countries.
44 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 appEXHIBITOR NEWS
From architectural
masterpieces like the Shard
and Gherkin to iconic
buildings such as the
Sydney Opera House and
Buckingham Palace, Coopers
Fire have been trusted to
protect the world’s most
prestigious buildings.
This year at The Big 5 it
will be displaying its range of
protective fire curtains:
The FireMaster Plus
insulating zone fire curtain
offers both integrity and
insulating zone so is a perfect
product for compartmentation
and protecting a means of
escape. The unique fabric
designed and engineered
by Coopers Fire has an
intumescent coating that
expands at 160 degrees
celsius thus creating a
Fire solutions by
the UK’s finest
HALL 2 B60
protection from radiant heat.
Developed and
manufactured by Coopers,
the SmokeStop smoke curtain
barrier is approved to provide
compartmentation and to
protect escalators and atria
in any standard commercial
building from smoke
migration and control smoke
for up to 30 minutes.
The FireMaster Horizontal
fire curtain is a perfect solution
for stairwells and atria in both
commercial and domestic
applications. Available in a
variety of sizes and offering
two hours fire protection.
FireMaster vertical
fire curtain. Coopers Fire
FireMaster A1 fire curtain is
compliant with BS 8524 Part
1 and offers over two hours
integrity.
FireMaster Concertina
fire curtain. Multi sided fire
curtain can be used to protect
stairways, escalators and atria.
Perfect for open plan
building designs as no
side guides or columns are
required. g
www.coopersfire.com
Pipe experts and
suppliers since 1998
The Bisan Group is a
supplier of steel pre-
insulated pipes across the
region for almost 20 years.
It stocks and supply
carbon steel pipes, butt-weld
fittings, flanges, flexible
joints, valves, malleable iron
fittings, stainless steel pipes
and fittings. we have proved
our experience and expertise
to provide maximum client
satisfaction to our buyers.
Bisan has a sound
infrastructure with a large
storage facility and the
ability to deliver bulk orders
smoothly and promptly.
It has branches across the
GCC and promises “quality
is the first priority”.
“Each product is rigorously
scrutinized and checked,
before dispatch. There is
an efficient quality control
check system to manage any
discrepancy.” g
www.bisantrading.com
HALL 1 G01
PMV B77
NFT has been reaching for the skies
for more than three decades
NFT is the first distributor
of tower cranes and hoists
in the GCC and is the sole
distributor of famous brands
like Manitowoc Potain, GJJ/
ORBIT and PEGA.
Born from a single man’s
vision and ambition, the
company is mostly specialised
in tower cranes, passengers
& materials hoists, as well as
other construction equipment
delivered by a highly qualified
technical team with a strong
emphasis on safety and safe-
work practices.
NFT is currently located
in Asia, Europe, Africa and
most recently Australia with
all global clients able to enjoy
a complete offering of its
products and services.
For more than 35 years,
the company has faced
engineering and logistic
challenges and has acquired
an excellent understanding
of stakes, constraints and
ways of working in the
construction business.
Today NFT’s team is
composed of more than 1000
qualified technicians and
employees, based across the
world. Its fleet is permanently
growing and now counts more
than 1,500 tower cranes, over
300 hoists and a complete
stock of available spare parts.
NFT’s strength resides
in the fact that it is able to
supply cranes or equipment
to any construction project
type or take up any technical
challenge. Its product portfolio
includes small self-erecting
cranes (700kg capacity/26m)
as well as much bigger slewing
cranes like the impressive
Potain MD 3200 able to carry
up to 80 tonnes. g
www.nftcrane.com
46 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 app
The Hoermann Group is
Europe’s leading supplier of
gates, doors and frames. It is
a family business which has
grown against a backdrop
of innovation, quality and
customer relationaships.
At The Big 5 2015 here are
some of the products being
displayed by this well-known
German brand:
•	 The Industrial Sectional
Door ALR67 Thermo. A
well-insulated industrial
sectional door essential in
heated buildings.
•	 The Decotherm Classic S
Rolling Shutter, which has
received confirmation of
the sustainability of all its
rolling shutters and rolling
grilles.
•	 Its High-speed-door V 5030
SEL is quiet and fast, vital
for areas where low-noise
is essential. Spring steel
ZABEEL HALL J120
Hoermann has a door
for every situation
wind locks integrate into a
curtain pocket, with lateral
twin rollers.
•	 Hoermann Spiral door HS
7030 PU are characterised
by their high thermal insu-
lation, fast opening speed
and light grilles as standard.
•	 Industrial Sectional door
SPU 42 allows the safe pas-
sage of pedestrians thanks
to the wicket door with
trip-free threshold.
•	 Hydraulic dock levelers
are available as hinged lip
or telescopic dock levelers.
they can bridge large
height differences between
the ramp and the lorry
loading level.
•	 Hörmann steel fire-rated
doors are available with a
thin rebate (standard) or a
thick rebate. With dou-
ble-leaf doors the fixed leaf
is secured with a rebate
latch or rebate locking bolt
at the top and bottom de-
pending on the function.
•	 Over many years Hörmanns
ZK doors have proven
themselves as robust doors
for everywhere from the
basement to the roof. ZK
doors do not warp and
come with a high-quality
surface that is durable,
resistant to stains and easy
to clean. g
www.hoermann.de
Isa Idrosanitaria
brings more than 50
years’ experience in the
manufacture of showers,
rods, arms and shower panels,
hoses, taps and many other
accessories for the bathroom.
It pledges a focus on
quality thanks to careful
selection of raw materials and
highly-qualified personnel.
Its maxim translates from
the Italian to: “The pleasure
of water, to be rediscovered
every day through our
creations.”
Among the display items at
The Big 5 2015 is the Kelly
hand shower with ultra-thin
design and new misty jet. It
is also showing its pecial grid
with anti-scale nozzles for
the Camelia shower set, its
Peonia brass shower set with
built-in mixer and Libera
shower rail with Ariel hand
shower and hose. g
www.isaidrosanitaria.com
‘Rediscover the
pleasure of water’
HALL 7 D295
Designed & Built for the Middle East
• Ducted Splits
• Roof Top Packaged Units
• Air Handling Units
• Condensing Units
• Fan Coil Units
• Cold Rooms
• Water Coolers
For Distributor Enquires,
Please Contact:
Gurjeet Singh Dahri
Head of Business Development
Mob: +973 32000353
Email: bd@hawaac.com
Factory No. 900
Road: 115, Block:601
Sitra Industrial Area
P.O.Box: 955, Manama
Kingdom of Bahrain
Proudly made in the
Kingdom of Bahrain
h a w a a c . c o m
EXHIBITOR NEWS
NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 47
Find every exhibitor on The Big 5 app
Korean supplier Interway
has its sights set firmly on
expansion into the Middle
East and believes The Big 5 in
Dubai will help it secure new
customers and buyers.
The company says: “Since
its inception, Interway has
been aiming to be a top
supplier across the world and
is currently reputed as one
of the leading players in the
market.
“We have solid experience
in PE, PVC tarpaulin, PE
scaffolding covers, PE nets and
all the related accessories.” g
www.interway-tarp.com
ZABEEL HALL T174
HVAC flexible ducts are
expected to attract a lot of
interest this year on the stand
of ISIL MUHENDISLIK AS.
ISIL AS was set up in 1998
when it started production of
flexible ventilation ducts and
duct connectors, used in the
heating, ventilation and air
conditioning (HVAC) industry,
as the first producer in Turkey.
It said: “We are proud to
present our new and unique
product artist self insulated
flexible duct. Artist goes faster
in the ventilation market
by unthroning the regular
insulation methods.
“While having such
progressions at international
market, ISIL AS also achieved
to meet the great parts of the
needs of domestic market and
participated in many important
projects nationally.”
Flexiva can link with any
kind of flexible ducts and has
its own unique technology.
A colourful new flexible
approach to HVAC
HALL 3 C111
ISIL AS is completing the
essential investments, and has
established new 5,000 sq m.
It said: “We have all the
colours of the earth and
Flexiva products have a wide
range of usage with his quality.
ISIL A.S. presently
exports to about 40 countries
and participates the most
important exhibitions around
the world from America to
Asia and Europe, Middle East
to Africa. g
www.flexiva.com.tr
Tarpaulin from the
Korean leader
C
M
Y
CM
MY
CY
CMY
K
BIG 5 Halfpage 219 mm X 145 mm_OL.pdf 1 11/10/2015 14:47
EXHIBITOR NEWS
48 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 app
TRADE CENTRE
ARENA
SHEIKH S
CONCOURSE 1
HALL 3HALL 2
AL
B
HALL 4HALL 1
ZABEEL HALL
ITALY
PAVILION
TURKEY
PAVILION
R
R
R
CAFÉ
L
L
L
Hall 8
Hall 2 a
Visitor registration /
badge collectionR
Middle East Concrete /
PMV Live
seminar theatre
Stairs to first floor
Sheikh Saeed Halls &
outdoor area
Sheikh Saeed Halls &
outdoor area
Lifts / Elevators
to first floor
Live demonstrations
theatre
Platinum Club lounge
LL
The Big 5 Focus
FOCUSFOCFOCFOC
FOCUS
NEW
NEW
FLOORPLAN
TRADE CENTRE
ARENA
CONCOURSE
HALL 3HALL 2HALL 1
ZABEEL HALL
R
R
R
CAFÉ
L
L
L
Visitor registr
badge collectR
Middle East Concrete /
PMV Live
seminar theatre
Stairs to first
Sheikh Saeed Halls &
outdoor area
Sheikh Saeed Halls &
outdoor area
Lifts / Elevators
to first floor
Live demonstrations
theatre
Platinum Club lounge
The Big 5 Focus
FOCUSFOCFOCFOC
FOCUS
NEW
NEW
FLOORPLAN
TRADE CENTRE
ARENA
SHEIKH SAEED HALLS
CONCOURSE 1
HALL 3
HALL 6
HALL 7
HALL 2
HALL 8
AL MULTAQUA
BALLROOM
HALL 4HALL 1
ZABEEL HALL
HALL
ITALY
PAVILION
TURKEY
PAVILION
METRO ST
R
R
R
CAFÉ
L
L
L
Hall 8
COATINGS,
ADHESIVES
& SEALANTS
Hall 2 and Hall 3
Visitor registration /
badge collectionR
Middle East Concrete /
PMV Live
seminar theatre
Stairs to first floor
Sheikh Saeed Halls &
outdoor area
Sheikh Saeed Halls &
outdoor area
Lifts / Elevators
to first floor
Live demonstrations
theatre
Platinum Club lounge
Lanyard pickup poL
The Big 5 Focus
FOCUSFOCFOCFOC
FOCUS
NEW
NEW
NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 49
Find every exhibitor on The Big 5 app
OUTDOOR AREA
SAEED HALLS
IBIS HOTEL
NOVOTEL
HOTEL
MAINCONCOURSE
HALL 6
HALL 7
HALL 8
L MULTAQUA
BALLROOM
SHEIKH
RASHID
HALL
SHEIKH
MAKTOUM
HALL
HALL 5
METRO STATION
R
R
R
L
L
Sheikh Maktoum and
Sheikh Rashid Halls
KITCHENS
& BATHROOMS
Hall 4 and
Al Multaqua Ballroom
WATER
TECHNOLOGY
COATINGS,
ADHESIVES
& SEALANTS
Halls 1, 2, 5, 6, 7, Zabeel Hall,
GENERAL
CONSTRUCTION
Sheikh Maktoum and
Sheikh Rashid Halls
BUILDING
INTERIORS
and Hall 3 Sheikh Saeed Halls Zabeel Hall
WINDOWS, DOORS
& CLADDING
Lanyard pickup point
Sheikh Saeed Halls, Trade Centre
Arena, Italy & Turkey Pavilions
OUTDOOR AREA
SHEIKH SAEED HALLS
IBIS HOTEL
NOVOTEL
HOTEL
MAINCONCOURSE
E 1
HALL 6
HALL 7
HALL 8
AL MULTAQUA
BALLROOM
SHEIKH
RASHID
HALL
SHEIKH
MAKTOUM
HALL
HALL 4
HALL 5
ITALY
PAVILION
TURKEY
PAVILION
METRO STATION
R
R
R
L
L
Sheikh Maktoum and
Sheikh Rashid Halls
KITCHENS
& BATHROOMS
Hall 4 and
Al Multaqua Ballroom
WATER
TECHNOLOGY
Hall 8
COATINGS,
ADHESIVES
& SEALANTS
Halls 1, 2, 5, 6, 7, Zabeel Hall,
GENERAL
CONSTRUCTION
Sheikh Maktoum and
Sheikh Rashid Halls
BUILDING
INTERIORS
Hall 2 and Hall 3 Sheikh Saeed Halls Zabeel Hall
WINDOWS, DOORS
& CLADDING
ration /
tion
floor
Lanyard pickup pointL
s
Sheikh Saeed Halls, Trade Centre
Arena, Italy & Turkey Pavilions
OUTDOOR AREA
S
IBIS HOTEL
NOVOTEL
HOTEL
MAINCONCOURSE
6
SHEIKH
RASHID
HALL
SHEIKH
MAKTOUM
HALL
5
TATION
R
R
R
L
L
Sheikh Maktoum and
Sheikh Rashid Halls
KITCHENS
& BATHROOMS
Hall 4 and
Al Multaqua Ballroom
WATER
TECHNOLOGY
Halls 1, 2, 5, 6, 7, Zabeel Hall,
GENERAL
CONSTRUCTION
Sheikh Maktoum and
Sheikh Rashid Halls
BUILDING
INTERIORS
Sheikh Saeed Halls Zabeel Hall
WINDOWS, DOORS
& CLADDING
oint
Sheikh Saeed Halls, Trade Centre
Arena, Italy & Turkey Pavilions
THE BIG 5 2015
FLOORPLAN
DUBAI WORLD TRADE CENTRE
50 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
10:30
11:00
11:15
11:30
12:00
12:50
13:15
14:15
The Design Summit
Innovation and efficiency in architecture
and urban planning
Held on Tuesday, 24 November, The Design Summit will bring together architects,
consultants, urban planners, engineers and contractors and will be the only conference in
the region to offer FREE detailed insight into the latest design trends, new technologies
and techniques such as sustainability and cost-efficiency, whilst also providing
unparalleled on the ground analysis of local and regional Middle East markets.
14:45
15:15
15:45
16:15
16:45
17:15
18:00
Tuesday, 24 November 2015 Room: Dubai C&D
REGISTRATION
Opening remarks from the Chair
Christopher Seymour, Head of Markets, Arcadis ME
Keynote Address: Powering Dubai’s smart city transformation
Keynote Address: Shaping Dubai’s green building evolution
Eng. Abdulla Rafia, Assistant Director General, Planning and Engineering,
Dubai Municipality
Masters of Architecture Panel: Shaping Arabian cityscapes and the
buildings of tomorrow
The GCC construction market is once again booming, with over US$315
billion in new projects announced last year in the UAE alone. Innovation and
forward-looking design is balanced with an ever-increasing emphasis on
sustainability, energy efficiency and better urban placemaking. This opening
keynote panel will bring together noted visionaries and design personalities
who are shaping GCC cityscapes, to share experiences and best practice in
innovation and efficiency in achieving sustainable urban design.
•	What are the latest trends and innovations influencing design choices
today?
•	What are the main challenges facing urban planners in the GCC?
•	Where are the biggest opportunities for designers in the GCC in the next
five years?
•	How are regulations and a growing awareness of sustainability issues
influencing design decisions?
•	How is innovation driving building design and what are the most innovative
buildings in the GCC and around the world today?
•	How can we balance contemporary design with the preservation of
cultural heritage?
Moderated by John Alexander Smith, Professor of Architecture, American
University in Dubai
Benjamin Piper, Director of Architecture, Perkins + Will
Janus Rostock, Regional Design Director, Middle East and India, Atkins
Raj Patel, Managing Director, Design Principal, KEO International Consultant
Rashad Bukhash, Director of Architectural Heritage Department, Dubai
Municipality
Sherif Anis, AIA ME 2015 Vice President and 2016 President-elect, American
Institute of Architects (AIA)
GCC Market Overview 2015: Updates and opportunities for the design and
construction sector
Recent reports indicate that construction projects worth US$103 billion
are likely to be awarded this year in the GCC, an increase of 21.2 per cent
from 2014. This session will provide data and analysis from mega-projects
across the region, providing the latest country and sector insights for
development and identifying forthcoming opportunities for the wider design
and construction industry.
Craig Plumb, Head of Research, MENA, Jones Lang LaSalle
Break
The Design Summit Global Showcase: Post-Expo legacy planning in Milan
Italy has invested a reported 1.4 billion Euros into Milan Expo 2015 and
will welcome over 20 million visitors during the course of the event. This
session will provide insights into how the Milan 2015 urban design team has
incorporated Post-Expo legacy planning into the design. It will examine the
planned renovation of the Expo site into a fully functioning mixed use urban
hub with connections to the city center and major airports following the
event, sharing lessons learnt for best practice in legacy planning and design.
Lorenzo Pallotta, Senior Architectural and Urban Planner, Project Manager,
Milan Expo 2015 Company, Arexpo Company
Designing the next generation of sustainable cities
•	Key design features of future sustainable cities
•	Master planning for resilience, liveability and inclusivity
•	Creating active and healthy cities through sustainable urban mobility
•	Understanding the importance of holistic design
Baharash Bagherian, Founder & Design Director, Baharash Architecture
Creating healthy and connected cities through efficient transport planning
•	Report card on planning and transport
•	Overcoming Middle East challenges to healthy cities
•	Mapping journeys of the future, forecasting future requirements
•	Lessons learnt from regional case studies
Roger Cruickshank, Director, Strategic Transport Planning, Atkins
Break
Transport Infrastructure Project Showcase: Developing the next
generation airport at Al Maktoum International expansion
Future-proofing for the latest innovations in technologies and designing
for space optimisation to create an integrated commercial environment
and elevate consumer engagement. This session will explore the
expansion of Al Maktoum International Airport to ensure adaptability and
efficiency whilst accommodating over 220 million passengers and 16
million tonnes of cargo per year.
Simon Scott, Head of International Business, Leslie Jones Architects
Innovation Project Showcase: Building The Opus: The history of a double
curved glazed Dubai project
This design case study will provide detailed information on the faÇade
design, procurement and installation of The Opus building, a Zaha Hadid
project in Business Bay that has combined challenging free flow geometry
and fully glazed faÇades.
Agnes Koltay, Director, Koltay FaÇades
Future Innovations Round Table: What new technologies and materials are
revolutionising the market?
This session will bring together a panel of experts to talk about what new
trends, technologies and materials they believe will revolutionise design in
coming years.
•	Reducing the GCC’s carbon footprint through better building design
•	New and improved materials and construction products taking the market
by storm
•	The latest technological innovations to optimise building performance
•	New material trends for contemporary design
Moderated by John Alexander Smith, Professor of Architecture, American
University in Dubai
Engi Jaber, Sustainability Manager, Dewan Architects & Engineers
Eng. Meshal Al Shamari, Director, Qatar Green Building Council
Dr. Robert Cooke, Associate Director, BuroHappold
Stuart Clarke, Associate Director, Middle East FaÇade Engineering Leader, Arup
End of the Design Summit at The Big 5
*Due to unforeseen circumstances, the programme may change and The
Big 5 reserves the right to alter the speakers.
SEMINAR AGENDA
52 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Sustainability
Theatre Agenda
The free to attend workshops are CPD accredited and you can register the
points earned with your professional association. Simply register online for
free entry and collect your free certificate onsite on the same day.
10:00-12:00
13:00-15:00
16:00-18:00
10:00-11:00
11:30-12:30
Monday, November 23 2015 Room: Abu Dhabi B
Updates to Dubai Municipality’s green building regulations
•	Overview of the Dubai’s initiatives for sustainability
•	Highlighting Dubai’s construction progress and the challenges in
meeting the increased demand on power and water
•	Latest update on the Dubai Green Building Project
•	Detailing the implementation mechanism of the Dubai Green
Building Regulations and Specifications
•	Outlining the requirements for assessment and certification of green
buildings
•	Moving forward: Dubai’s roadmap toward sustainability
Senior Representative, Dubai Municipality
Sustainable practices during construction
After attending this workshop, delegates will be able to:
•	Define and understand the roles and responsibilities for different
construction teams to deliver a green building
•	Identify the best practices for sustainability during construction
activities
•	Understand the construction phase credits, requirements and intents
•	Plan for key considerations and requirements for certification
documentation
Hamoda Youssef, Research Specialist, Qatar Green Building Council
Updated energy modeling strategies for LEED v4
•	Introduction to LEED v4
•	Understanding LEED BDC v4 energy and atmosphere and other
related LEED v4 credits
•	Compliance step by step guidance
•	Overview of the energy modeling process
•	Energy modeling requirements and documentation
Reniel Barroso, Engineering Manager, Green Technologies
Tuesday, November 24, 2015 / Room: Abu Dhabi B
Commissioning, recommissioning, and retro-commissioning: A triple
bottom-line return on investment
Commissioning’s ultimate goal is to provide an intensive quality
assurance process. A well-commissioned building will be able to
perform to the owner’s performance requirements, meets the needs
of its occupants, optimise energy and water efficiency as well as
be a safe and comfortable environment. Through the process of
commissioning new buildings and having a plan for re-commissioning
them every few years, and retro-commissioning existing buildings,
owners can achieve/enhance cost-savings. This session considers:
•	Addressing system and equipment problems so as to avoid
unnecessary utility bills;
•	Avoiding equipment repairs and replacement costs; and
•	Enhancing public health through better indoor environmental quality.
Sinan Rasheed, Executive Director, Corporate Sustainability, KEO
International Consultants
Sustainability is Free
•	The net benefit of sustainability outweighs the net costs
•	The sustainability movement today is analogous to what quality
management was in the 1980s
•	Investors, regulators and clients are driving higher levels of
performance
•	Sustainability is an imperative in business today
•	Sustainability is vital to our ecological and social well-being
14:00-15:00
16:00-18:00
10:00-12:00
13:00-14:00
15:00-16:00
16:30-17:30
Franklin Holtforster, President & CEO, MHPM_Driver
Top tips and tools to ensure you are maximising your building’s
energy savings
•	Highlighting common scenarios where the actual energy savings are
different from what’s promised
•	Conducting a building background check
•	Retro-commissioning and ASHRAE Level 1 and 2 Audits
•	Focusing on measurement and verification of energy conservation
(and renewable energy) performance
•	Determining a way forward: Potential strategies going forward and
which of those can overlap with rating systems like LEED O+M
Nandan Tavkar, Senior Sustainability Engineer, Buro Happold
Updated Indoor Environmental Quality (IEQ) strategies for LEED v4
•	Introduction of LEED v4
•	Explaining LEED BDC v4 Indoor Environmental Quality and other
related LEED v4 credits
•	Brief IEQ credit updates
•	Highlighting IEQ credits with impact on engineering design
Reniel Barroso, Engineering Manager, Green Technologies
Wednesday, 25 November 2015 / Room: Abu Dhabi B
Materials testing and certification
•	Testing of different products
•	Over view of legislation and regulations
•	Certification of products and process
Senior Representative, Dubai Central Laboratories
Managing the construction phase of sustainability targets
•	Understanding project priorities and constraints in order to develop
the right strategy to successfully implement sustainability at
construction
•	Filling the gaps between different trades and specialties on site,
project stages and conflicting interests to minimise the risk of
making mistakes
•	Providing on-site training on sustainability concepts and processes
to promote easier and faster communication
•	How to develop the right monitoring tools to facilitate reporting and
communication of progress
•	Applying an integrated development process during construction to
ensure efficient sharing of information
Francesca DePetris, Sustainability Manager, KEO International
Consultants
Life cycle cost assessment (LCCA) of green buildings
•	Overview of the concept of life cycle costing of buildings and
materials and how this is key to determining the true cost of
buildings
•	Understanding how green building strategies contribute to life cycle
cost reductions
•	Real life examples of green building strategies that contribute to
overall cost reduction
Michel Francis, Chief Architect, DEC Consultants
Improving sustainability in the GCC HVAC industry
•	District Cooling: Is it an outdated technology and what is the road
forward?
SEMINAR AGENDA
NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 53
•	Air Cooled systems: Should they be banned similar to the
incandescent lights or should they be substantially developed?
•	VRF Or VRV: Is the claim of energy savings credible and what is the
future development?
•	The chilled water FCU & AHU: Have they stagnated ? What is new
and what is the way forward?
•	Fresh AIR AHUs: Efficiencies and cross contamination issue
•	Other HVAC systems: Chilled beam, radiant cooling, etc.
George Berbari, CEO, DC Pro Engineering
Thursday, 26 November 2015 / Room: Abu Dhabi B
Introduction to the UN Global Compact Principles: Sustainability and
ethicality in real estate and construction
•	Introduction to the UN Global Compact for businesses committed to
aligning their operations and strategies with ten universally accepted
principles in the areas of human rights, labor, environment and anti-
corruption
•	Highlighting key corporate sustainability trends and priorities within
the MENA region
•	Identifying challenges and opportunities companies encounter in
the region when integrating corporate social responsibility into their
operations
Cara Tissandier, Sustainability Manager, Hoare Lea; Senior
Representative, Royal Institute of Chartered Surveyors (RICS)
Life cycle costing: Theory vs practice in the GCC region
•	What is LCC and its relevance to the construction industry?
•	Why should the industry do more to apply the LCC technique?
•	Who should know about the techniques and impact on decisions?
•	Challenges in the applications of LCC in the region
•	BIM and LCC
Assem al-Hajj, Academic Head, Heriot Watt University
10:00-11:30
12:00-13:00
Retrofitting existing buildings in the UAE
•	Overview of the UAE built environment
•	Understanding the market for energy savings through building
refurbishments and existing barriers
•	Highlighting existing policies, regulations, and financial models
•	Renovation with a vision defining a roadmap
•	Recommendations for a sustainable package
Dr. Hasim Altan, Associate Professor, Sustainable Design of the Built
Environment, British University in Dubai
Improving efficiency and reducing costs through effective FM
•	Exploring the latest innovations in facilities management (FM)
•	Strategies for getting the best out of FM service providers without
putting strict penalties in place
•	Methods to reduce costs in maintenance and cleaning
•	Top tips for improving the efficiency of your building through
effective FM
Mick Dalton, Director FM Meraas Estates Division, Meraas Holding
Company
*Due to unforeseen circumstances, the programme may change and
The Big 5 reserves the right to alter the speakers.
14:00-15:00
16:00-17:00
MANAGING THE CONSTRUCTION PHASE OF
SUSTAINABILITY TARGETS
Wednesday, November 25
1:00 pm - 2:00 pm
Francesca DePetris
Sustainability Manager, KEO International
SEMINAR AGENDA
54 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Business & Market Intelligence Theatre Agenda
The free to attend workshops are CPD accredited and you can register the points earned with your professional association.
Simply register online for free entry and collect your free certificate onsite on the same day.
10:00-11:00
11:30-13:30
14:30-16:00
16:30-18:00
10:00-11:00
12:00-14:00
Monday, November 23, 2015 Room: Al Ain F
Standards and certifications: What you need to know about
construction product testing Part I
•	Intro to BSI Group services worldwide
•	Highlighting the importance of standards within the construction
sector
•	How standards support emerging technologies: BIM focus
•	Overview of the types of certification solutions for the construction
sector
•	Introduction to the types of standards and certification for electrical
and gas sector product testing Part I
Andy Butterfield, Global Head of Construction, BSI
Graham McKay, Global Head of Electric and Gas, BSI
Arbitration and dispute resolution in construction claims
•	Identifying the main causes of construction disputes
•	Why arbitration is a preferred dispute resolution method
•	Understanding where and how to conduct arbitration
•	Outlining the procedural aspects of arbitration
Simon Palmer, Partner, DLA Piper
Suzannah Newboult, Legal Director, DLA Piper
Tim Haynes, Senior Managing Director, FTI Consulting
GCC construction sector update: Market potential and business
development opportunities
•	UAE market introduction
•	Overview of the project pipeline and mega-projects: UAE, Kuwait,
Qatar and Saudi Arabia
•	Exploring the ways your company can enter and be present in the
UAE market
Dr. Ouzaina Hankir, Managing Director, GTV Global
Project control best practice
•	Understanding the role of effective control mechanisms in achieving
project goals and project success
•	Understanding the major elements of project controls including:
Tracking time and cost, prioritisation, handling contingencies that
arise during project implementation, tracking key project milestones
and controlling and managing outside resources
Reem Murad, Planning and Cost Control Manager, Arabtec
Tuesday, November 24, 2015 / Room: Al Ain F
Standards and certifications: What you need to know about
construction product testing Part II
•	Intro to BSI Group services worldwide
•	Exploring the challenges of compliance with testing requirement of
standards within the construction sector
•	FPC systems: Things to consider when developing testing facilities
•	Understanding the types of testing requirements for the
construction sector, including examples of key products and testing
required to support certification
•	Highlighting the types of testing requirements for the electrical and
gas sector, including examples of key products and testing required
to support certification
Andy Butterfield, Global Head of Construction, BSI
Graham McKay, Global Head of Electric and Gas, BSI
Improving supply chain competitiveness
This workshop will explore the five key challenges for supply chains of
the future, including:
•	Cost containment
•	Customer-centricity
•	Globalisation
•	Visibility
•	Risk
Dr. Steyn Heckroodt, Dean - MBA and Corporate Training, Westford
University
Key finance skills for effective project managers
•	Introduction to the basic concepts of financial statements
•	Understanding income statements
•	Best practice in cash flow forecasting and monitoring
•	Overview of the budgeting process and what project managers need
to be aware of
Jayan Balakrishnan, Managing Director, Apt Consultancy Services
Pipe market overview, opportunities and innovations
•	Overview of the different types of pipes used in construction
•	Understanding the benefits of different types of pipes for different
purposes
•	Highlighting the latest advancements in pipe technology
•	How to avoid fake material for steel pipes on the market
•	Delivering a modern piping approach through innovation
•	Forecasting pipe market opportunities in the GCC and MENA region:
How big is the market and what opportunities are on the horizon?
Moderated by: Robert Lawrence, Managing Director, Gulf Plastics Pipe
Academy
Panelists: Marcin Rozko, Market Executive Manager, GCC & Asia,
KAN-therm
Rafael Quintero, International Manager, McElroy International
Viktor Bisovetskyi, UAE Sales Manager, Interpipe Middle East
Wednesday, 25 November 2015 / Room: Al Ain F
Developing leadership skills for the construction sector Part I*
•	Effective leadership skills are critical to the success of any business.
This session is recommended for managers and those in leadership
roles looking to improve their leadership skills to maximize team and
business performance. By attending, you will:
•	Be able to explain the qualities of an effective leader
•	Have benchmarked yourself against those qualities and developed
actions to improve
•	Be able to explain the difference between leading and managing
Liz Kentish, Managing Director, Kentish & Co
*Delegates are advised to attend Part I of this two-part workshop on
25th
November, and to return for Part II taking place on 26th
November.
15:00-16:00
17:00-18:00
10:00-11:00
ARBITRATION AND DISPUTE RESOLUTION IN
CONSTRUCTION CLAIMS
Monday, November 23
11:30 am - 1:30 pm
Tim Haynes
FTI Consulting, Senior Managing Director
SEMINAR AGENDA
NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 55
Design & Architecture
Theatre Agenda
The free to attend workshops are CPD accredited
and you can register the points earned with your
professional association. Simply register online
for free entry and collect your free certificate
onsite on the same day.
Monday, November 23 Room: Abu Dhabi A
11:00-12:00
Efficient procurement planning
•	Changing internal customers’ perception
•	Obtaining stakeholders’ engagement
•	Increasing procurement visibility
•	Anticipating customers’ needs and being proactive
•	Procurement planning
•	Inventory planning
•	Communicating achievements
Emad Ameen, Procurement Manager, Royal Group-Reem Readymix
Mega projects, simple solutions
•	Overview of the scope of mega-projects across the MENA region
•	Identifying the most common challenges to completing projects on
time, to budget and to specification
•	Top tips and solutions for preventative planning and for overcoming
common challenges
•	Lessons learnt from regional case studies
•	Establishing best practice in project and programme management of
mega-projects in the MENA region
Raad Hajjar, Head of Structure, Atkins
Managing a culturally-diverse team to optimise organisational
performance
•	How to develop an effective leadership style in the Gulf
•	What constitutes a team in the Gulf region and how would it look like
•	How to deal with high context communicators in your team
•	Building your intercultural competence and conflict management
skills
•	Motivating your multi-cultural team
Beatrice Hunt, General Manager, BE Consultants International
Construction contract management and ethical issues
Enforcing engineering codes of ethics
•	Whistleblowing in the engineering profession
4Whistleblower protection laws
•	Forming engineering and construction contracts
4Bidding
4Non-collusion
4Bid shopping
•	Contracts for engineering and construction services
4Conditions of contracts
4Specifications
•	Change orders and claims
•	Dispute resolution and ADR
Professor Rafiq M. Choudhry, Professor of Construction Engineering
and Management, King Faisal University
Thursday, 26 November 2015 / Room: Al Ain F
Leadership skills training for the construction sector Part II*
Effective leadership skills are critical to the success of any business.
This session is recommended for managers and those in leadership
roles looking to improve their leadership skills to maximize team and
business performance. By attending, you will:
•	Be able to explain the value of sharing the business vision with the
team
•	Be able to develop your team goals based on the business vision
•	Understand the comfort zone for yourself and your team
•	Understand the value of small steps
Liz Kentish, Managing Director, Kentish & Co
*Delegates are advised to attend Part I of this two-part workshop on
25th
November, and to return for Part II taking place on 26th
November.
Management of contractual disputes and issues within the site
perimeters
•	Introduction of time bound arbitration
•	Dealing with real time arbitration rather than virtual time arbitration
(pro-active versus post- active approach)
•	Assessing the benefits of time bound arbitration: Cost effective and
time controlled procedure whereby all disputes and problems will be
resolved during the construction period and not after completion of
the project as experienced in ordinary arbitration
•	Understanding how time bound arbitration can reduce the disputes
magnification and improve relations due to the efficiency and
promptness of the process which enhances relations in the
construction industry
Imad Al-Jamal, Managing Director, IDRAAC International
Introduction to property management
This three hour workshop will act as an introduction to the Certified
Property Management (CPM) course, the official training and
certification course that was developed by Harbor Real Estate in
2009 based on a brief from the Dubai Real Estate Institute (DREI),
the official training and certification arm of the RERA and the Dubai
Land Department. Over the last few years the course has evolved to
become one of the most sought after courses of the DREI and is now
taught across the UAE (Dubai, Abu Dhabi, Sharjah and Al Ain) and
other Gulf countries including Oman, Bahrain, KSA and Qatar. The
course covers the fundamentals of Asset and Property Management.
Topics that will be discussed during the workshop include:
•	The rise of income producing assets;
•	The definition of Property Management;
•	The cycle of Property Management;
•	The ongoing function of a property manager; and
•	The enablers that set any professional property manager for
success.
Mohanad Alwadiya, Managing Director, Harbor Real Estate; Instructor,
Dubai Real Estate Institute - Dubai Land Department
11:30-12:30
13:00-14:00
14:30-15:30
16:00-18:00
10:00-11:00
12:00-13:00
14:00-17:00
Best practice in energy efficiency retrofits
•	Introduction to Etihad ESCO
•	Overview of the process of Etihad ESCO’s energy retrofit projects
•	Identifying the main challenges encountered and the solutions
devised to address them
•	Case studies from the energy performance contracting market by
Dubai’s Super ESCO
Hany Ayesh, Director, Etihad ESCO
PIPE MARKET OVERVIEW, OPPORTUNITIES
AND INNOVATIONS
Tuesday, November 25
5:00 pm - 6:00 pm
Robert Lawrence
Managing Director
Gulf Plastics Pipe Academy
CONTINUED ON PAGE 58 u
SEMINAR AGENDA
56 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 app
Turkey’s Özcelik Makina san.
VE is the leading manufacturer
of machinery used both in the
door and window production
sectors, and in almost any other
industrial activities involving the
machining of aluminium and
PVC profiles since 1980.
Özçelik has one of the only
The machines you need for
door and window production
ZABEEL HALL O141
integrated production plants in
its field on 17,000 sqm area.
The company-wide range
of products are served without
any problems. Giving utmost
importance to certification,
Özçelik proved its quality
by holding Management
System Quality Certificate
(ISO 9001:2008 TUV CERT),
Russian (EAC), and Ukrainian
Poliran’s push fit pipes
and fittings are made of
polypropylene and have been
designed and manufactured to
the highest quality available in
the world’s market.
They promise simple
and easy installation, with
durability and reliability,
which makes Poliran’s new
drainage system one of the
best systems in the world,
claims the company.
The Poliran Push Fit
True Silent, for soil and
waste systems, offers
perfect sealing, high sound
absorbing properties,
hot water resistance and
resitance to chemicals.
The company also offers
compression fittings, clamp
saddles, welded flanges and
emitters.
It will also show it PE-
HD Sewers welded fittings,
which offer high resistance
to chemicals and are easy
to fit and install with low
maintenance guaranteed. g
www.poliran.org
HALL 3 C156
Pipe fitting made
easy with Poliran
Reliable utilities are a
precondition of any modern
building’s long service
life, as well as one of the
essential parameters directly
affecting the market value
of any facility, investors’
and buyers’ interest. That’s
why real estate developers
pay particular attention to
organisation of water supply,
heating, sewerage, drainage
FOCUS C77
Why top-notch utilities are vital
for any developer worth its salt
and pneumatic systems.
As a result, demand
for polyethylene and
polypropylene – high-quality
construction materials for
creation of utilities, which
have displaced the non-durable
and unreliable metal from the
leading position – is constantly
growing on the market.
Polypropylene pipes are
products of a European
manufacturer, which comply
with all quality requirements
and standards
implemented in
Europe.
They have a
wide number of
features making
a modern buyer
choose them.
The following
features should be
pointed out among
the products’
advantages:
1.	 1. Wide model
range including everything
necessary for high-quality
mounting of utilities of
various profiles, including
polypropylene pipes and
fittings.
2.	Top quality of raw materials.
3.	Thorough control over
technological compliance
throughout the phases of
production.
4.	Regular check of
mechanical, chemical and
thermal parameters in the
course of production.
5.	Service life reaching dozens
of years: 30 years or more
for hot water, and 50 years
or more for cold water.
The company will also
be showing its Altstream
Super flexible connectors
for connecting equipment,
including its WARMA and
RADENA radiators and its
Altstream PE-X pipes and
fittings. g
www.tebo.ru
product quality certificates and
European Safety Standards
Conformity Certificate (CE).
It will be showing its Lepus-
ii cnc controlled aluminum
composite panel processing
machine. It is ideal for the
cutting of and opening a
v-channel in composite panels
and plates. g
www.ozcelik.com
Sanvi Enterprise is a
reputed manufacturer
exporter and supplier of high
quality cabinet handles, glass
door handles and accessories,
door fittings, glass door
knobs, which stand apart for
their elegance, design and
beauty.
On its website the company
says: “My life is my canvas.
My moments are the colours
that make up the picture I
want to create over it. I will
choose the type of magic that
each moment will spell over
the world.”
At the Big 5 this year Sanvi
will be showing a range
of products including its
cabinet door handles which
are “made by the natural
inspiration”.
It will show glass door
handles made by Size
with the real stone, which
“combine the design with
real spices of life” and its
attractive coloured and fancy
handles. “We understand
your nature and made handle
for you and your dreams,”
says the company.
“For women is pink handle,
for man is will be leather, for
children it could be angry
bird.”
