SlideShare a Scribd company logo
1 of 5
Download to read offline
STRATEGIC TUNNEL ENHANCEMENT PROGRAMME
‫ـي‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ج‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ي‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ت‬‫ـرا‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ت‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫س‬�‫اال‬ ‫ـق‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ف‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ن‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ل‬‫ا‬ ‫ـر‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ي‬‫ـو‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ط‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ت‬ ‫ـج‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫م‬‫ـا‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ن‬‫ـر‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ب‬
WHAT IS STEP?
As a key capital investment brand of Abu Dhabi Sewerage Services Company (ADSSC), the
StrategicTunnel Enhancement Programme or“STEP”is an efficient and cost effective solution
to meet the long term needs of Abu Dhabi Island, Abu Dhabi Mainland and surrounding
Islands for the collection and conveyance of wastewater. The new system will provide for an
average wastewater flow of 800,000 m3/day by the end of 2014 and will have an ultimate
capacity to accommodate an average flow of 1.7 million m3/day by 2030 (or enough waste
water to fill 680 Olympic size swimming pools in a single day).
STEP comprises the following new infrastructure:
•	 Deep tunnel sewer, 41km long (the equivalent of distance from Abu Dhabi Island to 	
	 Shahama) and up to 5.5m in internal diameter (5.5m will accommodate a double
	 decker bus within the tunnel). The tunnel will be located up to 80m below ground
	 (the equivalent of a 25 storey building below ground). Approximately 450,000m3 	
	 of concrete will be used to line the deep tunnel (the equivalent of 180 Olympic 		
	 size swimming pools full of concrete)
•	 Series of link sewers over 50km long (the equivalent of distance from Abu Dhabi
	 Island to Al Bahya) and up to 3m in internal diameter
•	 Pumping station located at the termination of the deep tunnel sewer of 30 m3sec. 	
	 capacity (the pumps would take just over 1 minute to fill one Olympic size 		
	 swimming pool)
The concept of the STEP system is to use the link sewers
to intercept the wastewater flows in existing gravity
sewers just upstream of the existing pumping
stations and transfer these flows into the deep
tunnel sewer. The wastewater will be conveyed
by gravity via the deep tunnel sewer to
centralized wastewater treatment facilities
strategically located at Al Wathba. The
wastewater will then be treated and
reclaimed as treated sewage
effluent (TSE) for return to
the metropolitan area
for irrigation purposes
through other capital
projects of ADSSC.
‫النفق‬ ‫تطوير‬ ‫برنامج‬ ‫هو‬ ‫ما‬
‫اال�سرتاتيجي؟‬
‫أبوظبي‬� ‫ل�شركة‬ ‫الرئي�سي‬ ‫لال�ستثمار‬ ‫مميزة‬ ‫كعالمة‬
‫تطوير‬ ‫برنامج‬ ‫يعترب‬ ،‫ال�صحي‬ ‫ال�صرف‬ ‫خلدمات‬
‫العملية‬ ‫احللول‬ ‫أف�ضل‬� ‫من‬ ‫اال�سرتاتيجي‬ ‫النفق‬
‫املتعلقة‬ ‫االحتياجات‬ ‫�ستلبي‬ ‫التي‬ ‫واالقت�صادية‬
‫والرب‬ ‫ظبي‬ ‫أبو‬� ‫جلزيرة‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫بخدمات‬
‫النظام‬ ‫�سيعمل‬ ‫حيث‬ ،‫البعيد‬ ‫املدى‬ ‫على‬ ‫الرئي�سي‬
‫معدل‬ ‫توفري‬ ‫على‬ 2014 ‫عام‬ ‫نهاية‬ ‫مع‬ ‫اجلديد‬
‫من‬ ‫و�سيتم‬ ،‫يوميا‬ ‫مكعب‬ ‫مرت‬ ‫ألف‬� 800 ‫يبلغ‬ ‫دفق‬
‫مليون‬ 1.7 ‫معدله‬ ‫ما‬ ‫ا�ستيعاب‬ ‫امل�شروع‬ ‫هذا‬ ‫خالل‬
‫عام‬ ‫بحلول‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫مياه‬ ‫من‬ ‫يوميا‬ ‫مكعب‬ ‫مرت‬
.)‫أوملبية‬� ‫�سباحة‬ ‫بركة‬ 680 ‫�سعة‬ ‫يعادل‬ ‫ما‬ ‫أي‬�( 2030
-:‫يلي‬ ‫ما‬ ‫من‬ ‫اال�سرتاتيجي‬ ‫النفق‬ ‫تطوير‬ ‫برنامج‬ ‫ويتكون‬
‫كلم‬ 41 ‫يبلغ‬ ‫بطول‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫ملياه‬ ‫عميق‬ ‫نفق‬ 	•
‫ي�صل‬ ‫داخلي‬ ‫وقطر‬ ،)‫ال�شهامة‬ ‫اىل‬ ‫ظبي‬ ‫أبو‬� ‫جزيرة‬ ‫من‬ ‫امل�سافة‬ ‫يعادل‬ ‫ما‬ ‫أي‬�( 	
