                            Camera
                            Box & Zoom Lens                              SCC-C4239/C4339          39   SCC-B5396/B5398          53   Accessories
                            SCC-B1311/B1011                        23    SCC-C4253/C4353          40   SCC-B5397/B5399          54   SHG-120/220                    74
                            SCC-B9221                              24    SCC-C4255/C4355          41   SmartDome                     SHG-222                        75
                            SCC-B1331/B1031                        25    IR                            SCC-641/643A             55   SADT-100WM/101WM/102WM         76
                            SCC-B2331/B2031                        26    SCC-B9270               42    SCC-C6403                56   SADT-103WM/104WM               77
                            SCC-B2333/B2033                        27    SCC-B9371/B9372/B9373   43    SCC-C6405                57   SADT-732WM/732CM               78
                            SCC-B2335/B2035                        28    SCC-B9374               44    SCC-C6407                58   SADT-937WM                     79
                            SCC-B2337/B2037                        29    Dome                          SCC-C6433/C6435          60   SADT-100EC/101EC               80
                            SCC-A2333/A2033                        30    SCC-931T                45    SCC-C7433/C7435          62   SADT-100HM                     81
                            SCC-C4201/C4301                        31    SCC-C9302(F)            46    SCC-C7478/C7478C         63   SADT-100CM/110CM/100PM         82
                            SCC-C4203A/C4303A                      32    SCC-B5342/B5344         47    SCC-C6323/C6325/C7325    64   SCX-300WM/300CM/300LM/300HM    83
                            SCC-C4205/C4305                        33    SCC-B5343/B5345         48    SCC-C6437/C6439          66   SCX-300PM / 300KM              84
                            SCC-C4207/C4307                        34    SCC-B5223               49    SCC-C7437/C7439          68   SCX-DF300W                     85
                            SCC-C4233/C4333                        36    SCC-B5331/B5333/B5335   50    SCC-C6453/C6455          70   SBR-100DCM                     86
                            SCC-C4235/C4335                        37    SCC-B5366/B5368         51    SCC-C7453/C7455          72
                            SCC-C4237                              38    SCC-B5367/B5369         52




                            Monitor
                            LCD Monitor                                  SMT-1722/1922            93   SMT-3222/4022            95   SMC-145                        96
                            SMT-1712/1912                          92    SMT-1723/1923            94   Flat Color Monitor            SMC-215                        97



                            DVR
                            Standalone DVR                               SHR-6163/6164           109   SHR-8160/8162           113   Hybrid PC DVR
                            SHR-6040/6042                        106     SHR-7080/7082           110   SHR-3040                114   SNR-1162                      116
                            SHR-6080/6082                        107     SHR-7160/7162           111   PC base DVR
                            SHR-6160/6162                        108     SHR-8080/8082           112   SPR-9716/9816           115



                            Network
                            VMS                                          Network Camera                SNC-M300                130   SNC-B5368                     136
                            NET-i Viewer                         119     SNC-B2315               126   SNC-B2331               132   SNC-B5399                     138
                            NET-i Ware                           120     SNC-B5395               128   SNC-B2335               134   SNC-C7478/C7478C              140
                                                                                                                                     SNC-C6225/C7225               142

                            Controller
                            SSC-1000                             145     SSC-5000                146   SCX-RD100               147



                            EZ View
                            SHR-1041K                            150

                            * “N” stands for NTSC. “P” stands for PAL.
Video Security System

PRODUCT Line Up                                                        ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::

   : CAMERA                                                                                                                                         : CAMERA
Box & Zoom Lens                                                        Box & Zoom Lens                                                           Dome                                                                            SmartDome
                                                                        NEW                                                                                                                                                       NEW
                  High Resolution Color Camera                                           34x Optical Zoom Lens Camera                                          Super High-Resolution Day/Night Dome Camera                                     34x Optical Zoom High Speed Dome Camera
                  SCC-B1311/B1011                              | 23P                                                                     | 38P                 SCC-B5331/B5333/B5335                                     | 50P                                                                     | 66P
                                                                                         SCC-C4237                                                                                                                                             SCC-C6437/C6439

                                                                        NEW                                                                                                                                                       NEW
                  Bullet Type Camera                                                     34x Optical Zoom Lens Camera                                          Super High-Resolution Day/Night Dome Camera                                     34x Optical Zoom High Speed Dome Camera
                  SCC-B9221                                    | 24P                                                                     | 39P                 SCC-B5366/B5368                                           | 51P                 SCC-C7437/C7439                                     | 68P
                                                                                         SCC-C4239/C4339

