NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
NCCT
Embedded System Projects
NCCTPROMISE FOR THE BEST PROJECTS
FINAL YEAR PROJECTS
2013-2014
EMBEDDED SYSTEM PROJECTS
* MICROCONTROLLERS *
* VLSI * DSP * MATLAB *
109, 2nd
Floor, Bombay Flats, Nungambakkam High Road
Nungambakkam, Chennai – 34
Near Ganpat Hotel, Above IOB, Next to ICICI
www.ncct.in, www.ieeeprojects.net
ncctchennai@gmail.com, projects@ncct.in
044-28235816, 98411 93224, 89393 63501
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
EMBEDDED SYSTEM
PROJECTS
PROJECT AREAS
 MICROCONTROLLER PROJECTS
 VLSI PROJECTS
 DSP PROJECTS
 MATLAB PROJECTS
 BIO MEDICAL PROJECTS
 POWER SYSTEM PROJECTS
 POWER ELECTRONICS PROJECTS
 ELECTRICAL PROJECTS
 TELE COMMUNICATION PROJECTS
 BIO METRICS PROJECTS
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
 DIGITAL SIGNAL CONTROLLER PROJECTS
 MOTORS, DRIVES & CONTROL PROJECTS
 COMMUNICATION PROJECTS
 INSTRUMENTATION PROJECTS
 MECHANICAL PROJECTS
 MEMS / MECHATRONICS PROJECTS
 THERMAL ENGINEERING PROJECTS
 AUTOMOBILE / AUTOMOTIVE PROJECTS
 CONTROL ENGINEERING PROJECTS
 APPLIED ELECTRONICS PROJECTS
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
FINAL YEAR PROJECTS
2013 - 2014
Why NCCT
Complete Guidance * On time Completion *
Excellent Support
Multi platform Training * Flexibility
PROJECTS SUPPORTS & DELIVERABLES
Project Abstracts & IEEE Paper
Project Block Diagram & Circuit Diagram
Datasheets and Manuals
PPT & Review Details Guidance
Project Report Guidance
Working Procedure & Screen Shots
Materials & Reference Books in DVD
Project Completion Certificate
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
FINAL YEAR PROJECTS
American Sign Language based Hand Gesture Recognition & Performance
Energy Consumption – Energy Meter with Automatic Usage Monitoring and
Alarm System - Extra Power Requisition System
Driver Fatigue Accident Prevention using Eye Blink Sensor
Three Dimensional Password Authentication in ATM Networks
Library Robot - Path Guiding Robotic System with Artificial Intelligence
using Microcontroller
GPS and GSM based Biomedical Wearable Device for Remote Monitoring of
Physiological Signals
Zigbee enabled Pantry Updation - Wireless Network and Data
Synchronization using Hand Held Device - Zigbee enabled 2 Way
Implementation of Automated Multi Story Car Parking
Boatbot – Design & Implementation
Automatic Touch Screen based Vehicle Driving System
Staircase Climbing Robot – Implemented in Multi-Domain Approach
Alternative Energy Sources - Foot Power Generation
Helping Hand for Disabled Person - Hand Gripper Robot
Robotic Vision and Color Identification System with Solenoid Arm for
Colored Material Separation
Soil Moisture Content based Automatic Motor Starter for Irrigation Purpose
using Solar Energy
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Intelligent Train Engines and Hi Jack Control System or RF – Vehicle Hi
Jack – Train
Advanced Collision Avoidance Solar Powered Robot Car with Automatic
Charger - Seek for Sun Light and Charges when the Battery Goes Down
ASSIST - Automated System for Surgical Instrument and Sponge Tracking
Providing Group Tour Guide by RFIDs and Wireless Sensor Networks
Coin Operated Cell Phone Power Charger
Rail Track Inspector
Cockpit White Box
Trivector Meter – Design & Implementation
Power Failure Auto Announcement System at Customer Place from E.B
Station
Eye Ball Controlled Automatic Wheel Chair
A Security Framework in RFID based License Plate
Voice Operated & Head Movement Control Intelli Robotic Wheel Chair For
Specialty Operations
Density Traffic Analyzer - Traffic Control System for Ambulance Service
Design & Implementation
Flying Robot with Search and Rescue Feature for an Accident Area or
Natural Disaster Area
Botrobo – Tanker & Sound Detecting Robot
Ultrasonic based Vehicle Parking Guidance System
Medi Kit - Advanced Home Care System for Elderly Person Patients with
Remote & Auto Dialer with BP
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Advanced Helmet for Bikes for Security Measures
Iglass for Visually Impaired People
Robotic Assisted Operation Theatre with Voice Control
Boarding School Students Monitoring Systems (E-Id) using RFID
Intelligent Fuzzy Control Guided Vehicle with Collision Prevention –
Ultrasonic based Distance Monitoring and Fuzzy based Collision Avoidance
I Protect – Integrated Vehicle Tracking and Communication System with
Vehicle Command Unit – An Ultimate tool for Tracking, Real Time
Monitoring
Multisensor - Smoke, Fire, Temperature, Gas, Metal & Intruder based
Security Robot - Zigbee
Wireless Based Railway Bridge Damage or Track Fault Notification with
Alarm Systems
Intelligent Transport System using Wireless Technologies
Ultrasonic based Path Planning for the Blind Person
Intelligent System for Hazardous Gas, Human Detection and Temperature
Monitor Control Using GSM Technology
Alcohol Breath Analyzer / Alcohol Sensing Vehicle Starter System
Advanced Robotic Floor Cleaner with Wall Sensors and RF Remote
Controller for Systematic Cleaning
Effective Solar Tracking System for Optimal Power Generation and Lift
Operating Through Solar Power
Touch Screen based Wheel Chair Implementation
Anti Collision System in Railway & Location Monitoring using GSM and
GPS – Intelligent Train System with GPS
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Smart Tanker Robot for Security Operations in the Protected Area with
Wireless Secured Communication
Intelligent Train System – Automation, Collision Avoidance, Signal /
Unmanned Controlling, Moving Message Display, Voice Annunciation
Voice Recognition for Controlling Color Television
Wireless Remote Motor Starter with Acknowledgement using Solar Energy
Power for Agricultural Application
IVRS based Electronics Televoting with Response & Feedback
Intelli Robotic Wheel Chair for Specialty Operations with Key Operations
and Advanced Path Planning Routing System
Fuzzy Elevators - Group Elevator Scheduling With Advance Information for
Normal and Emergency Modes in Building Management Systems
Alive Human Being Detector in War Fields / Affected Areas using WAP with
Model & Camera
Design and Implementation of a Multiplex Parking System and Toll
Collection based on Time Management Techniques for Identifying the
Parking Violation based on Expiry Time
Distance Protection – Power Theft Identification & Location Detection
Judo Coat – Design & Implementation
Person Identification System – RF ID System used for Tracking &
Authentication Purposes Applying Back Scattering Technology
Wireless AI based Fire Fighting Robot for Relief Operations with Two Way
Communication
Advanced GSM based Theft Vehicle Identifying System using Remote PC
Smart Solar Tracking System for Optimal Power Generation
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Smart Wind Mill based Power Generation System for Mobile Charging
Zigbee – College / Industry – Wireless Network and Data Synchronization
using Hand Held Device
Development of Smart Notice Board – Active Information Display Systems
Mobile Robot -- Wireless Ai based Intelli Mobile Robot for Multi Specialty
Operations
Remote Controlled Water Splash Robot for Gardening
Wireless Intrusion Detection, Electronic Security & Control System using
Central Monitoring System
Design and Implementation of Railway Automation System with Sensors
Network
Fingerprint and RFID based Multi usage Card System - Design and
Implementation
Microcontroller based Portable Computer Aided Drug Dispenser Robot
Temple Security System -- Hi End Temple Security System with Frequency
Jammer
RF based Code Modulation – Decryption & Encryption for Secured Wireless
Communication with OFDM
Voice Controlled & Activated Wheel Chair Robot for Physically Challenged
Anesthesia Control System using Infusion Pump with Heart Beat
Monitoring System
Intelligent Train System with Collision Avoidance & Route Tracking
Cell Phone Jammer - Implementation of Highly Effective Mobile Cell Phone
Jammer
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Automated Car Parking System with Automatic Gate Opener
Coach Location Monitoring and Identification
Smart AI based Image Capturing Robot with Sensors Network
Cell Phone Controlled Ai based Five Axis Robot for Multi Specialty
Operations
IVRS based Robot Control with Response & Feed Back
Multiple Starters with Over Load and Low High Voltage Protection with
Multi Parameter Monitoring
RF based Intelligent Handheld Multi-Parameter Monitoring System with LCD
Display and DAS
Wireless Hybrid SCADA for Power Station Substation Monitoring &
Automation
Dish Position Controlling and Monitoring System Used for Radar & Other
Telecommunication Applications
Intelligent Power Sharing of Transformers with Auto Protection
Prepaid Electricity Billing RF 2 Way Automation using Contact Less EMPCR
Card & Reader with Voice Annunciation - IVRS
Energy Saving System using Thyristor Controllers
Finger Print based Physical Access Control Vehicle Immobilizer
RF enabled Energy Meter Digitization & Automation and Automatic Utility
Transfer with Two Way Communication
Speed Control of a Linear Induction Motor V/F Technique
Fuzzy based Speed Control of Induction Motor using Microcontroller
Noise Less Speed Control of DC Motor using PWM Converter
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Natural Failure Protector
PH Measurement
Implementation of Secured Black Box in Aircraft
Snake Robot – Serpentine Robot for Industrial Inspection and Surveillance
Blue Tooth Jammer for Security Application
Artificial Intelligence based Security for Telephone Exchange with SCADA
Microwave Spy Camera Jammer
IVRS based Students Mark Annunciation for their Parents
GPS based Active Fleet Management- Featured Rich Automatic Vehicle
Location Tracking, Collision Avoidance with Dual Communication using RF
Wireless Mouse Movement Recognition with VGA Display using Touch
Screen
Self Path Identification and Navigation Robot using Touch Screen
Infant Incubator Parameter Sensing & Monitoring through ZIGBEE Wireless
Sleep and Wake Categorization with ECG and Respiratory Effort Signals
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
EMBEDDED PROJECTS
DOMAIN WISE
BIOMEDICAL
PROJECTS
ASSIST - Automated System for Surgical Instrument and Sponge Tracking
A Portable Wireless Eye Movement-Controlled Human-Computer Interface
for the Disabled
ICU - Wearable Biomedical Sensors & Systems -- Wearable Body Sensor
Networks with BP
ICU - Smart Medicare Patient Monitoring System
Ultrasonic based Path Planning for the Blind Person
Anesthesia Control System using Infusion Pump with Heart Beat
Monitoring System
Heart Beat Rate Monitoring System - RF based Wireless Heart Beat Rate
Monitoring System
Peritoneal Dialysis – Design and Implementation of Blood Purification
System
Blood Pressure Analysis on Treadmill Environment
Blind Stick with Audio & Video Interface
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Infant Monitoring System
Smash – Smart Medical Automated System Handheld Device with Wireless
Technology
Monitoring System for Premature Babies
Eyeball Sensor for Automatic Wheel Chair Movement for Paralyzed Patients
Hand Talk – Assistive Technology for the Dumb
Hospital Automation with Patient Monitoring
Advanced Home Care System for Patients (Adhoc)
Glucose Level Monitoring and Predicting System
Intelligent “Prescription Drugs Abuse” and Addiction Control System using
RF / Proximity Cards
A Wireless Bio-Implantable Device for Monitoring Vital Body Parameters of
Transgetic Mice with Mems Technology
Advanced Remote Temperature and Heart Rate Monitoring System
Artificial Hands for Physically Disabled
Artificial Weaning Analyzer using Neural Network / Neural Network based
Vital Sign Monitor and Control
Bed Side Patient Monitoring System with BP & RF
Blind Identification and Equalization of FIR – Finite Impulse Response
Complete Body Scanning System with BP & RF
Defibrillator, External – ECG Monitoring Device While Transit
IGlass for Visually Impaired
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Intelligent Mobile based Patient Monitoring System
Measurement of Inhaled / Exhaled Respiratory System
Medi Kit - Advanced Home Care System for Elderly Person Patients with
Remote & Auto Dialer with BP
Monitoring Functional Arm Movement for Home based Therapy After Stroke
Wireless Telemetry for Line Data Transmission on a Mobile Unit
Zigbee based Medi Care - Patient Monitoring System with WAP RF BP
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
INTELLIGENT
TRANSPORT SYTEM
Vehicle Safety Speed Controller under Driver Fatigue using Eye Blink
Sensor
Intelligent Transport System using Wireless Technologies
Density Traffic Analyzer - Traffic Control System for Ambulance Service
Design & Implementation
Rail Track Inspector
Coach Location Monitoring and Identification
Design and Implementation of Railway Automation System with Sensors
Network
Cockpit White Box
Parameters Checking Before Take Off
Testing of Aircraft Box and Accessories before Take off
Bidirectional Communication Aircraft Landing System – ALS
Data Acquiring System for Airports
Radio-Controlled Surveillance System for Borders and Restricted Areas –
Flying Helicopter Ariel View System
Real Time Mid-Air Fight Collision Avoidance System with Auto Warning &
Flight Id, Position, Monitoring through Radio Frequency Link & PC
Auto Flight Pilot Simulation Applied in Real Time & Remote Monitoring
using High Speed RF Data Link for UAV / Flight
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Wireless Sensor Network based Model for Secure Railway Operations –
Performance, Computing & Communication Conference
Advanced Train Compartment Information Display System for Modern
Railways
Automatic Railway Gate Signaling Simulator & Controller
Automated & Unmanned Control System of Railway crossing using
Wireless IR Sensor
Model Railroad Automated Track Inspection Car
Blind Spot Location Identification - Bus Alert System for Vision Impaired
People
Vehicle Emission -- Automated Vehicle Emission Testing (Co2) and Issuing
online Certificate
Traffic Control System for Effective Ambulance Service – Design &
Implementation
Ticket Dispenser & Entry Lane Control Tower for Parking System
Intelli Public Transport System – Bus Status – Arriving / Leaving /
Breakdown indication System in the Bus Stop
Intelligent E-Police & Traffic Violation Automatic Recorder System for
Modern City Traffic using most Advanced Wireless Sensor Technology in
Real Time
Intelligent, Automatic & Modern Traffic Light Controller based On Traffic
Density
Interactive Environmental Air Pollution Monitoring Automatic Phone Dialing
System
Automated Accident Identification, Detection via Vibration Sensors using
RF Technology
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Automated Bus Ticket Tariff Calculation using Identification of Destination
Point
Automated Car Parking System with Automatic Gate Opener
Advanced Digital Wireless Entry / Exit Register System for Time Control in
Bus Stand with Remote Monitoring using PC
An Enhanced Parking Lot Service Model using Wireless Sensor Network
Application of Fuzzy Logic in Intelligent Traffic Control Systems
Automatic Auto Head Lamp Dim - Dip, Bright Illumination, Brightness
Control System of A Vehicle
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
ROBOTICS
PROJECTS
Robotics & Communication Projects –
Wired & Unwired
ROBOTICS PROJECT WITH REAL TIME
MECHANICAL MODELS
Staircase Climbing Robot – Implemented in Multi-Domain Approach
Helping Hand for Disabled Person - Hand Gripper Robot
Library Robot - Path Guiding Robotic System with Artificial Intelligence
using Microcontroller
BotRobo – Tanker & Sound Detecting Robot
Advanced Collision Avoidance Solar Powered Robot Car with Automatic
Charger - Seek for Sun Light and Charges when the Battery Goes Down
Mobile Robot -- Wireless Ai based Intelli Mobile Robot for Multi Specialty
Operations
Smart Tanker Robot for Security Operations in the Protected Area with
Wireless Secured Communication
Multisensor - Smoke, Fire, Temperature, Gas, Metal & Intruder based
Security Robot – Zigbee
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Voice Controlled & Activated Wheel Chair Robot for Physically Challenged
Intelli Robotic Wheel Chair for Specialty Operations with Key Operations
and Advanced Path Planning Routing System
Alive Human Being Detector in War Fields / Affected Areas using WAP with
Model & Camera
An intelligent Mobile Robot Navigation Technique using RFID Technology
Robotic Vision and Color Identification System with Solenoid Arm for
Colored Material Separation
Robot with Search and Rescue Feature for an Accident Area or Natural
Disaster Area
Boatbot – Design & Implementation
Advanced Robotic Vacuum Cleaner with Wall Sensors and RF Remote
Controller for Systematic Cleaning
Snake Robot – Serpentine Robot for Industrial Inspection and Surveillance
SMS based Controller – Robot Control
Remote Controlled Water Splash Robot for Gardening
RF Remote based Fire Fighting Robot for Relief Operations with Auto Dialer
Facility
Smart AI based Image Capturing Robot with Sensors Network
Cell Phone Controlled Ai based Five Axis Robot for Multi Specialty
Operations
PC Controlled Advanced Wireless Robot Vehicle with Camera for Bomb
Detection / Human Surveillance Application for Dangerous Areas
The OmniTread Serpentine Robot for Industrial Inspection and Surveillance
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Design & Implementation of Grass Shredding Robot
Autonomous Robot with Obstacle Avoidance, Drive Wheel Synchronization
and Line Tracking Capability
Wall Follower Robot with the Help of Multiple Artificial Eyes
Medical Robot – Design & Implementation
PCB Drilling System using Robot Known as Cartesian Robot
Remote Robot Control System based on DTMF of Mobile Phone
Sensor Rich Tele-Operational Mode Robotic Bush Fire Fighting
Robotics Assistance to Protection Services: Users Requirements
Motion Detection, Robotics Guidance and Proximity Sensing using
Ultrasonic Technology
Intelligent Escort Robot Moving Together with Human
Towards the Autonomous Navigation of intelligent Robots for Risky
Interventions
Testing Multi-Robot Systems for Operation in Risky Environments
The Watchdog - Robot inspector for An Area That Is Prone to intruders and
Possible Fire Hazards
Usability Analysis of a PDA-based User interface for Mobile Robot
Teleoperation
Design and Development of Line Follower Robot using the Principle of
Reflection of Light Rays
Dynamic Robot Networks for Search and Rescue Operations
Communication Issues in Distributed Multisensory Robotics
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Walking Robot for Impaired Peoples – Muscle Weakness
An Autonomous Assistant Robot for Book Manipulation in a Library
Self Guided Pedestrain Crossing Robot for Blinds and Elderly Persons –
Walking Stick
Electromagnetic Magnetic Type Pick and Place Robot for Materials
Handling
A Robust Architecture for Autonomous Robot Navigation and Control
A Mobile Platform for Nursing Robots
Rescue Robotics for Biomedical and Life Saving with Artificial Intelligence
A Novel Robot System for Surface inspection and Diameter Measurement of
Large Size Pipes
Advanced Human Detecting and Self-Guided Robotic Waiter for Hotels
Self Guided Object Tracking & Following Mobile Robot for Factories &
Mining Areas
Walking Robot with Hyper Line Tracker using IR Sensors for Uneven
Terrain
Vision Guided Law Enforcement Robotic Helicopters – A Revolutionary
New Interface
Advanced Miniature based Wireless Camera Monitoring System for Wildlife
Application
An Assistive Robotic Device that CAN Synchronize to the Pelvic Motion
During Human Gait Training
Automatic Collision Avoidance and Real Time Distance Monitoring
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Automatic, Advanced Robotic Arm for Welding in Automated Assembly
Line
Cell Phone based Materials Handling Robot
Cell Phone based Robot Direction & Alive Human Detecting
Cell Phone Controlled Fire Fighting Robot for Relief Operations
Cell Phone Controlled Smart Image Capturing Robot
Collision Avoidance By the Fusion of Different Beam-Width Ultrasonic
Sensors & Rescue Robot using PIR Sensor
Design & Implementation of Real Time Security Guard Robot using GSM
CDMA Networking
Design & Development of Obstacle Sensing and Object Guiding Robot
Distance Monitoring & Object Detecting Robot By RF Technology
Distributed Sensors Fusion for Object Position Estimation and
Approaching By Robotic System
Drishti: An Integrated Navigation System for Visually Impaired &Disabled
Electronic Nose for Robotics
Fire Ball for Fire Extinguishing with Robot Model
Fire Sensing Robot with Auto Dial-Up Facility & No Extinguisher
Gas Detection Robot for Atomic Power Station
Human Step Rehabilitation using A Robot Attached to the Pelvis
Hyper Line Tracking Control of Robotic Car using Track Sensors for
Industrial Application
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Intelligent Fire Sprinkler System
Fire Fighting Robo using Ultrasonic Technology
IVRS based Control of Alive Human Being Detector with Voice Feedback
Motion Activated Wireless Video Capturing System for Security Wild Life
Application
Path Guiding Robotic System with Artificial Intelligence
PC Controlled Alive Human Being Detector in War Fields / Affected Areas
using WAP with Model & Camera – PIR Sensor for Rescue Operations with
2 Way Communication
Programmable Surface Cleaning Robot using Blowers
SMS Controlled Intelli Robot Materials Handling
Most Advanced Land Roever with Wireless Remote Control using PC with
Camera and Solar Cell Power
Rescue Robot for Military Purpose with Voice Annunciation using PIR
Sensor and Metal Detection
RF - Remote Location Controlled Alive Human Being Detector Model
Robotic Exploration in Under Water with Remote RF Controller and 2.4 Ghz
Automatic IR Cameras for Night Vision and Remote Receiver
Robotic Technology Integration for Army Ground Vehicles – Zigbee
Automatic Human Seeker Robot with Human Body Heat Scanner
SMS based Alive Human Detector in Affected Areas / War Fields
SMS enabled towards Command & Control Networking of Cooperative
Autonomous Robotics for Military Applications
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
The Guide CAN – Applying Mobile Robot Technologies to Assist the
Visually Impaired
Ultra Sound Guided Collision Avoidance and Navigation Robotic System for
Multiple Applications
Visual Surviving and Multi Directional Light Signature Sensing and
Approaching Robot with Edge Detector for Tunnel Application
Climbing & Walking Robot for Uneven Terrain and Disaster Area
Application
Voice based Path Control of Robot Via the PC using RF Communication
Technology
Voice Control / Speech Recognition Alive Human Detector
Voice Control / Speech Recognition Fire Fighting Robot for Relief
Operations
Voice enabled Image Capturing and Transferring to PC using Robot
Voice enabled Pyroelectric Infrared Sensor based Security Alert System for
the Safer Guarding
Walking Robot with Infrared Sensors / Light Sensors / RF Sensor / Tactile
Sensors
Wireless AI based Fire Fighting Robot for Relief Operations with Two Way
Communication
Zigbee enabled Alive Human Being Detector Model with Camra
The development of intelligent home security robot