،)‫طابقني‬ ‫من‬ ‫مكونة‬ ‫ركاب‬ ‫حافلة‬ ‫ي�ستوعب‬ ‫أن‬� ‫ميكنه‬ ‫النفق‬ ‫قطر‬ ‫أن‬� ‫أي‬�(‫أمتار‬� 5.5 ‫اىل‬ 	
		 ‫يتم‬ ‫و�سوف‬ ،)‫طابقا‬ 25 ‫من‬ ‫مكونة‬ ‫بناية‬ ‫يعادل‬ ‫ما‬ ‫أي‬�( ‫أر�ض‬‫ل‬‫ا‬ ‫حتت‬ ‫مرتا‬ 80 ‫إىل‬� ‫ي�صل‬ ‫وعمق‬ 	
‫حجم‬ ‫يعادل‬ ‫ما‬ ‫أي‬�( ‫العميق‬ ‫للنفق‬ ‫كبطانة‬ ‫اخلر�سانة‬ ‫من‬ ‫مكعب‬ ‫مرت‬ ‫ألف‬� 450 ‫حويل‬ ‫ا�ستخدام‬ 	
.)‫باخلر�سانة‬ ‫معبئة‬ ‫أوملبية‬� ‫�سباحة‬ ‫بركة‬ 180 	
‫اىل‬ ‫ظبي‬ ‫أبو‬� ‫جزيرة‬ ‫من‬ ‫امل�سافة‬ ‫يعادل‬ ‫ما‬ ‫أي‬�( ‫كلم‬ 50 ‫من‬ ‫أكرث‬‫ل‬ ‫متتد‬ ‫الفرعية‬ ‫الربط‬ ‫�شبكات‬ ‫من‬ ‫�سل�سلة‬ 	•
.‫أمتار‬� 3 ‫إىل‬� ‫ي�صل‬ ‫داخلي‬ ‫وبقطر‬ ،)‫الباهية‬ 	
‫الثانية‬ ‫يف‬ ‫مكعبا‬ ‫مرتا‬ 30 ‫تبلغ‬ ‫�ضخ‬ ‫بطاقة‬ ‫العميق‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫خط‬ ‫نفق‬ ‫نهاية‬ ‫يف‬ ‫تقع‬ ‫�ضخ‬ ‫حمطة‬ 	•
.)‫واحدة‬ ‫دقيقة‬ ‫يقارب‬ ‫ما‬ ‫خالل‬ ‫أوملبية‬� ‫�سباحة‬ ‫بركة‬ ‫ملء‬ ‫ميكنها‬ ‫امل�ضخة‬ ‫هذه‬ ‫أن‬� ‫أي‬�( 	
‫القادم‬ ‫الدفق‬ ‫العرتا�ض‬ ‫فرعية‬ ‫�صحي‬ ‫�صرف‬ ‫خطوط‬ ‫ا�ستخدام‬ ‫على‬ ‫اال�سرتاتيجي‬ ‫النفق‬ ‫تطوير‬ ‫ويعتمد‬
‫�سيقوم‬ ‫الذي‬ ‫العميق‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫نفق‬ ‫إىل‬� ‫وحتويلها‬ ‫القائمة‬ ‫االنحدارية‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫خطوط‬ ‫من‬
‫تلك‬ ‫معاجلة‬ ‫هناك‬ ‫يتم‬ ‫حيث‬ ،‫الوثبة‬ ‫مبنطقة‬ ‫املركزية‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫مياه‬ ‫معاجلة‬ ‫حمطة‬ ‫إىل‬� ‫بنقلها‬
‫ل�شركة‬ ‫تابعة‬ ‫أخرى‬� ‫رئي�سية‬ ‫م�شاريع‬ ‫خالل‬ ‫من‬ ‫الري‬ ‫أغرا�ض‬‫ل‬ ‫ال�ستخدامها‬ ‫أبوظبي‬� ‫مناطق‬ ‫إىل‬� ‫إعادتها‬�‫و‬ ‫املياه‬
.‫ال�صحي‬ ‫ال�صرف‬ ‫خلدمات‬ ‫أبوظبي‬�
STEP - WHY IS IT NEEDED?
ADSSC is the service provider for sewerage services and currently owns and operates the
sewerage network and treatment plants throughout the Emirate of Abu Dhabi. The current
pace of growth is posing major challenges to the existing sewerage infrastructure because of
the residential and commercial construction sectors witnessing major growth in the Emirate
of Abu Dhabi, particularly in Abu Dhabi Island, Abu Dhabi Mainland and surrounding Islands
(Reem, Suwwah and Yas). Given its growing international image combined with projected
growth, the need for an efficient, adequate, and reliable wastewater management system
is vital.
ADSSC has adopted a proactive strategy to stay one step ahead of Abu Dhabi’s
growth and has already launched a major Capital Investment Programme (CIP)
to expand and improve its sewerage system. STEP is a major component of
the CIP and will address a mixture of strategic and conceptual needs.
BENEFITS OF STEP
The key benefit of the STEP will be to provide Abu Dhabi Emirate
with a new gravity sewer system that will cater for its needs
into the next century.
Other benefits are:
•	 Provides state-of-the-art used water facilities
•	 Provides medium term relief to critical parts of the
	 existing system on Abu Dhabi Island
•	 Provides a long-term solution to Abu Dhabi’s needs
	 beyond 2030
•	 Provides an environmentally friendly solution
	 with a low carbon footprint
•	 Gravitates existing pumping stations allowing them
	 to be removed
•	 Deep bored tunnel and microtunnelled link sewers prevent
	 major disruption to roads and other surface infrastructure during construction
•	 Prevents ground sterilization due to tunnel sewers being aligned under roads
The elimination of 34 existing pumping stations on Abu Dhabi Island and Mainland will:
•	 Reduce the potential for sewer system overflows and eliminates odour sources
•	 Result in improved health and environmental benefits
•	 Improve the aesthetic appearance in housing areas
•	 Create new land for redevelopment - offering alternative uses and financial benefits
‫اال�سرتاتيجي؟‬ ‫تطويرالنفق‬ ‫برنامج‬ ‫إىل‬� ‫احلاجة‬ ‫هي‬ ‫ما‬
‫متلك‬ ‫حيث‬ .‫ال�صحي‬ ‫ال�صرف‬ ‫خدمات‬ ‫لتزويد‬ ‫املخولة‬ ‫اجلهة‬ ‫هي‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫خلدمات‬ ‫أبوظبي‬� ‫�شركة‬ ‫إن‬�
