This document describes a grading machine with a screw elevator for sorting fish into different sizes. It includes specifications for the grading machine, which uses conveyor belts to separate fish into compartments by size. It also describes the screw elevator, which lifts fish from water into the grading machine. The screw elevator uses a rotating stainless steel pipe to lift fish and transport water, with adjustable angles and heights controlled by a hydraulic system.
Waterwise Garden Irrigator Program - AustraliaKaila694m
The document provides specifications for a waterwise garden irrigator program. It discusses approved watermark products for drip irrigation, rain sensors, soil moisture monitors and sprinkler systems. It also outlines standards for connecting the irrigation system to the mains water supply, installing the mainline piping, and using automatic control valves. The goal is to promote water-efficient irrigation products and ensure systems are installed properly to save significant amounts of water.
The document describes the Geared Centrifugal Pump (GCP), a new type of artificial lift system. The GCP uses a downhole gearbox to drive a centrifugal pump via a rod string, eliminating the need for downhole electrical components. It is more operationally flexible than ESPs and can handle higher temperatures up to 500 degrees Fahrenheit. Field trials of the GCP in the Permian Basin and Oman involved replacing ESPs and demonstrated efficiency improvements and operational reliability over multiple months.
This document provides instructions for safely installing and operating Delta's Hybrid servo drive for plastic injection molding machines. It outlines product specifications, selection guidelines, installation procedures, wiring details, parameter settings, fault diagnosis, maintenance recommendations, and optional accessories. Safety warnings are included to prevent personal injury and equipment damage from improper use.
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...ujjfjkskekmme
The document provides instructions for servicing components of a 973C track loader powered by a C9 engine, including removing and installing the turbocharger, exhaust manifold, and air inlet heater. Safety precautions are outlined, such as wearing protective equipment when working with refrigerant or hot coolant, and ensuring all fluids are contained. The removal and installation procedures provide illustrations and specify tools needed and torque specifications.
This document provides installation and wiring instructions for an AC motor drive. It includes information on installation requirements, main circuit wiring to power and connect the motor, and control circuit wiring. Diagrams show terminal block locations and pin assignments. Wiring must follow safety guidelines and be installed properly to ensure safe operation and avoid damage to the drive.
This document provides instructions for removing and installing fuel lines, the fuel filter and water separator, fuel transfer pump, and electronic unit injectors on a C32 industrial engine.
The removal and installation procedures are described in detail with accompanying illustrations. Special tools required are listed. Safety precautions are outlined, such as containing fluids and keeping parts clean. Best practices are provided for installing fuel lines properly.
Caterpillar cat 320 c excavator (prefix jtg) service repair manual (jtg00001 ...ufjjsjekkeidol
The document provides instructions for assembling and disassembling components of a 320C excavator travel motor. The disassembly procedure involves removing 27 individual parts from the travel motor in 28 steps. The assembly procedure instructs assembling the travel motor components in reverse order. Cleanliness is emphasized to prevent contamination of hydraulic components.
Waterwise Garden Irrigator Program - AustraliaKaila694m
The document provides specifications for a waterwise garden irrigator program. It discusses approved watermark products for drip irrigation, rain sensors, soil moisture monitors and sprinkler systems. It also outlines standards for connecting the irrigation system to the mains water supply, installing the mainline piping, and using automatic control valves. The goal is to promote water-efficient irrigation products and ensure systems are installed properly to save significant amounts of water.
The document describes the Geared Centrifugal Pump (GCP), a new type of artificial lift system. The GCP uses a downhole gearbox to drive a centrifugal pump via a rod string, eliminating the need for downhole electrical components. It is more operationally flexible than ESPs and can handle higher temperatures up to 500 degrees Fahrenheit. Field trials of the GCP in the Permian Basin and Oman involved replacing ESPs and demonstrated efficiency improvements and operational reliability over multiple months.
This document provides instructions for safely installing and operating Delta's Hybrid servo drive for plastic injection molding machines. It outlines product specifications, selection guidelines, installation procedures, wiring details, parameter settings, fault diagnosis, maintenance recommendations, and optional accessories. Safety warnings are included to prevent personal injury and equipment damage from improper use.
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...ujjfjkskekmme
The document provides instructions for servicing components of a 973C track loader powered by a C9 engine, including removing and installing the turbocharger, exhaust manifold, and air inlet heater. Safety precautions are outlined, such as wearing protective equipment when working with refrigerant or hot coolant, and ensuring all fluids are contained. The removal and installation procedures provide illustrations and specify tools needed and torque specifications.
This document provides installation and wiring instructions for an AC motor drive. It includes information on installation requirements, main circuit wiring to power and connect the motor, and control circuit wiring. Diagrams show terminal block locations and pin assignments. Wiring must follow safety guidelines and be installed properly to ensure safe operation and avoid damage to the drive.
This document provides instructions for removing and installing fuel lines, the fuel filter and water separator, fuel transfer pump, and electronic unit injectors on a C32 industrial engine.
