LYNX Blue Line Extension
                    Transit Station Area Plan Update to TSAC
                                  October 11, 2012
City of Charlotte
Today’s Meeting

 • Quick BLE Update
 • Background
 • Policy Context
 • Station Area Plan
 • Developing Plans
 • Next Steps




City of Charlotte
Blue Line Extension Update




City of Charlotte
BLE Overview

   • 9.3 mile light rail extension from Center
     City to UNC Charlotte campus

   • 11 Stations

   • 4 park and ride lots; 3,100 parking
     spaces

   • Will serve an additional 24,500
     riders/day

   • Congestion-free commute; 22 minutes
     from Center City to UNC Charlotte


City of Charlotte
BLE Stations

 •    11 Stations (7 walk-up / 4 park-and-ride)
 •    Platforms accommodate 3-car trains
 •    ~ 3,100 parking spaces
 •    Connecting bus services
 •    Station amenities:
       o   Security features
       o   Bicycle parking
       o   Public art
       o   Shelters, garbage cans, benches
       o   Trees
       o   Lighting
       o   Ticket vending machines (TVMs)
       o   Maps and schedules

City of Charlotte
Background




City of Charlotte
Station Area Plan Background


                           • Current Effort:
                              o   Parkwood
                              o   25th Street
                              o   36th Street
                              o   Sugar Creek
                              o   Old Concord Rd
                              o   Tom Hunter

                           • University City Area Plan
                              o Complete
                              o University Area Stations




City of Charlotte
What’s Been Done So Far?




City of Charlotte
Policy Context




City of Charlotte
Centers, Corridors & Wedges
                                       Growth Framework

    Activity Centers
    • Center City
    • Mixed Use Center
    • Industrial Center
    Growth Corridors
    • Established Neighborhood
      Areas
    • Transit Station Areas
    • Interchange Areas
    • General Corridor Areas
    Wedges

City of Charlotte
Station Area Plan




City of Charlotte
What is a Station Area Plan?

                      • Policy Guide
                      • Provides a Framework for
                        Future Growth and
                        Development
                      • Detailed Land Use and
                        Community Design
                        Recommendations
                                Station Area Plan
                      • Identifies Public and Private
                        Investments and Strategies
                      • Represents a Shared Vision
                        for the Future


City of Charlotte
Station Area Plan Principles




                                                   Land Use


        Community Design




                                        Mobility



City of Charlotte
Station Area Plan Elements

    • Elements Typical of Area Plans
          o Vision
          o Land Use/Transportation/Community Design
            Recommendations
          o Recommended Infrastructure Improvements
          o Implementation Section with Recommended Zoning
            Changes
          o Street cross-sections
               – Identify Future Curb Lines
               – Identifying Setbacks from
                 Back-of-Curb Lines




City of Charlotte
What it is and isn’t…

                    Clarify the Vision for the Area

Identify and provide policies to                    Create regulations or
address development opportunities   But not . . .   laws
and issues

Identify public and private                         Provide funding and
investments needed to achieve       But not . . .   implementation
vision                                              means overnight

Possibly recommend zoning           But not . . .   Rezone property
changes in appropriate locations

Guide more appropriate              But not . . .   Halt development
development

City of Charlotte
Implementation




          – Street Cross-sections that
            Identify Future Curb Lines
          – Identifying Setbacks from Back-
            of-Curb Lines




City of Charlotte
Developing Plans




City of Charlotte
Boundaries

                                              • Properties within ½
                                                mile of the transit
                                                station.
                                              • Includes some
                                                properties in
                                                neighborhoods
                                                zoned single family.
          – Street Cross-sections that        • Uses “natural”
            Identify Future Curb Lines          boundaries where
          – Identifying Setbacks from Back-     possible (streets,
            of-Curb Lines                       rear property lines,
                                                etc.).


