PEKANBARU, MARCH 20TH
.2012
FOR THE KINDEST ATTENTION OF PERSONNAL MANAGER.
DEAR SIR,
DUE TO THE COMPLETION OF MY ASSIGMENT FOR SEADRILL(S) PTE.LTD ON MARCH 08th
’2012 WITH
DRILLING AND WORKOVER JACK-UP RIG IN THE OIL AND GAS COMPANY. I FIND MY SELF IN THE SITUATION
OF SEEKING NEW EMPLOYMENT.
SINCE YOU FIRM HAS AN EXCELLENT REPUTATION, I WOULD LIKE TO BE CONSIDERED IN YOUR
ORGANIZATION. IN MY LAST POSITION OF AFFORDED AND OPPORTUNITY TO BE COME FAMILIAR WITH THE
FIELD OPERATION DEPARTMENTS IN ADDITION TO THEM. I HERE WITH WOULD LIKE TO LET YOU HAVE MY
POST THAT I HAD INCLUDED DECK SUPERVISOR AND CRANE OPERATOR AS WELL ' SINCE I FEEL MY
FUTURE OPPORTUNITIES OF MY PRESENT POSITION WOULD BE LIMITED, THUS, I AM SEEKING A POSITION
WITH A GREAT CHALLENGE.
HERE WITH, I HAVE ENCLOSED A COPY OF MY RESUME TO INFORM YOU OF ACTIVITIES TO THE PRESENT.
IN THE EVENT THAT YOU FIRM HAS ANY SUITABLE OR RECOMMENDED. I WOULD WELCOME THE
OPPORTUNITY OF PRESENTING MY QUALIFICATION IN A PERSONAL INTERVIEW.
MY PERMANENT CONTACT ADDRESSES
BAMBANG URIP SETIAWAN
JL. KARYA MASSA BLOK B NO.1
PERUM BHAKTI KARYA ASRI
KEL.TARAI BANGUN - KAMPAR
RIAU - INDONESIA
HP. 001-62.81381386908
EMAIL ADDRESS: <benksetiawan@Yahoo.com >
SHOULD THERE BE NO IMMEDIATE INTEREST, I WOULD SINCERELY APRECIATED YOUR RETAINING MY
RESUME FOR FUTURE CONSIDERATION AND REFERENCE.
VERY TRULY YOURS,
BAMBANG URIP SETIAWAN
DECK SUPERVISOR / BARGE FOREMAN
CURICULUM VITAE
BAMBANG URIP SETIAWAN
DECK SUPERVISOR / BARGE FOREMAN / CRANE OPERATOR.
PLACE DATE OF BIRTH : PAYAKUMBUH AUGUST 06, 1967
MARITAL STATUS : MARRIED (M4)
EDUCATION : ELEMENTARY SCHOOL - DUMAI -RIAU - 1980
JUNIOR HIGH SCHOOL - DUMAI -RIAU - 1983
SENIOR HIGH SCHOOL - DUMAI -RIAU - 1986
PASSPORT NO : S.626322
SEAMAN BOOK : NO.S.057108 - INDONESIA SEAMAN BOOK
: NO.448389 - REPUBLICA DEPANAMA
: NO.0021300 - REPUBLIC OF MARSHALL ISLANDS
DRIVING LICENSE : NO.670809140551/B.Il - ALL VEHICLE
CRANE OPT. LICENSE : NO.1005/OPK/KK/M/1998
: INDONESIA MANPOWER DEPARTMENT
: NO.5.2130.00
: INDONESIA DIRECTORATE GENERAL OF OIL & GAS
WORK HISTORY
I HAVE WORKED 19 YEARS WITH MANY OTHER PROJECTS FOR DRILLING / WORK OVER, HOOK-UP AND
CONSTRUCTION WORKS ESPECIALLY IN THE OIL AND GAS FACILITIES AND HAVE BEEN OPERATED MANY
TYPE OF CRANE.