‫العمراين‬ ‫االزدهار‬ ‫وب�سبب‬ .‫إدارتها‬� ‫على‬ ‫وتقوم‬ ،‫أبوظبي‬� ‫إمارة‬� ‫يف‬ ‫املعاجلة‬ ‫وحمطات‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫�شبكات‬ ‫ال�شركة‬
‫زمن‬ ‫يف‬ ‫�ضخمة‬ ‫تطويرية‬ ‫إن�شائية‬� ‫م�شروعات‬ ‫ظهور‬ ‫يف‬ ‫متمثال‬ ،‫خا�صة‬ ‫الرئي�سي‬ ‫والرب‬ ‫أبوظبي‬� ‫يف‬ ‫املتزايد‬ ‫والنمو‬
‫إيجاد‬� ‫لزاما‬ ‫أ�صبح‬�‫و‬ ،‫احلالية‬ ‫ال�شبكة‬ ‫على‬ ‫املتوقعة‬ ‫الزائدة‬ ‫أحمال‬‫ل‬‫ا‬ ‫ملواجهة‬ ‫كبرية‬ ‫حتديات‬ ‫ظهرت‬ ‫فقد‬ ،‫ق�صري‬
‫ميكن‬ ‫و‬ ،‫امل�ستقبلية‬ ‫والتطورات‬ ‫احلالية‬ ‫امل�ستجدات‬ ‫وا�ستيعاب‬ ‫مواكبة‬ ‫ميكنه‬ ‫ومنا�سب‬ ‫فعال‬ ‫�صحي‬ ‫�صرف‬ ‫برنامج‬
.‫عام‬ ‫ب�شكل‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫مياه‬ ‫إدارة‬� ‫يف‬ ‫عليه‬ ‫االعتماد‬
‫خطوة‬ ‫يف‬ ‫املال‬ ‫أ�س‬�‫ر‬ ‫ا�ستثمار‬ ‫برنامج‬ ‫إطالق‬�‫ب‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫خلدمات‬ ‫أبوظبي‬� ‫�شركة‬ ‫قامت‬ ‫وقد‬
‫ال�صرف‬ ‫نظام‬ ‫وحت�سني‬ ‫بتو�سيع‬ ‫فقامت‬ ،‫أبوظبي‬� ‫يف‬ ‫احلا�صل‬ ‫النمو‬ ‫ال�ستيعاب‬ ‫منها‬ ‫ا�ستباقية‬
‫الرئي�سية‬ ‫العنا�صر‬ ‫أهم‬� ‫من‬ ‫اال�سرتاتيجي‬ ‫النفق‬ ‫تطوير‬ ‫برنامج‬ ‫ويعترب‬ .‫لها‬ ‫التابع‬ ‫ال�صحي‬
‫منها‬ ‫يعاين‬ ‫التي‬ ‫احلالية‬ ‫امل�شكالت‬ ‫من‬ ‫كثريا‬ ‫يعالج‬ ‫الذي‬ ‫املال‬ ‫أ�س‬�‫ر‬ ‫ا�ستثمار‬ ‫لربنامج‬
.‫احلايل‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫نظام‬
‫اال�سرتاتيجي‬ ‫النفق‬ ‫تطوير‬ ‫برنامج‬ ‫فوائد‬
‫بتوفري‬ ‫�سيقوم‬ ‫أنه‬� ‫اال�سرتاتيجي‬ ‫النفق‬ ‫تطوير‬ ‫لربنامج‬ ‫الرئي�سية‬ ‫الفوائد‬ ‫أهم‬� ‫تتمثل‬
‫مدينة‬ ‫احتياجات‬ ‫تلبي‬ ‫التي‬ ‫االنحدارية‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫خطوط‬ ‫من‬ ‫جديدة‬ ‫�شبكة‬
‫تلخي�صها‬ ‫فيمكن‬ ‫الربنامج‬ ‫لهذا‬ ‫أخرى‬‫ل‬‫ا‬ ‫الفوائد‬ ‫أما‬� .‫املقبل‬ ‫القرن‬ ‫خالل‬ ‫أبوظبي‬�
:‫يلي‬ ‫مبا‬
.‫أبوظبي‬� ‫معامل‬ ‫من‬ ‫بارزا‬ ‫معلما‬ ‫يعترب‬ ‫ال�صحي‬ ‫لل�صرف‬ ‫جديد‬ ‫نظام‬ ‫توفري‬ 	•
		 ‫ال�شبكة‬ ‫تت�ضمنها‬ ‫التي‬ ‫احلالية‬ ‫للم�شكالت‬ ‫الق�صري‬ ‫املدى‬ ‫على‬ ‫معاجلة‬ ‫توفري‬ 	•
.‫ظبي‬ ‫أبو‬� ‫جزيرة‬ ‫يف‬ ‫القائمة‬ 	
.2030 ‫خطة‬ ‫بعد‬ ‫ما‬ ‫إىل‬� ‫ظبي‬ ‫أبو‬� ‫إمارة‬� ‫الحتياجات‬ ‫البعيد‬ ‫املدى‬ ‫على‬ ‫حلول‬ ‫توفر‬ 	•
.‫الكربونية‬ ‫االنبعاثات‬ ‫النخفا�ض‬ ‫نظرا‬ ‫للبيئة‬ ‫�صديقة‬ ‫حلول‬ ‫توفر‬ 	•
		‫مدينة‬ ‫و�سط‬ ‫املنت�شرة‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫حمطات‬ ‫من‬ ‫حمطة‬ 34 ‫من‬ ‫أكرث‬� ‫إلغاء‬� 	•
.‫و�ضواحيها‬ ‫أبوظبي‬�	
‫أ�سلوب‬�‫ب‬ ‫الفرعية‬ ‫الربط‬ ‫و�شبكات‬ ‫اال�سرتاتيجي‬ ‫النفق‬ ‫إن�شاء‬� ‫�سيتم‬ 	•
‫وال‬ ‫الرئي�سية‬ ‫للطرق‬ ‫تعطيال‬ ‫ي�سبب‬ ‫ال‬ ‫الذي‬ ‫أنفاق‬‫ل‬‫با‬ ‫الدقيق‬ ‫احلفر‬ 	
.‫إن�شاء‬‫ل‬‫ا‬ ‫عملية‬ ‫خالل‬ ‫أخرى‬‫ل‬‫ا‬ ‫التحتية‬ ‫البنية‬ ‫خلدمات‬ 	
‫خطوط‬ ‫متديد‬ ‫ب�سبب‬ ‫أر�ض‬‫ل‬‫ل‬ ‫تعقيم‬ ‫عمليات‬ ‫إجراء‬� ‫إىل‬� ‫احلاجة‬ ‫عدم‬ 	•
.‫عميق‬ ‫م�ستوى‬ ‫على‬ ‫ال�صحي‬ ‫ال�صرف‬ 	
‫إن�شاء‬� ‫بعد‬ ‫ظبي‬ ‫أبو‬� ‫جزيرة‬ ‫وخارج‬ ‫داخل‬ ‫قائمة‬ ‫�ضخ‬ ‫حمطة‬ 34 ‫إلغاء‬� ‫إن‬�
:‫يلي‬ ‫ما‬ ‫عليه‬ ‫يرتتب‬ ‫�سوف‬ ‫اال�سرتاتيجي‬ ‫النفق‬
‫املواقع‬ ‫من‬ ‫ـري‬‫ـ‬‫ث‬‫ك‬ ‫يف‬ ‫الكريهة‬ ‫ـح‬‫ـ‬‫ئ‬‫للروا‬ ‫املتزايد‬ ‫االنبعاث‬ ‫من‬ ‫التخل�ص‬ 	•
.‫احلايل‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫نظام‬ ‫ـدم‬‫ـ‬‫ق‬ ‫ب�سبب‬ 	
.‫والبيئية‬ ‫ال�صحية‬ ‫اخلدمات‬ ‫حت�سني‬ 	•
.‫ال�سكنية‬ ‫املناطق‬ ‫يف‬ ‫اجلمايل‬ ‫املظهر‬ ‫حت�سني‬ 	•
		 ‫جتارية‬ ‫م�شروعات‬ ‫يف‬ ‫املحطات‬ ‫هذه‬ ‫عليها‬ ‫تقوم‬ ‫التي‬ ‫أرا�ضي‬‫ل‬‫ا‬ ‫ا�ستغالل‬ 	•
.‫م�ستقبلية‬
STEP IMPLEMENTATION
Being delivered through a dedicated business unit of ADSSC, the Programme Management
Department, delivery of STEP was further facilitated by appointment of CH2M HILL as Programme
Manager in February 2008.
The ADSSC/CH2M HILL team packaged the components of STEP into the following contracts:
• 3 Design-Build Contracts for the deep tunnel
• 2 Design-Build Contracts for the link sewers
• 1 Design-Build Contract for the pumping station
‫اال�سرتاتيجي‬ ‫النفق‬ ‫تطوير‬ ‫برنامج‬ ‫تطبيق‬
‫ل�شركة‬ ‫التابع‬ ‫الربامج‬ ‫إدارة‬� ‫ق�سم‬ ‫من‬ ‫متخ�ص�صة‬ ‫عمل‬ ‫وحدة‬ ‫طريق‬ ‫عن‬ ‫اال�سرتاتيجي‬ ‫النفق‬ ‫تطوير‬ ‫برنامج‬ ‫تطبيق‬ ‫�سيتم‬
،2008 ‫فربايرعام‬ ‫يف‬ ‫للربنامج‬ ‫كمدير‬ CH2M HILL ‫اال�ست�شاري‬ ‫تعيني‬ ‫مت‬ ‫وقد‬ ،‫ال�صحي‬ ‫ال�صرف‬ ‫خلدمات‬ ‫أبوظبي‬�
‫عنا�صر‬ ‫بتق�سيم‬ CH2M HILL ‫واال�ست�شاري‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫خلدمات‬ ‫ظبي‬ ‫أبو‬� ‫�شركة‬ ‫من‬ ‫كل‬ ‫من‬ ‫املكون‬ ‫العمل‬ ‫فريق‬ ‫وقام‬
