STRUCTURE FIRE CONTROL INSTRUCTOR1
ACQUIREDACQUIRED
STRUCTURESTRUCTURE
PREPARATIONPREPARATION
STRUCTURE FIRE CONTROL INSTRUCTORSTRUCTURE FIRE CONTROL INSTRUCTOR 22
TERMINAL PERFORMANCETERMINAL PERFORMANCE
OBJECTIVEOBJECTIVE
The student, working as a member of aThe student, working as a member of a
team, shall conduct a pre-fire survey ofteam, shall conduct a pre-fire survey of
a structure and prepare it for use in livea structure and prepare it for use in live
fire training evolutions, so that thefire training evolutions, so that the
structure is rendered safe for use.structure is rendered safe for use.
STRUCTURE FIRE CONTROL INSTRUCTOR3
ENABLING OBJECTIVESENABLING OBJECTIVES
 Identify and describe all permits required forIdentify and describe all permits required for
use in training in an acquired structure.use in training in an acquired structure.
 Describe and demonstrate pre-burn planningDescribe and demonstrate pre-burn planning
procedures for an acquired structure.procedures for an acquired structure.
 Describe and demonstrate proper proceduresDescribe and demonstrate proper procedures
for making an acquired structure and thefor making an acquired structure and the
surrounding area safe for training.surrounding area safe for training.
STRUCTURE FIRE CONTROL INSTRUCTOR4
PERMITS & NOTIFICATIONSPERMITS & NOTIFICATIONS
 Written documentation from owner:Written documentation from owner:
Permission to burn structurePermission to burn structure
Clear titleClear title
Certificate of insurance cancellationCertificate of insurance cancellation
Acknowledgement of post-burn propertyAcknowledgement of post-burn property
conditioncondition
 Local burn permitLocal burn permit
 Permission to use fire hydrantsPermission to use fire hydrants
STRUCTURE FIRE CONTROL INSTRUCTOR5
PERMITS & NOTIFICATIONSPERMITS & NOTIFICATIONS
 DispatchersDispatchers
 Law Enforcement AgenciesLaw Enforcement Agencies
 NeighborsNeighbors
 EPDEPD
STRUCTURE FIRE CONTROL INSTRUCTORSTRUCTURE FIRE CONTROL INSTRUCTOR 66
LIABILITY INSURANCELIABILITY INSURANCE
Your department may wantYour department may want
to obtain liability insuranceto obtain liability insurance
to cover damage to otherto cover damage to other
property.property.
STRUCTURE FIRE CONTROL INSTRUCTOR7
PRE-BURNPRE-BURN
PLANNINGPLANNING
STRUCTURE FIRE CONTROL INSTRUCTOR8
PRE-BURN PLANPRE-BURN PLAN
Site plan drawingSite plan drawing
Building planBuilding plan
Floor planFloor plan
CP locationCP location
Apparatus positionsApparatus positions
Hose line positionsHose line positions
Emergency escape routesEmergency escape routes
Emergency evacuation assembly areaEmergency evacuation assembly area
Ingress/egress routes for emergency vehiclesIngress/egress routes for emergency vehicles
STRUCTURE FIRE CONTROL INSTRUCTOR9
PRE-BURN PLANNINGPRE-BURN PLANNING
Determine water supplyDetermine water supply
requirementsrequirements
Obtain apparatusObtain apparatus
Establish separate waterEstablish separate water
sourcessources
Obtain weather reportsObtain weather reports
Designate & markDesignate & mark
parking areasparking areas
Establish operations areaEstablish operations area
& mark perimeter& mark perimeter
EstablishEstablish
communicationscommunications
STRUCTURE FIRE CONTROL INSTRUCTOR10
RENDERING SITE SAFERENDERING SITE SAFE
Inspect building forInspect building for
structural integritystructural integrity
Ensure utilitiesEnsure utilities
disconnecteddisconnected
Remove wall, ceilingRemove wall, ceiling
& floor coverings& floor coverings
Patch holes in wallsPatch holes in walls
& ceilings& ceilings
Remove exceptionalRemove exceptional
weight from aboveweight from above
STRUCTURE FIRE CONTROL INSTRUCTOR11
RENDERING SITE SAFERENDERING SITE SAFE
Pre-cut ventilationPre-cut ventilation
openingsopenings
Remove windows &Remove windows &
cover openingscover openings
Ensure doorsEnsure doors
function or removefunction or remove
Check/operateCheck/operate
building componentsbuilding components
Make stairways safeMake stairways safe
STRUCTURE FIRE CONTROL INSTRUCTOR12
RENDERING SITE SAFERENDERING SITE SAFE
Check chimneyCheck chimney
stabilitystability
Remove fuel tanksRemove fuel tanks
Remove unnecessaryRemove unnecessary
debrisdebris
Make porches/stepsMake porches/steps