SMS Based automatic vehicle accident information system
Artificial Intelligent Based Automatic Path finding Cum Video Analyzing
Robot
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
FINGERPRINT
PROJECTS
Finger Print Verification for Passport Checking
Finger Print based ATM Authentication & Money Management System
RF ID & Finger Print based Campus Access Control System
RF ID & Finger Print based Electronic Passport – Multi Management
System
Finger Print based Campus Management System
Finger Print based Digital Locker Security
Finger Print based Digital Voting Machine
Finger Print based Physical Access Control Vehicle Immobilizer
Finger Print Identification / Recognition based Equipment Control System
Enterprise Security using USB Finger print Scanner
Bio-Finger Sensing Gate Opener for Security
Finger Print Authenticated, Access Control & Automated Door Opening
System
Finger Print based Authentication and Controlling System of Devices
Finger Print based Authentication, Access Control, Time, Attendance
Management System
Finger Print based Car Lock Security System
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Finger Print based Guard Alert System
Finger Print based Inter Electromagnetic Door Locking System
Finger Print based Time, Attendance & Library Management System
Finger Print based Vehicle Access System
Finger Print Recognition based Time Recorder with Weigh & Output
Finger Print Identification based Home Automation with Advanced Sensor
Finger Print Based Medical Information Retrieval & Patient Information
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
RF-ID PROJECTS
Unwired Communication Projects
The Electronic Passport & The Future of Government Issued RF ID based
Identification
Providing Group Tour Guide by RFIDs and Wireless Sensor Network
RF ID / Proximity based Multi Usage Card
Person Identification System – RF ID System used for Tracking &
Authentication Purposes Applying Back Scattering Technology
An RFID based Pilgrim Identification System
RF ID Proximity based Checking & Detecting Expiry Date (S), Stock
Updation
Advanced and Intelligent Distant Vehicle Identifying and Automatic Entry
System using Active RF ID
Automatic Vehicle Toll Collection & Gate Entry Exit System using RFID
RFID / Proximity based Pharma Health Card
A New Concept for Vehicle Localization of Road Debiting System using RF
Id / Active RF System – Intelligent Vehicles
Automated and Unmanned Parking System using RFID Technology
Advanced Digital Wireless Automatic Vehicle Register System for
Highways
Advanced Miniature Radio Collar Tracking System for Wild Life Application
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
A Security Framework in RFID based License Plate
GPS & RFID based Intelligent Guided Vehicle
Automatic Locker Machine - Design & Implementation, using RFID &
Embedded Microcontroller
Intelligent Retail Business: Location based Services for Mobile Customers
RFID based Animal Location Tracking and Identification System
RFID / Active RF based Equipment/ Personnel Tracking in Hospitals
RFID based Parking Lot Access and Control, Vehicle Tracking in Rental
Lots
RFID based Virtual Gate Entry Control
Security and Privacy in RFID and Applications in Telemedicine –
Communications
RFID based Customer Loyalty Programs
RFID Asset Tracking & Monitoring
RFID Applications Strategy and Deployment in Bike Renting System
RFID based Automated Airline Baggage Systems
Security and Privacy in RFID and Applications in Telemedicine –
Communications
RFID based Customer Loyalty Programs
RFID Asset Tracking & Monitoring
RFID Applications Strategy and Deployment in Bike Renting System
RFID based Automated Airline Baggage Systems
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
RFID based Student Tracking System
Secure Voting Through ATM Booths
RFID based Industrial Security System
Automatic Shopping & Billing in Super Market
A RFID System to Help Visually Impaired People in Mobility
RFID based Canteen Automation
A Mobile RFID -Tracking Security System
An RFID Application for the Disabled: Path Finder
Application Field of RFID in Health Safety and Environment Management
People / Visitors Tracking and Management with Area Localization /
Monitoring and Warning System using E-Ticket and Super RFID for
Amusement Park / Child Care / Play School in Real Time
Performance Evaluation of Operational Parameters on RFID Controlled
Conveyor System
Personnel and Equipment Locating System and Tracking for Mining
Solution using Super Active RFID Network Technology in Real Time
In Amusement Park / Visitor using Super RFID with in/Out Time
GIDS – A System for Combining RFID -based Site information and Web-
based Data for Virtually Displaying the Location on Hand Held Devices
Super Active RFID and Remote Access through Telephone Line
Location based Human Identification and Tracking System using RFID
Contactless Electromagnetic Proximity based Campus Management System
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Contactless Electromagnetic Proximity based Public Transport System
Data Storage and Remote Data Access using Super RFID
RFID based Automated Airline Baggage Systems
RFID based Parking Lot Access and Control, Vehicle Tracking in Rental
Lots
RFID based Prescriptions in Automated Pharmaceutical Systems
RFID based Unmanned Automated Electric Power Tariff Calculation by the
Remote EB Station
RFID based intelligent Books Shelving System
RFID based Car Security Systems
RFID based Equipment/Personnel Tracking in Hospitals
RFID based Multi Usage / Purpose Card System Design & Implementation
RFID based Valuable Objects Insurance Identification
RFID based Vehicle Tracking and Monitoring System
RFID Fare Verification - RFID Bus Pass System
Industrial Container CARGO monitoring and management using RFID
RFID based Automatic Toll Tax Deduction System
RFID based Blind man Stick
RFID based Electronic Road Pricing for Controlling the Traffic
RFID based Event Tracking System for Sports
RFID based Inventory Tracking System
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
RFID based Parts Tracking System for Manufacturing
RFID based Prepaid Energy Meter with Recharge Option
RFID based Railway Platform to Display Exact Position of Each Coach
RFID based Railway Reservation
Super Active RFID Applied in Cold Chain Logistics / Transportation with
Temperature Reading and Monitoring in Real Time
Super Active RF Tag based Long Range Vehicle Data Access System for
Traffic Monitoring with Multi Direction, Speed and Id for Automatic Data
Access, Monitor and Analyzing
Super RF Tag Applied in Hospital and Medical Care industry for Locating
Major Assets and Personnel in Real Time using Miniature Active RF
Network
SIP-RLTS: An RFID Location Tracking System based On Sip
Shopping Path Analysis and Transaction Mining based On RFID
Technology
Shortest Travel Distance for Full Reads on Least RFID Friendly Carton
Stacking Configuration using Advance Doe Technique & Age
Reproducibility & Repeatability
Super RFID Applied in Automatic Visitor / Tourist Guide information for
Personnel Announcement and Visitor Evaluation System Replacing
Conventional Guide
Unmanned Automatic Target Approaching Vehicle Applied for Blind using
Super Active RFID
Utilizing RFID Signaling Scheme for Localization of Stationary Objects &
Speed Estimation of Mobile Objects
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
GPS PROJECTS
GPS, GSM, TELECOMMUNICATION,
COMMUNICATION PROJECTS
WIRED AND UNWIRED
GPS and GSM based Biomedical Wearable Device for Remote Monitoring of
Physiological Signals
Anti Collision System in Railway & Location Monitoring using GSM and
GPS – Intelligent Train System with GPS
I Protect – Integrated Vehicle Tracking and Communication System with
Vehicle Command Unit – An Ultimate tool for Tracking, Real Time
Monitoring
Passenger Information System using GPS
Intelligent System for Hazardous Gas, Human Detection and Temperature
Monitor Control Using GSM Technology
Zigbee based Smart Vehicle System – Track, GPS based Vehicle Tracking,
Protection & Security System
An Automatic Collision Detection and Acceleration Control using Multi
Zone Transmission and Reception through RF Technology and GSM
Communication
Anti Collision System in Railway using GSM and GPS
GPS – Design & Implementation of 2 Way Communication System with
Transmit & Reception of Data using RF
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
GPS based Active Fleet Management- Featured Rich Automatic Vehicle
Location Tracking, Collision Avoidance with Dual Communication using RF
Advanced GSM based Theft Vehicle Identifying System using Remote PC
GPS GSM based Aircraft Collision Detection & Avoidance
GPS & GSM based Accident Alarm System
Real Time GPS based Vehicle Parameter Monitoring with Intelligent Data
Analysis
GPS based Substation Implementation
GPS based Intelligent Guided Vehicle with Collision Mitigation - Automatic
Vehicle Location Tracking, Collision GPS - Route Tracking System using
PC with 2 Way Dual Channel Communication
Embedded based GPS for Telephone Exchanges
Advanced Automatic Vehicle Crash Notification using GSM Technology
Automatic Vehicle Locator (AVL) using Global Positioning System (GPS)
GPS based Highway Monitoring & Control
GPS enabled PC based Geographic Information System (GIS) & Routing
Scheduling System
GPS based automatic route announcement system for blind people
GPS based automatic station announcement and display system for
trains/buses
GPS based bus or train collision avoiding system
GSM and GPS based human tracking system
Fabrication of GPS Robot
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Railway anti-collusion system using GPS
GPS based Air Craft Collision Avoidance
GPS & GSM based Real Time Vehicle Tracking System
GPS and GSM based Real Time Bus/Train Location Finder and Display on
Earth's Map
GSM and GPS based School Kids Tracking System.
GSM based Automatic Irrigation Water Controller System
GSM based Highway Road Traffic Monitoring System.
GSM based Home Security System to get intrusion Alerts Like
Door/Windows Open Alerts onto Your Cell Phone
GSM based Irrigation Control System
Standalone GPS Coordinates (Latitude, Longitude) Locater
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
VOICE-HM2007
PROJECTS
Voice Controlled Intelli Robot for Multi Specialty Operations
Voice based Activation and Control of Equipments
Voice based Elevator Movement and Display
Voice Control based Speed Control of Dc Motor
Voice Recognition for Controlling Color Television
Voice Communication Over Zigbee Networks
Voice Control / Speech Recognition Alive Human Detector
Voice Control / Speech Recognition Car Security System
Voice Control / Speech Recognition Home Automation
Voice Control / Speech Recognition Locker Security
Voice Control / Speech Recognition Rescue Robot for Military Purpose
using PIR Sensor and Metal Detection
Voice Control / Speech Recognition Voting System
Voice Operated Modern Restaurant System
Voice Recognition based Access Control System for Door Opening &
Closing using Microcontroller & Voice Hm2007 IC
Voice Recognition based Robotic Car
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
JAMMER PROJECTS
GSM / CDMA / DCS Tri Band Jammer
Cell Phone Jammer - Implementation of Highly Effective Mobile Cell Phone
Jammer
Blue Tooth Jammer for Security Application
Hi End Temple Security System with Frequency Jammer
GPS Jammer
Microwave Spy Camera Jammer
Effective Signal / Frequency Jammer System for Security & Protection
All Band Radio Jammer for Military Application
Advanced Radar Jammer for Military Application
Anti Bomb Explosion Frequency Jammer
Cell Phone Booster / Repeater
Practical Implementation of Full Band Radio Jammer for Security
Application
We can design and develop any Jammer Applications /
Repeaters / Boosters
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
ZIGBEE
PROJECTS
UNWIRED COMMUNICATION PROJECTS
Zigbee enabled Pantry Updation - Wireless Network and Data
Synchronization using Hand Held Device - Zigbee enabled 2 Way
Automatic Employee Tracking System using Zigbee Network and I2c
Memory Card Reader
Zigbee based Wireless Weather Station
Zigbee – College / Industry – Wireless Network and Data Synchronization
using Hand Held Device
Zigbee enabled ICU Care Taker - Life Support System
ZIGBEE based Infant Incubator Parameter Sensing & Monitoring
Real Time Passenger information System (RTPIS) using Zigbee Technology
Development of Zigbee based Street Light Control System
Development of Zigbee-based Electronics Ballast System
Remote Power On/off Control and Current Measurement for Home Electric
Outlets based on a Low-Power Embedded Board and Zigbee
Communication
Automated Roll Call with Palm based Device using Zigbee – SRD / ISM
Band
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Zigbee Data / Voice Communication System for Industrial Application
Zigbee Device Detector for Safety Application
Zigbee Enabled Speed Control of DC Motor
Zigbee Voice Communication System for Industrial Application
Hand Held Device - Restaurant Services Management & Attendance
Monitoring, Data Transfer, Updation
Zigbee Enabled Miniaturized Mote Control
A Wireless Network based on the Combination of Zigbee and GPRS
A Zigbee based Power Monitoring System with Direct Load Control
Capabilities
Bus Priority Control System based on Wireless Sensor Network (WSN) and
Zigbee
Commercial Applications of Wireless Sensor Networks using Zigbee
Custom Wireless Sensor Network based on Zigbee
Design of Air Pollution Monitoring System using Zigbee Networks for
Ubiquitous City
Development of Zigbee based Street Light Control System
Patient Monitoring System using Sensor Network based on the Zigbee
Remote Engine Performance Monitoring and Logger System using Zigbee
and I2c
Remote Power on/off Control and Current Measurement for Home Electric
Outlets based on A Low-Power Embedded Board and Zigbee
Communication
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Realization of Home Remote Control Network based on Zigbee
System for Measuring Power Supply Parameters with Zigbee Connectivity
Tea: Transmission Error Approximation for Distance Estimation Between
Two Zigbee Devices
The Implementation of Indoor Location System to Control Zigbee Home
Network
Wireless Automation of Unmanned Railway Crossing Gate Alert System
using Zigbee
Zigbee based Dynamic Control Scheme for Multiple Legacy IR Controllable
Digital Consumer Devices
Zigbee based Gas Leak Detection and Data Monitoring System
Zigbee based Money Transfer System
Zigbee based Monitoring System using Auto-Dialer
Zigbee based Wireless Sensor Networks and Its Applications in Industry
Zigbee Device Access Control & Reliable Data Transmission based Health
Monitoring
Zigbee for Building Control Wireless Sensor Networks
Zigbee Source Route Technology in Home Application
Zigbee Wireless Sensor in Industrial Applications
Wireless - RF Tx Rx, GSM/GPRS, GPS, Bluetooth, IrDA,
RFID, Zigbee
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
TELECOMMUNICATION
PROJECTS
Energy Consumption – Energy Meter with Automatic Usage Monitoring and
Alarm System - Extra Power Requisition System
Three Dimensional Password Authentication in ATM Networks
GPS and GSM based Biomedical Wearable Device for Remote Monitoring of
Physiological Signals
Power Failure Auto Announcement System at Customer Place from E.B Station
IVRS based Electronics Televoting with Response & Feedback
Advanced GSM based Theft Vehicle Identifying System using Remote PC
Temple Security System - Hi End Temple Security System with Frequency
Jammer
Cell Phone Controlled Ai based Five Axis Robot for Multi Specialty
Operations
IVRS based Robot Control with Response & Feed Back
Dish Position Controlling and Monitoring System Used for Radar & Other
Telecommunication Applications
Artificial Intelligence based Security for Telephone Exchange with SCADA
IVRS based Students Mark Annunciation for their Parents
Intelligent Train System – Automation, Collision Avoidance, Signal /
Unmanned Controlling, Moving Message Display, Voice Annunciation
IVRS based Smart Networked Home - Home Automation System
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Zigbee based Wireless Multi Channel Home Automation System with IVRS
Industrial Automation and Control System IVRS - Remote Location using
Remote Connection, with Immediate Voice Feedback
Mobile to PC interface for Controlling of Devices using interactive Voice
Response System
Intelligent & Automatic Fire Security System using Interactive Voice
Decoder and Telephone Line
Categorized Alarm Annunciation with Voice Annunciation and Controls
Prepaid Electricity Billing RF 2 Way Automation using Contact Less EMPCR
Card & Reader with Voice Annunciation - IVRS
SMS based Remote Motor Starter for Irrigation in Agricultural Application
IVRS based Automatic E-Filing Tracking and Monitoring, Localization,
Tracking Applied in Modern Administration Automation
Development of Smart Notice Board – Active Information Display Systems
using SMS based on Microcontroller
Design and Implementation of Real Time Security Guard Robo using
GSM/CDMA Networking
SMS based Alive Human Detector in Affected Areas / War Fields
Automatic Taxi Trip Sensing and Indicating System through GSM
Intelligent System for Hazardous Gas, Human Detection and Temperature
Monitor Control Using GSM Technology
An Automatic Collision Detection and Acceleration Control using Multi
Zone Transmission and Reception through RF Technology and GSM
Communication
Anti Collision System in Railway using GSM and GPS
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
IVRS PROJECTS
Interactive Voice Response System using APR
Finger Gesture Recognition using Flex Sensors with Voice Output
Intelligent Train System – Automation, Collision Avoidance, Signal /
Unmanned Controlling, Moving Message Display, Voice Annunciation
IVRS based Smart Networked Home - Home Automation System
Zigbee based Wireless Multi Channel Home Automation System with IVRS
IVRS based Students Mark Annunciation for their Parents
IVRS based Electronics Televoting with Response & Feedback
Industrial Automation and Control System IVRS - Remote Location using
Remote Connection, with Immediate Voice Feedback
Mobile to PC interface for Controlling of Devices using interactive Voice
Response System
Intelligent & Automatic Fire Security System using Interactive Voice
Decoder and Telephone Line
Categorized Alarm Annunciation with Voice Annunciation and Controls
Prepaid Electricity Billing RF 2 Way Automation using Contact Less EMPCR
Card & Reader with Voice Annunciation - IVRS
IVRS based Robot Control with Response & Feed Back
IVRS based Automatic E-Filing Tracking and Monitoring, Localization,
Tracking Applied in Modern Administration Automation
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
COMMUNICATION
PROJECTS
Wired – RS232, RS485 & Unwired –
RF, Zigbee, RFID
A Vehicle-to-Vehicle communication Protocol for Cooperative Collision
Warning
Dish Position Controlling and Monitoring System Used for Radar & Other
Telecommunication Applications
RF based Code Modulation – Decryption & Encryption for Secured Wireless
Communication with OFDM
Development of Smart Notice Board – Active Information Display Systems
A Miniaturized Mote for Wireless Sensor Network
Development of pedestrian-to-vehicle communication system prototype for
pedestrian safety using both wide-area and direct communication
Car-to-Car Communication
A Computerized Travel Aid for the Active Guidance of Blind Pedestrians
A Design of A Prototypic Hand-Talk, Assistive Technology for the Deaf
A Distributed, Adaptive Protocol for Handling Interference in Wireless
Communications
Enabling / Disabling & Wireless Control of Appliances & Devices using RF
Technology
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Fully Automatic Intelligent Wireless Remote Railway Gate Controller &
Monitoring System with Remote Train Stopper for Railway using Active RF
Id System
Machine-to-Machine Communication in Cellular Networks
Reduction of Disturbance Effects and Sustained Oscillation using Multi-
Sensor Implementing Wireless Communication
Remote Communication Devices for Electric Utility Applications, Electric
Power Conference
Remote Mobile Phone Motor Starter for Irrigation Purpose
Wireless Automatic Traffic Signaling System
Wireless Intrusion Detection, Electronic Security & Control System using
Central Monitoring System
Wireless Telemetry for Line Data Transmission on A Mobile Unit
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
SECURITY SYSTEM
PROJECTS
Integrate Intelligent Security System for Industrial Surveillance with WAP &
Auto Dialer
Intelli Home Security System with Auto Dialer, Peace Keeper – The Home of
Tomorrow
Smart Room Controller using Human Presence Detector
Wireless Voting System
A Low-Cost Solution for an Integrated Multisensor Lane Departure Warning
System
Intelligent Briefcase with Digital Code Lock and Shock Generator during
Unauthorized Access
Secret Codes & Secured Messages Transmission System through
Telephone Line
Smart Card based Human Identification & Personal Management System
Spy Camera Detector for Safety Application
Modern Wireless Entry / Exit Register & Alarm Display System for
Advanced Amusement Park
Implementation of Wireless Surveillance / Emergency Rescue Monitoring
Vehicle with Wireless Camera using Microwave Frequency with Microwave
Audio / Video Transmission
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Advanced Digital Wireless Multi Point Security System for Fire Safety with
Alarm
Advanced Wireless Bank Security System with Remote Alarm and Sensor
for Modern Security Application
Aircraft Airbox Ground Tester with Aircraft Accessories
Autonomous Helicopter System with Security System
Combination Lock for Security Applications
Design and Implementation of Mobile based Electrical Appliances Control
for Industrial Automation with High Security
Embedded System based Inter Locking System of Electromagnetic Doors
Finger Print / Bio Metrics based Industrial Authentication & Access Control
System
Industrial Security Robot with Multi Specialty Features
Intelligent Car Security System using Dynamic Generation of Random
Security Codes
Intelligent Information System for Police
Interactive Earthquake Monitoring & Low Frequency Vibrations & Noise
Sensing System
Mobile Device Security using Transient Authentication
Multi - Zone Fire Alarming Control Panel with Zone Location, Auto Dialer to
Fire Station
PC based Home Appliance Control System
Safe – Secure Anti Frequency Eliminator
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Safe Street Crossing System for Vision Impaired People
Secure Transmission of Sensitive Data using Multiple Channels
Voice Control / Speech Recognition Car Security System
Wireless Access Monitoring & Control System based on Digital Door Lock
Wireless Aircraft Automatic Landing System
Wireless LAN with Mono Alphabetic Substitution
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
SENSOR BASED
PROJECTS
Sensors Network & Wireless
Sensors Network Projects
Advanced Wireless Automatic Digital Pumping System for Agriculture
using Soil Sensor
Advanced Wireless Earth Quake Alarm System for Early Warning