                                                                        NEW                                                                                                                                                       NEW
                  Super High-Resolution Camera                                           43x Optical Zoom Lens Camera                                          Super High-Resolution Day/Night WDR Dome Camera                                 43x Optical Zoom High Speed Dome Camera
                  SCC-B1331/B1031                              | 25P                     SCC-C4253/C4353                                 | 40P                 SCC-B5367/B5369                                           | 52P                                                                     | 70P
                                                                                                                                                                                                                                               SCC-C6453/C6455

                                                                        NEW                                                                                                                                                       NEW
                  Super High-Resolution Day/Night Camera                                 43x Optical Zoom Lens Camera                                          Super High-Resolution Day/Night Anti-Vandal Dome Camera                         43x Optical Zoom High Speed Dome Camera
                  SCC-B2331/B2031                              | 26P                     SCC-C4255/C4355                                 | 41P                 SCC-B5396/B5398                                           | 53P                 SCC-C7453/C7455                                     | 72P


                  Super High-Resolution Day/Night Camera                                                                                                       Super High-Resolution WDR Anti-Vandal Dome Camera
                  SCC-B2333/B2033                              | 27P                                                                                           SCC-B5397/B5399                                           | 54P

                                                                       IR                                                                                                                                                        Accessories

                  Super High-Resolution Day/Night WDR Camera                             Bullet type IR LED Day/Night Camera                                                                                                                   Indoor / Outdoor Housing
                                                               | 28P                     SCC-B9270                                       | 42P                                                                                                 SHG-120/220                                         | 74P
                  SCC-B2335/B2035

                                                                                                                                                 SmartDome

                  Super High-Resolution Day/Night Camera                                 Bullet type IR LED Day/Night Camera                                   22x Zoom SmartDome Camera                                                       Outdoor Housing
                                                               | 29P                                                                     | 43P                                                                           | 55P                                                                     | 75P
                  SCC-B2337/B2037                                                        SCC-B9371/B9372/B9373                                                 SCC-641/643A                                                                    SHG-222



                  Super High-Resolution Day/Night Camera                                 Anti-Vandal Dome IR LED Day/Night Camera                              32x Zoom Day/Night SmartDome Camera                                             Wall Mount Adaptor
                                                               | 30P                     SCC-B9374
                                                                                                                                         | 44P                                                                           | 56P                                                                     | 76P
                  SCC-A2333/A2033                                                                                                                              SCC-C6403                                                                       SADT-100WM/101WM/102WM



                  22x Zoom Lens Camera                                                                                                                         22x Power Zoom Day/Night WDR SmartDome Camera                                   Wall Mount Adaptor
                  SCC-C4201/C4301
                                                               | 31P                                                                                           SCC-C6405                                                 | 57P                 SADT-103WM/104WM                                    | 77P

                                                                       Dome

                  22x Zoom Day/Night Camera                                              Anti Vandal Dome Camera                                               32x Zoom Day/Night WDR SmartDome Camera                                         Wall Mount / Celling Mount Adaptor
                  SCC-C4203A/C4303A
                                                               | 32P                                                                     | 45P                 SCC-C6407                                                 | 58P                 SADT-732WM/732CM                                    | 78P
                                                                                         SCC-931T


                  22x Zoom Day/Night WDR Camera                                          Anti Vandal 3-Axis Day/Night, WDR Dome Camera                         High Resolution SmartDome Camera                                                Wall Mount Adaptor
                                                               | 33P                     SCC-C9302(F)                                    | 46P                                                                           | 60P                 SADT-937WM                                          | 79P
                  SCC-C4205/C4305                                                                                                                              SCC-C6433/C6435


                  32x Zoom Day/Night WDR Camera                                          Day/Night Vari-Focal Dome Camera                                      High Resolution SmartDome Camera                                                Ceiling Mount Adaptor
                                                               | 34P                     SCC-B5342/B5344                                 | 47P                 SCC-C7433/C7435                                           | 62P                 SADT-100EC/101EC                                    | 80P
                  SCC-C4207/C4307