It has knobs, which make
it easy to push or pull system
for you drawer with glass
and wood and door mortise
handle for best locking and
attractive handle. g
www.sanvienterprise.com
Building interiors
ZABEEL HALL S180
EXHIBITOR NEWS
58 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
13:00-15:00
16:00-17:00
11:00-12:00
13:00-14:00
14:30-16:00
11:00-13:00
14:00-15:00
16:30-17:30
11:00-12:00
13:00-14:00
15:00-16:00
High-performance façades: Design and communication of innovative
building envelopes
•	Context and philosophy
•	Concept and design criteria
•	Design for manufacturability and materiality
•	Working platform and technology
•	Innovative communication
•	Design optimisation
•	Prototyping and testing
Abdulmajid Karanouh, Director, Head of Ramboll Innovation Design &
Façades
Ethan Kerber, Senior Innovation Designer, Ramboll
New architectural opportunities for small to medium scale (re-)
developments
•	Advantages of redeveloping an existing site as opposed to a green
field development
•	Enhancing the existing plot’s qualities and potentials
•	Authority regulations and the need for intelligent responses
•	Case study of the currently completed residential villa compound for
the Kanoo Group in Jumeirah Third
•	Creating win-win situations for investors/landlords and for, users/
tenants and for the city/environment
Florian Oettl, Principal, AD&D
Tuesday, November 24, 2015 / Room: Abu Dhabi A
Renewable energy integration onto buildings: Optimisation and the
impact of good HVAC design
•	Fundamentals of renewable energy technologies in GCC
•	Current and future renewable energy technologies for buildings
•	Solar thermal, solar power and solar cooling technologies
•	Optimising HVAC design for increasing the contribution of renewable
energy sources
•	Integration of renewable energy systems into buildings’ operations
Dr. Ioannis ‘Yianni’ Spanos, Senior Sustainability Manager, KEO
International Consultants
Innovative solutions for sustainability: Incorporating geothermal
cooling to achieve net zero carbon emissions
•	Introduction to Ministry of Public Works (MoPW) role and scope of
responsibility and project overview
•	Highlighting the use of innovative new technologies to achieve zero
carbon emissions in MoPW projects
•	Feedback and lessons learn from the UAE’s first geothermal cooling
project
Eng. Azza Sulimah, Director of Design Department, Ministry of
Public Works
Abdulrahman al-Kholay, Sr. Electrical Engineer, Ministry of Public Works
Optimising structural design for wind
•	Understanding wind and its characteristics
•	Design of buildings for wind safety and comfort
•	Natural ventilation and the climate
•	Optimise structural wind loads
•	Reducing and controlling dynamic wind loads
Dr Seifu Bekele, Principal Engineer, PhD, FIEAust
Wednesday, November 25, 2015 / Room: Abu Dhabi A
Fire safety in façades
•	Overview of global statistics related to fire accidents
•	Understanding the importance of good construction and passive fire
protection
•	Highlighting the need for fire protection in façade design
•	Key fire safety principles for building envelopes
•	Showcasing new age technology available to provide fire safe and
sustainable buildings
Ihab Mouallem, Commercial Director, Gulf Extrusions
Further speakers to be announced
Incorporating local and cultural influences into contemporary design
•	Overview of local architecture and traditional interior design:
Assessing traditional materials and aesthetics specific to Gulf region
•	Evaluating natural landscapes and indigenous plantation that can be
used as inspiration for designers
•	Looking at how regional inspiration can be used or translated into
contemporary design: Materials, color palette, form
•	Real world case studies: Reviewing existing interior spaces that have
stemmed from local culture and history and how this is translated
into the modern design concept
Rashida Rajkotwalla, Design Principal, Design Work Portfolio
Saving energy, cost and increasing comfort with sustainable lighting
•	Assessing sustainable lighting systems aimed at reducing energy
consumption, reducing cost and providing comfort
•	Understanding the purpose of sustainable lighting
•	Daylighting and passive lighting strategies in architecture
•	Examples of passive strategies
•	Highlighting the importance of the choice of the bulb
•	Control units and integrated control systems
•	Animated examples of control systems
Michel Francis, Chief Architect, DEC Consultants
Thursday, November 26, 2015 / Room: Abu Dhabi A
Improving air tightness of the building envelope
•	Understanding the impact of air leakage: Energy use, envelope
durability, thermal comfort and indoor air quality
•	Effective air flow and reducing moisture levels
•	Methods for improving air tightness of building enclosures and
monitoring during construction stage
•	Ensuring optimum energy performance of your building
•	Increasing the sustainability of building envelopes in extreme
climates: Materials, technologies, techniques and solutions
William Whistler, Managing Director, Green Building Solutions
International
Navigating the complexities of designing healthcare facilities
Andrew Humphries, Regional Service Leader for Health, EC Harris
Understanding the effects of design on behaviour and productivity in
the workplace
•	Overview of Middle East Council for Offices’ (MECO) research into
commercial office occupation in the Middle East
•	Introducing regional benchmarking for best practice in office design
•	Understanding the current state of office design and the impact on
output, productivity and employee satisfaction
•	Improving office design standards within the region
Cara Tissandier, Sustainability Associate, Hoare Lea Consulting Engineers
Chris Seymour, Co-Chair, Middle East Council for Offices
Lachlan Buchanan, Co-Chair, Middle East Council for Offices
Nick Nunnington, Professor of Corporate Real Estate at Nottingham
Trent University in the UK
*Due to unforeseen circumstances, the programme may change and
The Big 5 reserves the right to alter the speakers.
NEW ARCHITECTURAL OPPORTUNITIES
FOR SMALL TO MEDIUM SCALE (RE-)
DEVELOPMENTS
Monday, November 23
4pm - 5pm
Florian Oettl
Principal AD&D
CONTINUED FROM PAGE 55 u
SEMINAR AGENDA
NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 59
Affordable Housing and
Sustainable Communities
Theatre Agenda
The free to attend workshops are CPD accredited and
you can register the points earned with your professional
association. Simply register online for free entry and collect
your free certificate onsite on the same day.
Monday, November 23, 2015 Room: Al Ain D
14:00-16:00
11:00-13:00
14:00-15:00
Can sustainable and affordable housing become a reality in the
Middle East?
•	How should we define sustainable/green affordable housing? Can a
shared definition be found and applied?
•	Are sustainability and affordability opposing metrics in housing
development?
•	UAE and MENA Network approaches: One concept, various issues;
Are the challenges to Middle East countries uniform in terms of a)
sustainability and b) affordability? Why or why not?
•	What is the role of the industry in greening affordable housing?
•	Making sustainability affordable: stakeholders, regulations,
prioritising needs.
Abdallah Bdeir, Chairman of Jordan GBC
Eng. Meshal Al Shamari, Director, Qatar Green Building Council
Gerry Rogers, Senior Associate, Galadari Advocates & Legal
Consultants (DIFC) Limited
Tuesday, November 24, 2015 / Room: Al Ain D
Applications of Passivhaus techniques
•	Assessing the appropriateness of the Passivhaus concept in the
GCC region
•	Highlighting the main challenges of construction
•	Exploring comparative costs
•	Feedback from initial results
Dr. Alex Amato, Head of Sustainability, Qatar Green Building Council
Dr. Cynthia Skelhorn, Post-Doctoral Research Specialist, Qatar Green
Building Council
Building Green: Alternative methods to constructing sustainable
housing and environments
This workshop will cover how to construct sustainably through smart
planning, designing and execution of housing construction via the use
of alternative building methods and materials. The presentation will
showcase case studies of true examples of sustainable construction
based away from the conventional school of thought. It will focus on
the following topics:
•	Are we building sustainable?
•	Is it enough to implement sustainable standards and rating systems
to produce a sustainable outcome?
•	Designing and executing sustainable landscapes
•	Case Study 1: Sustainable Houses
•	Case Study 2: Sustainable Landscapes
•	Case Study 3: Sustainable Masterplan
Engi Jaber, Sustainability Manager, Dewan Architects and Engineers
Wednesday, November 25, 2015 / Room: Al Ain D
Sustainable design and procurement of buildings
•	Integrated life cycle design for sustainability and mitigation of CO2-
emissions through cost-effective solutions
•	Life cycle targets as tools in procurement
•	Performance based bidding for sustainable buildings
•	Industrial construction and delivery modes for fewer disturbances
from operations at site and less environmental pollution
•	Case study examples
Jyri Nieminen, Chief Sustainability Officer, Sweco Finland
Integrating high performance into the next generation of GCC
housing and communities
•	Drivers, challenges and opportunities for high-performance housing
for the GCC
•	A high performance home in the GCC region: What it is and how to
achieve it
•	Documenting high performance through the LEED for Homes rating
system and lessons learnt
•	Technology and systems used in the Home of Innovation™
Demonstration Home
•	Case study on SABIC’s Al-Waseel Hills Housing Compound
Abdullah Al-Refaie, Program Director, Home of Innovation™, SABIC
Dennis Steigerwalt, Director, International, IBACOS
Duncan Prahl, RA, AIA, Senior Research Architect, IBACOS
Michael Dickens, Partner & Chief Marketing Officer, IBACOS
Mohammad Abdullah Al-Aboudi, Project Engineer, Engineering and
Project Management, Riyadh, SABIC
Thursday, November 26, 2015 / Room: Al Ain D
FUJAIRAH VISION 2040 CASE STUDY:
Delivering affordable and sustainable
neighborhood housing
Monday, November 23
12:00 am-13:00 pm
Alaa Saber Mahmoud
Project Coordinator for the government project, Fujairah
Municipality
INNOVATIONS IN SUSTAINABLE LOW
INCOME HOUSING
Thursday, November 26
11:00 am - 13:00 pm
Camilo Cerro
Associate Professor of Architecture
American University of Sharjah
•	Introduction to the Fujairah Vision 2040’s overarching vision regarding sustainable
design and project sustainability
•	Challenges and opportunities in Fujairah: Market mentality, conditions and requirements
•	Overview of the project background and requirements and what has been done to date
•	Project advantages and disadvantages
•	Lessons learnt and future project outlook: Identifying key challenges and solutions as
well as sustainability applications for new projects in the pipeline and opportunities
for the market
Smart transport planning for Middle Eastern cities
•	Exploring existing challenges and opportunities
•	Transport planning tool box
•	Transport master planning charrette demonstration
•	Implementation and phasing approach
Martin Tillman, Director, Strategic Planning and Advisory, Aecom
Nadeem Afsar, Team Leader, Strategic Planning and Advisory, Aecom
•	Sustainability in the developing world
•	Energy self-sufficiency
•	Generating passive income through architecture
•	Exploring opportunities in urban farming
•	Delivering the infrastructure for population expansion
10:30-12:30
14:00-15:30
14:00-15:00
CONTINUED ON PAGE 62 u
SEMINAR AGENDA
60 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 appEXHIBITOR NEWS
Rivit, based in Italy’s
Bologna, specialises in the
production and distribution
of fastening systems and
tools to joint and deform
sheet metal, for industry and
building applications.
It has developed a full
program of products for
fastening: blind rivets, rivet
nuts, riveters, welding studs,
blind bolts, anchors, screws,
latches, tools and machines
for sheet metal working.
Technological innovation
play a key role in Rivit
products, but the direct
relationship with its
customers remains the focus.
To further develop its
projects, Rivit has built a
large production and design
plant with an automatic
warehouse that provides
and supports an advanced
logistic system to ensure
and efficiency when filling
commercial orders.
Additionally, Rivit’s
customer service includes
selling of spare parts,
design and engineering
services, designed to
eradicate any possible
problem.
The company operates in
more than 50 countries. g
www.rivit.it
Where there is metal…
ZABEEL HALL L121
The Sanha group is one
of the leading European
manufacturers of press
fittings pipe systems for
drinking water, gas, solar,
heating, cooling and sanitary
applications for use in
domestic and industrial
settings. It produces 8,500
items, mostly with copper,
copper alloys, stainless
and carbon steel, as well as
innovative silicon bronze lead-
free fittings for use in drinking
water applications.
Its premium systems
are installed throughout
Europe, Russia, Asia and
Australia in the the domestic,
industrial, food processing
and shipbuilding industries.
With a large portfolio, Sanha
is recognised as a respected
partner of distribution and
installation companies alike.
Sanha’s principal focus
is on system technology. Its
customers are central to all
Fit for a drink
its activities. As a family
enterprise, Sanha highly
values an active close and
long term relationship with all
its partners, from designers,
installers, contractors and
trading companies.
This will be demonstrated
at The Big 5, where Sanha
presents jointly with local
partner GFP S&B SP Trading
LLC installation systems for
building services including
hospitals, hotels, shipbuilding
as well as food industry and
many industrial applications.
Available in many materials
and dimensions, the systems
presented offer time-saving,
durable and economic
solutions that have proven their
value in many projects around
the world. g
www.sanha.com
Pinnacle
Building
Technology
FZE offers a
range of light
gauge steel building
systems, which promise,
“totally integrated design”.
Among its systems on
display at this year’s The big
5 is the Pinnacle LGS X5
Framing System, which has
been designed to accommodate
intermediate level LGS
manufacturing plants.
Typically it produces 5 + 5
C and U profiles from 75mm
to 250mm. This system is
being used for the framing
of residential buildings up to
eight stories.
The company says: “With
high throughput, reliability,
ease of maintenance and simple
operation, this totally integrated
ZABEEL Y177
design to manufacturing LGS
solution will deliver high
productivity, high quality and
accurate output.”
The Pinnacle LGS X5
Framing System is designed
for manufacturers of framing
and trusses across many
applications certified by
international, American,
British, and EU building
codes. The machine is
capable of producing all
web size profiles between
75mm to 250mm. There are
Light steel building systems
custom tailored for you
standard five web sizes tools
come with each machine
order, but any additional web
size tools can be added at
later stage if required.
Standard web sizes come
with machine are: 75mm,
89mm, 140mm, 200mm,
250mm. This machine can
handle material gauge from
0.7mm to 2.0mm (24g to 14g). g
www.pinnacleLGS.com
Coatings, adhesives
& sealants
WithUs Tape from Korea is
a specialist in manufacturing
high-quality colour-
pigmented PE impregnated
cloth tape, coated with high
performance solvent-free
natural rubber adhesive.
It says: “We export our
products worldwide in
jumbo rolls and finished/
retail rolls by OEM/custom
labelling basis. We use some
of the world best cloth tape
manufacturing techniques,
but keeping costs low to help
our OEM customers achieve
optimum sales.”
Included on the stand will
be the company’s natural
rubber-based cloth adhesive
and duct tape as well as
its natural rubber based
UV cloth masking tape
with double layered PE and
rubber.
WithUs produces cloth
adhesive tape for special
purpose: fluorescent,
camouflage, matt-finish and
its special black and yellow
striped warning tape.
There is paint masking tape
in both paper and cloth. g
www.withustape.com
Cloth tape ready for
every eventuality
ZABEEL T180
PAVILION D10
62 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
10:30-11:30
12:00-14:00
14:30-15:00
16:00-17:00
10:30-11:30
12:00-13:00
15:30-16:30
17:00-18:30
11:00-11:30
12:00-13:00
Technology in
Construction
Theatre Agenda
Monday, November 23, 2015 Room: Focus Hall
Introduction to ‘The Internet of Things’ for Smart Cities
•	A brief history of the Internet of Things (IoT)
•	Defining the vision of a smart city, highlighting the dimensions to
think along when approaching the design problem and presenting a
simple layered model to guide the solution implementation
•	Exploring the ‘Services Dimension:’ Experience architecture, the
human-centric approach, and designing future cities around citizens
•	Exploring the ‘Sustainability Dimension:’ Highlighting why green cities
are not only the environmentally responsible choice, but also an
economically-viable model and a smart business investment
•	Manifestation of IoT in a smart city: How IoT plays key roles in all
sectors and industries in a smart city; from manufacturing to utilities,
infrastructure, FM, energy, transport, oil & gas and more
Alaa Dalghan, General Manager UAE; Director, Middle East & Africa,
B&B SmartWorx
Introduction to UK BIM standards
•	Motivation behind UK BIM standards
•	Detailed Look at BIM standards and Specification:
•	BS1192:2007
•	PAS1192-2:2013
•	PAS1192-3:2014
•	A sneak peek at a new ISO standard based on BS1192
Muhammad Jabakhanji, Head of VDC + BIM, Alpin Middle East
Monitoring of bearing structures as the means of preventing
collapse of buildings and facilities
•	Threats that influence the stability of buildings and facilities
•	Structural Health Monitoring (SHM) as key approach to prevent
building collapse
•	BSCS as an example of Advanced Structural Health Monitoring
System
•	Application field of SHM-systems
•	Cases requiring BSCS system to be implemented
Andrei Linnik, Executive Director of BASIS Consultancy Company
(Dubai)
Cost savings and quality enhancement through computer assisted
facility management (CAFM)
•	Property management and computer-assisted facility management:
The clients’ perspective and advantages
•	Traditional facility management versus computer-assisted: The
recent evolution in Europe
•	How the CAFM systems work: A framework
•	Energy, human resources and money savings in CAFM versus
traditional FM, some real experience indicators
•	Three case studies: Offices, hospitals, education and laboratories
Uberto Visconti, Manager, Arco Tecnica Facility Management
Tuesday, November 24, 2015 / Room: Focus Hall
Adding value to your construction projects through efficient air
curtain technologies
•	To save energy by applying the best performing air curtains for their
construction projects
•	State of the art air curtains can contribute to a more healthy indoor
environmental quality
Francesco Scuderi, Technical and Regulatory Affairs Manager, Eurovent
Morten Schmelzer, Director Business Development and Strategic
Relations, Eurovent
BIM for facilities management
•	Understanding the motivation for using BIM for facilities
management (FM)
•	How to properly specify BIM requirements for downstream FM use
•	What is COBie?
•	Overview of BS 1192-4:2014 (UK Standard for BIM to FM)
•	As-Built and data handover
•	Emerging technologies that leverage BIM for FM
Muhammad Jabakhanji, Head of VDC + BIM, Alpin Middle East
Managing design information through 2D and 3D design tools
•	Overview of design tools including AutoCad, Revit, 3D Max, Sketchup
and Lumion
•	Design data work flow
•	Tools location on design process map
•	Highlighting best usage and perfect feedback
•	Change management techniques and strategies
•	Comparative analysis
Waleed Elewa, BIM Consultant and Revit Instructor, BIM Road
A cost-benefit analysis of energy efficient technologies
•	Indirect evaporative cooling based on heat recovery systems
4Comparison with other heat recovery technologies currently used
by HVAC consultants
4About enthalpy efficiency and enthalpy effectiveness
4Benefits of the proposition
•	Hybrid cooling systems for fresh air applications
4Comparison with existing technologies
4Compliance with Dubai Municipality building specifications
4Savings and other benefits
•	Cool roof coatings
4Solutions available
4Compliance with Dubai Municipality building specifications
4Benefits of the proposition
Durgesh Verma, Jumbo Engineering
Masood Raza, Jumbo Engineering
Nitu Jain, Jumbo Engineering
Wednesday, November 25, 2015 / Room: Focus Hall
Recent Innovations in testing and standards for Flexible Ducts
•	International testing standards for flexible ducts
•	Thermal conductivity standards for flexible ducting
•	Green technology associated with flexible ducts
•	Fire tests related to flexible duct
•	Flame penetration tests for flexible ducts
Amiruddin Thanawalla, Technical Director,M/s. Focus Air Conditioning
Industries L. L. C, Dubai, UAE
Third party certification for HVAC technologies
•	Certification: What is at stake?
•	Overview of the certification process: How does it work?
•	Introducing the accredited certification body
•	Understanding the accreditation framework
•	Assessing the value of certification for the HVAC industry
Erick Melquiond, President, Eurovent Certita Certification
Affordable housing construction technology solutions
•	New innovative building technologies: Simple technique and cost-
effectiveness
•	Use of local resources: Material and labour
•	Green and sustainable
•	Assessing long-term durability and disaster resilience
•	Integrating total community design, planning and build
Aaron. G. “Sandy” Amacher, PhD, Program Executive Director, MGT Group
16:00-17:00
CONTINUED FROM PAGE 59 uSEMINAR AGENDA
64 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 appEXHIBITOR NEWS
Saudi-based alfanar
electric is the industrial
arm of alfanar, specialising
in a variety of electrical
construction products
including distribution,
generation, and quality
control equipment.
The company is going
to showcase a wide range
of its products this year
including cables and wires,
transformers, lighting and
switches and sockets.
Alfanar electric operates
several industries in Riyadh,
Jubail (Saudi Arabia), Dubai
(UAE) and London (UK).
It also has a development
and engineering centre in
Chennai (India).
The base of alfanar’s
industrial activities is alfanar
Industrial City in Saudi
Arabia’s Third Industrial
Zone on Al-Kharj Road,
Riyadh. Spread across 700,000
square metres, the complex
houses alfanar’s facilities for
manufacturing low, medium
and high voltage products.
It has a comprehensive
infrastructure including a
data/ communication center
and a commercial zone. g
www.alfanar.com
More power to
construction
HALL 3 A 111
ZABEEL HALL, L110
New range of concealed hinges
New types of hinges have
made life easier in all kinds
of products. Double-acting
hinges let doors open in either
direction. Piano hinges, or
continuous hinges, let piano
tops or chest lids fold all the
way back so that they do not
detract from the workmanship
of the instrument. Equally, toy
box hinges limit a lid’s motion,
so that the top of the chest
won’t slam shut on little fingers.
And invisible hinges, like
Blum hinges or Soss hinges,
tuck away in cabinets so that
we don’t even notice them.
German company BaSys is
presenting a new concealed
hinge at The Big 5 Dubai this
year. Model PIVOTA DX
30 3-D hinges for unrebated
doors are not only technically
advanced but also reasonably
priced. With this new model,
the company has broken new
grounds in the low-end price
segment of concealed hinges.
The PIVOTA ® DX 30 3-D
is made of solid steel and is
produced in Germany as all
BaSys products. The hinge
is fully adjustable in three
dimensions and is maintenance-
free. The load capacity for flush
interior doors is 40 kg per pair. g
www.basys.com
CHECK OUT THE AMAZING HD THERMAL VIDEO AT WWW.FLIR.COM/T1K
The NEW FLIR T1K HD Thermal Camera.
BUILT FOR THE EXPERT, BY THE EXPERTS.
The Ultimate in
Infrared Performance
68 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 app
Innovative furniture
solutions with Italian flair
PAVILION D06
Italiana Ferramenta srl is
specialised in the production
of high-quality accessories and
ironmongery for the furniture
industry.
Modern planning
departments are characterised
by a constant research of new
and innovative solutions, which
prove to be long-lasting.
Thanks to the use of
advanced computer technology,
the search for new materials,
the creation of prototypes,
innovative ideas and high quality
control can offer customers a
specific product range.
On show at The Big 5 2015
will be: TRIADE concealed
mounting bracket for shelves
25 to 40mm thick. It has been
conceived to simplify the shelf
installation. It is provided with
three independent adjustments
and the shelf angle can be
adjusted front to back by turning
the supporting pins with a 10mm
open-ended wrench.
Its freshly-designed
drop-down opening system
conceived offer the sole
mechanism for cabinet sides
on the market that guarantees
both a soft opening and a
smooth closing movement of
the door. Installation is carried
out through very simple
drilling operations that doesn’t
require mills or grooves.
LIKU is the innovative
concealed hanger to fix
suspended libraries and
cabinets to the wall even when
their structure is conceived
without the back panel. LIKU is
to be inserted into the side of the
furniture and can be used with
panels minimum 25mm thick.
Libra H7 is the latest
development in the cabinet
hanger program. Conceived
for wall-mounted suspended
cabinets with heavy loads or
particularly deep drawers, ideal
for bathroom cabinets. KUBIC
is the new locking glass shelf
support to guarantee furniture
transportation with glass
shelves already assembled
and KALABRONE is the
new shelf support for free-
standing shelves. g
www.italianaferramenta.it
Sweden’s SSAB is a highly
specialised steel company,
a leading producer on the
market for Advanced High
Strength Steels (AHSS)
and Quenched & Tempered
Steels (Q&T), strip, plate and
tubular products as well as
construction solutions.
The company will present
Strenx and Hardox steels
during the show this year.
Strenx is a new high-
strength structural steel
product brand, which offers
the most extensive portfolio
of high-strength steels on the
market. Besides, SSAB has
long been a forerunner in wear
steel with Hardox wear plate.
SSAB Shape concept
combines SSAB’s premium
steel products, with
engineering support and
processing services.
If there is an OEM
operating in the industries
of lifting, trailer and truck
bodies, agriculture, as well
as industrial production, you
have much to gain.
SSAB’s Hardox Wearparts
business unit is the leading
manufacturer of wear parts
and wear service in the world.
With more than 150 centres
and more than 55 countries,
there is always a Hardox
Wearparts Centre close by.
SSAB’s production plants
in Sweden, Finland and
the US produce 8.8 million
tonnes of steel a year. g
www.ssab.com
True as
SSAB Steel
SAEED HALL, D130
Italian SPI insulating
windows are the result of the
most advanced technology
in combination with expert
craftsmanship. One of its
most popular products,
aluminium-wood windows
represents advanced research
applied to door and window
frames.
The SPI line of windows
combines the aesthetics and
elegance of wood with the
practicality of the robust
aluminium bearing structure,
which does not require any
particular maintenance work.
Each SPI product is made
with burglary-resistant
hardware with three-point
locking self- regulating,
selective safety glass filled
with argon gas, tilt-and-turn
opening and many other
standard features.
All SPI windows are
provided with the CE mark,
the European conformity
marking, which became
a compulsory legal
requirement in February
2010. Buying CE marked
windows means ensuring
that installed products satisfy
required safety criteria
and conform to current
regulations. g
www.spi-it.com
ZABEEL HALL 131
Window of opportunity
Kingspan Group announced
the acquisition of PAL Middle
East PIR LLC last year. PAL
Middle East PIR LLC has
now been assimilated into
the Kingspan Insulation
division. Kingspan Insulation
is a global manufacturer of
optimum, premium and high
performance rigid insulation
products and insulated
systems for building fabric and
building services applications.
Kingspan Insulation will be
exhibiting one of the widest
ranges of insulation products
available in the Middle East
market. This includes optimum
performance next generation
insulation, OPTIM-R premium
performance rigid thermoset
Kooltherm insulation and high
performance rigid thermoset
Therma insulation. Its products
are among the most thermally
efficient and technically
advanced insulation materials
HALL 3 D141
available and have many
advantages over traditional
insulation materials such as
man-made mineral fibre.
The stand will also
demonstrate a range of
innovative pre-insulated
ductwork including the
Kingspan PalDuct range
and The Kingspan KoolDuct
System.
Particular focus will be
on the Kingspan Kooltherm
K–range for wall, floor, soffit,
pipe and ductwork applications.
With a thermal conductivity as
low as 0.021 W/m.K, it utilises
the thinnest commonly used
insulation board to achieve
required U–values. The
product also boasts excellent
fire properties with Class 1 (A)
rated to ASTM E 84 and FM
solutions available.
Kingspan Insulation is
at the forefront of the low
energy building drive, helping
architects, engineers and
developers get the most energy
efficient building envelope and
building services performance,
offering triple benefits of
cutting energy use, cutting
operational carbon dioxide
emissions and cutting costs. g
www.kingspaninsulation.com
Kingspan’s insulation
EXHIBITOR NEWS
70 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 appEXHIBITOR NEWS
Bin Tamman ME provides
quality leisure equipment for
sauna cabin, spa units and
swimming pools.
It offers high-quality electric
sauna heaters and associate
control units for home and
commercial use. Its products
not only include a wide range
of sauna heaters and control
units but also infrared and
coloured light equipment plus
many different accessories.
BTME also provides
multi-surface pitches for sport
offering a “One-stop shop
offering a complete package”
consultation through to final
installation.
The company can also
provide synthetic grass
for homes and businesses,
which “reduce your water
consumption” with a natural
looking alternative to real grass.
It says: “The turf is soft
under foot and non-allergenic,
making it ideal for children
and pets whilst remaining
green all-year round promoting
a positive effect on our planet.
This is a great water and
money saving investment.”
BTME is also a leader in
the provision of facilities for
fitness and recreation with
rubber flooring solutions for
everything from children’s
play areas to indoor sports
arenas. Its acrylic floorings
are environmentally friendly
and again can be used from
commercial situations through
to outdoor sport arenas like
tennis and basketball courts. g
www.btmedxb.ae
The master of
flooring, pool and
spa solutions
ZABEEL Y171
Aqualyte is the ideal hydration solution for construction companies. Aqualyte was scientifically developed
in Australia with a low sugar, hypotonic formula that is quickly absorbed by the body. Aqualyte can be
consumed daily to prevent heat-related illnesses and maintain high productivity. Aqualyte is a cost effective
way to keep your workforce healthy and prepared to work safely, especially during the summer months
in the GCC.
Distributed by Sport In Life | +971 4 289 6001 | info@sportinlife.ae | www.sportinlife.ae
NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 71
Find every exhibitor on The Big 5 app
ASPEN is the leading
company in interior design
sector providing architectural
solutions. Aspen products
focus on four areas: suspended
ceilings, partition walls,
flooring and LED lighting.
ASPEN YAPI VE ZEMIN
SISTEMLERI was founded
in 1989, the ASP Building
and Ground Inc has become a
regional leader in Turkey.
ASPEN promises “modern
architecture and application
methods of the material
reinforces the brand
specialised in the sector by
increasing the power from day
to day”. g
www.aspen.com.tr
ZABEEL HALL N131
Interior with a Turkish accent win huge customer base
Take a SMART step.
Join the winning team!
Take a SMART step.
Join the winning team!
Complete anchor program: nylon, mechanical and chemical anchors
High quality products with CE/ETA marking
Excellent service and competitive prices
pgb-Europe nv
Headquarter
Gontrode Heirweg 170 | 9090 Melle | Belgium
Tel. +32 9 272 70 70 | Fax +32 9 272 70 95
info@pgb-europe.com | www.pgb-europe.com
Easy and clear to use;
3D view with real-time zoom function;
Different anchor plate designs;
Optimized setting depth option for chemical anchors;
Different temperature ranges for chemical anchors;
Comprehensive report in pdf;
Live updates.
SMART Anchor Design SoftwareSMART Anchor Design Software
DoPDeclaration of
Performance
pgb-Polska Sp. z o.o.
Production plant
Ul. Jondy 5 | 44-100 Gliwice | Poland
Tel.: +48 (32) 330 26 10 | Fax: +48 (32) 330 26 20
biuro@pgb-polska.com | www.pgb-polska.com
Visit us @
FOCUS D41
EXHIBITOR NEWS
72 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 appEXHIBITOR PROFILE
A
l Muqarram Industries
has been the largest
manufacturing facility
in the Middle East since 1999,
focusing on the GCC market
and now expanding rapidly all
over the world.
“Our biggest aim is to
make the UAE a place for
manufacturing while also
letting our customers know
that they don’t have to go
abroad to get high-value
materials,” said Safdar
Badami, Managing Director,
Al Muqarram Industries.
And though this goal would
strike some as ambitious, Al
Muqarram has expanded at a
tremendous rate, exporting to 45
countries as well as regions such
as Latin America, Europe and
Southeast Asia in just 15 years.
The company offers a
wide ranging and extensive
product line of sealants, tapes,
aerosol sprays and products for
automotive care.
But it is Al Muqarram’s
product line and high customer
service standards that have
helped the company achieve
such a formidable reputation in
the GCC market.
“The company wants
to be known as a leading
manufacturer for countries
all over the world, especially
Asian countries and regional
players,” said Badami.
Al Muqarram has
participated in The Big 5 for
six years as a way to increase
marketing and awareness of
a high-end product line and
Producing adhesives and sealants from the UAE to the world, Al
Muqarram is stretching its business far and wide with the best quality
products in the region.
Visit us at The Big 5
Concourse 510
Al Muqarram: A UAE brand
with a global presence
supplier that exists in the UAE.
This year, it is the official
adhesives and sealants partner
as well as a Gold Sponsor.
“Construction companies
tend to turn to Europe because
of reputation,” said Badami.
“We want people to know
that there is a manufacturer
locally available.”
This year, the company is
presenting a wide range of its
products, including its very
own Dolphin line. This will
include the Dolphin Fire stop
Silicone Sealant, Dolphin
Neutraseal 500 Silicone
Sealant, Dolphin AM-40
Anti Rust Lubricating Spray
Dolphin Aluminum Glass
Tape and the Dolphin PE tape,
among many others.
“Our biggest product is
our silicone sealants,” said
Badami. “Our technology is
superior and can be compared
to technologies that have been
in line in the US or European
markets which allows us to
penetrate new markets and
support existing customers.”
Al Muqarram will also
be strongly promoting its
Dolphine Fix & Seal Silicone
Sealant, a leading hybrid,
non toxic product made from
“green” technology that is the
first to be manufactured in
Middle East and North Africa
as well as the first ever be used
outside of Europe.
“We want to stress quality
and service above all else.
Once a consumer deals with
Al Muqarram they never go
anywhere else,” said Mahmoud
Soliman, Export Sales
Manager.
“The establishment itself
was built on a need to serve
our customers with the best,
starting in 1999 and really
taking shape in 2007 when
we started to export more
widely and extensively.”
Finally consumers can now
find a home-grown supplier
without going too far, aiding
in the cementing of the
UAE’s future reputation as
a high-quality manufacturer
the world over. g
By Jumana Abdel-Razzaq
W E L C O M E TO T H E M O R O C C A N PAV I L I O N
S H E I K H M A K T O U M H A L L B 1 3 1 & C 1 3 1
FOR A SUSTAINABLE AND INNOVATIVE CONSTRUCTION
CONSTRUCTION
SECTOR
In MOROCCO
MADE IN
MOROCCO
MOROCCAN EXHIBITORS
10 RAJAB
BENHADJ & FRERES
COLORADO
CUBAMAR
FAMASSER
FMC
GRILLAGES MAROCAINS
KHOUCHAR
MEA WOOD
MOROCCO TILES
SUPER CERAME
TERRAVITA
ZINE CREATION
MAROC EXPORT
74 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 app
OUSIDE OS 71 & HALL 8 F361
Watch Laticrete demonstrate
its Supercap pump truck live
every day at its stand.
The Supercap technology,
along with other new products,
will be presented at live
demonstrations at this year’s
The Big 5 show.
Formed as a joint venture
between Laticrete and
Supercap in 2011, Laticrete
Supercap, LLC is a manufacturer
of premium self-leveling
materials and industry leading,
patented pump truck technology
for the building industry.
The Laticrete Supercap
System is a time-saving, cost-
effective method for finishing
new concrete or capping
existing slabs by combining
a LEED-contributing, UL
GREENGUARD Gold Certified,
low-alkali, self-leveling,
cement-based technology with
a computer-controlled mobile
blending unit (pump truck).
The company will be giving
a live demonstration for the
Supercap-equipped truck and
the working method of the unit.
The ‘Pump Truck’ is a
computer-controlled, mobile
Laticrete to showcase new
Supercap pump truck live
blending unit (MBU) that
ensures perfect concrete mixing.
Once mixed, formulas
are pumped directly onto
prepared sub-floors through
a controlled high-rate piping
and hose system.
“Blending is done on-site at
street level,” says John Sacco
of Laticrete Supercap. “The
pump truck can continuously
deliver up to 15 tonnes of
material per hour to all kinds
of buildings, even high-rises
located in congested areas
that are as tall as 50 stories,
covering up to 50,000 square
feet per day.”
Laticrete Supercap will also
be presenting a host of other
new products at this year’s event.
This includes the Supercap
Mobile Blending Unit which
is a computer-controlled pump
truck with dual silos that
allow on-site blending. With
the ability to blend 30,000
pounds per hour and deliver
material up to 50 stories high,
this revolutionary system
benefits projects by providing
predictable results that save
time, money, and improve
overall quality.
The company is also
bringing the Laticrete
Supercap SC500 which is a
series of premium, low alkali,
cement-based self-leveling
underlayments.
The SC500 is ideal for
construction companies as well
as cement companies looking to
advance their product line with
the best quality technology from
a locally based firm.
Visit Laticrete’s live
demonstration of its new
technology every day at its
stand, located in the outside
area during all four days of The
Big 5. g
www.laticreterak.com
EXHIBITOR NEWS
NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 75
Find every exhibitor on The Big 5 app
Das International was
founded to provide a full
solution for tilers, plumbers,
masons and to cater the
requirements of the building
& construction industries.
It also supplier of
machinery & tools
manufactured in Italy and
a distributor of personal
protective equipment (ppe),
water heaters and others.
It says: “With our sourcing
expertise and partnerships with
the manufacturers globally, we
guarantee that we can provide
the customers requirements
and fulfill the comprehensive
services. We will continue
searching what other products
and services we can provide to
our beloved clients.”
At the show it will be
showing its Class 2 and
class 5 pipes and fittings
from Advanced Plastic
Industries, a manufacturer
of polypropylene (PP-RCT)
pipes and fittings. g
www.das-intl.ae
Pipes to protection, Das
International offers it all
CONCOURSE 316
Algorithms Software is
showcasing Xpedeon, fully
integrated ERP software,
purpose-built for the
projects industry.
Xpedeon is used by
various contracting and
consulting companies in
Gulf region such as Square
General Contracting,
ASCON, ETA, Al Watanyiah
United, Towell Construction
& Co, Oman Shapoorji,
Sobha Engineering etc.
Since 2010, more than
3000 users in Gulf region
log into Xpedeon every day.
It is also used extensively
across UK and India.
Xpedeon automates
the entire range of
activities including
estimating, contract
management, procurement,
subcontracting, plant,
financial accounting, payroll,
and job costing - delivering
significant benefits and
Empowering with Xpedeon
CONCOURSE 87
value for its customers. The
system is available as a
server and cloud based
application.
At The Big 5 Dubai 2015,
Algorithms is launching a
new product for real estate
and property management
companies in the Middle
East market – its CRM,
property sales, rentals and
facility management system
which is used extensively by
large developers in the UK.
Algorithms is also unveiling
its new mobility initiative,
Xpedeon On-the-Go which
gives organisations access
to their data and dashboards
through a radical mobile and
tablet based App. g
www.xpedeon.com
EXHIBITOR NEWS
76 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 app
As construction projects in
the UAE continue to increase
part of the worldwide Aalberts
Industries, is joining forces
with some of its group partners
to showcase its products..
Established in 1888, Pegler
Yorkshire has earned a
global reputation for quality
brassware products as well
as for its unique Connect and
Control principles, setting new
standards in the industry for
Pegler Yorkshire Exhibits
Products on Global Stage
STAND: 2 C90 connecting and controlling
flow for heating and plumbing
installations.
Paul Reasbeck, export
director for Pegler Yorkshire
said: “The UAE is a growing
market especially for our
range of products. Will be
taking an imposing stand at the
exhibition to enable us and our
partners from across the globe
to display and demonstrate
first-hand the quality and
engineering of our range.”
The company’s range of
valves, taps, mixers, showers,
fittings and heating products
are used in 110 countries
around the world, including
brands like Performa, Terrier,
XPress, Yorkshire, Tectite
and Prestex.
The main brands on show
will include Pegler Yorkshire’s
highly acclaimed Pegler range
of commercial and domestic
valves plus Tectite, its trusted
European brand of metal push-
fit solutions.
Visitors will also have a
chance to see demonstrations
on how the brands and
products can benefit
installations through time and
cost savings.
The HVAC sector represents
the biggest sector at the
event with Pegler Yorkshire
standing alongside some of
the leading global brands
from across the industry. g
www.pegleryorkshire.co.uk
HALL 6 B266
Italian company IBL
is planning two new
launches at this year’s
show, MultiChrome and
ModulBrick.
MultiChrome colored
tiles are the latest addition
to the range of clay roof tiles
produced by IBL. These are
available on request in any
color in the RAL chart, and
can be tailored to meet the
customer’s demands.
Easy-to-fix using glue,
ModulBrick is an innovative
brick product developed
by IBL and suits numerous
types of construction needs
whilst maintaining the
reputation of traditional
facing bricks slips. There
are no other products
available to fill this gap in
the market.
ModulBrick lends itself
to many types of internal
and external cladding works
by companies and DIY
installations by individual
customers.
IBL was founded in Italy
in 1964. It is dedicated to
creating sustainable products
at its facilities across Italy. g
www.ibl.it
Producing well
to build better
A subsidiary of Al-LAtifia Factory for Plastic Mesh
Please visit us:
stand S1 A152
info@g-tex.net
www.g-tex.net
Whenever Ground Reinforcement and Soil Stabilization are required
Knowledge, Expertise & Reliability
Sand Movement Control
Concrete Surface
Shrinkage Control
Underground
Pipes Protection
Ground Stabilization
Geosynthetics Technologies Company Ltd.
P.O. Box 700 Riyadh 11383 Saudi Arabia.
Tel: +966 1 265 0401 Fax: +966 1 265 0406
EXHIBITOR NEWS
NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 77
Find every exhibitor on The Big 5 app EXHIBITOR NEWS
Steel Color is the only
Italian company specialised
in embossed, coloured,
mirror finished and textured
stainless steel.
It said: “We are based in
Pescarolo ed Uniti, Cremona,
Italy where the core of
research and development as
well as production take place.
We carry out all the finishing
and coloring processes 100 per
cent in Italy.”
Steel Color operates in every
sector where stainless steel
is used: from architecture to
construction, from elevator
industry to interior, urban
design and automotive,
defining the highest quality
standards for the global market.
“The quality of our products
originates from a careful
selection of the raw material,
but the aesthetic component is
our strength: the Know How of
our Team is totally dedicated
to development, to offer
innovative proposals and the
most advanced and performing
products.”
Thanks to the flexibility
and the synergies achieved
in decades of experience, it
promises to provide a “tailored
service based on quality
and efficiency, which can
be completed by after-sale
support, without minimums on
the ordered quantity.”
The greatest architects
and designers all over the
world choose Steel Color as
the ideal partner for their
projects.
One of its most prominent
projects was Rundle Place
in Australia in 2014 with the
company’s stainless steel
perla rosso.
A ribbon made of steel color
colored and textured stainless
steel was used to provide an
iridescent and color-changing
feature that highlighted the
principal tenants. g
www.steelcolor.com
Mirrored stainless steel brings
unique aspect to new build
STAND 6 D271
Polycon Gulf Ltd is part
of Al Nasser Industrial
Enterprises (ANIE) – a group
established in 1993 with
interests in metal, power,
polymers, plastics and
environmental protection.
Polycon Water Tanks
are approved by UAE
Municipalities and FDA
and carry material and
performance guarantees.
Polycon Road Barriers are
high impact resistant road
barriers and are perfect for
traffic or crowd management
- suitable for small areas of
2x2m with turning radius of
90-degrees.
Polycon Road Barriers
comes with provision for
reflective stickers.
Clean and Hygienic,
Polycon Water Storage Tanks
are specifically designed with
a smooth inner layer that
resists growth of algae and
bacteria. Available from 50 to
10,000 USG
It also produces the most
rugged, longest lasting
portable restroom (toilet) in
the industry.
Polycon’s new range of
polyethylene car sheds is
ideal for the harsh weather
in the region. These state-
of-art sheds are absolutely
maintenance-free.
Polycon’s unique Track
Barrier system is better
looking than the tires or
wooden fencing alternatives,
and conveys a safe,
professional system.
Bring elegance to your decor
with Polycon’s illuminated
planters/flower pots. Polycon‘s
innovative polymer linings
solution for steel vessels, pipes
and fittings. high resistance to
corrosion, increased lifecycle
& seamless lining. g
www.polycongulf.com
Polymer expertise on
show at The Big 5
STAND 2A80
with our Quality & Style Variety there is NO Problems
NO Matter.. In Which Industry you work
Construction Oil & Gas petrochemicals Electrical Military Manpower &
Services
Others
www.slicshoes.com
Comfortable Footwear
For Tough Jobs
78 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
SPEAKER INTERVIEW
T
he GCC boasts some
of the most spectacular
buildings but they
exist in one of its harshest
climates in the world. Summer
temperatures can top 50
degrees centigrade, with
regular sandstorms, high
humidity but minimal rainfall.
In the past decade the region
– like the rest of the world – has
recognised the part buildings
play in global warming and the
drive towards sustainability has
turned to operating efficiency.
Focus has shifted to the
vital barrier between the
air-conditioned inside and
the tough climate outside: the
building envelope.
“The newly-developed
urban areas of the GCC are
really 24-hour, seven-days-a
week air-conditioned indoor
environments,” says William
Date: November 26, 2015
Time: 11am
Where: Design & Architect Theatre
See the full theatre programme on page 55
Who should attend?