- MANITOWOC CRANE - 4100W - 250T
- MANITOWOC CRANE - 4000 - 150T
- AMERICAN CRANE - 9320 - 250T
- AMERICAN CRANE - 9310 - 225T
- LINK BELT CRANE - HC-238-SS - 136T
P&H, LIEBHER LT.1160, GROVE, TADANO, KATO, HITACHI, SKK-1800-DT-AS, AMERICAN AERO, SEA KING AND
HERCULES, SEATRAX, BUCYRUS ERIE.FUKUSHIMA-OC.4513.4,FAVCO 20/10.K,& 7.5/10,PYRAMID 50K.
WITH DIFFERENTS CAPACITIES.
SPECIAL TRAINING
CRANE OPERATOR TRAINEE ( HOLDING CRANE LICENSE ) ATTENDED BY :
1. INDONESIA MAN POWER DEPARTMENT - ( 1st
.CLASS )
2. INDONESIA DIRECTORATE GENERAL OF OIL & GAS ( 1st
.CLASS )
3. DUBAI - VELOSI TUV BAYERN - CLASS NK - CERT. NO.# RR 7462
4. RINGING & SLINGING, H2S & B.A TRAINING
5. BASIC SAFETY TRAINING - CERT. NO. 6201038450010104
6. HUET- CERT, NO – BST.18187/IKS/10
7. ON JOB TRAINING (OJT) BY TRANSOCEAN - RSTC :
- CRANE OPERATOR OJT - PERMIT TO WORK OJT
- AIR HOIST/TUGGER TRAINING - HSE OJT
- SCAFOLDING RIG SITE - INDUCTION OJT
- ENVIRONMENTAL AWARNESS OJT - HELICOPTER SAFETY AWARNESS
- ENERGY ISOLATION - CONFINED SPACE ENTRY
- MANRIDING OJT - FALL PROTECTION AWARNESS
- PORTABLE LADDER - HAZARDAOUS MATERIALS AWARNESS
- ASBESTOS AWARNESS - HSE ADDITIONAL RIG BASE TRAINING
- PATHOGENS AWARNESS - ELEMENTARY FIRST AID OJT
- FIRE WATCHER - HLO TRAINING COURSE
- OFFSHORE FORK LIFT TRUCK OPERATOR.
DETAIL EXPERIENCE
Company : SEADRILL (S) Pte.Ltd.
Periods : January 06th
.2011 to March 08th
2012
Position : Deck Supervisor
Project : Employed Aboard Jack-Up Drilling Rig – West Prospero
for VSP ( Petro Vietso Company ) at BK-8 field project
Vietnam Sea.
Company : Nautika Sdn.Bhd – Global Workboat (s) Pte.Ltd.
Periods : February 23th
.2009 to November 18th
2010
Position : Barge Foreman
Project : Employed Aboard MV.Seasafe Supporter – Work Boat and accommodation Vessel for
BSP ( Brunei Shell Company ) at Champion and AMPA field – SCO and Kill Well
Project. – Brunei Darussalam Water. And KJO Project in Saudi Arabia.
Company : Momentun Engineering – Dubai – UAE.
Periods : August 02nd
2006 to December 31th
.2008
Position : Barge Foreman
Project : Employed Aboard Gulf Drill-9 - Workover and accommodation Barge for
PAN Oil Company. at Udang field – HWO "B" and "A" Platform – Region
Natuna– South China Sea of Indonesia.
- June.11 to Nov.08 - for PAN Oil Company - Udang A-B P/F - Natuna
- Sept. 07 to March.08 - for Pearl Oil Company - Jasmine Field Thailand
- June. 07 to Sept.07 - for Conoco Oil Company - South China Sea
- Feb.07 to June.07 - for Cairn Energy Oil Company- Sangu Field – Bangladesh
- Aug.06 to Dec.06 - for Dubai Petroleum Company- Dubai - UAE
Company : PT. Tata Sarana Indonesia ( Transocean - Sedco Forex )
Periods : July 20th
. 2005 to July 20th
.2006
Position : Crane Operator
Project : Employed Aboard Jack-Up Drilling Rig - Trident 06 for BK-7 White Tiger
Petrovietso and Trident-09 for Rang Dong-C1 field – JVPC - AAR Region
Vung tau – Vietnam sea.