Temple Security System -- Hi End Temple Security System with Frequency
Jammer
Integrate Intelligent Security System for Industrial Surveillance with WAP &
Auto Dialer
Driver Fatigue Accident Prevention using Eye Blink Sensor
Eye Ball Controlled Automatic Wheel Chair
Multisensor - Smoke, Fire, Temperature, Gas, Metal & Intruder based
Security Robot - Zigbee
RF Enabled ICU Care Taker – Life Support System
American Sign Language based Hand Gesture Recognition & Performance
Library Robot - Path Guiding Robotic System with Artificial Intelligence
using Microcontroller
Advanced Wireless Bank Security System with Remote Alarm and Sensor
for Modern Security Application
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Design & Implementation of Railway Automation System with Sensors
Network
Motion Detection, Robotics Guidance & Proximity Sensing using Ultrasonic
Technology
Real Time Lane Detection for Autonomous Vehicles – Ultrasonic Sensor
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
MOTORS, DRIVES &
CONTROL PROJECTS
Fuzzy Logic based Speed Control of AC Motor using Microcontroller with
Line Fault Identification
Fuzzy based Speed Control of Induction Motor using Microcontroller
Fuzzy Logic based Speed Control of DC Motor
Speed Control of AC Motor with Multi Parameter Monitoring
Speed Control of DC Motor with Field & Armature Control
Cycloconverter Drive for AC Motors
Digital PID Controller based Speed Control of DC Motor
Speed Control of a Linear Induction Motor V/F Technique
Noise Less Speed Control of DC Motor using PWM Converter
Brushless Speed Control of DC Motor
PWM based Bidirectional Speed Control of DC Motor
Voltage Stresses On Stator Windings of Induction Motors Driven By IGBT
PWM Inverters
Sensor less Speed Control of AC Induction Motor using Microcontroller
Speed Control of DC Motor using FQ / TQ Chopper Drive
Cell Phone based Motor Speed Control
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Closed Loop Dc Motor Speed Controller
Frequency Locked Loop Dc Motor Speed Control
IGBT based Dc Motor Drive Control System
Slip Ring induction Motor Drive with Slip Recovery using IGBT
Efficiency Detector for Relay & Circuit Breaker
Single Phase Multilevel Inverter SPWM with PC Interface and OLM
Wireless DC Motor Speed Control using Triac
Single Phase Input to DC Output – DC Motor Drive-Armature Voltage
Control
Single Phase Thyristorized Power Controller for Industrial Applications
Microcontroller based Firing Circuit for Thyristor Converters
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
POWER
ELECTRONICS
PROJECTS
Energy Consumption, Meter Reading and Additional Power Requisition
System
Alternative Energy Sources - Foot Power Generation
Soil Moisture Content based Automatic Motor Starter for Irrigation Purpose
Trivector Meter – Design & Implementation
Power Failure Auto Announcement System at Customer Place from E.B
Station
Portable Power Analyzer for Energy Audit
Design & Implementation of 3Phase Power Changer
Wireless Hybrid SCADA for Power Station Substation Monitoring &
Automation
Distance Protection – Power Theft Identification & Location Detection
RF based Intelligent Handheld Multi-Parameter Monitoring System with LCD
Display and DAS
Multiple Starters with Over Load and Low High Voltage Protection with
Multi Parameter Monitoring
Smart Wind Mill based Power Generation System for Mobile Charging
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Energy Saving System using Thyristor Controllers
Multiplexing Control of EMU
SCR DCR Circuit Breaker
Energy Saving Systems for Railway Platforms
Intelligent Power Sharing of Transformers with Auto Protection
RF enabled Energy Meter Digitization & Automation and Automatic Utility
Transfer with Two Way Communication
Inverter based Low - High Input Voltage Buck Booster Converter System
Design & Implementation
Multi Power Utilizer - Maximum Demand Indicator and Power Factor
Indicator
Natural Failure Protector
Distributed Control System for Industrial Transducers Failure Location &
Annunciation
Protective Relay V, I, V/F Protection & Impedance Relay
Soft Switching PWM Three Level Converters
Soft Switching PWM Three Level Inverters
Development of Energy Management and Warning System for Resident: An
Energy Saving
Energy Efficient Target Coverage in Wireless Sensor Networks
Design and Digital Monitoring of Uninterrupted Power Supply
Life Cycle Testing of Electrical Components
Multi Channel Temperature Indicator
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Battery Voltage and Current Monitoring for 8 Batteries
Wireless Transformer Failure Analysis
3 Phase Prepaid Electricity Billing Automation
Advanced Wireless Electrical Appliance Control System using PC and
Coded RF Protocol for industrial Application
Advanced Wireless Electrical Meter Reading System
Detection and Security System of Illegal Wireless Transmission
Diagnosis of Fault Distribution Transformer
Intelligent & Dynamic Power Saver & Control System for Industrial
Electrical Equipments
Design and Practical Implementation of Internet based Predictive Control of
A Servo System
Digital Tachometer using IR Optical Encoder Sensor
Electronic Switching System and Tackling Power Cut
Fault Location using Remote Connection, with Immediate Voice Feedback
Industrial Power Management System
Multi Channel Temperature Measurement and Controller
Multichannel Voltage Scanner and Control using SCADA
PID based Temperature Controller
Intelligent Power Factor Indicator & Correction with Multiple Capacitor
Banks
Power Generation through Solar Photovoltaic with Light Level Indication
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Power Line Monitoring with Seven Segment Display
Protection of Turbo Alternators - Generator Protection
Quasi Resonant Converter Fed DC Drive
Remote Mobile Phone based Motor Starter for Irrigation Purpose
SCR based Equipment Protection for Power Monitoring
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
AUTOMOBILE /
CAN BASED
PROJECTS
Over speed indication and Automatic accident Avoiding System for four-
wheeler
Automatic temperature controller with cooling system for car
SMS Based automatic vehicle accident information system
Remote controlled material handling equipment
Automatic reserve indication system
SMS based automatic two-wheeler locking system
GPS based vehicle route tracking system
Fabrication of Automatic headlamp alignment system with Dim/Bright
Controller
Automatic sensor based wall painting robot
GPS based automatic vehicle accident information system
Remote controlled tilting handicapped wheel chair
SMS based vehicle Ignition controlling system
Electrical Power Generation system using Railway track
Automatic material handling Fire Fighting Robot
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Cell phone controlled Solar Vehicle
Automatic Railways Signaling System
Automatic Rain operated wiper and Head light Dim/Bright Controller
Artificial Intelligent Based Automatic Path finding Cum Video Analyzing
vehicle
CAN based Smart Car Security System
CAN based Exteriors – Design & Implementation
Complete Automation of Automobile Control System using CAN
CAN based Collision Avoidance System for Automobiles
Control of Process Parameters in Industries using CAN
Speedometer Implementation using CAN
CAN based Industrial Automation
Implementation of Airbag System through CAN
Intellect speed breaker system using CAN
Automotive Network Diagnostics with Crash Data Retrieval System
Automated Vehicle Security System with ZigBee Keyless Entry over CAN
Adaptive Front lighting System using Fuzzy Logic over CAN - LIN
Multiplexed Network
Automatic Head Light Dimmer and Speed Control for Automotive Vehicles
using CAN-LIN
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
FUZZY LOGIC BASED
PROJECTS
Fuzzy Elevators - Group Elevator Scheduling With Advance Information for
Normal and Emergency Modes in Building Management Systems
Intelligent Fuzzy Control Guided Vehicle with Collision Prevention –
Ultrasonic based Distance Monitoring and Fuzzy based Collision Avoidance
Fuzzy Logic based Automated Train
Fuzzy Logic based Speed Control of AC Motor using Microcontroller with
Line Fault Identification
Fuzzy based Speed Control of Induction Motor using Microcontroller
Fuzzy Logic based Lift Control & Management System
Fuzzy Logic based Speed Control of DC Motor
Application of Fuzzy Logic in Intelligent Traffic Control Systems
Control of Boiler Turbine Unit based on Fuzzy Logic System
Fuzzified Computer Automated Crane Control System
Fuzzy Logic based Control of Level in A Non-Linear Tank
Fuzzy Rule based Object Identification Methodology for Navy System
Fuzzy Speed Control of AC Motor using Microcontroller
Intelligent Application of Fuzzy Logic in Automated Train Speed Control
System
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
SCADA BASED
PROJECTS
Wireless Hybrid SCADA for Power Station Substation Monitoring &
Automation
SCADA for Instrumentation
Artificial Intelligence based Security for Telephone Exchange with SCADA
SCADA based Waste Water Treatment
Optical Isolated Transparency SCADA - for Telephone Exchange
SCADA for Local Distribution Network
Development of Human Machine Interface using any SCADA Package
Fault Prediction in Quasi-Steady System with SCADA for Pressure & Flow
Multichannel Voltage Scanner and Control using SCADA
SCADA based Temperature Measurement & Control System
Remote Digital RPM Indicator using Proximity or Magnetic Pick Up - SCADA
Remote Frequency Indicator with SCADA
Remote Terminal Unit (RTU) & PLC System
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
PLC / THERMAL
PROJECTS
PLC based Bottle Filling Station with Conveyor Model
PLC based Automatic Boiler Management
PLC based Automatic Car Parking System
PLC based Door Open and Closing System
PLC based Irrigation Controller for Garden
PLC based Traffic Density Control using Sensor
PLC based Wireless Energy Meter
PLC based Control of Advertisement Display
PLC with Internal Locking System and Control
Multi Channel Temperature Measurement and Controller
Temperature Monitoring and Control System with Automatic Equipment
Control using Computers
Thermal Overload Protection for Transformer
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
SMS BASED
PROJECTS
SMS based Universal Motor Speed Controller
SMS based Remote Motor Starter for Irrigation in Agricultural Application
SMS Controlled Home Automation System
Development of Smart Notice Board – Active Information Display Systems
using SMS based on Microcontroller
SMS based Appliance Control System
SMS Controlled Intelli Robot Materials Handling
SMS Controlled Load Monitoring System
Design and Implementation of Real Time Security Guard Robo using
GSM/CDMA Networking
Ferreting Out Peripatetic Device using GSM Technology
SMS based Alive Human Detector in Affected Areas / War Fields
SMS enabled towards Command & Control Networking of Cooperative
Autonomous Robotics for Military Applications
Automatic Taxi Trip Sensing and Indicating System through GSM
GSM based Message Moving Display
SMS based Anti Theft System for Vehicles
SMS based Automatic Electricity Bill Information System
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
AUTOMATION
PROJECTS
Automatic Vehicle Speed Management System
Control of Process Parameters in Industries using CAN
Monitoring of Engine Parameters
Train Engine Automation System
Wireless Crane Control System using PC
Intelligent System for Vehicle Parking Guidance System
Intelligent System for Aiding Public In Transportation and Stage
Announcement System
Car Speed Monitor and Data Logger System
Solar Car Automation
GPS & GSM Interface for Tracking System
Accident Prevention System for Railways Using GPS
Driver Assist Co-Pilot System for Emergency Cruise Control using Hybrid
Sensor Network of Wired CAN and Wireless PAN
Smart Automatic Windscreen Wiper Control System using Fuzzy Logic and
LIN
Automated Highway Network for Traffic Analyzer and Vehicle Speed
Regulator over CAN
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Train Collision Prevention System using Automatic Block Signaling
Network over CAN
Hospital Area Network for Multiple ECG Signal Acquisition over High Speed
CAN
Autonomous Self Parking Vehicle using CAN
Smart Room Controller using Human Presence Detector
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
INDUSTRIAL
APPLICATIONS
PROJECTS
High Speed Object Counter
Maximum Demand Indicator & Controller
Multi Channel Temperature Measurement & Controller
Multiple Industrial Timer
PC based Multi Channel Temperature Controller & Logger and Data
Analyzer
Single Channel Temperature Measurement & Controller
Ultrasonic Distance Monitor & Range Finder
Water Control System for Rolling Mill
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
INSTRUMENTATION & LEVEL
MEASUREMENT PROJECTS
SCADA for Instrumentation
SCADA based Waste Water Treatment
PH Measurement / Controller
Multichannel Voltage Scanner and Control using SCADA
Boiler and Burner Management & Controller System
Multichannel Petrochemical Fire Sensor, Monitoring and Control System
with Automatic Telephone Dialing
Liquid Level Remote Transmitter
Digital Temperature Indicator & Controller with DAS & Analyzer
Multi Channel Temperature Scanner using Current Loop Transmission
De-Icing Temperature Controller System PC based Multi Channel
Temperature Controller & Logger and DAS Analyzer
Temperature Measurement & Controller for Furnaces with Different Time
Period & Set Points
PC based Programmable Temperature Controller for Furnaces
Digital Ph Measurement & Controller Meter
PC based Programmable Temperature Controller for Cement Plant
Fluid Level Monitoring System
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
PROCESS CONTROL
PROJECTS
An on-Line Distributed System for Improved Real-Time Process
Performance
Design Criteria for Obstacle Avoidance in A Shared Control System
Design Methodology for Modeling A Microcontroller – Teleload Switch
Digital PID Controller for Multi Channel Temperature using Frequency
Response / Root Locus Technique
Digital Temperature Indicator & Controller with DAS & Analyzer
Fuzzy Logic based Traffic Light Controller
Industrial Annunciator with Voice, Alarm
Multi Burner Management & Controller with Auto Flame Detection & Failure
Indicator
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
MECHANICAL & MODEL
BASED PROJECTS
Automated Weigh Load Cell
Automatic Motorized Electromagnetic Glass Door Open / Close Mechanism
Batch Weighing & Automation System
Commercial Weighing System
Multi Axis Stepper Controller / Driver with Opto Isolation
Multi Axis Stepper Robotics with Artificial Intelligence
Stain Gauge Weighing System
Tank – Hopper Weighing System
Textile Industries based Programmable Label Cutting Machine
Two Axis Stepper Controller / Driver with Opto Isolation
Wireless Crane Control System using PC
Fabrication of Remote operated weapon system
Fabrication of sewage water treatment plant
Fabrication of water cooler cum air conditioner
Fabrication of transformer heat reduction system
Fabrication of Soar Air conditioner
Solar Powered Auto charging grinding machine
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Remote controlled tilting wheel chair for physically disables
Automatic paint spraying pick and place Equipment
Automatic Car Parking System for apartment Building
Sensor Based Automatic paint marking machine for sprocket Industries
Conveyor Belt Sequential Timer Controller with Model for Bottling Plant
Automatic Vehicle Speed Management System
Design of Induction Furnace Control System
Boiler and Burner Management & Controller System
Computer Controlled Drilling Machine
Crane & Lift Operation Controlling and information System
Computerized Thread Mill Implementation
Conveyer Belt Monitoring & Control System
Flow Totalizer - Computerized Flow Totalizer for Juice Industries
Textile Industries based Programmable Label Cutting Machine
Wireless Crane Control System using PC
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
SOLAR SYSTEM
PROJECTS
Effective Solar Tracking System for Optimal Power Generation and Lift
Operating Through Solar Power
Wireless Remote Motor Starter with Acknowledgement using Solar Energy
Power for Agricultural Application Smart Solar Powered Car
Smart Solar Tracking System for Optimal Power Generation
Solar based Computerized Irrigation System
Solar based Energy Saver Controllers
Solar Cell Voltage Generation with Auto Tracking System
Solar Powered Bike, Solar Power based Two Wheeler Systems
Solar Powered Car, Solar Power based Car Navigation System
Solar Powered Fence - Electrified Perimeter Fencing Systems
Solar Powered Traffic Signals
Solar Water Heater Controller with Temperature Display
A Novel Optimum Operating Point Tracker of the Solar Cell Power Supply
System
Solar Energized Artificial Intelligent Embedded Line Tracking Follower
Robot
Solar Power for Automatic Water Heating / Solar Energy for Electrical
Applications
Solar Powered Wireless Weather Station
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
AGRICULTURAL
PROJECTS
Fabrication of Solar powered tealeaf-cutting machine
Electricity and Water Pumping System using Wind Mill
Fabrication of solar irrigation System
Solar Powered Agricultural Water Pumping System with Auto Tracking
Fabrication of Solar Seeds Sprayer
Automatic Water level Sensing Crane
Fabrication of Solar seed Dryer with Auto Tracking
Automatic Moisture and Light Controlling System for Garden
Automatic Water Tape Controlling System
Automatic Packing control Machine
Fabrication of Agricultural Motor Pump Running using Solar Power
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
MEMS
(MICRO ELECTRO MECHANICAL
SYSTEM)/ ELECTRO MECHANICAL /
MECHATRONICS
Motion Operated Scrolling Display using MEMS Accelerometer and I2c
Protocol
Miniature Wireless Sensor, MEMS based, Application in Cold Chain
(Food/Medicine Process) Logistics with Real Time Temperature
Advanced Parachute Deployment System using MEMS Free Fall Detector
and I2c Protocol
Automotive Crash Detection and Airbag Deployment using MEMS
Accelerometer
Electronic Speedometer using Inertial MEMS Sensor and I2c Protocol
Measuring and Transmitting Vital Body Signs using MEMS Sensor
Motion Activated Power Saving System using MEMS Accelerometer and I2c
Protocol
Motion Controlled Password System for Compact Embedded Systems
using MEMS Sensor
Anti Theft System for Electronic Equipments using Inertial MEMS Sensor
and ZigBee
Automotive Airbag Deployment System with Crash Data Logger using
MEMS Accelerometer
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Human Fall Protection System using Wearable Airbags and MEMS
Accelerometer
Wireless Pervasive Health Care Monitoring System using MEMS & ZigBee
Advanced Collision Avoidance Solar Powered Robo Car with Automatic
Charger
Automatic Plant Irrigation Robot with Self-Guided Action for Agricultural
Application
Automatic, Advanced Robotic Arm for Welding in Automated Assembly
Line
Hyper Line Tracking Control of Robotic Car using Track Sensors for
Industrial Application
Non GPS Navigation with the Personal Dead Reckoning- Pdr System
Self Direction Detected and Guided Robotic Vehicle with Magnetic
Compass Navigation
Visual Servoving and Multi Directional Light Signature Sensing and
Approaching Robot with Edge Detector for Tunnel Application
Automatic Car Parking System for apartment Building
Fabrication of Remote operated weapon System
Cell phone controlled pick and place robot
SMS based automatic pneumatic Punching and riveting machine
Video Analyzing remote controlled vacuum Cleaner
SMS based automatic vehicle accident information system
Automatic Distance Measurement and Braking System By using Ultrasonic
Waves
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
SMS based Bomb detecting robot
Fabrication of Automatic Vehicle Over speed controlling system for School
Zone
Remote controlled Aircraft (Flying Model)
GPS based vehicle route tracking system
Fabrication of Automatic temperature controller with cooling system
Remote controlled material handling motorized crane
GPS based blind people path announcement system
Automatic sensor based wall painting robot
GSM based two wheeler security systems
Two Wheeler Automation with security System
Automatic Power Saving Conveyor for Industrial Application
Automatic Visitor Guided with Material Handling Vehicle
Automatic Break Failure and Engine Over Heating Indication
Sensor Based Material loading/unloading system for different section
SMS based Automatic two-wheeler locking system
Auto head-lamp Alignment system for automobile
Railways accident Avoiding System – (Level crossing and Fire Alarm)
SMS based automatic drilling machine
Fabrication of Solar automatic cell phone charger with pay system
PC based Automatic sheet cutting Machine
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Automatic Vehicle Accident Information System
Automatic Paint Spraying Equipment
Automatic drunken drive avoiding system for automobile
Remote controlled Vacuum Cleaning Robot
Automatic Scrap Collecting Vehicle
Automatic Fire fighting cum material handling vehicle
Sensor Based Automatic paint marking machine for sprocket Industries
Automatic railway track crack detecting Vehicle
Design & Fabrication of Conveyor Automation
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
MORE EMBEDDED PROJECTS
Digital Counter using CMOS Technology
Need of Ad Hoc type Networking for Modern Airports for Aircraft Landing
A Proposal for Design of Hybrid Multi Functional Implantable Biochip using
Bio-intelligent Expert System
A Survey of Communication Network Paradigms for Substation Automation
A Wireless Escape System for Industrial Accidents using Adhoc
Positioning
AC Generator Monitoring – Generating Voltage, Oil Level, Fuel Level, Etc
Through Wireless
Adhoc – Advanced Home Care System for Elderly Patients
Advanced Digital Remote Panic Alarm Button for Bank / industrial
Application
Advanced Full Function Remote Home Automation System using Encrypted
RF Technology
Artificial intelligent based Equipments Failure Detecting & Automatic
Dialing to the Concern Service Engineer Cell-Phone / Telephone
Attendance Marker System with IRC Reader and Face Indicator
Automatic Cell Phone Detector and Mute Switch for TV / DVD
Automatic Controller for Elevator and Escalator with Sensor Network & AI
Automatic Intelligent Plant Watering System
Automatic Load Sharing of Transformers with Protective Analysis
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Automatic Repeat Protocol for Distribution Automation System through
Power line Communication
Automatic Rolling Shutter Opener with RF Remote Control
Automatic Room Light / Cooling System Controller with Visitor Counter
Automatic System for Measuring & Controlling the Length of a Moving
Product in Industries
Automatic Vehicle Location Tracking, Collision Avoidance with Dual
Communication using RF
Automobile Exterior Safety System
Autonomous Stabilization System for a Coaxial Helicopter
Cable Fault Finder for Electrical Transmission Lines
Cell Phone based Remote Car Starter
Biometric Bank Locker System for Manager and Customer
Bio-On Chip (B-Chip) Micro Miniaturized Wearable / Body Area Network for
