Agile Testing – APragmaticApproach
SubramanyaMudukutore
AGENDA
< 2
>
• The Essence
• Context for Agile Testing
• Testing in Agile Teams
• Organizational Challenges
• Keys for Success
Definition
Glen Myers
Testing is the process of executing a program with the intent
of finding errors
Objective explained
Paul Jorgensen
Testing is obviously concerned with errors, faults, failures and
incidents. A test is the act of exercising software with test
cases with an objective of
• Finding failure
• Demonstrate correct execution
A TESTING LIFE CYCLE
< 4
>
Requirement
Specs
Design
Coding
Testing
Fault
Resolution
Fault
Isolation
Fault
Classification
Error
Fault
Fault
Fault
Error
Error
incident
Fix
Requirements
•Business
Requirements
•Technical
Requirements
Analysis &
Design
•System
Specifications
•Component
Specifications
Code
•C#, C, C++ etc.
•Big-Bang
Integration
Test
•Validation Tests
•Verification Tests
Deploy
Cost
Of
Change
Time 5
Context:- Testing Waterfall Approach
AGILE INSIGHTS
< 6
>
Agile: iterative and
incremental
- Each story is expanded,
coded and tested
- Possible release after
each iteration
Context :- Agile Approach
Cost
of
Change
Time 7
Iteration 1
Requirements
Analysis & Design
Code
Test
Iteration 2
Requirements
Analysis & Design
Code
Test
Iteration 3
Requirements
Analysis & Design
Code
Test
Iteration 4
Requirements
Analysis & Design
Code
Test
Deploy
Context :- Agile Testing Approach
CONTEXT : AGILE TESTING SUCCESS FACTORS
•Be cathedral builders not stone cutters
•Collective ownership
Testers are part
of the team
•Drop the “Quality Police” mindset
•Focus on team goals & customer value
Agile testing
mindset
•Automate tests wherever practical
•Need rapid feedbackAutomate tests
•Balance against developer focus on
technical implementation
•Use agile test matrix as guide
Look at the big
picture
< 8
>
Source: http://www.agiletester.ca/
•Session-based testing, Agile test
environments
•Informative workspace
Foundation of
critical practices
•Collaborate with customers
•Collaborate within teamCollaborate
•Team retrospectives
•Personal training: reading, blogs, QAI, local
QA groups
Continually
improve
< 9
>
Source: http://www.agiletester.ca/
Context : Agile Testing Success Factors
< 10
>
Context :- Quarry
A quarry owner was walking through a quarry
and came across a worker and asked her
what she was doing. She said I am cutting
rocks.
She walked on came across a second worker
and asked her the same question. The
response was “I am supporting my family by
working here cutting rocks”. The owner was
impressed because it was more than just a
job; there was a deep important purpose to
the worker.
Finally, the owner came upon a third worker.
The third worker said that they were building a
cathedral.
We need to think of ourselves as cathedral
builders.
< 11
>
Context :- Traditional Engineering
Engineering is a mix of science, craft and
experiment
- experiments provide critical feedback
Engineering after 2nd world war heavily
shifted towards science at the expense of
craft and feedback.
Agile and lean are really a shift back to
traditional engineering
›Testing in Agile Testing
• Agile Testing – Early Feedback
• Key Agile Testing practices
• Why Automate Tests
• Adaptations to handle these
• Outcome assessment
Collaborate with
Test early
Reduce # of open Focus on buggy or
defects critical areas
Testers‘ objective is to enable timely release
of quality software. They find defects and
verify the fixes as part of this objective
developers Automate
(reproducing alongside during
defects, bug Sprints
verification etc.)