Company : PT. Patra Drilling Offshore Contractor
Periods : November 02nd
. 2004 to July O8th.2005.
Position : Deck Foreman
Project Incharged on board Baruna-1 Drilling /WOR barge to arrangement all kind of
matterials and drilling equipment on deck, loading /backloading cargos, superviced on
deck crews and assisted to Barge Master for anchor job, maintains the stability of the
barge and handling to the anchor winch for positioning on location and keep wach due
emergency during bad weather to cast off from platform. Considered to Safety
program on daily duties under Kondur Petroleum SA – project in Malacca Strait Sea -
Indonesia.
Company : PT. Tata Sarana Indonesia ( Transocean - Sedco Forex )
Periods : June 15th. 2004 to October 05th, 2004
Position : Crane Operator
Project : Employed Aboard Drilling Ship - Discoverer D.534 for Drilling
Operated by RELIANCE - AAR Region India Sea.
Company : Seabulk Offshore International Inc.
Periods : March 19th 1999 to February 6th 2004
Position : Crane Operator
Project : Employed Aboard Seabulk Vessel and Barge for Hook-Ups
Diving Jobs, Pipeline Repair etc. (as per Chartered)
- April, 99 to August 99 - for Pogo Oil Company Bencamas Field Thailand
- Dec, 99 to Jan. 00 - for Unocal Oil Company Erawan Field -Thailand
- Feb. 00 to March. 00 - for Conoco Oil Company South China Sea
- April.00 to March.00 - for Kodeco Oil Company Poleng Field - Indonesia
- Oct.00 to Nov. 00 - for QGPC-PS.1& PS.2 Field Doha - Gatar
- Dec.00 to Feb.01 - for Duala Field Cameron South Africa
- May.01 to Sept.01 - for Qatar Gas - PS. 3 Doha - Qatar
- Jan.02 to Sept. 02 - for Petronas - APNG Field Kemaman - Malaysia
- Oct.02 to Feb.04 - for Chevron Texaco Field Gulf of Thailand
Company : Pioneer Offshore Enterprise Pte.Ltd.
Periods : September 21st
.1998 to March 06th. 1999
Position : Crane Operator
Project : Employed Aboard Ocean Lift Barge with Projects
Involve Hook-Ups. Maintenance, Etc. As per Chartered
Company : PT. Wanantara Dharma
Periods : Jan 29th, 1998 to August, 28th 1998
Position : Crane Operator
Project : Employed Aboard Jack Up Rig ""JDC-Hakuruyu-IX"
Drilling Operation PS.1, PS.2 & PS.3 QGPC (Qatar Gas Petroleum
Company) DOHA – QATAR
Company : CV. Brahmana Olifiled Services
Periods : June 1997 to December 1997
Position : Crane Operator
Project : Employed Aboard Jack-Up Rig, Sime Dual-7
Driling operation for Marathon Oil Company Natuna - South China Sea.
Company : PT. Patra Drilling Offshore Contractor
Periods : June 02nd, 1995 to May 05th, 1997
Position : Crane Operator
Project : Employed Aboard Semar Barge for Drilling / Work Over
Development Operated by ARRI (Atlantic Rich Field Indonesia Inc.) In the Java Sea.
Company : PT.Calmarine Offshore and Engineering Contractor
Periods : April 05th
.1994 to May 23th.1995
Position : Crane Operator
Project : Employed Aboard CB-One, Construction Barge with Project Involve
Hook-Ups, Modification, Pipeline
Repairs, Maintenance Operated by ARRI (Atlantic Rich Field Indonesia)
in the Java Sea.
Company : Fluor Daniel Eastern Inc.
Periods : May 03th’1993 to March 23th’1994
Position : Crane Operator
Project : Employed for Timika Guest House / Inn Construction
And other Project owned by PT. Freeport Indonesia (Gold and
Cooper Mining) Expansion project in Timika-Irian Jaya.
Company : PT. Aquanur Engineering and Offshore Construction
Periods : April 14th-1991 to April 30TH
.1993
Position : Equipment Dispatcher
Project : Employee for construction and maintenance & others Project
Owned by Lasmo Oil Malacca Strait Ltd. In Padang Island - Riau -
Indonesia.