City of Charlotte
Conceptual Plans

    • Consider vision and
      goals

    • Illustrate
      recommended
      development
      pattern

    • General in nature
      and to provide
      guidance for
      policies


City of Charlotte
Next Steps




City of Charlotte
Next Steps
                                                               Sugaw Creek
                                                            Presbyterian Church
                                  Public                   101 W. Sugar Creek Road
                                 Workshop                     Charlotte, NC 28213
                                  No. 2                            6:00 p.m.
                                  October 18,
               Public                2012
                                                   Public
              Workshop                            Workshop
               No. 1                               No. 3
               October 4, 2012                    November 1,
                                                     2012




       Data
                                  Review                         Wrap-Up
                                                                  Public
     Collection                    and                           Meeting
        and                                                       January 2013
      Analysis                    Adoptio
       Summer 2012
                                    n
                                    Spring 2013
City of Charlotte
Thank You!




City of Charlotte

More Related Content

Similar to 2012 1011 BLE SAP TSAC Presentation

Meet the Primes - LYNX Blue Line Extension
Meet the Primes - LYNX Blue Line ExtensionMeet the Primes - LYNX Blue Line Extension
Meet the Primes - LYNX Blue Line ExtensionCharlotte Chamber
 
Broadway Tod Report 3 Recommendations
Broadway Tod Report 3 RecommendationsBroadway Tod Report 3 Recommendations
Broadway Tod Report 3 Recommendationsjseattle
 
City of Peoria, AZ- Entertainment District Presentation
City of Peoria, AZ- Entertainment District PresentationCity of Peoria, AZ- Entertainment District Presentation
City of Peoria, AZ- Entertainment District Presentationsbettencourt
 
ULI Seattle’s Bus Rapid Transit and Land Use Initiative Developing the Next F...
ULI Seattle’s Bus Rapid Transit and Land Use Initiative Developing the Next F...ULI Seattle’s Bus Rapid Transit and Land Use Initiative Developing the Next F...
ULI Seattle’s Bus Rapid Transit and Land Use Initiative Developing the Next F...Virtual ULI
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...Rail~Volution
 
Peoria Transit Study Public Meeting #3 Slides
Peoria Transit Study Public Meeting #3 SlidesPeoria Transit Study Public Meeting #3 Slides
Peoria Transit Study Public Meeting #3 Slidesrtspincog
 
Capitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open HouseCapitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open Housejseattle
 
Station area plan jan 2013
Station area plan jan 2013Station area plan jan 2013
Station area plan jan 2013Adina Levin
 
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1Toronto Public Consultation Unit
 
High Speed Rail - Riverside County
High Speed Rail - Riverside CountyHigh Speed Rail - Riverside County
High Speed Rail - Riverside CountyDarrell Talbert
 
Dan Ross NextGen ppt FINAL
Dan Ross NextGen ppt FINALDan Ross NextGen ppt FINAL
Dan Ross NextGen ppt FINALDan Ross
 
OPDC - Old Oak Neighbourhood Area and Forum OPDC Board Presentation - Septemb...
OPDC - Old Oak Neighbourhood Area and Forum OPDC Board Presentation - Septemb...OPDC - Old Oak Neighbourhood Area and Forum OPDC Board Presentation - Septemb...
OPDC - Old Oak Neighbourhood Area and Forum OPDC Board Presentation - Septemb...Alexandra Dobson
 
DRAFT: Development Guidelines and Urban Design Recommendations Report
DRAFT: Development Guidelines and Urban Design Recommendations ReportDRAFT: Development Guidelines and Urban Design Recommendations Report
DRAFT: Development Guidelines and Urban Design Recommendations Reportjseattle
 
GA Project Capstone-City of Melbourne street furniture-final
GA Project Capstone-City of Melbourne street furniture-finalGA Project Capstone-City of Melbourne street furniture-final
GA Project Capstone-City of Melbourne street furniture-finalHang (Henry) YAN
 

Similar to 2012 1011 BLE SAP TSAC Presentation (20)

Meet the Primes - LYNX Blue Line Extension
Meet the Primes - LYNX Blue Line ExtensionMeet the Primes - LYNX Blue Line Extension
Meet the Primes - LYNX Blue Line Extension
 
Rio Vista, CA: Rio Vision Community Process
Rio Vista, CA: Rio Vision Community ProcessRio Vista, CA: Rio Vision Community Process
Rio Vista, CA: Rio Vision Community Process
 