The removal and installation procedures are described in detail with accompanying illustrations. Special tools required are listed. Safety precautions are outlined, such as containing fluids and keeping parts clean. Best practices are provided for installing fuel lines properly.
Caterpillar cat 320 c excavator (prefix jtg) service repair manual (jtg00001 ...ufjjsjekkeidol
The document provides instructions for assembling and disassembling components of a 320C excavator travel motor. The disassembly procedure involves removing 27 individual parts from the travel motor in 28 steps. The assembly procedure instructs assembling the travel motor components in reverse order. Cleanliness is emphasized to prevent contamination of hydraulic components.
The document discusses Aqua-Barrier water-filled dams that are used for dewatering worksites and providing stability during construction projects. It describes how the system utilizes an internal baffle for stability and can be deployed compactly. Application examples mentioned include pipeline construction and repair projects where Aqua-Barriers were used to access underwater areas and control water in a safe and environmentally-friendly way.
Thienam Offshorer Service presentation in BriefBimal Bosmia
Thien Nam Offshore Services is a leading offshore and subsea services provider based in Vung Tau, Vietnam. They offer various subsea services including mass flow trenching, grouting, diving, umbilical/cable lay, and survey and positioning services. They have experience executing challenging offshore projects in Vietnam utilizing owned equipment like mass flow excavation tools, grouting spreads, and a 200m saturation diving system. The company aims to be a long-term partner in Vietnam's offshore market through local investment and staffing.
Effective water management is critical to both open-pit and sub-surface mining operations. Mine dewatering is an essential part of resource extraction, as it lowers the water table around the mine or quarry. Effectively managed dewatering processes typically employ continuous water level monitoring.
PT. Hazelindo Pratama is an Indonesian company established in 2008 that specializes in manufacturing oil and gas equipment. The company has experience in research and development, engineering design, and adheres to QHSE regulations. It produces various wireline units and hydraulic power packs that are used in bottom hole surveillance operations. The company has completed many projects for oil and gas clients in Indonesia and other countries.
This document discusses advances in pre-commissioning of subsea and deepwater pipelines. It describes challenges like needing large diameter lines to flood deep pipelines and recover tools. New technologies like the remote flooding module, smart gauge tool, and subsea data loggers address these challenges by allowing flooding, gauging, and testing without surface connections or tool recovery. These technologies improve efficiency and reduce cost and risk for pre-commissioning deepwater pipelines.
This document summarizes Bourbon Offshore's fleet of modern offshore support vessels, which averages 6 years old. It outlines new vessel classes being ordered, including various sizes of multi-purpose supply vessels, anchor handlers, platform supply vessels, fast supply vessels, and tugs. These new vessels will provide improved capabilities like exceptional maneuverability, precise station keeping, increased capacity, and fuel efficiency. The document also discusses Bourbon's programs for crew training, maintenance reliability, safety, and information systems to ensure high standards of performance.
Essae Digitronics - Top Steel Weighbridge Manufacturer and Supplier in IndiaEssaeDigitronics
Our steel weighbridge decks offer higher strength, greater reliability and faster installation than conventional systems. Each load cell of a weighbridge is calibrated & tested to full capacity at the plant before being sent to site.
This document discusses various deck machinery and equipment used on fishing vessels, including winches, net haulers, and other small deck machinery. It describes the purpose and function of different types of winches, including trawl winches, and how they can be powered. It also explains net haulers, net drums, power blocks, and other equipment used to haul nets and lines, such as triplex winches, transport rollers, line haulers, and fishing reels. The document provides details on how this deck machinery assists with fishing operations and is chosen based on the vessel and fishing methods used.
EDRILL-1 is a self-erecting tender assist drilling rig combining a lightweight drilling equipment set (DES) with an upsized deep-draft barge. The DES can be handled in three lifts to reduce rig move times, while the large barge supports batch drilling and completions. EDRILL-1 is well-suited for production drilling and completions in regions like Southeast Asia, Western Australia, West Africa, Gulf of Mexico or Brazil. It features a 400MT crane, 170-person accommodation, three 1,600HP mud pumps, and can operate in up to 250m water depths.
Buy BOP CONTROL REEL to deploy and retrieve cables. Use of Hoses to control the signal to the subsea BOP. This can be used in mid-level water and deep level as well.
Raw Water/Pre-Loading Reel Systems provide an effective means of storing, lowering, and retrieving a hose at the end of which an ESP (Electrical Submersible Pump) is attached and run below the ocean surface to deliver seawater to an elevated offshore structure. The systems can be retrofitted to an existing vessel or supplied for new construction.
Signal International operates six fabrication facilities across Mississippi and Texas. They have over 500 employees and specialize in offshore oil and gas construction. Safety is their top priority and they have extensive project management and quality control systems in place. Their facilities are well equipped for modular construction and located for optimal access to Gulf of Mexico projects.