Wireless Patient Monitoring
Cell Phone based Total Car Controlling System – Car Moving, Forward,
Reverse, Etc.,
Cell Phone Detector for Security Application
Cell Phone to Cell Phone Appliance Control System
Computer based Wireless Control System of Devices
Computer Keyboard Dual Controller for Switching Electrical Devices
Control of Pc DTMF Technology via Mobile Phone
Design a Wireless Sensor Network for Methane Monitoring System
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Design and Implementation of Home Automation using CAN
Digital Steam, Pressure and Liquid Level Monitor
Digital Surface Distance / Length Measurement using Microcontroller
Distributed Multi Area Power System Load Flow Monitoring
Dynamic & Automatic Programmable Temperature Control System for
industrial Machineries Safety Control System
Dynamic Security and Access Control System for 5 independent Zones
E- Seal Applied in Fragile Safety in Transport, Real Time
E-Driving License and intelligent E-Police Applied in Modern Electronic
Travel Aids – ETA
Embedded based Level Controller with Two Tanks with Transparent Level
Display
Embedded Controller for Non Linear Partially Interacting Process (NlPIP)
E-Ticket Applied in Monitoring and Management Evaluation
Embedded Microcontroller based Transformer Oil Testing Machine
Embedded Microcontroller based Weighing Analyzer using Load Cell
Embedded Microcontroller based PH Controller for Sugar Industries
Embedded System based Inter Locking System of Electromagnetic Doors
Chemical, Cement & Pharmaceutical Industries
Feeder Protective Relay Monitoring and Data Logger
Frequency Division Multiplexing for a Multi-Sensor Wireless Telemetry
System
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Fully Automatic E-Filing System with Location, Tracking Applied in Real
Time Single Window System for Modern Govt. / Document / File
Management
Garment Conveyor Remote Controller
Guardhouse Visitor Screening Security System
Handheld Electronic Voting Machine & Data Retrieval System
Highway Car Accident Identification & Auto Communication to Patrol or
Hospital
Hi-Tech Car with Remote Camera for the Police
Implementation of Device Status Monitoring and Controlling using
Telephone Lines
Humidity Monitoring and Pump Controlling System
Implementation of Global and Remote Positioning System for Defense and
other Purposes using Mobile Networks
Implementing Process Control & Monitoring System using Can
Intelligent & Advanced Digital Wireless Audience Polling System for Quiz
Program
Internet-Enabled Calibration Services: Design of a Secure Calibration
System
Microcontroller based intelligent Multi-Timer System for industrial
Automation
Microcontroller based Moving Person Place Detecting System (MPP)
Mosfet based Current Mode Control Buck / Boost Converter
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Most Advanced Digital Wireless Two Wheeler Security System with Remote
Starter
Multi Boiler Management & Controller with Auto Failure Indicator – Pcs
Multi Zone Fire Alarming Control Panel with Zone Location, Auto Dialer to
Fire Station
Multiple Programmable Batch Event Counter with Conveyor Belt
Arrangement
Neural Implementation of Energy Consumption in Power Distribution
People / Patient Tracking and Management System for Hospital / Factory
using Wireless Network System
Pressure Sensor and Trigger System for industrial Application
Production Automation and Control, Innovative Future Manufacturing
Public Address System Controller - Automated Timing & Music System
Microcontroller to Microcontroller Communication with LCD
Radio Frequency Foot Pressure Measuring System
Remote Camera Controller for Security Application using Servo Motor
Remote Wireless Wind Speed Meter for Modern Remote Weather Monitoring
Station with Digital Read Out
Research of Remote Real Time Monitor System for Electromechanical
Equipments based on Internet
Robust Environmental Sound Recognition for Home Automation
Room Humidity Checking with Air Conditioner Cooling Effect Controlling
System
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Route Selection for Vehicle Navigation and Control
Sea Navigation for Rescue Operations using Microcontroller
Simultaneous Localization, Mapping and Moving Object Tracking
Single Phase integral Cycle Inverter using Mosfet
Thyristor Controlled Heating System with Model
Towards a Unified Location Tracking System for Heterogeneous Industrial
Environments
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
DOMAINS COVERED
Power Quality and Harmonics filters | ZVS and ZCS
converters | Improved power quality converters and inverters
| Power factor corrected AC-DC converters | Switching mode
converters | Multilevel inverters | Fuel cell based converters |
Power system based converters | Active Power Filtering
Concept | Switched Mode Power Supplies - SMPS |
Uninterruptible Power Supply - UPS | Solar Photo Voltaic
Power Conversion System - Solar Energy | Soft Switching
converters - ZVS and ZCS Converters | Matrix Converter for
Frequency Changing Power Supply Application | DC to DC
Converters
Chopper drive for DC motor - Two Quadrant operation / Four Quadrant
operation
DC Motor drive (Armature voltage control) - Single phase input-DC output
Protective Relay - DF/DT protection
Speed control by slip power recovery scheme
Thyristorized power controller for industrial application
Multi Level Inverter-Single phase
Robust PID controller for DC motor
PWM based DC drive for bi-directional speed control using single
potentiometer
Resonant inverter
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Fuzzy controller design for DC Motor speed control system
Protective relay-V, I, V / F protection
Protective relay-Impedance relay
Voltage regulation of alternator
Modeling & Analysis of a fuzzy logic based unified Power Controller
A Novel thyristor based BLDC
Linear induction Motor with V/F drive
Power converter using control circuits
Electric drives Modeling and their control
Speed Control of DC motor using PWM technique
Speed synchronization of two DC motors
TRIAC based Speed Control Of Induction Motor
Automatic load sharing of transformers
Electrical Apparatus Control System In A Plant Using RF Wireless
Communication
Microcontroller based Zero Voltage switching resonant converter
Microcontroller based quasi resonant converter
Microcontroller based PWM converter with minimum Hardware
PWM inverter with minimum Hardware
Microcontroller based measurement of flow, color, position and level
Energy saving in Single Phase induction motor using A.C Chopper
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Microcontroller based Generator protection
Microcontroller based induction heating
Microcontroller based Transformer Protection
Microcontroller based Induction motor protection
Microcontroller based Thyristor Controlled Reactor
Microcontroller based measurement of current, voltage, power factor and
temperature etc
Resonant inverter
Thyristor Switched Capacitor scheme for fast changing industrial loads
Harmonic Reduction using Diode Clamped Multilevel Inverter
Noiseless speed control of AC Servo Motor using PWM Inverter
Third Harmonic auxiliary commutated Current Source Inverter with
minimum hardware
Solid state transfer switch for custom power system
Harmonic reduction using Capacitor Clamped Multilevel Inverter
L-type High Frequency Quasi Resonant Zero Current Switch
M-type High Frequency Quasi Resonant Switch
Soft starter and energy saver for 1-phase Induction Motor using
Bidirectional Voltage Regulator
Static excitation for large Alternator with fast response to improve Dynamic
Stability
Performance of DC motor fed from Quasi Resonant Converter
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Integral Cycle Controlled Inverter fed Induction Motor drive
FC-TCR type Static VAR generator for FACTS
High frequency Zero Voltage Switching Resonant Converter
ZVS Multi-resonant Quasi Resonant Converter
Noiseless speed control of PM DC motor using PWM Converter
SCADA for large scale power system
Data Acquisition System for large electrical drive
Four switch inverter for 3-phase BLDC motor
Two input full bridge DC TO DC Converter for selective Harmonic
elimination
Severless DC to DC Boost Converter using Comparator
Two input Full Bridge Inverter with improved output waveform
A New Simplified Multilevel Inverter topology for DC-AC Conversion
Boost DC-AC Inverter: A New Control Strategy
Electrical Network Automation & Communication Systems
Energy Saver for Auditoriums
Fault Tolerant Neuro Controlled Level Processing Panel
IGBT based PWM Inverter using Microcontroller
Measurement of the Radio Frequency Signal of A Circuit-Breaker
Programmable Temperature Control System
Power Line Fault Analysis, Monitoring and Load Sharing System
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Remote Access Control and Automation System for Electrical Appliances
using Telephone Line
Centralized Electricity Billing Through Telephone Line
Electricity Billing System Automation with IRC Reader
Fault Location using Remote Connection, with Immediate Voice Feedback
Energy Management System for Pulse Output Meters
Programmable active power factor improvement scheme for single phase
switch mode boost rectifiers
SVPWM Techniques and Applications in HTS PMSM Machines Control
Space vector pulse width modulation of three level inverter extending
operation into over modulation region
Impact of Reactive Power in Power Evacuation from Wind Turbines
Transient Fault Response of Grid Connected Wind Electric Generators
PMSM Speed Sensor less Direct Torque Control Based on EKF
Zbus Transmission Network Cost Allocation
Electromagnetic Interference with Electronic apparatus by switching
surges in GIS – Cable system
Predictive Valley Current Control for Two Inductor Boost Converter
A Modular Fuel Cell, Modular DC–DC Converter Concept for High
Performance and Enhanced Reliability
A Simple Control Scheme for Single-Phase Shunt Active Power Filter with
Fuzzy Logic Based DC Bus Voltage Controller
A 24-pulse AC-DC converter employing a pulse doubling technique for
vector controlled induction motor drives
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Modeling of three levels converters used in Electric Traction
Harmonic Current Reduction in Railway System
Second Order Sliding Mode for Traction Control in Ride-by-Wire Sport
Motorcycles
A Modular Strategy for Control and Voltage Balancing of Cascaded H-
Bridge Rectifiers
Development of a Slip and Slide Simulator for Electric Locomotive Based
on Inverter Controlled Induction Motor
Power Quality Analysis of Traction Supply Systems with High Speed Train
using Active Filters to Reduce THD in Traction Systems
Direct torque with fuzzy logic ripple reduction based stator flux vector
control
Optimized Discontinuous PWM Algorithm With Variable Load Power Factor
For Multilevel Inverters
Novel Direct Power Control for Compensating Voltage Unbalance and Load
Fluctuations in PWM Rectifiers
New DTC Control Scheme for Induction Motors fed with a Three-level
Inverter
Sensor less Speed Estimation of Induction Motor in a Direct Torque Control
System
MRAS based Speed Control of sensorless Induction Motor Drives
A Novel Technique for Distribution System Feeder reconfiguration
Power Upgrading of Transmission Line by Combining AC–DC Transmission
A Single Phase Z-Source Cycloconverter (SPZC) Based on Single Phase
Matrix Converter (SPMC) Topology with Safe Commutation Strategy
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Simulation of a Space Vector PWM Controller for a Three-Level Voltage Fed
Inverter Motor Drive
Optimal Intelligent Controller for Matrix Converter Induction Motor Drive
System
3-Phase Power Factor Correction, Using Vienna Rectifier Approach &
Modular Construction for Improved Overall Performance, Efficiency &
Reliability
A Comparative Study between two Strategies for Four-Wire Shunt Active
Filter Control
A Simple New Control Technique For Unified Power Quality Conditioner
(UPQC)
Direct Power Control for three-phase PWM rectifier with active filtering
function
Space Vector Control of 5-phase PMSM supplied by 5 H-bridge VSIs
Simulation and Modeling of a Dynamic Voltage Restorer.
Dynamic modeling, design and simulation of a wind/fuel cell/ultra-
capacitor-based hybrid power generation system
Sensor less Control of Interior Permanent-Magnet Machine Drives With
Zero Phase Lag Position Estimation
Torque-Ripple Minimization in Switched Reluctance Machines Over a Wide
Speed Range
Torque-Ripple Minimization in Switched Reluctance Motors Using Adaptive
Fuzzy Control
Possibility of Power Tapping From Composite AC–DC Power Transmission
Lines
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Prediction-based ripple reduction in Direct Torque Control of an induction
machine
Artificial Neural Network Controlled Shunt Active Power Filter
Three-phase, power quality improvement ac/dc converters
DTC-SVM Scheme for Induction Motors Fed with a Three-level Inverter
Real and Reactive Power Coordination for a Unified Power Flow Controller
Control and Analysis of a Unified Power Flow Controller
Performance Analysis of Fuzzy Logic Based Unified Power Flow Controller
Direct Power Control Strategies for Multilevel Inverter Based Custom Power
Devices
Switching Losses and Harmonic Investigations in Multilevel Inverters
Modeling and Control of a Fuel Cell Based Z-Source Converter
Fuzzy Control of Fuel Cell Distributed Generation Systems
Intelligent Control of Fuel Cell Distributed Generation Systems
Modeling and Control of Fuel Cell Based Distributed Generation Systems in
a Standalone AC Power Supply
A Low-Cost Inverter for Domestic Fuel Cell Applications
Analysis and Design Considerations of Zero-Voltage and Zero-Current
Switching (ZVZCS) Full-Bridge PWM Converters
A Fast Space-Vector Modulation Algorithm for Multilevel Three-Phase
Converters
Fuzzy Logic Controller Based Three-phase Shunt Active Filter for Line
Harmonics Reduction
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
A Fuzzy-Controlled Active Front-End Rectifier with Current Harmonic
Filtering Characteristics and Minimum Sensing Variables
The use of Facts devices in disturbed Power Systems-Modeling, Interface,
and Case Study
A Novel Maximum Power Point Tracker for PV Panels Using Switching
Frequency Modulation
Single Phase Power Factor Correction: A Survey
Modified SVPWM Algorithm for Three Levels VSI With Synchronized and
Symmetrical Waveforms
A Closed Loop Observer for Rotor Flux Estimation in Induction Machines
Fuzzy Logic Speed Control of a DC Motor
A New Topology for Unipolar Brushless DC Motor Drive with High Power
Factor
The Discontinuous Conduction Mode Sepic and Cuk Power Factor
Preregulators: Analysis and Design
Development of Low Cost Multi Phase Brushless DC (BLDC) Motors with
Unipolar Current Excitations
Direct Torque Control of Five-Phase Induction Motor Using Space Vector
Modulation with Harmonics Elimination and Optimal Switching Sequence
Optimal Placement of Shunt Connected Facts Device in a Series
Compensated Long Transmission Line
PSCAD/EMTDC Simulation of Unified Series-Shunt Compensator for Power
Quality Improvement
Effects of Power Oscillations Damping Controllers by UPFC Using Different
Fault Conditions
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Transient Stability Improvement of SMIB With Unified Power Flow
Controller
Control of Grid-interfacing Inverters with Integrated Voltage Unbalance
Correction
Three-Leg VSC and a Transformer Based Three-Phase Four-Wire
DSTATCOM for Distribution Systems
Modeling of a DSTATCOM with Ultra Capacitor Energy Storage for Power
Distribution System Applications
Control strategies for distribution static compensator for power quality
improvement
Optimization of PI Coefficients in DSTATCOM Nonlinear Controller for
Regulating DC Voltage using Genetic Algorithm
Operation and Control of Single Phase Micro Sources in a Utility Connected
Grid
Voltage Flicker Compensation using STATCOM
A Novel Voltage-Boosting Converter with Passive Voltage Clamping
Pulse Width Modulated Buck-Boost Five-Level Current Source Inverters
Wound Rotor Induction Generator With Sensor less Control and Integrated
Active Filter for Feeding Nonlinear Loads in a Stand-Alone Grid
Optimum Control of Selective and Total Harmonic Distortion in Current and
Voltage Under Non sinusoidal Conditions
Filter based non-invasive control of chaos in Buck converter
Voltage and Energy Utilization Enhancement in a Stand-alone WECS Using
a Fuzzy Logic Controlled SPWM Converter Interface Scheme
Hybrid Cascaded Multilevel Inverter with PWM Control Method
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
Fuzzy Logic Based Control of Variable Speed Induction Machine wind
Generation System
Control of Three Phase, Four-Wire PWM Rectifier
Indirect Matrix Converter Based on Investigations of Field-oriented control
for Induction Motor
Two-stage Matrix Converter Used in Wind Power Generation System
Application Research
Development of a Grid – Connected WIND/PV/BESS Hybrid Distributed
Generation System
Improvement of Voltage Stability and Reduce Power System Losses by
Optimal GA based Allocation of Multi-type FACTS Devices
Impacts of AC Generators and DSTATCOM Devices on the Dynamic
Performance of Distribution Systems
Digital Signal Controllers Improve Efficiency for Solar power Inverters
The Use of Matrix Converters in Direct Torque Control of Induction Machines
Analysis of Different Schemes of Matrix Converter with Maximum Voltage
Conversion Ratio
Power Flow Control with UPFC in Power Transmission System
Wind driven self excited induction generator with voltage and frequency
regulated by a reduced rating voltage source inverter
A new fuzzy color correlated impulse noise reduction method
A unified three phase transformer model for distribution load flow
calculations
Power flow control with UPFC in power transmission system
Experiment on Fractional Frequency Transmission System
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
A space Vector Modulation Scheme to Reduce Common Mode Voltage for
Cascade Multilevel Inverters
Analysis, Design and Implementation of modified single phase inverter
Switching Frequency Imposition and Ripple Reduction in DTC Drives by
Using Multilevel Converter
Simultaneous Phase Balancing at Substations and Switches with Time-
Varying Load Patterns
Consideration of Input Parameter Uncertainties in Load Flow Solution of
Three-Phase Unbalanced Radial Distribution System
A Three-Phase Power Flow Method For Real-Time Distribution System Analysis
Novel Method of Load Compensation under Unbalanced & Distorted Voltages
Development of Three-Phase Unbalanced Power Flow Using PV and PQ
Models for Distributed Generation and Study of the Impact of DG Models
Position Control Design Project (PD Controller – Root – Locus Design)
Multi-Input Inverter for Grid-Connected Hybrid PV/Wind Power System
Unbalanced Three-Phase Distribution System Load-Flow Studies Including
Induction Machines
Power Flow Control in a Distribution System Through an Inverter Interfaced
Distributed Generator
A simple Circuit-Oriented model for predicting six-phase induction machine
performances
Photovoltaic-Battery-Powered DC Bus System for Common Portable
Electronic Devices
A Fast and Accurate Maximum Power Point Tracker for PV Systems
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
FINAL YEAR PROJECTS
2013 - 2014
Why NCCT
Complete Guidance * On time Completion *
Excellent Support
Multi platform Training * Flexibility
PROJECTS SUPPORTS & DELIVERABLES
Project Abstracts & IEEE Paper
Project Block Diagram & Circuit Diagram
Datasheets and Manuals
PPT & Review Details Guidance
Project Report Guidance
Working Procedure & Screen Shots
Materials & Reference Books in DVD
Project Completion Certificate
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
IEEE DOMAINS
IEEE TRANSACTIONS
PROJECTS ON
AUTOMATIC CONTROL
BIOMEDICAL ENGINEERING
BROADCASTING
COMMUNICATIONS
CONSUMER ELECTRONICS
CONTROL SYSTEMS
ENERGY CONVERSION
FUZZY SYSTEMS
INDUSTRIAL ELECTRONICS
INSTRUMENTATION AND MEASUREMENT
INTELLIGENT TRANSPORTATION SYSTEMS
POWER ELECTRONICS
POWER SYSTEMS
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
ROBOTICS
VLSI SYSTEMS
WIRELESS COMMUNICATIONS
MICROELECTROMECHANICAL SYSTEMS
MECHATRONICS
We are offering Wide Range of
Projects in IEEE Domains including
Embedded Microcontroller Kits,
Models
Any IEEE & NON IEEE Projects in
any Domain / any Application can be
Implemented
Do you have any Innovative /
Challenging Projects or Concepts
needs to be Developed, We are here
to do it…
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
EMBEDDED PROJECT
DOMAINS
BIO MEDICAL
BIO METRICS - FINGER PRINT, RFID, VOICE
ROBOTICS
SECURITY SYSTEM
TELE COMMUNICATION
COMMUNICATION
UNWIRED - ZIGBEE, RFID, GSM, RF, BLUETOOTH,
WIFI, GPS
WIRED - RS232, RS485, USB, CAN
ELECTRICAL
JAMMERS
MOTORS, DRIVES & CONTROLS
NETWORKING
POWER ELECTRONICS - DC TO DC, BUCK BOOST,
INVERTERS, POWER FACTOR, CONVERTERS,
HARMONICS & FILTERS, IMPEDANCE
GPS
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
TOUCH SCREEN
ULTRASONIC
ACCESS CONTROL
INTELLIGENT TRANSPORT SYSTEM
SENSORS NETWORK - WIRELESS SENSORS NETWORK
AUTOMATION AND CONTROL
AUTOMOTIVE
ENERGY MANAGEMENT
POWER SYSTEMS
CONSUMER ELECTRONICS
INDUSTRIAL ELECTRONICS
ENCRYPTION AND DECRYPTION
CAN / DAS / DCS / PLC / SCADA
ARTIFICIAL INTELLIGENCE / FUZZY LOGIC / NEURAL
NETWORKS
IVRS / SMS
INSTRUMENTATION
LEVEL & ANALYTICAL INSTRUMENTATION
MEASUREMENT AND CONTROL SYSTEM
PROCESS CONTROL
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
WEIGHING SYSTEM
MECHANICAL
MECHATRONICS
MEMS
WINDMILL
SOLAR
THERMAL
AGRICULTURAL
Any IEEE & NON IEEE Projects in any
Domain / any Application can be
Implemented
Do you have any Innovative / Challenging
Projects or Concepts needs to be
Developed, We are here to do it…
NCCT
Final Year Projects
Promise for the Best Projects
PROJECTS 2013-14
NCCT, 109, 2nd
Floor, Bombay Flats, Nungambakkam High Road,
Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank,
Above IOB, Near Taj Hotel
www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com
044-2823 5816, 98411 93224, 89393 63501
MICROCONTROLLERS - 8051 from Atmel / ARM - ARM7, ARM9 /
Microchip - PIC 16x, DSPIC / Atmel AVR
DSP - Texas Instruments - MSC1210xx, MSP430xx / Analog
Devices - ADSP, Blackfin
VLSI - Cypress – PsoC / Xilinx - FPGAs & CPLDs / Altera -
FPGAs & CPLDs
Peripheral Interface: CAN, USB, Ethernet, SPI, I2C, PS/2, RS232,
RS485
Wireless: RF Tx Rx, GSM/GPRS, GPS, Bluetooth, IrDA, RFID,
Zigbee
Server - Intel Pentium Dual Core Server Running Windows
Clients - Intel & AMD powered Client PC(s) running Windows
XP, Linux
Networking - Routers, Switches and Wireless Access Points
Telecommunication Modules & Devices, CAT 5 Cables, Cross
Over Cables, Modems

2013 14 embedded systems project list - non ieee based embedded - electronics - electrical - power electronics - 2013-14

  • 1.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 NCCT Embedded System Projects NCCTPROMISE FOR THE BEST PROJECTS FINAL YEAR PROJECTS 2013-2014 EMBEDDED SYSTEM PROJECTS * MICROCONTROLLERS * * VLSI * DSP * MATLAB * 109, 2nd Floor, Bombay Flats, Nungambakkam High Road Nungambakkam, Chennai – 34 Near Ganpat Hotel, Above IOB, Next to ICICI www.ncct.in, www.ieeeprojects.net ncctchennai@gmail.com, projects@ncct.in 044-28235816, 98411 93224, 89393 63501