:‫هي‬ ‫جمموعات‬ ‫ثالث‬ ‫من‬ ‫تكونت‬ ‫التي‬ ‫إن�شائية‬‫ل‬‫أ‬� ‫العقود‬ ‫من‬ ‫عدد‬ ‫إىل‬� ‫الربنامج‬
.‫العميق‬ ‫النفق‬ ‫إن�شاء‬�‫و‬ ‫لت�صميم‬ ‫عقود‬ ‫ثالثة‬ 	•
.‫الفرعية‬ ‫الربط‬ ‫خطوط‬ ‫إن�شاء‬�‫و‬ ‫لت�صميم‬ ‫عقدان‬ 	•
.‫الرئي�سية‬ ‫ال�ضخ‬ ‫حمطة‬ ‫إن�شاء‬�‫و‬ ‫لت�صميم‬ ‫واحد‬ ‫عقد‬ 	•
Abu Dhabi, UAE, Tel: +971 2 416 8504, Fax: +971 2 443 9230Abu Dhabi, UAE, Tel: +971 2 694 3333, Fax: +971 2 694 3773
ABOUT ADSSC
Established in June 2005 and currently under the
ChairmanshipofH.EAbdullaAliMuslehAlAhbabi,
ADSSC collects and treats wastewater discharged
from all residential and commercial customers
in the Emirate of Abu Dhabi and safely dispose
of both the solid and liquid waste components.
ADSSC provides treated wastewater and bio-
solids to the Municipalities for horticulture
purposes. ADSSC contributes effectively to the
Emirate of Abu Dhabi vision and is a key link in
the overall value-proposition offered to private,
public and commercial customers. ADSSC
services form an integral part of the Government
of Abu Dhabi utilities value-chain.
ADSSC achievements in the last 5 years include,
but are not limited to:
•	 Issuance of a 25 year Sewerage Master Plan
	 in 2007, in full alignment with Plan
	 Abu Dhabi 2030
•	 International recognition of ADSSC Best
	 Practices related to,“Continuous Demand 	
	 Forecasting in a High Growth Environment”	
	 and“Program Management Office -
	 a collaborated approach”by the Australian 	
	 Water and Waste Water Benchmarking 		
	 Association in 2008
•	 ADSSC Sewerage Master Plan award, bestowed	
	 at the BEX Conference in Valencia, Spain,
	 in 2009
•	 Triple ISO Certification to ISO 9001, ISO 14001 	
	 and OHSAS 18001 in 2010
‫ال�صحي‬ ‫ال�صرف‬ ‫خلدمات‬ ‫ظبي‬ ‫أبو‬� ‫�شركة‬ ‫عن‬ ‫نبذه‬
‫�شهر‬ ‫يف‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫خلدمات‬ ‫ظبي‬ ‫أبو‬� ‫�شركة‬ ‫أ�س�ست‬�‫ت‬
‫ال�صادر‬ 2005 ‫ل�سنة‬ 17 ‫القانون‬ ‫مبوجب‬ 2005 ‫عام‬ ‫من‬ ‫يونيو‬
‫حاليا‬ ‫ويقوم‬ .‫اهلل‬ ‫حفظه‬ ‫الدولة‬ ‫رئي�س‬ ‫ال�سمو‬ ‫�صاحب‬ ‫عن‬
.‫أحبابي‬‫ل‬‫ا‬ ‫م�صلح‬ ‫علي‬ ‫ـه‬‫ل‬‫عبدال‬ ‫�سعادة‬ ‫إدارتها‬� ‫جمل�س‬ ‫برئا�سة‬
‫من‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫مياه‬ ‫ومعاجلة‬ ‫بجمع‬ ‫ال�شركة‬ ‫وتقوم‬
‫والتخل�ص‬ ،‫ظبي‬ ‫أبو‬� ‫إمارة‬� ‫يف‬ ‫والتجارية‬ ‫ال�سكنية‬ ‫املناطق‬
‫آمنة‬� ‫بطريقة‬ ‫فيها‬ ‫املوجودة‬ ‫وال�سائلة‬ ‫ال�صلبة‬ ‫املكونات‬ ‫من‬
‫أة‬�‫واحلم‬‫املعاجلة‬‫ال�صحي‬‫ال�صرف‬‫مياه‬‫ال�شركة‬‫وتوفر‬.‫و�سليمة‬
‫ال�شركة‬ ‫وت�ساهم‬ .‫الب�ستنة‬ ‫أغرا�ض‬‫ل‬ ‫ال�ستخدامها‬ ‫للبلديات‬
‫على‬ ‫تعمل‬ ‫حيث‬ ،‫أبوظبي‬� ‫إمارة‬� ‫ؤية‬�‫ر‬ ‫تنفيذ‬ ‫يف‬ ‫فعال‬ ‫ب�شكل‬
‫للقطاعات‬ ‫املعاجلة‬ ‫واملياه‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫خدمات‬ ‫تقدمي‬
‫التي‬ ‫اخلدمات‬ ‫من‬ ‫يجعل‬ ‫مما‬ ،‫املختلفة‬ ‫واخلا�صة‬ ‫العامة‬
‫وخدمات‬ ‫مرافق‬ ‫منظومة‬ ‫من‬ ‫أ‬�‫يتجز‬ ‫ال‬ ‫جزءا‬ ‫ال�شركة‬ ‫تقدمها‬
.‫ظبي‬ ‫أبو‬� ‫حكومة‬
‫ال�سنوات‬ ‫خالل‬ ‫ال�شركة‬ ‫حققتها‬ ‫التي‬ ‫االجنازات‬ ‫أهم‬� ‫من‬ ‫و‬
:‫يلي‬ ‫ما‬ ‫املا�ضية‬ ‫اخلم�س‬
	‫ـرف‬‫ـ‬‫ص‬�‫ـ‬‫ل‬‫ل‬ ‫ـي‬‫ـ‬‫س‬�‫ـ‬‫ي‬‫ـ‬‫ئ‬‫ر‬ ‫ـط‬‫ط‬‫ـ‬‫خ‬‫ـ‬‫م‬ ‫إ�صدار‬� 2007 ‫ـام‬‫ع‬ ‫ـالل‬‫خ‬ ‫ـم‬‫ت‬ 	•
‫ـة‬‫ـ‬‫ـ‬‫ـ‬‫ط‬‫ـ‬‫خ‬ ‫ـع‬‫م‬ ‫ـا‬‫م‬‫ـا‬‫م‬‫ـ‬‫ت‬ ‫ـق‬‫ـ‬‫ـ‬‫ف‬‫ـوا‬‫ـ‬‫ت‬‫ـ‬‫ي‬ ‫ـام‬‫ع‬ 25 ‫ـه‬‫ـ‬‫ت‬‫مد‬ ‫ال�صحي‬ 	
.2030 ‫ظبي‬ ‫ـو‬‫ب‬‫أ‬�	
	‫هيئة‬ ‫قبل‬ ‫من‬ ‫دويل‬ ‫اعرتاف‬ ‫على‬ 2008 ‫عام‬ ‫ال�شركة‬ ‫ح�صول‬ 	•
‫ن�شاطات‬ ‫أف�ضل‬� ‫عن‬ ‫اال�سرتالية‬ ‫واملقايي�س‬ ‫العادمة‬ ‫املياه‬ 	
‫إدارة‬� ‫“مكتب‬ :‫يف‬ ‫متثلت‬ ‫والتي‬ ‫وممار�ساتها‬ ‫ال�شركة‬ 	
		 ‫بيئة‬ ‫ـي‬‫ف‬ ‫اخلدمات‬ ‫على‬ ‫الطلب‬ ‫و“زيادة‬ ”‫الربنامج‬ 	
.”‫النمو‬ ‫مت�سارعة‬ 	
	‫على‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫خلدمات‬ ‫ظبي‬ ‫أبو‬� ‫�شركة‬ ‫ح�صول‬ 	•
	‫ؤمتر‬�‫م‬ ‫يف‬ ‫ال�صحي‬ ‫لل�صرف‬ ‫الرئي�سي‬ ‫املخطط‬ ‫جائزة‬ 	
.2009 ‫هام‬ ‫ا�سبانيا‬ - ‫فالن�سيا‬ ‫يف‬ ‫بيك�س‬ 		
		 ‫يف‬ ‫�شهادات‬ ‫ثالث‬ ‫0102على‬ ‫عام‬ ‫يف‬ ‫ال�شركة‬ ‫ح�صول‬ 	•
ISO 14001 ‫و‬ ISO 9001 :‫هي‬ ‫آيزو‬‫ل‬‫ا‬ ‫برنامج‬ ‫من‬ ‫اجلودة‬ 	
.OHSAS 18001 ‫و‬