Duties : To arrange the equipment for support drilling and construction
operation, road maintenance. Lands transportation. Responsibilities
for rig moving and material arrangement to coordinated field
preparation activates : controlling all equipments, time keeper
supervision, daily time sheet of all personnel and equip (daily,
weekly, monthly) & finally summarized a monthly repot. Invoicing
and for client signature, daily report preparation & sent to Jakarta
office. For above concern and report all activities to the site Manager.
Company : PT. Paranada Offshore And Enginnering Construction
Periods : August 06th, 1989 To April 01st , 1991
Position : Equipment Supervisor
Project : Employed For Kurau Land Transportation And Road Maintenance
And Offshore Project Owned By Hud-Bay Oil Malacca Strait Ltd. In
Padang Island-Riau-Indonesia
Duties : In Charge All Equipments, Coordinating All Matter In Relation With
Equipments In Drilling Operation To Supervise Operators And
Drivers, Time Keeper, Controlling Of All Equipments Operation,
Paper Works / Time Sheet Preparation For All Equipments Which
Is On Operating All Activities Reported Directly To The Project Manager.
Company : PT. Maju Terus Jaya
Periods : October 17th, 1987 To July 15th, 1989
Position : Crane Operator & H/E. Operator
Project : Employed For Heavy Equipments Operator Especially Heavy Lifting
And Erection, Earth Work Jobs, Loading & Unloading And Rental H/Equipts.
For Various Project In Jakarta And Others Island In Indonesia.
Company : PT. Risma Anugerah Utama
Periods : June 27th, 1986 To February 10th, 1987
Position : Clerk
Project : Employed For Kurau Land Transportation Construction Off-shore
Project Owned By Hud-Bay Oil Malacca Strait Ltd. In Padang
Island Riau - Indonesia.
Prepared By
Bambang Urip Setiawan
DECK SUPERVISOR.
Project : Employed for Timika Guest House / Inn Construction
And other Project owned by PT. Freeport Indonesia (Gold and
Cooper Mining) Expansion project in Timika-Irian Jaya.
Company : PT. Aquanur Engineering and Offshore Construction
Periods : April 14th-1991 to April 30TH
.1993
Position : Equipment Dispatcher
Project : Employee for construction and maintenance & others Project
Owned by Lasmo Oil Malacca Strait Ltd. In Padang Island - Riau -
Indonesia.
Duties : To arrange the equipment for support drilling and construction
operation, road maintenance. Lands transportation. Responsibilities
for rig moving and material arrangement to coordinated field
preparation activates : controlling all equipments, time keeper
supervision, daily time sheet of all personnel and equip (daily,
weekly, monthly) & finally summarized a monthly repot. Invoicing
and for client signature, daily report preparation & sent to Jakarta
office. For above concern and report all activities to the site Manager.
Company : PT. Paranada Offshore And Enginnering Construction
Periods : August 06th, 1989 To April 01st , 1991
Position : Equipment Supervisor
Project : Employed For Kurau Land Transportation And Road Maintenance
And Offshore Project Owned By Hud-Bay Oil Malacca Strait Ltd. In
Padang Island-Riau-Indonesia
Duties : In Charge All Equipments, Coordinating All Matter In Relation With
Equipments In Drilling Operation To Supervise Operators And
Drivers, Time Keeper, Controlling Of All Equipments Operation,
Paper Works / Time Sheet Preparation For All Equipments Which
Is On Operating All Activities Reported Directly To The Project Manager.
Company : PT. Maju Terus Jaya
Periods : October 17th, 1987 To July 15th, 1989
Position : Crane Operator & H/E. Operator
Project : Employed For Heavy Equipments Operator Especially Heavy Lifting
And Erection, Earth Work Jobs, Loading & Unloading And Rental H/Equipts.
For Various Project In Jakarta And Others Island In Indonesia.
Company : PT. Risma Anugerah Utama
Periods : June 27th, 1986 To February 10th, 1987
Position : Clerk
Project : Employed For Kurau Land Transportation Construction Off-shore
Project Owned By Hud-Bay Oil Malacca Strait Ltd. In Padang
Island Riau - Indonesia.
