The document summarizes an interior design project for an amphitheater in Mashhad, Iran. It provides details on the design, construction timeline from May 2009 to October 2009, budgets, areas, and credits the project architects, engineers, contractor and consultants involved. The amphitheater featured a steel structural frame, composite floor system, and interior partitioning and suspended ceilings made of KNAUF paneling systems.