                  High Resolution 32x Zoom Camera                                        Day/Night Vari-Focal Dome Camera                                      36x Zoom SmartDome Camera                                                       Hanging Mount Adaptor
                  SCC-C4233/C4333
                                                               | 36P                                                                     | 48P                 SCC-C7478/C7478C
                                                                                                                                                                                                                         | 63P                 SADT-100HM                                          | 81P
                                                                                         SCC-B5343/B5345


                  High Resolution WDR 32x Zoom Camera                                    Super High-Resolution Mini Dome Camera                                10x Zoom Mini SmartDome Camera                                                  Ceiling Mount / Corner Mount / Pole Mount Adaptor
                  SCC-C4235/C4335
                                                               | 37P                                                                     | 49P                 SCC-C6323/C6325/C7325                                     | 64P                 SADT-100CM/110CM/100PM                              | 82P
                                                                                         SCC-B5223
Video Security System

PRODUCT Line Up                                                                   ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::

    : CAMERA                                                                         : DVR                                                                    : NETWORK                                                           : CONTROLLER
Accessories                                                                       Standalone DVR                                                           Network Camera
 NEW
                     Wall Mount / Ceiling Mount / Hanging Mount / Parapet Mount                    4Ch Standalone DVR                                                       Dual Codec D1 Real-time Network Camera                            System Controller
                     SCX-300WM / 300CM / 300HM / 300LM                | 83P                        SHR-6040/6042                                  | 106P                    SNC-B2315                                    | 126P               SSC-1000                                     | 145P

 NEW
                     Pole Mount / Coner Mount Adaptor                                              8Ch Standalone DVR                                                       Dual Codec Anti-Vandal Dome Network Camera                        TFT Color LCD Touch Screen System Keyboard
                     SCX-300PM / 300KM                                | 84P                                                                       | 107P                                                                 | 128P               SSC-5000                                     | 146P
                                                                                                   SHR-6080/6082                                                            SNC-B5395

 NEW
                     Dome Flush Housing                                                            16Ch Standalone DVR                                                      3 Mega-Pixel Network Camera                                       System Controller
                     SCX-DF300W                                       | 85P                        SHR-6160/6162/6163/6164                        | 108P                    SNC-M300                                     | 130P               SCX-RD100                                    | 147P

                                                                                                                                                            NEW
                     Ceiling-Mount Bracket                                                         8Ch CIF Resolution Real-time Standalone DVR                              H.264 4CIF Real-Time Network Camera
                     SBR-100DCM                                       | 86P                        SHR-7080/7082                                  | 110P                    SNC-B2331                                    | 132P



                                                                                                   16Ch CIF Resolution Real-time Standalone DVR
                                                                                                                                                            NEW
                                                                                                                                                                            H.264 4CIF Real-Time WDR Network Camera
                                                                                                                                                                                                                                  : EZ VIEW
                                                                                                   SHR-7160/7162                                  | 111P                    SNC-B2335                                    | 134P


    : MONITOR                                                                                      8Ch D1 Resolution Real-time Standalone DVR
                                                                                                                                                            NEW
                                                                                                                                                                            H.264 WDR Mini Dome Network Camera                                EZ View : 4Ch Real-time DVR
                                                                                                   SHR-8080/8082
                                                                                                                                                  | 112P                                                                 | 136P               SHR-1041K                                    | 150P
LCD Monitor                                                                                                                                                                 SNC-B5368

 NEW                                                                                                                                                        NEW
                     17"/19" TFT-LCD Monitor                                                       16Ch D1 Resolution Real-time Standalone DVR                              H.264 Anti-vandal Dome Network Camera
                     SMT-1712/1912                                    | 92P                                                                       | 113P                    SNC-B5399                                    | 138P
                                                                                                   SHR-8160/8162


                     17"/19" TFT-LCD Monitor                                                       4Ch Real-time Standalone DVR                                             36x Zoom SmartDome Network Camera
                     SMT-1722/1922                                    | 93P                        SHR-3040                                       | 114P                    SNC-C7478/C7478C                             | 140P


                     17"/19" TFT-LCD Monitor                                                                                                                                10x Zoom Mini SmartDome Network Camera
                     SMT-1723/1923                                    | 94P                                                                                                 SNC-C6225/C7225                              | 142P
                                                                                  PC base DVR

                     32"/40" TFT-LCD Monitor                                                       16Ch PC Based DVR
                     SMT-3222/4022                                    | 95P                        SPR-9716/9816                                  | 115P