Architects, engineers, developers, builders, HVAC professionals
façade designers
“Gaining a competitive edge is critical to construction
product manufacturers as its becoming increasingly
important for companies to not only meet their legal
obligations but also remain competitive in the global
market place.”
We speak to William Whistler prior to his
presentation on one of the key seminars of this year’s
Design & Architect Theatre.
By Gary Wright
Make an air-conditioned
building a green sanctuary
WHAT IS THE ‘BUILDING
ENVELOPE’ ?
It is more than the just the glass
façade, it is the total physical
barrier between the conditioned
and unconditioned environment
of the building.
The envelope is its resistance
to air, water, heat, light, and noise
transfer that keeps the ‘outside out
and the inside in’
Whistler, CEO of Green
Building Solutions.
He is a key speaker at this
year’s Design & Architect
Theatre and offers a unique
insight and almost unrivalled
experience in this vital sector
of construction.
“Unlike many moderate
climates, our outdoor air
gathers dust, salt and biological
spores as its travels thousands of
miles from distant sub-tropical
lands, across vast deserts and
huge expanses of sea.
“And that air can find
its way into our buildings
because of insecure
envelopes. Spores
become trapped in air
conditioning systems,
micro-organisms
recirculate and the hot
humid air promotes the
growth of mould and
corrosion.
All of these things
can have negative
effect on the health of
people, especially respiratory
problems.”
During the building boom,
which culminated in the
crash of 2008-2009, many
towers were completed
without an envelope that is
vital to preserve internal air
integrity. In a region where
energy is cheap few expressed
concern about leakage and
fewer recognised the potential
problems.
Today all that has changed
and in a world where
‘sustainability’ is an overused
term, Whistler explains that
securing the building envelope
is a low-cost way to achieve
sustainability.
“Cutting energy consumption
saves millions of tonnes of
carbon dioxide, and if your
building envelope does not
leak, it’s pretty easy,” he says
“No one plans to design a
leaky building, no one plans to
buy a leaky building – yet they
get built all the time.
“Air tightness should not
be an additional cost. The
architectural detailing of the
construction practices to create
the building envelope integrity
is, in fact, a fundamental
expectation of any habitable,
built structure.”
Some so-called experts
will point to the fact that
many buildings have air-con
systems running at ‘positive
pressurization’, which in theory
should prevent bad air getting
inside the building even if the
envelope is not airtight.
In practice the system is
flawed, says Whistler. For
example, the idea fails at night
when the system is turned
down, or where vacant floors
are not air conditioned.
Equally, strong winds
around the building will reduce
pressure on one side making
positive pressurization a failure.
And once the contaminated
air is inside, it recirculates.
“It is 10 times more cost
effective to improve the quality
of the building envelope than
to spend money improving
the efficiency of the HVAC
system,” he says.
“We must develop a local
knowledge base that reflects
the unique conditions of this
region not the moderate climates
that are the learning centres for
many of our engineers.”
Overall Whistler says
that the UAE is one of the
world leaders in setting these
standards.
“Consider this, “ he says.
“There are only two place in
the world where significant
testing of the building
envelope air tightness is
legally compulsory: Northern
Europe, where the oil crisis of
the 1970s made governments
consider energy waste.
“And the second is the UAE,
which has lead the way, with
a Abu Dhabi’s 2030 Estidama
plan, its pearl rating system
and neighboring Dubai’s Green
Building Regulations, which
insist on proper inspection.”
This region is at the
forefront of building envelope
research and understanding.
Whistler believes the
experiences in this region will
benefit not only future building
programmes here, but across
the world. g
William Whistler
IMPROVING AIR TIGHTNESS AND GREENING THE BUILDING ENVELOPE
See page 55 for The business Intelligence Theatre
NEW EXHIBITORS.
NEW PRODUCTS.
NEW FEATURES.
DON’T MISS OUT!
NEW HALL
The 2014 edition of The Big 5 was a record breaking year,
a sellout show which delivered an outstanding 80,178*
participants, making it the largest event in The Big 5’s history.
To continue with the expansion and development of The Big 5
we are introducing The Big 5 Focus in 2015.
Platinum Sponsors
Hotel Contracting Partner
Organised by
Show Daily Sponsor Adhesives and Sealants Partner Inverter Expert
Free Zone Partner
Construction Solutions Partner
Bathroom Solutions Partner
**To receive your CPD points and certificate you MUST attend the first 30 minutes of the workshop(s) you have registered for.
TECHNOLOGY IN CONSTRUCTION
will present the latest advances to visitors where they
can interact with industry experts plus source the latest
and most innovative technology software.
PROJECT MANAGEMENT SEMINAR
will get serious about the problems,
solutions, applications and ideas core
to the management of projects.
PRIZE GIVEAWAYS
We’re giving away prizes to select visitors on each day of the
show!
Victoriknox
swiss tool
Free Italian or
Turkish coffee
Complimentary
sandwich and drink
CPD CERTIFICATE COLLECTION AREA**
to collect your Professional Development
Unit points which can be added to your
profile.
Key features include:
Free to attend for registrants
Free to attend
for registrants
Register for free entry before 23 November and
save AED 150
www.thebig5.ae/hfregister
* BPA Audited
80 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Middle East Concrete
and PMV Live, two events
co-located with The Big
5 Dubai are promising
even more features and
opportunities this year.
“One of our long term
exhibitors, MAN Truck and
Bus is celebrating its 100th
anniversary by bringing a
100 year-old truck to display
on their stand during
the event,” said Nathan
Waugh, Portfolio Director,
Middle East Concrete and
PMV Live.
Last year, more than
36,500 people participated
over four days, making it the
most successful edition since
they first started five years
ago, a huge indicator of the
market recovery and overall
outlook.
“We have a few new
things happening this year
for Middle East Concrete
and PMV Live, both from the
exhibitor’s side and from our
side as well,” he said.
The show has consistently
grown in both size and
number of participants from
179 exhibitors and 5,424sqm
of floor space in 2011 to
more than 400 exhibitors
and over 10,000sqm of floor
space in 2014.
And the numbers are
expected to just keep getting
better. Organisers will work
“ We are focusing on working
with our exhibitors to do more
live demonstrations while also
expanding the educational content
for this year”
November 23-26, 2015
DUBAI WORLD TRADE CENTRE
Nathan Waugh Portfolio
Director, Middle East
Concrete and PMV Live
with exhibitors to do several
live demonstrations while
also expanding educational
content this year.
“Laticrete, a major concrete
company based in Ras
Al Khaimah, UAE, will be
holding a live demonstration
of its SUPERCAP system,
a new method of laying
concrete, in the outdoor area
at Middle East Concrete,”
Nathan said.
For 2015, Middle East
Concrete and PMV Live
have further developed their
educational programmes with
more workshops and topics
than ever before.
Educational programmes
were a huge success in
2014, providing a range of
topics including, “How to
trade in the UAE” seminar
as well as 40 other technical
seminars on topics such as
infrastructure, sustainability
and fire & safety.
This year too, panel
discussions and technical
seminars will be conducted,
located in the open seminar
theatre, featuring the most
trending industry topics.
While, the workshop
programme will continue
to provide CPD accredited
courses helping industry
professionals leverage their
industry knowledge which
can help them grow their
business. g
Concrete is the most
used building material
in the world and with an
increase in the residential
building market forecasted
for 2015, the demand for
concrete grows.
Kryton has waterproofed
hundreds of high-risk
concrete waterproofing
project around the world
using Krystol Technology,
including Dubai’s Palm
Jumierah, Singapore’s
Marina Bay Sands, and the
megaproject CityCenter
in Las Vegas with
tremendous success.
Kryton has offices
around the globe, over fifty
distributors in forty countries
and operates the largest
concrete permeability testing
laboratory in North America.
Currently, concrete
structures around the
world are not meeting
Durable concrete waterproofing solution
their designed service life
due to rapid deterioration
– most of which is caused
by the transport of fluids
and moisture through the
concrete.
Unfortunately, many
common concrete
waterproofing methods
do not last the life of the
concrete, contain harmful
toxins, and are difficult to
apply. Fortunately, crystalline
waterproofing admixtures
provide another option, the
leader of which is Kryton’s
Krystol technology.
When added to the
concrete mix itself, the
Krystol proprietary
chemicals react with
water or moisture to grow
millions of needle-shaped
crystals. These unique
crystals grow deep into the
concrete to fill and block
the capillary pores and
microcracks and stop the
migration of water through
the concrete, efficiently
rendering the concrete
itself waterproof.
In fact, Kryton’s Krystol
Internal Membrane (KIM)
technology is the category
leader and is the only
PRAH (Permeability
Reducing Admixture for
Hydrostatic Conditions)
according to the leading
concrete authority in
the world, the American
Concrete Institute (ACI). g
www.kryton.com
MEC & PMV LIVE
Two great shows
OUR ADDED VALUE SERVICES
On Site Assistance Demonstration & Training Facilities Technological Support Consultancy & Design
Bahrain | Oman | Saudi Arabia | UAE | Qatar | Lebanon | Kuwait | Iraq
RMD Kwikform Middle East
T: +971 6 553 4173
F: +971 6 553 4327
E: rmd.me@rmdkwikform.com
W: www.rmdkwikform.com
RMD KWIKFORM
65 YEARS GLOBAL FORMWORK & SHORING SOLUTIONS
VISIT US AT:
Co-located with
23-26 November 2015
Dubai World Trade Centre
MEC D57
82 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 app
ROBUD GROUP is an
international manufacturer of
modular formwork systems,
headed in Germany.
The company supplies
goods globally with its
formwork systems being
successfully implemented
in all kinds of projects in
Europe, Africa, Asia and,
now, the Middle East.
ROBUD has many
advantages that make it a
competitive company including
modern production assets and
highly qualified personnel.
It also supplies the best
technical support for clients
with engineers performing
formwork calculations
according to the client’s
drawings as well as quick and
efficient feedback.
ROBUD only uses the best
quality goods made with the
German Formwork for an
international audience
STAND: PMVC80
best German steel profiles.
Hardened forged formwork
accessories are galvanized to
assure long lifetime and high
bearing capacity.
Manufacture facilities are
located in Eastern Europe,
reducing production expenses
to offer the best price and
quality combination.
Supervising and workers
training are available on
sight, provided for free for
first formwork assembling
with technical support
available throughout
formwork usage. g
www.robud.info
Weiler is a leading supplier
of machinery, providing
complete production facilities
for the manufacture of
concrete precast worldwide.
The company provides
turn-key precast concrete
plants and smart precast
technology for modern
building systems and for
foundations, skeleton, walls,
floors and roofs.
Weiler also provides
application for residential,
social, commercial and
industrial buildings.
With trendsetting
innovations, the company has
a wide variety of machines,
equipment and tailor-made
turn-key plants and offers the
best engineering, consultation
and after-sales-services.
Weiler is renowned for
having the best start-up for
its Mobile Turn-key Factory
that is fast and easy to set-up
with minimum preparation
and investment. In addition,
the company also offers the
widest range of products
and flexibility.
All these products are
from one experienced hand –
Weiler, made in Germany. g
www.weiler.net
Weiler – the smartest
precast technology
STAND: MEC D127
MEC,PMV EXHIBITOR NEWS
84 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
A series of free-to-attend technical seminars, panel discussions, case studies and practical workshops providing the latest industry
trends, tools, applications and technologies for the concrete and plant, machinery and construction vehicles markets
Middle East Concrete &
PMV Live Educational Agenda
DAY 1 Show floor Agenda, Monday, November 23, 2015
Technical Seminar: The Benefits of using BS 7533 Compliant
Materials in the installation of paving in rigid constructions
•	What is BS 7533?
•	What are the benefits of using proven and certified products to this
standard when working on large scale public projects?
•	Examples of projects worldwide, including UAE where BS 7533
compliant materials have been used.
•	Photography and videos of projects
Matthew Kinson, Export Manager, Instarmac
Technical Seminar: Permeation properties, durability and service life
of concrete structures
•	Permeation properties of concrete
•	Permeability, absorption or diffusion?
•	Hydrophobic and pore-blocking properties
•	Pudlo with super low absorption, permeability and diffusion
•	Living testimony of long service life of structures
Dr Abu Saleh Mohammod, GM, Pudlo Middle East
Technical Seminar: Disputes and claims in EPC and design and build
contracts
•	Definition of D&B contracts and different contract forms for this type
i.e. FIDIC
•	Criteria to select D&B contracts for any project
•	Understanding the main differences between D&B contract and other
FIDIC contracts
•	Highlighting the risks that have been avoided in this type of contract
and the risks that have been accepted
•	Exploring the origin of and reasons for the disputes in this type of
contract
•	Assessing conflicting views between the client and the contractor for
any claims in D&B contract and how this can be avoided
•	Case study for calculating of claims in similar contracts
Maisara al-Rais, Senior Projects Construction Engineer, LPG & Civil
Projects Group, Kuwait Oil Tanker Company
Technical Seminar: Innovative Techniques and Technologies in Core
Wall Setting Out for High Rise Towers
•	Different methodology of geomatics and positioning techniques in
setting out of high rise towers core walls
•	Combination of different methodology in setting out of core walls
and its impact as per site conditions
•	Integration of different sensors for the method of setting out
•	Correction actions for the misaligned core wall during the
construction
Mohammed Abusharkh, Structural Engineer, Consolidated Contractors
Company
Panel Session: Top tips and best practice in project management for
construction projects in the GCC
•	Understanding the main challenges facing construction project
managers
•	Developing and implementing a strategic project management plan:
Contracting strategy; financing contracts; organizing the project;
project life cycle
•	Stakeholder management planning and implementation
•	Controlling scope, time and cost
•	Implementing proper risk management and assessment procedures
and taking the necessary action to prevent problems
•	Change management: What to do when things don’t go to plan
Moderated by Dr. Ibrahim Bakry - Assistant Professor of Civil
Engineering at the American University in Dubai (AUD)
Amir Besibis, Project Manager, Parsons
David Clifton, Development Director, Faithful+Gould
Maisara al-Rais, Senior Projects Construction Engineer, LPG & Civil
Projects Group, Kuwait Oil Tanker Company
Shijas Pottammal, Assistant Director, International Engineers and
Consultants
Technical Seminar: Exploring the benefits of Continuously
Galvanized Rebar (CGR)
•	Assessing the new low cost CGR galvanizing process
•	Evaluating high formability CGR rebar
•	Highlighting the high corrosion resistance of zinc coated rebar
•	Overview of product standard specifications
•	Evaluating best practice and CGR applications
Wes Miller, International Zinc Association
Project Case Studies: Optimizing building envelopes integrity with
concrete wall systems: Louvre Abu Dhabi and ‘Green Building of the
Year 2014’
•	Importance of building envelope integrity for energy efficiency,
building comfort and human health issues in an extreme climate
•	Assessing the superior qualities of concrete wall assemblies for air
tightness and thermal resistance continuity
•	Concrete wall system case studies: Louvre Abu Dhabi and ‘Green
Building of the Year 2014’
William Whistler, Managing Director, Green Building Solutions
International
Technical Seminar: Implementation of multi-geodetic and geotechnical
sensors in structural health monitoring for mega structures
•	The advantages of having structural health monitoring for mega
projects
•	Health monitoring systems integration
•	Implementation of health monitoring systems in high rise towers
•	Implementations of health monitoring systems in other structures
Mohammed Abusharkh, Structural Engineer, Consolidated Contractors
Company
Panel Session: Assessing new models of construction procurement
and risk allocation and mitigation strategies
•	Overview of traditional and new models of construction procurement
being used in the region
•	Highlighting the key principles of early supplier engagement,
transparency of cost, integrated team working and collaborative
working
•	Assessing the changing dynamics of risk allocation
•	Incorporating effective risk mitigation strategies in construction
procurement
•	Outsourcing services and how to mitigate risks when working with
subcontractors and multiple stakeholders
Moderated by Dr. Ibrahim Bakry, Assistant Professor of Civil
Engineering at the American University in Dubai (AUD)
Madhu Nagarajan, AVP - Strategy, Al Siraj Holdings
Mark Shea, Head of Hospitality, Faithful+Gould
Mohamad Nasser, Partner, Grant Thornton
R. Venkat, Director, C Cubed Consultants
Trevor Butcher, Partner and Head of Finance & Projects, Middle East,
DLA Piper
11:30
12:00
12:30
13:00
13:30
14:30
15:00
16:00
16:30
SEMINAR AGENDA
NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 85
Technical Seminar: Critical success factors influencing performance
of construction projects
•	Introduction about concept of project success factor
•	Idea about project success criteria
•	Identification, classification and assessment of critical success
factors in project life cycle
•	Conceptual model of critical success factors and project success
•	Significance of critical success factors
Sumesh Sudheer Babu, Operations Manager, Al Rumooz Electrical and
Mechanical Contracting
DAY 1 Workshop Agenda Monday, November 23, 2015
Workshop: Industrial manufacturing and application of drymix
mortars
•	Automated plants for drymix mortars
•	Silo- and jobsite logistics
•	Mortar mixers and pumps
•	Machine supported application of drymix mortars
•	Formulation of machine applied renders
Ferdinand Leopolder, Secretary General, Middle East Dry Mortar Mix
Association (MEDMA)
Workshop: Formulating and testing high performance drymix
mortars
•	Laboratory equipment and training
•	Fundamental testing requirements for industrial mortars
•	ISO 13007: The GSO endorsed standard for tile adhesives in the GCC
•	Standards for industrial mortars including renders, screeds and
masonry mortars
17:30
10:00-12:00
12:30-13:30
•	Functional additives for high performance drymix mortars
Ferdinand Leopolder, Secretary General, Middle East Dry Mortar Mix
Association (MEDMA)
Workshop: Utilizing colloidal nano-silica to improve concrete
durability
•	An overview of colloidal nano-silica in concrete: Physical and
chemical characteristics, chemical reaction in Portland cement
concrete and research-observed improved behavior
•	Details of specific spray-applied colloidal nano-silica used in UTC
laboratory studies: UTC laboratory-observed improvements in
Portland cement concrete
•	Impacts of spray-applied colloidal silica on life cycle predictive
modeling of concrete
•	Case study discussion of actual in-place projects utilising spray-
applied colloidal silica
•	Method of using spray-applied colloidal silica
A. Brent Rollins, Director, Civil Engineering Materials Research
Laboratory, The University of Tennessee at Chattanooga
Workshop: The importance of effective construction management in
today’s competitive marketplace
•	Understanding the interrelation and importance of estimating,
scheduling, productivity and safety to construction management
success
•	Obtaining an understanding of conceptual, preliminary and detailed
estimating techniques and opportunities for enhancement through
BIM and other technologies
•	Understanding the role of Gantt Charts and Precedence Diagrams
and the relationships between the time management techniques
•	Exploring opportunities for using PERT and Linear Scheduling in
heavy and commercial construction activities
14:00-15:00
15:00-16:00
CONTINUED ON PAGE 90 u
SEMINAR AGENDA
86 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
SPEAKER INTERVIEW
“Durable concrete increases the service life of structures with reduced
maintenance, correlating with a cost effective and sustainable environment.”
- Dr. Abu Saleh Mohammod
Durable and sustainable
future for concrete
Date: Day 4, Thursday, November 26, 2015
Time: 3:30pm
D
r Abu Saleh
Mohammod, General
Manager, Pudlo
Middle East will be giving
a presentation at this year’s
Middle East Concrete on a
significant aspect of building
in today’s industry.
“There are three elements
in the title which are
interdependent,” says Dr
Mohammod, speaking on
the subject of his seminar,
Permeation properties,
durability and service life of
concrete structures.
The main objective of the
seminar, he says, is to share
the knowledge of different
techniques available to
enhance the permeation
properties of concrete for
design and production while
also enhancing its durability
and performance.
“A concrete structure that
is designed to last for a
longer service life needs to
have durable concrete and
will only be durable if the
permeation properties of
concrete are good.”
Dr Mohammod continued
to explain that Concrete with
good permeation properties
is low in water permeability,
absorption and diffusion
so that water and other
deleterious materials would
not be able to enter into the
concrete matrix.
“The seminar will focus
on how these permeation
properties can be enhanced to
attain the required durability
to achieve the design service
life of structures,” he says.
And how is this topic
important for the Middle East
specifically?
Dr Mohammod said: “Most
of the major cities in the
Middle East are situated
along the coastal region
and in fact many of them
are being developed on
the ‘Sabkha’ region where
the environmental exposure
conditions in terms of the
presence of chloride and
sulfate salts are extreme.
“Chemicals such as chloride
and sulfate could only enter
into concrete and attack
structural elements if there is a
presence of moisture. The high
ambient temperatures of the
Middle East also aggravate the
situation, as the rate of these
chemical attacks increased
with higher temperature.
“Therefore, designing
concrete to be watertight is
an important aspect of the
construction of concrete
structures especially in the
Middle East.”
With the trend now moving
towards a more durable and
environmentally sustainable
concrete, Dr Mohammad’s
seminar is one to watch this
year at the MEC conference,
and will provide some
insightful information. g
Who should attend?
The seminar is designed for almost all layer of the industry including clients, consultant engineers,
architects, contractors, concrete producers or anyone who is interested in concrete and durability.
Dr Abu Saleh Mohammod
TECHNICAL SEMINAR: PERMEATION PROPERTIES, DURABILITY AND SERVICE LIFE OF CONCRETE STRUCTURES
88 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 appMEC,PMV EXHIBITOR NEWS
Gulf Elevators Co LLC is active
in the business of elevator sales,
installation, service & repair and
has been catering to a wide number
of clients in the UAE through its
offices in Sharjah, Dubai and Abu
Dhabi.
“Formed from humble
beginnings and still following
the core values of loyalty and
customer service, the company was
established in the year 1976 in the
U.A.E by His Excellency Sheikh
Faisal Bin Khalid Mohammed Al
Qassimi – Member of Ruling Family
of Sharjah, who is our local partner.”
Gulf Elevators specialises in
elevator installations for all types
of premium villas and mid size
residential & commercial buildings
in the UAE.
The firm has highly skilled
engineers and technicians for
installing and maintaining traction
elevators, hydraulic elevators and
platform elevators.
In addition, Gulf Elevators is the
sole certified distributors of Aritco
lifts which are manufactured
in Sweden and conform to the
highest international quality
standards with respect to safety
and functionality.
Aritco Home Lifts comes in
different sizes and with great
freedom of choice in colours and
details to make the lift stylish and
perfectly fit into your home.
The lifts are known for their
reliability and low maintenance
costs. They are also rated energy
class ‘A’ and cost less than $0.2 per
day in operating costs.
Aritco Home Lifts are operated
by a screw and nut - a well proven
and smart technology. They are
delivered with a self-supporting
shaft minimising the builder’s
work and the installation is
completed in just a few days. g
STAND: PMV B121
Elevator
expertise
Support for steel
producers
Industrial Trade Solutions has
established itself as a provider
of solutions and services to the
industry.
The company provides
support and backup service for
manufacturers of steel construction
materials including manufacturers
of reinforcing meshes, cut and
bent rebar, engineered meshes,
gratings, steel mesh fencing
products, LRPC wire, cold rolled
wire, lattice girders and other
associated products.
Within a short space of time,
ITS has added Eurolls SpA and
Clifford Welding Systems to its
portfolio of capital equipment
manufacturers with more agencies
currently under negotiation.
Graham Raynor, General
Manager of ITS, based in Dubai,
said that he is excited about the
opportunities available in the
local market and looks forward to
sharing his vast knowledge with
manufacturers in the region as well
as bringing world class products
with extensive and knowledgeable
backup to the region.
International Trade Solutions
brings world class machinery with
a knowledgeable service team and
a spare parts inventory to ensure
that the industry in the region gets
only the best products and service
that they deserve. g
www.itsol.ae
Top Global Parts Co Ltd was
established in 1994 with the
vision of expanding into a global
industry market.
The company is one of the
major distributors of earth
moving and construction
equipment parts in Korea.
Top Global Parts also provides
quality undercarriage, hydraulics
swing bearing, crank shaft and
engine parts.
All of TGP’s products are
manufactured by Doosan,
Hyundai, Volvo and other
Korean makers. g
www.itopglobal.com
STAND: PMV A110
VIP Delta, a licensed manufacturing
partner of VIP Germany, is a leading
solution provider of high performance
coating systems. The company is
specialised in supplying customised
coating systems to the construction,
waste water and oil & gas industry.
The company’s integrated system
approach includes substrate repair,
preparation products, priming
and pre-treatment systems, high
performance coatings and superior
aesthetic finishes. Long term
partnerships with consultants,
engineers, major contractors and a
strong technical back up are the keys
to success for VIP-DELTA around
the region.
Delta also offers regional sales for
Graco plural reactors for spraying
Polyurethanes and polyureas and
Hennecke GmbH machinery for
intelligent lightweight construction of
polyurethane sandwich panels with
PUR-CSM technology. g
www.vip-delta.com
STAND: PMV C117
Coating solution
Supplying the spares
STAND: PMV B127
90 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 app
•	Understanding the role of productivity analysis for successful time
and cost management of the constructed facility
•	Realising the importance of construction safety on profitability and
recognized opportunities for safety assurance
Dr. Edgar Small, Coordinator of Construction Management and
Associate Professor of Civil Engineering, School of Engineering, AUD
Workshop: How can zinc improve concrete performance?
•	New low cost CGR galvanizing process
•	Understanding the properties of CGR rebar
•	Overview of product standard specifications
•	Improved protection of rebar in concrete from corrosion
•	Data and best practice from case histories
Prof. Stephen Yeomans, International Zinc Association
DAY 2 Show floor Agenda Tuesday, November 24, 2015
Technical Seminar: Concretely Light Slabs
•	Voided Slab System introduction.
•	Cobiax Slab System
•	How it works
•	Advantages:
4Sustainability ( Economic, Environmental and Social)
4Engineering and Financial Benefits (Architectural, Structural, Owner
and Contractor).
•	Project references
Mr. Azzam Khaled, CEO, Cobiax Middle East DMCC
Technical Seminar: Updates on the use and development of glass-
reinforced concrete (GRC)
•	Overview of current applications of GRC
•	Exploring production methods
•	Forecasting future developments
•	Assessing high performance GRC
•	New developments in ‘green’ GRC
Richard Lavery, Assistant Technical Manager, Power-Sprays
Technical Seminar: Reinforced lightweight block rather than
polystyrene forms in ICF (insulation concrete forms)
•	Introduction of ICF (insulation concrete forms) as modern
construction systems
•	Analysis of the advantages and disadvantages of ICF
•	Guidance for using lightweight blocks
•	Overview and introduction to reinforced lightweight blocks
•	Assessing how reinforced blocks can improve properties of ICF
construction
Mohammad Alidousti, Quality Control Manager, Leca
Technical Seminar: Quality control of concrete ingredients and ready
mix plant inspections in Emirate of Fujairah
•	Overview of aggregate sources in Fujairah: Crushers, production
process of aggregate from natural rocks, etc.
•	Testing and quality control of aggregate used in concrete
•	Testing of other materials used for production of concrete: Cement,
water, admixtures, etc.
•	Quality controlling of ready mix plants working in the Emirate of
Fujairah
•	Understanding the procedures for plant inspections, fresh concrete
inspections in plant and sites, etc.
Mahesh Palat Kalathil, Chemical Analyst, Fujairah Municipality
Building Lab
Panel Session: Emerging trends and innovations in concrete
•	Low carbon-emitting innovations to improve sustainability and cost-
effectiveness of concrete structures
•	Cost effective concrete solutions for refurbishment and repair
•	Assessing the latest advancements in concrete products and
technologies
•	What new products and developments are taking the industry by storm?
16:30-17:30
11:30
12:00
12:30
13:00
13:30
Moderated by Dr. Peiman Kianmehr, Assistant Professor of Civil
Engineering, School of Engineering, AUD
A. Brent Rollins, Director, Civil Engineering Materials Research
Laboratory, The University of Tennessee at Chattanooga
Dr. Abu Saleh Mohammod, General Manager, Pudlo Middle East
Mamdouh Hamouda, Engineering Director, Arkan Consultants
Dr. Mohammed Alhaj Hussein, CEO, The Green Quality Testing
Laboratory and Engineering Consulting Office
Mohammad Alidousti, Quality Control Manager, Leca
Technical Seminar: Determination of the thermal history on concrete
structures by thermogravimetric analysis and infrared spectroscopy
•	New regulations requiring cement replacement materials to
reduce carbon footprint: lack of published studies on the thermal
degradation of alternative materials
•	Parametric research focusing on thermal resistance of newly
developed concrete formulations, with special reference to gabbro/
limestone aggregates frequently used by the construction industry
in the UAE
•	The need to study physico-chemical changes in the cement matrix
as temperature increases
•	Exploring a range of assessment methodologies available: Thermo-
gravimetric analysis including TGA/DSC, X-ray Diffraction and FTIR
•	A comparison of results of different groups of concrete under
elevated temperature testing
Eng. Mohammad Ali Alqassim, Captain, Dubai Police General
Headquarters
Project Case Study: Post-tensioned concrete slab of a high rise
building in Saudi Arabia
•	Overview of project scope and challenges encountered: Incorrect
strength of concrete slabs poured on one of the floors
•	How would an engineer deal with this situation?
•	What are the consequences of such a mistake?
•	What are the required repairs that need to be done?
•	Lessons learnt: Highlighting the corrective actions taken and
solutions put in place
Omar Sheikh al Ard, Executive Manager, Philadelphia Post Tensioning
Company
Technical Seminar: Exploring applications and methods of
waterproofing, coating and concrete admixtures
•	Identifying the main challenges of application of construction
chemicals
•	Assessing the best construction chemicals to use depending on
project type and requirements
•	Highlighting construction chemical solutions for design and
engineering, repairs and renovations
Rakesh Shah, Managing Director, Fairmate Chemicals
Panel Session: Updates and advancements in concrete repair
technologies and applications
•	Taking a proactive approach to infrastructure asset management to
improve asset life cycle and maximize economic returns
•	Best practice in repairing, maintaining, rehabilitating and retrofitting
existing infrastructure
•	Highlighting the latest advancements in structural performance and
material durability
•	Surface protection methods and materials
•	Strengthening materials and techniques and exploring best practice
in repair methods
Moderated by Dr. Mohamad Nagi, Director of Infrastructure
Sustainability and Assessment Centre, School of Engineering, AUD
Fawas al-Otaiby, General Manager, Diamond Shell
Mamdouh Hamouda, Engineering Director, Arkan Consultants
Eng. Mohammad Ali Alqassim, Captain, Dubai Police General
Headquarters
Dr. Mohammed Alhaj Hussein, CEO, The Green Quality Testing
Laboratory and Engineering Consulting Office
14:30
15:00
16:00
16:30
SEMINAR AGENDA CONTINUED FROM PAGE 85 u
NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 91
Find every exhibitor on The Big 5 app
CONTINUED ON PAGE 93 u
17:30
18:00
10:00-12:00
12:30-13:30
14:30-15:30
16:00-17:00
Technical Seminar: Reducing construction time with a panelised
building system
•	Introduction and description of the formwork system
•	Assessing the benefits of using panelised building systems
•	Applications: Overview of the steps of the construction process
•	Technical Specifications: Panel, reinforcement, concrete
•	Handling, storage and safety of panelized systems
Fawas al-Otaiby, General Manager, Diamond Shell
Technical Seminar: PC Strand manufacturing for Precast and Post
tension market
•	Statistical Process and Quality Control
•	Manufacturing processes and process parameters for pc strand
production
•	How process parameters are derived, monitored and controlled
•	Statistical quality control
•	Special developments for USA precast markets
•	Special developments for USA post tension markets
Jayant Gokhale, Plant Manager, Gulf Steel Strands FZE
DAY 2 Workshop Agenda Tuesday, November 24, 2015
Workshop: Service life and life-cycle cost of reinforced concrete
structures
•	Durability characteristics controlling the performance of reinforced
concrete structures
•	Chloride–induced corrosion of reinforcing steel and its effect on
service life
•	Service life predicting computer models
•	Life-cycle costs analysis and calculation of reinforced concrete
structures
•	Service life enhancement methods.
Dr. Mohamad Nagi, Director of Infrastructure Sustainability and
Assessment Centre, School of Engineering, AUD
Workshop: Durability and sustainability of reinforced concrete
construction in the Middle East
•	Overview of reinforced concrete properties and performance in
harsh climates
•	Exploring the numerous design and specification factors and wide
range of choices of materials, products and systems that can be
used to extend the life of reinforced concrete structures
•	Proven technologies and analytical procedures to assess the
strength of reinforced concrete structures
•	Investigating defects and deterioration to reinforced concrete
structures and identifying the cause or reasons in terms of the
design, material specification, construction workmanship and the
service environment
•	Top tips for avoiding premature deterioration of reinforced concrete
structures
John Young, Managing Director, Young Engineering Consultancy
Workshop: Quality control and testing of high-performance concrete
•	Introduction to and historical background of high-performance
concrete
•	Overview of selection of materials and processing
•	Understanding the properties of high-strength concrete
•	Structural design considerations
•	Testing of high-strength concrete
Amr Sherbini, Assistant Professor, Jazan University
Workshop: Effective contracts management
•	Understanding how a valid contract is formed and its key elements
•	Overview of the rights and obligations of various parties in a
construction contract
•	Understanding the role of a contract administrator in pre and post
contract phases

•	Practical tips for effective contracts life cycle management
•	Local legal considerations: Beware of the traps!
R. Venkat, Director, C Cubed Consultants
DAY 3 Show floor Agenda Wednesday, November 25, 2015
Technical Seminar: The latest innovations in Fully Bonded
Waterproofing Systems
Mr. Hani Fikri, Target Market Manager Waterproofing – GCC, Sika
Technical Seminar: Improvements in hot weather concreting
Innovation in concrete technology for hot weather construction
•	Durability of building in hot weather regions
•	Greening hot weather concreting
Dr. Samer Al Martini, Associate Professor, Concrete and Construction
Materials, Abu Dhabi University
Technical Seminar: Exploring the effect of Soil Structure Interaction
(SSI) on the response of structures
•	Definition of SSI, its historical development and modeling techniques
•	Exploring the effect of SSI on response of high-rise buildings
•	Assessing the effect of SSI on thermal repose of structures in hot
weather
•	SSI of underground infrastructure (tunnels, pipelines and manholes)
and foundation response (shallow and pile foundations)
Prof. Reem Sabouni, Assistant Professor, Civil Engineering, Al Hosn
University
Technical Seminar: Assessing the benefits of thermal-insulating
concrete in building design
•	Introduction to Insulating Concrete Forms (ICF) systems
•	Exploring the benefits of ICF for building owners and contractors
•	Understanding the different ICF systems and designs and when they
are best used
•	Measuring the energy efficient properties of thermal-insulating
concrete
Kostas Mitsios, Technical Director, Gulf Perlite
Panel Session: New trends in decorative concrete
•	Overview of the latest trends in decorative markets including integral
color, stamp, stain, overlays, polish, sealers and coatings
•	Identifying common design and installation challenges and how to
overcome them
•	Evaluating polishing trends including overlay selection, preparation,
mixing and set up stations
•	Assessing a variety of decorative overlays for successful product
selection, equipment, preparation and pouring techniques
•	Highlighting job site conditions for best results
Moderated by Dr. Mohamad Nagi, Director of Infrastructure
Sustainability and Assessment Centre, School of Engineering, AUD
Adel El-Hajj, Architect, Manager of Mizaje division, Macroni Interior
Design
Ana Margarida D’ Castro, Senior Architect & Managing Director, BIA
Design
Andrew Paylor, General Manager, Readymix Qatar Group, Lafarge GCC
Hilal El-Hassan, Assistant Professor of Civil Engineering, United Arab
Emirates University
Jon Brooks, Company Manager, Readymix Qatar Group, Lafarge GCC
Richard Lavery, Assistant Technical Manager, Power-Sprays
Technical Seminar: Competitive advantage and sustainable supply
chain strategy
•	Overview on organizational competitive advantages
•	Highlighting some important sustainable supply chain practices for
the construction industry and its impact on competitive advantage
•	Overview of best sustainable supply chain practices according to the
UN Global Compact Principles
•	New 4-stage model of ranking supply chain strategy in line with
11:30
12:00
12:30
13:00
13:30
14:30
SEMINAR AGENDA
92 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
Find every exhibitor on The Big 5 app
World Shotcrete Group, a
Georgian manufacturer and
supplier, is a leading producer
of shotcrete, grout machine,
refractory gunning machine,
ventilation, fans and other
accessories.
The Shotcrete application
can be either a wet or dry
mixture in vertical, horizontal
and overhead surfaces
performed in a short period
of time. The company also
repairs and supplies spare
parts for all products, meeting
the needs of markets through
quality, innovative design and
construction of mechanised
devices.
In addition, Shotcrete is
used in building repair, due
to its unique application and
properties. For example, the
Shotcrete fan system circulates
air flow inside tunnels by fan
Shotcrete range will
impress... wet or dry
air flow. As a result, effectively
controlled air flow without
waste makes the system very
cost-effective.
The company works in a
number of sectors including
building foundations,
hydropower projects, canal
lining, refractory gunning,
bridge rehabilitation and
concrete repair and restoration,
among many others.
Visit World Shotcrete
Group at stand MEC J70 and
get a first look at its quality,
injection and ventilation
system. g
www.worldshotcrete.com
STAND: MEC J70
IMKO is presenting a
new generation of moisture
sensors with the novel
SONO sensors, based on
the innovative and patented
TRIME®radar technology.
This year, the company
will present its TRIME®
radar technology and SONO
sensors which can eliminate
many disadvantages and
problems for all previous
moisture probes and make it
easier to warrant high safety
standards economically,
without loss of time.
Coarse aggregate can
contain a lot of water which
in turn may lead to incorrect
calculation, making the
precise measurements of
the moisture content very
important. With IMKO’s new
product line it has now made
it easier to measure coarse
aggregates reliably over many
years, from sizes 1-32mm and
regardless of texture.
IMKO will also be
presenting its brand new
mobile Water/Cement
Analyzer SONO-WZ which
is used to measure the water
content in fresh concrete
directly on site, offering a
completely new concept for
the construction industry. g
www.imko.de
New dimension
quality control
STAND: MEC H100
BFS GmbH, Blaubeuren
develops designs and builds
machines for the production of
high quality precast concrete
elements for application in
irrigation and waste water
systems.
The company deals with
sophisticated machine
technology for the production
processes with flexible depth
of fabrication as the core
Quality precast
competences of BFS GmbH
and its Italian daughter
company, BFS S.r.l.
The diversity of the range
of products is based on the
individual requirement and
explicit execution of the
machines and production
lines. In close cooperation
with each individual customer,
a customised and efficient
production platform is created
for high quality products.
Starting from semi-
STAND: MEC B96
automated stand-alone
machines, up to complete
turnkey and fully automated
factories, BFS designs and
delivers individual equipment
based on modular elements.
With up to date technology
and knowhow BFS has
managed to establish itself
as an innovation engine and
technology leader.
Small or large plans? You
can find the answers at BFS
GmbH. g www.bfs-casagrande.de
Futuretech is a young
and dynamic organisation
meeting the ever growing
demands of various industries
and sectors.
The company exclusively
supplies high quality
European machinery, from
individual units to complete
plants. Its portfolio also
includes a wide range of
components, accessories
& spare parts, specialising
in plants for production of
building materials, handling
and transportation systems
such as conveying, discharging,
conditioning & mixing.
Futuretech’s portfolio
extends to offer durable
industrial strapping of the
highest quality and other
packaging products and
services. Its steel factory
is capable of fabricating
steel structures that meet
OEM plant standards
while producing all the
automation technology
for both mechanical and
electric works in plant. All
assembling of equipment
and commission plant
installation is fully serviced
by Futuretech as well as
all servicing and repairs of
industrial equipment.
Futuretech undertake’s
specialised contracting
projects and focus on
building the foundations that
are required to establish any
type of factory or machinery. g
www.ft-eng.com
Brilliant range
of services
STAND: MEC C107
MEC,PMV EXHIBITOR NEWS
NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 93
sustainable development
•	Embracing a collaborative and innovative approach to your supply
chain strategy
Emad Ameen, Independent Researcher
Project Case Study: Overcoming challenges in ground engineering
Paul Groves, Head of Tunneling and Ground Engineering, Middle East
and India, Atkins
Technical Seminar: Recycling for reuse: Options for construction and
demolition waste
•	Overview of CD&E waste recycling – MEA
•	Highlighting the main challenges facing the CD&E waste recycling
industry in MEA
•	Understanding the limitations of current systems used in MEA for
recycling CD&E waste
•	Introduction to advanced methods of recycling CD&E waste
•	Assessing the advantages of CD&E waste recycling with advanced
methods
Ruchin Garg, Business Development Manager, CDE Global
Panel Session: Assessing the latest advancements in deep
foundation design and construction
•	Exploring new innovations in deep foundations construction and
cost benefit analysis of the latest tools and technologies
•	Highlighting solutions to common challenges in piling and deep
foundations construction
•	Platforms to excavations and concreting of inclined shafts
•	Understanding how to innovate in order to safely increase
productivity
•	Feedback from regional case studies on new technologies and
techniques
Moderated by Dr. Elias Saqan, Chair and Professor of Civil
Engineering, School of Engineering, AUD
Derek King, General Manager, Al Ghurair Foundations
Jason Redgers, Regional Business Development Manager GCC,
Menard Vibro
Paul Groves, Head of Tunneling and Ground Engineering, Middle East
and India, Atkins
Peter Titus, Managing Director, Total Foundations Solutions
Technical Seminar: Improving structure durability with epoxy powder
coating for steel rebar
•	Understanding the main causes of corrosion of steel rebar
•	Why should you use FBE-coated rebar?