FRONTIER Equipment Manufacturing produces various oilfield equipment including spoolers, rod handling equipment, rod welding and repair units, trailers, and workover rigs. Their multi-spooler can handle up to 6 cable spools simultaneously. They also offer rod welders, pinch rollers, shears and other tools for repair and maintenance of sucker rods and downhole equipment. Their workover rigs are equipped with pumps, winches, cranes and other tools for general well workover operations.
Dwain Bercegeay has over 15 years of experience as an ROV supervisor and senior pilot technician. He has extensive experience mobilizing and operating 4000m ROVs and has participated in numerous offshore projects involving installations, inspections, surveys, and repairs. Some of his responsibilities include drill support, installation of subsea infrastructure, pipeline inspections, and removal of munitions. He is proficient in various ROV systems and has worked on various vessels worldwide.
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Charlie Reith
The document discusses subsea oil and gas transportation systems, long subsea tie-backs, and production assurance programs. It focuses on a 140km subsea tie-back project to a remote onshore location, outlining key expectations around reliability performance and mitigating deferred production scenarios. The production assurance program aims to improve availability and reduce operational risks over the life of the field through reliability-led design and maintenance strategies.
National Oilwell Varco (NOV) Floating Production Solutions offers innovative and customized solutions for floating production and loading of oil and gas. They provide integrated solutions through expertise in design, fabrication, project management and manufacturing facilities. Their goal is to create the best and most cost-effective solutions through innovation and life-cycle commitment in order to improve customers' profits over the long term. Advanced Production and Loading (APL) specializes in mooring systems like the Submerged Turret Loading (STL) and Submerged Turret Production (STP) systems, which allow for flexible and safe offshore loading and production in harsh environments.
The document provides information about the FPV Merlin, a fisheries patrol vessel operated by the Sussex Inshore Fisheries and Conservation Authority (SIFCA). The Merlin was designed and built in 2012-2013 to support SIFCA's work of managing marine fisheries and conservation in over 500 square miles of coastal waters. Key features of the Merlin include a Volvo diesel engine and Hamilton jet unit for long range and shallow draft, a navigation system and communications for compliance and research, and a shock absorbing seating and bespoke storage for crew and equipment. Specifications are provided on the vessel's dimensions, construction details, and technical systems.
This document provides an overview of offshore oil and gas production systems. It describes the major components which include wells, platforms, pipelines and processing facilities. It outlines different types of offshore platforms suited for varying water depths, such as fixed steel structures, compliant towers, jack-up platforms and floating production systems. It discusses the crews and roles required to operate offshore platforms. It also summarizes fire and explosion protection systems, environmental protection measures, and how supervisory control and data acquisition (SCADA) systems are used to remotely monitor wells.
Swift Drilling designed and operates the SWIFT10 jack-up drilling rig to meet Shell's economic and technical requirements for exploring shallow waters of the North Sea. Key features include the ability to operate in 40m of water and drill down to 5,500m. Automation reduces risks and crew size. SWIFT10's design achieved a 35-40% reduction in well costs. Swift Drilling is now developing SWIFT11, a larger jack-up rig that will introduce more advanced automation for drilling, tubular handling, and mud systems to further improve safety, efficiency and reduce costs.
More Related Content
Similar to Aquamaof GRADING BELTS MACHINE and SCREW ELEVATOR FOR CAGES
The document discusses Aqua-Barrier water-filled dams that are used for dewatering worksites and providing stability during construction projects. It describes how the system utilizes an internal baffle for stability and can be deployed compactly. Application examples mentioned include pipeline construction and repair projects where Aqua-Barriers were used to access underwater areas and control water in a safe and environmentally-friendly way.
Thienam Offshorer Service presentation in BriefBimal Bosmia
Thien Nam Offshore Services is a leading offshore and subsea services provider based in Vung Tau, Vietnam. They offer various subsea services including mass flow trenching, grouting, diving, umbilical/cable lay, and survey and positioning services. They have experience executing challenging offshore projects in Vietnam utilizing owned equipment like mass flow excavation tools, grouting spreads, and a 200m saturation diving system. The company aims to be a long-term partner in Vietnam's offshore market through local investment and staffing.
Effective water management is critical to both open-pit and sub-surface mining operations. Mine dewatering is an essential part of resource extraction, as it lowers the water table around the mine or quarry. Effectively managed dewatering processes typically employ continuous water level monitoring.
PT. Hazelindo Pratama is an Indonesian company established in 2008 that specializes in manufacturing oil and gas equipment. The company has experience in research and development, engineering design, and adheres to QHSE regulations. It produces various wireline units and hydraulic power packs that are used in bottom hole surveillance operations. The company has completed many projects for oil and gas clients in Indonesia and other countries.
This document discusses advances in pre-commissioning of subsea and deepwater pipelines. It describes challenges like needing large diameter lines to flood deep pipelines and recover tools. New technologies like the remote flooding module, smart gauge tool, and subsea data loggers address these challenges by allowing flooding, gauging, and testing without surface connections or tool recovery. These technologies improve efficiency and reduce cost and risk for pre-commissioning deepwater pipelines.