Sensitise
developers
towards planned
tests
›Tester Role – In Agile
›Agile Tester Role – Project
Progress
 Testers are first class citizens on agile teams
and part of the “whole team” supporting
customers, business stakeholders, developers
and other team members
 Testers support quality infusion through entire
team and product cycle
 Test tasks and stories are planned and
executed like development tasks and stories
 Automate where possible and use session-
based testing for exploratory testing
 Communicate through information radiators
< 15
>
Key Agile Testing Practices
Agile Practice Benefits
Whole Team
• Quality is not just a tester responsibility
• Quality is more than just testing
• Testing role shifts to quality infusion
throughout project life cycle
Continuous
Integration
• Developers cannot check in code with
failing tests
Continuous Testing • Avoids long delays with “big-bang”
testing after the “final build”
• Bugs found closer to when they are
introduced making them easier to fix
16
›Key Agile Testing Practices
Continuous Integration and Automated test
 Nightly builds followed by automated tests
 Code to verification cycle will be less than a day.
 Automated suite should grow with every Sprint.
 Focus on Critical functional areas for automated System test
Image: http://www.agilenutshell.com/assets/continuous-integration/continuous-integration.png
›Key Agile Testing Practices
Test throughout the Sprint duration, not just at the end
The user stories are to be tested throughout the Sprint, not just when they are
completed (mini-waterfall) – and prevent clogging at the end.
›Key Agile Testing Practices
TEST AUTOMATION – KEY BENEFITS
 Provides safety net
 Supports rapid iterations
 Provides footholds to keep notching upward
 Provides rapid feedback
 Focuses effort on what is valuable
 Frees people to do their best work
< 19
>
Why Automate Tests?
Need to balance automation costs against delivered value
MIKE COHN’S TESTING PYRAMID
Why Automate Tests?
< 20
>
GUI
Acceptance
Tests
FitNesse
Unit Tests
• Small number
• Automate many
• Find the right ones
• Largest numbers
• Foster Test Driven Design
Start Stop Look
BREAK THE MANUAL TESTING PARADIGM
Why Automate Tests?
< 21
>
Manual GUI
Acceptance
Tests
Unit
Tests
Automated
GUI Tests
•Easy to Create
•Very familiar – what we always do
•Typically tedious
•How do we know coverage?
•Need Automation specialists
•Automation good for performance
•Seems like we always rewrite
•Sometimes fragile
•What is Dev testing?
•How do we know what these are?
•How do we know when they fail?
Start Stop Look
“You can never have too many manual
acceptance tests”
 Manual tests are cute little bunnies, before you know it you have
hundreds or thousands in your regression suite
 You inadvertently dig a hole you can never get out of
 Whole team had to help run regression suite
Defect count typically is high
 Most defects were found as manual tests were elaborated
 Regression tests typically didn’t find many defects
 Commonly found defects – things we didn’t think of
Adaptations to handle these
BETTER, BUT NOT PERFECT TESTING ARCHITECTURE
< 23
>
Unit Tests
Manual GUI
Acceptance
Tests
Automated
GUI Tests
& FitNesse
• Still too many here
• Add FitNesse
• Increase Coverage
• Increase Capability
Start Stop Look
Adaptations to handle these
TESTING TYPES AND SCHEDULING
Acceptance –
GUI?
•Minimize Manual
•Generate off of Use
Cases to get scenario
tests.
•During the Iteration
Acceptance -
Functional
•Combination of Unit
tests, FitNesse
•Build Verification and Run
Nightly
Load &
Performance
•Profiling and
Simulation
Automation
•Do it periodically
•Don’t wait till the end of
the Release cycle
Regression •Acceptance and
Functional tests from
previous Iterations
•Run Nightly
Exploratory •Manual Group
Explore
•Roles and Personas
•Before Releasing
Adaptations to handle these
UI Tests Through UI
Selenium
QC & QTP
Test Complete
Functional
Tests
In business
language
Fit/FitNesse
Unit Tests
In same
language as
system
xUnit
< 25
>
Types of Automated Tests
c
o
s
t
< 26
>
• Continuous Builds assures better quality
• > 50% of Acceptance Test Automated
• 90-95% Unit Test Case Coverage
• Feature Based Testing less defects
• Testers and Developer Co-ordination
Increased.
