CAT BOSS                                                                                  4. attach tool to process
OPERATING INSTRUCTIONS

It is important that tools are
 hydro-tested prior to each use.
Do not modify, change or adapt
any other equipment to these
tools. Do not use in confined
spaces. Do not use any
leverage device or pipe wrench
                                                    2. check for
to assist tool.                 1. connect
                                                        leaks at                                           5. open process valve
                                   nitrogen
                                                        packing
•      1. Connect nitrogen hose    hose
       (with swivel) to tool.                           gland
•      2. Be certain packing                                       3. close valve                                   NITROGEN FLOW
       gland is tight and will not
       leak during use.
•      3. Close vent valve (1/4
       turn ball valve on side of
       tool)
•      4. With tool fully
       retracted, attach tool to
       process connection.
       Tighten sufficiently to
       prevent leaks. Open
       nitrogen supply to tool.
•      5. Open process valve
       and check for leaks. If 6. rotate ratchet
       any leaks, immediately handle and push
       close process valve. If fully into process
                                                                                                                   NITROGEN FLOW
       no leaks appear, open
       process valve to the full
       open position.
•      6. Rotate ratchet handle
       and push fully into
       process
•      7. Open vent valve to
       allow catalyst to be
       removed from aeration
       tap.
•      8. When aeration tap has
       been cleared, there will
       be no catalyst debris                                               NITROGEN FLOW
       venting from valve.
•      9. Close vent valve and
       retract tool fully. When
       fully retracted the
       process valve can be                                                         7. Open valve and vent catalyst debris
       closed and the tool
       removed from the
       process connection.

AMS® CAT BOSS™ Cleaner Procedure

  • 1.
    CAT BOSS 4. attach tool to process OPERATING INSTRUCTIONS It is important that tools are hydro-tested prior to each use. Do not modify, change or adapt any other equipment to these tools. Do not use in confined spaces. Do not use any leverage device or pipe wrench 2. check for to assist tool. 1. connect leaks at 5. open process valve nitrogen packing • 1. Connect nitrogen hose hose (with swivel) to tool. gland • 2. Be certain packing 3. close valve NITROGEN FLOW gland is tight and will not leak during use. • 3. Close vent valve (1/4 turn ball valve on side of tool) • 4. With tool fully retracted, attach tool to process connection. Tighten sufficiently to prevent leaks. Open nitrogen supply to tool. • 5. Open process valve and check for leaks. If 6. rotate ratchet any leaks, immediately handle and push close process valve. If fully into process NITROGEN FLOW no leaks appear, open process valve to the full open position. • 6. Rotate ratchet handle and push fully into process • 7. Open vent valve to allow catalyst to be removed from aeration tap. • 8. When aeration tap has been cleared, there will be no catalyst debris NITROGEN FLOW venting from valve. • 9. Close vent valve and retract tool fully. When fully retracted the process valve can be 7. Open valve and vent catalyst debris closed and the tool removed from the process connection.