More Related Content

Viewers also liked

KJE Information Packet 2015
KJE Information Packet 2015KJE Information Packet 2015
KJE Information Packet 2015
John Lellish
 

Viewers also liked (11)

SOAL PENGAYAAN BAHASA INDONESIA UN 2016
SOAL PENGAYAAN  BAHASA INDONESIA UN 2016SOAL PENGAYAAN  BAHASA INDONESIA UN 2016
SOAL PENGAYAAN BAHASA INDONESIA UN 2016
 
SOAL PENGAYAAN BAHASA INGGRIS UN 2016
SOAL PENGAYAAN  BAHASA INGGRIS UN 2016SOAL PENGAYAAN  BAHASA INGGRIS UN 2016
SOAL PENGAYAAN BAHASA INGGRIS UN 2016
 
resume
resumeresume
resume
 
KJE Information Packet 2015
KJE Information Packet 2015KJE Information Packet 2015
KJE Information Packet 2015
 
MATERI BACAAN MEMAKNAI KATA
MATERI BACAAN MEMAKNAI KATAMATERI BACAAN MEMAKNAI KATA
MATERI BACAAN MEMAKNAI KATA
 
MENYUNTING KATA
MENYUNTING KATAMENYUNTING KATA
MENYUNTING KATA
 
KALIMAT EFEKTIF
KALIMAT EFEKTIFKALIMAT EFEKTIF
KALIMAT EFEKTIF
 
SOAL PENGAYAAN MATEMATIKA UN 2016
SOAL PENGAYAAN  MATEMATIKA UN 2016SOAL PENGAYAAN  MATEMATIKA UN 2016
SOAL PENGAYAAN MATEMATIKA UN 2016
 
T/DG - Business Process Outsourcing Increase Productivity and Profitability
T/DG - Business Process Outsourcing Increase Productivity and ProfitabilityT/DG - Business Process Outsourcing Increase Productivity and Profitability
T/DG - Business Process Outsourcing Increase Productivity and Profitability
 
FABEL (DONGENG)
FABEL (DONGENG)FABEL (DONGENG)
FABEL (DONGENG)
 