                                                                                  Hybrid PC DVR
Flat Color Monitor
 NEW
                                                                                                   Hybrid PC DVR
                     14" Flat Color CRT Monitor                                                                                                   | 116P
                     SMT-145                                          | 96P                        SNR-1162



                     21" Flat Color CRT Monitor
                     SMT-215                                          | 97P
CCD Camera Comparison Chart by Model                                  ::::::::::::::::::::::
                                                                                                                      Spec   Imaging     Total     Synchronization     Horizontal    Min. Scene                              Power      Day &         Privacy
                                                                                                         Model                Device     Pixels       Method           Resolution    Illumination   S/N Ratio    Lens      Requirment   Night   WDR    Zone


                                                                                                                                                                                                                             AC24V
                                                                                                         SCC-B1311            1/3"     410K/470K      Int./L.L       540 TV Lines      0.4Lux        50dB       DC/Video                 No     No      No
                                                                                                                                                                                                                             DC12V



                                                                                                         SCC-B1011            1/3"       470K         Int./L.L       540 TV Lines      0.4Lux        50dB       DC/Video     AC220V      No     No      No




                                                                                                         SCC-B9221            1/3"       410K           Int.         480 TV Lines      0.3Lux        48dB        f=4.9mm     DC12V       No     No      No


 CAMERA                                                                                                  SCC-B1331            1/3"     410K/470K      Int./L.L       600 TV Lines     0.12Lux        52dB       DC/Video
                                                                                                                                                                                                                             AC24V
                                                                                                                                                                                                                             DC12V
                                                                                                                                                                                                                                         No     No    Zone-12



                                                                                                                                                                                                                            AC220V                    Zone-12
                                                                                                         SCC-B1031            1/3"       470K         Int./L.L       600 TV Lines     0.12Lux        52dB       DC/Video
                                                                                                                                                                                                                            ~240V
                                                                                                                                                                                                                                         No     No    (Mosaic)


                                                                                                                                                                                                                             AC24V                    Zone-12
                                                                                                         SCC-B2331            1/3"     410K/470K      Int./L.L       600 TV Lines    0.0002Lux       52dB       DC/Video                 Yes    No    (Mosaic)
                                                                                                                                                                                                                             DC12V


                                                                                                                                                                                                                            AC220V                    Zone-12
                                                                                                         SCC-B2031            1/3"       470K         Int./L.L       600 TV Lines    0.0002Lux       52dB       DC/Video                 Yes    No    (Mosaic)
                                                                                                                                                                                                                            ~240V


                                                                                                                                                                                                                             AC24V                    Zone-12
                                                                                                         SCC-B2333            1/3"     410K/470K      Int./L.L       600 TV Lines    0.00002Lux      52dB       DC/Video                 Yes    No    (Mosaic)
                                                                                                                                                                                                                             DC12V


                                                                                                                                                                                                                            AC220V                    Zone-12
                                                                                                         SCC-B2033            1/3"       470K         Int./L.L       600 TV Lines    0.00002Lux      52dB       DC/Video                 Yes    No    (Mosaic)
                                                                                                                                                                                                                            ~240V


                                                                                                                                                                                                                             AC24V                    Zone-12
                                                                                                         SCC-B2335            1/3"     410K/470K      Int./L.L       600 TV Lines    0.00002Lux      52dB       DC/Video
                                                                                                                                                                                                                             DC12V
                                                                                                                                                                                                                                         Yes    Yes   (Mosaic)
Box & Zoom Lens
SCC-B1311/B1011          SCC-B2335/B2035         SCC-C4205/C4305                     SCC-C4239/C4339                                                                                                                        AC220V                    Zone-12
                                                                                                         SCC-B2035            1/3"       470K         Int./L.L       600 TV Lines    0.00002Lux      52dB       DC/Video                 Yes    Yes   (Mosaic)
SCC-B9221                SCC-B2337/B2037         SCC-C4207/C4307                     SCC-C4253/C4353                                                                                                                        ~240V
SCC-B1331/B1031          SCC-A2333/A2033         SCC-C4233/C4333                     SCC-C4255/C4355
SCC-B2331/B2031          SCC-C4201/C4301         SCC-C4235/C4335
SCC-B2333/B2033          SCC-C4203A/C4303A       SCC-C4237                                                                                                                                                                   AC24V                    Zone-12
                                                                                                         SCC-B2337            1/3"     410K/470K      Int./L.L       600 TV Lines    0.00002Lux      50dB       DC/Video                 Yes    No    (Mosaic)
                                                                                                                                                                                                                             DC12V