This document summarizes Bourbon Offshore's fleet of modern offshore support vessels, which averages 6 years old. It outlines new vessel classes being ordered, including various sizes of multi-purpose supply vessels, anchor handlers, platform supply vessels, fast supply vessels, and tugs. These new vessels will provide improved capabilities like exceptional maneuverability, precise station keeping, increased capacity, and fuel efficiency. The document also discusses Bourbon's programs for crew training, maintenance reliability, safety, and information systems to ensure high standards of performance.
Essae Digitronics - Top Steel Weighbridge Manufacturer and Supplier in IndiaEssaeDigitronics
Our steel weighbridge decks offer higher strength, greater reliability and faster installation than conventional systems. Each load cell of a weighbridge is calibrated & tested to full capacity at the plant before being sent to site.
This document discusses various deck machinery and equipment used on fishing vessels, including winches, net haulers, and other small deck machinery. It describes the purpose and function of different types of winches, including trawl winches, and how they can be powered. It also explains net haulers, net drums, power blocks, and other equipment used to haul nets and lines, such as triplex winches, transport rollers, line haulers, and fishing reels. The document provides details on how this deck machinery assists with fishing operations and is chosen based on the vessel and fishing methods used.
EDRILL-1 is a self-erecting tender assist drilling rig combining a lightweight drilling equipment set (DES) with an upsized deep-draft barge. The DES can be handled in three lifts to reduce rig move times, while the large barge supports batch drilling and completions. EDRILL-1 is well-suited for production drilling and completions in regions like Southeast Asia, Western Australia, West Africa, Gulf of Mexico or Brazil. It features a 400MT crane, 170-person accommodation, three 1,600HP mud pumps, and can operate in up to 250m water depths.
Buy BOP CONTROL REEL to deploy and retrieve cables. Use of Hoses to control the signal to the subsea BOP. This can be used in mid-level water and deep level as well.
Raw Water/Pre-Loading Reel Systems provide an effective means of storing, lowering, and retrieving a hose at the end of which an ESP (Electrical Submersible Pump) is attached and run below the ocean surface to deliver seawater to an elevated offshore structure. The systems can be retrofitted to an existing vessel or supplied for new construction.
Signal International operates six fabrication facilities across Mississippi and Texas. They have over 500 employees and specialize in offshore oil and gas construction. Safety is their top priority and they have extensive project management and quality control systems in place. Their facilities are well equipped for modular construction and located for optimal access to Gulf of Mexico projects.
FRONTIER Equipment Manufacturing produces various oilfield equipment including spoolers, rod handling equipment, rod welding and repair units, trailers, and workover rigs. Their multi-spooler can handle up to 6 cable spools simultaneously. They also offer rod welders, pinch rollers, shears and other tools for repair and maintenance of sucker rods and downhole equipment. Their workover rigs are equipped with pumps, winches, cranes and other tools for general well workover operations.
Dwain Bercegeay has over 15 years of experience as an ROV supervisor and senior pilot technician. He has extensive experience mobilizing and operating 4000m ROVs and has participated in numerous offshore projects involving installations, inspections, surveys, and repairs. Some of his responsibilities include drill support, installation of subsea infrastructure, pipeline inspections, and removal of munitions. He is proficient in various ROV systems and has worked on various vessels worldwide.
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Charlie Reith
The document discusses subsea oil and gas transportation systems, long subsea tie-backs, and production assurance programs. It focuses on a 140km subsea tie-back project to a remote onshore location, outlining key expectations around reliability performance and mitigating deferred production scenarios. The production assurance program aims to improve availability and reduce operational risks over the life of the field through reliability-led design and maintenance strategies.
National Oilwell Varco (NOV) Floating Production Solutions offers innovative and customized solutions for floating production and loading of oil and gas. They provide integrated solutions through expertise in design, fabrication, project management and manufacturing facilities. Their goal is to create the best and most cost-effective solutions through innovation and life-cycle commitment in order to improve customers' profits over the long term. Advanced Production and Loading (APL) specializes in mooring systems like the Submerged Turret Loading (STL) and Submerged Turret Production (STP) systems, which allow for flexible and safe offshore loading and production in harsh environments.
The document provides information about the FPV Merlin, a fisheries patrol vessel operated by the Sussex Inshore Fisheries and Conservation Authority (SIFCA). The Merlin was designed and built in 2012-2013 to support SIFCA's work of managing marine fisheries and conservation in over 500 square miles of coastal waters. Key features of the Merlin include a Volvo diesel engine and Hamilton jet unit for long range and shallow draft, a navigation system and communications for compliance and research, and a shock absorbing seating and bespoke storage for crew and equipment. Specifications are provided on the vessel's dimensions, construction details, and technical systems.
This document provides an overview of offshore oil and gas production systems. It describes the major components which include wells, platforms, pipelines and processing facilities. It outlines different types of offshore platforms suited for varying water depths, such as fixed steel structures, compliant towers, jack-up platforms and floating production systems. It discusses the crews and roles required to operate offshore platforms. It also summarizes fire and explosion protection systems, environmental protection measures, and how supervisory control and data acquisition (SCADA) systems are used to remotely monitor wells.
