This document outlines the schedule for a construction project taking place from October 2015 to July 2016. It lists over 400 separate tasks needed to complete the project broken down by floor and area. The project involves construction of multiple levels including the ground floor, basement, lower ground floor, 1st floor and 2nd floor. Each task has an assigned duration and start and finish dates. The overall master programme duration is 41.4 weeks.