Broadway Tod Report 3 Recommendations
Broadway Tod Report 3 RecommendationsBroadway Tod Report 3 Recommendations
Broadway Tod Report 3 Recommendations
 
City of Peoria, AZ- Entertainment District Presentation
City of Peoria, AZ- Entertainment District PresentationCity of Peoria, AZ- Entertainment District Presentation
City of Peoria, AZ- Entertainment District Presentation
 
Sebastopol SDAT Presentation
Sebastopol SDAT PresentationSebastopol SDAT Presentation
Sebastopol SDAT Presentation
 
ULI Seattle’s Bus Rapid Transit and Land Use Initiative Developing the Next F...
ULI Seattle’s Bus Rapid Transit and Land Use Initiative Developing the Next F...ULI Seattle’s Bus Rapid Transit and Land Use Initiative Developing the Next F...
ULI Seattle’s Bus Rapid Transit and Land Use Initiative Developing the Next F...
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
 
Peoria Transit Study Public Meeting #3 Slides
Peoria Transit Study Public Meeting #3 SlidesPeoria Transit Study Public Meeting #3 Slides
Peoria Transit Study Public Meeting #3 Slides
 
Capitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open HouseCapitol Hill Transit Oriented Development Open House
Capitol Hill Transit Oriented Development Open House
 
Station area plan jan 2013
Station area plan jan 2013Station area plan jan 2013
Station area plan jan 2013
 
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
 
Where Do I Start? New Tools to Prioritize Investments in Bicycle and Pedestri...
Where Do I Start? New Tools to Prioritize Investments in Bicycle and Pedestri...Where Do I Start? New Tools to Prioritize Investments in Bicycle and Pedestri...
Where Do I Start? New Tools to Prioritize Investments in Bicycle and Pedestri...
 
High Speed Rail - Riverside County
High Speed Rail - Riverside CountyHigh Speed Rail - Riverside County
High Speed Rail - Riverside County
 
Dan Ross NextGen ppt FINAL
Dan Ross NextGen ppt FINALDan Ross NextGen ppt FINAL
Dan Ross NextGen ppt FINAL
 
Lbdc 081013
Lbdc 081013Lbdc 081013
Lbdc 081013
 
OPDC - Old Oak Neighbourhood Area and Forum OPDC Board Presentation - Septemb...
OPDC - Old Oak Neighbourhood Area and Forum OPDC Board Presentation - Septemb...OPDC - Old Oak Neighbourhood Area and Forum OPDC Board Presentation - Septemb...
OPDC - Old Oak Neighbourhood Area and Forum OPDC Board Presentation - Septemb...
 
DRAFT: Development Guidelines and Urban Design Recommendations Report
DRAFT: Development Guidelines and Urban Design Recommendations ReportDRAFT: Development Guidelines and Urban Design Recommendations Report
DRAFT: Development Guidelines and Urban Design Recommendations Report
 
GA Project Capstone-City of Melbourne street furniture-final
GA Project Capstone-City of Melbourne street furniture-finalGA Project Capstone-City of Melbourne street furniture-final
GA Project Capstone-City of Melbourne street furniture-final
 
Highland Creek Village Transportation Master Plan
Highland Creek Village Transportation Master PlanHighland Creek Village Transportation Master Plan
Highland Creek Village Transportation Master Plan
 