EJAAN DAN TANDA BACA
EJAAN DAN TANDA BACAEJAAN DAN TANDA BACA
EJAAN DAN TANDA BACA
 

about STEP

  • 1. STRATEGIC TUNNEL ENHANCEMENT PROGRAMME ‫ـي‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ج‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ي‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ت‬‫ـرا‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ت‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫س‬�‫اال‬ ‫ـق‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ف‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ن‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ل‬‫ا‬ ‫ـر‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ي‬‫ـو‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ط‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ت‬ ‫ـج‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫م‬‫ـا‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ن‬‫ـر‬‫ـ‬‫ـ‬‫ـ‬‫ـ‬‫ب‬
  • 2. WHAT IS STEP? As a key capital investment brand of Abu Dhabi Sewerage Services Company (ADSSC), the StrategicTunnel Enhancement Programme or“STEP”is an efficient and cost effective solution to meet the long term needs of Abu Dhabi Island, Abu Dhabi Mainland and surrounding Islands for the collection and conveyance of wastewater. The new system will provide for an average wastewater flow of 800,000 m3/day by the end of 2014 and will have an ultimate capacity to accommodate an average flow of 1.7 million m3/day by 2030 (or enough waste water to fill 680 Olympic size swimming pools in a single day). STEP comprises the following new infrastructure: • Deep tunnel sewer, 41km long (the equivalent of distance from Abu Dhabi Island to Shahama) and up to 5.5m in internal diameter (5.5m will accommodate a double decker bus within the tunnel). The tunnel will be located up to 80m below ground (the equivalent of a 25 storey building below ground). Approximately 450,000m3 of concrete will be used to line the deep tunnel (the equivalent of 180 Olympic size swimming pools full of concrete) • Series of link sewers over 50km long (the equivalent of distance from Abu Dhabi Island to Al Bahya) and up to 3m in internal diameter • Pumping station located at the termination of the deep tunnel sewer of 30 m3sec. capacity (the pumps would take just over 1 minute to fill one Olympic size swimming pool) The concept of the STEP system is to use the link sewers to intercept the wastewater flows in existing gravity sewers just upstream of the existing pumping stations and transfer these flows into the deep tunnel sewer. The wastewater will be conveyed by gravity via the deep tunnel sewer to centralized wastewater treatment facilities strategically located at Al Wathba. The wastewater will then be treated and reclaimed as treated sewage effluent (TSE) for return to the metropolitan area for irrigation purposes through other capital projects of ADSSC. ‫النفق‬ ‫تطوير‬ ‫برنامج‬ ‫هو‬ ‫ما‬ ‫اال�سرتاتيجي؟‬ ‫أبوظبي‬� ‫ل�شركة‬ ‫الرئي�سي‬ ‫لال�ستثمار‬ ‫مميزة‬ ‫كعالمة‬ ‫تطوير‬ ‫برنامج‬ ‫يعترب‬ ،‫ال�صحي‬ ‫ال�صرف‬ ‫خلدمات‬ ‫العملية‬ ‫احللول‬ ‫أف�ضل‬� ‫من‬ ‫اال�سرتاتيجي‬ ‫النفق‬ ‫املتعلقة‬ ‫االحتياجات‬ ‫�ستلبي‬ ‫التي‬ ‫واالقت�صادية‬ ‫والرب‬ ‫ظبي‬ ‫أبو‬� ‫جلزيرة‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫بخدمات‬ ‫النظام‬ ‫�سيعمل‬ ‫حيث‬ ،‫البعيد‬ ‫املدى‬ ‫على‬ ‫الرئي�سي‬ ‫معدل‬ ‫توفري‬ ‫على‬ 2014 ‫عام‬ ‫نهاية‬ ‫مع‬ ‫اجلديد‬ ‫من‬ ‫و�سيتم‬ ،‫يوميا‬ ‫مكعب‬ ‫مرت‬ ‫ألف‬� 800 ‫يبلغ‬ ‫دفق‬ ‫مليون‬ 1.7 ‫معدله‬ ‫ما‬ ‫ا�ستيعاب‬ ‫امل�شروع‬ ‫هذا‬ ‫خالل‬ ‫عام‬ ‫بحلول‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫مياه‬ ‫من‬ ‫يوميا‬ ‫مكعب‬ ‫مرت‬ .)‫أوملبية‬� ‫�سباحة‬ ‫بركة‬ 680 ‫�سعة‬ ‫يعادل‬ ‫ما‬ ‫أي‬�( 2030 -:‫يلي‬ ‫ما‬ ‫من‬ ‫اال�سرتاتيجي‬ ‫النفق‬ ‫تطوير‬ ‫برنامج‬ ‫ويتكون‬ ‫كلم‬ 41 ‫يبلغ‬ ‫بطول‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫ملياه‬ ‫عميق‬ ‫نفق‬ • ‫ي�صل‬ ‫داخلي‬ ‫وقطر‬ ،)‫ال�شهامة‬ ‫اىل‬ ‫ظبي‬ ‫أبو‬� ‫جزيرة‬ ‫من‬ ‫امل�سافة‬ ‫يعادل‬ ‫ما‬ ‫أي‬�( ،)‫طابقني‬ ‫من‬ ‫مكونة‬ ‫ركاب‬ ‫حافلة‬ ‫ي�ستوعب‬ ‫أن‬� ‫ميكنه‬ ‫النفق‬ ‫قطر‬ ‫أن‬� ‫أي‬�(‫أمتار‬� 5.5 ‫اىل‬ ‫يتم‬ ‫و�سوف‬ ،)‫طابقا‬ 25 ‫من‬ ‫مكونة‬ ‫بناية‬ ‫يعادل‬ ‫ما‬ ‫أي‬�( ‫أر�ض‬‫ل‬‫ا‬ ‫حتت‬ ‫مرتا‬ 80 ‫إىل‬� ‫ي�صل‬ ‫وعمق‬ ‫حجم‬ ‫يعادل‬ ‫ما‬ ‫أي‬�( ‫العميق‬ ‫للنفق‬ ‫كبطانة‬ ‫اخلر�سانة‬ ‫من‬ ‫مكعب‬ ‫مرت‬ ‫ألف‬� 450 ‫حويل‬ ‫ا�ستخدام‬ .)‫باخلر�سانة‬ ‫معبئة‬ ‫أوملبية‬� ‫�سباحة‬ ‫بركة‬ 180 ‫اىل‬ ‫ظبي‬ ‫أبو‬� ‫جزيرة‬ ‫من‬ ‫امل�سافة‬ ‫يعادل‬ ‫ما‬ ‫أي‬�( ‫كلم‬ 50 ‫من‬ ‫أكرث‬‫ل‬ ‫متتد‬ ‫الفرعية‬ ‫الربط‬ ‫�شبكات‬ ‫من‬ ‫�سل�سلة‬ • .‫أمتار‬� 3 ‫إىل‬� ‫ي�صل‬ ‫داخلي‬ ‫وبقطر‬ ،)‫الباهية‬ ‫الثانية‬ ‫يف‬ ‫مكعبا‬ ‫مرتا‬ 30 ‫تبلغ‬ ‫�ضخ‬ ‫بطاقة‬ ‫العميق‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫خط‬ ‫نفق‬ ‫نهاية‬ ‫يف‬ ‫تقع‬ ‫�ضخ‬ ‫حمطة‬ • .)‫واحدة‬ ‫دقيقة‬ ‫يقارب‬ ‫ما‬ ‫خالل‬ ‫أوملبية‬� ‫�سباحة‬ ‫بركة‬ ‫ملء‬ ‫ميكنها‬ ‫امل�ضخة‬ ‫هذه‬ ‫أن‬� ‫أي‬�( ‫القادم‬ ‫الدفق‬ ‫العرتا�ض‬ ‫فرعية‬ ‫�صحي‬ ‫�صرف‬ ‫خطوط‬ ‫ا�ستخدام‬ ‫على‬ ‫اال�سرتاتيجي‬ ‫النفق‬ ‫تطوير‬ ‫ويعتمد‬ ‫�سيقوم‬ ‫الذي‬ ‫العميق‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫نفق‬ ‫إىل‬� ‫وحتويلها‬ ‫القائمة‬ ‫االنحدارية‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫خطوط‬ ‫من‬ ‫تلك‬ ‫معاجلة‬ ‫هناك‬ ‫يتم‬ ‫حيث‬ ،‫الوثبة‬ ‫مبنطقة‬ ‫املركزية‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫مياه‬ ‫معاجلة‬ ‫حمطة‬ ‫إىل‬� ‫بنقلها‬ ‫ل�شركة‬ ‫تابعة‬ ‫أخرى‬� ‫رئي�سية‬ ‫م�شاريع‬ ‫خالل‬ ‫من‬ ‫الري‬ ‫أغرا�ض‬‫ل‬ ‫ال�ستخدامها‬ ‫أبوظبي‬� ‫مناطق‬ ‫إىل‬� ‫إعادتها‬�‫و‬ ‫املياه‬ .‫ال�صحي‬ ‫ال�صرف‬ ‫خلدمات‬ ‫أبوظبي‬�
