Background
Work Experience
Projects
 Aim: Develop skills for automation and manufacturing leading to process
improvement. Learn at least one new skill each year related to automation.
 Hometown: Mumbai, India
 Bachelors in Electronics Engineering, NMIMS University, Mumbai.
 Masters in Mechanical Engineering, Purdue University, Indianapolis.
Track Concentration – Mechatronics.
 Hobbies: Cricket, watch documentaries, cooking.
2
 Intern, NML Automation Pvt LTD, Mumbai, India
 Dates: June 2013 – July 2013
Design automotive parts on solid works (training module).
Hands on experience with fatek, delta PLC programming.
Performed onsite startup and troubleshooting.
3
 Bosch Rexroth Lab, NMIMS University, Mumbai, India
 Dates: Jan 2014 – April 2014
Theory classes for various BOSCH industrial automation components.
Learn and Understand various hydraulics, Pneumatic symbols and principles.
Performed practical ladder logic examples on Indralogic PLC software
Performed practical exercises on electrical engineering, pneumatic and hydraulics.
4
 Energy Engineer, Industrial Assessment Center, Indianapolis.
 Dates: Sep 2014 – Current
Developed spreadsheet by understanding utility rate structures and use them to
calculate energy usage.
Created energy reduction plans and cost savings analysis showing different energy
conservation measures (ECMs).
Lead and conducted (8) ASHRAE level II energy audits with approximate energy
savings of $2.5 million and average payback period of 16 months.
5
 Certified Automation Engineer, SMEC labs, Mumbai , India
 Dates: January 2016
Hands on training for Allen Bradley Micrologix 1400, Wonderware Intouch SCADA,
Schneider Vijeologix HMI.
Performed practical exercises and interfacing of PLC, SCADA and HMI.
Understood and implemented various instructions, script writing and design of
HMI and SCADA screens.
6
 Automation of Bottle filling plant, May 2014
 Cause: Increase in production and shortage of labor
7
Developed iron frame with rubber conveyor.
Developed ladder logic on Fatek eco series PLC.
Reduction in Human Interface by 70%.
Learnt about capacitive sensors and few other sensors.
 Automation of Extraction of molten aluminum from sludge.
 Cause: Operator Injury risk and increase productivity.
8
Understand operation to be automated.
Research of robots for respective operations.
Comparison of robots on AHP technique.
Design of Robotic simulation in KUKA SimPro.
 Engine and Blower Assembly & Manufacturing
 Cause : Learn ProE software
9
Designed parts of engine, blower,
Apply various elements of software.
Performed simulation in PTC Creo 2.0.
Simulated manufacturing sequence for CNC machining.
 International Space station (ISS) observatory module .
 Cause: Learn Systems engineering and project management
Chief Engineer for development for CUPOLA design to Launch process.
Apply various systems engineering principles for tasks such as resource allocation,
requirements, work breakdown structure (WBS).
Present progress presentation to stakeholders for permission to progress to next stage.
10
 Assembly Line Simulation and Ergonomics for paper manufacturing
 Cause: Identify Machine Usage
11
 Performed time study for the different process in the production flow.
 Remodel the facility in Siemens Tecnomatix – Plant simulation.
 Identify bottle neck in the process and perform machine usage analysis.
 Develop a report regarding current process and recommendation for scope of
improvement.
12
 Structured text language for PLC
Stage: Beginner.
Aim: Learn syntax and integration of Structured text for plc programming.
 ABB RobotStudio 6.03
Stage: Beginner
Aim: Learn various tools and design constraints for robot programming
13
14
15

ABOUT ME

  • 1.
  • 2.
     Aim: Developskills for automation and manufacturing leading to process improvement. Learn at least one new skill each year related to automation.  Hometown: Mumbai, India  Bachelors in Electronics Engineering, NMIMS University, Mumbai.  Masters in Mechanical Engineering, Purdue University, Indianapolis. Track Concentration – Mechatronics.  Hobbies: Cricket, watch documentaries, cooking. 2
  • 3.
     Intern, NMLAutomation Pvt LTD, Mumbai, India  Dates: June 2013 – July 2013 Design automotive parts on solid works (training module). Hands on experience with fatek, delta PLC programming. Performed onsite startup and troubleshooting. 3
  • 4.
     Bosch RexrothLab, NMIMS University, Mumbai, India  Dates: Jan 2014 – April 2014 Theory classes for various BOSCH industrial automation components. Learn and Understand various hydraulics, Pneumatic symbols and principles. Performed practical ladder logic examples on Indralogic PLC software Performed practical exercises on electrical engineering, pneumatic and hydraulics. 4
  • 5.
     Energy Engineer,Industrial Assessment Center, Indianapolis.  Dates: Sep 2014 – Current Developed spreadsheet by understanding utility rate structures and use them to calculate energy usage. Created energy reduction plans and cost savings analysis showing different energy conservation measures (ECMs). Lead and conducted (8) ASHRAE level II energy audits with approximate energy savings of $2.5 million and average payback period of 16 months. 5
  • 6.
     Certified AutomationEngineer, SMEC labs, Mumbai , India  Dates: January 2016 Hands on training for Allen Bradley Micrologix 1400, Wonderware Intouch SCADA, Schneider Vijeologix HMI. Performed practical exercises and interfacing of PLC, SCADA and HMI. Understood and implemented various instructions, script writing and design of HMI and SCADA screens. 6
  • 7.
     Automation ofBottle filling plant, May 2014  Cause: Increase in production and shortage of labor 7 Developed iron frame with rubber conveyor. Developed ladder logic on Fatek eco series PLC. Reduction in Human Interface by 70%. Learnt about capacitive sensors and few other sensors.
  • 8.
     Automation ofExtraction of molten aluminum from sludge.  Cause: Operator Injury risk and increase productivity. 8 Understand operation to be automated. Research of robots for respective operations. Comparison of robots on AHP technique. Design of Robotic simulation in KUKA SimPro.
  • 9.
     Engine andBlower Assembly & Manufacturing  Cause : Learn ProE software 9 Designed parts of engine, blower, Apply various elements of software. Performed simulation in PTC Creo 2.0. Simulated manufacturing sequence for CNC machining.
  • 10.
     International Spacestation (ISS) observatory module .  Cause: Learn Systems engineering and project management Chief Engineer for development for CUPOLA design to Launch process. Apply various systems engineering principles for tasks such as resource allocation, requirements, work breakdown structure (WBS). Present progress presentation to stakeholders for permission to progress to next stage. 10
  • 11.
     Assembly LineSimulation and Ergonomics for paper manufacturing  Cause: Identify Machine Usage 11
  • 12.
     Performed timestudy for the different process in the production flow.  Remodel the facility in Siemens Tecnomatix – Plant simulation.  Identify bottle neck in the process and perform machine usage analysis.  Develop a report regarding current process and recommendation for scope of improvement. 12
  • 13.
     Structured textlanguage for PLC Stage: Beginner. Aim: Learn syntax and integration of Structured text for plc programming.  ABB RobotStudio 6.03 Stage: Beginner Aim: Learn various tools and design constraints for robot programming 13
  • 14.
  • 15.

Editor's Notes

  • #3 just put hometown: Mumbai, india