A5 Form Based Codes
A5 Form Based CodesA5 Form Based Codes
A5 Form Based Codes
 

2012 1011 BLE SAP TSAC Presentation

  • 1. LYNX Blue Line Extension Transit Station Area Plan Update to TSAC October 11, 2012 City of Charlotte
  • 2. Today’s Meeting • Quick BLE Update • Background • Policy Context • Station Area Plan • Developing Plans • Next Steps City of Charlotte
  • 3. Blue Line Extension Update City of Charlotte
  • 4. BLE Overview • 9.3 mile light rail extension from Center City to UNC Charlotte campus • 11 Stations • 4 park and ride lots; 3,100 parking spaces • Will serve an additional 24,500 riders/day • Congestion-free commute; 22 minutes from Center City to UNC Charlotte City of Charlotte
  • 5. BLE Stations • 11 Stations (7 walk-up / 4 park-and-ride) • Platforms accommodate 3-car trains • ~ 3,100 parking spaces • Connecting bus services • Station amenities: o Security features o Bicycle parking o Public art o Shelters, garbage cans, benches o Trees o Lighting o Ticket vending machines (TVMs) o Maps and schedules City of Charlotte
  • 7. Station Area Plan Background • Current Effort: o Parkwood o 25th Street o 36th Street o Sugar Creek o Old Concord Rd o Tom Hunter • University City Area Plan o Complete o University Area Stations City of Charlotte
  • 8. What’s Been Done So Far? City of Charlotte
  • 10. Centers, Corridors & Wedges Growth Framework Activity Centers • Center City • Mixed Use Center • Industrial Center Growth Corridors • Established Neighborhood Areas • Transit Station Areas • Interchange Areas • General Corridor Areas Wedges City of Charlotte
  • 11. Station Area Plan City of Charlotte
  • 12. What is a Station Area Plan? • Policy Guide • Provides a Framework for Future Growth and Development • Detailed Land Use and Community Design Recommendations Station Area Plan • Identifies Public and Private Investments and Strategies • Represents a Shared Vision for the Future City of Charlotte
  • 13. Station Area Plan Principles Land Use Community Design Mobility City of Charlotte
  • 14. Station Area Plan Elements • Elements Typical of Area Plans o Vision o Land Use/Transportation/Community Design Recommendations o Recommended Infrastructure Improvements o Implementation Section with Recommended Zoning Changes o Street cross-sections – Identify Future Curb Lines – Identifying Setbacks from Back-of-Curb Lines City of Charlotte
  • 15. What it is and isn’t… Clarify the Vision for the Area Identify and provide policies to Create regulations or address development opportunities But not . . . laws and issues Identify public and private Provide funding and investments needed to achieve But not . . . implementation vision means overnight Possibly recommend zoning But not . . . Rezone property changes in appropriate locations Guide more appropriate But not . . . Halt development development City of Charlotte
  • 16. Implementation – Street Cross-sections that Identify Future Curb Lines – Identifying Setbacks from Back- of-Curb Lines City of Charlotte
  • 18. Boundaries • Properties within ½ mile of the transit station. • Includes some properties in neighborhoods zoned single family. – Street Cross-sections that • Uses “natural” Identify Future Curb Lines boundaries where – Identifying Setbacks from Back- possible (streets, of-Curb Lines rear property lines, etc.). City of Charlotte
  • 19. Conceptual Plans • Consider vision and goals • Illustrate recommended development pattern • General in nature and to provide guidance for policies City of Charlotte
  • 20. Next Steps City of Charlotte
  • 21. Next Steps Sugaw Creek Presbyterian Church Public 101 W. Sugar Creek Road Workshop Charlotte, NC 28213 No. 2 6:00 p.m. October 18, Public 2012 Public Workshop Workshop No. 1 No. 3 October 4, 2012 November 1, 2012 Data Review Wrap-Up Public Collection and Meeting and January 2013 Analysis Adoptio Summer 2012 n Spring 2013 City of Charlotte
  • 22. Thank You! City of Charlotte