  • 2.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 EMBEDDED SYSTEM PROJECTS PROJECT AREAS  MICROCONTROLLER PROJECTS  VLSI PROJECTS  DSP PROJECTS  MATLAB PROJECTS  BIO MEDICAL PROJECTS  POWER SYSTEM PROJECTS  POWER ELECTRONICS PROJECTS  ELECTRICAL PROJECTS  TELE COMMUNICATION PROJECTS  BIO METRICS PROJECTS
  • 3.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501  DIGITAL SIGNAL CONTROLLER PROJECTS  MOTORS, DRIVES & CONTROL PROJECTS  COMMUNICATION PROJECTS  INSTRUMENTATION PROJECTS  MECHANICAL PROJECTS  MEMS / MECHATRONICS PROJECTS  THERMAL ENGINEERING PROJECTS  AUTOMOBILE / AUTOMOTIVE PROJECTS  CONTROL ENGINEERING PROJECTS  APPLIED ELECTRONICS PROJECTS
  • 4.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 FINAL YEAR PROJECTS 2013 - 2014 Why NCCT Complete Guidance * On time Completion * Excellent Support Multi platform Training * Flexibility PROJECTS SUPPORTS & DELIVERABLES Project Abstracts & IEEE Paper Project Block Diagram & Circuit Diagram Datasheets and Manuals PPT & Review Details Guidance Project Report Guidance Working Procedure & Screen Shots Materials & Reference Books in DVD Project Completion Certificate
  • 5.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 FINAL YEAR PROJECTS American Sign Language based Hand Gesture Recognition & Performance Energy Consumption – Energy Meter with Automatic Usage Monitoring and Alarm System - Extra Power Requisition System Driver Fatigue Accident Prevention using Eye Blink Sensor Three Dimensional Password Authentication in ATM Networks Library Robot - Path Guiding Robotic System with Artificial Intelligence using Microcontroller GPS and GSM based Biomedical Wearable Device for Remote Monitoring of Physiological Signals Zigbee enabled Pantry Updation - Wireless Network and Data Synchronization using Hand Held Device - Zigbee enabled 2 Way Implementation of Automated Multi Story Car Parking Boatbot – Design & Implementation Automatic Touch Screen based Vehicle Driving System Staircase Climbing Robot – Implemented in Multi-Domain Approach Alternative Energy Sources - Foot Power Generation Helping Hand for Disabled Person - Hand Gripper Robot Robotic Vision and Color Identification System with Solenoid Arm for Colored Material Separation Soil Moisture Content based Automatic Motor Starter for Irrigation Purpose using Solar Energy
  • 6.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Intelligent Train Engines and Hi Jack Control System or RF – Vehicle Hi Jack – Train Advanced Collision Avoidance Solar Powered Robot Car with Automatic Charger - Seek for Sun Light and Charges when the Battery Goes Down ASSIST - Automated System for Surgical Instrument and Sponge Tracking Providing Group Tour Guide by RFIDs and Wireless Sensor Networks Coin Operated Cell Phone Power Charger Rail Track Inspector Cockpit White Box Trivector Meter – Design & Implementation Power Failure Auto Announcement System at Customer Place from E.B Station Eye Ball Controlled Automatic Wheel Chair A Security Framework in RFID based License Plate Voice Operated & Head Movement Control Intelli Robotic Wheel Chair For Specialty Operations Density Traffic Analyzer - Traffic Control System for Ambulance Service Design & Implementation Flying Robot with Search and Rescue Feature for an Accident Area or Natural Disaster Area Botrobo – Tanker & Sound Detecting Robot Ultrasonic based Vehicle Parking Guidance System Medi Kit - Advanced Home Care System for Elderly Person Patients with Remote & Auto Dialer with BP
  • 7.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Advanced Helmet for Bikes for Security Measures Iglass for Visually Impaired People Robotic Assisted Operation Theatre with Voice Control Boarding School Students Monitoring Systems (E-Id) using RFID Intelligent Fuzzy Control Guided Vehicle with Collision Prevention – Ultrasonic based Distance Monitoring and Fuzzy based Collision Avoidance I Protect – Integrated Vehicle Tracking and Communication System with Vehicle Command Unit – An Ultimate tool for Tracking, Real Time Monitoring Multisensor - Smoke, Fire, Temperature, Gas, Metal & Intruder based Security Robot - Zigbee Wireless Based Railway Bridge Damage or Track Fault Notification with Alarm Systems Intelligent Transport System using Wireless Technologies Ultrasonic based Path Planning for the Blind Person Intelligent System for Hazardous Gas, Human Detection and Temperature Monitor Control Using GSM Technology Alcohol Breath Analyzer / Alcohol Sensing Vehicle Starter System Advanced Robotic Floor Cleaner with Wall Sensors and RF Remote Controller for Systematic Cleaning Effective Solar Tracking System for Optimal Power Generation and Lift Operating Through Solar Power Touch Screen based Wheel Chair Implementation Anti Collision System in Railway & Location Monitoring using GSM and GPS – Intelligent Train System with GPS
  • 8.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Smart Tanker Robot for Security Operations in the Protected Area with Wireless Secured Communication Intelligent Train System – Automation, Collision Avoidance, Signal / Unmanned Controlling, Moving Message Display, Voice Annunciation Voice Recognition for Controlling Color Television Wireless Remote Motor Starter with Acknowledgement using Solar Energy Power for Agricultural Application IVRS based Electronics Televoting with Response & Feedback Intelli Robotic Wheel Chair for Specialty Operations with Key Operations and Advanced Path Planning Routing System Fuzzy Elevators - Group Elevator Scheduling With Advance Information for Normal and Emergency Modes in Building Management Systems Alive Human Being Detector in War Fields / Affected Areas using WAP with Model & Camera Design and Implementation of a Multiplex Parking System and Toll Collection based on Time Management Techniques for Identifying the Parking Violation based on Expiry Time Distance Protection – Power Theft Identification & Location Detection Judo Coat – Design & Implementation Person Identification System – RF ID System used for Tracking & Authentication Purposes Applying Back Scattering Technology Wireless AI based Fire Fighting Robot for Relief Operations with Two Way Communication Advanced GSM based Theft Vehicle Identifying System using Remote PC Smart Solar Tracking System for Optimal Power Generation
  • 9.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Smart Wind Mill based Power Generation System for Mobile Charging Zigbee – College / Industry – Wireless Network and Data Synchronization using Hand Held Device Development of Smart Notice Board – Active Information Display Systems Mobile Robot -- Wireless Ai based Intelli Mobile Robot for Multi Specialty Operations Remote Controlled Water Splash Robot for Gardening Wireless Intrusion Detection, Electronic Security & Control System using Central Monitoring System Design and Implementation of Railway Automation System with Sensors Network Fingerprint and RFID based Multi usage Card System - Design and Implementation Microcontroller based Portable Computer Aided Drug Dispenser Robot Temple Security System -- Hi End Temple Security System with Frequency Jammer RF based Code Modulation – Decryption & Encryption for Secured Wireless Communication with OFDM Voice Controlled & Activated Wheel Chair Robot for Physically Challenged Anesthesia Control System using Infusion Pump with Heart Beat Monitoring System Intelligent Train System with Collision Avoidance & Route Tracking Cell Phone Jammer - Implementation of Highly Effective Mobile Cell Phone Jammer
  • 10.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Automated Car Parking System with Automatic Gate Opener Coach Location Monitoring and Identification Smart AI based Image Capturing Robot with Sensors Network Cell Phone Controlled Ai based Five Axis Robot for Multi Specialty Operations IVRS based Robot Control with Response & Feed Back Multiple Starters with Over Load and Low High Voltage Protection with Multi Parameter Monitoring RF based Intelligent Handheld Multi-Parameter Monitoring System with LCD Display and DAS Wireless Hybrid SCADA for Power Station Substation Monitoring & Automation Dish Position Controlling and Monitoring System Used for Radar & Other Telecommunication Applications Intelligent Power Sharing of Transformers with Auto Protection Prepaid Electricity Billing RF 2 Way Automation using Contact Less EMPCR Card & Reader with Voice Annunciation - IVRS Energy Saving System using Thyristor Controllers Finger Print based Physical Access Control Vehicle Immobilizer RF enabled Energy Meter Digitization & Automation and Automatic Utility Transfer with Two Way Communication Speed Control of a Linear Induction Motor V/F Technique Fuzzy based Speed Control of Induction Motor using Microcontroller Noise Less Speed Control of DC Motor using PWM Converter
  • 11.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Natural Failure Protector PH Measurement Implementation of Secured Black Box in Aircraft Snake Robot – Serpentine Robot for Industrial Inspection and Surveillance Blue Tooth Jammer for Security Application Artificial Intelligence based Security for Telephone Exchange with SCADA Microwave Spy Camera Jammer IVRS based Students Mark Annunciation for their Parents GPS based Active Fleet Management- Featured Rich Automatic Vehicle Location Tracking, Collision Avoidance with Dual Communication using RF Wireless Mouse Movement Recognition with VGA Display using Touch Screen Self Path Identification and Navigation Robot using Touch Screen Infant Incubator Parameter Sensing & Monitoring through ZIGBEE Wireless Sleep and Wake Categorization with ECG and Respiratory Effort Signals
  • 12.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 EMBEDDED PROJECTS DOMAIN WISE BIOMEDICAL PROJECTS ASSIST - Automated System for Surgical Instrument and Sponge Tracking A Portable Wireless Eye Movement-Controlled Human-Computer Interface for the Disabled ICU - Wearable Biomedical Sensors & Systems -- Wearable Body Sensor Networks with BP ICU - Smart Medicare Patient Monitoring System Ultrasonic based Path Planning for the Blind Person Anesthesia Control System using Infusion Pump with Heart Beat Monitoring System Heart Beat Rate Monitoring System - RF based Wireless Heart Beat Rate Monitoring System Peritoneal Dialysis – Design and Implementation of Blood Purification System Blood Pressure Analysis on Treadmill Environment Blind Stick with Audio & Video Interface
  • 13.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Infant Monitoring System Smash – Smart Medical Automated System Handheld Device with Wireless Technology Monitoring System for Premature Babies Eyeball Sensor for Automatic Wheel Chair Movement for Paralyzed Patients Hand Talk – Assistive Technology for the Dumb Hospital Automation with Patient Monitoring Advanced Home Care System for Patients (Adhoc) Glucose Level Monitoring and Predicting System Intelligent “Prescription Drugs Abuse” and Addiction Control System using RF / Proximity Cards A Wireless Bio-Implantable Device for Monitoring Vital Body Parameters of Transgetic Mice with Mems Technology Advanced Remote Temperature and Heart Rate Monitoring System Artificial Hands for Physically Disabled Artificial Weaning Analyzer using Neural Network / Neural Network based Vital Sign Monitor and Control Bed Side Patient Monitoring System with BP & RF Blind Identification and Equalization of FIR – Finite Impulse Response Complete Body Scanning System with BP & RF Defibrillator, External – ECG Monitoring Device While Transit IGlass for Visually Impaired
  • 14.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Intelligent Mobile based Patient Monitoring System Measurement of Inhaled / Exhaled Respiratory System Medi Kit - Advanced Home Care System for Elderly Person Patients with Remote & Auto Dialer with BP Monitoring Functional Arm Movement for Home based Therapy After Stroke Wireless Telemetry for Line Data Transmission on a Mobile Unit Zigbee based Medi Care - Patient Monitoring System with WAP RF BP
  • 15.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 INTELLIGENT TRANSPORT SYTEM Vehicle Safety Speed Controller under Driver Fatigue using Eye Blink Sensor Intelligent Transport System using Wireless Technologies Density Traffic Analyzer - Traffic Control System for Ambulance Service Design & Implementation Rail Track Inspector Coach Location Monitoring and Identification Design and Implementation of Railway Automation System with Sensors Network Cockpit White Box Parameters Checking Before Take Off Testing of Aircraft Box and Accessories before Take off Bidirectional Communication Aircraft Landing System – ALS Data Acquiring System for Airports Radio-Controlled Surveillance System for Borders and Restricted Areas – Flying Helicopter Ariel View System Real Time Mid-Air Fight Collision Avoidance System with Auto Warning & Flight Id, Position, Monitoring through Radio Frequency Link & PC Auto Flight Pilot Simulation Applied in Real Time & Remote Monitoring using High Speed RF Data Link for UAV / Flight
  • 16.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Wireless Sensor Network based Model for Secure Railway Operations – Performance, Computing & Communication Conference Advanced Train Compartment Information Display System for Modern Railways Automatic Railway Gate Signaling Simulator & Controller Automated & Unmanned Control System of Railway crossing using Wireless IR Sensor Model Railroad Automated Track Inspection Car Blind Spot Location Identification - Bus Alert System for Vision Impaired People Vehicle Emission -- Automated Vehicle Emission Testing (Co2) and Issuing online Certificate Traffic Control System for Effective Ambulance Service – Design & Implementation Ticket Dispenser & Entry Lane Control Tower for Parking System Intelli Public Transport System – Bus Status – Arriving / Leaving / Breakdown indication System in the Bus Stop Intelligent E-Police & Traffic Violation Automatic Recorder System for Modern City Traffic using most Advanced Wireless Sensor Technology in Real Time Intelligent, Automatic & Modern Traffic Light Controller based On Traffic Density Interactive Environmental Air Pollution Monitoring Automatic Phone Dialing System Automated Accident Identification, Detection via Vibration Sensors using RF Technology
  • 17.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Automated Bus Ticket Tariff Calculation using Identification of Destination Point Automated Car Parking System with Automatic Gate Opener Advanced Digital Wireless Entry / Exit Register System for Time Control in Bus Stand with Remote Monitoring using PC An Enhanced Parking Lot Service Model using Wireless Sensor Network Application of Fuzzy Logic in Intelligent Traffic Control Systems Automatic Auto Head Lamp Dim - Dip, Bright Illumination, Brightness Control System of A Vehicle
  • 18.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 ROBOTICS PROJECTS Robotics & Communication Projects – Wired & Unwired ROBOTICS PROJECT WITH REAL TIME MECHANICAL MODELS Staircase Climbing Robot – Implemented in Multi-Domain Approach Helping Hand for Disabled Person - Hand Gripper Robot Library Robot - Path Guiding Robotic System with Artificial Intelligence using Microcontroller BotRobo – Tanker & Sound Detecting Robot Advanced Collision Avoidance Solar Powered Robot Car with Automatic Charger - Seek for Sun Light and Charges when the Battery Goes Down Mobile Robot -- Wireless Ai based Intelli Mobile Robot for Multi Specialty Operations Smart Tanker Robot for Security Operations in the Protected Area with Wireless Secured Communication Multisensor - Smoke, Fire, Temperature, Gas, Metal & Intruder based Security Robot – Zigbee
  • 19.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Voice Controlled & Activated Wheel Chair Robot for Physically Challenged Intelli Robotic Wheel Chair for Specialty Operations with Key Operations and Advanced Path Planning Routing System Alive Human Being Detector in War Fields / Affected Areas using WAP with Model & Camera An intelligent Mobile Robot Navigation Technique using RFID Technology Robotic Vision and Color Identification System with Solenoid Arm for Colored Material Separation Robot with Search and Rescue Feature for an Accident Area or Natural Disaster Area Boatbot – Design & Implementation Advanced Robotic Vacuum Cleaner with Wall Sensors and RF Remote Controller for Systematic Cleaning Snake Robot – Serpentine Robot for Industrial Inspection and Surveillance SMS based Controller – Robot Control Remote Controlled Water Splash Robot for Gardening RF Remote based Fire Fighting Robot for Relief Operations with Auto Dialer Facility Smart AI based Image Capturing Robot with Sensors Network Cell Phone Controlled Ai based Five Axis Robot for Multi Specialty Operations PC Controlled Advanced Wireless Robot Vehicle with Camera for Bomb Detection / Human Surveillance Application for Dangerous Areas The OmniTread Serpentine Robot for Industrial Inspection and Surveillance
  • 20.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Design & Implementation of Grass Shredding Robot Autonomous Robot with Obstacle Avoidance, Drive Wheel Synchronization and Line Tracking Capability Wall Follower Robot with the Help of Multiple Artificial Eyes Medical Robot – Design & Implementation PCB Drilling System using Robot Known as Cartesian Robot Remote Robot Control System based on DTMF of Mobile Phone Sensor Rich Tele-Operational Mode Robotic Bush Fire Fighting Robotics Assistance to Protection Services: Users Requirements Motion Detection, Robotics Guidance and Proximity Sensing using Ultrasonic Technology Intelligent Escort Robot Moving Together with Human Towards the Autonomous Navigation of intelligent Robots for Risky Interventions Testing Multi-Robot Systems for Operation in Risky Environments The Watchdog - Robot inspector for An Area That Is Prone to intruders and Possible Fire Hazards Usability Analysis of a PDA-based User interface for Mobile Robot Teleoperation Design and Development of Line Follower Robot using the Principle of Reflection of Light Rays Dynamic Robot Networks for Search and Rescue Operations Communication Issues in Distributed Multisensory Robotics
  • 21.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Walking Robot for Impaired Peoples – Muscle Weakness An Autonomous Assistant Robot for Book Manipulation in a Library Self Guided Pedestrain Crossing Robot for Blinds and Elderly Persons – Walking Stick Electromagnetic Magnetic Type Pick and Place Robot for Materials Handling A Robust Architecture for Autonomous Robot Navigation and Control A Mobile Platform for Nursing Robots Rescue Robotics for Biomedical and Life Saving with Artificial Intelligence A Novel Robot System for Surface inspection and Diameter Measurement of Large Size Pipes Advanced Human Detecting and Self-Guided Robotic Waiter for Hotels Self Guided Object Tracking & Following Mobile Robot for Factories & Mining Areas Walking Robot with Hyper Line Tracker using IR Sensors for Uneven Terrain Vision Guided Law Enforcement Robotic Helicopters – A Revolutionary New Interface Advanced Miniature based Wireless Camera Monitoring System for Wildlife Application An Assistive Robotic Device that CAN Synchronize to the Pelvic Motion During Human Gait Training Automatic Collision Avoidance and Real Time Distance Monitoring
  • 22.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Automatic, Advanced Robotic Arm for Welding in Automated Assembly Line Cell Phone based Materials Handling Robot Cell Phone based Robot Direction & Alive Human Detecting Cell Phone Controlled Fire Fighting Robot for Relief Operations Cell Phone Controlled Smart Image Capturing Robot Collision Avoidance By the Fusion of Different Beam-Width Ultrasonic Sensors & Rescue Robot using PIR Sensor Design & Implementation of Real Time Security Guard Robot using GSM CDMA Networking Design & Development of Obstacle Sensing and Object Guiding Robot Distance Monitoring & Object Detecting Robot By RF Technology Distributed Sensors Fusion for Object Position Estimation and Approaching By Robotic System Drishti: An Integrated Navigation System for Visually Impaired &Disabled Electronic Nose for Robotics Fire Ball for Fire Extinguishing with Robot Model Fire Sensing Robot with Auto Dial-Up Facility & No Extinguisher Gas Detection Robot for Atomic Power Station Human Step Rehabilitation using A Robot Attached to the Pelvis Hyper Line Tracking Control of Robotic Car using Track Sensors for Industrial Application
  • 23.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Intelligent Fire Sprinkler System Fire Fighting Robo using Ultrasonic Technology IVRS based Control of Alive Human Being Detector with Voice Feedback Motion Activated Wireless Video Capturing System for Security Wild Life Application Path Guiding Robotic System with Artificial Intelligence PC Controlled Alive Human Being Detector in War Fields / Affected Areas using WAP with Model & Camera – PIR Sensor for Rescue Operations with 2 Way Communication Programmable Surface Cleaning Robot using Blowers SMS Controlled Intelli Robot Materials Handling Most Advanced Land Roever with Wireless Remote Control using PC with Camera and Solar Cell Power Rescue Robot for Military Purpose with Voice Annunciation using PIR Sensor and Metal Detection RF - Remote Location Controlled Alive Human Being Detector Model Robotic Exploration in Under Water with Remote RF Controller and 2.4 Ghz Automatic IR Cameras for Night Vision and Remote Receiver Robotic Technology Integration for Army Ground Vehicles – Zigbee Automatic Human Seeker Robot with Human Body Heat Scanner SMS based Alive Human Detector in Affected Areas / War Fields SMS enabled towards Command & Control Networking of Cooperative Autonomous Robotics for Military Applications
  • 24.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 The Guide CAN – Applying Mobile Robot Technologies to Assist the Visually Impaired Ultra Sound Guided Collision Avoidance and Navigation Robotic System for Multiple Applications Visual Surviving and Multi Directional Light Signature Sensing and Approaching Robot with Edge Detector for Tunnel Application Climbing & Walking Robot for Uneven Terrain and Disaster Area Application Voice based Path Control of Robot Via the PC using RF Communication Technology Voice Control / Speech Recognition Alive Human Detector Voice Control / Speech Recognition Fire Fighting Robot for Relief Operations Voice enabled Image Capturing and Transferring to PC using Robot Voice enabled Pyroelectric Infrared Sensor based Security Alert System for the Safer Guarding Walking Robot with Infrared Sensors / Light Sensors / RF Sensor / Tactile Sensors Wireless AI based Fire Fighting Robot for Relief Operations with Two Way Communication Zigbee enabled Alive Human Being Detector Model with Camra The development of intelligent home security robot SMS Based automatic vehicle accident information system Artificial Intelligent Based Automatic Path finding Cum Video Analyzing Robot