Prepared By
Bambang Urip Setiawan
DECK SUPERVISOR.

Benks CV for NEW JOB

  • 1.
    PEKANBARU, MARCH 20TH .2012 FORTHE KINDEST ATTENTION OF PERSONNAL MANAGER. DEAR SIR, DUE TO THE COMPLETION OF MY ASSIGMENT FOR SEADRILL(S) PTE.LTD ON MARCH 08th ’2012 WITH DRILLING AND WORKOVER JACK-UP RIG IN THE OIL AND GAS COMPANY. I FIND MY SELF IN THE SITUATION OF SEEKING NEW EMPLOYMENT. SINCE YOU FIRM HAS AN EXCELLENT REPUTATION, I WOULD LIKE TO BE CONSIDERED IN YOUR ORGANIZATION. IN MY LAST POSITION OF AFFORDED AND OPPORTUNITY TO BE COME FAMILIAR WITH THE FIELD OPERATION DEPARTMENTS IN ADDITION TO THEM. I HERE WITH WOULD LIKE TO LET YOU HAVE MY POST THAT I HAD INCLUDED DECK SUPERVISOR AND CRANE OPERATOR AS WELL ' SINCE I FEEL MY FUTURE OPPORTUNITIES OF MY PRESENT POSITION WOULD BE LIMITED, THUS, I AM SEEKING A POSITION WITH A GREAT CHALLENGE. HERE WITH, I HAVE ENCLOSED A COPY OF MY RESUME TO INFORM YOU OF ACTIVITIES TO THE PRESENT. IN THE EVENT THAT YOU FIRM HAS ANY SUITABLE OR RECOMMENDED. I WOULD WELCOME THE OPPORTUNITY OF PRESENTING MY QUALIFICATION IN A PERSONAL INTERVIEW. MY PERMANENT CONTACT ADDRESSES BAMBANG URIP SETIAWAN JL. KARYA MASSA BLOK B NO.1 PERUM BHAKTI KARYA ASRI KEL.TARAI BANGUN - KAMPAR RIAU - INDONESIA HP. 001-62.81381386908 EMAIL ADDRESS: <benksetiawan@Yahoo.com > SHOULD THERE BE NO IMMEDIATE INTEREST, I WOULD SINCERELY APRECIATED YOUR RETAINING MY RESUME FOR FUTURE CONSIDERATION AND REFERENCE. VERY TRULY YOURS, BAMBANG URIP SETIAWAN DECK SUPERVISOR / BARGE FOREMAN CURICULUM VITAE
  • 2.
    BAMBANG URIP SETIAWAN DECKSUPERVISOR / BARGE FOREMAN / CRANE OPERATOR. PLACE DATE OF BIRTH : PAYAKUMBUH AUGUST 06, 1967 MARITAL STATUS : MARRIED (M4) EDUCATION : ELEMENTARY SCHOOL - DUMAI -RIAU - 1980 JUNIOR HIGH SCHOOL - DUMAI -RIAU - 1983 SENIOR HIGH SCHOOL - DUMAI -RIAU - 1986 PASSPORT NO : S.626322 SEAMAN BOOK : NO.S.057108 - INDONESIA SEAMAN BOOK : NO.448389 - REPUBLICA DEPANAMA : NO.0021300 - REPUBLIC OF MARSHALL ISLANDS DRIVING LICENSE : NO.670809140551/B.Il - ALL VEHICLE CRANE OPT. LICENSE : NO.1005/OPK/KK/M/1998 : INDONESIA MANPOWER DEPARTMENT : NO.5.2130.00 : INDONESIA DIRECTORATE GENERAL OF OIL & GAS WORK HISTORY I HAVE WORKED 19 YEARS WITH MANY OTHER PROJECTS FOR DRILLING / WORK OVER, HOOK-UP AND CONSTRUCTION WORKS ESPECIALLY IN THE OIL AND GAS FACILITIES AND HAVE BEEN OPERATED MANY TYPE OF CRANE. - MANITOWOC CRANE - 4100W - 250T - MANITOWOC CRANE - 4000 - 150T - AMERICAN CRANE - 9320 - 250T - AMERICAN CRANE - 9310 - 225T - LINK BELT CRANE - HC-238-SS - 136T P&H, LIEBHER LT.1160, GROVE, TADANO, KATO, HITACHI, SKK-1800-DT-AS, AMERICAN AERO, SEA KING AND HERCULES, SEATRAX, BUCYRUS ERIE.FUKUSHIMA-OC.4513.4,FAVCO 20/10.K,& 7.5/10,PYRAMID 50K. WITH DIFFERENTS CAPACITIES. SPECIAL TRAINING CRANE OPERATOR TRAINEE ( HOLDING CRANE LICENSE ) ATTENDED BY : 1. INDONESIA MAN POWER DEPARTMENT - ( 1st .CLASS ) 2. INDONESIA DIRECTORATE GENERAL OF OIL & GAS ( 1st .CLASS ) 3. DUBAI - VELOSI TUV BAYERN - CLASS NK - CERT. NO.