9. Fig. 6. Diferent
surfaces, obtained
from Fuzzy 1,
regarding each risk
category considered
in this work, i.e.: a)
Time (T) b)
Performance (P) c)
Cost (C)
10. Fig. 7. Some of the projects already designed and implemented by the company:
a) Wind Power Systems b) PV Systems c) Hydro Power Systems d) Wind. Power Systems