  • 25.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 FINGERPRINT PROJECTS Finger Print Verification for Passport Checking Finger Print based ATM Authentication & Money Management System RF ID & Finger Print based Campus Access Control System RF ID & Finger Print based Electronic Passport – Multi Management System Finger Print based Campus Management System Finger Print based Digital Locker Security Finger Print based Digital Voting Machine Finger Print based Physical Access Control Vehicle Immobilizer Finger Print Identification / Recognition based Equipment Control System Enterprise Security using USB Finger print Scanner Bio-Finger Sensing Gate Opener for Security Finger Print Authenticated, Access Control & Automated Door Opening System Finger Print based Authentication and Controlling System of Devices Finger Print based Authentication, Access Control, Time, Attendance Management System Finger Print based Car Lock Security System
  • 26.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Finger Print based Guard Alert System Finger Print based Inter Electromagnetic Door Locking System Finger Print based Time, Attendance & Library Management System Finger Print based Vehicle Access System Finger Print Recognition based Time Recorder with Weigh & Output Finger Print Identification based Home Automation with Advanced Sensor Finger Print Based Medical Information Retrieval & Patient Information
  • 27.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 RF-ID PROJECTS Unwired Communication Projects The Electronic Passport & The Future of Government Issued RF ID based Identification Providing Group Tour Guide by RFIDs and Wireless Sensor Network RF ID / Proximity based Multi Usage Card Person Identification System – RF ID System used for Tracking & Authentication Purposes Applying Back Scattering Technology An RFID based Pilgrim Identification System RF ID Proximity based Checking & Detecting Expiry Date (S), Stock Updation Advanced and Intelligent Distant Vehicle Identifying and Automatic Entry System using Active RF ID Automatic Vehicle Toll Collection & Gate Entry Exit System using RFID RFID / Proximity based Pharma Health Card A New Concept for Vehicle Localization of Road Debiting System using RF Id / Active RF System – Intelligent Vehicles Automated and Unmanned Parking System using RFID Technology Advanced Digital Wireless Automatic Vehicle Register System for Highways Advanced Miniature Radio Collar Tracking System for Wild Life Application
  • 28.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 A Security Framework in RFID based License Plate GPS & RFID based Intelligent Guided Vehicle Automatic Locker Machine - Design & Implementation, using RFID & Embedded Microcontroller Intelligent Retail Business: Location based Services for Mobile Customers RFID based Animal Location Tracking and Identification System RFID / Active RF based Equipment/ Personnel Tracking in Hospitals RFID based Parking Lot Access and Control, Vehicle Tracking in Rental Lots RFID based Virtual Gate Entry Control Security and Privacy in RFID and Applications in Telemedicine – Communications RFID based Customer Loyalty Programs RFID Asset Tracking & Monitoring RFID Applications Strategy and Deployment in Bike Renting System RFID based Automated Airline Baggage Systems Security and Privacy in RFID and Applications in Telemedicine – Communications RFID based Customer Loyalty Programs RFID Asset Tracking & Monitoring RFID Applications Strategy and Deployment in Bike Renting System RFID based Automated Airline Baggage Systems
  • 29.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 RFID based Student Tracking System Secure Voting Through ATM Booths RFID based Industrial Security System Automatic Shopping & Billing in Super Market A RFID System to Help Visually Impaired People in Mobility RFID based Canteen Automation A Mobile RFID -Tracking Security System An RFID Application for the Disabled: Path Finder Application Field of RFID in Health Safety and Environment Management People / Visitors Tracking and Management with Area Localization / Monitoring and Warning System using E-Ticket and Super RFID for Amusement Park / Child Care / Play School in Real Time Performance Evaluation of Operational Parameters on RFID Controlled Conveyor System Personnel and Equipment Locating System and Tracking for Mining Solution using Super Active RFID Network Technology in Real Time In Amusement Park / Visitor using Super RFID with in/Out Time GIDS – A System for Combining RFID -based Site information and Web- based Data for Virtually Displaying the Location on Hand Held Devices Super Active RFID and Remote Access through Telephone Line Location based Human Identification and Tracking System using RFID Contactless Electromagnetic Proximity based Campus Management System
  • 30.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Contactless Electromagnetic Proximity based Public Transport System Data Storage and Remote Data Access using Super RFID RFID based Automated Airline Baggage Systems RFID based Parking Lot Access and Control, Vehicle Tracking in Rental Lots RFID based Prescriptions in Automated Pharmaceutical Systems RFID based Unmanned Automated Electric Power Tariff Calculation by the Remote EB Station RFID based intelligent Books Shelving System RFID based Car Security Systems RFID based Equipment/Personnel Tracking in Hospitals RFID based Multi Usage / Purpose Card System Design & Implementation RFID based Valuable Objects Insurance Identification RFID based Vehicle Tracking and Monitoring System RFID Fare Verification - RFID Bus Pass System Industrial Container CARGO monitoring and management using RFID RFID based Automatic Toll Tax Deduction System RFID based Blind man Stick RFID based Electronic Road Pricing for Controlling the Traffic RFID based Event Tracking System for Sports RFID based Inventory Tracking System
  • 31.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 RFID based Parts Tracking System for Manufacturing RFID based Prepaid Energy Meter with Recharge Option RFID based Railway Platform to Display Exact Position of Each Coach RFID based Railway Reservation Super Active RFID Applied in Cold Chain Logistics / Transportation with Temperature Reading and Monitoring in Real Time Super Active RF Tag based Long Range Vehicle Data Access System for Traffic Monitoring with Multi Direction, Speed and Id for Automatic Data Access, Monitor and Analyzing Super RF Tag Applied in Hospital and Medical Care industry for Locating Major Assets and Personnel in Real Time using Miniature Active RF Network SIP-RLTS: An RFID Location Tracking System based On Sip Shopping Path Analysis and Transaction Mining based On RFID Technology Shortest Travel Distance for Full Reads on Least RFID Friendly Carton Stacking Configuration using Advance Doe Technique & Age Reproducibility & Repeatability Super RFID Applied in Automatic Visitor / Tourist Guide information for Personnel Announcement and Visitor Evaluation System Replacing Conventional Guide Unmanned Automatic Target Approaching Vehicle Applied for Blind using Super Active RFID Utilizing RFID Signaling Scheme for Localization of Stationary Objects & Speed Estimation of Mobile Objects
  • 32.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 GPS PROJECTS GPS, GSM, TELECOMMUNICATION, COMMUNICATION PROJECTS WIRED AND UNWIRED GPS and GSM based Biomedical Wearable Device for Remote Monitoring of Physiological Signals Anti Collision System in Railway & Location Monitoring using GSM and GPS – Intelligent Train System with GPS I Protect – Integrated Vehicle Tracking and Communication System with Vehicle Command Unit – An Ultimate tool for Tracking, Real Time Monitoring Passenger Information System using GPS Intelligent System for Hazardous Gas, Human Detection and Temperature Monitor Control Using GSM Technology Zigbee based Smart Vehicle System – Track, GPS based Vehicle Tracking, Protection & Security System An Automatic Collision Detection and Acceleration Control using Multi Zone Transmission and Reception through RF Technology and GSM Communication Anti Collision System in Railway using GSM and GPS GPS – Design & Implementation of 2 Way Communication System with Transmit & Reception of Data using RF
  • 33.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 GPS based Active Fleet Management- Featured Rich Automatic Vehicle Location Tracking, Collision Avoidance with Dual Communication using RF Advanced GSM based Theft Vehicle Identifying System using Remote PC GPS GSM based Aircraft Collision Detection & Avoidance GPS & GSM based Accident Alarm System Real Time GPS based Vehicle Parameter Monitoring with Intelligent Data Analysis GPS based Substation Implementation GPS based Intelligent Guided Vehicle with Collision Mitigation - Automatic Vehicle Location Tracking, Collision GPS - Route Tracking System using PC with 2 Way Dual Channel Communication Embedded based GPS for Telephone Exchanges Advanced Automatic Vehicle Crash Notification using GSM Technology Automatic Vehicle Locator (AVL) using Global Positioning System (GPS) GPS based Highway Monitoring & Control GPS enabled PC based Geographic Information System (GIS) & Routing Scheduling System GPS based automatic route announcement system for blind people GPS based automatic station announcement and display system for trains/buses GPS based bus or train collision avoiding system GSM and GPS based human tracking system Fabrication of GPS Robot
  • 34.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Railway anti-collusion system using GPS GPS based Air Craft Collision Avoidance GPS & GSM based Real Time Vehicle Tracking System GPS and GSM based Real Time Bus/Train Location Finder and Display on Earth's Map GSM and GPS based School Kids Tracking System. GSM based Automatic Irrigation Water Controller System GSM based Highway Road Traffic Monitoring System. GSM based Home Security System to get intrusion Alerts Like Door/Windows Open Alerts onto Your Cell Phone GSM based Irrigation Control System Standalone GPS Coordinates (Latitude, Longitude) Locater
  • 35.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 VOICE-HM2007 PROJECTS Voice Controlled Intelli Robot for Multi Specialty Operations Voice based Activation and Control of Equipments Voice based Elevator Movement and Display Voice Control based Speed Control of Dc Motor Voice Recognition for Controlling Color Television Voice Communication Over Zigbee Networks Voice Control / Speech Recognition Alive Human Detector Voice Control / Speech Recognition Car Security System Voice Control / Speech Recognition Home Automation Voice Control / Speech Recognition Locker Security Voice Control / Speech Recognition Rescue Robot for Military Purpose using PIR Sensor and Metal Detection Voice Control / Speech Recognition Voting System Voice Operated Modern Restaurant System Voice Recognition based Access Control System for Door Opening & Closing using Microcontroller & Voice Hm2007 IC Voice Recognition based Robotic Car
  • 36.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 JAMMER PROJECTS GSM / CDMA / DCS Tri Band Jammer Cell Phone Jammer - Implementation of Highly Effective Mobile Cell Phone Jammer Blue Tooth Jammer for Security Application Hi End Temple Security System with Frequency Jammer GPS Jammer Microwave Spy Camera Jammer Effective Signal / Frequency Jammer System for Security & Protection All Band Radio Jammer for Military Application Advanced Radar Jammer for Military Application Anti Bomb Explosion Frequency Jammer Cell Phone Booster / Repeater Practical Implementation of Full Band Radio Jammer for Security Application We can design and develop any Jammer Applications / Repeaters / Boosters
  • 37.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 ZIGBEE PROJECTS UNWIRED COMMUNICATION PROJECTS Zigbee enabled Pantry Updation - Wireless Network and Data Synchronization using Hand Held Device - Zigbee enabled 2 Way Automatic Employee Tracking System using Zigbee Network and I2c Memory Card Reader Zigbee based Wireless Weather Station Zigbee – College / Industry – Wireless Network and Data Synchronization using Hand Held Device Zigbee enabled ICU Care Taker - Life Support System ZIGBEE based Infant Incubator Parameter Sensing & Monitoring Real Time Passenger information System (RTPIS) using Zigbee Technology Development of Zigbee based Street Light Control System Development of Zigbee-based Electronics Ballast System Remote Power On/off Control and Current Measurement for Home Electric Outlets based on a Low-Power Embedded Board and Zigbee Communication Automated Roll Call with Palm based Device using Zigbee – SRD / ISM Band
  • 38.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Zigbee Data / Voice Communication System for Industrial Application Zigbee Device Detector for Safety Application Zigbee Enabled Speed Control of DC Motor Zigbee Voice Communication System for Industrial Application Hand Held Device - Restaurant Services Management & Attendance Monitoring, Data Transfer, Updation Zigbee Enabled Miniaturized Mote Control A Wireless Network based on the Combination of Zigbee and GPRS A Zigbee based Power Monitoring System with Direct Load Control Capabilities Bus Priority Control System based on Wireless Sensor Network (WSN) and Zigbee Commercial Applications of Wireless Sensor Networks using Zigbee Custom Wireless Sensor Network based on Zigbee Design of Air Pollution Monitoring System using Zigbee Networks for Ubiquitous City Development of Zigbee based Street Light Control System Patient Monitoring System using Sensor Network based on the Zigbee Remote Engine Performance Monitoring and Logger System using Zigbee and I2c Remote Power on/off Control and Current Measurement for Home Electric Outlets based on A Low-Power Embedded Board and Zigbee Communication
  • 39.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Realization of Home Remote Control Network based on Zigbee System for Measuring Power Supply Parameters with Zigbee Connectivity Tea: Transmission Error Approximation for Distance Estimation Between Two Zigbee Devices The Implementation of Indoor Location System to Control Zigbee Home Network Wireless Automation of Unmanned Railway Crossing Gate Alert System using Zigbee Zigbee based Dynamic Control Scheme for Multiple Legacy IR Controllable Digital Consumer Devices Zigbee based Gas Leak Detection and Data Monitoring System Zigbee based Money Transfer System Zigbee based Monitoring System using Auto-Dialer Zigbee based Wireless Sensor Networks and Its Applications in Industry Zigbee Device Access Control & Reliable Data Transmission based Health Monitoring Zigbee for Building Control Wireless Sensor Networks Zigbee Source Route Technology in Home Application Zigbee Wireless Sensor in Industrial Applications Wireless - RF Tx Rx, GSM/GPRS, GPS, Bluetooth, IrDA, RFID, Zigbee
  • 40.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 TELECOMMUNICATION PROJECTS Energy Consumption – Energy Meter with Automatic Usage Monitoring and Alarm System - Extra Power Requisition System Three Dimensional Password Authentication in ATM Networks GPS and GSM based Biomedical Wearable Device for Remote Monitoring of Physiological Signals Power Failure Auto Announcement System at Customer Place from E.B Station IVRS based Electronics Televoting with Response & Feedback Advanced GSM based Theft Vehicle Identifying System using Remote PC Temple Security System - Hi End Temple Security System with Frequency Jammer Cell Phone Controlled Ai based Five Axis Robot for Multi Specialty Operations IVRS based Robot Control with Response & Feed Back Dish Position Controlling and Monitoring System Used for Radar & Other Telecommunication Applications Artificial Intelligence based Security for Telephone Exchange with SCADA IVRS based Students Mark Annunciation for their Parents Intelligent Train System – Automation, Collision Avoidance, Signal / Unmanned Controlling, Moving Message Display, Voice Annunciation IVRS based Smart Networked Home - Home Automation System
  • 41.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Zigbee based Wireless Multi Channel Home Automation System with IVRS Industrial Automation and Control System IVRS - Remote Location using Remote Connection, with Immediate Voice Feedback Mobile to PC interface for Controlling of Devices using interactive Voice Response System Intelligent & Automatic Fire Security System using Interactive Voice Decoder and Telephone Line Categorized Alarm Annunciation with Voice Annunciation and Controls Prepaid Electricity Billing RF 2 Way Automation using Contact Less EMPCR Card & Reader with Voice Annunciation - IVRS SMS based Remote Motor Starter for Irrigation in Agricultural Application IVRS based Automatic E-Filing Tracking and Monitoring, Localization, Tracking Applied in Modern Administration Automation Development of Smart Notice Board – Active Information Display Systems using SMS based on Microcontroller Design and Implementation of Real Time Security Guard Robo using GSM/CDMA Networking SMS based Alive Human Detector in Affected Areas / War Fields Automatic Taxi Trip Sensing and Indicating System through GSM Intelligent System for Hazardous Gas, Human Detection and Temperature Monitor Control Using GSM Technology An Automatic Collision Detection and Acceleration Control using Multi Zone Transmission and Reception through RF Technology and GSM Communication Anti Collision System in Railway using GSM and GPS
  • 42.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 IVRS PROJECTS Interactive Voice Response System using APR Finger Gesture Recognition using Flex Sensors with Voice Output Intelligent Train System – Automation, Collision Avoidance, Signal / Unmanned Controlling, Moving Message Display, Voice Annunciation IVRS based Smart Networked Home - Home Automation System Zigbee based Wireless Multi Channel Home Automation System with IVRS IVRS based Students Mark Annunciation for their Parents IVRS based Electronics Televoting with Response & Feedback Industrial Automation and Control System IVRS - Remote Location using Remote Connection, with Immediate Voice Feedback Mobile to PC interface for Controlling of Devices using interactive Voice Response System Intelligent & Automatic Fire Security System using Interactive Voice Decoder and Telephone Line Categorized Alarm Annunciation with Voice Annunciation and Controls Prepaid Electricity Billing RF 2 Way Automation using Contact Less EMPCR Card & Reader with Voice Annunciation - IVRS IVRS based Robot Control with Response & Feed Back IVRS based Automatic E-Filing Tracking and Monitoring, Localization, Tracking Applied in Modern Administration Automation
  • 43.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 COMMUNICATION PROJECTS Wired – RS232, RS485 & Unwired – RF, Zigbee, RFID A Vehicle-to-Vehicle communication Protocol for Cooperative Collision Warning Dish Position Controlling and Monitoring System Used for Radar & Other Telecommunication Applications RF based Code Modulation – Decryption & Encryption for Secured Wireless Communication with OFDM Development of Smart Notice Board – Active Information Display Systems A Miniaturized Mote for Wireless Sensor Network Development of pedestrian-to-vehicle communication system prototype for pedestrian safety using both wide-area and direct communication Car-to-Car Communication A Computerized Travel Aid for the Active Guidance of Blind Pedestrians A Design of A Prototypic Hand-Talk, Assistive Technology for the Deaf A Distributed, Adaptive Protocol for Handling Interference in Wireless Communications Enabling / Disabling & Wireless Control of Appliances & Devices using RF Technology
  • 44.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Fully Automatic Intelligent Wireless Remote Railway Gate Controller & Monitoring System with Remote Train Stopper for Railway using Active RF Id System Machine-to-Machine Communication in Cellular Networks Reduction of Disturbance Effects and Sustained Oscillation using Multi- Sensor Implementing Wireless Communication Remote Communication Devices for Electric Utility Applications, Electric Power Conference Remote Mobile Phone Motor Starter for Irrigation Purpose Wireless Automatic Traffic Signaling System Wireless Intrusion Detection, Electronic Security & Control System using Central Monitoring System Wireless Telemetry for Line Data Transmission on A Mobile Unit
  • 45.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 SECURITY SYSTEM PROJECTS Integrate Intelligent Security System for Industrial Surveillance with WAP & Auto Dialer Intelli Home Security System with Auto Dialer, Peace Keeper – The Home of Tomorrow Smart Room Controller using Human Presence Detector Wireless Voting System A Low-Cost Solution for an Integrated Multisensor Lane Departure Warning System Intelligent Briefcase with Digital Code Lock and Shock Generator during Unauthorized Access Secret Codes & Secured Messages Transmission System through Telephone Line Smart Card based Human Identification & Personal Management System Spy Camera Detector for Safety Application Modern Wireless Entry / Exit Register & Alarm Display System for Advanced Amusement Park Implementation of Wireless Surveillance / Emergency Rescue Monitoring Vehicle with Wireless Camera using Microwave Frequency with Microwave Audio / Video Transmission
  • 46.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Advanced Digital Wireless Multi Point Security System for Fire Safety with Alarm Advanced Wireless Bank Security System with Remote Alarm and Sensor for Modern Security Application Aircraft Airbox Ground Tester with Aircraft Accessories Autonomous Helicopter System with Security System Combination Lock for Security Applications Design and Implementation of Mobile based Electrical Appliances Control for Industrial Automation with High Security Embedded System based Inter Locking System of Electromagnetic Doors Finger Print / Bio Metrics based Industrial Authentication & Access Control System Industrial Security Robot with Multi Specialty Features Intelligent Car Security System using Dynamic Generation of Random Security Codes Intelligent Information System for Police Interactive Earthquake Monitoring & Low Frequency Vibrations & Noise Sensing System Mobile Device Security using Transient Authentication Multi - Zone Fire Alarming Control Panel with Zone Location, Auto Dialer to Fire Station PC based Home Appliance Control System Safe – Secure Anti Frequency Eliminator
  • 47.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Safe Street Crossing System for Vision Impaired People Secure Transmission of Sensitive Data using Multiple Channels Voice Control / Speech Recognition Car Security System Wireless Access Monitoring & Control System based on Digital Door Lock Wireless Aircraft Automatic Landing System Wireless LAN with Mono Alphabetic Substitution