• Team Deliverables are high
• Early Feedback and Good Customer
Growth
• Cost of Quality reduced due early to Early
Testing.
Outcome Assessments
< 27
>
Organizational Challenges
• Dev as Testers and Testers as Dev – how does that
happen?
•Resistance to Change – how do we get the team
to welcome and embrace changes and not feel
threatened?
•Testers are an integral part of the team- do we
need to re-organize to make this happen?
KEYS TO OVERCOME THE ORGANIZATIONAL
CHALLENGES
< 28
>
›Have Dev help run manual Regression
tests
›Pair Dev and Test on Unit Testing
›Co-location of all the team
›Daily Standups
›Do Retrospectives
< 29
>
Summary
Agile Pulls Testing Forward
›You need to change your tools and
approaches to move it forward
›You might need to change the
model/structure of your team
›With Agile, you will create faster Release
cycles, shorter Iterations, more satisfied
customers, and team members that enjoy
what they are doing
Toyota plant in Cambridge near Waterloo builds 350,000 cars annually yet
carries no more than 1 day of inventory.
Kanban – there is no traditional sophisticate MRP show floor/inventory
system that “pushes” work through the plant. Instead Kanban cards are
used to “pull” new parts from upstream suppliers. The result is a highly
optimized inventory system that is responsive. When teams have nothing to
do they clean their work area or help other teams.
On agile teams our “inventory” are incomplete requirements. Or more
accurately any “unconfirmed decision” – such as a requirement,
specification, architecture, design, technical document or test case. We
want to minimize our inventory by pulling new requirements from concept
to working software within each of our “shifts” – which in agile terms is an
iteration or sprint.
At Toyota, each year the 67,000 employees submit approximately 700,000
improvement ideas. Each of these ideas saves money. Over 99% of the ideas area
implemented. The point is that it is the people closest to the work that know best
how to optimize and Toyota empowers them and rewards them for doing so.
< 30
>
Case Study – Toyota Motors

AgileTesting_Ver1.0

  • 1.
    Agile Testing –APragmaticApproach SubramanyaMudukutore
  • 2.
    AGENDA < 2 > • TheEssence • Context for Agile Testing • Testing in Agile Teams • Organizational Challenges • Keys for Success
  • 3.
    Definition Glen Myers Testing isthe process of executing a program with the intent of finding errors Objective explained Paul Jorgensen Testing is obviously concerned with errors, faults, failures and incidents. A test is the act of exercising software with test cases with an objective of • Finding failure • Demonstrate correct execution
  • 4.
    A TESTING LIFECYCLE < 4 > Requirement Specs Design Coding Testing Fault Resolution Fault Isolation Fault Classification Error Fault Fault Fault Error Error incident Fix
  • 5.
    Requirements •Business Requirements •Technical Requirements Analysis & Design •System Specifications •Component Specifications Code •C#, C,C++ etc. •Big-Bang Integration Test •Validation Tests •Verification Tests Deploy Cost Of Change Time 5 Context:- Testing Waterfall Approach
  • 6.
    AGILE INSIGHTS < 6 > Agile:iterative and incremental - Each story is expanded, coded and tested - Possible release after each iteration Context :- Agile Approach
  • 7.
    Cost of Change Time 7 Iteration 1 Requirements Analysis& Design Code Test Iteration 2 Requirements Analysis & Design Code Test Iteration 3 Requirements Analysis & Design Code Test Iteration 4 Requirements Analysis & Design Code Test Deploy Context :- Agile Testing Approach
  • 8.