Swift Drilling designed and operates the SWIFT10 jack-up drilling rig to meet Shell's economic and technical requirements for exploring shallow waters of the North Sea. Key features include the ability to operate in 40m of water and drill down to 5,500m. Automation reduces risks and crew size. SWIFT10's design achieved a 35-40% reduction in well costs. Swift Drilling is now developing SWIFT11, a larger jack-up rig that will introduce more advanced automation for drilling, tubular handling, and mud systems to further improve safety, efficiency and reduce costs.
Similar to Aquamaof GRADING BELTS MACHINE and SCREW ELEVATOR FOR CAGES (20)
Aquamaof GRADING BELTS MACHINE and SCREW ELEVATOR FOR CAGES
1. Doc. No. SDS 60 4 0000 Rev. A
Page 1 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
Passport
Product Name:
GRADIND BELTS MACHINE FPR CAGES WITH SCREW ELEVATOR
2. Doc. No. SDS 60 4 0000 Rev. A
Page 2 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
GRADING MACHINE WITH FISH LIFTING BY SCREW ELEVATOR
Technical Specification:
1. Sorting machine has 4 conveyor belts made of PVC, propelled by 4 electric
motors.
2. The sorting machine will be built from stainless steel.
3. The belt conveyor is three meters long and made of PVC.
4. There are three compartments under the belts.
5. Ten-inch chute under the sorting bath is mounted to a plastic hose.
6. Receiving tank at the frontal side of the sorting machine.
7. The four conveyors are run by electric motors.
8. The system will be powered by a electric motors.
9. A screw elevator SS 304 cylinder, with hydraulic gear motor and belts
propulsion rotating screw, diameter 546 mm and distance between pitches
26-33 cm. Screw rotation at up to 40 rpm.
3. Doc. No. SDS 60 4 0000 Rev. A
Page 3 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
GRADIND BELTS MACHINE
The GRADER is an electrically-driven mechanical machine used to segregate fish
crops into several pre-set sizes.
Operation
The fish are delivered into the Collection Basin. The most useful and recommended
method of delivery is by means of a dedicated SCREW ELEVATOR, also a
valuable product of AquaMaof Ltd.
From the Basin the fish enter a belted conveyor: a V-shaped channel with a variable
distance. Two closed-loop, electric motors driven rotating belts form the channel
walls.
The conveyor-transported fish fall through the increasing opening between the two
belts, to be distributed through swiveling outlets and pipe extensions – into
separate, different containers. The separation of fish according to their size is
achieved.
4. Doc. No. SDS 60 4 0000 Rev. A
Page 4 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
Mounting and Positioning
The Grader can be mounted on a variety of chassis:
a) Direct, fixed mount on any type of floor or a raised, fixed platform;
b) Fixed mount on a fishing raft;
c) Towed and wheeled, adjustable height platform;
The positioning is determined according to the mounting environment. When used
with a Screw Elevator, the two machines should be placed in-line, adjacent one to
the other, forming a complete fish distribution system set-up.
Model Definitions
The Graders can be ordered in a variety of model configurations, according to their
use:
a) Manual or Automatic (motorized);
b) Single Channel or Dual Channel (belt conveyors);
c) Choice of structural materials: SAE 304, SAE 316 or ST 37 (SAE A570);
d) Choice of belt materials: SAE 304, SAE 316 or PVC.
5. Doc. No. SDS 60 4 0000 Rev. A
Page 5 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
Specifications
General:
1. Footprint: 167 cm (W) x 488 cm (L)
2. Height: 195 cm
3. Estimated Weight: 860 kG (without mounting chassis)
Structural:
1. Grading Channels: 2
2. Channel Length: 3 m
3. Channel Width: 0 to 130 mm (belt adjustable)
4. Channel Belts: Plastic
5. Belt Velocity: 0.8 to 1.2 m/sec (variable)
6. Belt Motion: 2 / 4 electric motors, independent belt drive
7. Number of Outlets: 2 to 5, 250 mm dia., swiveling
8. Outlet Extensions: up to 2.5 m long, 250 mm dia., PVC or SAE 304/316
9. Structural Materials: choice of SAE 304, SAE 316, ST 37 (SAE A570)
Performance:
1. Grading Capacity: 5 ton/hr (automatic mode, 2 grading channels)
2. Fish Mover Speed: (see Belt Velocity)
3. Control: all-velocities, Electronic Control Panel (PC) enabled
Interfaces:
1. Power Consumption: 0.75 kW each motor
2. Total Power Supply: Single Phase, 220 V, 2.5 / 4.0 kW (one/two channels,
resp.)