  • 48.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 SENSOR BASED PROJECTS Sensors Network & Wireless Sensors Network Projects Advanced Wireless Automatic Digital Pumping System for Agriculture using Soil Sensor Advanced Wireless Earth Quake Alarm System for Early Warning Temple Security System -- Hi End Temple Security System with Frequency Jammer Integrate Intelligent Security System for Industrial Surveillance with WAP & Auto Dialer Driver Fatigue Accident Prevention using Eye Blink Sensor Eye Ball Controlled Automatic Wheel Chair Multisensor - Smoke, Fire, Temperature, Gas, Metal & Intruder based Security Robot - Zigbee RF Enabled ICU Care Taker – Life Support System American Sign Language based Hand Gesture Recognition & Performance Library Robot - Path Guiding Robotic System with Artificial Intelligence using Microcontroller Advanced Wireless Bank Security System with Remote Alarm and Sensor for Modern Security Application
  • 49.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Design & Implementation of Railway Automation System with Sensors Network Motion Detection, Robotics Guidance & Proximity Sensing using Ultrasonic Technology Real Time Lane Detection for Autonomous Vehicles – Ultrasonic Sensor
  • 50.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 MOTORS, DRIVES & CONTROL PROJECTS Fuzzy Logic based Speed Control of AC Motor using Microcontroller with Line Fault Identification Fuzzy based Speed Control of Induction Motor using Microcontroller Fuzzy Logic based Speed Control of DC Motor Speed Control of AC Motor with Multi Parameter Monitoring Speed Control of DC Motor with Field & Armature Control Cycloconverter Drive for AC Motors Digital PID Controller based Speed Control of DC Motor Speed Control of a Linear Induction Motor V/F Technique Noise Less Speed Control of DC Motor using PWM Converter Brushless Speed Control of DC Motor PWM based Bidirectional Speed Control of DC Motor Voltage Stresses On Stator Windings of Induction Motors Driven By IGBT PWM Inverters Sensor less Speed Control of AC Induction Motor using Microcontroller Speed Control of DC Motor using FQ / TQ Chopper Drive Cell Phone based Motor Speed Control
  • 51.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Closed Loop Dc Motor Speed Controller Frequency Locked Loop Dc Motor Speed Control IGBT based Dc Motor Drive Control System Slip Ring induction Motor Drive with Slip Recovery using IGBT Efficiency Detector for Relay & Circuit Breaker Single Phase Multilevel Inverter SPWM with PC Interface and OLM Wireless DC Motor Speed Control using Triac Single Phase Input to DC Output – DC Motor Drive-Armature Voltage Control Single Phase Thyristorized Power Controller for Industrial Applications Microcontroller based Firing Circuit for Thyristor Converters
  • 52.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 POWER ELECTRONICS PROJECTS Energy Consumption, Meter Reading and Additional Power Requisition System Alternative Energy Sources - Foot Power Generation Soil Moisture Content based Automatic Motor Starter for Irrigation Purpose Trivector Meter – Design & Implementation Power Failure Auto Announcement System at Customer Place from E.B Station Portable Power Analyzer for Energy Audit Design & Implementation of 3Phase Power Changer Wireless Hybrid SCADA for Power Station Substation Monitoring & Automation Distance Protection – Power Theft Identification & Location Detection RF based Intelligent Handheld Multi-Parameter Monitoring System with LCD Display and DAS Multiple Starters with Over Load and Low High Voltage Protection with Multi Parameter Monitoring Smart Wind Mill based Power Generation System for Mobile Charging
  • 53.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Energy Saving System using Thyristor Controllers Multiplexing Control of EMU SCR DCR Circuit Breaker Energy Saving Systems for Railway Platforms Intelligent Power Sharing of Transformers with Auto Protection RF enabled Energy Meter Digitization & Automation and Automatic Utility Transfer with Two Way Communication Inverter based Low - High Input Voltage Buck Booster Converter System Design & Implementation Multi Power Utilizer - Maximum Demand Indicator and Power Factor Indicator Natural Failure Protector Distributed Control System for Industrial Transducers Failure Location & Annunciation Protective Relay V, I, V/F Protection & Impedance Relay Soft Switching PWM Three Level Converters Soft Switching PWM Three Level Inverters Development of Energy Management and Warning System for Resident: An Energy Saving Energy Efficient Target Coverage in Wireless Sensor Networks Design and Digital Monitoring of Uninterrupted Power Supply Life Cycle Testing of Electrical Components Multi Channel Temperature Indicator
  • 54.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Battery Voltage and Current Monitoring for 8 Batteries Wireless Transformer Failure Analysis 3 Phase Prepaid Electricity Billing Automation Advanced Wireless Electrical Appliance Control System using PC and Coded RF Protocol for industrial Application Advanced Wireless Electrical Meter Reading System Detection and Security System of Illegal Wireless Transmission Diagnosis of Fault Distribution Transformer Intelligent & Dynamic Power Saver & Control System for Industrial Electrical Equipments Design and Practical Implementation of Internet based Predictive Control of A Servo System Digital Tachometer using IR Optical Encoder Sensor Electronic Switching System and Tackling Power Cut Fault Location using Remote Connection, with Immediate Voice Feedback Industrial Power Management System Multi Channel Temperature Measurement and Controller Multichannel Voltage Scanner and Control using SCADA PID based Temperature Controller Intelligent Power Factor Indicator & Correction with Multiple Capacitor Banks Power Generation through Solar Photovoltaic with Light Level Indication
  • 55.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Power Line Monitoring with Seven Segment Display Protection of Turbo Alternators - Generator Protection Quasi Resonant Converter Fed DC Drive Remote Mobile Phone based Motor Starter for Irrigation Purpose SCR based Equipment Protection for Power Monitoring
  • 56.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 AUTOMOBILE / CAN BASED PROJECTS Over speed indication and Automatic accident Avoiding System for four- wheeler Automatic temperature controller with cooling system for car SMS Based automatic vehicle accident information system Remote controlled material handling equipment Automatic reserve indication system SMS based automatic two-wheeler locking system GPS based vehicle route tracking system Fabrication of Automatic headlamp alignment system with Dim/Bright Controller Automatic sensor based wall painting robot GPS based automatic vehicle accident information system Remote controlled tilting handicapped wheel chair SMS based vehicle Ignition controlling system Electrical Power Generation system using Railway track Automatic material handling Fire Fighting Robot
  • 57.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Cell phone controlled Solar Vehicle Automatic Railways Signaling System Automatic Rain operated wiper and Head light Dim/Bright Controller Artificial Intelligent Based Automatic Path finding Cum Video Analyzing vehicle CAN based Smart Car Security System CAN based Exteriors – Design & Implementation Complete Automation of Automobile Control System using CAN CAN based Collision Avoidance System for Automobiles Control of Process Parameters in Industries using CAN Speedometer Implementation using CAN CAN based Industrial Automation Implementation of Airbag System through CAN Intellect speed breaker system using CAN Automotive Network Diagnostics with Crash Data Retrieval System Automated Vehicle Security System with ZigBee Keyless Entry over CAN Adaptive Front lighting System using Fuzzy Logic over CAN - LIN Multiplexed Network Automatic Head Light Dimmer and Speed Control for Automotive Vehicles using CAN-LIN
  • 58.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 FUZZY LOGIC BASED PROJECTS Fuzzy Elevators - Group Elevator Scheduling With Advance Information for Normal and Emergency Modes in Building Management Systems Intelligent Fuzzy Control Guided Vehicle with Collision Prevention – Ultrasonic based Distance Monitoring and Fuzzy based Collision Avoidance Fuzzy Logic based Automated Train Fuzzy Logic based Speed Control of AC Motor using Microcontroller with Line Fault Identification Fuzzy based Speed Control of Induction Motor using Microcontroller Fuzzy Logic based Lift Control & Management System Fuzzy Logic based Speed Control of DC Motor Application of Fuzzy Logic in Intelligent Traffic Control Systems Control of Boiler Turbine Unit based on Fuzzy Logic System Fuzzified Computer Automated Crane Control System Fuzzy Logic based Control of Level in A Non-Linear Tank Fuzzy Rule based Object Identification Methodology for Navy System Fuzzy Speed Control of AC Motor using Microcontroller Intelligent Application of Fuzzy Logic in Automated Train Speed Control System
  • 59.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 SCADA BASED PROJECTS Wireless Hybrid SCADA for Power Station Substation Monitoring & Automation SCADA for Instrumentation Artificial Intelligence based Security for Telephone Exchange with SCADA SCADA based Waste Water Treatment Optical Isolated Transparency SCADA - for Telephone Exchange SCADA for Local Distribution Network Development of Human Machine Interface using any SCADA Package Fault Prediction in Quasi-Steady System with SCADA for Pressure & Flow Multichannel Voltage Scanner and Control using SCADA SCADA based Temperature Measurement & Control System Remote Digital RPM Indicator using Proximity or Magnetic Pick Up - SCADA Remote Frequency Indicator with SCADA Remote Terminal Unit (RTU) & PLC System
  • 60.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 PLC / THERMAL PROJECTS PLC based Bottle Filling Station with Conveyor Model PLC based Automatic Boiler Management PLC based Automatic Car Parking System PLC based Door Open and Closing System PLC based Irrigation Controller for Garden PLC based Traffic Density Control using Sensor PLC based Wireless Energy Meter PLC based Control of Advertisement Display PLC with Internal Locking System and Control Multi Channel Temperature Measurement and Controller Temperature Monitoring and Control System with Automatic Equipment Control using Computers Thermal Overload Protection for Transformer
  • 61.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 SMS BASED PROJECTS SMS based Universal Motor Speed Controller SMS based Remote Motor Starter for Irrigation in Agricultural Application SMS Controlled Home Automation System Development of Smart Notice Board – Active Information Display Systems using SMS based on Microcontroller SMS based Appliance Control System SMS Controlled Intelli Robot Materials Handling SMS Controlled Load Monitoring System Design and Implementation of Real Time Security Guard Robo using GSM/CDMA Networking Ferreting Out Peripatetic Device using GSM Technology SMS based Alive Human Detector in Affected Areas / War Fields SMS enabled towards Command & Control Networking of Cooperative Autonomous Robotics for Military Applications Automatic Taxi Trip Sensing and Indicating System through GSM GSM based Message Moving Display SMS based Anti Theft System for Vehicles SMS based Automatic Electricity Bill Information System
  • 62.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 AUTOMATION PROJECTS Automatic Vehicle Speed Management System Control of Process Parameters in Industries using CAN Monitoring of Engine Parameters Train Engine Automation System Wireless Crane Control System using PC Intelligent System for Vehicle Parking Guidance System Intelligent System for Aiding Public In Transportation and Stage Announcement System Car Speed Monitor and Data Logger System Solar Car Automation GPS & GSM Interface for Tracking System Accident Prevention System for Railways Using GPS Driver Assist Co-Pilot System for Emergency Cruise Control using Hybrid Sensor Network of Wired CAN and Wireless PAN Smart Automatic Windscreen Wiper Control System using Fuzzy Logic and LIN Automated Highway Network for Traffic Analyzer and Vehicle Speed Regulator over CAN
  • 63.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Train Collision Prevention System using Automatic Block Signaling Network over CAN Hospital Area Network for Multiple ECG Signal Acquisition over High Speed CAN Autonomous Self Parking Vehicle using CAN Smart Room Controller using Human Presence Detector
  • 64.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 INDUSTRIAL APPLICATIONS PROJECTS High Speed Object Counter Maximum Demand Indicator & Controller Multi Channel Temperature Measurement & Controller Multiple Industrial Timer PC based Multi Channel Temperature Controller & Logger and Data Analyzer Single Channel Temperature Measurement & Controller Ultrasonic Distance Monitor & Range Finder Water Control System for Rolling Mill
  • 65.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 INSTRUMENTATION & LEVEL MEASUREMENT PROJECTS SCADA for Instrumentation SCADA based Waste Water Treatment PH Measurement / Controller Multichannel Voltage Scanner and Control using SCADA Boiler and Burner Management & Controller System Multichannel Petrochemical Fire Sensor, Monitoring and Control System with Automatic Telephone Dialing Liquid Level Remote Transmitter Digital Temperature Indicator & Controller with DAS & Analyzer Multi Channel Temperature Scanner using Current Loop Transmission De-Icing Temperature Controller System PC based Multi Channel Temperature Controller & Logger and DAS Analyzer Temperature Measurement & Controller for Furnaces with Different Time Period & Set Points PC based Programmable Temperature Controller for Furnaces Digital Ph Measurement & Controller Meter PC based Programmable Temperature Controller for Cement Plant Fluid Level Monitoring System
  • 66.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 PROCESS CONTROL PROJECTS An on-Line Distributed System for Improved Real-Time Process Performance Design Criteria for Obstacle Avoidance in A Shared Control System Design Methodology for Modeling A Microcontroller – Teleload Switch Digital PID Controller for Multi Channel Temperature using Frequency Response / Root Locus Technique Digital Temperature Indicator & Controller with DAS & Analyzer Fuzzy Logic based Traffic Light Controller Industrial Annunciator with Voice, Alarm Multi Burner Management & Controller with Auto Flame Detection & Failure Indicator
  • 67.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 MECHANICAL & MODEL BASED PROJECTS Automated Weigh Load Cell Automatic Motorized Electromagnetic Glass Door Open / Close Mechanism Batch Weighing & Automation System Commercial Weighing System Multi Axis Stepper Controller / Driver with Opto Isolation Multi Axis Stepper Robotics with Artificial Intelligence Stain Gauge Weighing System Tank – Hopper Weighing System Textile Industries based Programmable Label Cutting Machine Two Axis Stepper Controller / Driver with Opto Isolation Wireless Crane Control System using PC Fabrication of Remote operated weapon system Fabrication of sewage water treatment plant Fabrication of water cooler cum air conditioner Fabrication of transformer heat reduction system Fabrication of Soar Air conditioner Solar Powered Auto charging grinding machine
  • 68.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Remote controlled tilting wheel chair for physically disables Automatic paint spraying pick and place Equipment Automatic Car Parking System for apartment Building Sensor Based Automatic paint marking machine for sprocket Industries Conveyor Belt Sequential Timer Controller with Model for Bottling Plant Automatic Vehicle Speed Management System Design of Induction Furnace Control System Boiler and Burner Management & Controller System Computer Controlled Drilling Machine Crane & Lift Operation Controlling and information System Computerized Thread Mill Implementation Conveyer Belt Monitoring & Control System Flow Totalizer - Computerized Flow Totalizer for Juice Industries Textile Industries based Programmable Label Cutting Machine Wireless Crane Control System using PC
  • 69.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 SOLAR SYSTEM PROJECTS Effective Solar Tracking System for Optimal Power Generation and Lift Operating Through Solar Power Wireless Remote Motor Starter with Acknowledgement using Solar Energy Power for Agricultural Application Smart Solar Powered Car Smart Solar Tracking System for Optimal Power Generation Solar based Computerized Irrigation System Solar based Energy Saver Controllers Solar Cell Voltage Generation with Auto Tracking System Solar Powered Bike, Solar Power based Two Wheeler Systems Solar Powered Car, Solar Power based Car Navigation System Solar Powered Fence - Electrified Perimeter Fencing Systems Solar Powered Traffic Signals Solar Water Heater Controller with Temperature Display A Novel Optimum Operating Point Tracker of the Solar Cell Power Supply System Solar Energized Artificial Intelligent Embedded Line Tracking Follower Robot Solar Power for Automatic Water Heating / Solar Energy for Electrical Applications Solar Powered Wireless Weather Station
  • 70.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 AGRICULTURAL PROJECTS Fabrication of Solar powered tealeaf-cutting machine Electricity and Water Pumping System using Wind Mill Fabrication of solar irrigation System Solar Powered Agricultural Water Pumping System with Auto Tracking Fabrication of Solar Seeds Sprayer Automatic Water level Sensing Crane Fabrication of Solar seed Dryer with Auto Tracking Automatic Moisture and Light Controlling System for Garden Automatic Water Tape Controlling System Automatic Packing control Machine Fabrication of Agricultural Motor Pump Running using Solar Power
  • 71.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 MEMS (MICRO ELECTRO MECHANICAL SYSTEM)/ ELECTRO MECHANICAL / MECHATRONICS Motion Operated Scrolling Display using MEMS Accelerometer and I2c Protocol Miniature Wireless Sensor, MEMS based, Application in Cold Chain (Food/Medicine Process) Logistics with Real Time Temperature Advanced Parachute Deployment System using MEMS Free Fall Detector and I2c Protocol Automotive Crash Detection and Airbag Deployment using MEMS Accelerometer Electronic Speedometer using Inertial MEMS Sensor and I2c Protocol Measuring and Transmitting Vital Body Signs using MEMS Sensor Motion Activated Power Saving System using MEMS Accelerometer and I2c Protocol Motion Controlled Password System for Compact Embedded Systems using MEMS Sensor Anti Theft System for Electronic Equipments using Inertial MEMS Sensor and ZigBee Automotive Airbag Deployment System with Crash Data Logger using MEMS Accelerometer
  • 72.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Human Fall Protection System using Wearable Airbags and MEMS Accelerometer Wireless Pervasive Health Care Monitoring System using MEMS & ZigBee Advanced Collision Avoidance Solar Powered Robo Car with Automatic Charger Automatic Plant Irrigation Robot with Self-Guided Action for Agricultural Application Automatic, Advanced Robotic Arm for Welding in Automated Assembly Line Hyper Line Tracking Control of Robotic Car using Track Sensors for Industrial Application Non GPS Navigation with the Personal Dead Reckoning- Pdr System Self Direction Detected and Guided Robotic Vehicle with Magnetic Compass Navigation Visual Servoving and Multi Directional Light Signature Sensing and Approaching Robot with Edge Detector for Tunnel Application Automatic Car Parking System for apartment Building Fabrication of Remote operated weapon System Cell phone controlled pick and place robot SMS based automatic pneumatic Punching and riveting machine Video Analyzing remote controlled vacuum Cleaner SMS based automatic vehicle accident information system Automatic Distance Measurement and Braking System By using Ultrasonic Waves
  • 73.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 SMS based Bomb detecting robot Fabrication of Automatic Vehicle Over speed controlling system for School Zone Remote controlled Aircraft (Flying Model) GPS based vehicle route tracking system Fabrication of Automatic temperature controller with cooling system Remote controlled material handling motorized crane GPS based blind people path announcement system Automatic sensor based wall painting robot GSM based two wheeler security systems Two Wheeler Automation with security System Automatic Power Saving Conveyor for Industrial Application Automatic Visitor Guided with Material Handling Vehicle Automatic Break Failure and Engine Over Heating Indication Sensor Based Material loading/unloading system for different section SMS based Automatic two-wheeler locking system Auto head-lamp Alignment system for automobile Railways accident Avoiding System – (Level crossing and Fire Alarm) SMS based automatic drilling machine Fabrication of Solar automatic cell phone charger with pay system PC based Automatic sheet cutting Machine
  • 74.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Automatic Vehicle Accident Information System Automatic Paint Spraying Equipment Automatic drunken drive avoiding system for automobile Remote controlled Vacuum Cleaning Robot Automatic Scrap Collecting Vehicle Automatic Fire fighting cum material handling vehicle Sensor Based Automatic paint marking machine for sprocket Industries Automatic railway track crack detecting Vehicle Design & Fabrication of Conveyor Automation
  • 75.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 MORE EMBEDDED PROJECTS Digital Counter using CMOS Technology Need of Ad Hoc type Networking for Modern Airports for Aircraft Landing A Proposal for Design of Hybrid Multi Functional Implantable Biochip using Bio-intelligent Expert System A Survey of Communication Network Paradigms for Substation Automation A Wireless Escape System for Industrial Accidents using Adhoc Positioning AC Generator Monitoring – Generating Voltage, Oil Level, Fuel Level, Etc Through Wireless Adhoc – Advanced Home Care System for Elderly Patients Advanced Digital Remote Panic Alarm Button for Bank / industrial Application Advanced Full Function Remote Home Automation System using Encrypted RF Technology Artificial intelligent based Equipments Failure Detecting & Automatic Dialing to the Concern Service Engineer Cell-Phone / Telephone Attendance Marker System with IRC Reader and Face Indicator Automatic Cell Phone Detector and Mute Switch for TV / DVD Automatic Controller for Elevator and Escalator with Sensor Network & AI Automatic Intelligent Plant Watering System Automatic Load Sharing of Transformers with Protective Analysis