•	Facts and figures supporting improved structure durability
•	Service life and cost comparison
Waleed Nashaat, Architectural Specification Executive, Jotun Powder
DAY 3 Workshop Agenda Wednesday, November 25, 2015
Workshop: Best practice in piling design
•	Preparing a plan for the design and construction of pile foundations
•	Identifying appropriate subsurface exploration procedures and tests
to provide design soil parameters
•	How to choose the appropriate pile type in a given soil
•	Assessing methods of pile foundation design in application
subsurface conditions
•	Understanding the appropriate methods of pile installation
Peter Titus, Managing Director, Total Foundations Solutions
Workshop: Environmental legislation and regulations governing UAE
cement plants
•	Overview of the role of the Ministry of Environment and Water in
regulating plants and industrial projects in the UAE
•	Understanding targets and aims of regulations in line with the UAE
Strategic Vision 2021
•	Important regulations and guidelines for the quarrying industry
15:00
16:00
16:30
17:30
10:00-12:00
12:30-13:30
•	Environmental legislation for cement plants: What do plant owners
and industry stakeholders need to be aware of?
•	Lessons learnt from case studies and real world examples

Eng. Eman Alshuweihi, Environmental Auditer, UAE Ministry of
Environment and Water
Workshop: Latest advancements in design and construction of
precast concrete structures
•	What is precast concrete?
•	Design of precast concrete structures
•	Overview of the construction elements of precast concrete
structures
Eng. Mohammed Zaid, Design Manager, United Precast Concrete
Workshop: Assessing the benefits of tilt-up construction
•	What is tilt up concrete?
•	Design of tilt up concrete concrete structures
•	Overview of the construction elements of tilt up concrete structures
Eng. Mohammed Zaid, Design Manager, United Precast Concrete
Workshop: Carbon mitigation through concrete block carbonation
curing
•	Global carbon emission and mitigation techniques
•	Chemical reaction of carbon dioxide and cement
•	Carbonation of concrete masonry units
•	Effect of carbonation on mechanical properties, microstructure, and
durability of concrete
•	Environmental impact of carbonation process
Hilal El-Hassan, Assistant Professor of Civil Engineering, UAE
University
DAY 4 Show floor Agenda Thursday, November 26, 2015
Project Case Study: Al Hail Greens Housing Development Oman
Phase I
•	Understanding the real definition of concrete durability
•	Outlining the key factors contributing to durability of concrete
•	Highlighting factors affecting concrete durability
•	Selection of concrete based on requirements
•	Case study of the concrete used and its properties, with SD,
variance etc.
Sambasiva Rao Bandla, General Manager - Operations, Arcop &
Partners Engineering Consultancy
Technical Seminar: Greening of concrete: Trends and priorities
•	Overview of concrete materials and the concrete industry
•	Introducing greening tools and strategies
•	Prioritizing actions for greening the concrete chain
•	The future of concrete versus the concrete of the future
•	The UAE experience
Prof. Abdul Rahim Sabouni, CEO, Span Management Consulting;
Development Adviser, AIC Consultants
Technical Seminar: What you need to know about guarantee and
warranty mechanisms for material and equipment
Moawia AbdulRahman Sayed, Project Engineer, Al Ain Distribution
Company
Panel Session: Construction sector future outlook: New
developments and opportunities in the region’s construction and
infrastructure sectors
•	Construction and infrastructure market overview: How has the
market moved on since 2014?
•	How are mega-events around the region impacting project pipelines
and delivery timelines?
•	What new developments are happening in transport infrastructure?
•	Opportunities in social infrastructure: Focus on schools, hospitals and
government buildings
14:00-15:00
15:30-16:30
17:00-18:00
12:00
12:30
13:00
13:30
CONTINUED FROM PAGE 91 u
SEMINAR AGENDA
94 THE BIG 5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE
•	How are oil prices affecting the market?
•	Forecasting 2016: What is in store for the region’s construction sector?
Moderated by Dr. Edgar Small, Coordinator of Construction
Management and Associate Professor of Civil Engineering, School of
Engineering, AUD
Prof. Abdul Rahim Sabouni, CEO, Span Management Consulting;
Development Adviser, AIC Consultants
Asif Shafi, Senior Vice President, Business Development, Civil
Infrastructure, AECOM Middle East
Attia Mahmoud, General Manager, Al Arif Contracting
Christopher Seymour, Head of Markets, ARCADIS ME
Craig Plumb, Head of Research, MENA, Jones Lang LaSalle
David Clifton, Development Director, Faithful+Gould
Sarfraz Dairkee, General Manager- Corporate
Development&Engineering, MAHY Khoory & Co. LLC
Technical Seminar: Introduction to efficient material reconciliation
Moawia AbdulRahman Sayed, Project Engineer, Al Ain Distribution
Company
Panel Session: Introduction to Dubai’s accident investigation policies
and procedures
•	Overview of the accident investigation system throughout the
industry
•	Explaining the UAE procedures
•	Outlining roles and responsibilities
Moderated by Jason Woods, Middle East Representative IPAF and
PASMA
Ahmed Khalil Abdulkareem, Principal Safety Officer, Dubai
Municipality
Dr. Ali Salem, Dubai Ministry of Labour
Elaine Harbour, Head of Liaison, Middle East, UK Health & Safety
Executive Worldwide
Technical Seminar: Emergency procedures when using Mobile
Elevating Work platforms at height
•	Outlining the different emergency procedures to be aware of when
using Mobile Elevating Work platforms at height
Jason Woods, Middle East Representative, IPAF and PASMA
Panel Session: New trends and developments in improving plant and
asset performance
•	Getting the most out of your maintenance programme by developing
and integrating best practice in predictive maintenance
•	Optimising maintenance by implementing an effective reliability-
centered maintenance (RCM) programme
•	Selecting the best maintenance approach for your assets
14:30
15:00
16:00
16:30
•	Identifying and troubleshooting potential failures
•	Best practice
Moderated by Dr. Edgar Small, Coordinator of Construction
Management and Associate Professor of Civil Engineering, School of
Engineering, AUD
Dr. Abu Saleh Mohammod, General Manager, Pudlo Middle East
John Jandles, Safelift
Narayanan Venkatesan, Senior Planning Engineer, Emirates Global
Aluminium
Technical Seminar: Safe use of Mobile Scaffold Towers : Standards
versus non-standards
•	Important facts when using Access Towers, what the user must be
aware of before erecting structures.
Jason Woods, Middle East Representative, IPAF and PASMA
DAY 4 Workshop Agenda Thursday, November 26, 2015
Workshop: Exploration of risks and risk management in construction
project delivery
Risks are pervasive throughout the construction process. How are
the risks quantified? How can the risks be mitigated. These and
other questions are addressed through this session with the goal
of conveying knowledge, understanding and practical tools for
management of risks for project participants.
Dr Edgar Small, Coordinator of Construction Management and
Associate Professor of Civil Engineering, School of Engineering, AUD
Workshop: Chemical attack on the durability of underground
structures
•	Definition of concrete durability
•	Investigating the types of chemical attack
•	Identifying the common factor
•	Mitigating chemical attack
•	Lessons learnt from real world case studies
Dr. Abu Saleh Mohammod, General Manager, Pudlo Middle East
Workshop: Optimization of preventive maintenance to reduce
maintenance costs and increase equipment availability
•	What is preventive maintenance?
•	Overview of the types of preventive maintenance
•	Identifying ideal preventive maintenance
•	A practical approach to optimise equipment availability
•	Techniques for optimisation
Narayanan Venkatesan, Senior Planning Engineer, Emirates Global
Aluminium
17:30
10:00 -11:30
12:00 -13:00
14:00- 15:00
Sam Patel
Publisher
Victoria James
Commercial Manager
Te:l +971 4 445 3748
VictoriaJames@dmgeventsme.com
Macy Ugbomah
Sales Executive
Tel: +971 4 438 0355
MacyUgbomah@dmgeventsme.com
Rehan Ahmed
Digital Sales Executive
Tel: +971 4 448 3706
RehanAhmed@dmgeventsme.com
© Copyright 2015. All rights reserved. Reproduction without permission is prohibited.
Official Publication for:
Gary Wright
Editor
Tel: +971 4 445 3698
GaryWright@dmgeventsme.com
Jumana Abdel-Razzaq
Assistant Editor
Tel: +971 4 4438 0355
JumanaRazzaq@dmgeventsme.com
Hina Latif
Reporter
Tel: +971 4 445 3713
HinaLatif@dmgeventsme.com
Cris Malapitan
Design
Tel: +971 4 445 3713
SEMINAR AGENDA
Big 5
Big 5

Big 5

  • 1.
    TIME TO INVEST INSIDE: ALSOINSIDE Preview of the Middle East Concrete 2015 and PMV Live 2015. Interviews, exhibitor news and conference programnmne. From P80 ACCREDITED SEMINARS Interview with speakers at our biggest ever series of free professional development workshops. Full programme from P50 EXHIBITOR NEWS Previews of more than 100 of this year’s exhibitors MOBILE APP O F F I C I A L N E W S P U B L I C AT I O N O F T H E B I G 5 DUBAI WORLD TRADE CENTRE NOVEMBER 23-26 2015 BROUGHT TO YOU BY THE SHOW ORGANISER PREVIEW Major economies in the Middle East are investing heavily in diversification as The Big 5 attracts professionals from all sectors of the construction industry to Dubai for its biggest ever show I nvestment in the GCC construction sector is set to soar over the next three years as member states focus on economic diversification, according to a new report. The report by Alpen Capital says: “Favourable macroeconomics, positive demographics, and rising tourism plus increasing populations and a demand for infrastructure have given governments initiative to start diversifying, and start building...big.” Massive investment in building and infrastructure across the GCC guarantees growth despite falling oil prices, according to a Ventures Onsite report GCC Construction Industry Trends & Challenges 2015. It was commissioned for The Big 5 and says the UAE, Saudi Arabia and Qatar are the region’s leaders but the UAE offers top investment opportunities thanks to sophisticated infrastructure and regulated real estate markets. By Jumana Abdel-Razzaq SHOW DAILY SPONSOR CONTINUED ON PAGE 3 u GCC investment is at an all time high from both government and the private sector. This is The Palm Gateway by Nakheel, one of this year’s most discussed projects. See more Dubai megaprojects revealed in 2015 on page 8 Discover more with our Free mobile app DOWNLOAD DETAILS ON P18
  • 3.
    NOVEMBER 23 -262015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 03 CONTENTS But the report highlights Saudi Arabia’s construction sector as it registered the highest non-oil GDP growth rate at 6.7 per cent in 2014. The kingdom’s 2015 reflects its diversification plan with major spending on construction in key government segments. GCC population is set to grow from 35 million to 60.2m by 2050, increasing the need for more housing, especially affordable housing, reflected in one of the strongest trends of 2015 so far. Population growth has seen strong investment in infrastructure, education and healthcare, according to the report. The Big 5 2015 is the largest meeting place for construction professionals in the Middle East. For more than 35 years, it has earned its place, reflecting the changing demands of the region and bringing the finest building and construction products from around the world. “There is no bigger event than The Big 5 Dubai and this year there has been huge support for the new event,” said Event Director Josine Heijmans. Last year saw more than 2,800 exhibitors from more than 60 countries at The World Trade Centre which attracted 81,000 participants making it a record breaking year with a a sell-out show. The GCC construction sector is set to register strong performance as billions of dollars are being invested on building and infrastructure projects and mega events such as Dubai Expo 2020, Qatar 2019 Athletics World Championship and Qatar FIFA World Cup 2022. And with contract awards in all GCC countries likely to remain strong, growth and expansion remains positive over the next five years and beyond. g Gary Wright GaryWright@dmgeventsme.com CONTINUED FROM PAGE 1 u See you there The Big 5 Event Director Josine Heijmans looks forward to this year’s show and offers advice on getting the very best from your visit Sponsors & Partners Those who help make it happen UAE Construction news Exhibitor news Digilock, HP, Poloplast Speaker interview Baharash Bagherian’s Designing the next generation of sustainable cities Exhibitor news SEP Società Europea, Vironline, Slezak Pre-Registration Sign up now and attend for free Exhibitor news Alumil Middle East, Calflex Exhibitor news RAKTherm, Elmark, Emirates Steel Speaker interview Liz Kentish, who will present Developing leadership skills Exhibitor news Salice Paolo, Vifra, Technoform, Unnati How to Trade in the UAE Half-day seminar on day two of the show, helping you succeed in the region 04 06 08 10 12 14 16 18 20-21 22 24 26 Exhibitor news Flir, Birco and Bronx International Travelling to The Big 5 First visit to Dubai? Take a look at our top travel tips Exhibitors news Jorns HG Development Focus Dubai South - a new city of a million people The Big 5 Platinum Club Plus exhibitor news Dunham- Bush, Elleci Exhibitor news G&G Engineering, Franklin Electric, Ferreo Legno, Gamma Meccanica Speaker interview Andy Butterfield’s Construction testing standards seminar Exhibitor News De Boer Waterproofing, Elite Decor, Ariston, Bellota Speaker Interview Beatrice Hunt presents Managing a culturally diverse workforce Exhibitor News Coopers Fire, The Bisan Group, NCT Exhibitor News Hoermann Group, Isa Idrosanitaria, ISIL Muhendislik, Interway Tarp Show map Layout of the region’s biggest construction show. Download our app to save time 28-29 30 32 33 34 36-37 38 40-41 42 44 46-47 48-49 The Design Summit Day 2. The region’s only free-to- attend summit for architects and designers Sustainability Theatre Agenda Four days of CPD accredited workshops Business & Market Intelligence Theatre Agenda Four days of CPD accredited workshops Design & Architecture Theatre Agenda Four days of CPD accredited workshops Exhibitor News Özcelik Makina, Poliran, Tebo, Sanvi Enterprise Affordable Housing & Sustainable Communities Theatre Agenda Four days of CPD accredited workshops Exhibitor news Sanha Group, Rivit, Pinnacle, WithUs Tape Technology in Construction Theatre Agenda Four days of CPD accredited workshops Exhibitor news Alfanar, Basys, Seeley International, Matrix, Hurner, Kottman Gaia Awards 2015 Celebrating the finest green construction products & equipment Exhibitor news Ferramenta, SPI insulating, Kingspan Group, SSAB Exhibitor news Bin Tamman ME, Aspen Exhibitor Profile Al Muqarram is stretching its business far and wide Exhibitor news Laticrete, Xpedeon, Das International Exhibitor news Peglar, IBL, Steel Color, Polycon Gulf Speaker interview William Whistler, who will explain improving airtightness and constructing greener buildings MIDDLE EAST CONCRETE 2015 & PMV LIVE 2015 Exhibitor News Middle East Concrete & PMV Live Educational Agenda Speaker interview Dr Abu Saleh, presenting Service life of concrete structures Exhibitor News Top Global Parts, Gulf Elevators, Industrial Trade, VIP Delta Exhibitor News Futuretech, World Shotcrete Group, IMKO, BFS GmbH 50 52 54 55 56 59 60 62 64-65 66 68 70-71 72 74-75 76-77 78 80 82 84 86 88 92 Editor’s Note Last year was a record-breaking show… this year will be bigger. Nowhere in the world can compare with the projects in this region and The Big 5 2015 brings together the greatest gathering of construction professionals anywhere. Enjoy this Preview and I look forward to meeting many of your during the show.
  • 4.
    04 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE INTERVIEW: JOSINE HEIJMANS By Gary Wright Josine Heijmans F or the construction industry in the Middle East there is no bigger event than The Big 5 and I’m excited to be part of it,” says Josine Heijmans, the new event director for The Big 5 Dubai. Heijmans took the helm of the show earlier this year and promises exhibitors and visitors that this year will be something special, building on last year’s incredible success. In 2014, 80,178 participants gathered at the World Trade Centre during the four days, which was an increase of 9 per cent on the previous year – and this year is set to be bigger, says Heijmans. “The response in terms of business and participants has been excellent with huge support for new features at The Big 5.” This is a big event and the new event director, who brings a wealth of experience in the event industry to the role, reveals a genuine enthusiasm for the construction sector. “The Big 5 is the main event of the year for all construction professionals. Nowhere else offers the opportunity to meet and network with so many people as well as the chance to view literally thousands of products across all sectors. “We have a great team and a track record of success from which we can continue to grow for the benefit of the sector.” Heijmans believes however that no show can stand still and this year there are an estimated 36,000 products and the exhibitors are expected to top 3,000. But she says that The Big 5 is more than that: “The whole team is focused on a great visitor experience with an expected 63 countries exhibiting. “Planning is the key to get the most out of your event visit,” says the event director. “Firstly, download The Big 5 app on your smartphone. It’s easy and makes your visit to the World Trade Centre more efficient. “Next, get a feel for the layout of the show: see where the sections that interest you are located, check the individual companies, network with industry peers and look through the programme of workshops and talks. Decide what interests you and start planning your event visit well in advance. Also make sure to benefit from the print at home badge after pre-registering your visit to the show to avoid the queues onsite. “The Big 5 covers the whole exhibition centre, it may need a couple of days to ensure you get to see everything that interests you. Remember this is the sole event of its type that offers so much in one place and everyone I’ve spoken to The Big 5 event director Josine Heijmans looks forward to this year’s event and offers advice on getting the very best from your visit to the Middle East’s biggest construction and build show. who visited last year agreed pre-planning was the answer. Decide how many hours you feel you’ll need there – then double it. There’s so much to see.” She said: “The enhanced educational programme has grown to more than 75 CPD workshops this year.” Also, this year there is extra attention for the role of distributors at the show. “One of the difficulties for distributors was to meet with new manufacturers, they come to the show where they are promoting their existing products and may not get the opportunity to take on new lines,” says Heijmans. “This year we have addressed that directly and on the third day of the show we have an event specifically for key distributors to meet international manufacturers with products new to the region.” The Big 5 is the largest construction event in the region and for thousands of people it is the chance to meet, exchange ideas and do business. “But it is also about entertainment and this year’s The Big 5 2015 will be the biggest ever DOWNLOAD THE APP Make it easy to find what interests you. PLAN AHEAD The Big 5 covers a huge space. Prepare in advance and allow plenty of time, there are lots of other attractions ALLOW AN EXTRA DAY For many visitors one day is not enough. Take time out of your diary to immerse yourself in the region’s biggest construction show. “ The response in terms of business and participants has been excellent with huge support for new features at The Big 5” live demonstrations promise to be a key attraction,” says Heijmans. “We want there to be a fun element too and if that includes an element of education, that’s even better.” Last year’s show was a sell out, with no exhibition space unfilled. This year the addition of The Big 5 Focus has increased the capacity of the event. Heijmans said: “The Big 5 Focus is almost a show within a show with even more international exhibitors, free CPD certified educational sessions on project management and construction technology, as well as prize giveaways and the CPD certificate collection point. Focus will be a must-visit section at the show.” It is also in the Big 5 Focus Hall – in the Technology in Construction Theatre - that the prize winner of the Gaia awards will be announced on the second show day, with the chance to win $50,000 on marketing exposure for the winning sustainable product. g JOSINE HEIJMANS 5 TOP TIPS DON’T MISS The Big 5 attracts some of the key names in the business to speak. Take a look at the seminars, live demos and host of attractions MAKE TIME TO NETWORK Nowhere else attracts so many construction professionals under one roof at one time.
  • 6.
    06 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE SPONSORS THE BIG 5 WOULD LIKE TO THANK ALL OF OUR SPONSORS AND PARTNERS ADHESIVES AND SEALANT PARTNER BATHROOM SOLUTIONS PARTNER PLATINUM SPONSOR PLATINUM SPONSOR FREEZONE PARTNER HOTEL CONTRACTING PARTNER SHOW DAILY SPONSOR CONSTRUCTION SOLUTIONS PARTNER INVERTER EXPERT LIVE DEMONSTRATION SPONSOR EXPOTIM INTERNATIONAL FAIR ORGANIZATIONS INC. Expotim International Fair Organizations INC. located in Istanbul, Turkey, is the organiser of leading international sector specific fairs at different business hubs of the world. The company was established by an experienced team of sector professionals in 2003. EXPOTIM, which is authorised by the Ministry of Economy has an A-Class license to organise exhibitions abroad and provide national participation to international exhibitions as well. EXPOTIM has continuously held the A-Class license between 2005 - 2012 The Saudi economic indicators exhibit tangible and spectacular success in which the private sector actively participated. This sector includes companies, institutions, and businessmen with various names, sizes, and capital. The roles of other sectors in the state should not be overlooked; neither is their quest for reinforcing our national economy and achieving positive results in economic and development fields. Ideal Standard MENA, the leading provider of innovative Total Bathroom Solutions, across Middle East and Africa region. EXPOTIM has different sector- specific groups of building, food & agriculture, household, machinery, fashion as well as an overseas sales group in order to organize international fairs. The company essentially focuses on developing countries with the goal of finding new alternative markets for exporting companies. It has more than 10 years’ experience and has enjoyed continual growth. Expotim’s organisations are distinctive in terms of customer satisfaction and its quality-focused profile. By the end of 2012, EXPOTIM was the organiser of 253 exhibitions in 34 different countries with participation of more than 8,000 exhibitors and 185,000 sqm. stand area since its foundation. In addition, EXPOTIM has been organising international fairs abroad for the last three years as a main organiser. The company’s sector-specific structure is supported with specialised service departments, thereby creating a customer- centered system contributing to both customer satisfaction and development of Turkey. With more than 70 employees at EXPOTIM, it organises all logistics support and services ranging from transportation to customs, tourism, and stand designing with utmost customer satisfaction in mind. For more information, contact info@expotim.com Jebel Ali Free Zone (Jafza) is one of the world’s leading free zones. Established in 1985, Jafza is today home to over 7,300 companies, including more than 120 of the Global Fortune 500 enterprises from across the world. It is a leading driver of the burgeoning UAE economy. Art Line is a renowned interior contracting company founded in 1999, running operations in the Middle East, North Africa (MENA) and gulf region through several branches; in Jordan, Lebanon, Qatar, UAE, China, UK, KSA, Spain and Algeria. Classified “Class 1”, our strength lies in the field of appealing and cost effective construction projects, which we can support with the high degree of knowledge and expertise that is available within our organisation.” Al Muqarram Industry – The leading manufacturer of silicone sealants, adhesive tapes, aerosol spray paints and lubricants. LATICRETE is a world-wide manufacturer and marketer of globally proven construction solutions used in residential, commercial and industrial applications. Hisense is a $16bn global conglomerate with a presence in over 16 countries across North America, Europe, Australia, Africa, the Middle East and Southeast Asia. ZABEEL A111 & A121 CONCOURSE 510 SHEIKH RASHID C191 CONCOURSE 620 CONCOURSE 148 8E361 FOCUS A50 CONCOURSE 837
  • 7.
  • 8.
    08 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE UAE CONSTRUCTION NEWS The Roads and Transport Authority (RTA) is starting the tendering of the Union Oasis project to developers and investors from the private sector this month in an invitation to complete the prequalification requirements. The project will focus on RTA to begin qualifications for Union Oasis project developing the Union Square in Dubai’s Deira area by providing residential units, offices, vital utilities, retail outlets, among others. Work is currently underway in revising the Project Manual along with the bidding conditions for selecting the best partners to align them with the Law No (22) for 2015 governing the Public Private Dubai, UAE A mixed-use community of more than 1,500 villas and serviced residences at Nad al Sheba gets the go ahead with a multi-million contract signing. Dubai developer Nakheel signed three new contracts worth $650m (AED2.4bn) for construction work at its new mixed-use community of more than 1,500 villas and serviced residences at Nad al Sheba. The community is expected to be completed in early 2018 with contracts for 1,439 residential villas. There are three contract awards: Package 1: $226m (AED830m) contract awarded to Trojan for main community infrastructure work and the construction of 489 villas. Package 2: $214m (AED789m) to UNEC for 482 villas and infrastructure work. Package 3: $212m (AED781m) to Metac for 468 villas and infrastructure. Spanning 232,000 sqm, Nakheel’s Nad Al Sheba community includes 1,439 three to five-bedroom homes and around 100 serviced villas. g Nakheel signs three new deals worth $650m Dubai, UAE Partnership in the Emirate of Dubai. The RTA will also follow the global Public-Private Partnership (PPP) model, which will contribute to invigorating Deira. The Union Oasis Project will be the first Transit-Oriented Development (TOD) concept in the region to attract Dubai’s residents and visitors. g 10 Dubai projects revealed in 2015 1. MEYDAN ONE Meydan One features a 711m-high tower, a huge new mall, the world’s largest indoor ski slope, a 25,000 sqm indoor sports facility, the biggest dancing fountains in the world, a beach and a civic plaza capable of hosting up to 60,000 people. It is also to contain a 100-berth marina. Phase 1 to be completed by 2020. 2. BURJ 2020 DISTRICT At more than one million sqm, the Burj 2020 District’s built up area will be the size of approximately one-third of the existing JLT area and nearly twice the size of New York’s Rockefeller Centre. A world-class retail offering totalling over 100,000 sqm will serve a captive market in the DMCC Free Zone, JLT and the surrounding areas. 3. SWAROVSKI SPARKLE TOWERS Dubai-based property developer Tebyan has signed an agreement with Austrian crystal giant Swarovski at its headquarters in Wattens, Austria, to create crystal-inspired ‘Sparkle Towers at Dubai Marina’. The project consists of two towers: the first offers views of Dubai Marina from three sides while the second overlooks Jumeirah Beach Residence with partial views of the marina and the sea. A residential podium connects the two towers. 4. ETTORE 971 BUGATTI VILLAS The world’s first homes designed around the Bugatti sports car will be built within Damac’s Akoya Oxygen project on the Umm Sequeim Road on the outskirts of Dubai. Not only will the homes be built to mirror the curved Bugatti Veyron design, but each home will include an indoor vehicle display area where owners can admire their cars from their sofa. Villas overlook the Tiger Woods-designed, Trump World Golf Club... they’ll cost $9.8m. 5. SHARJAH WATERFRONT CITY Spread across 36km of coastline with a total area of 5.6m sqm providing a fully advanced residential, commercial, and tourism development project in the region. Dusit will begin constructionb hotels in 2016 and expected to open to public in 2019. 6. THE PALM GATEWAY Nakheel has also announced The Palm Gateway, a three-tower waterfront living and leisure complex located at the entrance to Palm Jumeirah. 7. AL NOOR ISLAND The 45,470-square metre project is expected to be handed over at the end of 2015.With a central butterfly design theme, the development will feature a butterfly habitat housing over 500 species, a 3,500 metre walkway and floating bridge serving as an entrance to the island, a literature pavilion, children›s playground, and an egg-shaped art sculpture. 8. MIDTOWN BY DEYAAR Deyaar has unveiled the masterplan of its 5.5 million square upscale development Midtown by Deyaar, which will include a total of 27 buildings. 9. CREEKSIDE 18 Emaar Properties has launched its latest residential project at Dubai Creek Harbour at The Lagoons. Extending in to the heart of the creek, Creekside 18 comprises two towers 37 storeys high with 480 apartments. Dubai Creek Harbour at The Lagoons is a brand new city, almost three times larger than Downtown Dubai. 10. MEYDAN AVENUE Construction has begun on the newly branded Meydan Avenue – previously known as Diamond Business Park – which sits in the shadows of The Meydan Hotel, Racecourse and Grandstand.
  • 10.
    10 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 appEXHIBITOR NEWS HP has introduced a new portfolio of HP PageWide XL Printers, offering the fastest large-format production printing available in colour and black-and-white. HP PageWide XL Printers do the job of two printers in one single device, providing monochrome and colour prints at breakthrough speeds up to 60 per cent faster than the fastest monochrome light- emitting diode (LED) printer. HP PageWide XL Printers are the first products introduced under the new HP PageWide sub-brand. Based on proven HP PageWide Technology, which currently powers HP Inkjet Web Presses, HP business printers and will be scaled for upcoming HP 3D Multi Jet Fusion printers, the new portfolio delivers on the announcement made last year, providing low operation costs driven by life-long printheads, high ink efficiency and cloud- based support. The HP PageWide XL Printer portfolio includes The HP PageWide XL 8000 Printer offering high-end production printing at revolutionary speeds up to 30 D/A1-size prints per minute as well as two 775 milliliter ink cartridges per colour with automatic switching and up to six rolls -- more than 3,900 feet (1,200 meters) -- of media for sustained productivity.. g www.hprint.in CONCOURSE, 102 Providing secure personal storage for a growing mobile workforce is essential. American company Digilock has launched Numeris, a simplified security solution designed for file cabinets, storage, and case goods. With assigned and shared use functionalities, Numeris enables storage options with ZABEEL HALL, S116 the flexibility to adapt to the evolving workspace. In the GCC, Digilock has a large customer base among many four and five-star hotels and fitness clubs but Digilock also supplies their locks to airports, furniture companies and golf courses. Digilock plans to expand their operations in Dubai by 2015-end. g www.digilock.com Digilock’s new offerings POLOPLAST is pleased to present the systems POLO- ECOSAN and POLO- POLYMUTAN from its Installation Systems division. These two installation systems – comprised of a selection of pipes designed for a range of applications – ensure the flawless supply of the most precious of all foodstuffs: drinking water. The premium-quality polypropylene installation pipes POLO-ECOSAN and POLO-POLYMUTAN and the multilayer fibre composite pipes used as pipelines in building services engineering Interior installations guarantee a safe, long-lasting and flawless supply. The POLO-ECOSAN ML5 and POLO- POLYMUTAN ML5 pipes represent a milestone in PP-R development. 5-layer fibre pipes made of glass- fibre-reinforced PP-R and PP-RCT. Experience in multilayer technology proved particularly beneficial in developing this novel type of pipe, along with the in- house polymer-compound development. The sandwich design combines the advantages of PP-RCT and those of glass-fibre-reinforced PP-R in one product. g www.poloplast.com Fastest printer on market Our daily newspapers keeps exhibitors and visitors informed of the show highlights plus all the key events during the four days of The Big 5 2015. It is the only publication allowed to be distributed during the show and the sole point of print contact with participants. And you can be part of it. Contact The Big 5 sales and promotional team to find out how to get your business in front of more than 20,000 people every day. Victoria James Sponsorship & Publishing Email: Victoriajames@dmgeventsme.com Mobile: +971 56 174 7510 PROMOTIONAL OPPORTUNITIES FOR THE BIG 5 2015 ZABEEL HALL, Q110
  • 12.
    12 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE SPEAKER INTERVIEW Ultimately, it will be the people and their quality of green lifestyle that will be the real measurement to the success of sustainable cities. Why residents are just as important as design in the cities of the future We talk with Baharash Bagherian, founder and designer of Baharash Architecture, an award-winning studio in London, which is the lead designer for phase 2 of Dubai’s first sustainable city. I work with fully trained and professional teams, all committed to design excellence and the delivery of high-quality architecture. Prior to establishing Baharash Architecture, I worked in senior positions for some of the world’s most renowned architects working on high- profile international projects. “I believe great architecture is more than buildings, it’s about creating sustainable destinations that make people feel healthy to live in, inspired to work in and want to visit. “Although there are various aspects that influence the quality of life - such as crime rates, health statistics, unemployment, income growth, cost of living etc - the built environment, and the way a city is designed, has a great influence on the quality of life, as well as helping to minimise people’s impact on the environment. “A sustainable city is one that provides the highest quality of life together with the lowest environmental footprint, whilst ensuring the needs of future generations are not compromised. “At a neighbourhood scale, Hammarby Sjostad in Stockholm has been widely studied as a good example of sustainable development. “At the very early stages of the project, a ‘closed loop’ infrastructure strategy was drawn up for the project, including new public transport routes, district heating and cooling and an underground waste collection system for the development as a whole. Although the project adopted various passive and active strategies, I believe that the best models of sustainable cities should focus more on passive solutions, since these provide the biggest environmental gains with the least financial investment for the project. “One of the key successes of this project was the collaborative process between municipal authorities, urban planners, developers, architects, landscape architects, engineers, and energy & water companies. “This holistic approach to master planning created a special place for Stockholm, a place that is vibrant, healthy and sustainable. “The other key success was the participation and education model created for the district’s residents. It is believed that water consumption and pollutants can be reduced by 50 per cent by increasing environmental awareness.” For the future he says: “First, let’s look at the big picture. Over the next decade, there will be a significant increase in population and urbanisation, which will have severe impacts on our cities’ infrastructures and resources, as well as the health and wellbeing of its inhabitants. To mitigate these effects and provide a higher quality of life, we need to look at holistic solutions at various scales. “Fostering a bottom-up entrepreneurial spirit in sustainable development is a passive way to achieve this. This inward investment in people, businesses and organisations that are passionate about improving their own city is in my opinion the most passive way of creating more green jobs and will most likely result in a new way of thinking about sustainable cities. “Ecotourism will also be another area for development. The UAE is expected to welcome 30 million international tourists a year by 2021. The country has some of the most beautiful natural landscapes in the region, a perfect destination for eco resorts. There are also great economic, socio- cultural and environmental benefits for developing eco resorts. Eco resorts help create job opportunities for locals, creating a more diversified economy. They also help preserve the region’s heritage and provide greater interaction with native people. “Another area of development will be inclusivity. There is a significant demand for affordable housing. Any development, which claims to be sustainable but does not integrate affordable housing into the heart of neighbourhoods is, in my opinion, a failed concept of a sustainable city.” The best models of sustainable cities wwill provide housing for all types of people, without segregation or excuse about land prices. “An inclusive city also values the needs of all people equally, including the workers who are contributing to their legacy. “Today, there are many countries that do not see the long term social and economic benefits migrant workers bring to their cities, thus they fail at meeting the very basic needs to their livelihoods such as health and safety.” g Date: Tuesday November 24 Time: 2:45pm Where: Design Summit Who should attend? Developers, architects, engineers, landscape designers, government officials or anyone with a passion to improve their city is welcome to attend the presentation. - Baharash Bagherian DESIGNING THE NEXT GENERATION OF SUSTAINABLE CITIES See page 50 for The Design Summit agenda
  • 14.
    14 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 appEXHIBITOR NEWS Established in 1971, VIR’s principal activity is the production and distribution of ball valves, balancing valves, gate valves and butterfly valves in brass, bronze, polypropylene and cast-iron for the distribution of water and gas to be applied in HALL 2, E87 Releasing the pressure Italy’s SEP Società Europea Plastica is a leader in the thermoplastic market with the SepLux high quality 100% polycarbonate honeycomb panels of varying thicknesses . The patented joint and excellent technical characteristics make these Panels for perfect buildings PAVILION B13 Established in 2001, Slezák RAV is a famous is producer of water taps in Czech Republic. It produces special water taps for baths, pool - showers, sensor taps and mixers for water heaters. Additionally, they make taps in chromium, gold, old- brass and newly in colour surfacing schemes black/ white and chromium. The company prides itself on a high-quality drafting department, CNC programmers and team of high-skilled workers. The cartridge for its products comes from Hungarian company Kerox. All types of our water taps can be delivered with economic cartridge. g www.slezak-rav.cz Wonder water taps ZABEEL HALL, S160 panels the perfect solution for industrial buildings, particularly, given the infinite array of applications, for transparent architectural projects. Forty years of continuous technological research in manufacturing innovative and market oriented products together with the efficiency in the logistics organization, through a flexible and dynamic company structure, has driven SEP into leadership on the domestic market and made them a growing presence internationally. SEP polycarbonate panels are lightweight, which makes their use and installation easy and practical, as well as reducing transportation costs. The panels’ 78 per cent transparency results in high light transmittance. These are suitable for inclined roofs, vertical closures, industrial windows, sheds, vertical façade and green houses. The special cellular structure offers high strength and resistance to impact, cracking and loads. The product offers 10 years guarantee against UV and hail damage, high resistance to fire and UV radiation and temperature-range from -40° to 120°C. The patented UNI for Seplux 40 – 40 5px – 40 9P – system ensure perfect and constant watertight seal. g www.sepitalia.com plumbing, conditioning, industrial and irrigation installations. The Company has a highly qualified team of technicians, dedicated to the development, research and study of new products; since 1992 VIR has held a quality system certification according to UNI EN ISO 9001:2008 standards, and innumerable international specific product certifications. The quality of the products is attained by means of constant investment in innovation and the care given to manufacturing from the very first productive stages. It is rare to find in the sector, but VIR has its own internal foundry, and itself provides the design and construction of the machines necessary for the assembly and packaging of the products, in order to guarantee a constant qualitative control. The latest addition to its range is the VIR 9700 series Pressure Independent Control Valves (PICV) which implement high quality technical features with a compact design. It offers simplified presetting without the need for complicated diagrams. The analogical rotational index clearly indicates the maximum flow of the valve and the preset flow (that will be kept independently from the pressure in the line) is expressed as a percentage of this value. It has the capability to modulate the flow always using the whole valve stroke independently from the preset. And its test points (optional) placed on inlet and outlet of the valve allow measuring the generated head-loss. g www.vironline.com
  • 15.
    So much morethan tile and stone installation materials LATICRETE Middle East LLC.. P.O. Box : 86028, Ras Al Khaimah, United Arab Emirates. Tel.: + 971 7 244 6396, + 971 7 244 5119. Fax: +971 7 244 5915 E-mail : enquiry@laticrete.me | www.laticrete.me 2015 LATICRETE International, Inc. All trademarks shown are the intellectual properties of their respective owners OUR STAND AT HALL # 8, STAND 8E 361 SUPERCAP DEMO AT OUTDOOR AREA - OS 71 So much more than tile and stone installation materials LATICRETE Middle East LLC.. P.O. Box : 86028, Ras Al Khaimah, United Arab Emirates. Tel.: + 971 7 244 6396, + 971 7 244 5119. Fax: +971 7 244 5915 E-mail : enquiry@laticrete.me | www.laticrete.me 2015 LATICRETE International, Inc. All trademarks shown are the intellectual properties of their respective owners OUR STAND AT HALL # 8, STAND 8E 361 SUPERCAP DEMO AT OUTDOOR AREA - OS 71
  • 16.
    16 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE PRE-REGISTRATION For anyone who fails to register before November 22 an entry fee of AED150 per person will apply to visitors who register at the venue. Sign up now and attend for FREE In six easy steps, attendees will have the advantage of sharing their interests, recommending colleagues and fast-tracking their badge confirmation to make for quicker and smoother participation at the event. Visitors can register to attend all three events, including our two co-located shows PMV Live and Middle East Concrete or opt to register for The Big 5 Show only. Visit www.thebig5.ae and get unlimited admission to the biggest construction show in the Middle East. Register online for free entry until November 22 on The Big 5 official website and have full access to all events, conferences vand workshops for all four days of the show.
  • 18.
    18 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 appEXHIBITOR NEWS Wellness and Relaxation Products are increasingly becoming popular and the build industry is not behind. Italy’s Calflex is celebrating its 30th anniversary at The Big 5 by launching shower solutions focused on health and wellbeing. New shower space solutions integrate hydrotherapy, chromotherapy, aromatherapy and music devices. The wellness range is characterised by regenerating cascades, refreshing atomizers, relaxing rain jets and a real chromotherapy experience. Also, thermostatic taps make choosing water temperature easy. Mario Carimali, CEO and Chairman of Calflex said: “We designed and developed our new multifunctional shower heads thinking of sensations that everyone would dream of daily. So, body jets massaging your body, chromotherapy, music and aromatherapy devices were integrated in a unique solution for the complete relaxation at the end of a busy working day.” The company says that the new line will enhance users’ psychological and physical well-being by creating wellness paths inside designer shower spaces. g RASHID HALL, B240 New wellness concept Designed to enhance the experience of the attendee before, during and after the show, the app puts unlimited features and information at your fingertips, including: YOU CAN ALSO GET THE LATEST EXHIBITOR INFORMATION, SCHEDULE MEETINGS AND EVEN WIN PRIZES. The Big 5 app gives you easy access to everything you need to know for your visit to the biggest construction event this November. † Personalised agenda † Exhibitor listings † Floorplan maps † Social networking † Speaker listings DOWNLOAD THE BIG 5 APP, NOW FOR FREE To download for FREE today, visit: www.thebig5.ae/ downloadapp iPhone Android Visitor Portal (Desktop Web Browser) All Other Internet-Enabled Mobile Phones * START BY SELECTING YOUR PREFERRED PLATFORM FROM: Alumil Middle East, provides more than 85 varieties of architectural aluminium systems. These include high-performance products matching highest specification/performance requirements for windows, doors, sliding, hinged, thermal & non thermal break, facades, skylights, partitions, louvres, folding doors, balustrade, railings & pergolas etc. Alumil Aluminium is the largest private extrusion industry in Europe, designing and producing aluminium extrusions. With more than 35 years of experience, ALUMIL Aluminium is one of the most advanced companies Alumil Middle East at The Big 5 ZABEEL HALL, G121 in the design and production of aluminium extrusion products. Alumil Middle East provides high specification architectural solutions to building owners, architects, project consultants, contractors and aluminium fabricators. The company says: “From our UAE regional base, we support the aluminium requirements of residential & commercial projects across the Middle East, Near East, India, Sri Lanka, Iraq, Iran, North and East Africa.” ALUMIL produces architectural aluminium systems, which are designed, developed and tested in the Group’s Research & Development Department and then tested and certified by internationally accredited fenestration laboratories, such as IFT ROSENHEIM, various laboratories in the USA, INSTITUTO JORDANO in Italy and EXOVA in Dubai. At this year’s The Big 5 exhibition at the World Trade Centre in Dubai, Alumil will present the Entrance doors series ZEN of high performance in alignment with contemporary architectural design and technological evolution with the famous PIVOT System, as well as Smart Entrance doors. Also, Alumil will showcase two of its top class Supreme sliding systems S600 and S700 with impressive characteristics and design. g www.alumil.com
  • 20.