    CONTEXT : AGILETESTING SUCCESS FACTORS •Be cathedral builders not stone cutters •Collective ownership Testers are part of the team •Drop the “Quality Police” mindset •Focus on team goals & customer value Agile testing mindset •Automate tests wherever practical •Need rapid feedbackAutomate tests •Balance against developer focus on technical implementation •Use agile test matrix as guide Look at the big picture < 8 > Source: http://www.agiletester.ca/
  • 9.
    •Session-based testing, Agiletest environments •Informative workspace Foundation of critical practices •Collaborate with customers •Collaborate within teamCollaborate •Team retrospectives •Personal training: reading, blogs, QAI, local QA groups Continually improve < 9 > Source: http://www.agiletester.ca/ Context : Agile Testing Success Factors
  • 10.
    < 10 > Context :-Quarry A quarry owner was walking through a quarry and came across a worker and asked her what she was doing. She said I am cutting rocks. She walked on came across a second worker and asked her the same question. The response was “I am supporting my family by working here cutting rocks”. The owner was impressed because it was more than just a job; there was a deep important purpose to the worker. Finally, the owner came upon a third worker. The third worker said that they were building a cathedral. We need to think of ourselves as cathedral builders.
  • 11.
    < 11 > Context :-Traditional Engineering Engineering is a mix of science, craft and experiment - experiments provide critical feedback Engineering after 2nd world war heavily shifted towards science at the expense of craft and feedback. Agile and lean are really a shift back to traditional engineering
  • 12.
    ›Testing in AgileTesting • Agile Testing – Early Feedback • Key Agile Testing practices • Why Automate Tests • Adaptations to handle these • Outcome assessment
  • 13.
    Collaborate with Test early Reduce# of open Focus on buggy or defects critical areas Testers‘ objective is to enable timely release of quality software. They find defects and verify the fixes as part of this objective developers Automate (reproducing alongside during defects, bug Sprints verification etc.) Sensitise developers towards planned tests ›Tester Role – In Agile
  • 14.
    ›Agile Tester Role– Project Progress
  • 15.
     Testers arefirst class citizens on agile teams and part of the “whole team” supporting customers, business stakeholders, developers and other team members  Testers support quality infusion through entire team and product cycle  Test tasks and stories are planned and executed like development tasks and stories  Automate where possible and use session- based testing for exploratory testing  Communicate through information radiators < 15 > Key Agile Testing Practices
  • 16.
    Agile Practice Benefits WholeTeam • Quality is not just a tester responsibility • Quality is more than just testing • Testing role shifts to quality infusion throughout project life cycle Continuous Integration • Developers cannot check in code with failing tests Continuous Testing • Avoids long delays with “big-bang” testing after the “final build” • Bugs found closer to when they are introduced making them easier to fix 16 ›Key Agile Testing Practices
  • 17.
    Continuous Integration andAutomated test  Nightly builds followed by automated tests  Code to verification cycle will be less than a day.  Automated suite should grow with every Sprint.  Focus on Critical functional areas for automated System test Image: http://www.agilenutshell.com/assets/continuous-integration/continuous-integration.png ›Key Agile Testing Practices
  • 18.
    Test throughout theSprint duration, not just at the end The user stories are to be tested throughout the Sprint, not just when they are completed (mini-waterfall) – and prevent clogging at the end. ›Key Agile Testing Practices
  • 19.
    TEST AUTOMATION –KEY BENEFITS  Provides safety net  Supports rapid iterations  Provides footholds to keep notching upward  Provides rapid feedback  Focuses effort on what is valuable  Frees people to do their best work < 19 > Why Automate Tests? Need to balance automation costs against delivered value
  • 20.
    MIKE COHN’S TESTINGPYRAMID Why Automate Tests? < 20 > GUI Acceptance Tests FitNesse Unit Tests • Small number • Automate many • Find the right ones • Largest numbers • Foster Test Driven Design Start Stop Look
  • 21.