  • 76.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Automatic Repeat Protocol for Distribution Automation System through Power line Communication Automatic Rolling Shutter Opener with RF Remote Control Automatic Room Light / Cooling System Controller with Visitor Counter Automatic System for Measuring & Controlling the Length of a Moving Product in Industries Automatic Vehicle Location Tracking, Collision Avoidance with Dual Communication using RF Automobile Exterior Safety System Autonomous Stabilization System for a Coaxial Helicopter Cable Fault Finder for Electrical Transmission Lines Cell Phone based Remote Car Starter Biometric Bank Locker System for Manager and Customer Bio-On Chip (B-Chip) Micro Miniaturized Wearable / Body Area Network for Wireless Patient Monitoring Cell Phone based Total Car Controlling System – Car Moving, Forward, Reverse, Etc., Cell Phone Detector for Security Application Cell Phone to Cell Phone Appliance Control System Computer based Wireless Control System of Devices Computer Keyboard Dual Controller for Switching Electrical Devices Control of Pc DTMF Technology via Mobile Phone Design a Wireless Sensor Network for Methane Monitoring System
  • 77.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Design and Implementation of Home Automation using CAN Digital Steam, Pressure and Liquid Level Monitor Digital Surface Distance / Length Measurement using Microcontroller Distributed Multi Area Power System Load Flow Monitoring Dynamic & Automatic Programmable Temperature Control System for industrial Machineries Safety Control System Dynamic Security and Access Control System for 5 independent Zones E- Seal Applied in Fragile Safety in Transport, Real Time E-Driving License and intelligent E-Police Applied in Modern Electronic Travel Aids – ETA Embedded based Level Controller with Two Tanks with Transparent Level Display Embedded Controller for Non Linear Partially Interacting Process (NlPIP) E-Ticket Applied in Monitoring and Management Evaluation Embedded Microcontroller based Transformer Oil Testing Machine Embedded Microcontroller based Weighing Analyzer using Load Cell Embedded Microcontroller based PH Controller for Sugar Industries Embedded System based Inter Locking System of Electromagnetic Doors Chemical, Cement & Pharmaceutical Industries Feeder Protective Relay Monitoring and Data Logger Frequency Division Multiplexing for a Multi-Sensor Wireless Telemetry System
  • 78.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Fully Automatic E-Filing System with Location, Tracking Applied in Real Time Single Window System for Modern Govt. / Document / File Management Garment Conveyor Remote Controller Guardhouse Visitor Screening Security System Handheld Electronic Voting Machine & Data Retrieval System Highway Car Accident Identification & Auto Communication to Patrol or Hospital Hi-Tech Car with Remote Camera for the Police Implementation of Device Status Monitoring and Controlling using Telephone Lines Humidity Monitoring and Pump Controlling System Implementation of Global and Remote Positioning System for Defense and other Purposes using Mobile Networks Implementing Process Control & Monitoring System using Can Intelligent & Advanced Digital Wireless Audience Polling System for Quiz Program Internet-Enabled Calibration Services: Design of a Secure Calibration System Microcontroller based intelligent Multi-Timer System for industrial Automation Microcontroller based Moving Person Place Detecting System (MPP) Mosfet based Current Mode Control Buck / Boost Converter
  • 79.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Most Advanced Digital Wireless Two Wheeler Security System with Remote Starter Multi Boiler Management & Controller with Auto Failure Indicator – Pcs Multi Zone Fire Alarming Control Panel with Zone Location, Auto Dialer to Fire Station Multiple Programmable Batch Event Counter with Conveyor Belt Arrangement Neural Implementation of Energy Consumption in Power Distribution People / Patient Tracking and Management System for Hospital / Factory using Wireless Network System Pressure Sensor and Trigger System for industrial Application Production Automation and Control, Innovative Future Manufacturing Public Address System Controller - Automated Timing & Music System Microcontroller to Microcontroller Communication with LCD Radio Frequency Foot Pressure Measuring System Remote Camera Controller for Security Application using Servo Motor Remote Wireless Wind Speed Meter for Modern Remote Weather Monitoring Station with Digital Read Out Research of Remote Real Time Monitor System for Electromechanical Equipments based on Internet Robust Environmental Sound Recognition for Home Automation Room Humidity Checking with Air Conditioner Cooling Effect Controlling System
  • 80.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Route Selection for Vehicle Navigation and Control Sea Navigation for Rescue Operations using Microcontroller Simultaneous Localization, Mapping and Moving Object Tracking Single Phase integral Cycle Inverter using Mosfet Thyristor Controlled Heating System with Model Towards a Unified Location Tracking System for Heterogeneous Industrial Environments
  • 81.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 DOMAINS COVERED Power Quality and Harmonics filters | ZVS and ZCS converters | Improved power quality converters and inverters | Power factor corrected AC-DC converters | Switching mode converters | Multilevel inverters | Fuel cell based converters | Power system based converters | Active Power Filtering Concept | Switched Mode Power Supplies - SMPS | Uninterruptible Power Supply - UPS | Solar Photo Voltaic Power Conversion System - Solar Energy | Soft Switching converters - ZVS and ZCS Converters | Matrix Converter for Frequency Changing Power Supply Application | DC to DC Converters Chopper drive for DC motor - Two Quadrant operation / Four Quadrant operation DC Motor drive (Armature voltage control) - Single phase input-DC output Protective Relay - DF/DT protection Speed control by slip power recovery scheme Thyristorized power controller for industrial application Multi Level Inverter-Single phase Robust PID controller for DC motor PWM based DC drive for bi-directional speed control using single potentiometer Resonant inverter
  • 82.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Fuzzy controller design for DC Motor speed control system Protective relay-V, I, V / F protection Protective relay-Impedance relay Voltage regulation of alternator Modeling & Analysis of a fuzzy logic based unified Power Controller A Novel thyristor based BLDC Linear induction Motor with V/F drive Power converter using control circuits Electric drives Modeling and their control Speed Control of DC motor using PWM technique Speed synchronization of two DC motors TRIAC based Speed Control Of Induction Motor Automatic load sharing of transformers Electrical Apparatus Control System In A Plant Using RF Wireless Communication Microcontroller based Zero Voltage switching resonant converter Microcontroller based quasi resonant converter Microcontroller based PWM converter with minimum Hardware PWM inverter with minimum Hardware Microcontroller based measurement of flow, color, position and level Energy saving in Single Phase induction motor using A.C Chopper
  • 83.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Microcontroller based Generator protection Microcontroller based induction heating Microcontroller based Transformer Protection Microcontroller based Induction motor protection Microcontroller based Thyristor Controlled Reactor Microcontroller based measurement of current, voltage, power factor and temperature etc Resonant inverter Thyristor Switched Capacitor scheme for fast changing industrial loads Harmonic Reduction using Diode Clamped Multilevel Inverter Noiseless speed control of AC Servo Motor using PWM Inverter Third Harmonic auxiliary commutated Current Source Inverter with minimum hardware Solid state transfer switch for custom power system Harmonic reduction using Capacitor Clamped Multilevel Inverter L-type High Frequency Quasi Resonant Zero Current Switch M-type High Frequency Quasi Resonant Switch Soft starter and energy saver for 1-phase Induction Motor using Bidirectional Voltage Regulator Static excitation for large Alternator with fast response to improve Dynamic Stability Performance of DC motor fed from Quasi Resonant Converter
  • 84.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Integral Cycle Controlled Inverter fed Induction Motor drive FC-TCR type Static VAR generator for FACTS High frequency Zero Voltage Switching Resonant Converter ZVS Multi-resonant Quasi Resonant Converter Noiseless speed control of PM DC motor using PWM Converter SCADA for large scale power system Data Acquisition System for large electrical drive Four switch inverter for 3-phase BLDC motor Two input full bridge DC TO DC Converter for selective Harmonic elimination Severless DC to DC Boost Converter using Comparator Two input Full Bridge Inverter with improved output waveform A New Simplified Multilevel Inverter topology for DC-AC Conversion Boost DC-AC Inverter: A New Control Strategy Electrical Network Automation & Communication Systems Energy Saver for Auditoriums Fault Tolerant Neuro Controlled Level Processing Panel IGBT based PWM Inverter using Microcontroller Measurement of the Radio Frequency Signal of A Circuit-Breaker Programmable Temperature Control System Power Line Fault Analysis, Monitoring and Load Sharing System
  • 85.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Remote Access Control and Automation System for Electrical Appliances using Telephone Line Centralized Electricity Billing Through Telephone Line Electricity Billing System Automation with IRC Reader Fault Location using Remote Connection, with Immediate Voice Feedback Energy Management System for Pulse Output Meters Programmable active power factor improvement scheme for single phase switch mode boost rectifiers SVPWM Techniques and Applications in HTS PMSM Machines Control Space vector pulse width modulation of three level inverter extending operation into over modulation region Impact of Reactive Power in Power Evacuation from Wind Turbines Transient Fault Response of Grid Connected Wind Electric Generators PMSM Speed Sensor less Direct Torque Control Based on EKF Zbus Transmission Network Cost Allocation Electromagnetic Interference with Electronic apparatus by switching surges in GIS – Cable system Predictive Valley Current Control for Two Inductor Boost Converter A Modular Fuel Cell, Modular DC–DC Converter Concept for High Performance and Enhanced Reliability A Simple Control Scheme for Single-Phase Shunt Active Power Filter with Fuzzy Logic Based DC Bus Voltage Controller A 24-pulse AC-DC converter employing a pulse doubling technique for vector controlled induction motor drives
  • 86.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Modeling of three levels converters used in Electric Traction Harmonic Current Reduction in Railway System Second Order Sliding Mode for Traction Control in Ride-by-Wire Sport Motorcycles A Modular Strategy for Control and Voltage Balancing of Cascaded H- Bridge Rectifiers Development of a Slip and Slide Simulator for Electric Locomotive Based on Inverter Controlled Induction Motor Power Quality Analysis of Traction Supply Systems with High Speed Train using Active Filters to Reduce THD in Traction Systems Direct torque with fuzzy logic ripple reduction based stator flux vector control Optimized Discontinuous PWM Algorithm With Variable Load Power Factor For Multilevel Inverters Novel Direct Power Control for Compensating Voltage Unbalance and Load Fluctuations in PWM Rectifiers New DTC Control Scheme for Induction Motors fed with a Three-level Inverter Sensor less Speed Estimation of Induction Motor in a Direct Torque Control System MRAS based Speed Control of sensorless Induction Motor Drives A Novel Technique for Distribution System Feeder reconfiguration Power Upgrading of Transmission Line by Combining AC–DC Transmission A Single Phase Z-Source Cycloconverter (SPZC) Based on Single Phase Matrix Converter (SPMC) Topology with Safe Commutation Strategy
  • 87.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Simulation of a Space Vector PWM Controller for a Three-Level Voltage Fed Inverter Motor Drive Optimal Intelligent Controller for Matrix Converter Induction Motor Drive System 3-Phase Power Factor Correction, Using Vienna Rectifier Approach & Modular Construction for Improved Overall Performance, Efficiency & Reliability A Comparative Study between two Strategies for Four-Wire Shunt Active Filter Control A Simple New Control Technique For Unified Power Quality Conditioner (UPQC) Direct Power Control for three-phase PWM rectifier with active filtering function Space Vector Control of 5-phase PMSM supplied by 5 H-bridge VSIs Simulation and Modeling of a Dynamic Voltage Restorer. Dynamic modeling, design and simulation of a wind/fuel cell/ultra- capacitor-based hybrid power generation system Sensor less Control of Interior Permanent-Magnet Machine Drives With Zero Phase Lag Position Estimation Torque-Ripple Minimization in Switched Reluctance Machines Over a Wide Speed Range Torque-Ripple Minimization in Switched Reluctance Motors Using Adaptive Fuzzy Control Possibility of Power Tapping From Composite AC–DC Power Transmission Lines
  • 88.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Prediction-based ripple reduction in Direct Torque Control of an induction machine Artificial Neural Network Controlled Shunt Active Power Filter Three-phase, power quality improvement ac/dc converters DTC-SVM Scheme for Induction Motors Fed with a Three-level Inverter Real and Reactive Power Coordination for a Unified Power Flow Controller Control and Analysis of a Unified Power Flow Controller Performance Analysis of Fuzzy Logic Based Unified Power Flow Controller Direct Power Control Strategies for Multilevel Inverter Based Custom Power Devices Switching Losses and Harmonic Investigations in Multilevel Inverters Modeling and Control of a Fuel Cell Based Z-Source Converter Fuzzy Control of Fuel Cell Distributed Generation Systems Intelligent Control of Fuel Cell Distributed Generation Systems Modeling and Control of Fuel Cell Based Distributed Generation Systems in a Standalone AC Power Supply A Low-Cost Inverter for Domestic Fuel Cell Applications Analysis and Design Considerations of Zero-Voltage and Zero-Current Switching (ZVZCS) Full-Bridge PWM Converters A Fast Space-Vector Modulation Algorithm for Multilevel Three-Phase Converters Fuzzy Logic Controller Based Three-phase Shunt Active Filter for Line Harmonics Reduction
  • 89.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 A Fuzzy-Controlled Active Front-End Rectifier with Current Harmonic Filtering Characteristics and Minimum Sensing Variables The use of Facts devices in disturbed Power Systems-Modeling, Interface, and Case Study A Novel Maximum Power Point Tracker for PV Panels Using Switching Frequency Modulation Single Phase Power Factor Correction: A Survey Modified SVPWM Algorithm for Three Levels VSI With Synchronized and Symmetrical Waveforms A Closed Loop Observer for Rotor Flux Estimation in Induction Machines Fuzzy Logic Speed Control of a DC Motor A New Topology for Unipolar Brushless DC Motor Drive with High Power Factor The Discontinuous Conduction Mode Sepic and Cuk Power Factor Preregulators: Analysis and Design Development of Low Cost Multi Phase Brushless DC (BLDC) Motors with Unipolar Current Excitations Direct Torque Control of Five-Phase Induction Motor Using Space Vector Modulation with Harmonics Elimination and Optimal Switching Sequence Optimal Placement of Shunt Connected Facts Device in a Series Compensated Long Transmission Line PSCAD/EMTDC Simulation of Unified Series-Shunt Compensator for Power Quality Improvement Effects of Power Oscillations Damping Controllers by UPFC Using Different Fault Conditions
  • 90.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Transient Stability Improvement of SMIB With Unified Power Flow Controller Control of Grid-interfacing Inverters with Integrated Voltage Unbalance Correction Three-Leg VSC and a Transformer Based Three-Phase Four-Wire DSTATCOM for Distribution Systems Modeling of a DSTATCOM with Ultra Capacitor Energy Storage for Power Distribution System Applications Control strategies for distribution static compensator for power quality improvement Optimization of PI Coefficients in DSTATCOM Nonlinear Controller for Regulating DC Voltage using Genetic Algorithm Operation and Control of Single Phase Micro Sources in a Utility Connected Grid Voltage Flicker Compensation using STATCOM A Novel Voltage-Boosting Converter with Passive Voltage Clamping Pulse Width Modulated Buck-Boost Five-Level Current Source Inverters Wound Rotor Induction Generator With Sensor less Control and Integrated Active Filter for Feeding Nonlinear Loads in a Stand-Alone Grid Optimum Control of Selective and Total Harmonic Distortion in Current and Voltage Under Non sinusoidal Conditions Filter based non-invasive control of chaos in Buck converter Voltage and Energy Utilization Enhancement in a Stand-alone WECS Using a Fuzzy Logic Controlled SPWM Converter Interface Scheme Hybrid Cascaded Multilevel Inverter with PWM Control Method
  • 91.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 Fuzzy Logic Based Control of Variable Speed Induction Machine wind Generation System Control of Three Phase, Four-Wire PWM Rectifier Indirect Matrix Converter Based on Investigations of Field-oriented control for Induction Motor Two-stage Matrix Converter Used in Wind Power Generation System Application Research Development of a Grid – Connected WIND/PV/BESS Hybrid Distributed Generation System Improvement of Voltage Stability and Reduce Power System Losses by Optimal GA based Allocation of Multi-type FACTS Devices Impacts of AC Generators and DSTATCOM Devices on the Dynamic Performance of Distribution Systems Digital Signal Controllers Improve Efficiency for Solar power Inverters The Use of Matrix Converters in Direct Torque Control of Induction Machines Analysis of Different Schemes of Matrix Converter with Maximum Voltage Conversion Ratio Power Flow Control with UPFC in Power Transmission System Wind driven self excited induction generator with voltage and frequency regulated by a reduced rating voltage source inverter A new fuzzy color correlated impulse noise reduction method A unified three phase transformer model for distribution load flow calculations Power flow control with UPFC in power transmission system Experiment on Fractional Frequency Transmission System
  • 92.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 A space Vector Modulation Scheme to Reduce Common Mode Voltage for Cascade Multilevel Inverters Analysis, Design and Implementation of modified single phase inverter Switching Frequency Imposition and Ripple Reduction in DTC Drives by Using Multilevel Converter Simultaneous Phase Balancing at Substations and Switches with Time- Varying Load Patterns Consideration of Input Parameter Uncertainties in Load Flow Solution of Three-Phase Unbalanced Radial Distribution System A Three-Phase Power Flow Method For Real-Time Distribution System Analysis Novel Method of Load Compensation under Unbalanced & Distorted Voltages Development of Three-Phase Unbalanced Power Flow Using PV and PQ Models for Distributed Generation and Study of the Impact of DG Models Position Control Design Project (PD Controller – Root – Locus Design) Multi-Input Inverter for Grid-Connected Hybrid PV/Wind Power System Unbalanced Three-Phase Distribution System Load-Flow Studies Including Induction Machines Power Flow Control in a Distribution System Through an Inverter Interfaced Distributed Generator A simple Circuit-Oriented model for predicting six-phase induction machine performances Photovoltaic-Battery-Powered DC Bus System for Common Portable Electronic Devices A Fast and Accurate Maximum Power Point Tracker for PV Systems
  • 93.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 FINAL YEAR PROJECTS 2013 - 2014 Why NCCT Complete Guidance * On time Completion * Excellent Support Multi platform Training * Flexibility PROJECTS SUPPORTS & DELIVERABLES Project Abstracts & IEEE Paper Project Block Diagram & Circuit Diagram Datasheets and Manuals PPT & Review Details Guidance Project Report Guidance Working Procedure & Screen Shots Materials & Reference Books in DVD Project Completion Certificate
  • 94.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 IEEE DOMAINS IEEE TRANSACTIONS PROJECTS ON AUTOMATIC CONTROL BIOMEDICAL ENGINEERING BROADCASTING COMMUNICATIONS CONSUMER ELECTRONICS CONTROL SYSTEMS ENERGY CONVERSION FUZZY SYSTEMS INDUSTRIAL ELECTRONICS INSTRUMENTATION AND MEASUREMENT INTELLIGENT TRANSPORTATION SYSTEMS POWER ELECTRONICS POWER SYSTEMS
  • 95.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 ROBOTICS VLSI SYSTEMS WIRELESS COMMUNICATIONS MICROELECTROMECHANICAL SYSTEMS MECHATRONICS We are offering Wide Range of Projects in IEEE Domains including Embedded Microcontroller Kits, Models Any IEEE & NON IEEE Projects in any Domain / any Application can be Implemented Do you have any Innovative / Challenging Projects or Concepts needs to be Developed, We are here to do it…
  • 96.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 EMBEDDED PROJECT DOMAINS BIO MEDICAL BIO METRICS - FINGER PRINT, RFID, VOICE ROBOTICS SECURITY SYSTEM TELE COMMUNICATION COMMUNICATION UNWIRED - ZIGBEE, RFID, GSM, RF, BLUETOOTH, WIFI, GPS WIRED - RS232, RS485, USB, CAN ELECTRICAL JAMMERS MOTORS, DRIVES & CONTROLS NETWORKING POWER ELECTRONICS - DC TO DC, BUCK BOOST, INVERTERS, POWER FACTOR, CONVERTERS, HARMONICS & FILTERS, IMPEDANCE GPS
  • 97.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 TOUCH SCREEN ULTRASONIC ACCESS CONTROL INTELLIGENT TRANSPORT SYSTEM SENSORS NETWORK - WIRELESS SENSORS NETWORK AUTOMATION AND CONTROL AUTOMOTIVE ENERGY MANAGEMENT POWER SYSTEMS CONSUMER ELECTRONICS INDUSTRIAL ELECTRONICS ENCRYPTION AND DECRYPTION CAN / DAS / DCS / PLC / SCADA ARTIFICIAL INTELLIGENCE / FUZZY LOGIC / NEURAL NETWORKS IVRS / SMS INSTRUMENTATION LEVEL & ANALYTICAL INSTRUMENTATION MEASUREMENT AND CONTROL SYSTEM PROCESS CONTROL
  • 98.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 WEIGHING SYSTEM MECHANICAL MECHATRONICS MEMS WINDMILL SOLAR THERMAL AGRICULTURAL Any IEEE & NON IEEE Projects in any Domain / any Application can be Implemented Do you have any Innovative / Challenging Projects or Concepts needs to be Developed, We are here to do it…
  • 99.
    NCCT Final Year Projects Promisefor the Best Projects PROJECTS 2013-14 NCCT, 109, 2nd Floor, Bombay Flats, Nungambakkam High Road, Nungambakkam, Chennai – 600 034, Tamil Nadu. Next to ICICI Bank, Above IOB, Near Taj Hotel www.ncct.in, www.ieeeprojects.net, ncctchennai@gmail.com 044-2823 5816, 98411 93224, 89393 63501 MICROCONTROLLERS - 8051 from Atmel / ARM - ARM7, ARM9 / Microchip - PIC 16x, DSPIC / Atmel AVR DSP - Texas Instruments - MSC1210xx, MSP430xx / Analog Devices - ADSP, Blackfin VLSI - Cypress – PsoC / Xilinx - FPGAs & CPLDs / Altera - FPGAs & CPLDs Peripheral Interface: CAN, USB, Ethernet, SPI, I2C, PS/2, RS232, RS485 Wireless: RF Tx Rx, GSM/GPRS, GPS, Bluetooth, IrDA, RFID, Zigbee Server - Intel Pentium Dual Core Server Running Windows Clients - Intel & AMD powered Client PC(s) running Windows XP, Linux Networking - Routers, Switches and Wireless Access Points Telecommunication Modules & Devices, CAT 5 Cables, Cross Over Cables, Modems