    20 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 appEXHIBITOR NEWS British electricity company Elmark expanded its operations in the Middle East by opening a factory in Dubai last year. The brand already has worldwide recognition for its low voltage electrical and lighting products. Georgiev, CEO of Elmark Holding told The Big 5 Hub: “We gained more visibility in the Gulf region after we set up the factory in Dubai Silicon Oasis. Our commercial policy is to supply Elmark product portfolio through dealership, as well as project fulfilment in the whole Middle East region. “I am sure that Elmark’s market presence would strengthen after this exhibition.” Elmark is exhibiting for the first time this year at The Big 5 Dubai 2015 to explore new opportunities and establish connections with potential partners. It will showcase a variety of automation, monitoring and control products, as well as the wide range of LED lighting products. g www.elmarkholding.eu Elmark expands in Middle East CONCOURSE, 244 The creation of RAKTherm anti-UV fittings came up to provide a complete line up of piping solutions for outdoor installations. RAKTherm is one of the first manufacturers of anti-UV fittings that have been registered in SKZ - the leading German certifying body for the plastic industry, affirming its conformance to tvvhe highest standard of quality. RAKTherm will administer a full network of anti-UV pipeline solution under direct and exposed sunlight applications. RAKTherm anti-UV pipes and fittings is engineered with black anti-UV component and developed to withstand hot and cold RAKTherm’s anti-UV is top level engineering HALL 4, B177 temperatures from 5°C up to 95°C for longer service life; integrated with anti- UV black technology for lower linear expansion and contraction rates. RAKTherm guarantees pipes are no longer affected by the sun’s UV radiation. RAKTherm utilises its quality management systems combined with technical expertise in developing the most comprehensive piping solutions, rendering essential contributions on the technological development of the piping industry, delivering significant advantages and developments on traditional piping systems. g www.raktherm.com Collective Protection Personal Protection Access Solutions Service Solutions Meet us at The BIG 5: stand MECJ 96 TAMMET Systems International GmbH Member of TCT Tesic Group Im Kurzen Busch 11 · D- 58640 Iserlohn · Germany Phone: + 49 2371 21 95 5795 · Fax: +49 2371 21 95 870 E-Mail: info@tammet-systems.com www.tammet-systems.com Our Business Areas Made in Germany Making your construction site a safer place Collective Protection Personal Protection Access Solutions Service Solutions Meet us at The BIG 5: stand MECJ 96 TAMMET Systems International GmbH Member of TCT Tesic Group Im Kurzen Busch 11 · D- 58640 Iserlohn · Germany Phone: + 49 2371 21 95 5795 · Fax: +49 2371 21 95 870 E-Mail: info@tammet-systems.com www.tammet-systems.com Our Business Areas Made in Germany Making your construction site a safer place
  • 21.
    NOVEMBER 23 -262015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 21 Find every exhibitor on The Big 5 app EXHIBITOR NEWS SAEED HALL, A151 Steeling the show Emirates Steel, the only integrated steel plant in the UAE, owned by SENAAT, is participating in The Big 5 Dubai for the fifth consecutive year. It will showcase its steel product range including rebar, rebar in coil, wire rod, heavy sections and sheet piles. Mohammed Al Afari, Emirates Steel VP of Marketing said: “The Big 5 is an important event for us, and is an excellent venue to showcase our expertise in steel, and enhance our presence at local and regional market. “To us the exhibition is an ideal destination to showcase our range of products, promote Emirates Steel products to all GCC countries in line with the growing demand for high quality steel products in the regional market and to have direct contact with end customers. We were satisfied with the response we received during last year’s edition.” Emirates Steel announced a move into sheet piles specifically aimed at the construction sector, becoming the first company to manufacture them in the Gulf. It intends to extend its range to include five Z-pile products by 2017. GCC demand for sheet pile currently stands at around 80,000 tonnes per year whereas Emirates Steel aims to manufacture about 150,000 tonnes each year. Established in 1998, Emirates Steel grew in a relatively short period of time from a simple re-roller of imported steel billets to a complex integrated manufacturing plant, using modern solutions to tackle traditional industrial problems to generate value for its various stakeholders. g www.emiratessteel.com Since 1975 ONLY GUARANTEE YOU EVER NEED ISO 9001 & ISO 14001 REGISTERED FIRM For Trade Enquiries Please visit Stall No. 4D187 Call: 0561137793
  • 22.
    22 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE SPEAKER INTERVIEW Date: Part 1 November 25, Part 2 November 26 Time: 10-11am (both days) Where: Business Intelligence Theatre Who should attend? People who are starting out on their management career, those looking for a step up and those looking to polish and update their existing management skills. It is also a great opportunity for people to learn from each other and to network with like-minded professionals. “Great leaders know their strengths and weaknesses, what makes them productive, how they best communicate... and they know the areas where they don’t perform well.” Great leadership comes from understanding yourself We talk with Liz Kentish, managing director of Kentish & Co, and former deputy chairman of the British Institute of Facilities Management as she prepared for her seminars on improving your leadership skills. W e have worked with a number of construction and facilities management companies and teams around the world helping them to develop leadership skills, improving their relationships and boosting the performance of their people,” says Liz Kentish. Liz is a qualified coach, licensed trainer, international conference chairman and public speaker who has specialised in the service sector for more than 20 years. She is recognised internationally for her ability to make a difference to the lives of her clients and trusted friends. Her energetic and inspiring nature is infectious, helping to boost business performance and achieve results quickly. She is a consummate networker and highly regarded within both the facilities management and coaching industries in the UK and Middle East – you’ve probably already seen her on a conference platform or met her at a networking event. Her track record includes some of the biggest names in construction and she has helped restructure management approach. Liz said: “One is John Laing Integrated Services where we ran the UK’s Institute of Leadership and Management levels 3 and 5 supporting people taking their first steps into management and honing the skills of those with considerable management experience under their belt. “As a result the teams gained a more rounded approach to leadership, and individuals took on far more personal responsibility across the contracts, so if they were an operator, they would also look at what else they could offer the client, essentially taking on a business development role. “There was a significant rise in internal promotions and productivity and performance increased markedly. As an external training provider, we bring experience from working with lots of different people, in lots of different environments and industries. We have a consummate understanding of what works and what doesn’t and some brilliant anecdotes to share. “But students don’t just learn from us. One of the most valuable aspects of attending a training course is that the students learn from each other, share experiences and create, what can be life-long, networks. She has become closely associated with The Big 5 and its associated shows, like FM EXPO, and has a strong understanding of the construction sector in the Middle East. She said: “Property investors in the Middle East are recognising the importance of a strong maintenance programme if they are to realise their return on investment. This is great news for the facilities management and construction sector. The construction and FM sector in Europe is accustomed to focusing on maintenance and operation thanks to the legacy stock of some very old, challenging buildings which often require considerable retrofitting. The Middle East is fortunate as in many ways it is a blank canvas. The speed of progress is astonishing as the countries are learning from the mistakes (and best practice) of the more established markets, and will soon be overtaking them.” Her two-part presentation covers ‘Developing leadership skills for the construction section’. But if she had one top tip for managers, what would it be? “Our two-part presentation are interactive workshops where we help people to understand their strengths and weaknesses when it comes to leadership and management. “My key piece of advice is to ‘know thy self›. Great leaders know their strengths and weaknesses; they know what makes them productive; they know how they best communicate; and how they best learn; and they know the areas where they don’t perform well. “And they hire people with complementary skills to fill those gaps. To be a good manager and a leader, you need to spend time focusing on your own skills and understanding yourself better.” g Liz Kentish, managing director of Kentish & Co DEVELOPING LEADERSHIP SKILLS FOR THE CONSTRUCTION SECTOR PARTS 1 & 2 See page 54 for The Business Intelligence Theatre
  • 24.
    24 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 appEXHIBITOR NEWS Salice Paolo is leader in modern and classic door handles, bathroom accessories and faucets, fully made of pure brass. It was during the 1940s and 50s when Serie Classica became famous, thanks to new young minds from prestigious Scuola d’Arte in Cantù. Its wide range of products confers elegance and style to every room and every setting, enriching the house with luxurious details, such as hinges, switchovers, door pulls, knobs and much more The company says: “Volterra is an example of sober and austere neoclassical style, in which the handle and plaque communicate over minor aesthetic differences and through different eras. “Its dual nature makes it suitable for environments with pieces of mixed stylistic extraction, while maintaining a delicate aplomb.” The Rococo fittings bring something special: “It offers the chance to play with asymmetrical and rich shapes, especially lively in this light and graceful model. “These features make it a sophisticated and refined but also original and versatile suggestion. Presented at the last Expo in Milan, it has been high praised from both designers and retailers.” For the most luxurious and glamorous settings it suggests two new series of fittings embellished with stones and crystals in various shades. While decorating with reflections and shiny surfaces, they are the answer to the current trends and to desire for exclusivity. The series comes in two versions: Glitter, with small crystals, to create a true bright texture. Drops, with larger stones, encrusted on the handle like a jewel. These crystal decorations are currently available on the model ‘Dubai’. g www.salicepaolo.it Fittings for beautiful homes HALL 6 B261 Polyamide Profiles for Thermal Break Insulating an aluminium profile with a material with low thermal conductivity installed between metal components to retard the passage of heat through a window assembly, called Thermal Break. The principle of thermal break and thermal bridge is a fundamental of heat transfer where a penetration of the insulation layer by a highly conductive or non-insulating material takes place in the separation between the interior and exterior environments of a building assembly. The company said: “For over 40 years, we have been developing bespoke solutions for innovative systems, together with our customers. “Our worldwide market presence, with eight production Technoform Middle East ZABEEL HALL E116 plants on three continents enables us to produce flexibly and to order, ensuring short lead-times. 22 distribution sites worldwide ensure close customer support at your location. Producing over 300 million metres of insulating profiles annually, Technoform Bautec is the leader in this market.” Thermal bridging is created when materials with high thermal conductivity come into contact, allowing heat to flow through the path of least thermal resistance. Technoform’s TGI-Spacer is the perfect solution to create optimal living temperatures within a building: minimal heat transfer through the windows High comfort as the room temperature stays consistent – neither too hot nor too cold. Energy and cost saving on both production of IGUs and operating life costs Reduction of mould and condensation forming Technoform Glass Insulation provides better thermal performance The TGI-Spacer can be bent around the glass unit, which has a number of advantages such as: preventing gas leakage (argon and krypton) through the corners Longer and better performance of the windows. g www.technoform-bautec.ae Unnati Pumps is a leading submersible pumps and submersible motors from India. It says: “We offer quality of submersible pumps and motors from 3-inch to 10- inch with complete state-of- art technology on par with the best in the world. Incorporated 1985, Unnati Pumps produces more than 200 differing pumps, which can be customized to meet clients’ individual needs.” It has a manufacturing Unit at “Ahmadabad” Gujarat and a Corporate Marketing office at Haryana, Madhya Pradesh, Chhattisgarh, Karnataka and Andhra Pradesh. “We have obtained the ISO 9001 Certificate, ‘ISI’ marks from the Indian Standard Bureau and STAR RATING from Bureau of Energy Efficiency.” The company makes and markets pump sets and submersible open well monosets under the brand name of Unnati through its own dealers network backed up by prompt after sales & service. The company’s maxim is simple: “Together we have done it, together we will do it.” g www.unnatipump.com FOCUS HALL E61 VIFRA opened its first plant in 1980 in Via Matteotti in the province of Novara, Italy. By 1991 success meant it moved to Via Vedani expanding production, and in 2007 moved again to Via Barro expanding even further its plants. The Group currently has 30 employees with an area of 20,000 square metres, of which 8,000 is covered. It has a raw materials warehouse, storage and semi-finished products warehouse, production warehouse and a head office. Its 21st century production process allows the company to expand into different sectors: plumbing, cosmetics, perfumery, precision mechanics. On show at The Big 5 2015 will be the Kit PLUG shut- off hand shower available in chromed ABS, support bracket and flex hose in a range of finishes. Another of its popular fittings is the brass column shower set with sliding rails set, hand shower and showerheads. It too is available in a range of finishes including chrome, gold, copper or bronze. g www.vifra.comvvvvwv Italian bathrooms with a special range of finishes HALL 5 G210 Range of submersibles to suit every need
  • 26.
    26 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE HOW TO TRADE SEMINAR Wednesday, November 25, 2015 08:30 9:00 09:15 09:45 10:30 10:45 11:15 11:45 12:00 REGISTRATION Welcome Trevor Butcher, Partner and Head of Finance & Projects, Middle East, DLA Piper An introduction to UAE culture and business etiquette • Negotiation and communication – fundamental differences between Middle Eastern and Western styles of verbal and non-verbal communication • Management styles, challenges and opportunities of working with culturally-diverse teams • Understanding the unique dynamic of family businesses in the UAE and Middle East • Building sustainable relationships to ensure future success Beatrice Hunt, General Manager, BE Consultants International Outlining the options and key considerations for businesses interested in entering the UAE market • Establishing a company - Local commercial partnerships and distribution agreements - Appointment of a commercial representative - Joint venture agreements - Mergers and acquisitions as an alternative route to market • Overview of the new UAE Commercial Companies Law and how it will affect newcomers to the market • Protecting your investment: The role of the DIFC Courts Trevor Butcher, Partner and Head of Finance & Projects, Middle East, DLA Piper Networking break UAE’s free zones: Allowing foreign companies unrestricted import of labour and export capital • Highlighting the differences of free zone requirements • What are the benefits for foreign companies setting up in free zones? • Identifying the range of free zone options available and determining which is right for you and your business Adil Al Zarooni, SVP – Sales, JAFZA Introduction to product licensing and registration • Understanding the policies guiding technical regulations and standards • Overview of certification processes, product testing and compliance • What you need to know to ensure your products comply with UAE technical regulations and approved international, regional and national standards Mike Luna, General Manager, Building Products, MENA, Intertek Closing remarks and key takeaways • Getting started: A guide of what needs to be done and where you need to go • Approximate timeframe for each step of the process • Important contacts Trevor Butcher, Partner and Head of Finance & Projects, Middle East, DLA Piper End of workshop HOW TO TRADE IN THE UAE SEMINAR This half-day seminar helps you navigate the complex regulatory framework to set up a business and win work in the UAE’s booming construction market, and provides information on laws and effective business practices even for established businesses within the UAE. H ow to Trade in the UAE is an exclusive seminar for all registered visitors which gives insight on how to successfully do business in the United Arab Emirates. The seminar provides information on navigating the complex regulatory framework to set up a business and obtain work in the UAE’s booming construction market. It also provides information on laws and effective business practices for already established companies in the UAE. How to Trade begins with an introduction on culture and business environment for those hoping to work in the country’s thriving cities, including trade hubs like Dubai and Abu Dhabi. The programme also takes a look at how to work with free zones, with one workshop led by Jafza’s Senior Vice President of Sales, Adil Zarooni giving specific direction on options and requirements for interested companies. Attend this year’s seminar to learn more about how to work in one of the most exciting business environments on the globe. g The free-to-attend seminar is back at The Big 5 for 2015 Getting down to business: How to Trade in the UAE By Jumana Abdel-Razzaq
  • 27.
    Email:Jafza-big5@ezw.com | Tel:+971 4 801 0174 | Mob: +971 50 189 7323 To schedule a one to one meeting please contact Construct your business on solid foundation with jafza Jafza is home to over 762 global and local players from the construction and building industry — a leading sector among the 7,000 plus business community. We bring to you all the facilities and infrastructure that you need to optimise your business including the most efficient modes of transportation. Visit our stand and pavilion and our team will provide you with all the information that you may need to start up at Jafza. Visit us at Big 5 Show Main Concourse – Stand 620, Opposite Hall 6 Dubai World Trade Centre 23-26 November 2015 11:00 am – 7:00 pm Email:Jafza-big5@ezw.com | Tel: +971 4 801 0174 | Mob: +971 50 189 7323 To schedule a one to one meeting please contact Construct your business on solid foundation with jafza Jafza is home to over 762 global and local players from the construction and building industry — a leading sector among the 7,000 plus business community. We bring to you all the facilities and infrastructure that you need to optimise your business including the most efficient modes of transportation. Visit our stand and pavilion and our team will provide you with all the information that you may need to start up at Jafza. Visit us at Big 5 Show Main Concourse – Stand 620, Opposite Hall 6 @jafzadubai www.jafza.ae@jafzadubaijafzadubaiJafzaDXB Dubai World Trade Centre 23-26 November 2015 11:00 am – 7:00 pm
  • 28.
    28 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 appEXHIBITOR NEWS How BIRCO channel systems transform public spaces HALL 2 E91 BIRCO is a German family company in its third generation, with headquarters in Baden-Baden. It belongs to the leading suppliers of channel systems in Europe. Products are sold through its own sales offices in Germany, France, Benelux and through distributors and licensees in 17 other countries. The company develops balanced, holistic drainage concepts for a varierty of projects from initial consultation through to final delivery. BIRCOlight’s attractive range of covers can provide a characteristic element in urban or public space design while add. providing sufficient load reserves for those times when traffic is heavier. BIRCOsir is its wide variety of drainage concepts and there are “virtually no limits to the application possibilities”. BIRCOlux is its integrated lighting technology while BIRCOlux “opens unimagined perspectives for the architectural design of building façades and open public spaces in different geometries and changing colours.” g www.birco.de FLIR Systems will exhibit the new FLIR T1020, also known as the FLIR T1K, a premium thermal camera for use in a multitude of industrial and building diagnostics applications, at The Big 5 show. The T1K is a high definition, handheld instrument featuring exceptional measurement performance, outstanding image clarity, and a highly- responsive user-interface. The T1K allows users to find hot spots quickly, measure them precisely and streamline their entire work process. The advanced image processing features provide the highest quality images available in a compact system. High definition imaging requires high precision HD thermal imaging HALL 3 C116 optics and the T1K’s lenses deliver best-in-class performance. The T1K features FLIR’s OSXTM Precision HDIR optics, which deliver superior image quality and range performance and allow for accurate temperature measurements from twice as far away compared to the industry-standard lenses. The T1K also features a new focusing system that offers continuous autofocus as well as a dynamic manual focus. The T1K is now available for purchase from selected channel partners. g www.flir.com Water Saving Products Aerators Connecting Hoses Shower Hoses NEOPERL MEA DMCC, Office No. 101, Jumeirah Bay X3 Tower, Jumeirah Lake Tower, P. O. Box 72625 Dubai, United Arab Emirates info@neoperl.ae, www.neoperl.ae YOU’LL FIND US AT BIG5 2015 IN DUBAI, RASHID HALL, STAND NO E187. NEO_BIG5_219x145_rz.indd 1 01.10.15 08:26
  • 29.
    NOVEMBER 23 -262015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 29 Find every exhibitor on The Big 5 app EXHIBITOR NEWS Intumescent coatings for fire protection. How RENITHERM works: In case of fire, intumescent coatings expand to form a foam barrier which is 30-50 times thicker. Saving time for more safety! AL GHORAIRI AND PARTNERS WLL DOHA, avanikumar@hotmail.com Phone: +974-4432-4959 AUDAX-Keck GmbH Germany fire@audax.de, www.renitherm.com I Reliable fire protection of structural steel, wood, electrical cables I Tested according to British Standard 476:21 I Top product quality. Made in Germany. I Approved building projects, e.g. - Hamad Int. Airport Hangar, Qatar - New Taipa Ferry Terminal, Macao BIG 5 Show, Dubai 23 - 26 Nov 15 Zabeel N 120 Anz_Big5_219x145_AUDAX 07.10.15 11:37 Seite 1 Coil boating line solutions for steel and aluminium companies SAEED HALL 1, A166 Continual development since 1940 ensures Bronx International is a world innovator in design, manufacture and technology of: colour coating lines (coil coating lines), galvanizing & metal coating lines, chemical and paint coaters, thermal equipment (paint ovens, oxidisers, incinerators), surface correction mills, tension levelling lines, strip joiners, equipment upgrades. All Bronx lines offer the following benefits to our customers: Bronx-designed and Europe-manufactured, supervision of installation and commissioning, full training package for operators and production personnel. Bronx International has recently partnered with the Galfan Technology Centre to become the exclusive agent for Galfan licenses in sheet and coil applications. Bronx is now offering Galfan as an option on new lines and as an upgrade to existing lines. Recognising both the market trend towards lower coating weights and the advantages of Galfan coatings, Bronx will be discussing how to reduce costs and coating weight, without compromising corrosion resistance. Why Galfan? Galfan is an established coating, delivering excellent corrosion resistance and formability, as well as greater painted product performance than regular galvanised coatings. The unique microstructure and physical properties of Galfan also allows lower coating weights to be achieved than conventional zinc coatings. Galfan’s unique benefits around ductility and corrosion resistance are related to its characteristic microstructure, making it suitable for a wide range of applications including building, construction, appliance, roofing and walling, harsh winter environments and deep drawing. Galfan microstructure is particularly suited to low coating weight applications. g www.bronxintl.com
  • 30.
    30 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE GETTING THERE Travelling to the Big 5 As the gateway to the Middle East, Dubai has become a beacon for the integration of cultures from all over the world. The city is a major business and distribution hub as well as the exhibition and conference capital of the MENA region... and of course it’s become a top vacation destination with some of the most spectacular and exciting architecture in the world FLIGHTS INTO THE UAE Dubai International Airport is the world’s busiest with some of the finest facilities in the world. Dubai’s flagship carrier Emirates Airlines runs one of the youngest fleets of aircraft in the world. Abu Dhabi International serving the the capital of the UAE and its largest emirate is an hour car journey from Dubai. For those traveling regionally Sharjah Airport also offers flights and is only 20 minutes away from central Dubai. ARRIVING BY ROAD OR RAIL Travelling by car gives direct access from the city’s main highway and commercial skyscraper corridor, Sheikh Zayed Road. Within the DWTC complex there is extensive multi-storey parking facilities for around 5,000 cars. The DWTC is also on the main public transport bus and metro route, with its own dedicated metro station. Taxis are well regulated and efficient. A 25-minute journey, covering 30km costs around $18. VISA REQUIREMENTS Citizens of countries within the Gulf Cooperation Council do not need a visa to enter the UAE and 40 other countries, including most EU countries, Australia, New Zealand, Hong Kong and the USA, are eligible for a 30-day visa on arrival. For all other nationalities, a visa must be applied for before the visitor arrives in the country either through their embassy, a local UAE sponsor or a local hotel. Bon Tours is a full service destination management company offering its partners more than 220 contracted hotel rates, a variety of excursions and leisure options and vehicles, including luxury options for transfers. Bon Tours also has its own online visa system with Dubai Immigration allowing quick and smooth issuance of tourist visas. Find out more at www.thebig5hub.com OUR OFFICIAL TRAVEL PARTNER The Big 5 2015 and its colocated shows PMV Live 2015 and MEC 2015 has selected Bon Tours as the Official Travel Agent offering full travel services and assistance including: • Transfers • Meet & assist • Vehicle & chauffeur WELCOME!
  • 31.
    Look at thePLUS points Market leading range of valves for commercial and domestic plumbing and heating applications Superior choice of end connection available including Tectite, XPress and Henco ends as well as traditional threaded, flanged or compression jointing British quality, for performance and durability you can rely on World wide reputation for excellence with over 100 years of valve manufacturing experience Robust designs providing outstanding operation throughout the product life cycle Tel: +971 4 5015 929 Fax: +971 4 5015 930 email: pydubai@mailme.ae Turn to Pegler Yorkshire for fully integrated support Come see us at The BIG 5 International Building and Construction Show on stand 2C90 from 23rd Nov- 26th Nov www.pegleryorkshire.co.uk PUTTING YOU IN CONTROL BRITISH QUALITY FOR RELIABILITY AND WHOLE LIFE PERFORMANCE - CHOOSE PEGLER Pegler
  • 32.
    32 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 app Jorns AG is the manufacturer of bending machines, double bending machines, compact strip cutting lines, rounding Architectural metal for professionals machines as well as accessories used for processing sheet metal. Customers of Jorns AG, who are mainly working in the field of roofing or architectural sheet metal industry, have used our machines for more ZABEEL HALL Y153 than 40 years, allowing the most professional and efficient way of manufacturing their architectural sheet metal needs. The Jorns product line remains a trendsetter for the next decade. The Norma-Line, Maxi- Line and Super-Line modules are innovations of our existing machine series. Stands and arms are designed using sturdy box-type welded construction. Our bending machines come with user-friendly controls mounted on a mobile console. You have a range of choices for equipping your machines: from a simple 2-axis OP3100 control unit to the ultra-modern CP100 multi-touchscreen control unit. With positive-negative bending using two bending beams, the full-automated TwinMatic-Pro and the semi- automated TwinBend-Pro are more adaptable and many times faster than conventional bending machines. In most of the cases, rotating or flipping the profile during the bending process can be avoided. Depending on the type of machine, the pneumatic or hydraulic gripping fingers allow a full automated process to work steel sheet up to a thickness of 2.0mm (400N/ mm²). The insertion depth is 1150/1300 mm. All the above mentioned lines are available in length of 3.2, 4, 6.4, 8, 10, 12.2 metres. g www.jorns.ch EXHIBITOR NEWS INSPIRING GLOBAL BUSINESS Located in Sharjah, UAE, Hamriyah Free Zone is home to more than 6,000 businesses from 155 UNPARALLELED INDUSTRIAL LANDSCAPE Hamriyah Free Zone Authority United Arab Emirates
  • 33.
    NOVEMBER 23 -262015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 33 DEVELOPMENT FOCUS I n 25 years time around one million people will live and work in the new 145 sq km city called Dubai South. It’s a brand new name for a master-planned development known since 2006 as Dubai World Central with the emirate’s second airport at its heart. Expo 2020 will be in Dubai South and it is already home to the prestigious Dubai Airshow. The announcement was made following a new law issued by HH Sheikh Mohammad Bin Rashid Al Maktoum, Vice-President and Prime Minister of the UAE, in his capacity as Ruler of Dubai. The city is forecast to generate over half a million jobs and sustain a total population twice that number. Dubai South is home to Al Maktoum International Airport – already operational - which will become the world’s largest once complete. The airport will have capacity to fly 220 million passengers and 16 million tonnes of cargo a year. g Newly named Dubai South will be a city of a million people and new focus for the emirate The largest rooftop free-standing frame manufacturer in the world! Simply a better way Big Foot Systems combine experience, quality, innovation and forward thinking to bring you the very best products enquiry@bigfootsupport.com +44 (0)1323 844 355bigfootsupport.com @bigfootsystems BIG 5 Dubai Visit us Hall 2, Stand 2B61
  • 34.
    34 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 app Where past meets future 6B240 For over 23 years Elleci has been committed to achieve, what has always been considered the technological expression and the key point between past and future: innovation. It will show a range of products including its new kitchen fitment range, Elleci describes itself as a “washing area expert with great attention to the colour matching in the kitchen environment’. On its stand take a look at the new Fox 360: a versatile sink that perfectly fits each available space on the kitchen top. It can be equipped with For more information please visit: www.thebig5.ae/features/platinum-club OR Contact: thebig5platinumclub@dmgeventsme.com JOIN THE KEY BUYERS’ CLUB AT THE BIG 5 Platinum Club members get their own lounge, fast track services and many more special benefits during the show WHAT YOU GET WITH A MEMBERSHIP: • Dedicated badge collection point for Platinum Club Members to avoid queues and save time • Platinum Club badge recognised by exhibitors and Members for easy networking • Access to the Platinum Club Lounge, featuring: • Complimentary Wi-Fi • Refreshments served throughout the show days • Comfortable lounge seating area and private meeting rooms • Dedicated lounge hostess offering personalised exhibitor and workshop information • Priority access to all CPD certified workshops to ensure entry and preferential seating • Automatic access to attend the exclusive Design Summit • Complimentary parking pass* The exclusive members-only Big 5 Platinum Club is back, bringing the most influential regional buyers in the construction industry together during The Big 5 show. Offering first class services and benefits, Platinum Club members are given direct access to a full range of opportunities provided only for industry professionals who influence the purchasing of products and services for projects valued at more than $100 Million. Individuals working for architectural firms, contractors, engineering consultancies, project management, property development or government agencies are all eligible to apply for membership. The Platinum Club mainly aims to provide a platform to connect buyers with suppliers and manufacturers within the industry, offering a huge advantage for generating business and sustainable prospects. Members will also be able to enjoy VIP services and complete entry to selected show features and events. In fact, member status stretches across all The Big 5 shows including Saudi Arabia, Kuwait, Indonesia, India and the new East Africa show. Platinum Club applications are evaluated by a team of industry experts according to stringent membership criteria. This selection process ensures each member’s suitability and reinforces the Club’s prestige and integrity. Key decision makers on high- budget projects are eligible to apply online. For more information please visit www.thebig5. ae/platinumclub or contact thebig5platinumclub@ dmgeventsme.com MEMBERSHIP CRITERIA: • Platinum Club Members must be directly involved in the specifying or purchasing of products and services for construction projects valued at $100+ million, and work for one of the following types of companies: • Architectural Firm • Interior Design Firm • Consultant • Engineering Firm • Property Developer • Contractor - Main & Sub • Government Agency PLATINUM CLUB Dunham-Bush is one of the world’s top commercial air conditioning manufacturers. For more than 100 years it has been committed to offering creative solutions for the customers requirements in the heating, ventilation, air-conditioning and refrigeration (HVAC/R) sector. Dunham-Bush offers a complete range of HVAC/R products including large chillers, heat pumps, thermal energy storage, packaged, airside system and unitary to residences, commercial buildings & industrial facilities. Its display at The Big 5 2015 will include: DB Centrifugal Chiller, DB Rooftop Packaged, DB Fan Coil Unit, D B Aire Unit and the DB Compressor Unit. g www.dunham-bush.com FOCUS C66 100-years of history makesDB and HVAC leader many accessories. And its Quadra minimal sinks collection succeeds in highlighting its modern and clean shapes. The new smart composite sink with flat aesthetic that see the installation of the innovative compact draining system S.I.R. Smart. g www.elleci.com EXHIBITION NEWS
  • 35.
    Visit us at ZabeelHall Main entrance Maktoum Hall Main entrance Sponsored by saudiexports.sa Largst SAUDI Products Participation Visit us at Zabeel Hall Main entrance Maktoum Hall Main entrance Sponsored by saudiexports.sa @SaudiExports Largest SAUDI Products Participation
  • 36.
    36 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 appEXHIBITOR NEWS HALL 6 B242 G&G Engineering colour samples for kitchen tops, exhibition material, objects for events and displays, 2D prototypes. g www.ggengineering.net Studio: the steps transforming an idea into an industrial plan are the most concrete elements of a successful project. Waterjet: stainless steel tank, ball screw transmission, Window based PC Control Panel, automatic greasing system, high pressure pump, VMS system T.S.C. system is a machine that allows the mould a composite for bathrooms mosaics, kitchen back, living room wall coating, elegant and stylish bi-dimensional objects for decoration, mirrors and trays. It can also be used in advertising objects, banners, Franklin Electric is a global leader in the production and marketing of systems and components for the movement of water and automotive fuels. Recognised as a technical leader in its specialties, Franklin Electric serves customers around the world in residential, commercial, agricultural, industrial, municipal, and fueling applications. Founded in 1944, Franklin Electric has grown from a small motor manufacturing company into a leading global provider of complete water systems and fueling systems. Franklin Electric’s principal markets include clean water systems, water transfer and grey water systems, and fueling systems. Headquartered in Fort Wayne, Indiana, Franklin serves all corners of the world with more than 14 manufacturing and distribution facilities. g www.franklin-electric.com Franklin Electric Submersible Motors HALL 2 D81 General construction G&G Engineering says its main goal has always been to create high-innovative industrial factories in order to offer to its clientele a competitive and technological advantage. Founded in June 2000 with a precise aim: planning production plants suitable for the moulding of composite materials. “Our Team consists of skilled staff able to better analyse the needs of the customers, implement and start a new production bearing in mind the final costs. Furthermore, our Team provides a service always quick to resolve any doubt and easily evaluate new requests.” Its engineers use “the best desktop 3D printer on the market” to render clients’ prototypes. These are the three steps: Roof with living plants & solar panels Roof with living plants & solar panels
  • 37.
    NOVEMBER 23 -262015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 37 Find every exhibitor on The Big 5 app EXHIBITOR NEWS This is the second time that FerreroLegno has exhibited at The Big 5 and its reasons are simple: “We have had several requests from the Middle East about our products and we think it is very interesting market for our products. This year will see the launch Clever Italian cupboard space will impress HALL 6 A240 of its new Skema closure system, ideal for kitchen rooms, walk-in wardrobes, utility rooms, niches, under-stair storage closets or control panels. Its customisable comes in a variety of designs. It’s made- to-measure, and is available with book closure. swing and folding. “Skema provides absolute continuity in the wall, Established in 1977 in Italy, Gamma Meccanica Spa comprises three divisions, each one focused on a specific sector: Insulation division designs and produces lines for the production of mineral wools. The plastics division is specialised in lines for recycling of plastic material The extruded polystyrene division is dedicated to the creation of systems for the production of XPS panels. Constant technological and applicative research by the highly-qualified staff make Gamma Meccanica SpA one of the leading players on the international market in these fields. At The Big 5 2015, find out more about the centrifuge for stone wool. “In the stone wool production, the lava is converted into thin fiber by means of a centrifugation process.” g www.gamma-meccanica.it Insulation... the Italian way HALL 7 F305 optimising spaces and making each opening an integral part,” says the company. The Italian company is concentrating on this region in the medium term, knowing that it where expansion is most likely compared with the “difficult” market in its home country and Europe. g www.ferrerolegno.com
  • 38.
    38 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE SPEAKER INTERVIEW Date: Part 1 November 23, Part 2 November 24 Time: 10-11am (both days) Where: Business Intelligence Theatre Who should attend? Manufacturers supplying to the construction, electrical/gas, fire and PPE sectors. This includes QA managers but also marketing and sales professionals who wish to understand how BSI can help with creating commercial advantage. Construction organisations will be interested in our new Kitemark for BIM and the presentation will include a case study to explain the relationship between standards and certification. “Gaining a competitive edge is critical to construction product manufacturers as its becoming increasingly important for companies to not only meet their legal obligations but also remain competitive in the global market place.” - Andy Butterfield We talk with Andy Butterfield, the Global Head of Construction for BSI, who will present for two days in The Business Intelligence Theatre. A ndy Butterfield oversees British Standards Institution’s (BSI’s) network of regional offices in 74 countries around the world. BSI’s Product Certification construction sector services includes; Kitemark Certification, CE marking, Keymark, Watermark and Benchmark. He has 30 years of experience in quality assurance, testing and certification, and is a qualified Mechanical Engineer and ISO 9001:2000 Lead Assessor. He explained his two-part seminar will cover testing and certification for two distinct areas; product manufacturing for the construction sector (products which are supplied to the construction sector such as windows, doors, pipes, fittings, concrete, cement) and will also be discussing a new area which is a certification of processes and organizations for digital technology in construction such as BIM (Building Information Modeling). He said: “The presentation will focus upon the need for effective standards and assurance solutions which support implementation and adoption of standards – I will also focus upon global market access.” He says being aware of the standards and understanding the benefits is vital across the construction sector and he offers a look back to the beginning of the last century for a simple explanation of why: “The need for standards has been an issue for well over 100 years and is perfectly illustrated through the formation of BSI,” he said. “In 1901 the transport sector was struggling with a big problem with the differing sections of steel being manufactured for tram lines. There were no standards in place at the time and the result was that there were in excess of 75 different sizes of steel section, which made the construction of projects almost impossible, as you can imagine the waste in terms of time, labour and materials would have been significant.” The solution came in the form of Sir John Wolfe Barry developing the very first British Standards for steel sections for tram lines, and so the British Standards Institution was born. The result was truly transformational effectively reducing the number of steel section types from 75 to just six. The six makes the process of construction far easier, cost effective and efficient. “People face the same challenges in today’s world, whilst the processes and Why understanding construction material standards is vital…and profitable materials may have changed, the same need for standards is as relevant today and it was back in 1901,” said Butterfield. He explained that the BSI Kitemark evolved within two years, which enabled organisations to demonstrate that they met both product and process standards and enabled them to demonstrate this to industry stakeholders and supply chain partners. Kitemark schemes are available for many different type of standards ranging from British (BS), European (EN), International (ISO) and American (ASTM) standards to standards which have been specifically created where there is no existing standard in the market, known as Publically Available Standards (PAS). BSI is therefore able to help local markets, such as the GCC region, by creating Kitemark certification schemes which are relevant to the local issues. “We actively assist manufacturers in the region to demonstrate their commitment to quality and best practice in order to secure a commercial advantage through differentiating their products and services,” said Butterfield. “I will structure my presentation to include an overview of what the BSI Group does and how we are structured to help with global market access. I will include pictures and a couple of case studies as examples of where we have helped in the ME region. I will also be explaining how standards are helping to shape solutions for current issues related to the construction sector.” g Andy Butterfield STANDARDS & CERTIFICATIONS: WHAT YOU NEED TO KNOW ABOUT CONSTRUCTION PRODUCT TESTING PART 1 & 2 See page 54 for The business Intelligence Theatre
  • 40.
    40 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 app HALL 1 F21 De Boer Waterproofing Solutions is a manufacturer of waterproofing membranes since 1922. It said: “We focus on innovative systems and cherish long-term client relations. Our passion is to produce high quality waterproofing systems for a multitude of applications such as flat roofs, podium decks, green roofs, tanking and infrastructure projects. “Through innovation, we have continuously upgraded our Duo High Tech waterproofing membrane range. This state of the art waterproofing membrane combines TPO-modified bitumen with SBS-modified bitumen in one layer. Duo membranes have been installed worldwide since 1989 and have a proven durability in various climate zones.” De Boer Waterproofing Solutions will be showing a wide selection of waterproof membranes for a variety of applications. Duotherm warm roof systems by De Boer. These flat roof systems provide you waterproofing and thermal insulation in one system. The roof built-up is designed Guaranteed waterproof wherever you need it tailor-made to the building’s requirements. A great solution for buildings that need a durable waterproofing system with energy cost saving features in one. Available in different colors and the top Duo membrane can be left exposed in different climate types. g www.deboer.be FOCUS C106 Traditional architectural additions with 21st century manufacture Elite Décor Industry produces a variety of polyurethane stucco decor collections by its own designers and specifically to meet customers’ orders. Its most famous collections of architectural decorative mouldings made of polyurethane are GRAND DECOR and HARMONY, which include more than 1,200 items: crown mouldings, cornices, moldings, ceiling roses, medallions, ceiling tiles, and similar. This product is free of CFC, cyanides and asbestos and boast a density of 250- 400 kg/m³ with the lowest indoor VOC emissions. It also produces fibreglass columns, capitals, bases, pedestals, domes and niches from Elite Decor Industry are satisfying combination of modern-day technology and low maintenance care. Quality materials, excellent workmanship and aesthetic appeal make Elite Decor products an exceptional value. Elite Décor Industry produces faux wood beams based on polyurethane structural foam. This is a light and firm material with excellent decorative and consumer properties, high rates of safety and sustainability. Prestige Decor exterior architectural mouldings (facade decoration) are made of coated polystyrene. The product does not contain harmful substances. g www.elitedecor.ua DiTOIL® MIDDLE EAST FZE PO Box 120435, Saif-Zone, Sharjah, UAE. T +971 6531 2557 E info@ditoil.ae www.ditoilmefze.ae EXHIBITOR NEWS
  • 41.
    NOVEMBER 23 -262015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 41 Find every exhibitor on The Big 5 app Italian company Ariston Group, a world leader in water heating solutions, aims to achieve 80 per cent of revenues from renewable/energy efficient products by 2020. Ariston Thermo Group will present its latest sustainable technologies at The Big 5 Dubai 2015. Visitors to its stand can learn about products and solutions designed specifically for the Middle East markets, with a focus on performances and energy saving. These include heat pumps, solar water heaters, electric water heaters and gas boilers. In addition to electric water heaters for domestic and industrial applications, Ariston personnel will let customers try the new range of heat pump water heaters. The latter guarantees an energy saving of 75 per cent compared to a traditional electric water heater. Solar water heaters will have a special focus on the Ariston stand, with opportunities to discuss the product with its design manager so visitors can make the most out of their visit. g www.ariston.com The future of water heating HALL 7 C290-C291 Spain’s Bellota manufactured its first tool more than 106 years ago. Today, it is an international group offering 18,000 products in 120 countries for agricultural, gardening and building sectors. The company owns ten ZABEEL HALL, Y181 manufacturing plants in countries including Spain, Denmark, USA, Mexico, Colombia, Brazil and India. It is going to launch a new TECH Tile Cutter for large formats (up to 42.2 inch) at this year’s show. Visitors to its stand also have access to cutting products (tile cutters, scoring wheels, tapes, pliers and diamond discs), laying products (spacers, rubber trowels, floats, spatulas, mixers and levels) and cleaning products (sponges, sponge trowels and complements). In addition, Bellota will present more than 40 different varieties of its safety footwear lines including the latest TRAIL and EXPLORE ranges. g www.bellota.com Agricultural components and tools FEXIBILITY, TECHNOLOGY AND QUALITY MADE BY JORNS The new bending tool geometry, hardenable to 55 HRC (1800 N/mm2 ), leaves nothing to be desired. Our range includes machines in lengths from 3 to 12,2 m and the bending capacity of 1,25 to 3 mm in steel (400 N/mm2 ). Available with hydraulic material thickness adjustment, SUPER HIGH SPEED and hem pretension with which the material spring back of an open hem can be compensated in the middle of the sheet. The required protective devices according to the EC Machinery Directive 2006/42/EC are a standard with us since 2010. JornsAG CH-4932Lotzwil/Switzerland Phone+41(0)629198050 info@jorns.ch www.jorns.ch We exhibit on the Big 5 in Dubai: Swiss Pavillion Zabeel Y153 We are also looking for local distribution partners in different areas. 275° EXHIBITOR NEWS
  • 42.