    BREAK THE MANUALTESTING PARADIGM Why Automate Tests? < 21 > Manual GUI Acceptance Tests Unit Tests Automated GUI Tests •Easy to Create •Very familiar – what we always do •Typically tedious •How do we know coverage? •Need Automation specialists •Automation good for performance •Seems like we always rewrite •Sometimes fragile •What is Dev testing? •How do we know what these are? •How do we know when they fail? Start Stop Look
  • 22.
    “You can neverhave too many manual acceptance tests”  Manual tests are cute little bunnies, before you know it you have hundreds or thousands in your regression suite  You inadvertently dig a hole you can never get out of  Whole team had to help run regression suite Defect count typically is high  Most defects were found as manual tests were elaborated  Regression tests typically didn’t find many defects  Commonly found defects – things we didn’t think of Adaptations to handle these
  • 23.
    BETTER, BUT NOTPERFECT TESTING ARCHITECTURE < 23 > Unit Tests Manual GUI Acceptance Tests Automated GUI Tests & FitNesse • Still too many here • Add FitNesse • Increase Coverage • Increase Capability Start Stop Look Adaptations to handle these
  • 24.
    TESTING TYPES ANDSCHEDULING Acceptance – GUI? •Minimize Manual •Generate off of Use Cases to get scenario tests. •During the Iteration Acceptance - Functional •Combination of Unit tests, FitNesse •Build Verification and Run Nightly Load & Performance •Profiling and Simulation Automation •Do it periodically •Don’t wait till the end of the Release cycle Regression •Acceptance and Functional tests from previous Iterations •Run Nightly Exploratory •Manual Group Explore •Roles and Personas •Before Releasing Adaptations to handle these
  • 25.
    UI Tests ThroughUI Selenium QC & QTP Test Complete Functional Tests In business language Fit/FitNesse Unit Tests In same language as system xUnit < 25 > Types of Automated Tests c o s t
  • 26.
    < 26 > • ContinuousBuilds assures better quality • > 50% of Acceptance Test Automated • 90-95% Unit Test Case Coverage • Feature Based Testing less defects • Testers and Developer Co-ordination Increased. • Team Deliverables are high • Early Feedback and Good Customer Growth • Cost of Quality reduced due early to Early Testing. Outcome Assessments
  • 27.
    < 27 > Organizational Challenges •Dev as Testers and Testers as Dev – how does that happen? •Resistance to Change – how do we get the team to welcome and embrace changes and not feel threatened? •Testers are an integral part of the team- do we need to re-organize to make this happen?
  • 28.
    KEYS TO OVERCOMETHE ORGANIZATIONAL CHALLENGES < 28 > ›Have Dev help run manual Regression tests ›Pair Dev and Test on Unit Testing ›Co-location of all the team ›Daily Standups ›Do Retrospectives
  • 29.
    < 29 > Summary Agile PullsTesting Forward ›You need to change your tools and approaches to move it forward ›You might need to change the model/structure of your team ›With Agile, you will create faster Release cycles, shorter Iterations, more satisfied customers, and team members that enjoy what they are doing
  • 30.
    Toyota plant inCambridge near Waterloo builds 350,000 cars annually yet carries no more than 1 day of inventory. Kanban – there is no traditional sophisticate MRP show floor/inventory system that “pushes” work through the plant. Instead Kanban cards are used to “pull” new parts from upstream suppliers. The result is a highly optimized inventory system that is responsive. When teams have nothing to do they clean their work area or help other teams. On agile teams our “inventory” are incomplete requirements. Or more accurately any “unconfirmed decision” – such as a requirement, specification, architecture, design, technical document or test case. We want to minimize our inventory by pulling new requirements from concept to working software within each of our “shifts” – which in agile terms is an iteration or sprint. At Toyota, each year the 67,000 employees submit approximately 700,000 improvement ideas. Each of these ideas saves money. Over 99% of the ideas area implemented. The point is that it is the people closest to the work that know best how to optimize and Toyota empowers them and rewards them for doing so. < 30 > Case Study – Toyota Motors