Editor's Notes

  1. Welcome…..
  2. BLE Update Station Area Plan Background Policy Context Station Area Plan – What are they & what they aren’t Developing Plans Next Steps
  3. Quick Blue Line Extension Update It’s my understanding that at a future TSAC meeting, CATS BLE staff will be delivering a more detailed update.
  4. 9.3 miles Implementation in 2017 +25,000 daily riders Connects UNC Charlotte campuses in 22 minutes
  5. Has anyone ridden the South Corridor Blue Line? It will be very similar to that project. There will be 11 stations – seven walk up and four with park and ride facilities. The stations are designed to accommodate three car trains. There will be about 3,000 parking spaces and an extensive connecting bus service. Stations are designed to be safe and convenient for customers and include security features, bicycling parking and they incorporate public art, trees and lighting. Tickets are purchased at the stations.
  6. Station Area Plan Background
  7. Multi-agency plan: There are many city and county departments that are working on this effort The current Station Area Planning process is covering the inner stations Station area plans were completed for four of these stations – Rocky River, City Boulevard, Harris/North Tryon and University City – as part of the University City Area Plan. However, as part of the Preliminary Engineering work, the Rocky River station was renamed “University City Boulevard”, the City Boulevard and Harris/North Tryon stations were combined as one station – McCullough – and the University City station was renamed “JW Clay Boulevard”. Updates to the University City Area Plan will be made to incorporate these changes.
  8. A lot of ground work has been done toward station area planning for the BLE over the past several years. To begin with, Charlotte adopted Transit Station Area Principles in 2001 that are our starting point in this process. These make general recommendations for the type of land use, design and transportation facilities desired within a half mile walk distance of transit stations. We’ll discuss these further in a minute. We also use adopted land use plans, such as Belmont and Optimist Park and the NoDa Vision Plan that was developed by the NoDa community. Last summer, CATS and Planning staff prepared a New Starts application and Environmental Impact Statement as part of the Federal requirements for the project. Both of these documents look at both the entire corridor and each station in great detail to analyze demographics, environmental information, the street network and pedestrian environment, infrastructure, issues and opportunities and much more. This information then became part of the Existing Conditions Report that was developed for this project and all are available to the public
  9. So why do we do Station Area Planning? What is the greater planning framework and policies that set this up?
  10. I mentioned the Transit Station Area Principles earlier and another broad policy document we use as a starting point is the Centers, Corridors, and Wedges Growth Framework, Charlotte’s broad-based framework for growth. It has been used in some form since 1994 as the basis for the development of more detailed plans and policies. It illustrates a generalized land development pattern for Charlotte by categorizing land into one of three categories: Activity Centers, Growth Corridors, and Wedges. The Northeast Corridor is a Growth Corridor and were discussing Transit Station Areas within it. We’ll also identify Established Neighborhood Areas within the Corridor. “ Established Neighborhood Areas These sub-areas are those existing, primarily low density residential communities that are located within the Growth Corridors. These areas: are typically comprised of single family housing, but may also include some multi-family, commercial and civic uses, as well as some mixed or multi-use developments; should be maintained and enhanced; should be protected with a transition from more intense development that adversely impacts the character of the neighborhood. “
  11. Station Area Plan What is it? What does it cover? What kind of Elements does it contain? What it isn’t. How it is implemented
  12. What is a station area plan? It’s a policy guide that provides a framework for future growth and development. It provide detailed land use, community design and transportation recommendations for each station area. It identifies public and private investments and strategies needed to realize the plan vision. And it represents a shared vision for the future.
  13. The principles cover: detailed land use, community design and transportation recommendations for each station area.
  14. Station area plans are very similar to your typical area plan – They include a vision, land use/community design and transportation recommendations, recommended infrastructure improvements and sometimes recommended zoning changes. They also include street cross section that identify future curb lines and building setbacks from the curb.
  15. There are several ways that area plan recommendations are implemented. One is through the rezoning process as development occurs; Another is through public/private partnerships and joint development opportunities; Another is through corrective rezonings and transit supportive zoning; And another is through the Northeast Corridor Infrastructure Program, also referred to as NECI. NECI identifies a wide variety of infrastructure projects, like sidewalks, bicycle facilities, stormwater improvements and others that improve accessibility and promote economic development in station areas. At this time, the NECI program is only partially funded, but we hope that will change. We’ll discuss this program and identified projects at our 3 rd workshop.
  16. How do we develop station area plans? Establish Boundaries Provide Conceptual Plans for Public Reaction Public meetings, workshops and next steps
  17. The red lines show the station area boundaries that we’ll be discussing tonight. Generally, the boundaries include properties within a half mile walk distance of the transit station area. Some include properties zoned single family. I want to stress, though, that typically established neighborhoods are identified for protection and preservation. We also use “natural” boundaries like streets and rear property lines where possible.
  18. Considers the vision and goals Illustrates the recommended development pattern General in nature and to provide guidance for policies Along with a similar overview presentation to this, at the last meeting on October 4, staff presented the conceptual plans
  19. Major next steps for the project include Utility Relocation, ROW Acquisition and Final Design. Construction is scheduled to begin next fall with operations to begin in the spring of 2017.