The 2010 Lincoln MKX offers luxury features like heated and cooled leather seats, advanced voice-activated navigation, and a high-end audio system with THX® surround sound. It has a powerful yet efficient 3.5L V6 engine with adaptive features like intelligent all-wheel drive and a trailer tow package. Safety is prioritized with six airbags, advanced stability controls, and standard systems like blind spot mirrors and SOS post-crash alert.