safesafe
Fence off groundFence off ground
openingsopenings
STRUCTURE FIRE CONTROL INSTRUCTOR13
RENDERING SITE SAFERENDERING SITE SAFE
Cover holes in walls/ceilingsCover holes in walls/ceilings
Check Cabinets for unsafe contentsCheck Cabinets for unsafe contents
STRUCTURE FIRE CONTROL INSTRUCTOR14
RENDERING SITE SAFERENDERING SITE SAFE
Clearly mark all burn roomsClearly mark all burn rooms
Clearly mark all sides of buildingClearly mark all sides of building
STRUCTURE FIRE CONTROL INSTRUCTOR15
RENDERING SITE SAFERENDERING SITE SAFE
Clearly mark all exitsClearly mark all exits
STRUCTURE FIRE CONTROL INSTRUCTOR16
RENDERING SITE SAFERENDERING SITE SAFE
Cover windows and doors so that rapidCover windows and doors so that rapid
egress can still be achievedegress can still be achieved
STRUCTURE FIRE CONTROL INSTRUCTOR17
RENDERING SITE SAFERENDERING SITE SAFE
Eliminate toxic weed,Eliminate toxic weed,
hives & verminhives & vermin
Remove hazardousRemove hazardous
vegetationvegetation
Protect exposuresProtect exposures
Prepare fire setsPrepare fire sets
STRUCTURE FIRE CONTROL INSTRUCTOR18
ENABLING OBJECTIVE REVIEWENABLING OBJECTIVE REVIEW
 We have identified and describes all permitsWe have identified and describes all permits
required for use in training in an acquiredrequired for use in training in an acquired
structure.structure.
 We have described and demonstrated pre-burnWe have described and demonstrated pre-burn
planning procedures for an acquired structure.planning procedures for an acquired structure.
 We have described and demonstrated properWe have described and demonstrated proper
procedures for making an acquired structureprocedures for making an acquired structure
and the surrounding area safe for training.and the surrounding area safe for training.
STRUCTURE FIRE CONTROL INSTRUCTOR19
END OF SECTIONEND OF SECTION
ONON
ACQUIREDACQUIRED
STRUCTURESTRUCTURE
PREPARATIONPREPARATION

Aquired structure prep

  • 1.
    STRUCTURE FIRE CONTROLINSTRUCTOR1 ACQUIREDACQUIRED STRUCTURESTRUCTURE PREPARATIONPREPARATION
  • 2.
    STRUCTURE FIRE CONTROLINSTRUCTORSTRUCTURE FIRE CONTROL INSTRUCTOR 22 TERMINAL PERFORMANCETERMINAL PERFORMANCE OBJECTIVEOBJECTIVE The student, working as a member of aThe student, working as a member of a team, shall conduct a pre-fire survey ofteam, shall conduct a pre-fire survey of a structure and prepare it for use in livea structure and prepare it for use in live fire training evolutions, so that thefire training evolutions, so that the structure is rendered safe for use.structure is rendered safe for use.
  • 3.
    STRUCTURE FIRE CONTROLINSTRUCTOR3 ENABLING OBJECTIVESENABLING OBJECTIVES  Identify and describe all permits required forIdentify and describe all permits required for use in training in an acquired structure.use in training in an acquired structure.  Describe and demonstrate pre-burn planningDescribe and demonstrate pre-burn planning procedures for an acquired structure.procedures for an acquired structure.  Describe and demonstrate proper proceduresDescribe and demonstrate proper procedures for making an acquired structure and thefor making an acquired structure and the surrounding area safe for training.surrounding area safe for training.
  • 4.
    STRUCTURE FIRE CONTROLINSTRUCTOR4 PERMITS & NOTIFICATIONSPERMITS & NOTIFICATIONS  Written documentation from owner:Written documentation from owner: Permission to burn structurePermission to burn structure Clear titleClear title Certificate of insurance cancellationCertificate of insurance cancellation Acknowledgement of post-burn propertyAcknowledgement of post-burn property conditioncondition  Local burn permitLocal burn permit  Permission to use fire hydrantsPermission to use fire hydrants
  • 5.
    STRUCTURE FIRE CONTROLINSTRUCTOR5 PERMITS & NOTIFICATIONSPERMITS & NOTIFICATIONS  DispatchersDispatchers  Law Enforcement AgenciesLaw Enforcement Agencies  NeighborsNeighbors  EPDEPD
  • 6.
    STRUCTURE FIRE CONTROLINSTRUCTORSTRUCTURE FIRE CONTROL INSTRUCTOR 66 LIABILITY INSURANCELIABILITY INSURANCE Your department may wantYour department may want to obtain liability insuranceto obtain liability insurance to cover damage to otherto cover damage to other property.property.