    42 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE SPEAKER INTERVIEW Multi-cultural management made simple and successful Date: Wednesday November 25, 2015 Time: 2:30pm Where: The Business Intelligence Theatre Who should attend? Mid and senior level managers and executives who are tasked with managing an intercultural team in a regional or multi-national market environment. “Differences in managementvary from the person who leads a team and also, often subconsciously, the cultural background of a leader.” - Beatrice Hunt We speak to Beatrice Hunt, GM of BE Consultants International as she prepares for her seminar on managing staff from a variety of backgrounds. T he wide diversity of the workforce requires skill, tact, and discreet flexing of communication styles to not increase the barriers and walls that already exist and that actually impact clear communication,” says Beatrice Hunt. Her career has seen her involved with people from differing cultures and backgrounds through her work with NGOs. She has lived in Dubai, Saudi Arabia and Kuwait during the past 14 years. She said: “I perceived that there are many challenges an executive has to cope and contend with. “Differences in management vary from the person who leads a team and also, often subconsciously, the cultural background of a leader can influence the way he leads a team. In the Middle East region each company and office is literally a hybrid of many different nationalities, languages, and cultures. “Having everyone work together and in harmony- building consensus and esprit de corps requires mastery of intercultural competence, emotional intelligence, and conflict management.” The MENA region presents its own set of unique challenges, says Hunt: “The wide diversity of the work force requires skill, tact, and discreet flexing of communication styles to not increase the barriers and walls that already exist and that actually impact clear communication.” And her seminar will focus on ensuring the best possible management of those staff aided by a new tool, she says. “Our sister company Institute for Leadership Development in Berlin’s has a new tool, which is called ‘4Cs of Leadership’ – it’s a diagnostic tool for leadership and management developed by the respected Eckert business school in Florida, USA.” Hunt believes there are huge benefits: “How a culturally diverse workforce is more efficient, I will explain in my workshop. “Diversity also brings different areas of thoughts, ideas, experiences on how to accomplish things. It is always good to also receive real feedback to ensure keeping everything on track to reach whatever goal is being sought.” And finally, she believes that the Gulf offers real opportunity for the right businesses. She said: “The GCC market and the construction industry is currently undergoing change. The global oil spot price might not recover to higher levels, and that means public spending will slow. It will be a growing private sector that will eventually win the day. “Having a strong foundation on cultural awareness, good interpersonal communication skills, empathy, and strong emotional intelligence will allow you to cherish, profit, and learn from your experiences in the Gulf.” g Beatrice Hunt MANAGING A CULTURALLY DIVERSE BACKGROUND TO OPTIMISE ORGANISATIONAL PERFORMANCE See page 54 for The Business Intelligence Theatre programme
  • 43.
    isinvolvedin: • Electrical, Electromechanical and Civil Engineering Construction • Manufacturing and Marketing Electrical Construction Products • Allied Engineering Services Tel. : + 966-92-000-6111 www.alfanar.com Headquartered in Riyadh, Saudi Arabia, we operate construction and manufacturing businesses, design & development centers and a host of facilities in the Middle East and other countries.
  • 44.
    44 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 appEXHIBITOR NEWS From architectural masterpieces like the Shard and Gherkin to iconic buildings such as the Sydney Opera House and Buckingham Palace, Coopers Fire have been trusted to protect the world’s most prestigious buildings. This year at The Big 5 it will be displaying its range of protective fire curtains: The FireMaster Plus insulating zone fire curtain offers both integrity and insulating zone so is a perfect product for compartmentation and protecting a means of escape. The unique fabric designed and engineered by Coopers Fire has an intumescent coating that expands at 160 degrees celsius thus creating a Fire solutions by the UK’s finest HALL 2 B60 protection from radiant heat. Developed and manufactured by Coopers, the SmokeStop smoke curtain barrier is approved to provide compartmentation and to protect escalators and atria in any standard commercial building from smoke migration and control smoke for up to 30 minutes. The FireMaster Horizontal fire curtain is a perfect solution for stairwells and atria in both commercial and domestic applications. Available in a variety of sizes and offering two hours fire protection. FireMaster vertical fire curtain. Coopers Fire FireMaster A1 fire curtain is compliant with BS 8524 Part 1 and offers over two hours integrity. FireMaster Concertina fire curtain. Multi sided fire curtain can be used to protect stairways, escalators and atria. Perfect for open plan building designs as no side guides or columns are required. g www.coopersfire.com Pipe experts and suppliers since 1998 The Bisan Group is a supplier of steel pre- insulated pipes across the region for almost 20 years. It stocks and supply carbon steel pipes, butt-weld fittings, flanges, flexible joints, valves, malleable iron fittings, stainless steel pipes and fittings. we have proved our experience and expertise to provide maximum client satisfaction to our buyers. Bisan has a sound infrastructure with a large storage facility and the ability to deliver bulk orders smoothly and promptly. It has branches across the GCC and promises “quality is the first priority”. “Each product is rigorously scrutinized and checked, before dispatch. There is an efficient quality control check system to manage any discrepancy.” g www.bisantrading.com HALL 1 G01 PMV B77 NFT has been reaching for the skies for more than three decades NFT is the first distributor of tower cranes and hoists in the GCC and is the sole distributor of famous brands like Manitowoc Potain, GJJ/ ORBIT and PEGA. Born from a single man’s vision and ambition, the company is mostly specialised in tower cranes, passengers & materials hoists, as well as other construction equipment delivered by a highly qualified technical team with a strong emphasis on safety and safe- work practices. NFT is currently located in Asia, Europe, Africa and most recently Australia with all global clients able to enjoy a complete offering of its products and services. For more than 35 years, the company has faced engineering and logistic challenges and has acquired an excellent understanding of stakes, constraints and ways of working in the construction business. Today NFT’s team is composed of more than 1000 qualified technicians and employees, based across the world. Its fleet is permanently growing and now counts more than 1,500 tower cranes, over 300 hoists and a complete stock of available spare parts. NFT’s strength resides in the fact that it is able to supply cranes or equipment to any construction project type or take up any technical challenge. Its product portfolio includes small self-erecting cranes (700kg capacity/26m) as well as much bigger slewing cranes like the impressive Potain MD 3200 able to carry up to 80 tonnes. g www.nftcrane.com
  • 46.
    46 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 app The Hoermann Group is Europe’s leading supplier of gates, doors and frames. It is a family business which has grown against a backdrop of innovation, quality and customer relationaships. At The Big 5 2015 here are some of the products being displayed by this well-known German brand: • The Industrial Sectional Door ALR67 Thermo. A well-insulated industrial sectional door essential in heated buildings. • The Decotherm Classic S Rolling Shutter, which has received confirmation of the sustainability of all its rolling shutters and rolling grilles. • Its High-speed-door V 5030 SEL is quiet and fast, vital for areas where low-noise is essential. Spring steel ZABEEL HALL J120 Hoermann has a door for every situation wind locks integrate into a curtain pocket, with lateral twin rollers. • Hoermann Spiral door HS 7030 PU are characterised by their high thermal insu- lation, fast opening speed and light grilles as standard. • Industrial Sectional door SPU 42 allows the safe pas- sage of pedestrians thanks to the wicket door with trip-free threshold. • Hydraulic dock levelers are available as hinged lip or telescopic dock levelers. they can bridge large height differences between the ramp and the lorry loading level. • Hörmann steel fire-rated doors are available with a thin rebate (standard) or a thick rebate. With dou- ble-leaf doors the fixed leaf is secured with a rebate latch or rebate locking bolt at the top and bottom de- pending on the function. • Over many years Hörmanns ZK doors have proven themselves as robust doors for everywhere from the basement to the roof. ZK doors do not warp and come with a high-quality surface that is durable, resistant to stains and easy to clean. g www.hoermann.de Isa Idrosanitaria brings more than 50 years’ experience in the manufacture of showers, rods, arms and shower panels, hoses, taps and many other accessories for the bathroom. It pledges a focus on quality thanks to careful selection of raw materials and highly-qualified personnel. Its maxim translates from the Italian to: “The pleasure of water, to be rediscovered every day through our creations.” Among the display items at The Big 5 2015 is the Kelly hand shower with ultra-thin design and new misty jet. It is also showing its pecial grid with anti-scale nozzles for the Camelia shower set, its Peonia brass shower set with built-in mixer and Libera shower rail with Ariel hand shower and hose. g www.isaidrosanitaria.com ‘Rediscover the pleasure of water’ HALL 7 D295 Designed & Built for the Middle East • Ducted Splits • Roof Top Packaged Units • Air Handling Units • Condensing Units • Fan Coil Units • Cold Rooms • Water Coolers For Distributor Enquires, Please Contact: Gurjeet Singh Dahri Head of Business Development Mob: +973 32000353 Email: bd@hawaac.com Factory No. 900 Road: 115, Block:601 Sitra Industrial Area P.O.Box: 955, Manama Kingdom of Bahrain Proudly made in the Kingdom of Bahrain h a w a a c . c o m EXHIBITOR NEWS
  • 47.
    NOVEMBER 23 -262015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 47 Find every exhibitor on The Big 5 app Korean supplier Interway has its sights set firmly on expansion into the Middle East and believes The Big 5 in Dubai will help it secure new customers and buyers. The company says: “Since its inception, Interway has been aiming to be a top supplier across the world and is currently reputed as one of the leading players in the market. “We have solid experience in PE, PVC tarpaulin, PE scaffolding covers, PE nets and all the related accessories.” g www.interway-tarp.com ZABEEL HALL T174 HVAC flexible ducts are expected to attract a lot of interest this year on the stand of ISIL MUHENDISLIK AS. ISIL AS was set up in 1998 when it started production of flexible ventilation ducts and duct connectors, used in the heating, ventilation and air conditioning (HVAC) industry, as the first producer in Turkey. It said: “We are proud to present our new and unique product artist self insulated flexible duct. Artist goes faster in the ventilation market by unthroning the regular insulation methods. “While having such progressions at international market, ISIL AS also achieved to meet the great parts of the needs of domestic market and participated in many important projects nationally.” Flexiva can link with any kind of flexible ducts and has its own unique technology. A colourful new flexible approach to HVAC HALL 3 C111 ISIL AS is completing the essential investments, and has established new 5,000 sq m. It said: “We have all the colours of the earth and Flexiva products have a wide range of usage with his quality. ISIL A.S. presently exports to about 40 countries and participates the most important exhibitions around the world from America to Asia and Europe, Middle East to Africa. g www.flexiva.com.tr Tarpaulin from the Korean leader C M Y CM MY CY CMY K BIG 5 Halfpage 219 mm X 145 mm_OL.pdf 1 11/10/2015 14:47 EXHIBITOR NEWS
  • 48.
    48 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 app TRADE CENTRE ARENA SHEIKH S CONCOURSE 1 HALL 3HALL 2 AL B HALL 4HALL 1 ZABEEL HALL ITALY PAVILION TURKEY PAVILION R R R CAFÉ L L L Hall 8 Hall 2 a Visitor registration / badge collectionR Middle East Concrete / PMV Live seminar theatre Stairs to first floor Sheikh Saeed Halls & outdoor area Sheikh Saeed Halls & outdoor area Lifts / Elevators to first floor Live demonstrations theatre Platinum Club lounge LL The Big 5 Focus FOCUSFOCFOCFOC FOCUS NEW NEW FLOORPLAN TRADE CENTRE ARENA CONCOURSE HALL 3HALL 2HALL 1 ZABEEL HALL R R R CAFÉ L L L Visitor registr badge collectR Middle East Concrete / PMV Live seminar theatre Stairs to first Sheikh Saeed Halls & outdoor area Sheikh Saeed Halls & outdoor area Lifts / Elevators to first floor Live demonstrations theatre Platinum Club lounge The Big 5 Focus FOCUSFOCFOCFOC FOCUS NEW NEW FLOORPLAN TRADE CENTRE ARENA SHEIKH SAEED HALLS CONCOURSE 1 HALL 3 HALL 6 HALL 7 HALL 2 HALL 8 AL MULTAQUA BALLROOM HALL 4HALL 1 ZABEEL HALL HALL ITALY PAVILION TURKEY PAVILION METRO ST R R R CAFÉ L L L Hall 8 COATINGS, ADHESIVES & SEALANTS Hall 2 and Hall 3 Visitor registration / badge collectionR Middle East Concrete / PMV Live seminar theatre Stairs to first floor Sheikh Saeed Halls & outdoor area Sheikh Saeed Halls & outdoor area Lifts / Elevators to first floor Live demonstrations theatre Platinum Club lounge Lanyard pickup poL The Big 5 Focus FOCUSFOCFOCFOC FOCUS NEW NEW
  • 49.
    NOVEMBER 23 -262015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 49 Find every exhibitor on The Big 5 app OUTDOOR AREA SAEED HALLS IBIS HOTEL NOVOTEL HOTEL MAINCONCOURSE HALL 6 HALL 7 HALL 8 L MULTAQUA BALLROOM SHEIKH RASHID HALL SHEIKH MAKTOUM HALL HALL 5 METRO STATION R R R L L Sheikh Maktoum and Sheikh Rashid Halls KITCHENS & BATHROOMS Hall 4 and Al Multaqua Ballroom WATER TECHNOLOGY COATINGS, ADHESIVES & SEALANTS Halls 1, 2, 5, 6, 7, Zabeel Hall, GENERAL CONSTRUCTION Sheikh Maktoum and Sheikh Rashid Halls BUILDING INTERIORS and Hall 3 Sheikh Saeed Halls Zabeel Hall WINDOWS, DOORS & CLADDING Lanyard pickup point Sheikh Saeed Halls, Trade Centre Arena, Italy & Turkey Pavilions OUTDOOR AREA SHEIKH SAEED HALLS IBIS HOTEL NOVOTEL HOTEL MAINCONCOURSE E 1 HALL 6 HALL 7 HALL 8 AL MULTAQUA BALLROOM SHEIKH RASHID HALL SHEIKH MAKTOUM HALL HALL 4 HALL 5 ITALY PAVILION TURKEY PAVILION METRO STATION R R R L L Sheikh Maktoum and Sheikh Rashid Halls KITCHENS & BATHROOMS Hall 4 and Al Multaqua Ballroom WATER TECHNOLOGY Hall 8 COATINGS, ADHESIVES & SEALANTS Halls 1, 2, 5, 6, 7, Zabeel Hall, GENERAL CONSTRUCTION Sheikh Maktoum and Sheikh Rashid Halls BUILDING INTERIORS Hall 2 and Hall 3 Sheikh Saeed Halls Zabeel Hall WINDOWS, DOORS & CLADDING ration / tion floor Lanyard pickup pointL s Sheikh Saeed Halls, Trade Centre Arena, Italy & Turkey Pavilions OUTDOOR AREA S IBIS HOTEL NOVOTEL HOTEL MAINCONCOURSE 6 SHEIKH RASHID HALL SHEIKH MAKTOUM HALL 5 TATION R R R L L Sheikh Maktoum and Sheikh Rashid Halls KITCHENS & BATHROOMS Hall 4 and Al Multaqua Ballroom WATER TECHNOLOGY Halls 1, 2, 5, 6, 7, Zabeel Hall, GENERAL CONSTRUCTION Sheikh Maktoum and Sheikh Rashid Halls BUILDING INTERIORS Sheikh Saeed Halls Zabeel Hall WINDOWS, DOORS & CLADDING oint Sheikh Saeed Halls, Trade Centre Arena, Italy & Turkey Pavilions THE BIG 5 2015 FLOORPLAN DUBAI WORLD TRADE CENTRE
  • 50.
    50 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE 10:30 11:00 11:15 11:30 12:00 12:50 13:15 14:15 The Design Summit Innovation and efficiency in architecture and urban planning Held on Tuesday, 24 November, The Design Summit will bring together architects, consultants, urban planners, engineers and contractors and will be the only conference in the region to offer FREE detailed insight into the latest design trends, new technologies and techniques such as sustainability and cost-efficiency, whilst also providing unparalleled on the ground analysis of local and regional Middle East markets. 14:45 15:15 15:45 16:15 16:45 17:15 18:00 Tuesday, 24 November 2015 Room: Dubai C&D REGISTRATION Opening remarks from the Chair Christopher Seymour, Head of Markets, Arcadis ME Keynote Address: Powering Dubai’s smart city transformation Keynote Address: Shaping Dubai’s green building evolution Eng. Abdulla Rafia, Assistant Director General, Planning and Engineering, Dubai Municipality Masters of Architecture Panel: Shaping Arabian cityscapes and the buildings of tomorrow The GCC construction market is once again booming, with over US$315 billion in new projects announced last year in the UAE alone. Innovation and forward-looking design is balanced with an ever-increasing emphasis on sustainability, energy efficiency and better urban placemaking. This opening keynote panel will bring together noted visionaries and design personalities who are shaping GCC cityscapes, to share experiences and best practice in innovation and efficiency in achieving sustainable urban design. • What are the latest trends and innovations influencing design choices today? • What are the main challenges facing urban planners in the GCC? • Where are the biggest opportunities for designers in the GCC in the next five years? • How are regulations and a growing awareness of sustainability issues influencing design decisions? • How is innovation driving building design and what are the most innovative buildings in the GCC and around the world today? • How can we balance contemporary design with the preservation of cultural heritage? Moderated by John Alexander Smith, Professor of Architecture, American University in Dubai Benjamin Piper, Director of Architecture, Perkins + Will Janus Rostock, Regional Design Director, Middle East and India, Atkins Raj Patel, Managing Director, Design Principal, KEO International Consultant Rashad Bukhash, Director of Architectural Heritage Department, Dubai Municipality Sherif Anis, AIA ME 2015 Vice President and 2016 President-elect, American Institute of Architects (AIA) GCC Market Overview 2015: Updates and opportunities for the design and construction sector Recent reports indicate that construction projects worth US$103 billion are likely to be awarded this year in the GCC, an increase of 21.2 per cent from 2014. This session will provide data and analysis from mega-projects across the region, providing the latest country and sector insights for development and identifying forthcoming opportunities for the wider design and construction industry. Craig Plumb, Head of Research, MENA, Jones Lang LaSalle Break The Design Summit Global Showcase: Post-Expo legacy planning in Milan Italy has invested a reported 1.4 billion Euros into Milan Expo 2015 and will welcome over 20 million visitors during the course of the event. This session will provide insights into how the Milan 2015 urban design team has incorporated Post-Expo legacy planning into the design. It will examine the planned renovation of the Expo site into a fully functioning mixed use urban hub with connections to the city center and major airports following the event, sharing lessons learnt for best practice in legacy planning and design. Lorenzo Pallotta, Senior Architectural and Urban Planner, Project Manager, Milan Expo 2015 Company, Arexpo Company Designing the next generation of sustainable cities • Key design features of future sustainable cities • Master planning for resilience, liveability and inclusivity • Creating active and healthy cities through sustainable urban mobility • Understanding the importance of holistic design Baharash Bagherian, Founder & Design Director, Baharash Architecture Creating healthy and connected cities through efficient transport planning • Report card on planning and transport • Overcoming Middle East challenges to healthy cities • Mapping journeys of the future, forecasting future requirements • Lessons learnt from regional case studies Roger Cruickshank, Director, Strategic Transport Planning, Atkins Break Transport Infrastructure Project Showcase: Developing the next generation airport at Al Maktoum International expansion Future-proofing for the latest innovations in technologies and designing for space optimisation to create an integrated commercial environment and elevate consumer engagement. This session will explore the expansion of Al Maktoum International Airport to ensure adaptability and efficiency whilst accommodating over 220 million passengers and 16 million tonnes of cargo per year. Simon Scott, Head of International Business, Leslie Jones Architects Innovation Project Showcase: Building The Opus: The history of a double curved glazed Dubai project This design case study will provide detailed information on the faÇade design, procurement and installation of The Opus building, a Zaha Hadid project in Business Bay that has combined challenging free flow geometry and fully glazed faÇades. Agnes Koltay, Director, Koltay FaÇades Future Innovations Round Table: What new technologies and materials are revolutionising the market? This session will bring together a panel of experts to talk about what new trends, technologies and materials they believe will revolutionise design in coming years. • Reducing the GCC’s carbon footprint through better building design • New and improved materials and construction products taking the market by storm • The latest technological innovations to optimise building performance • New material trends for contemporary design Moderated by John Alexander Smith, Professor of Architecture, American University in Dubai Engi Jaber, Sustainability Manager, Dewan Architects & Engineers Eng. Meshal Al Shamari, Director, Qatar Green Building Council Dr. Robert Cooke, Associate Director, BuroHappold Stuart Clarke, Associate Director, Middle East FaÇade Engineering Leader, Arup End of the Design Summit at The Big 5 *Due to unforeseen circumstances, the programme may change and The Big 5 reserves the right to alter the speakers. SEMINAR AGENDA
  • 52.
    52 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Sustainability Theatre Agenda The free to attend workshops are CPD accredited and you can register the points earned with your professional association. Simply register online for free entry and collect your free certificate onsite on the same day. 10:00-12:00 13:00-15:00 16:00-18:00 10:00-11:00 11:30-12:30 Monday, November 23 2015 Room: Abu Dhabi B Updates to Dubai Municipality’s green building regulations • Overview of the Dubai’s initiatives for sustainability • Highlighting Dubai’s construction progress and the challenges in meeting the increased demand on power and water • Latest update on the Dubai Green Building Project • Detailing the implementation mechanism of the Dubai Green Building Regulations and Specifications • Outlining the requirements for assessment and certification of green buildings • Moving forward: Dubai’s roadmap toward sustainability Senior Representative, Dubai Municipality Sustainable practices during construction After attending this workshop, delegates will be able to: • Define and understand the roles and responsibilities for different construction teams to deliver a green building • Identify the best practices for sustainability during construction activities • Understand the construction phase credits, requirements and intents • Plan for key considerations and requirements for certification documentation Hamoda Youssef, Research Specialist, Qatar Green Building Council Updated energy modeling strategies for LEED v4 • Introduction to LEED v4 • Understanding LEED BDC v4 energy and atmosphere and other related LEED v4 credits • Compliance step by step guidance • Overview of the energy modeling process • Energy modeling requirements and documentation Reniel Barroso, Engineering Manager, Green Technologies Tuesday, November 24, 2015 / Room: Abu Dhabi B Commissioning, recommissioning, and retro-commissioning: A triple bottom-line return on investment Commissioning’s ultimate goal is to provide an intensive quality assurance process. A well-commissioned building will be able to perform to the owner’s performance requirements, meets the needs of its occupants, optimise energy and water efficiency as well as be a safe and comfortable environment. Through the process of commissioning new buildings and having a plan for re-commissioning them every few years, and retro-commissioning existing buildings, owners can achieve/enhance cost-savings. This session considers: • Addressing system and equipment problems so as to avoid unnecessary utility bills; • Avoiding equipment repairs and replacement costs; and • Enhancing public health through better indoor environmental quality. Sinan Rasheed, Executive Director, Corporate Sustainability, KEO International Consultants Sustainability is Free • The net benefit of sustainability outweighs the net costs • The sustainability movement today is analogous to what quality management was in the 1980s • Investors, regulators and clients are driving higher levels of performance • Sustainability is an imperative in business today • Sustainability is vital to our ecological and social well-being 14:00-15:00 16:00-18:00 10:00-12:00 13:00-14:00 15:00-16:00 16:30-17:30 Franklin Holtforster, President & CEO, MHPM_Driver Top tips and tools to ensure you are maximising your building’s energy savings • Highlighting common scenarios where the actual energy savings are different from what’s promised • Conducting a building background check • Retro-commissioning and ASHRAE Level 1 and 2 Audits • Focusing on measurement and verification of energy conservation (and renewable energy) performance • Determining a way forward: Potential strategies going forward and which of those can overlap with rating systems like LEED O+M Nandan Tavkar, Senior Sustainability Engineer, Buro Happold Updated Indoor Environmental Quality (IEQ) strategies for LEED v4 • Introduction of LEED v4 • Explaining LEED BDC v4 Indoor Environmental Quality and other related LEED v4 credits • Brief IEQ credit updates • Highlighting IEQ credits with impact on engineering design Reniel Barroso, Engineering Manager, Green Technologies Wednesday, 25 November 2015 / Room: Abu Dhabi B Materials testing and certification • Testing of different products • Over view of legislation and regulations • Certification of products and process Senior Representative, Dubai Central Laboratories Managing the construction phase of sustainability targets • Understanding project priorities and constraints in order to develop the right strategy to successfully implement sustainability at construction • Filling the gaps between different trades and specialties on site, project stages and conflicting interests to minimise the risk of making mistakes • Providing on-site training on sustainability concepts and processes to promote easier and faster communication • How to develop the right monitoring tools to facilitate reporting and communication of progress • Applying an integrated development process during construction to ensure efficient sharing of information Francesca DePetris, Sustainability Manager, KEO International Consultants Life cycle cost assessment (LCCA) of green buildings • Overview of the concept of life cycle costing of buildings and materials and how this is key to determining the true cost of buildings • Understanding how green building strategies contribute to life cycle cost reductions • Real life examples of green building strategies that contribute to overall cost reduction Michel Francis, Chief Architect, DEC Consultants Improving sustainability in the GCC HVAC industry • District Cooling: Is it an outdated technology and what is the road forward? SEMINAR AGENDA
  • 53.
    NOVEMBER 23 -262015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 53 • Air Cooled systems: Should they be banned similar to the incandescent lights or should they be substantially developed? • VRF Or VRV: Is the claim of energy savings credible and what is the future development? • The chilled water FCU & AHU: Have they stagnated ? What is new and what is the way forward? • Fresh AIR AHUs: Efficiencies and cross contamination issue • Other HVAC systems: Chilled beam, radiant cooling, etc. George Berbari, CEO, DC Pro Engineering Thursday, 26 November 2015 / Room: Abu Dhabi B Introduction to the UN Global Compact Principles: Sustainability and ethicality in real estate and construction • Introduction to the UN Global Compact for businesses committed to aligning their operations and strategies with ten universally accepted principles in the areas of human rights, labor, environment and anti- corruption • Highlighting key corporate sustainability trends and priorities within the MENA region • Identifying challenges and opportunities companies encounter in the region when integrating corporate social responsibility into their operations Cara Tissandier, Sustainability Manager, Hoare Lea; Senior Representative, Royal Institute of Chartered Surveyors (RICS) Life cycle costing: Theory vs practice in the GCC region • What is LCC and its relevance to the construction industry? • Why should the industry do more to apply the LCC technique? • Who should know about the techniques and impact on decisions? • Challenges in the applications of LCC in the region • BIM and LCC Assem al-Hajj, Academic Head, Heriot Watt University 10:00-11:30 12:00-13:00 Retrofitting existing buildings in the UAE • Overview of the UAE built environment • Understanding the market for energy savings through building refurbishments and existing barriers • Highlighting existing policies, regulations, and financial models • Renovation with a vision defining a roadmap • Recommendations for a sustainable package Dr. Hasim Altan, Associate Professor, Sustainable Design of the Built Environment, British University in Dubai Improving efficiency and reducing costs through effective FM • Exploring the latest innovations in facilities management (FM) • Strategies for getting the best out of FM service providers without putting strict penalties in place • Methods to reduce costs in maintenance and cleaning • Top tips for improving the efficiency of your building through effective FM Mick Dalton, Director FM Meraas Estates Division, Meraas Holding Company *Due to unforeseen circumstances, the programme may change and The Big 5 reserves the right to alter the speakers. 14:00-15:00 16:00-17:00 MANAGING THE CONSTRUCTION PHASE OF SUSTAINABILITY TARGETS Wednesday, November 25 1:00 pm - 2:00 pm Francesca DePetris Sustainability Manager, KEO International SEMINAR AGENDA
  • 54.
    54 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Business & Market Intelligence Theatre Agenda The free to attend workshops are CPD accredited and you can register the points earned with your professional association. Simply register online for free entry and collect your free certificate onsite on the same day. 10:00-11:00 11:30-13:30 14:30-16:00 16:30-18:00 10:00-11:00 12:00-14:00 Monday, November 23, 2015 Room: Al Ain F Standards and certifications: What you need to know about construction product testing Part I • Intro to BSI Group services worldwide • Highlighting the importance of standards within the construction sector • How standards support emerging technologies: BIM focus • Overview of the types of certification solutions for the construction sector • Introduction to the types of standards and certification for electrical and gas sector product testing Part I Andy Butterfield, Global Head of Construction, BSI Graham McKay, Global Head of Electric and Gas, BSI Arbitration and dispute resolution in construction claims • Identifying the main causes of construction disputes • Why arbitration is a preferred dispute resolution method • Understanding where and how to conduct arbitration • Outlining the procedural aspects of arbitration Simon Palmer, Partner, DLA Piper Suzannah Newboult, Legal Director, DLA Piper Tim Haynes, Senior Managing Director, FTI Consulting GCC construction sector update: Market potential and business development opportunities • UAE market introduction • Overview of the project pipeline and mega-projects: UAE, Kuwait, Qatar and Saudi Arabia • Exploring the ways your company can enter and be present in the UAE market Dr. Ouzaina Hankir, Managing Director, GTV Global Project control best practice • Understanding the role of effective control mechanisms in achieving project goals and project success • Understanding the major elements of project controls including: Tracking time and cost, prioritisation, handling contingencies that arise during project implementation, tracking key project milestones and controlling and managing outside resources Reem Murad, Planning and Cost Control Manager, Arabtec Tuesday, November 24, 2015 / Room: Al Ain F Standards and certifications: What you need to know about construction product testing Part II • Intro to BSI Group services worldwide • Exploring the challenges of compliance with testing requirement of standards within the construction sector • FPC systems: Things to consider when developing testing facilities • Understanding the types of testing requirements for the construction sector, including examples of key products and testing required to support certification • Highlighting the types of testing requirements for the electrical and gas sector, including examples of key products and testing required to support certification Andy Butterfield, Global Head of Construction, BSI Graham McKay, Global Head of Electric and Gas, BSI Improving supply chain competitiveness This workshop will explore the five key challenges for supply chains of the future, including: • Cost containment • Customer-centricity • Globalisation • Visibility • Risk Dr. Steyn Heckroodt, Dean - MBA and Corporate Training, Westford University Key finance skills for effective project managers • Introduction to the basic concepts of financial statements • Understanding income statements • Best practice in cash flow forecasting and monitoring • Overview of the budgeting process and what project managers need to be aware of Jayan Balakrishnan, Managing Director, Apt Consultancy Services Pipe market overview, opportunities and innovations • Overview of the different types of pipes used in construction • Understanding the benefits of different types of pipes for different purposes • Highlighting the latest advancements in pipe technology • How to avoid fake material for steel pipes on the market • Delivering a modern piping approach through innovation • Forecasting pipe market opportunities in the GCC and MENA region: How big is the market and what opportunities are on the horizon? Moderated by: Robert Lawrence, Managing Director, Gulf Plastics Pipe Academy Panelists: Marcin Rozko, Market Executive Manager, GCC & Asia, KAN-therm Rafael Quintero, International Manager, McElroy International Viktor Bisovetskyi, UAE Sales Manager, Interpipe Middle East Wednesday, 25 November 2015 / Room: Al Ain F Developing leadership skills for the construction sector Part I* • Effective leadership skills are critical to the success of any business. This session is recommended for managers and those in leadership roles looking to improve their leadership skills to maximize team and business performance. By attending, you will: • Be able to explain the qualities of an effective leader • Have benchmarked yourself against those qualities and developed actions to improve • Be able to explain the difference between leading and managing Liz Kentish, Managing Director, Kentish & Co *Delegates are advised to attend Part I of this two-part workshop on 25th November, and to return for Part II taking place on 26th November. 15:00-16:00 17:00-18:00 10:00-11:00 ARBITRATION AND DISPUTE RESOLUTION IN CONSTRUCTION CLAIMS Monday, November 23 11:30 am - 1:30 pm Tim Haynes FTI Consulting, Senior Managing Director SEMINAR AGENDA
  • 55.
    NOVEMBER 23 -262015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 55 Design & Architecture Theatre Agenda The free to attend workshops are CPD accredited and you can register the points earned with your professional association. Simply register online for free entry and collect your free certificate onsite on the same day. Monday, November 23 Room: Abu Dhabi A 11:00-12:00 Efficient procurement planning • Changing internal customers’ perception • Obtaining stakeholders’ engagement • Increasing procurement visibility • Anticipating customers’ needs and being proactive • Procurement planning • Inventory planning • Communicating achievements Emad Ameen, Procurement Manager, Royal Group-Reem Readymix Mega projects, simple solutions • Overview of the scope of mega-projects across the MENA region • Identifying the most common challenges to completing projects on time, to budget and to specification • Top tips and solutions for preventative planning and for overcoming common challenges • Lessons learnt from regional case studies • Establishing best practice in project and programme management of mega-projects in the MENA region Raad Hajjar, Head of Structure, Atkins Managing a culturally-diverse team to optimise organisational performance • How to develop an effective leadership style in the Gulf • What constitutes a team in the Gulf region and how would it look like • How to deal with high context communicators in your team • Building your intercultural competence and conflict management skills • Motivating your multi-cultural team Beatrice Hunt, General Manager, BE Consultants International Construction contract management and ethical issues Enforcing engineering codes of ethics • Whistleblowing in the engineering profession 4Whistleblower protection laws • Forming engineering and construction contracts 4Bidding 4Non-collusion 4Bid shopping • Contracts for engineering and construction services 4Conditions of contracts 4Specifications • Change orders and claims • Dispute resolution and ADR Professor Rafiq M. Choudhry, Professor of Construction Engineering and Management, King Faisal University Thursday, 26 November 2015 / Room: Al Ain F Leadership skills training for the construction sector Part II* Effective leadership skills are critical to the success of any business. This session is recommended for managers and those in leadership roles looking to improve their leadership skills to maximize team and business performance. By attending, you will: • Be able to explain the value of sharing the business vision with the team • Be able to develop your team goals based on the business vision • Understand the comfort zone for yourself and your team • Understand the value of small steps Liz Kentish, Managing Director, Kentish & Co *Delegates are advised to attend Part I of this two-part workshop on 25th November, and to return for Part II taking place on 26th November. Management of contractual disputes and issues within the site perimeters • Introduction of time bound arbitration • Dealing with real time arbitration rather than virtual time arbitration (pro-active versus post- active approach) • Assessing the benefits of time bound arbitration: Cost effective and time controlled procedure whereby all disputes and problems will be resolved during the construction period and not after completion of the project as experienced in ordinary arbitration • Understanding how time bound arbitration can reduce the disputes magnification and improve relations due to the efficiency and promptness of the process which enhances relations in the construction industry Imad Al-Jamal, Managing Director, IDRAAC International Introduction to property management This three hour workshop will act as an introduction to the Certified Property Management (CPM) course, the official training and certification course that was developed by Harbor Real Estate in 2009 based on a brief from the Dubai Real Estate Institute (DREI), the official training and certification arm of the RERA and the Dubai Land Department. Over the last few years the course has evolved to become one of the most sought after courses of the DREI and is now taught across the UAE (Dubai, Abu Dhabi, Sharjah and Al Ain) and other Gulf countries including Oman, Bahrain, KSA and Qatar. The course covers the fundamentals of Asset and Property Management. Topics that will be discussed during the workshop include: • The rise of income producing assets; • The definition of Property Management; • The cycle of Property Management; • The ongoing function of a property manager; and • The enablers that set any professional property manager for success. Mohanad Alwadiya, Managing Director, Harbor Real Estate; Instructor, Dubai Real Estate Institute - Dubai Land Department 11:30-12:30 13:00-14:00 14:30-15:30 16:00-18:00 10:00-11:00 12:00-13:00 14:00-17:00 Best practice in energy efficiency retrofits • Introduction to Etihad ESCO • Overview of the process of Etihad ESCO’s energy retrofit projects • Identifying the main challenges encountered and the solutions devised to address them • Case studies from the energy performance contracting market by Dubai’s Super ESCO Hany Ayesh, Director, Etihad ESCO PIPE MARKET OVERVIEW, OPPORTUNITIES AND INNOVATIONS Tuesday, November 25 5:00 pm - 6:00 pm Robert Lawrence Managing Director Gulf Plastics Pipe Academy CONTINUED ON PAGE 58 u SEMINAR AGENDA
  • 56.
    56 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 app Turkey’s Özcelik Makina san. VE is the leading manufacturer of machinery used both in the door and window production sectors, and in almost any other industrial activities involving the machining of aluminium and PVC profiles since 1980. Özçelik has one of the only The machines you need for door and window production ZABEEL HALL O141 integrated production plants in its field on 17,000 sqm area. The company-wide range of products are served without any problems. Giving utmost importance to certification, Özçelik proved its quality by holding Management System Quality Certificate (ISO 9001:2008 TUV CERT), Russian (EAC), and Ukrainian Poliran’s push fit pipes and fittings are made of polypropylene and have been designed and manufactured to the highest quality available in the world’s market. They promise simple and easy installation, with durability and reliability, which makes Poliran’s new drainage system one of the best systems in the world, claims the company. The Poliran Push Fit True Silent, for soil and waste systems, offers perfect sealing, high sound absorbing properties, hot water resistance and resitance to chemicals. The company also offers compression fittings, clamp saddles, welded flanges and emitters. It will also show it PE- HD Sewers welded fittings, which offer high resistance to chemicals and are easy to fit and install with low maintenance guaranteed. g www.poliran.org HALL 3 C156 Pipe fitting made easy with Poliran Reliable utilities are a precondition of any modern building’s long service life, as well as one of the essential parameters directly affecting the market value of any facility, investors’ and buyers’ interest. That’s why real estate developers pay particular attention to organisation of water supply, heating, sewerage, drainage FOCUS C77 Why top-notch utilities are vital for any developer worth its salt and pneumatic systems. As a result, demand for polyethylene and polypropylene – high-quality construction materials for creation of utilities, which have displaced the non-durable and unreliable metal from the leading position – is constantly growing on the market. Polypropylene pipes are products of a European manufacturer, which comply with all quality requirements and standards implemented in Europe. They have a wide number of features making a modern buyer choose them. The following features should be pointed out among the products’ advantages: 1. 1. Wide model range including everything necessary for high-quality mounting of utilities of various profiles, including polypropylene pipes and fittings. 2. Top quality of raw materials. 3. Thorough control over technological compliance throughout the phases of production. 4. Regular check of mechanical, chemical and thermal parameters in the course of production. 5. Service life reaching dozens of years: 30 years or more for hot water, and 50 years or more for cold water. The company will also be showing its Altstream Super flexible connectors for connecting equipment, including its WARMA and RADENA radiators and its Altstream PE-X pipes and fittings. g www.tebo.ru product quality certificates and European Safety Standards Conformity Certificate (CE). It will be showing its Lepus- ii cnc controlled aluminum composite panel processing machine. It is ideal for the cutting of and opening a v-channel in composite panels and plates. g www.ozcelik.com Sanvi Enterprise is a reputed manufacturer exporter and supplier of high quality cabinet handles, glass door handles and accessories, door fittings, glass door knobs, which stand apart for their elegance, design and beauty. On its website the company says: “My life is my canvas. My moments are the colours that make up the picture I want to create over it. I will choose the type of magic that each moment will spell over the world.” At the Big 5 this year Sanvi will be showing a range of products including its cabinet door handles which are “made by the natural inspiration”. It will show glass door handles made by Size with the real stone, which “combine the design with real spices of life” and its attractive coloured and fancy handles. “We understand your nature and made handle for you and your dreams,” says the company. “For women is pink handle, for man is will be leather, for children it could be angry bird.” It has knobs, which make it easy to push or pull system for you drawer with glass and wood and door mortise handle for best locking and attractive handle. g www.sanvienterprise.com Building interiors ZABEEL HALL S180 EXHIBITOR NEWS
  • 58.
    58 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE 13:00-15:00 16:00-17:00 11:00-12:00 13:00-14:00 14:30-16:00 11:00-13:00 14:00-15:00 16:30-17:30 11:00-12:00 13:00-14:00 15:00-16:00 High-performance façades: Design and communication of innovative building envelopes • Context and philosophy • Concept and design criteria • Design for manufacturability and materiality • Working platform and technology • Innovative communication • Design optimisation • Prototyping and testing Abdulmajid Karanouh, Director, Head of Ramboll Innovation Design & Façades Ethan Kerber, Senior Innovation Designer, Ramboll New architectural opportunities for small to medium scale (re-) developments • Advantages of redeveloping an existing site as opposed to a green field development • Enhancing the existing plot’s qualities and potentials • Authority regulations and the need for intelligent responses • Case study of the currently completed residential villa compound for the Kanoo Group in Jumeirah Third • Creating win-win situations for investors/landlords and for, users/ tenants and for the city/environment Florian Oettl, Principal, AD&D Tuesday, November 24, 2015 / Room: Abu Dhabi A Renewable energy integration onto buildings: Optimisation and the impact of good HVAC design • Fundamentals of renewable energy technologies in GCC • Current and future renewable energy technologies for buildings • Solar thermal, solar power and solar cooling technologies • Optimising HVAC design for increasing the contribution of renewable energy sources • Integration of renewable energy systems into buildings’ operations Dr. Ioannis ‘Yianni’ Spanos, Senior Sustainability Manager, KEO International Consultants Innovative solutions for sustainability: Incorporating geothermal cooling to achieve net zero carbon emissions • Introduction to Ministry of Public Works (MoPW) role and scope of responsibility and project overview • Highlighting the use of innovative new technologies to achieve zero carbon emissions in MoPW projects • Feedback and lessons learn from the UAE’s first geothermal cooling project Eng. Azza Sulimah, Director of Design Department, Ministry of Public Works Abdulrahman al-Kholay, Sr. Electrical Engineer, Ministry of Public Works Optimising structural design for wind • Understanding wind and its characteristics • Design of buildings for wind safety and comfort • Natural ventilation and the climate • Optimise structural wind loads • Reducing and controlling dynamic wind loads Dr Seifu Bekele, Principal Engineer, PhD, FIEAust Wednesday, November 25, 2015 / Room: Abu Dhabi A Fire safety in façades • Overview of global statistics related to fire accidents • Understanding the importance of good construction and passive fire protection • Highlighting the need for fire protection in façade design • Key fire safety principles for building envelopes • Showcasing new age technology available to provide fire safe and sustainable buildings Ihab Mouallem, Commercial Director, Gulf Extrusions Further speakers to be announced Incorporating local and cultural influences into contemporary design • Overview of local architecture and traditional interior design: Assessing traditional materials and aesthetics specific to Gulf region • Evaluating natural landscapes and indigenous plantation that can be used as inspiration for designers • Looking at how regional inspiration can be used or translated into contemporary design: Materials, color palette, form • Real world case studies: Reviewing existing interior spaces that have stemmed from local culture and history and how this is translated into the modern design concept Rashida Rajkotwalla, Design Principal, Design Work Portfolio Saving energy, cost and increasing comfort with sustainable lighting • Assessing sustainable lighting systems aimed at reducing energy consumption, reducing cost and providing comfort • Understanding the purpose of sustainable lighting • Daylighting and passive lighting strategies in architecture • Examples of passive strategies • Highlighting the importance of the choice of the bulb • Control units and integrated control systems • Animated examples of control systems Michel Francis, Chief Architect, DEC Consultants Thursday, November 26, 2015 / Room: Abu Dhabi A Improving air tightness of the building envelope • Understanding the impact of air leakage: Energy use, envelope durability, thermal comfort and indoor air quality • Effective air flow and reducing moisture levels • Methods for improving air tightness of building enclosures and monitoring during construction stage • Ensuring optimum energy performance of your building • Increasing the sustainability of building envelopes in extreme climates: Materials, technologies, techniques and solutions William Whistler, Managing Director, Green Building Solutions International Navigating the complexities of designing healthcare facilities Andrew Humphries, Regional Service Leader for Health, EC Harris Understanding the effects of design on behaviour and productivity in the workplace • Overview of Middle East Council for Offices’ (MECO) research into commercial office occupation in the Middle East • Introducing regional benchmarking for best practice in office design • Understanding the current state of office design and the impact on output, productivity and employee satisfaction • Improving office design standards within the region Cara Tissandier, Sustainability Associate, Hoare Lea Consulting Engineers Chris Seymour, Co-Chair, Middle East Council for Offices Lachlan Buchanan, Co-Chair, Middle East Council for Offices Nick Nunnington, Professor of Corporate Real Estate at Nottingham Trent University in the UK *Due to unforeseen circumstances, the programme may change and The Big 5 reserves the right to alter the speakers. NEW ARCHITECTURAL OPPORTUNITIES FOR SMALL TO MEDIUM SCALE (RE-) DEVELOPMENTS Monday, November 23 4pm - 5pm Florian Oettl Principal AD&D CONTINUED FROM PAGE 55 u SEMINAR AGENDA
  • 59.