# RR 7462 4. RINGING & SLINGING, H2S & B.A TRAINING 5. BASIC SAFETY TRAINING - CERT. NO. 6201038450010104 6. HUET- CERT, NO – BST.18187/IKS/10 7. ON JOB TRAINING (OJT) BY TRANSOCEAN - RSTC : - CRANE OPERATOR OJT - PERMIT TO WORK OJT - AIR HOIST/TUGGER TRAINING - HSE OJT - SCAFOLDING RIG SITE - INDUCTION OJT - ENVIRONMENTAL AWARNESS OJT - HELICOPTER SAFETY AWARNESS - ENERGY ISOLATION - CONFINED SPACE ENTRY - MANRIDING OJT - FALL PROTECTION AWARNESS - PORTABLE LADDER - HAZARDAOUS MATERIALS AWARNESS - ASBESTOS AWARNESS - HSE ADDITIONAL RIG BASE TRAINING - PATHOGENS AWARNESS - ELEMENTARY FIRST AID OJT - FIRE WATCHER - HLO TRAINING COURSE - OFFSHORE FORK LIFT TRUCK OPERATOR. DETAIL EXPERIENCE Company : SEADRILL (S) Pte.Ltd.
  • 3.
    Periods : January06th .2011 to March 08th 2012 Position : Deck Supervisor Project : Employed Aboard Jack-Up Drilling Rig – West Prospero for VSP ( Petro Vietso Company ) at BK-8 field project Vietnam Sea. Company : Nautika Sdn.Bhd – Global Workboat (s) Pte.Ltd. Periods : February 23th .2009 to November 18th 2010 Position : Barge Foreman Project : Employed Aboard MV.Seasafe Supporter – Work Boat and accommodation Vessel for BSP ( Brunei Shell Company ) at Champion and AMPA field – SCO and Kill Well Project. – Brunei Darussalam Water. And KJO Project in Saudi Arabia. Company : Momentun Engineering – Dubai – UAE. Periods : August 02nd 2006 to December 31th .2008 Position : Barge Foreman Project : Employed Aboard Gulf Drill-9 - Workover and accommodation Barge for PAN Oil Company. at Udang field – HWO "B" and "A" Platform – Region Natuna– South China Sea of Indonesia. - June.11 to Nov.08 - for PAN Oil Company - Udang A-B P/F - Natuna - Sept. 07 to March.08 - for Pearl Oil Company - Jasmine Field Thailand - June. 07 to Sept.07 - for Conoco Oil Company - South China Sea - Feb.07 to June.07 - for Cairn Energy Oil Company- Sangu Field – Bangladesh - Aug.06 to Dec.06 - for Dubai Petroleum Company- Dubai - UAE Company : PT. Tata Sarana Indonesia ( Transocean - Sedco Forex ) Periods : July 20th . 2005 to July 20th .2006 Position : Crane Operator Project : Employed Aboard Jack-Up Drilling Rig - Trident 06 for BK-7 White Tiger Petrovietso and Trident-09 for Rang Dong-C1 field – JVPC - AAR Region Vung tau – Vietnam sea. Company : PT. Patra Drilling Offshore Contractor Periods : November 02nd . 2004 to July O8th.2005. Position : Deck Foreman Project Incharged on board Baruna-1 Drilling /WOR barge to arrangement all kind of matterials and drilling equipment on deck, loading /backloading cargos, superviced on deck crews and assisted to Barge Master for anchor job, maintains the stability of the barge and handling to the anchor winch for positioning on location and keep wach due emergency during bad weather to cast off from platform. Considered to Safety program on daily duties under Kondur Petroleum SA – project in Malacca Strait Sea - Indonesia. Company : PT. Tata Sarana Indonesia ( Transocean - Sedco Forex ) Periods : June 15th. 2004 to October 05th, 2004 Position : Crane Operator Project : Employed Aboard Drilling Ship - Discoverer D.534 for Drilling Operated by RELIANCE - AAR Region India Sea. Company : Seabulk Offshore International Inc.