  • 7.
    STRUCTURE FIRE CONTROLINSTRUCTOR7 PRE-BURNPRE-BURN PLANNINGPLANNING
  • 8.
    STRUCTURE FIRE CONTROLINSTRUCTOR8 PRE-BURN PLANPRE-BURN PLAN Site plan drawingSite plan drawing Building planBuilding plan Floor planFloor plan CP locationCP location Apparatus positionsApparatus positions Hose line positionsHose line positions Emergency escape routesEmergency escape routes Emergency evacuation assembly areaEmergency evacuation assembly area Ingress/egress routes for emergency vehiclesIngress/egress routes for emergency vehicles
  • 9.
    STRUCTURE FIRE CONTROLINSTRUCTOR9 PRE-BURN PLANNINGPRE-BURN PLANNING Determine water supplyDetermine water supply requirementsrequirements Obtain apparatusObtain apparatus Establish separate waterEstablish separate water sourcessources Obtain weather reportsObtain weather reports Designate & markDesignate & mark parking areasparking areas Establish operations areaEstablish operations area & mark perimeter& mark perimeter EstablishEstablish communicationscommunications
  • 10.
    STRUCTURE FIRE CONTROLINSTRUCTOR10 RENDERING SITE SAFERENDERING SITE SAFE Inspect building forInspect building for structural integritystructural integrity Ensure utilitiesEnsure utilities disconnecteddisconnected Remove wall, ceilingRemove wall, ceiling & floor coverings& floor coverings Patch holes in wallsPatch holes in walls & ceilings& ceilings Remove exceptionalRemove exceptional weight from aboveweight from above
  • 11.
    STRUCTURE FIRE CONTROLINSTRUCTOR11 RENDERING SITE SAFERENDERING SITE SAFE Pre-cut ventilationPre-cut ventilation openingsopenings Remove windows &Remove windows & cover openingscover openings Ensure doorsEnsure doors function or removefunction or remove Check/operateCheck/operate building componentsbuilding components Make stairways safeMake stairways safe
  • 12.
    STRUCTURE FIRE CONTROLINSTRUCTOR12 RENDERING SITE SAFERENDERING SITE SAFE Check chimneyCheck chimney stabilitystability Remove fuel tanksRemove fuel tanks Remove unnecessaryRemove unnecessary debrisdebris Make porches/stepsMake porches/steps safesafe Fence off groundFence off ground openingsopenings
  • 13.
    STRUCTURE FIRE CONTROLINSTRUCTOR13 RENDERING SITE SAFERENDERING SITE SAFE Cover holes in walls/ceilingsCover holes in walls/ceilings Check Cabinets for unsafe contentsCheck Cabinets for unsafe contents
  • 14.
    STRUCTURE FIRE CONTROLINSTRUCTOR14 RENDERING SITE SAFERENDERING SITE SAFE Clearly mark all burn roomsClearly mark all burn rooms Clearly mark all sides of buildingClearly mark all sides of building
  • 15.
    STRUCTURE FIRE CONTROLINSTRUCTOR15 RENDERING SITE SAFERENDERING SITE SAFE Clearly mark all exitsClearly mark all exits
  • 16.
    STRUCTURE FIRE CONTROLINSTRUCTOR16 RENDERING SITE SAFERENDERING SITE SAFE Cover windows and doors so that rapidCover windows and doors so that rapid egress can still be achievedegress can still be achieved
  • 17.
    STRUCTURE FIRE CONTROLINSTRUCTOR17 RENDERING SITE SAFERENDERING SITE SAFE Eliminate toxic weed,Eliminate toxic weed, hives & verminhives & vermin Remove hazardousRemove hazardous vegetationvegetation Protect exposuresProtect exposures Prepare fire setsPrepare fire sets
  • 18.
    STRUCTURE FIRE CONTROLINSTRUCTOR18 ENABLING OBJECTIVE REVIEWENABLING OBJECTIVE REVIEW  We have identified and describes all permitsWe have identified and describes all permits required for use in training in an acquiredrequired for use in training in an acquired structure.structure.  We have described and demonstrated pre-burnWe have described and demonstrated pre-burn planning procedures for an acquired structure.planning procedures for an acquired structure.  We have described and demonstrated properWe have described and demonstrated proper procedures for making an acquired structureprocedures for making an acquired structure and the surrounding area safe for training.and the surrounding area safe for training.
  • 19.
    STRUCTURE FIRE CONTROLINSTRUCTOR19 END OF SECTIONEND OF SECTION ONON ACQUIREDACQUIRED STRUCTURESTRUCTURE PREPARATIONPREPARATION