    NOVEMBER 23 -262015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 59 Affordable Housing and Sustainable Communities Theatre Agenda The free to attend workshops are CPD accredited and you can register the points earned with your professional association. Simply register online for free entry and collect your free certificate onsite on the same day. Monday, November 23, 2015 Room: Al Ain D 14:00-16:00 11:00-13:00 14:00-15:00 Can sustainable and affordable housing become a reality in the Middle East? • How should we define sustainable/green affordable housing? Can a shared definition be found and applied? • Are sustainability and affordability opposing metrics in housing development? • UAE and MENA Network approaches: One concept, various issues; Are the challenges to Middle East countries uniform in terms of a) sustainability and b) affordability? Why or why not? • What is the role of the industry in greening affordable housing? • Making sustainability affordable: stakeholders, regulations, prioritising needs. Abdallah Bdeir, Chairman of Jordan GBC Eng. Meshal Al Shamari, Director, Qatar Green Building Council Gerry Rogers, Senior Associate, Galadari Advocates & Legal Consultants (DIFC) Limited Tuesday, November 24, 2015 / Room: Al Ain D Applications of Passivhaus techniques • Assessing the appropriateness of the Passivhaus concept in the GCC region • Highlighting the main challenges of construction • Exploring comparative costs • Feedback from initial results Dr. Alex Amato, Head of Sustainability, Qatar Green Building Council Dr. Cynthia Skelhorn, Post-Doctoral Research Specialist, Qatar Green Building Council Building Green: Alternative methods to constructing sustainable housing and environments This workshop will cover how to construct sustainably through smart planning, designing and execution of housing construction via the use of alternative building methods and materials. The presentation will showcase case studies of true examples of sustainable construction based away from the conventional school of thought. It will focus on the following topics: • Are we building sustainable? • Is it enough to implement sustainable standards and rating systems to produce a sustainable outcome? • Designing and executing sustainable landscapes • Case Study 1: Sustainable Houses • Case Study 2: Sustainable Landscapes • Case Study 3: Sustainable Masterplan Engi Jaber, Sustainability Manager, Dewan Architects and Engineers Wednesday, November 25, 2015 / Room: Al Ain D Sustainable design and procurement of buildings • Integrated life cycle design for sustainability and mitigation of CO2- emissions through cost-effective solutions • Life cycle targets as tools in procurement • Performance based bidding for sustainable buildings • Industrial construction and delivery modes for fewer disturbances from operations at site and less environmental pollution • Case study examples Jyri Nieminen, Chief Sustainability Officer, Sweco Finland Integrating high performance into the next generation of GCC housing and communities • Drivers, challenges and opportunities for high-performance housing for the GCC • A high performance home in the GCC region: What it is and how to achieve it • Documenting high performance through the LEED for Homes rating system and lessons learnt • Technology and systems used in the Home of Innovation™ Demonstration Home • Case study on SABIC’s Al-Waseel Hills Housing Compound Abdullah Al-Refaie, Program Director, Home of Innovation™, SABIC Dennis Steigerwalt, Director, International, IBACOS Duncan Prahl, RA, AIA, Senior Research Architect, IBACOS Michael Dickens, Partner & Chief Marketing Officer, IBACOS Mohammad Abdullah Al-Aboudi, Project Engineer, Engineering and Project Management, Riyadh, SABIC Thursday, November 26, 2015 / Room: Al Ain D FUJAIRAH VISION 2040 CASE STUDY: Delivering affordable and sustainable neighborhood housing Monday, November 23 12:00 am-13:00 pm Alaa Saber Mahmoud Project Coordinator for the government project, Fujairah Municipality INNOVATIONS IN SUSTAINABLE LOW INCOME HOUSING Thursday, November 26 11:00 am - 13:00 pm Camilo Cerro Associate Professor of Architecture American University of Sharjah • Introduction to the Fujairah Vision 2040’s overarching vision regarding sustainable design and project sustainability • Challenges and opportunities in Fujairah: Market mentality, conditions and requirements • Overview of the project background and requirements and what has been done to date • Project advantages and disadvantages • Lessons learnt and future project outlook: Identifying key challenges and solutions as well as sustainability applications for new projects in the pipeline and opportunities for the market Smart transport planning for Middle Eastern cities • Exploring existing challenges and opportunities • Transport planning tool box • Transport master planning charrette demonstration • Implementation and phasing approach Martin Tillman, Director, Strategic Planning and Advisory, Aecom Nadeem Afsar, Team Leader, Strategic Planning and Advisory, Aecom • Sustainability in the developing world • Energy self-sufficiency • Generating passive income through architecture • Exploring opportunities in urban farming • Delivering the infrastructure for population expansion 10:30-12:30 14:00-15:30 14:00-15:00 CONTINUED ON PAGE 62 u SEMINAR AGENDA
  • 60.
    60 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 appEXHIBITOR NEWS Rivit, based in Italy’s Bologna, specialises in the production and distribution of fastening systems and tools to joint and deform sheet metal, for industry and building applications. It has developed a full program of products for fastening: blind rivets, rivet nuts, riveters, welding studs, blind bolts, anchors, screws, latches, tools and machines for sheet metal working. Technological innovation play a key role in Rivit products, but the direct relationship with its customers remains the focus. To further develop its projects, Rivit has built a large production and design plant with an automatic warehouse that provides and supports an advanced logistic system to ensure and efficiency when filling commercial orders. Additionally, Rivit’s customer service includes selling of spare parts, design and engineering services, designed to eradicate any possible problem. The company operates in more than 50 countries. g www.rivit.it Where there is metal… ZABEEL HALL L121 The Sanha group is one of the leading European manufacturers of press fittings pipe systems for drinking water, gas, solar, heating, cooling and sanitary applications for use in domestic and industrial settings. It produces 8,500 items, mostly with copper, copper alloys, stainless and carbon steel, as well as innovative silicon bronze lead- free fittings for use in drinking water applications. Its premium systems are installed throughout Europe, Russia, Asia and Australia in the the domestic, industrial, food processing and shipbuilding industries. With a large portfolio, Sanha is recognised as a respected partner of distribution and installation companies alike. Sanha’s principal focus is on system technology. Its customers are central to all Fit for a drink its activities. As a family enterprise, Sanha highly values an active close and long term relationship with all its partners, from designers, installers, contractors and trading companies. This will be demonstrated at The Big 5, where Sanha presents jointly with local partner GFP S&B SP Trading LLC installation systems for building services including hospitals, hotels, shipbuilding as well as food industry and many industrial applications. Available in many materials and dimensions, the systems presented offer time-saving, durable and economic solutions that have proven their value in many projects around the world. g www.sanha.com Pinnacle Building Technology FZE offers a range of light gauge steel building systems, which promise, “totally integrated design”. Among its systems on display at this year’s The big 5 is the Pinnacle LGS X5 Framing System, which has been designed to accommodate intermediate level LGS manufacturing plants. Typically it produces 5 + 5 C and U profiles from 75mm to 250mm. This system is being used for the framing of residential buildings up to eight stories. The company says: “With high throughput, reliability, ease of maintenance and simple operation, this totally integrated ZABEEL Y177 design to manufacturing LGS solution will deliver high productivity, high quality and accurate output.” The Pinnacle LGS X5 Framing System is designed for manufacturers of framing and trusses across many applications certified by international, American, British, and EU building codes. The machine is capable of producing all web size profiles between 75mm to 250mm. There are Light steel building systems custom tailored for you standard five web sizes tools come with each machine order, but any additional web size tools can be added at later stage if required. Standard web sizes come with machine are: 75mm, 89mm, 140mm, 200mm, 250mm. This machine can handle material gauge from 0.7mm to 2.0mm (24g to 14g). g www.pinnacleLGS.com Coatings, adhesives & sealants WithUs Tape from Korea is a specialist in manufacturing high-quality colour- pigmented PE impregnated cloth tape, coated with high performance solvent-free natural rubber adhesive. It says: “We export our products worldwide in jumbo rolls and finished/ retail rolls by OEM/custom labelling basis. We use some of the world best cloth tape manufacturing techniques, but keeping costs low to help our OEM customers achieve optimum sales.” Included on the stand will be the company’s natural rubber-based cloth adhesive and duct tape as well as its natural rubber based UV cloth masking tape with double layered PE and rubber. WithUs produces cloth adhesive tape for special purpose: fluorescent, camouflage, matt-finish and its special black and yellow striped warning tape. There is paint masking tape in both paper and cloth. g www.withustape.com Cloth tape ready for every eventuality ZABEEL T180 PAVILION D10
  • 62.
    62 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE 10:30-11:30 12:00-14:00 14:30-15:00 16:00-17:00 10:30-11:30 12:00-13:00 15:30-16:30 17:00-18:30 11:00-11:30 12:00-13:00 Technology in Construction Theatre Agenda Monday, November 23, 2015 Room: Focus Hall Introduction to ‘The Internet of Things’ for Smart Cities • A brief history of the Internet of Things (IoT) • Defining the vision of a smart city, highlighting the dimensions to think along when approaching the design problem and presenting a simple layered model to guide the solution implementation • Exploring the ‘Services Dimension:’ Experience architecture, the human-centric approach, and designing future cities around citizens • Exploring the ‘Sustainability Dimension:’ Highlighting why green cities are not only the environmentally responsible choice, but also an economically-viable model and a smart business investment • Manifestation of IoT in a smart city: How IoT plays key roles in all sectors and industries in a smart city; from manufacturing to utilities, infrastructure, FM, energy, transport, oil & gas and more Alaa Dalghan, General Manager UAE; Director, Middle East & Africa, B&B SmartWorx Introduction to UK BIM standards • Motivation behind UK BIM standards • Detailed Look at BIM standards and Specification: • BS1192:2007 • PAS1192-2:2013 • PAS1192-3:2014 • A sneak peek at a new ISO standard based on BS1192 Muhammad Jabakhanji, Head of VDC + BIM, Alpin Middle East Monitoring of bearing structures as the means of preventing collapse of buildings and facilities • Threats that influence the stability of buildings and facilities • Structural Health Monitoring (SHM) as key approach to prevent building collapse • BSCS as an example of Advanced Structural Health Monitoring System • Application field of SHM-systems • Cases requiring BSCS system to be implemented Andrei Linnik, Executive Director of BASIS Consultancy Company (Dubai) Cost savings and quality enhancement through computer assisted facility management (CAFM) • Property management and computer-assisted facility management: The clients’ perspective and advantages • Traditional facility management versus computer-assisted: The recent evolution in Europe • How the CAFM systems work: A framework • Energy, human resources and money savings in CAFM versus traditional FM, some real experience indicators • Three case studies: Offices, hospitals, education and laboratories Uberto Visconti, Manager, Arco Tecnica Facility Management Tuesday, November 24, 2015 / Room: Focus Hall Adding value to your construction projects through efficient air curtain technologies • To save energy by applying the best performing air curtains for their construction projects • State of the art air curtains can contribute to a more healthy indoor environmental quality Francesco Scuderi, Technical and Regulatory Affairs Manager, Eurovent Morten Schmelzer, Director Business Development and Strategic Relations, Eurovent BIM for facilities management • Understanding the motivation for using BIM for facilities management (FM) • How to properly specify BIM requirements for downstream FM use • What is COBie? • Overview of BS 1192-4:2014 (UK Standard for BIM to FM) • As-Built and data handover • Emerging technologies that leverage BIM for FM Muhammad Jabakhanji, Head of VDC + BIM, Alpin Middle East Managing design information through 2D and 3D design tools • Overview of design tools including AutoCad, Revit, 3D Max, Sketchup and Lumion • Design data work flow • Tools location on design process map • Highlighting best usage and perfect feedback • Change management techniques and strategies • Comparative analysis Waleed Elewa, BIM Consultant and Revit Instructor, BIM Road A cost-benefit analysis of energy efficient technologies • Indirect evaporative cooling based on heat recovery systems 4Comparison with other heat recovery technologies currently used by HVAC consultants 4About enthalpy efficiency and enthalpy effectiveness 4Benefits of the proposition • Hybrid cooling systems for fresh air applications 4Comparison with existing technologies 4Compliance with Dubai Municipality building specifications 4Savings and other benefits • Cool roof coatings 4Solutions available 4Compliance with Dubai Municipality building specifications 4Benefits of the proposition Durgesh Verma, Jumbo Engineering Masood Raza, Jumbo Engineering Nitu Jain, Jumbo Engineering Wednesday, November 25, 2015 / Room: Focus Hall Recent Innovations in testing and standards for Flexible Ducts • International testing standards for flexible ducts • Thermal conductivity standards for flexible ducting • Green technology associated with flexible ducts • Fire tests related to flexible duct • Flame penetration tests for flexible ducts Amiruddin Thanawalla, Technical Director,M/s. Focus Air Conditioning Industries L. L. C, Dubai, UAE Third party certification for HVAC technologies • Certification: What is at stake? • Overview of the certification process: How does it work? • Introducing the accredited certification body • Understanding the accreditation framework • Assessing the value of certification for the HVAC industry Erick Melquiond, President, Eurovent Certita Certification Affordable housing construction technology solutions • New innovative building technologies: Simple technique and cost- effectiveness • Use of local resources: Material and labour • Green and sustainable • Assessing long-term durability and disaster resilience • Integrating total community design, planning and build Aaron. G. “Sandy” Amacher, PhD, Program Executive Director, MGT Group 16:00-17:00 CONTINUED FROM PAGE 59 uSEMINAR AGENDA
  • 64.
    64 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 appEXHIBITOR NEWS Saudi-based alfanar electric is the industrial arm of alfanar, specialising in a variety of electrical construction products including distribution, generation, and quality control equipment. The company is going to showcase a wide range of its products this year including cables and wires, transformers, lighting and switches and sockets. Alfanar electric operates several industries in Riyadh, Jubail (Saudi Arabia), Dubai (UAE) and London (UK). It also has a development and engineering centre in Chennai (India). The base of alfanar’s industrial activities is alfanar Industrial City in Saudi Arabia’s Third Industrial Zone on Al-Kharj Road, Riyadh. Spread across 700,000 square metres, the complex houses alfanar’s facilities for manufacturing low, medium and high voltage products. It has a comprehensive infrastructure including a data/ communication center and a commercial zone. g www.alfanar.com More power to construction HALL 3 A 111 ZABEEL HALL, L110 New range of concealed hinges New types of hinges have made life easier in all kinds of products. Double-acting hinges let doors open in either direction. Piano hinges, or continuous hinges, let piano tops or chest lids fold all the way back so that they do not detract from the workmanship of the instrument. Equally, toy box hinges limit a lid’s motion, so that the top of the chest won’t slam shut on little fingers. And invisible hinges, like Blum hinges or Soss hinges, tuck away in cabinets so that we don’t even notice them. German company BaSys is presenting a new concealed hinge at The Big 5 Dubai this year. Model PIVOTA DX 30 3-D hinges for unrebated doors are not only technically advanced but also reasonably priced. With this new model, the company has broken new grounds in the low-end price segment of concealed hinges. The PIVOTA ® DX 30 3-D is made of solid steel and is produced in Germany as all BaSys products. The hinge is fully adjustable in three dimensions and is maintenance- free. The load capacity for flush interior doors is 40 kg per pair. g www.basys.com
  • 67.
    CHECK OUT THEAMAZING HD THERMAL VIDEO AT WWW.FLIR.COM/T1K The NEW FLIR T1K HD Thermal Camera. BUILT FOR THE EXPERT, BY THE EXPERTS. The Ultimate in Infrared Performance
  • 68.
    68 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 app Innovative furniture solutions with Italian flair PAVILION D06 Italiana Ferramenta srl is specialised in the production of high-quality accessories and ironmongery for the furniture industry. Modern planning departments are characterised by a constant research of new and innovative solutions, which prove to be long-lasting. Thanks to the use of advanced computer technology, the search for new materials, the creation of prototypes, innovative ideas and high quality control can offer customers a specific product range. On show at The Big 5 2015 will be: TRIADE concealed mounting bracket for shelves 25 to 40mm thick. It has been conceived to simplify the shelf installation. It is provided with three independent adjustments and the shelf angle can be adjusted front to back by turning the supporting pins with a 10mm open-ended wrench. Its freshly-designed drop-down opening system conceived offer the sole mechanism for cabinet sides on the market that guarantees both a soft opening and a smooth closing movement of the door. Installation is carried out through very simple drilling operations that doesn’t require mills or grooves. LIKU is the innovative concealed hanger to fix suspended libraries and cabinets to the wall even when their structure is conceived without the back panel. LIKU is to be inserted into the side of the furniture and can be used with panels minimum 25mm thick. Libra H7 is the latest development in the cabinet hanger program. Conceived for wall-mounted suspended cabinets with heavy loads or particularly deep drawers, ideal for bathroom cabinets. KUBIC is the new locking glass shelf support to guarantee furniture transportation with glass shelves already assembled and KALABRONE is the new shelf support for free- standing shelves. g www.italianaferramenta.it Sweden’s SSAB is a highly specialised steel company, a leading producer on the market for Advanced High Strength Steels (AHSS) and Quenched & Tempered Steels (Q&T), strip, plate and tubular products as well as construction solutions. The company will present Strenx and Hardox steels during the show this year. Strenx is a new high- strength structural steel product brand, which offers the most extensive portfolio of high-strength steels on the market. Besides, SSAB has long been a forerunner in wear steel with Hardox wear plate. SSAB Shape concept combines SSAB’s premium steel products, with engineering support and processing services. If there is an OEM operating in the industries of lifting, trailer and truck bodies, agriculture, as well as industrial production, you have much to gain. SSAB’s Hardox Wearparts business unit is the leading manufacturer of wear parts and wear service in the world. With more than 150 centres and more than 55 countries, there is always a Hardox Wearparts Centre close by. SSAB’s production plants in Sweden, Finland and the US produce 8.8 million tonnes of steel a year. g www.ssab.com True as SSAB Steel SAEED HALL, D130 Italian SPI insulating windows are the result of the most advanced technology in combination with expert craftsmanship. One of its most popular products, aluminium-wood windows represents advanced research applied to door and window frames. The SPI line of windows combines the aesthetics and elegance of wood with the practicality of the robust aluminium bearing structure, which does not require any particular maintenance work. Each SPI product is made with burglary-resistant hardware with three-point locking self- regulating, selective safety glass filled with argon gas, tilt-and-turn opening and many other standard features. All SPI windows are provided with the CE mark, the European conformity marking, which became a compulsory legal requirement in February 2010. Buying CE marked windows means ensuring that installed products satisfy required safety criteria and conform to current regulations. g www.spi-it.com ZABEEL HALL 131 Window of opportunity Kingspan Group announced the acquisition of PAL Middle East PIR LLC last year. PAL Middle East PIR LLC has now been assimilated into the Kingspan Insulation division. Kingspan Insulation is a global manufacturer of optimum, premium and high performance rigid insulation products and insulated systems for building fabric and building services applications. Kingspan Insulation will be exhibiting one of the widest ranges of insulation products available in the Middle East market. This includes optimum performance next generation insulation, OPTIM-R premium performance rigid thermoset Kooltherm insulation and high performance rigid thermoset Therma insulation. Its products are among the most thermally efficient and technically advanced insulation materials HALL 3 D141 available and have many advantages over traditional insulation materials such as man-made mineral fibre. The stand will also demonstrate a range of innovative pre-insulated ductwork including the Kingspan PalDuct range and The Kingspan KoolDuct System. Particular focus will be on the Kingspan Kooltherm K–range for wall, floor, soffit, pipe and ductwork applications. With a thermal conductivity as low as 0.021 W/m.K, it utilises the thinnest commonly used insulation board to achieve required U–values. The product also boasts excellent fire properties with Class 1 (A) rated to ASTM E 84 and FM solutions available. Kingspan Insulation is at the forefront of the low energy building drive, helping architects, engineers and developers get the most energy efficient building envelope and building services performance, offering triple benefits of cutting energy use, cutting operational carbon dioxide emissions and cutting costs. g www.kingspaninsulation.com Kingspan’s insulation EXHIBITOR NEWS
  • 70.
    70 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 appEXHIBITOR NEWS Bin Tamman ME provides quality leisure equipment for sauna cabin, spa units and swimming pools. It offers high-quality electric sauna heaters and associate control units for home and commercial use. Its products not only include a wide range of sauna heaters and control units but also infrared and coloured light equipment plus many different accessories. BTME also provides multi-surface pitches for sport offering a “One-stop shop offering a complete package” consultation through to final installation. The company can also provide synthetic grass for homes and businesses, which “reduce your water consumption” with a natural looking alternative to real grass. It says: “The turf is soft under foot and non-allergenic, making it ideal for children and pets whilst remaining green all-year round promoting a positive effect on our planet. This is a great water and money saving investment.” BTME is also a leader in the provision of facilities for fitness and recreation with rubber flooring solutions for everything from children’s play areas to indoor sports arenas. Its acrylic floorings are environmentally friendly and again can be used from commercial situations through to outdoor sport arenas like tennis and basketball courts. g www.btmedxb.ae The master of flooring, pool and spa solutions ZABEEL Y171 Aqualyte is the ideal hydration solution for construction companies. Aqualyte was scientifically developed in Australia with a low sugar, hypotonic formula that is quickly absorbed by the body. Aqualyte can be consumed daily to prevent heat-related illnesses and maintain high productivity. Aqualyte is a cost effective way to keep your workforce healthy and prepared to work safely, especially during the summer months in the GCC. Distributed by Sport In Life | +971 4 289 6001 | info@sportinlife.ae | www.sportinlife.ae
  • 71.
    NOVEMBER 23 -262015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 71 Find every exhibitor on The Big 5 app ASPEN is the leading company in interior design sector providing architectural solutions. Aspen products focus on four areas: suspended ceilings, partition walls, flooring and LED lighting. ASPEN YAPI VE ZEMIN SISTEMLERI was founded in 1989, the ASP Building and Ground Inc has become a regional leader in Turkey. ASPEN promises “modern architecture and application methods of the material reinforces the brand specialised in the sector by increasing the power from day to day”. g www.aspen.com.tr ZABEEL HALL N131 Interior with a Turkish accent win huge customer base Take a SMART step. Join the winning team! Take a SMART step. Join the winning team! Complete anchor program: nylon, mechanical and chemical anchors High quality products with CE/ETA marking Excellent service and competitive prices pgb-Europe nv Headquarter Gontrode Heirweg 170 | 9090 Melle | Belgium Tel. +32 9 272 70 70 | Fax +32 9 272 70 95 info@pgb-europe.com | www.pgb-europe.com Easy and clear to use; 3D view with real-time zoom function; Different anchor plate designs; Optimized setting depth option for chemical anchors; Different temperature ranges for chemical anchors; Comprehensive report in pdf; Live updates. SMART Anchor Design SoftwareSMART Anchor Design Software DoPDeclaration of Performance pgb-Polska Sp. z o.o. Production plant Ul. Jondy 5 | 44-100 Gliwice | Poland Tel.: +48 (32) 330 26 10 | Fax: +48 (32) 330 26 20 biuro@pgb-polska.com | www.pgb-polska.com Visit us @ FOCUS D41 EXHIBITOR NEWS
  • 72.
    72 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 appEXHIBITOR PROFILE A l Muqarram Industries has been the largest manufacturing facility in the Middle East since 1999, focusing on the GCC market and now expanding rapidly all over the world. “Our biggest aim is to make the UAE a place for manufacturing while also letting our customers know that they don’t have to go abroad to get high-value materials,” said Safdar Badami, Managing Director, Al Muqarram Industries. And though this goal would strike some as ambitious, Al Muqarram has expanded at a tremendous rate, exporting to 45 countries as well as regions such as Latin America, Europe and Southeast Asia in just 15 years. The company offers a wide ranging and extensive product line of sealants, tapes, aerosol sprays and products for automotive care. But it is Al Muqarram’s product line and high customer service standards that have helped the company achieve such a formidable reputation in the GCC market. “The company wants to be known as a leading manufacturer for countries all over the world, especially Asian countries and regional players,” said Badami. Al Muqarram has participated in The Big 5 for six years as a way to increase marketing and awareness of a high-end product line and Producing adhesives and sealants from the UAE to the world, Al Muqarram is stretching its business far and wide with the best quality products in the region. Visit us at The Big 5 Concourse 510 Al Muqarram: A UAE brand with a global presence supplier that exists in the UAE. This year, it is the official adhesives and sealants partner as well as a Gold Sponsor. “Construction companies tend to turn to Europe because of reputation,” said Badami. “We want people to know that there is a manufacturer locally available.” This year, the company is presenting a wide range of its products, including its very own Dolphin line. This will include the Dolphin Fire stop Silicone Sealant, Dolphin Neutraseal 500 Silicone Sealant, Dolphin AM-40 Anti Rust Lubricating Spray Dolphin Aluminum Glass Tape and the Dolphin PE tape, among many others. “Our biggest product is our silicone sealants,” said Badami. “Our technology is superior and can be compared to technologies that have been in line in the US or European markets which allows us to penetrate new markets and support existing customers.” Al Muqarram will also be strongly promoting its Dolphine Fix & Seal Silicone Sealant, a leading hybrid, non toxic product made from “green” technology that is the first to be manufactured in Middle East and North Africa as well as the first ever be used outside of Europe. “We want to stress quality and service above all else. Once a consumer deals with Al Muqarram they never go anywhere else,” said Mahmoud Soliman, Export Sales Manager. “The establishment itself was built on a need to serve our customers with the best, starting in 1999 and really taking shape in 2007 when we started to export more widely and extensively.” Finally consumers can now find a home-grown supplier without going too far, aiding in the cementing of the UAE’s future reputation as a high-quality manufacturer the world over. g By Jumana Abdel-Razzaq
  • 73.
    W E LC O M E TO T H E M O R O C C A N PAV I L I O N S H E I K H M A K T O U M H A L L B 1 3 1 & C 1 3 1 FOR A SUSTAINABLE AND INNOVATIVE CONSTRUCTION CONSTRUCTION SECTOR In MOROCCO MADE IN MOROCCO MOROCCAN EXHIBITORS 10 RAJAB BENHADJ & FRERES COLORADO CUBAMAR FAMASSER FMC GRILLAGES MAROCAINS KHOUCHAR MEA WOOD MOROCCO TILES SUPER CERAME TERRAVITA ZINE CREATION MAROC EXPORT
  • 74.
    74 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 app OUSIDE OS 71 & HALL 8 F361 Watch Laticrete demonstrate its Supercap pump truck live every day at its stand. The Supercap technology, along with other new products, will be presented at live demonstrations at this year’s The Big 5 show. Formed as a joint venture between Laticrete and Supercap in 2011, Laticrete Supercap, LLC is a manufacturer of premium self-leveling materials and industry leading, patented pump truck technology for the building industry. The Laticrete Supercap System is a time-saving, cost- effective method for finishing new concrete or capping existing slabs by combining a LEED-contributing, UL GREENGUARD Gold Certified, low-alkali, self-leveling, cement-based technology with a computer-controlled mobile blending unit (pump truck). The company will be giving a live demonstration for the Supercap-equipped truck and the working method of the unit. The ‘Pump Truck’ is a computer-controlled, mobile Laticrete to showcase new Supercap pump truck live blending unit (MBU) that ensures perfect concrete mixing. Once mixed, formulas are pumped directly onto prepared sub-floors through a controlled high-rate piping and hose system. “Blending is done on-site at street level,” says John Sacco of Laticrete Supercap. “The pump truck can continuously deliver up to 15 tonnes of material per hour to all kinds of buildings, even high-rises located in congested areas that are as tall as 50 stories, covering up to 50,000 square feet per day.” Laticrete Supercap will also be presenting a host of other new products at this year’s event. This includes the Supercap Mobile Blending Unit which is a computer-controlled pump truck with dual silos that allow on-site blending. With the ability to blend 30,000 pounds per hour and deliver material up to 50 stories high, this revolutionary system benefits projects by providing predictable results that save time, money, and improve overall quality. The company is also bringing the Laticrete Supercap SC500 which is a series of premium, low alkali, cement-based self-leveling underlayments. The SC500 is ideal for construction companies as well as cement companies looking to advance their product line with the best quality technology from a locally based firm. Visit Laticrete’s live demonstration of its new technology every day at its stand, located in the outside area during all four days of The Big 5. g www.laticreterak.com EXHIBITOR NEWS
  • 75.
    NOVEMBER 23 -262015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 75 Find every exhibitor on The Big 5 app Das International was founded to provide a full solution for tilers, plumbers, masons and to cater the requirements of the building & construction industries. It also supplier of machinery & tools manufactured in Italy and a distributor of personal protective equipment (ppe), water heaters and others. It says: “With our sourcing expertise and partnerships with the manufacturers globally, we guarantee that we can provide the customers requirements and fulfill the comprehensive services. We will continue searching what other products and services we can provide to our beloved clients.” At the show it will be showing its Class 2 and class 5 pipes and fittings from Advanced Plastic Industries, a manufacturer of polypropylene (PP-RCT) pipes and fittings. g www.das-intl.ae Pipes to protection, Das International offers it all CONCOURSE 316 Algorithms Software is showcasing Xpedeon, fully integrated ERP software, purpose-built for the projects industry. Xpedeon is used by various contracting and consulting companies in Gulf region such as Square General Contracting, ASCON, ETA, Al Watanyiah United, Towell Construction & Co, Oman Shapoorji, Sobha Engineering etc. Since 2010, more than 3000 users in Gulf region log into Xpedeon every day. It is also used extensively across UK and India. Xpedeon automates the entire range of activities including estimating, contract management, procurement, subcontracting, plant, financial accounting, payroll, and job costing - delivering significant benefits and Empowering with Xpedeon CONCOURSE 87 value for its customers. The system is available as a server and cloud based application. At The Big 5 Dubai 2015, Algorithms is launching a new product for real estate and property management companies in the Middle East market – its CRM, property sales, rentals and facility management system which is used extensively by large developers in the UK. Algorithms is also unveiling its new mobility initiative, Xpedeon On-the-Go which gives organisations access to their data and dashboards through a radical mobile and tablet based App. g www.xpedeon.com EXHIBITOR NEWS
  • 76.
    76 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 app As construction projects in the UAE continue to increase part of the worldwide Aalberts Industries, is joining forces with some of its group partners to showcase its products.. Established in 1888, Pegler Yorkshire has earned a global reputation for quality brassware products as well as for its unique Connect and Control principles, setting new standards in the industry for Pegler Yorkshire Exhibits Products on Global Stage STAND: 2 C90 connecting and controlling flow for heating and plumbing installations. Paul Reasbeck, export director for Pegler Yorkshire said: “The UAE is a growing market especially for our range of products. Will be taking an imposing stand at the exhibition to enable us and our partners from across the globe to display and demonstrate first-hand the quality and engineering of our range.” The company’s range of valves, taps, mixers, showers, fittings and heating products are used in 110 countries around the world, including brands like Performa, Terrier, XPress, Yorkshire, Tectite and Prestex. The main brands on show will include Pegler Yorkshire’s highly acclaimed Pegler range of commercial and domestic valves plus Tectite, its trusted European brand of metal push- fit solutions. Visitors will also have a chance to see demonstrations on how the brands and products can benefit installations through time and cost savings. The HVAC sector represents the biggest sector at the event with Pegler Yorkshire standing alongside some of the leading global brands from across the industry. g www.pegleryorkshire.co.uk HALL 6 B266 Italian company IBL is planning two new launches at this year’s show, MultiChrome and ModulBrick. MultiChrome colored tiles are the latest addition to the range of clay roof tiles produced by IBL. These are available on request in any color in the RAL chart, and can be tailored to meet the customer’s demands. Easy-to-fix using glue, ModulBrick is an innovative brick product developed by IBL and suits numerous types of construction needs whilst maintaining the reputation of traditional facing bricks slips. There are no other products available to fill this gap in the market. ModulBrick lends itself to many types of internal and external cladding works by companies and DIY installations by individual customers. IBL was founded in Italy in 1964. It is dedicated to creating sustainable products at its facilities across Italy. g www.ibl.it Producing well to build better A subsidiary of Al-LAtifia Factory for Plastic Mesh Please visit us: stand S1 A152 info@g-tex.net www.g-tex.net Whenever Ground Reinforcement and Soil Stabilization are required Knowledge, Expertise & Reliability Sand Movement Control Concrete Surface Shrinkage Control Underground Pipes Protection Ground Stabilization Geosynthetics Technologies Company Ltd. P.O. Box 700 Riyadh 11383 Saudi Arabia. Tel: +966 1 265 0401 Fax: +966 1 265 0406 EXHIBITOR NEWS
  • 77.
    NOVEMBER 23 -262015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 77 Find every exhibitor on The Big 5 app EXHIBITOR NEWS Steel Color is the only Italian company specialised in embossed, coloured, mirror finished and textured stainless steel. It said: “We are based in Pescarolo ed Uniti, Cremona, Italy where the core of research and development as well as production take place. We carry out all the finishing and coloring processes 100 per cent in Italy.” Steel Color operates in every sector where stainless steel is used: from architecture to construction, from elevator industry to interior, urban design and automotive, defining the highest quality standards for the global market. “The quality of our products originates from a careful selection of the raw material, but the aesthetic component is our strength: the Know How of our Team is totally dedicated to development, to offer innovative proposals and the most advanced and performing products.” Thanks to the flexibility and the synergies achieved in decades of experience, it promises to provide a “tailored service based on quality and efficiency, which can be completed by after-sale support, without minimums on the ordered quantity.” The greatest architects and designers all over the world choose Steel Color as the ideal partner for their projects. One of its most prominent projects was Rundle Place in Australia in 2014 with the company’s stainless steel perla rosso. A ribbon made of steel color colored and textured stainless steel was used to provide an iridescent and color-changing feature that highlighted the principal tenants. g www.steelcolor.com Mirrored stainless steel brings unique aspect to new build STAND 6 D271 Polycon Gulf Ltd is part of Al Nasser Industrial Enterprises (ANIE) – a group established in 1993 with interests in metal, power, polymers, plastics and environmental protection. Polycon Water Tanks are approved by UAE Municipalities and FDA and carry material and performance guarantees. Polycon Road Barriers are high impact resistant road barriers and are perfect for traffic or crowd management - suitable for small areas of 2x2m with turning radius of 90-degrees. Polycon Road Barriers comes with provision for reflective stickers. Clean and Hygienic, Polycon Water Storage Tanks are specifically designed with a smooth inner layer that resists growth of algae and bacteria. Available from 50 to 10,000 USG It also produces the most rugged, longest lasting portable restroom (toilet) in the industry. Polycon’s new range of polyethylene car sheds is ideal for the harsh weather in the region. These state- of-art sheds are absolutely maintenance-free. Polycon’s unique Track Barrier system is better looking than the tires or wooden fencing alternatives, and conveys a safe, professional system. Bring elegance to your decor with Polycon’s illuminated planters/flower pots. Polycon‘s innovative polymer linings solution for steel vessels, pipes and fittings. high resistance to corrosion, increased lifecycle & seamless lining. g www.polycongulf.com Polymer expertise on show at The Big 5 STAND 2A80 with our Quality & Style Variety there is NO Problems NO Matter.. In Which Industry you work Construction Oil & Gas petrochemicals Electrical Military Manpower & Services Others www.slicshoes.com Comfortable Footwear For Tough Jobs
  • 78.
    78 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE SPEAKER INTERVIEW T he GCC boasts some of the most spectacular buildings but they exist in one of its harshest climates in the world. Summer temperatures can top 50 degrees centigrade, with regular sandstorms, high humidity but minimal rainfall. In the past decade the region – like the rest of the world – has recognised the part buildings play in global warming and the drive towards sustainability has turned to operating efficiency. Focus has shifted to the vital barrier between the air-conditioned inside and the tough climate outside: the building envelope. “The newly-developed urban areas of the GCC are really 24-hour, seven-days-a week air-conditioned indoor environments,” says William Date: November 26, 2015 Time: 11am Where: Design & Architect Theatre See the full theatre programme on page 55 Who should attend? Architects, engineers, developers, builders, HVAC professionals façade designers “Gaining a competitive edge is critical to construction product manufacturers as its becoming increasingly important for companies to not only meet their legal obligations but also remain competitive in the global market place.” We speak to William Whistler prior to his presentation on one of the key seminars of this year’s Design & Architect Theatre. By Gary Wright Make an air-conditioned building a green sanctuary WHAT IS THE ‘BUILDING ENVELOPE’ ? It is more than the just the glass façade, it is the total physical barrier between the conditioned and unconditioned environment of the building. The envelope is its resistance to air, water, heat, light, and noise transfer that keeps the ‘outside out and the inside in’ Whistler, CEO of Green Building Solutions. He is a key speaker at this year’s Design & Architect Theatre and offers a unique insight and almost unrivalled experience in this vital sector of construction. “Unlike many moderate climates, our outdoor air gathers dust, salt and biological spores as its travels thousands of miles from distant sub-tropical lands, across vast deserts and huge expanses of sea. “And that air can find its way into our buildings because of insecure envelopes. Spores become trapped in air conditioning systems, micro-organisms recirculate and the hot humid air promotes the growth of mould and corrosion. All of these things can have negative effect on the health of people, especially respiratory problems.” During the building boom, which culminated in the crash of 2008-2009, many towers were completed without an envelope that is vital to preserve internal air integrity. In a region where energy is cheap few expressed concern about leakage and fewer recognised the potential problems. Today all that has changed and in a world where ‘sustainability’ is an overused term, Whistler explains that securing the building envelope is a low-cost way to achieve sustainability. “Cutting energy consumption saves millions of tonnes of carbon dioxide, and if your building envelope does not leak, it’s pretty easy,” he says “No one plans to design a leaky building, no one plans to buy a leaky building – yet they get built all the time. “Air tightness should not be an additional cost. The architectural detailing of the construction practices to create the building envelope integrity is, in fact, a fundamental expectation of any habitable, built structure.” Some so-called experts will point to the fact that many buildings have air-con systems running at ‘positive pressurization’, which in theory should prevent bad air getting inside the building even if the envelope is not airtight. In practice the system is flawed, says Whistler. For example, the idea fails at night when the system is turned down, or where vacant floors are not air conditioned. Equally, strong winds around the building will reduce pressure on one side making positive pressurization a failure. And once the contaminated air is inside, it recirculates. “It is 10 times more cost effective to improve the quality of the building envelope than to spend money improving the efficiency of the HVAC system,” he says. “We must develop a local knowledge base that reflects the unique conditions of this region not the moderate climates that are the learning centres for many of our engineers.” Overall Whistler says that the UAE is one of the world leaders in setting these standards. “Consider this, “ he says. “There are only two place in the world where significant testing of the building envelope air tightness is legally compulsory: Northern Europe, where the oil crisis of the 1970s made governments consider energy waste. “And the second is the UAE, which has lead the way, with a Abu Dhabi’s 2030 Estidama plan, its pearl rating system and neighboring Dubai’s Green Building Regulations, which insist on proper inspection.” This region is at the forefront of building envelope research and understanding. Whistler believes the experiences in this region will benefit not only future building programmes here, but across the world. g William Whistler IMPROVING AIR TIGHTNESS AND GREENING THE BUILDING ENVELOPE See page 55 for The business Intelligence Theatre
  • 79.
    NEW EXHIBITORS. NEW PRODUCTS. NEWFEATURES. DON’T MISS OUT! NEW HALL The 2014 edition of The Big 5 was a record breaking year, a sellout show which delivered an outstanding 80,178* participants, making it the largest event in The Big 5’s history. To continue with the expansion and development of The Big 5 we are introducing The Big 5 Focus in 2015. Platinum Sponsors Hotel Contracting Partner Organised by Show Daily Sponsor Adhesives and Sealants Partner Inverter Expert Free Zone Partner Construction Solutions Partner Bathroom Solutions Partner **To receive your CPD points and certificate you MUST attend the first 30 minutes of the workshop(s) you have registered for. TECHNOLOGY IN CONSTRUCTION will present the latest advances to visitors where they can interact with industry experts plus source the latest and most innovative technology software. PROJECT MANAGEMENT SEMINAR will get serious about the problems, solutions, applications and ideas core to the management of projects. PRIZE GIVEAWAYS We’re giving away prizes to select visitors on each day of the show! Victoriknox swiss tool Free Italian or Turkish coffee Complimentary sandwich and drink CPD CERTIFICATE COLLECTION AREA** to collect your Professional Development Unit points which can be added to your profile. Key features include: Free to attend for registrants Free to attend for registrants Register for free entry before 23 November and save AED 150 www.thebig5.ae/hfregister * BPA Audited
  • 80.