3. Water Supply: Low pressure, xxx cu.m/hr
4. Space: 640 cm (W) x 503 cm (L) x 195 cm (H)
Options:
1. Fish counter;
2. Wheeled, towed, adjustable height platform;
3. Walking platform w/stepladder.
6. Doc. No. SDS 60 4 0000 Rev. A
Page 6 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
Engineering Drawing – General Views and Dimensions
7. Doc. No. SDS 60 4 0000 Rev. A
Page 7 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
Screw Elevator DRH 5.5/546/93
General Description
System consists of two units:
1. Main construction with screw pipe installed on raft. Change of pipe incline and
height by hydraulic piston. Turning of pipe by hydraulic motor. Low rotation and
high momentum. Motor is controlled by regulating unit. Power supplier of entire
unit is located on main construction. Motor operates two oil pumps; one for screw
elevator motor and pistons on screw elevator and the other for sorting machine’s
motors and water pump.
8. Doc. No. SDS 60 4 0000 Rev. A
Page 8 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
The elevator is constructed of a number of elements:
1. Main construction + stabilizing post + brakes + front axle swivel-able
wheel
2. Construction for sliding and tilting
3. Carrying and sliding beam + supporting ring + rubber supporting
rollers
4. Screw pipe + lower water and fish collector
5. Upper water separator
6. Collector shield
7. Hydraulic system
1. Main Construction
The main construction serves to support the machine, as a base for its
transportation and to support it on-site. It is constructed of:
1. Main wheels – for moving from place to place
2. Front axle swivel-able wheel – which serves as an axis when moving the machine
manually
3. Hydraulic power system – which supplies energy to the elevator pistons
4. Wheel brakes – to prevent the wheels’ sliding forward or backward
5. Stabilizing leg – to stabilize machine while placing it on-site
6. Lifting piston – to shift the elevator’s center of height in order to achieve different
inclines
9. Doc. No. SDS 60 4 0000 Rev. A
Page 9 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
2. Construction for Sliding and Tilting
The construction tilts the elevator in various angles as needed and moves the
elevator backwards and forwards on the main construction. This determines
the optimum distance and depth needed to draw the fish from the water (that
is, when the pipe extends to the maximum in the rear and the tilt is 48%, the
depth will be maximum. This construction also serves as a base for the
carrying beam.
The construction consists of:
1. A U-shaped rail for sliding wheels
2. Tilting piston – which is connected to the main construction
3. Lifting piston – which is connected to the main construction and raises the tilting axis
10. Doc. No. SDS 60 4 0000 Rev. A
Page 10 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
3. Carrying and Sliding Beam
The beam serves as a base for the elevator’s pipe. The pipe’s supports are mounted
on it, as well as the bases that enable sliding back and forth. Also mounted on the
beam are the collector shield, the upper water separator, the collapsible safety pull
and the motor.
The beam consists of:
1. Main beam
2. Polyurethane rollers – which turn the elevator pipe
3. Rollers – located in the U-shaped tilt rail to allow the beam’s sliding
forward and backward within the tilting construction.
4. Support ring – for stopping the pipe from sliding backwards along the
beam and as a base for vertical rotation.
5. Motor – The base is mounted on the beam and allows movement of the
Archimedes screw
11. Doc. No. SDS 60 4 0000 Rev. A
Page 11 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
4. Screw Pipe
The screw pipe is the central base of the entire elevator. It lifts the fish from the
water. The fish flow through the pipe and are emitted at its end. The pipe consists
of:
1. A stainless steel pipe in which is welded a spiral that seals in the water
and brings it to the pipe’s end.
2. Lower collector – gathers the fish from the net (a relatively large area)
and introduces the fish into the pipe. The collector also has a grate that
adjusts the amount of water in order to prevent internal whirlpools.
3. Sliding ring – mounted on pipe in order to prevent pipe from sliding
on beam.
12. Doc. No. SDS 60 4 0000 Rev. A
Page 12 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
5. Upper Water Separator
Separator is located at the upper end of the pipe. It separates the water from the fish
and returns it to the pool, allowing only the fish to be weighed. It also serves as an
adjusting axis for the optimum incline for unloading fish. It consists of:
1. Separator base – inside base is the grate along which the fish and water
pass. At its base is a 6” nickel pipe connected to the flexible pipe that
returns the water to the pool.
2. Separating adapter – which serves as axis of water separator and pipe
elevator
3. Winch cable - that raises and lowers the water separator and sets the
desired height and incline of grate.
4. At the end of the separator is a 12” pipe on which can be mounted
either an angle pipe (to shift the flow of fish) or a tarpaulin bag (to
channel the fish to the container’s opening).
13. Doc. No. SDS 60 4 0000 Rev. A
Page 13 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
6. Collector Shield
The shield:
1. Protects the collector
2. Prevents the fish from returning to the water
3. Correlates between collector and pit
It is constructed of:
1. Pipes – that serve as the shield’s base
2. A rubber sealing ring and a forward stainless steel ring that seal off the
net from the rapidly rotating collector.
3. U-parts or small bridges mounted on the shield, which anchor the net
to the shield and ensure that it will not come loose, as well as to
prevent the fish from escaping. It is recommended that fisheries with a
proper drawing out pit have a soft 10 cm rubber ring in order to ensure
a total seal between the pit’s pipe and the collector’s shield.