IR
                                                                                                                                                                                                                            AC220V                    Zone-12
SCC-B9270                SCC-B9371/B9372/B9373   SCC-B9374                                               SCC-B2037            1/3"       470K         Int./L.L       600 TV Lines    0.00002Lux      50dB       DC/Video                 Yes    No    (Mosaic)
                                                                                                                                                                                                                            ~240V


Dome                                                                                                                                                                                                                         AC24V                    Zone-12
                                                                                                         SCC-A2333            1/2"     410K/470K      Int./L.L       600 TV Lines   0.0000006Lux     50dB       DC/Video                 Yes    No    (Mosaic)
                                                                                                                                                                                                                             DC12V
SCC-931T                 SCC-B5344/B5345         SCC-B5366/B5367                     SCC-B5396/B5397
SCC-C9302(F)             SCC-B5223               SCC-B5368/B5369                     SCC-B5398/B5399
SCC-B5342/B5343          SCC-B5331/B5333/B5335                                                                                                                                                                                                        Zone-12
                                                                                                                                                                                                                            AC220V
                                                                                                         SCC-A2033            1/2"       410K         Int./L.L       600 TV Lines   0.0000006Lux     50dB       DC/Video                 Yes    No    (Mosaic)
                                                                                                                                                                                                                            ~240V
SmartDome
                                                                                                                                                                                                                22x Zoom
SCC-641/643A             SCC-C6407               SCC-C7478/C7478C                    SCC-C7437/C7439     SCC-C4201            1/4"     410K/470K        Int.         480 TV Lines    0.0005Lux       52dB        (f=3.6~     DC12V       No     No      No
SCC-C6403                SCC-C6433/C6435         SCC-C6323/C6325/C7325               SCC-C6453/C6455                                                                                                            79.2mm)
SCC-C6405                SCC-C7433/C7435         SCC-C6437/C6439                     SCC-C7453/C7455
                                                                                                                                                                                                                22x Zoom
                                                                                                                                                                                                                             AC24V
                                                                                                         SCC-C4301            1/4"     410K/470K      Int./L.L       480 TV Lines     0.005Lux       52dB        (f=3.6~                 No     No      No
Accessories                                                                                                                                                                                                                  DC12V
                                                                                                                                                                                                                79.2mm)

SHG-120/220              SADT-732WM/732CM        SADT-100CM/110CM/100PM              SCX-300PM / 300KM                                                                                                          22x Zoom
SHG-222                  SADT-937WM              SBR-100DCM                          SCX-DF300W                                                                                                                  (f=3.6~
                                                                                                         SCC-C4203A           1/4"     410K/470K        Int.         480 TV Lines    0.0005Lux       50dB                    DC12V       Yes    No      No
SADT-100WM/101WM/102WM   SADT-100EC/101EC        SCX-300WM / 300CM / 300LM / 300HM                                                                                                                              79.2mm)
SADT-103WM/104WM         SADT-100HM
CCD Camera Comparison Chart by Model : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : :
             Spec   Imaging     Total     Synchronization     Horizontal   Min. Scene                              Power      Day &          Privacy                     Spec   Imaging     Total     Synchronization     Horizontal   Min. Scene                                Power      Day &          Privacy
Model                Device     Pixels       Method           Resolution   Illumination   S/N Ratio     Lens     Requirment   Night   WDR     Zone     Model                     Device     Pixels       Method           Resolution   Illumination   S/N Ratio      Lens      Requirment   Night   WDR     Zone

                                                                                                      22x Zoom
                                                                                                                   AC24V                                                                                                                                            f=3.8~       AC24V
SCC-C4303A           1/4"     410K/470K      Int./L.L       480 TV Lines   0.0005Lux       50dB        (f=3.6~
                                                                                                                   DC12V
                                                                                                                               Yes    No      No       SCC-B9372                 1/3"       470K           Int.         540 TV Lines      0Lux         48dB
                                                                                                                                                                                                                                                                    9.5mm        DC12V
                                                                                                                                                                                                                                                                                             Yes    No       No
                                                                                                      79.2mm)