  • 3. STEP - WHY IS IT NEEDED? ADSSC is the service provider for sewerage services and currently owns and operates the sewerage network and treatment plants throughout the Emirate of Abu Dhabi. The current pace of growth is posing major challenges to the existing sewerage infrastructure because of the residential and commercial construction sectors witnessing major growth in the Emirate of Abu Dhabi, particularly in Abu Dhabi Island, Abu Dhabi Mainland and surrounding Islands (Reem, Suwwah and Yas). Given its growing international image combined with projected growth, the need for an efficient, adequate, and reliable wastewater management system is vital. ADSSC has adopted a proactive strategy to stay one step ahead of Abu Dhabi’s growth and has already launched a major Capital Investment Programme (CIP) to expand and improve its sewerage system. STEP is a major component of the CIP and will address a mixture of strategic and conceptual needs. BENEFITS OF STEP The key benefit of the STEP will be to provide Abu Dhabi Emirate with a new gravity sewer system that will cater for its needs into the next century. Other benefits are: • Provides state-of-the-art used water facilities • Provides medium term relief to critical parts of the existing system on Abu Dhabi Island • Provides a long-term solution to Abu Dhabi’s needs beyond 2030 • Provides an environmentally friendly solution with a low carbon footprint • Gravitates existing pumping stations allowing them to be removed • Deep bored tunnel and microtunnelled link sewers prevent major disruption to roads and other surface infrastructure during construction • Prevents ground sterilization due to tunnel sewers being aligned under roads The elimination of 34 existing pumping stations on Abu Dhabi Island and Mainland will: • Reduce the potential for sewer system overflows and eliminates odour sources • Result in improved health and environmental benefits • Improve the aesthetic appearance in housing areas • Create new land for redevelopment - offering alternative uses and financial benefits ‫اال�سرتاتيجي؟‬ ‫تطويرالنفق‬ ‫برنامج‬ ‫إىل‬� ‫احلاجة‬ ‫هي‬ ‫ما‬ ‫متلك‬ ‫حيث‬ .‫ال�صحي‬ ‫ال�صرف‬ ‫خدمات‬ ‫لتزويد‬ ‫املخولة‬ ‫اجلهة‬ ‫هي‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫خلدمات‬ ‫أبوظبي‬� ‫�شركة‬ ‫إن‬� ‫العمراين‬ ‫االزدهار‬ ‫وب�سبب‬ .‫إدارتها‬� ‫على‬ ‫وتقوم‬ ،‫أبوظبي‬� ‫إمارة‬� ‫يف‬ ‫املعاجلة‬ ‫وحمطات‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫�شبكات‬ ‫ال�شركة‬ ‫زمن‬ ‫يف‬ ‫�ضخمة‬ ‫تطويرية‬ ‫إن�شائية‬� ‫م�شروعات‬ ‫ظهور‬ ‫يف‬ ‫متمثال‬ ،‫خا�صة‬ ‫الرئي�سي‬ ‫والرب‬ ‫أبوظبي‬� ‫يف‬ ‫املتزايد‬ ‫والنمو‬ ‫إيجاد‬� ‫لزاما‬ ‫أ�صبح‬�‫و‬ ،‫احلالية‬ ‫ال�شبكة‬ ‫على‬ ‫املتوقعة‬ ‫الزائدة‬ ‫أحمال‬‫ل‬‫ا‬ ‫ملواجهة‬ ‫كبرية‬ ‫حتديات‬ ‫ظهرت‬ ‫فقد‬ ،‫ق�صري‬ ‫ميكن‬ ‫و‬ ،‫امل�ستقبلية‬ ‫والتطورات‬ ‫احلالية‬ ‫امل�ستجدات‬ ‫وا�ستيعاب‬ ‫مواكبة‬ ‫ميكنه‬ ‫ومنا�سب‬ ‫فعال‬ ‫�صحي‬ ‫�صرف‬ ‫برنامج‬ .‫عام‬ ‫ب�شكل‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫مياه‬ ‫إدارة‬� ‫يف‬ ‫عليه‬ ‫االعتماد‬ ‫خطوة‬ ‫يف‬ ‫املال‬ ‫أ�س‬�‫ر‬ ‫ا�ستثمار‬ ‫برنامج‬ ‫إطالق‬�‫ب‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫خلدمات‬ ‫أبوظبي‬� ‫�شركة‬ ‫قامت‬ ‫وقد‬ ‫ال�صرف‬ ‫نظام‬ ‫وحت�سني‬ ‫بتو�سيع‬ ‫فقامت‬ ،‫أبوظبي‬� ‫يف‬ ‫احلا�صل‬ ‫النمو‬ ‫ال�ستيعاب‬ ‫منها‬ ‫ا�ستباقية‬ ‫الرئي�سية‬ ‫العنا�صر‬ ‫أهم‬� ‫من‬ ‫اال�سرتاتيجي‬ ‫النفق‬ ‫تطوير‬ ‫برنامج‬ ‫ويعترب‬ .‫لها‬ ‫التابع‬ ‫ال�صحي‬ ‫منها‬ ‫يعاين‬ ‫التي‬ ‫احلالية‬ ‫امل�شكالت‬ ‫من‬ ‫كثريا‬ ‫يعالج‬ ‫الذي‬ ‫املال‬ ‫أ�س‬�‫ر‬ ‫ا�ستثمار‬ ‫لربنامج‬ .‫احلايل‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫نظام‬ ‫اال�سرتاتيجي‬ ‫النفق‬ ‫تطوير‬ ‫برنامج‬ ‫فوائد‬ ‫بتوفري‬ ‫�سيقوم‬ ‫أنه‬� ‫اال�سرتاتيجي‬ ‫النفق‬ ‫تطوير‬ ‫لربنامج‬ ‫الرئي�سية‬ ‫الفوائد‬ ‫أهم‬� ‫تتمثل‬ ‫مدينة‬ ‫احتياجات‬ ‫تلبي‬ ‫التي‬ ‫االنحدارية‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫خطوط‬ ‫من‬ ‫جديدة‬ ‫�شبكة‬ ‫تلخي�صها‬ ‫فيمكن‬ ‫الربنامج‬ ‫لهذا‬ ‫أخرى‬‫ل‬‫ا‬ ‫الفوائد‬ ‫أما‬� .‫املقبل‬ ‫القرن‬ ‫خالل‬ ‫أبوظبي‬� :‫يلي‬ ‫مبا‬ .‫أبوظبي‬� ‫معامل‬ ‫من‬ ‫بارزا‬ ‫معلما‬ ‫يعترب‬ ‫ال�صحي‬ ‫لل�صرف‬ ‫جديد‬ ‫نظام‬ ‫توفري‬ • ‫ال�شبكة‬ ‫تت�ضمنها‬ ‫التي‬ ‫احلالية‬ ‫للم�شكالت‬ ‫الق�صري‬ ‫املدى‬ ‫على‬ ‫معاجلة‬ ‫توفري‬ • .‫ظبي‬ ‫أبو‬� ‫جزيرة‬ ‫يف‬ ‫القائمة‬ .2030 ‫خطة‬ ‫بعد‬ ‫ما‬ ‫إىل‬� ‫ظبي‬ ‫أبو‬� ‫إمارة‬� ‫الحتياجات‬ ‫البعيد‬ ‫املدى‬ ‫على‬ ‫حلول‬ ‫توفر‬ • .‫الكربونية‬ ‫االنبعاثات‬ ‫النخفا�ض‬ ‫نظرا‬ ‫للبيئة‬ ‫�صديقة‬ ‫حلول‬ ‫توفر‬ • ‫مدينة‬ ‫و�سط‬ ‫املنت�شرة‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫حمطات‬ ‫من‬ ‫حمطة‬ 34 ‫من‬ ‫أكرث‬� ‫إلغاء‬� • .‫و�ضواحيها‬ ‫أبوظبي‬� ‫أ�سلوب‬�‫ب‬ ‫الفرعية‬ ‫الربط‬ ‫و�شبكات‬ ‫اال�سرتاتيجي‬ ‫النفق‬ ‫إن�شاء‬� ‫�سيتم‬ • ‫وال‬ ‫الرئي�سية‬ ‫للطرق‬ ‫تعطيال‬ ‫ي�سبب‬ ‫ال‬ ‫الذي‬ ‫أنفاق‬‫ل‬‫با‬ ‫الدقيق‬ ‫احلفر‬ .‫إن�شاء‬‫ل‬‫ا‬ ‫عملية‬ ‫خالل‬ ‫أخرى‬‫ل‬‫ا‬ ‫التحتية‬ ‫البنية‬ ‫خلدمات‬ ‫خطوط‬ ‫متديد‬ ‫ب�سبب‬ ‫أر�ض‬‫ل‬‫ل‬ ‫تعقيم‬ ‫عمليات‬ ‫إجراء‬� ‫إىل‬� ‫احلاجة‬ ‫عدم‬ • .‫عميق‬ ‫م�ستوى‬ ‫على‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫إن�شاء‬� ‫بعد‬ ‫ظبي‬ ‫أبو‬� ‫جزيرة‬ ‫وخارج‬ ‫داخل‬ ‫قائمة‬ ‫�ضخ‬ ‫حمطة‬ 34 ‫إلغاء‬� ‫إن‬� :‫يلي‬ ‫ما‬ ‫عليه‬ ‫يرتتب‬ ‫�سوف‬ ‫اال�سرتاتيجي‬ ‫النفق‬ ‫املواقع‬ ‫من‬ ‫ـري‬‫ـ‬‫ث‬‫ك‬ ‫يف‬ ‫الكريهة‬ ‫ـح‬‫ـ‬‫ئ‬‫للروا‬ ‫املتزايد‬ ‫االنبعاث‬ ‫من‬ ‫التخل�ص‬ • .‫احلايل‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫نظام‬ ‫ـدم‬‫ـ‬‫ق‬ ‫ب�سبب‬ .‫والبيئية‬ ‫ال�صحية‬ ‫اخلدمات‬ ‫حت�سني‬ • .‫ال�سكنية‬ ‫املناطق‬ ‫يف‬ ‫اجلمايل‬ ‫املظهر‬ ‫حت�سني‬ • ‫جتارية‬ ‫م�شروعات‬ ‫يف‬ ‫املحطات‬ ‫هذه‬ ‫عليها‬ ‫تقوم‬ ‫التي‬ ‫أرا�ضي‬‫ل‬‫ا‬ ‫ا�ستغالل‬ • .‫م�ستقبلية‬