4. Emergency ring and cable installed at the shield’s upper end, to stop
elevator operation in times of emergency.
14. Doc. No. SDS 60 4 0000 Rev. A
Page 14 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
7. Hydraulic System
Description of unit:
Two hydraulic gearwheel pump supply power for the two units; one for the sorting
machine and one for the screw elevator. Pump for screw elevator supplies power for
height control, tilting, sliding, and rotating the pipe. Speed of rotation is controlled by
oil regulator. System is protected by relief valve.
Sorting unit is operated by four hydraulic motors connected in pairs on line to receive
identical speed and power between belts. Telescopic piston changes sorting
machine’s height. Valve 50/50 divides oil between pairs of motors. Belt speed
determined by quantity regulator and system is protected by 2 relief valves. Water
pump is also installed on sorting machine and is operated by high-speed oil motor
controlled by quantity regulator. (Sketches included)
The hydraulic system supplies all options for controlling the angles, height and
length of the elevator’s operations as well as the depth of fish extraction and
position of the pipe on the central construction.
The system consists of:
1. A hydraulic power unit with an oil tank, pump and motor, which supply the
pistons with oil.
2. Lifting piston – that determines the center of the elevator’s tilt, as well as
the height of its tail while it is transferred from place to place. For example,
if the piston is open to the maximum height, the screw’s tail will be at its
highest.
3. Tilting piston –sets the elevator’s angle. For example, if the pool is 1.30 m
deep, the screw’s base stands on its edge and the needed height of the spill
is 2.50 m, the tilt piston will determine the elevator’s angle according to the
conditions in the field. This piston is located at the front of the central
construction and is attached to the tilting and sliding construction and
allows collapse of the front axle swivel-able wheel to achieve convenient
transporting. This piston allows determination of the height of the safety
pulling device, in order to attach it to a tractor or car.
4. The sliding piston is located on the underside of the main beam and parallel
to it and is attached to the beam and to the sliding and tilting rails. It slides
the pipe up and down or backwards and forwards in order to set the distance
for fish removal from the base, as well as the height at which the fish are
ejected. If there is a problem of distance from the base, the sliding piston
will set the distance at which the fish will be ejected from the construction.
15. Doc. No. SDS 60 4 0000 Rev. A
Page 15 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
If there is a problem of depth, the sliding and tilting pistons will both enable
removal of fish at as great a depth as possible.
5. Selectors – control the pistons. Each hand selector has its own color, which
is the same as the color on the piston. This enables identification of the
piston you wish to operate.
16. Doc. No. SDS 60 4 0000 Rev. A
Page 16 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
Operation Checklist
A. Oil level in oil tank window.
B. Air pressure in tires and tires’ condition
C. Screws and pins are tight and in place
D. Full fuel tank
E. Support jacks are in proper position
F. No oil leaks
G. Pipes properly connected (screw elevator only/screw + sorting)
Operation Instructions
1. Placement of the elevator
2. Selecting angle and depth of drawing out fish
3. Adjusting angle of the grate on elevator’s top
4. Operating machine and routine work
5. Folding of elevator and preparation for moving from place to place
6. General upkeep
1. Placement of the Elevator
The following should be taken into account when positioning the elevator:
1. The slope of the embankment near the pool
2. Off-loading area
3. Height of off-loading
After selecting the site, the elevator should be placed as close as possible to the
worksite. Hook up the electricity and lower the front axle swivel-able wheel to
transfer position. Using tilting piston, release connection to vehicle. Move the
elevator manually to its final site. Release the brakes and place them in front of and
behind transfer wheels. Make sure that they are properly tightened (after gaining
work experience on the elevator it will be possible to position it immediately, using
the vehicle). Lower the support beams so that the base of the legs is as firmly
planted on the ground as possible and tighten the screws to prevent the legs from
slipping. Tilt the elevator slightly backwards. Remove the safe pulling system’s
17. Doc. No. SDS 60 4 0000 Rev. A
Page 17 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
locking pin so that it can move back and be free (if necessary, the safe pulling
system can be tied back to allow the tank to get as close as possible to the elevator).
Begin tilting the elevator to the desired angle with the tilting piston, to desired
depth and distance. The ideal position for drawing out fish is when 2/3 of the
collector is covered with water and the machine is as horizontal as possible. But the
elevator can draw out fish even from 10 cm of water and at a maximum angle of
48°. Make sure
that the elevator is not leaning heavily on its lower edge, in order to avoid
damaging or bending the collector.
2. Selecting Angle and Depth
Selection of angle and depth of drawing fish from the pool depends on a number of
factors:
1. The pool’s depth relative to the elevator’s location
2. The height from which the fish are poured – the height of the tank or fish sorter
In principle, the more the machine is horizontal, the larger the quantity of fish and
water between the spiral pitches, and the fishing conditions improve. In addition,
when the angle of the grate separating the water from the fish is insufficient, the
fish will not slide properly and if the channel is at too steep an angle, the water will
flow forward beyond the grate. An angle of 10°-15° is ideal.
