Caeden is an innovative lifestyle brand that uses technology and design to inspire dynamic and engaged living. Their latest product is the Sona connected bracelet, which measures heart rate variability (HRV) through an accurate photoplethysmography sensor to provide a single daily number reflecting overall stress levels and resilience. The Caeden app uses HRV and other sensor data to track active time, guide resonance breathing meditation sessions, and provide analytics and progress tracking. Caeden aims to commercialize HRV technology in an accessible form factor while addressing the growing wellness market need beyond existing fitness trackers.