  • 4. STEP IMPLEMENTATION Being delivered through a dedicated business unit of ADSSC, the Programme Management Department, delivery of STEP was further facilitated by appointment of CH2M HILL as Programme Manager in February 2008. The ADSSC/CH2M HILL team packaged the components of STEP into the following contracts: • 3 Design-Build Contracts for the deep tunnel • 2 Design-Build Contracts for the link sewers • 1 Design-Build Contract for the pumping station ‫اال�سرتاتيجي‬ ‫النفق‬ ‫تطوير‬ ‫برنامج‬ ‫تطبيق‬ ‫ل�شركة‬ ‫التابع‬ ‫الربامج‬ ‫إدارة‬� ‫ق�سم‬ ‫من‬ ‫متخ�ص�صة‬ ‫عمل‬ ‫وحدة‬ ‫طريق‬ ‫عن‬ ‫اال�سرتاتيجي‬ ‫النفق‬ ‫تطوير‬ ‫برنامج‬ ‫تطبيق‬ ‫�سيتم‬ ،2008 ‫فربايرعام‬ ‫يف‬ ‫للربنامج‬ ‫كمدير‬ CH2M HILL ‫اال�ست�شاري‬ ‫تعيني‬ ‫مت‬ ‫وقد‬ ،‫ال�صحي‬ ‫ال�صرف‬ ‫خلدمات‬ ‫أبوظبي‬� ‫عنا�صر‬ ‫بتق�سيم‬ CH2M HILL ‫واال�ست�شاري‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫خلدمات‬ ‫ظبي‬ ‫أبو‬� ‫�شركة‬ ‫من‬ ‫كل‬ ‫من‬ ‫املكون‬ ‫العمل‬ ‫فريق‬ ‫وقام‬ :‫هي‬ ‫جمموعات‬ ‫ثالث‬ ‫من‬ ‫تكونت‬ ‫التي‬ ‫إن�شائية‬‫ل‬‫أ‬� ‫العقود‬ ‫من‬ ‫عدد‬ ‫إىل‬� ‫الربنامج‬ .‫العميق‬ ‫النفق‬ ‫إن�شاء‬�‫و‬ ‫لت�صميم‬ ‫عقود‬ ‫ثالثة‬ • .‫الفرعية‬ ‫الربط‬ ‫خطوط‬ ‫إن�شاء‬�‫و‬ ‫لت�صميم‬ ‫عقدان‬ • .‫الرئي�سية‬ ‫ال�ضخ‬ ‫حمطة‬ ‫إن�شاء‬�‫و‬ ‫لت�صميم‬ ‫واحد‬ ‫عقد‬ •
  • 5. Abu Dhabi, UAE, Tel: +971 2 416 8504, Fax: +971 2 443 9230Abu Dhabi, UAE, Tel: +971 2 694 3333, Fax: +971 2 694 3773 ABOUT ADSSC Established in June 2005 and currently under the ChairmanshipofH.EAbdullaAliMuslehAlAhbabi, ADSSC collects and treats wastewater discharged from all residential and commercial customers in the Emirate of Abu Dhabi and safely dispose of both the solid and liquid waste components. ADSSC provides treated wastewater and bio- solids to the Municipalities for horticulture purposes. ADSSC contributes effectively to the Emirate of Abu Dhabi vision and is a key link in the overall value-proposition offered to private, public and commercial customers. ADSSC services form an integral part of the Government of Abu Dhabi utilities value-chain. ADSSC achievements in the last 5 years include, but are not limited to: • Issuance of a 25 year Sewerage Master Plan in 2007, in full alignment with Plan Abu Dhabi 2030 • International recognition of ADSSC Best Practices related to,“Continuous Demand Forecasting in a High Growth Environment” and“Program Management Office - a collaborated approach”by the Australian Water and Waste Water Benchmarking Association in 2008 • ADSSC Sewerage Master Plan award, bestowed at the BEX Conference in Valencia, Spain, in 2009 • Triple ISO Certification to ISO 9001, ISO 14001 and OHSAS 18001 in 2010 ‫ال�صحي‬ ‫ال�صرف‬ ‫خلدمات‬ ‫ظبي‬ ‫أبو‬� ‫�شركة‬ ‫عن‬ ‫نبذه‬ ‫�شهر‬ ‫يف‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫خلدمات‬ ‫ظبي‬ ‫أبو‬� ‫�شركة‬ ‫أ�س�ست‬�‫ت‬ ‫ال�صادر‬ 2005 ‫ل�سنة‬ 17 ‫القانون‬ ‫مبوجب‬ 2005 ‫عام‬ ‫من‬ ‫يونيو‬ ‫حاليا‬ ‫ويقوم‬ .‫اهلل‬ ‫حفظه‬ ‫الدولة‬ ‫رئي�س‬ ‫ال�سمو‬ ‫�صاحب‬ ‫عن‬ .‫أحبابي‬‫ل‬‫ا‬ ‫م�صلح‬ ‫علي‬ ‫ـه‬‫ل‬‫عبدال‬ ‫�سعادة‬ ‫إدارتها‬� ‫جمل�س‬ ‫برئا�سة‬ ‫من‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫مياه‬ ‫ومعاجلة‬ ‫بجمع‬ ‫ال�شركة‬ ‫وتقوم‬ ‫والتخل�ص‬ ،‫ظبي‬ ‫أبو‬� ‫إمارة‬� ‫يف‬ ‫والتجارية‬ ‫ال�سكنية‬ ‫املناطق‬ ‫آمنة‬� ‫بطريقة‬ ‫فيها‬ ‫املوجودة‬ ‫وال�سائلة‬ ‫ال�صلبة‬ ‫املكونات‬ ‫من‬ ‫أة‬�‫واحلم‬‫املعاجلة‬‫ال�صحي‬‫ال�صرف‬‫مياه‬‫ال�شركة‬‫وتوفر‬.‫و�سليمة‬ ‫ال�شركة‬ ‫وت�ساهم‬ .‫الب�ستنة‬ ‫أغرا�ض‬‫ل‬ ‫ال�ستخدامها‬ ‫للبلديات‬ ‫على‬ ‫تعمل‬ ‫حيث‬ ،‫أبوظبي‬� ‫إمارة‬� ‫ؤية‬�‫ر‬ ‫تنفيذ‬ ‫يف‬ ‫فعال‬ ‫ب�شكل‬ ‫للقطاعات‬ ‫املعاجلة‬ ‫واملياه‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫خدمات‬ ‫تقدمي‬ ‫التي‬ ‫اخلدمات‬ ‫من‬ ‫يجعل‬ ‫مما‬ ،‫املختلفة‬ ‫واخلا�صة‬ ‫العامة‬ ‫وخدمات‬ ‫مرافق‬ ‫منظومة‬ ‫من‬ ‫أ‬�‫يتجز‬ ‫ال‬ ‫جزءا‬ ‫ال�شركة‬ ‫تقدمها‬ .‫ظبي‬ ‫أبو‬� ‫حكومة‬ ‫ال�سنوات‬ ‫خالل‬ ‫ال�شركة‬ ‫حققتها‬ ‫التي‬ ‫االجنازات‬ ‫أهم‬� ‫من‬ ‫و‬ :‫يلي‬ ‫ما‬ ‫املا�ضية‬ ‫اخلم�س‬ ‫ـرف‬‫ـ‬‫ص‬�‫ـ‬‫ل‬‫ل‬ ‫ـي‬‫ـ‬‫س‬�‫ـ‬‫ي‬‫ـ‬‫ئ‬‫ر‬ ‫ـط‬‫ط‬‫ـ‬‫خ‬‫ـ‬‫م‬ ‫إ�صدار‬� 2007 ‫ـام‬‫ع‬ ‫ـالل‬‫خ‬ ‫ـم‬‫ت‬ • ‫ـة‬‫ـ‬‫ـ‬‫ـ‬‫ط‬‫ـ‬‫خ‬ ‫ـع‬‫م‬ ‫ـا‬‫م‬‫ـا‬‫م‬‫ـ‬‫ت‬ ‫ـق‬‫ـ‬‫ـ‬‫ف‬‫ـوا‬‫ـ‬‫ت‬‫ـ‬‫ي‬ ‫ـام‬‫ع‬ 25 ‫ـه‬‫ـ‬‫ت‬‫مد‬ ‫ال�صحي‬ .2030 ‫ظبي‬ ‫ـو‬‫ب‬‫أ‬� ‫هيئة‬ ‫قبل‬ ‫من‬ ‫دويل‬ ‫اعرتاف‬ ‫على‬ 2008 ‫عام‬ ‫ال�شركة‬ ‫ح�صول‬ • ‫ن�شاطات‬ ‫أف�ضل‬� ‫عن‬ ‫اال�سرتالية‬ ‫واملقايي�س‬ ‫العادمة‬ ‫املياه‬ ‫إدارة‬� ‫“مكتب‬ :‫يف‬ ‫متثلت‬ ‫والتي‬ ‫وممار�ساتها‬ ‫ال�شركة‬ ‫بيئة‬ ‫ـي‬‫ف‬ ‫اخلدمات‬ ‫على‬ ‫الطلب‬ ‫و“زيادة‬ ”‫الربنامج‬ .”‫النمو‬ ‫مت�سارعة‬ ‫على‬ ‫ال�صحي‬ ‫ال�صرف‬ ‫خلدمات‬ ‫ظبي‬ ‫أبو‬� ‫�شركة‬ ‫ح�صول‬ • ‫ؤمتر‬�‫م‬ ‫يف‬ ‫ال�صحي‬ ‫لل�صرف‬ ‫الرئي�سي‬ ‫املخطط‬ ‫جائزة‬ .2009 ‫هام‬ ‫ا�سبانيا‬ - ‫فالن�سيا‬ ‫يف‬ ‫بيك�س‬ ‫يف‬ ‫�شهادات‬ ‫ثالث‬ ‫0102على‬ ‫عام‬ ‫يف‬ ‫ال�شركة‬ ‫ح�صول‬ • ISO 14001 ‫و‬ ISO 9001 :‫هي‬ ‫آيزو‬‫ل‬‫ا‬ ‫برنامج‬ ‫من‬ ‫اجلودة‬ .OHSAS 18001 ‫و‬