  • 4.
    Periods : March19th 1999 to February 6th 2004 Position : Crane Operator Project : Employed Aboard Seabulk Vessel and Barge for Hook-Ups Diving Jobs, Pipeline Repair etc. (as per Chartered) - April, 99 to August 99 - for Pogo Oil Company Bencamas Field Thailand - Dec, 99 to Jan. 00 - for Unocal Oil Company Erawan Field -Thailand - Feb. 00 to March. 00 - for Conoco Oil Company South China Sea - April.00 to March.00 - for Kodeco Oil Company Poleng Field - Indonesia - Oct.00 to Nov. 00 - for QGPC-PS.1& PS.2 Field Doha - Gatar - Dec.00 to Feb.01 - for Duala Field Cameron South Africa - May.01 to Sept.01 - for Qatar Gas - PS. 3 Doha - Qatar - Jan.02 to Sept. 02 - for Petronas - APNG Field Kemaman - Malaysia - Oct.02 to Feb.04 - for Chevron Texaco Field Gulf of Thailand Company : Pioneer Offshore Enterprise Pte.Ltd. Periods : September 21st .1998 to March 06th. 1999 Position : Crane Operator Project : Employed Aboard Ocean Lift Barge with Projects Involve Hook-Ups. Maintenance, Etc. As per Chartered Company : PT. Wanantara Dharma Periods : Jan 29th, 1998 to August, 28th 1998 Position : Crane Operator Project : Employed Aboard Jack Up Rig ""JDC-Hakuruyu-IX" Drilling Operation PS.1, PS.2 & PS.3 QGPC (Qatar Gas Petroleum Company) DOHA – QATAR Company : CV. Brahmana Olifiled Services Periods : June 1997 to December 1997 Position : Crane Operator Project : Employed Aboard Jack-Up Rig, Sime Dual-7 Driling operation for Marathon Oil Company Natuna - South China Sea. Company : PT. Patra Drilling Offshore Contractor Periods : June 02nd, 1995 to May 05th, 1997 Position : Crane Operator Project : Employed Aboard Semar Barge for Drilling / Work Over Development Operated by ARRI (Atlantic Rich Field Indonesia Inc.) In the Java Sea. Company : PT.Calmarine Offshore and Engineering Contractor Periods : April 05th .1994 to May 23th.1995 Position : Crane Operator Project : Employed Aboard CB-One, Construction Barge with Project Involve Hook-Ups, Modification, Pipeline Repairs, Maintenance Operated by ARRI (Atlantic Rich Field Indonesia) in the Java Sea. Company : Fluor Daniel Eastern Inc. Periods : May 03th’1993 to March 23th’1994 Position : Crane Operator
  • 5.