    80 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Middle East Concrete and PMV Live, two events co-located with The Big 5 Dubai are promising even more features and opportunities this year. “One of our long term exhibitors, MAN Truck and Bus is celebrating its 100th anniversary by bringing a 100 year-old truck to display on their stand during the event,” said Nathan Waugh, Portfolio Director, Middle East Concrete and PMV Live. Last year, more than 36,500 people participated over four days, making it the most successful edition since they first started five years ago, a huge indicator of the market recovery and overall outlook. “We have a few new things happening this year for Middle East Concrete and PMV Live, both from the exhibitor’s side and from our side as well,” he said. The show has consistently grown in both size and number of participants from 179 exhibitors and 5,424sqm of floor space in 2011 to more than 400 exhibitors and over 10,000sqm of floor space in 2014. And the numbers are expected to just keep getting better. Organisers will work “ We are focusing on working with our exhibitors to do more live demonstrations while also expanding the educational content for this year” November 23-26, 2015 DUBAI WORLD TRADE CENTRE Nathan Waugh Portfolio Director, Middle East Concrete and PMV Live with exhibitors to do several live demonstrations while also expanding educational content this year. “Laticrete, a major concrete company based in Ras Al Khaimah, UAE, will be holding a live demonstration of its SUPERCAP system, a new method of laying concrete, in the outdoor area at Middle East Concrete,” Nathan said. For 2015, Middle East Concrete and PMV Live have further developed their educational programmes with more workshops and topics than ever before. Educational programmes were a huge success in 2014, providing a range of topics including, “How to trade in the UAE” seminar as well as 40 other technical seminars on topics such as infrastructure, sustainability and fire & safety. This year too, panel discussions and technical seminars will be conducted, located in the open seminar theatre, featuring the most trending industry topics. While, the workshop programme will continue to provide CPD accredited courses helping industry professionals leverage their industry knowledge which can help them grow their business. g Concrete is the most used building material in the world and with an increase in the residential building market forecasted for 2015, the demand for concrete grows. Kryton has waterproofed hundreds of high-risk concrete waterproofing project around the world using Krystol Technology, including Dubai’s Palm Jumierah, Singapore’s Marina Bay Sands, and the megaproject CityCenter in Las Vegas with tremendous success. Kryton has offices around the globe, over fifty distributors in forty countries and operates the largest concrete permeability testing laboratory in North America. Currently, concrete structures around the world are not meeting Durable concrete waterproofing solution their designed service life due to rapid deterioration – most of which is caused by the transport of fluids and moisture through the concrete. Unfortunately, many common concrete waterproofing methods do not last the life of the concrete, contain harmful toxins, and are difficult to apply. Fortunately, crystalline waterproofing admixtures provide another option, the leader of which is Kryton’s Krystol technology. When added to the concrete mix itself, the Krystol proprietary chemicals react with water or moisture to grow millions of needle-shaped crystals. These unique crystals grow deep into the concrete to fill and block the capillary pores and microcracks and stop the migration of water through the concrete, efficiently rendering the concrete itself waterproof. In fact, Kryton’s Krystol Internal Membrane (KIM) technology is the category leader and is the only PRAH (Permeability Reducing Admixture for Hydrostatic Conditions) according to the leading concrete authority in the world, the American Concrete Institute (ACI). g www.kryton.com MEC & PMV LIVE Two great shows
  • 81.
    OUR ADDED VALUESERVICES On Site Assistance Demonstration & Training Facilities Technological Support Consultancy & Design Bahrain | Oman | Saudi Arabia | UAE | Qatar | Lebanon | Kuwait | Iraq RMD Kwikform Middle East T: +971 6 553 4173 F: +971 6 553 4327 E: rmd.me@rmdkwikform.com W: www.rmdkwikform.com RMD KWIKFORM 65 YEARS GLOBAL FORMWORK & SHORING SOLUTIONS VISIT US AT: Co-located with 23-26 November 2015 Dubai World Trade Centre MEC D57
  • 82.
    82 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 app ROBUD GROUP is an international manufacturer of modular formwork systems, headed in Germany. The company supplies goods globally with its formwork systems being successfully implemented in all kinds of projects in Europe, Africa, Asia and, now, the Middle East. ROBUD has many advantages that make it a competitive company including modern production assets and highly qualified personnel. It also supplies the best technical support for clients with engineers performing formwork calculations according to the client’s drawings as well as quick and efficient feedback. ROBUD only uses the best quality goods made with the German Formwork for an international audience STAND: PMVC80 best German steel profiles. Hardened forged formwork accessories are galvanized to assure long lifetime and high bearing capacity. Manufacture facilities are located in Eastern Europe, reducing production expenses to offer the best price and quality combination. Supervising and workers training are available on sight, provided for free for first formwork assembling with technical support available throughout formwork usage. g www.robud.info Weiler is a leading supplier of machinery, providing complete production facilities for the manufacture of concrete precast worldwide. The company provides turn-key precast concrete plants and smart precast technology for modern building systems and for foundations, skeleton, walls, floors and roofs. Weiler also provides application for residential, social, commercial and industrial buildings. With trendsetting innovations, the company has a wide variety of machines, equipment and tailor-made turn-key plants and offers the best engineering, consultation and after-sales-services. Weiler is renowned for having the best start-up for its Mobile Turn-key Factory that is fast and easy to set-up with minimum preparation and investment. In addition, the company also offers the widest range of products and flexibility. All these products are from one experienced hand – Weiler, made in Germany. g www.weiler.net Weiler – the smartest precast technology STAND: MEC D127 MEC,PMV EXHIBITOR NEWS
  • 84.
    84 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE A series of free-to-attend technical seminars, panel discussions, case studies and practical workshops providing the latest industry trends, tools, applications and technologies for the concrete and plant, machinery and construction vehicles markets Middle East Concrete & PMV Live Educational Agenda DAY 1 Show floor Agenda, Monday, November 23, 2015 Technical Seminar: The Benefits of using BS 7533 Compliant Materials in the installation of paving in rigid constructions • What is BS 7533? • What are the benefits of using proven and certified products to this standard when working on large scale public projects? • Examples of projects worldwide, including UAE where BS 7533 compliant materials have been used. • Photography and videos of projects Matthew Kinson, Export Manager, Instarmac Technical Seminar: Permeation properties, durability and service life of concrete structures • Permeation properties of concrete • Permeability, absorption or diffusion? • Hydrophobic and pore-blocking properties • Pudlo with super low absorption, permeability and diffusion • Living testimony of long service life of structures Dr Abu Saleh Mohammod, GM, Pudlo Middle East Technical Seminar: Disputes and claims in EPC and design and build contracts • Definition of D&B contracts and different contract forms for this type i.e. FIDIC • Criteria to select D&B contracts for any project • Understanding the main differences between D&B contract and other FIDIC contracts • Highlighting the risks that have been avoided in this type of contract and the risks that have been accepted • Exploring the origin of and reasons for the disputes in this type of contract • Assessing conflicting views between the client and the contractor for any claims in D&B contract and how this can be avoided • Case study for calculating of claims in similar contracts Maisara al-Rais, Senior Projects Construction Engineer, LPG & Civil Projects Group, Kuwait Oil Tanker Company Technical Seminar: Innovative Techniques and Technologies in Core Wall Setting Out for High Rise Towers • Different methodology of geomatics and positioning techniques in setting out of high rise towers core walls • Combination of different methodology in setting out of core walls and its impact as per site conditions • Integration of different sensors for the method of setting out • Correction actions for the misaligned core wall during the construction Mohammed Abusharkh, Structural Engineer, Consolidated Contractors Company Panel Session: Top tips and best practice in project management for construction projects in the GCC • Understanding the main challenges facing construction project managers • Developing and implementing a strategic project management plan: Contracting strategy; financing contracts; organizing the project; project life cycle • Stakeholder management planning and implementation • Controlling scope, time and cost • Implementing proper risk management and assessment procedures and taking the necessary action to prevent problems • Change management: What to do when things don’t go to plan Moderated by Dr. Ibrahim Bakry - Assistant Professor of Civil Engineering at the American University in Dubai (AUD) Amir Besibis, Project Manager, Parsons David Clifton, Development Director, Faithful+Gould Maisara al-Rais, Senior Projects Construction Engineer, LPG & Civil Projects Group, Kuwait Oil Tanker Company Shijas Pottammal, Assistant Director, International Engineers and Consultants Technical Seminar: Exploring the benefits of Continuously Galvanized Rebar (CGR) • Assessing the new low cost CGR galvanizing process • Evaluating high formability CGR rebar • Highlighting the high corrosion resistance of zinc coated rebar • Overview of product standard specifications • Evaluating best practice and CGR applications Wes Miller, International Zinc Association Project Case Studies: Optimizing building envelopes integrity with concrete wall systems: Louvre Abu Dhabi and ‘Green Building of the Year 2014’ • Importance of building envelope integrity for energy efficiency, building comfort and human health issues in an extreme climate • Assessing the superior qualities of concrete wall assemblies for air tightness and thermal resistance continuity • Concrete wall system case studies: Louvre Abu Dhabi and ‘Green Building of the Year 2014’ William Whistler, Managing Director, Green Building Solutions International Technical Seminar: Implementation of multi-geodetic and geotechnical sensors in structural health monitoring for mega structures • The advantages of having structural health monitoring for mega projects • Health monitoring systems integration • Implementation of health monitoring systems in high rise towers • Implementations of health monitoring systems in other structures Mohammed Abusharkh, Structural Engineer, Consolidated Contractors Company Panel Session: Assessing new models of construction procurement and risk allocation and mitigation strategies • Overview of traditional and new models of construction procurement being used in the region • Highlighting the key principles of early supplier engagement, transparency of cost, integrated team working and collaborative working • Assessing the changing dynamics of risk allocation • Incorporating effective risk mitigation strategies in construction procurement • Outsourcing services and how to mitigate risks when working with subcontractors and multiple stakeholders Moderated by Dr. Ibrahim Bakry, Assistant Professor of Civil Engineering at the American University in Dubai (AUD) Madhu Nagarajan, AVP - Strategy, Al Siraj Holdings Mark Shea, Head of Hospitality, Faithful+Gould Mohamad Nasser, Partner, Grant Thornton R. Venkat, Director, C Cubed Consultants Trevor Butcher, Partner and Head of Finance & Projects, Middle East, DLA Piper 11:30 12:00 12:30 13:00 13:30 14:30 15:00 16:00 16:30 SEMINAR AGENDA
  • 85.
    NOVEMBER 23 -262015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 85 Technical Seminar: Critical success factors influencing performance of construction projects • Introduction about concept of project success factor • Idea about project success criteria • Identification, classification and assessment of critical success factors in project life cycle • Conceptual model of critical success factors and project success • Significance of critical success factors Sumesh Sudheer Babu, Operations Manager, Al Rumooz Electrical and Mechanical Contracting DAY 1 Workshop Agenda Monday, November 23, 2015 Workshop: Industrial manufacturing and application of drymix mortars • Automated plants for drymix mortars • Silo- and jobsite logistics • Mortar mixers and pumps • Machine supported application of drymix mortars • Formulation of machine applied renders Ferdinand Leopolder, Secretary General, Middle East Dry Mortar Mix Association (MEDMA) Workshop: Formulating and testing high performance drymix mortars • Laboratory equipment and training • Fundamental testing requirements for industrial mortars • ISO 13007: The GSO endorsed standard for tile adhesives in the GCC • Standards for industrial mortars including renders, screeds and masonry mortars 17:30 10:00-12:00 12:30-13:30 • Functional additives for high performance drymix mortars Ferdinand Leopolder, Secretary General, Middle East Dry Mortar Mix Association (MEDMA) Workshop: Utilizing colloidal nano-silica to improve concrete durability • An overview of colloidal nano-silica in concrete: Physical and chemical characteristics, chemical reaction in Portland cement concrete and research-observed improved behavior • Details of specific spray-applied colloidal nano-silica used in UTC laboratory studies: UTC laboratory-observed improvements in Portland cement concrete • Impacts of spray-applied colloidal silica on life cycle predictive modeling of concrete • Case study discussion of actual in-place projects utilising spray- applied colloidal silica • Method of using spray-applied colloidal silica A. Brent Rollins, Director, Civil Engineering Materials Research Laboratory, The University of Tennessee at Chattanooga Workshop: The importance of effective construction management in today’s competitive marketplace • Understanding the interrelation and importance of estimating, scheduling, productivity and safety to construction management success • Obtaining an understanding of conceptual, preliminary and detailed estimating techniques and opportunities for enhancement through BIM and other technologies • Understanding the role of Gantt Charts and Precedence Diagrams and the relationships between the time management techniques • Exploring opportunities for using PERT and Linear Scheduling in heavy and commercial construction activities 14:00-15:00 15:00-16:00 CONTINUED ON PAGE 90 u SEMINAR AGENDA
  • 86.
    86 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE SPEAKER INTERVIEW “Durable concrete increases the service life of structures with reduced maintenance, correlating with a cost effective and sustainable environment.” - Dr. Abu Saleh Mohammod Durable and sustainable future for concrete Date: Day 4, Thursday, November 26, 2015 Time: 3:30pm D r Abu Saleh Mohammod, General Manager, Pudlo Middle East will be giving a presentation at this year’s Middle East Concrete on a significant aspect of building in today’s industry. “There are three elements in the title which are interdependent,” says Dr Mohammod, speaking on the subject of his seminar, Permeation properties, durability and service life of concrete structures. The main objective of the seminar, he says, is to share the knowledge of different techniques available to enhance the permeation properties of concrete for design and production while also enhancing its durability and performance. “A concrete structure that is designed to last for a longer service life needs to have durable concrete and will only be durable if the permeation properties of concrete are good.” Dr Mohammod continued to explain that Concrete with good permeation properties is low in water permeability, absorption and diffusion so that water and other deleterious materials would not be able to enter into the concrete matrix. “The seminar will focus on how these permeation properties can be enhanced to attain the required durability to achieve the design service life of structures,” he says. And how is this topic important for the Middle East specifically? Dr Mohammod said: “Most of the major cities in the Middle East are situated along the coastal region and in fact many of them are being developed on the ‘Sabkha’ region where the environmental exposure conditions in terms of the presence of chloride and sulfate salts are extreme. “Chemicals such as chloride and sulfate could only enter into concrete and attack structural elements if there is a presence of moisture. The high ambient temperatures of the Middle East also aggravate the situation, as the rate of these chemical attacks increased with higher temperature. “Therefore, designing concrete to be watertight is an important aspect of the construction of concrete structures especially in the Middle East.” With the trend now moving towards a more durable and environmentally sustainable concrete, Dr Mohammad’s seminar is one to watch this year at the MEC conference, and will provide some insightful information. g Who should attend? The seminar is designed for almost all layer of the industry including clients, consultant engineers, architects, contractors, concrete producers or anyone who is interested in concrete and durability. Dr Abu Saleh Mohammod TECHNICAL SEMINAR: PERMEATION PROPERTIES, DURABILITY AND SERVICE LIFE OF CONCRETE STRUCTURES
  • 88.
    88 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 appMEC,PMV EXHIBITOR NEWS Gulf Elevators Co LLC is active in the business of elevator sales, installation, service & repair and has been catering to a wide number of clients in the UAE through its offices in Sharjah, Dubai and Abu Dhabi. “Formed from humble beginnings and still following the core values of loyalty and customer service, the company was established in the year 1976 in the U.A.E by His Excellency Sheikh Faisal Bin Khalid Mohammed Al Qassimi – Member of Ruling Family of Sharjah, who is our local partner.” Gulf Elevators specialises in elevator installations for all types of premium villas and mid size residential & commercial buildings in the UAE. The firm has highly skilled engineers and technicians for installing and maintaining traction elevators, hydraulic elevators and platform elevators. In addition, Gulf Elevators is the sole certified distributors of Aritco lifts which are manufactured in Sweden and conform to the highest international quality standards with respect to safety and functionality. Aritco Home Lifts comes in different sizes and with great freedom of choice in colours and details to make the lift stylish and perfectly fit into your home. The lifts are known for their reliability and low maintenance costs. They are also rated energy class ‘A’ and cost less than $0.2 per day in operating costs. Aritco Home Lifts are operated by a screw and nut - a well proven and smart technology. They are delivered with a self-supporting shaft minimising the builder’s work and the installation is completed in just a few days. g STAND: PMV B121 Elevator expertise Support for steel producers Industrial Trade Solutions has established itself as a provider of solutions and services to the industry. The company provides support and backup service for manufacturers of steel construction materials including manufacturers of reinforcing meshes, cut and bent rebar, engineered meshes, gratings, steel mesh fencing products, LRPC wire, cold rolled wire, lattice girders and other associated products. Within a short space of time, ITS has added Eurolls SpA and Clifford Welding Systems to its portfolio of capital equipment manufacturers with more agencies currently under negotiation. Graham Raynor, General Manager of ITS, based in Dubai, said that he is excited about the opportunities available in the local market and looks forward to sharing his vast knowledge with manufacturers in the region as well as bringing world class products with extensive and knowledgeable backup to the region. International Trade Solutions brings world class machinery with a knowledgeable service team and a spare parts inventory to ensure that the industry in the region gets only the best products and service that they deserve. g www.itsol.ae Top Global Parts Co Ltd was established in 1994 with the vision of expanding into a global industry market. The company is one of the major distributors of earth moving and construction equipment parts in Korea. Top Global Parts also provides quality undercarriage, hydraulics swing bearing, crank shaft and engine parts. All of TGP’s products are manufactured by Doosan, Hyundai, Volvo and other Korean makers. g www.itopglobal.com STAND: PMV A110 VIP Delta, a licensed manufacturing partner of VIP Germany, is a leading solution provider of high performance coating systems. The company is specialised in supplying customised coating systems to the construction, waste water and oil & gas industry. The company’s integrated system approach includes substrate repair, preparation products, priming and pre-treatment systems, high performance coatings and superior aesthetic finishes. Long term partnerships with consultants, engineers, major contractors and a strong technical back up are the keys to success for VIP-DELTA around the region. Delta also offers regional sales for Graco plural reactors for spraying Polyurethanes and polyureas and Hennecke GmbH machinery for intelligent lightweight construction of polyurethane sandwich panels with PUR-CSM technology. g www.vip-delta.com STAND: PMV C117 Coating solution Supplying the spares STAND: PMV B127
  • 90.
    90 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 app • Understanding the role of productivity analysis for successful time and cost management of the constructed facility • Realising the importance of construction safety on profitability and recognized opportunities for safety assurance Dr. Edgar Small, Coordinator of Construction Management and Associate Professor of Civil Engineering, School of Engineering, AUD Workshop: How can zinc improve concrete performance? • New low cost CGR galvanizing process • Understanding the properties of CGR rebar • Overview of product standard specifications • Improved protection of rebar in concrete from corrosion • Data and best practice from case histories Prof. Stephen Yeomans, International Zinc Association DAY 2 Show floor Agenda Tuesday, November 24, 2015 Technical Seminar: Concretely Light Slabs • Voided Slab System introduction. • Cobiax Slab System • How it works • Advantages: 4Sustainability ( Economic, Environmental and Social) 4Engineering and Financial Benefits (Architectural, Structural, Owner and Contractor). • Project references Mr. Azzam Khaled, CEO, Cobiax Middle East DMCC Technical Seminar: Updates on the use and development of glass- reinforced concrete (GRC) • Overview of current applications of GRC • Exploring production methods • Forecasting future developments • Assessing high performance GRC • New developments in ‘green’ GRC Richard Lavery, Assistant Technical Manager, Power-Sprays Technical Seminar: Reinforced lightweight block rather than polystyrene forms in ICF (insulation concrete forms) • Introduction of ICF (insulation concrete forms) as modern construction systems • Analysis of the advantages and disadvantages of ICF • Guidance for using lightweight blocks • Overview and introduction to reinforced lightweight blocks • Assessing how reinforced blocks can improve properties of ICF construction Mohammad Alidousti, Quality Control Manager, Leca Technical Seminar: Quality control of concrete ingredients and ready mix plant inspections in Emirate of Fujairah • Overview of aggregate sources in Fujairah: Crushers, production process of aggregate from natural rocks, etc. • Testing and quality control of aggregate used in concrete • Testing of other materials used for production of concrete: Cement, water, admixtures, etc. • Quality controlling of ready mix plants working in the Emirate of Fujairah • Understanding the procedures for plant inspections, fresh concrete inspections in plant and sites, etc. Mahesh Palat Kalathil, Chemical Analyst, Fujairah Municipality Building Lab Panel Session: Emerging trends and innovations in concrete • Low carbon-emitting innovations to improve sustainability and cost- effectiveness of concrete structures • Cost effective concrete solutions for refurbishment and repair • Assessing the latest advancements in concrete products and technologies • What new products and developments are taking the industry by storm? 16:30-17:30 11:30 12:00 12:30 13:00 13:30 Moderated by Dr. Peiman Kianmehr, Assistant Professor of Civil Engineering, School of Engineering, AUD A. Brent Rollins, Director, Civil Engineering Materials Research Laboratory, The University of Tennessee at Chattanooga Dr. Abu Saleh Mohammod, General Manager, Pudlo Middle East Mamdouh Hamouda, Engineering Director, Arkan Consultants Dr. Mohammed Alhaj Hussein, CEO, The Green Quality Testing Laboratory and Engineering Consulting Office Mohammad Alidousti, Quality Control Manager, Leca Technical Seminar: Determination of the thermal history on concrete structures by thermogravimetric analysis and infrared spectroscopy • New regulations requiring cement replacement materials to reduce carbon footprint: lack of published studies on the thermal degradation of alternative materials • Parametric research focusing on thermal resistance of newly developed concrete formulations, with special reference to gabbro/ limestone aggregates frequently used by the construction industry in the UAE • The need to study physico-chemical changes in the cement matrix as temperature increases • Exploring a range of assessment methodologies available: Thermo- gravimetric analysis including TGA/DSC, X-ray Diffraction and FTIR • A comparison of results of different groups of concrete under elevated temperature testing Eng. Mohammad Ali Alqassim, Captain, Dubai Police General Headquarters Project Case Study: Post-tensioned concrete slab of a high rise building in Saudi Arabia • Overview of project scope and challenges encountered: Incorrect strength of concrete slabs poured on one of the floors • How would an engineer deal with this situation? • What are the consequences of such a mistake? • What are the required repairs that need to be done? • Lessons learnt: Highlighting the corrective actions taken and solutions put in place Omar Sheikh al Ard, Executive Manager, Philadelphia Post Tensioning Company Technical Seminar: Exploring applications and methods of waterproofing, coating and concrete admixtures • Identifying the main challenges of application of construction chemicals • Assessing the best construction chemicals to use depending on project type and requirements • Highlighting construction chemical solutions for design and engineering, repairs and renovations Rakesh Shah, Managing Director, Fairmate Chemicals Panel Session: Updates and advancements in concrete repair technologies and applications • Taking a proactive approach to infrastructure asset management to improve asset life cycle and maximize economic returns • Best practice in repairing, maintaining, rehabilitating and retrofitting existing infrastructure • Highlighting the latest advancements in structural performance and material durability • Surface protection methods and materials • Strengthening materials and techniques and exploring best practice in repair methods Moderated by Dr. Mohamad Nagi, Director of Infrastructure Sustainability and Assessment Centre, School of Engineering, AUD Fawas al-Otaiby, General Manager, Diamond Shell Mamdouh Hamouda, Engineering Director, Arkan Consultants Eng. Mohammad Ali Alqassim, Captain, Dubai Police General Headquarters Dr. Mohammed Alhaj Hussein, CEO, The Green Quality Testing Laboratory and Engineering Consulting Office 14:30 15:00 16:00 16:30 SEMINAR AGENDA CONTINUED FROM PAGE 85 u
  • 91.
    NOVEMBER 23 -262015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 91 Find every exhibitor on The Big 5 app CONTINUED ON PAGE 93 u 17:30 18:00 10:00-12:00 12:30-13:30 14:30-15:30 16:00-17:00 Technical Seminar: Reducing construction time with a panelised building system • Introduction and description of the formwork system • Assessing the benefits of using panelised building systems • Applications: Overview of the steps of the construction process • Technical Specifications: Panel, reinforcement, concrete • Handling, storage and safety of panelized systems Fawas al-Otaiby, General Manager, Diamond Shell Technical Seminar: PC Strand manufacturing for Precast and Post tension market • Statistical Process and Quality Control • Manufacturing processes and process parameters for pc strand production • How process parameters are derived, monitored and controlled • Statistical quality control • Special developments for USA precast markets • Special developments for USA post tension markets Jayant Gokhale, Plant Manager, Gulf Steel Strands FZE DAY 2 Workshop Agenda Tuesday, November 24, 2015 Workshop: Service life and life-cycle cost of reinforced concrete structures • Durability characteristics controlling the performance of reinforced concrete structures • Chloride–induced corrosion of reinforcing steel and its effect on service life • Service life predicting computer models • Life-cycle costs analysis and calculation of reinforced concrete structures • Service life enhancement methods. Dr. Mohamad Nagi, Director of Infrastructure Sustainability and Assessment Centre, School of Engineering, AUD Workshop: Durability and sustainability of reinforced concrete construction in the Middle East • Overview of reinforced concrete properties and performance in harsh climates • Exploring the numerous design and specification factors and wide range of choices of materials, products and systems that can be used to extend the life of reinforced concrete structures • Proven technologies and analytical procedures to assess the strength of reinforced concrete structures • Investigating defects and deterioration to reinforced concrete structures and identifying the cause or reasons in terms of the design, material specification, construction workmanship and the service environment • Top tips for avoiding premature deterioration of reinforced concrete structures John Young, Managing Director, Young Engineering Consultancy Workshop: Quality control and testing of high-performance concrete • Introduction to and historical background of high-performance concrete • Overview of selection of materials and processing • Understanding the properties of high-strength concrete • Structural design considerations • Testing of high-strength concrete Amr Sherbini, Assistant Professor, Jazan University Workshop: Effective contracts management • Understanding how a valid contract is formed and its key elements • Overview of the rights and obligations of various parties in a construction contract • Understanding the role of a contract administrator in pre and post contract phases
 • Practical tips for effective contracts life cycle management • Local legal considerations: Beware of the traps! R. Venkat, Director, C Cubed Consultants DAY 3 Show floor Agenda Wednesday, November 25, 2015 Technical Seminar: The latest innovations in Fully Bonded Waterproofing Systems Mr. Hani Fikri, Target Market Manager Waterproofing – GCC, Sika Technical Seminar: Improvements in hot weather concreting Innovation in concrete technology for hot weather construction • Durability of building in hot weather regions • Greening hot weather concreting Dr. Samer Al Martini, Associate Professor, Concrete and Construction Materials, Abu Dhabi University Technical Seminar: Exploring the effect of Soil Structure Interaction (SSI) on the response of structures • Definition of SSI, its historical development and modeling techniques • Exploring the effect of SSI on response of high-rise buildings • Assessing the effect of SSI on thermal repose of structures in hot weather • SSI of underground infrastructure (tunnels, pipelines and manholes) and foundation response (shallow and pile foundations) Prof. Reem Sabouni, Assistant Professor, Civil Engineering, Al Hosn University Technical Seminar: Assessing the benefits of thermal-insulating concrete in building design • Introduction to Insulating Concrete Forms (ICF) systems • Exploring the benefits of ICF for building owners and contractors • Understanding the different ICF systems and designs and when they are best used • Measuring the energy efficient properties of thermal-insulating concrete Kostas Mitsios, Technical Director, Gulf Perlite Panel Session: New trends in decorative concrete • Overview of the latest trends in decorative markets including integral color, stamp, stain, overlays, polish, sealers and coatings • Identifying common design and installation challenges and how to overcome them • Evaluating polishing trends including overlay selection, preparation, mixing and set up stations • Assessing a variety of decorative overlays for successful product selection, equipment, preparation and pouring techniques • Highlighting job site conditions for best results Moderated by Dr. Mohamad Nagi, Director of Infrastructure Sustainability and Assessment Centre, School of Engineering, AUD Adel El-Hajj, Architect, Manager of Mizaje division, Macroni Interior Design Ana Margarida D’ Castro, Senior Architect & Managing Director, BIA Design Andrew Paylor, General Manager, Readymix Qatar Group, Lafarge GCC Hilal El-Hassan, Assistant Professor of Civil Engineering, United Arab Emirates University Jon Brooks, Company Manager, Readymix Qatar Group, Lafarge GCC Richard Lavery, Assistant Technical Manager, Power-Sprays Technical Seminar: Competitive advantage and sustainable supply chain strategy • Overview on organizational competitive advantages • Highlighting some important sustainable supply chain practices for the construction industry and its impact on competitive advantage • Overview of best sustainable supply chain practices according to the UN Global Compact Principles • New 4-stage model of ranking supply chain strategy in line with 11:30 12:00 12:30 13:00 13:30 14:30 SEMINAR AGENDA
  • 92.
    92 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE Find every exhibitor on The Big 5 app World Shotcrete Group, a Georgian manufacturer and supplier, is a leading producer of shotcrete, grout machine, refractory gunning machine, ventilation, fans and other accessories. The Shotcrete application can be either a wet or dry mixture in vertical, horizontal and overhead surfaces performed in a short period of time. The company also repairs and supplies spare parts for all products, meeting the needs of markets through quality, innovative design and construction of mechanised devices. In addition, Shotcrete is used in building repair, due to its unique application and properties. For example, the Shotcrete fan system circulates air flow inside tunnels by fan Shotcrete range will impress... wet or dry air flow. As a result, effectively controlled air flow without waste makes the system very cost-effective. The company works in a number of sectors including building foundations, hydropower projects, canal lining, refractory gunning, bridge rehabilitation and concrete repair and restoration, among many others. Visit World Shotcrete Group at stand MEC J70 and get a first look at its quality, injection and ventilation system. g www.worldshotcrete.com STAND: MEC J70 IMKO is presenting a new generation of moisture sensors with the novel SONO sensors, based on the innovative and patented TRIME®radar technology. This year, the company will present its TRIME® radar technology and SONO sensors which can eliminate many disadvantages and problems for all previous moisture probes and make it easier to warrant high safety standards economically, without loss of time. Coarse aggregate can contain a lot of water which in turn may lead to incorrect calculation, making the precise measurements of the moisture content very important. With IMKO’s new product line it has now made it easier to measure coarse aggregates reliably over many years, from sizes 1-32mm and regardless of texture. IMKO will also be presenting its brand new mobile Water/Cement Analyzer SONO-WZ which is used to measure the water content in fresh concrete directly on site, offering a completely new concept for the construction industry. g www.imko.de New dimension quality control STAND: MEC H100 BFS GmbH, Blaubeuren develops designs and builds machines for the production of high quality precast concrete elements for application in irrigation and waste water systems. The company deals with sophisticated machine technology for the production processes with flexible depth of fabrication as the core Quality precast competences of BFS GmbH and its Italian daughter company, BFS S.r.l. The diversity of the range of products is based on the individual requirement and explicit execution of the machines and production lines. In close cooperation with each individual customer, a customised and efficient production platform is created for high quality products. Starting from semi- STAND: MEC B96 automated stand-alone machines, up to complete turnkey and fully automated factories, BFS designs and delivers individual equipment based on modular elements. With up to date technology and knowhow BFS has managed to establish itself as an innovation engine and technology leader. Small or large plans? You can find the answers at BFS GmbH. g www.bfs-casagrande.de Futuretech is a young and dynamic organisation meeting the ever growing demands of various industries and sectors. The company exclusively supplies high quality European machinery, from individual units to complete plants. Its portfolio also includes a wide range of components, accessories & spare parts, specialising in plants for production of building materials, handling and transportation systems such as conveying, discharging, conditioning & mixing. Futuretech’s portfolio extends to offer durable industrial strapping of the highest quality and other packaging products and services. Its steel factory is capable of fabricating steel structures that meet OEM plant standards while producing all the automation technology for both mechanical and electric works in plant. All assembling of equipment and commission plant installation is fully serviced by Futuretech as well as all servicing and repairs of industrial equipment. Futuretech undertake’s specialised contracting projects and focus on building the foundations that are required to establish any type of factory or machinery. g www.ft-eng.com Brilliant range of services STAND: MEC C107 MEC,PMV EXHIBITOR NEWS
  • 93.
    NOVEMBER 23 -262015. DUBAI WORLD TRADE CENTRE .THE BIG 5 SHOW PREVIEW 93 sustainable development • Embracing a collaborative and innovative approach to your supply chain strategy Emad Ameen, Independent Researcher Project Case Study: Overcoming challenges in ground engineering Paul Groves, Head of Tunneling and Ground Engineering, Middle East and India, Atkins Technical Seminar: Recycling for reuse: Options for construction and demolition waste • Overview of CD&E waste recycling – MEA • Highlighting the main challenges facing the CD&E waste recycling industry in MEA • Understanding the limitations of current systems used in MEA for recycling CD&E waste • Introduction to advanced methods of recycling CD&E waste • Assessing the advantages of CD&E waste recycling with advanced methods Ruchin Garg, Business Development Manager, CDE Global Panel Session: Assessing the latest advancements in deep foundation design and construction • Exploring new innovations in deep foundations construction and cost benefit analysis of the latest tools and technologies • Highlighting solutions to common challenges in piling and deep foundations construction • Platforms to excavations and concreting of inclined shafts • Understanding how to innovate in order to safely increase productivity • Feedback from regional case studies on new technologies and techniques Moderated by Dr. Elias Saqan, Chair and Professor of Civil Engineering, School of Engineering, AUD Derek King, General Manager, Al Ghurair Foundations Jason Redgers, Regional Business Development Manager GCC, Menard Vibro Paul Groves, Head of Tunneling and Ground Engineering, Middle East and India, Atkins Peter Titus, Managing Director, Total Foundations Solutions Technical Seminar: Improving structure durability with epoxy powder coating for steel rebar • Understanding the main causes of corrosion of steel rebar • Why should you use FBE-coated rebar? • Facts and figures supporting improved structure durability • Service life and cost comparison Waleed Nashaat, Architectural Specification Executive, Jotun Powder DAY 3 Workshop Agenda Wednesday, November 25, 2015 Workshop: Best practice in piling design • Preparing a plan for the design and construction of pile foundations • Identifying appropriate subsurface exploration procedures and tests to provide design soil parameters • How to choose the appropriate pile type in a given soil • Assessing methods of pile foundation design in application subsurface conditions • Understanding the appropriate methods of pile installation Peter Titus, Managing Director, Total Foundations Solutions Workshop: Environmental legislation and regulations governing UAE cement plants • Overview of the role of the Ministry of Environment and Water in regulating plants and industrial projects in the UAE • Understanding targets and aims of regulations in line with the UAE Strategic Vision 2021 • Important regulations and guidelines for the quarrying industry 15:00 16:00 16:30 17:30 10:00-12:00 12:30-13:30 • Environmental legislation for cement plants: What do plant owners and industry stakeholders need to be aware of? • Lessons learnt from case studies and real world examples
 Eng. Eman Alshuweihi, Environmental Auditer, UAE Ministry of Environment and Water Workshop: Latest advancements in design and construction of precast concrete structures • What is precast concrete? • Design of precast concrete structures • Overview of the construction elements of precast concrete structures Eng. Mohammed Zaid, Design Manager, United Precast Concrete Workshop: Assessing the benefits of tilt-up construction • What is tilt up concrete? • Design of tilt up concrete concrete structures • Overview of the construction elements of tilt up concrete structures Eng. Mohammed Zaid, Design Manager, United Precast Concrete Workshop: Carbon mitigation through concrete block carbonation curing • Global carbon emission and mitigation techniques • Chemical reaction of carbon dioxide and cement • Carbonation of concrete masonry units • Effect of carbonation on mechanical properties, microstructure, and durability of concrete • Environmental impact of carbonation process Hilal El-Hassan, Assistant Professor of Civil Engineering, UAE University DAY 4 Show floor Agenda Thursday, November 26, 2015 Project Case Study: Al Hail Greens Housing Development Oman Phase I • Understanding the real definition of concrete durability • Outlining the key factors contributing to durability of concrete • Highlighting factors affecting concrete durability • Selection of concrete based on requirements • Case study of the concrete used and its properties, with SD, variance etc. Sambasiva Rao Bandla, General Manager - Operations, Arcop & Partners Engineering Consultancy Technical Seminar: Greening of concrete: Trends and priorities • Overview of concrete materials and the concrete industry • Introducing greening tools and strategies • Prioritizing actions for greening the concrete chain • The future of concrete versus the concrete of the future • The UAE experience Prof. Abdul Rahim Sabouni, CEO, Span Management Consulting; Development Adviser, AIC Consultants Technical Seminar: What you need to know about guarantee and warranty mechanisms for material and equipment Moawia AbdulRahman Sayed, Project Engineer, Al Ain Distribution Company Panel Session: Construction sector future outlook: New developments and opportunities in the region’s construction and infrastructure sectors • Construction and infrastructure market overview: How has the market moved on since 2014? • How are mega-events around the region impacting project pipelines and delivery timelines? • What new developments are happening in transport infrastructure? • Opportunities in social infrastructure: Focus on schools, hospitals and government buildings 14:00-15:00 15:30-16:30 17:00-18:00 12:00 12:30 13:00 13:30 CONTINUED FROM PAGE 91 u SEMINAR AGENDA
  • 94.
    94 THE BIG5 SHOW PREVIEW. NOVEMBER 23 -26 2015. DUBAI WORLD TRADE CENTRE • How are oil prices affecting the market? • Forecasting 2016: What is in store for the region’s construction sector? Moderated by Dr. Edgar Small, Coordinator of Construction Management and Associate Professor of Civil Engineering, School of Engineering, AUD Prof. Abdul Rahim Sabouni, CEO, Span Management Consulting; Development Adviser, AIC Consultants Asif Shafi, Senior Vice President, Business Development, Civil Infrastructure, AECOM Middle East Attia Mahmoud, General Manager, Al Arif Contracting Christopher Seymour, Head of Markets, ARCADIS ME Craig Plumb, Head of Research, MENA, Jones Lang LaSalle David Clifton, Development Director, Faithful+Gould Sarfraz Dairkee, General Manager- Corporate Development&Engineering, MAHY Khoory & Co. LLC Technical Seminar: Introduction to efficient material reconciliation Moawia AbdulRahman Sayed, Project Engineer, Al Ain Distribution Company Panel Session: Introduction to Dubai’s accident investigation policies and procedures • Overview of the accident investigation system throughout the industry • Explaining the UAE procedures • Outlining roles and responsibilities Moderated by Jason Woods, Middle East Representative IPAF and PASMA Ahmed Khalil Abdulkareem, Principal Safety Officer, Dubai Municipality Dr. Ali Salem, Dubai Ministry of Labour Elaine Harbour, Head of Liaison, Middle East, UK Health & Safety Executive Worldwide Technical Seminar: Emergency procedures when using Mobile Elevating Work platforms at height • Outlining the different emergency procedures to be aware of when using Mobile Elevating Work platforms at height Jason Woods, Middle East Representative, IPAF and PASMA Panel Session: New trends and developments in improving plant and asset performance • Getting the most out of your maintenance programme by developing and integrating best practice in predictive maintenance • Optimising maintenance by implementing an effective reliability- centered maintenance (RCM) programme • Selecting the best maintenance approach for your assets 14:30 15:00 16:00 16:30 • Identifying and troubleshooting potential failures • Best practice Moderated by Dr. Edgar Small, Coordinator of Construction Management and Associate Professor of Civil Engineering, School of Engineering, AUD Dr. Abu Saleh Mohammod, General Manager, Pudlo Middle East John Jandles, Safelift Narayanan Venkatesan, Senior Planning Engineer, Emirates Global Aluminium Technical Seminar: Safe use of Mobile Scaffold Towers : Standards versus non-standards • Important facts when using Access Towers, what the user must be aware of before erecting structures. Jason Woods, Middle East Representative, IPAF and PASMA DAY 4 Workshop Agenda Thursday, November 26, 2015 Workshop: Exploration of risks and risk management in construction project delivery Risks are pervasive throughout the construction process. How are the risks quantified? How can the risks be mitigated. These and other questions are addressed through this session with the goal of conveying knowledge, understanding and practical tools for management of risks for project participants. Dr Edgar Small, Coordinator of Construction Management and Associate Professor of Civil Engineering, School of Engineering, AUD Workshop: Chemical attack on the durability of underground structures • Definition of concrete durability • Investigating the types of chemical attack • Identifying the common factor • Mitigating chemical attack • Lessons learnt from real world case studies Dr. Abu Saleh Mohammod, General Manager, Pudlo Middle East Workshop: Optimization of preventive maintenance to reduce maintenance costs and increase equipment availability • What is preventive maintenance? • Overview of the types of preventive maintenance • Identifying ideal preventive maintenance • A practical approach to optimise equipment availability • Techniques for optimisation Narayanan Venkatesan, Senior Planning Engineer, Emirates Global Aluminium 17:30 10:00 -11:30 12:00 -13:00 14:00- 15:00 Sam Patel Publisher Victoria James Commercial Manager Te:l +971 4 445 3748 VictoriaJames@dmgeventsme.com Macy Ugbomah Sales Executive Tel: +971 4 438 0355 MacyUgbomah@dmgeventsme.com Rehan Ahmed Digital Sales Executive Tel: +971 4 448 3706 RehanAhmed@dmgeventsme.com © Copyright 2015. All rights reserved. Reproduction without permission is prohibited. Official Publication for: Gary Wright Editor Tel: +971 4 445 3698 GaryWright@dmgeventsme.com Jumana Abdel-Razzaq Assistant Editor Tel: +971 4 4438 0355 JumanaRazzaq@dmgeventsme.com Hina Latif Reporter Tel: +971 4 445 3713 HinaLatif@dmgeventsme.com Cris Malapitan Design Tel: +971 4 445 3713 SEMINAR AGENDA