Tilt the elevator by using the tilting piston until the collector slides into the water.
The lifting piston also determines the angle. The more the piston is closed, the
lower the edge of the elevator. Balance is achieved by using the three pistons –
tilting, lifting and sliding.
Work with the pistons must be done most gently in order to avoid damage to the
elevator and to other machinery in the area. The final angle can also be achieved
after placing the sorter or the tank.
If the pool is emptied, leave a range for sliding and tilting down and also enough
height above the sorting machine or the tank.
18. Doc. No. SDS 60 4 0000 Rev. A
Page 18 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
3. Adjusting angle of ejection
Adjustment of the angle of fish ejection is carried out using the water separator
located on the elevator’s upper end. The separator is controlled by a manual
winch which determines the grate’s and the separator’s incline, as well as the
elevator’s final ejection height. In principle, it is worthwhile to maintain an
angle of approximately 10°-15° in order to allow the fish to slide easily while
still being able to effectively control the water. But it is also possible to place a
cover over the grate in order to direct the water to the sorter’s receiving tank.
Final adjustment of the separator’s angle is carried out only after placing the
additional equipment and then the separator is lowered to its final position. Take
into account that the fish flow forwards when you place the additional
equipment. It is possible to attach a 90° or 45° 12-inch plastic pipe in order to
channel the direction the fish flow in.
19. Doc. No. SDS 60 4 0000 Rev. A
Page 19 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
4. Starting the machine and routine work
Before starting the elevator, check that no one is working on its placement or
doing any other work on it. Make sure that the net tied to the opening will not
interfere with the flow of the fish (tighten the weights around the collector
shield and make sure that there is no surplus net to get caught in the rotating
screw. Make sure that the water separator is properly positioned and is at the
proper incline and that the fish will flow to the tank or to the sorter. Once all
this is done, the elevator can be turned on. Begin operation at very slow speed
until the elevator is filled with water (at that time, water will begin to flow in
the overflow pipe coming out of the water separator). After this, speed can be
increased.
There is a direction selector in the portable control box. In order to draw the
fish out of the water, set the selector so that the pipe’s rotation is in the same
direction as the arrows on the pipe. At work’s end, make sure that the pipe is
empty by turning it in a backwards direction for 2-3 minutes. Pace of fish
withdrawal from the water will be set by the sorters at the sorting table or by
the operator of the water tank.
Before operating, make sure that:
1. All emergency buttons are in operating position (pull them out)
2. The “reset” button is in operating position
3. The elevator is working on minimum speed
4. The elevator is properly stabilized. If not, rotations will cause
vibrations to the right and left.
During work it is possible to leave the hydraulic power unit working and it is
also possible, in certain situations, to shut off the motor if the elevator does not
sink.
5. Folding the machine and preparing it for transfer from place to place
At work’s end, make sure that the elevator is empty of water (most important!).
The elevator should never be moved when there is water in the pipe. After
emptying the pipe by rotating it backwards, slide the pipe forward to lift the safe
pulling system forward to where it can be fixed in the travel position.
20. Doc. No. SDS 60 4 0000 Rev. A
Page 20 of 20
AquaMaof Technologies Ltd., P.O. Box 32, Lower Galilee Industrial Park, Tiberias, 14101, Israel
Phone: +972 (0) 4 673-7630 Fax: +972 (0) 4 673-7633 info@aquamaof.com www.aquamaof.com
Lift the elevator’s tail as much as possible and move the vehicle close. Lift the
stabilizing legs to their highest position from the ground. Set the safe pulling
system’s height to the height suitable to the vehicle and attach it. Raise the front
wheel to a position from which you can fold it upwards and secure it in the
upward position. Raise the water separator as much as possible using the hand
winch.
Raise the elevator’s tail as much as possible using the raising piston. Make sure
that the separator is a safe distance away from the vehicle. Remove the brakes and
bring them back to their place. Brakes are to be removed only after the safety pull
is attached to the vehicle. Make sure that the safety pins are in place, that no one
is near the elevator and that the elevator’s tail is free of the net, rope or anything
else.
6. General maintenance
1. Grease the support ring every 14 days.
2. Oil the rubber wheels every 14 days with grease or silicon chain oil.
3. Oil the cable’s pulley every 30 days.
4. Check oil in hydraulic power unit and make sure that the amount of oil
shown in the indicator is sufficient.
5. Grease pins in safe pulling system every 21 days.
6. Grease pins in front wheel’s front axle swivel-able wheel system and front
wheel’s bearing every 21 days
7. Grease the sliding system, rollers in sliding channel and the channel itself
every 30 days
8. Grease all the pistons in the base and edge every 30 days.
9. Grease the lifting piston’s conduit every 21 days.
Once every seven days:
10.Major cleaning includes motor and construction.
11.Check for cracks in the construction
12.Check bearings and sliding wheels
13.Check motor’s undercarriage.