    Project : Employedfor Timika Guest House / Inn Construction And other Project owned by PT. Freeport Indonesia (Gold and Cooper Mining) Expansion project in Timika-Irian Jaya. Company : PT. Aquanur Engineering and Offshore Construction Periods : April 14th-1991 to April 30TH .1993 Position : Equipment Dispatcher Project : Employee for construction and maintenance & others Project Owned by Lasmo Oil Malacca Strait Ltd. In Padang Island - Riau - Indonesia. Duties : To arrange the equipment for support drilling and construction operation, road maintenance. Lands transportation. Responsibilities for rig moving and material arrangement to coordinated field preparation activates : controlling all equipments, time keeper supervision, daily time sheet of all personnel and equip (daily, weekly, monthly) & finally summarized a monthly repot. Invoicing and for client signature, daily report preparation & sent to Jakarta office. For above concern and report all activities to the site Manager. Company : PT. Paranada Offshore And Enginnering Construction Periods : August 06th, 1989 To April 01st , 1991 Position : Equipment Supervisor Project : Employed For Kurau Land Transportation And Road Maintenance And Offshore Project Owned By Hud-Bay Oil Malacca Strait Ltd. In Padang Island-Riau-Indonesia Duties : In Charge All Equipments, Coordinating All Matter In Relation With Equipments In Drilling Operation To Supervise Operators And Drivers, Time Keeper, Controlling Of All Equipments Operation, Paper Works / Time Sheet Preparation For All Equipments Which Is On Operating All Activities Reported Directly To The Project Manager. Company : PT. Maju Terus Jaya Periods : October 17th, 1987 To July 15th, 1989 Position : Crane Operator & H/E. Operator Project : Employed For Heavy Equipments Operator Especially Heavy Lifting And Erection, Earth Work Jobs, Loading & Unloading And Rental H/Equipts. For Various Project In Jakarta And Others Island In Indonesia. Company : PT. Risma Anugerah Utama Periods : June 27th, 1986 To February 10th, 1987 Position : Clerk Project : Employed For Kurau Land Transportation Construction Off-shore Project Owned By Hud-Bay Oil Malacca Strait Ltd. In Padang Island Riau - Indonesia. Prepared By Bambang Urip Setiawan DECK SUPERVISOR.
  • 6.
    Project : Employedfor Timika Guest House / Inn Construction And other Project owned by PT. Freeport Indonesia (Gold and Cooper Mining) Expansion project in Timika-Irian Jaya. Company : PT. Aquanur Engineering and Offshore Construction Periods : April 14th-1991 to April 30TH .1993 Position : Equipment Dispatcher Project : Employee for construction and maintenance & others Project Owned by Lasmo Oil Malacca Strait Ltd. In Padang Island - Riau - Indonesia. Duties : To arrange the equipment for support drilling and construction operation, road maintenance. Lands transportation. Responsibilities for rig moving and material arrangement to coordinated field preparation activates : controlling all equipments, time keeper supervision, daily time sheet of all personnel and equip (daily, weekly, monthly) & finally summarized a monthly repot. Invoicing and for client signature, daily report preparation & sent to Jakarta office. For above concern and report all activities to the site Manager. Company : PT. Paranada Offshore And Enginnering Construction Periods : August 06th, 1989 To April 01st , 1991 Position : Equipment Supervisor Project : Employed For Kurau Land Transportation And Road Maintenance And Offshore Project Owned By Hud-Bay Oil Malacca Strait Ltd. In Padang Island-Riau-Indonesia Duties : In Charge All Equipments, Coordinating All Matter In Relation With Equipments In Drilling Operation To Supervise Operators And Drivers, Time Keeper, Controlling Of All Equipments Operation, Paper Works / Time Sheet Preparation For All Equipments Which Is On Operating All Activities Reported Directly To The Project Manager. Company : PT. Maju Terus Jaya Periods : October 17th, 1987 To July 15th, 1989 Position : Crane Operator & H/E. Operator Project : Employed For Heavy Equipments Operator Especially Heavy Lifting And Erection, Earth Work Jobs, Loading & Unloading And Rental H/Equipts. For Various Project In Jakarta And Others Island In Indonesia. Company : PT. Risma Anugerah Utama Periods : June 27th, 1986 To February 10th, 1987 Position : Clerk Project : Employed For Kurau Land Transportation Construction Off-shore Project Owned By Hud-Bay Oil Malacca Strait Ltd. In Padang Island Riau - Indonesia. Prepared By Bambang Urip Setiawan DECK SUPERVISOR.