                                                                                                      22x Zoom
                                                                                                                                                                                                                                                                    f=6~         AC24V
SCC-C4205            1/4"     410K/470K        Int.         480 TV Lines   0.0002Lux       50dB        (f=3.6~     DC12V       Yes    Yes     No       SCC-B9373                 1/3"     410K/470K        Int.         540 TV Lines      0Lux         48dB
                                                                                                                                                                                                                                                                    50mm         DC12V
                                                                                                                                                                                                                                                                                             Yes    No       No
                                                                                                      79.2mm)

                                                                                                      22x Zoom
                                                                                                                   AC24V                                                                                                                                            f=3.8~       AC24V
SCC-C4305            1/4"     410K/470K      Int./L.L       480 TV Lines   0.0002Lux       50dB        (f=3.6~
                                                                                                                   DC12V       Yes    Yes     No       SCC-B9374                 1/3"     410K/470K        Int.         540 TV Lines      0Lux         48dB                                  Yes    No       No
                                                                                                                                                                                                                                                                    9.5mm        DC12V
                                                                                                      79.2mm)

                                                                                                      32x Zoom                                                                                                                                                     12x Zoom
                                                                                                                                             Zone-8                                                                                                                              AC24V
SCC-C4207            1/4"     410K/470K        Int.         480 TV Lines   0.0002Lux       50dB       (f=3.55~     DC12V       Yes    Yes              SCC-931T                  1/4"     410K/470K      Int./L.L       480 TV Lines    0.005Lux       52dB         (f=3.6~                  No     No       No
                                                                                                                                            (Mosaic)                                                                                                                             DC12V
                                                                                                       113mm)                                                                                                                                                      43.2mm)

                                                                                                      32x Zoom                                                                                                                                                     12x Zoom
                                                                                                                                             Zone-8                                                                                                                              AC24V                    Zone-8
SCC-C4307            1/4"     410K/470K      Int./L.L       480 TV Lines   0.0002Lux       50dB       (f=3.55~     AC24V       Yes    Yes              SCC-C9302(F)              1/4"     410K/470K      Int./L.L       480 TV Lines   0.0002Lux       52dB         (f=3.6~                  Yes    Yes
                                                                                                                                            (Mosaic)                                                                                                                             DC12V                    (Solid)
                                                                                                       113mm)                                                                                                                                                      43.2mm)

                                                                                                      32x Zoom
                                                                                                                                            Zone-16                                                                                                               f=2.5~6mm/     AC24V
SCC-C4233            1/4"     410K/470K        Int.         540 TV Lines   0.0002Lux       50dB       (f=3.55~     DC12V       Yes    No               SCC-B5342/B5344           1/3"     410K/470K        Int.         540 TV Lines   0.0009Lux       50dB                                  Yes    No       No
                                                                                                                                            (Mosaic)                                                                                                              f=2.9~10mm     DC12V
                                                                                                       113mm)

                                                                                                      32x Zoom
                                                                                                                                            Zone-16                                                                                                                 f=2.5~       AC24V
SCC-C4235            1/4"     410K/470K        Int.         540 TV Lines   0.0001Lux       50dB       (f=3.55~     DC12V       Yes    Yes              SCC-B5343                 1/3"     410K/470K        Int.         540 TV Lines   0.00009Lux      50dB                                  Yes    No       No
                                                                                                                                            (Mosaic)                                                                                                                6.0mm        DC12V
                                                                                                       113mm)

                                                                                                      32x Zoom
                                                                                                                   AC24V                    Zone-16                                                                                                                 f=2.9~       AC24V
SCC-C4333            1/4"     410K/470K      Int./L.L       540 TV Lines   0.0002Lux       50dB       (f=3.55~                 Yes    No               SCC-B5345                 1/3"     410K/470K        Int.         540 TV Lines   0.00009Lux      50dB                                  Yes    No       No
                                                                                                                   DC12V                    (Mosaic)                                                                                                                 10mm        DC12V
                                                                                                       113mm)

                                                                                                      32x Zoom
                                                                                                                                            Zone-16
SCC-C4335            1/4"     410K/470K      Int./L.L       540 TV Lines   0.0001Lux       50dB       (f=3.55~     DC12V       Yes    Yes   (Mosaic)
                                                                                                                                                       SCC-B5223                 1/3"     410K/470K        Int.         600 TV Lines    0.075Lux       52dB        f=3.0mm       DC12V       No     No       No
                                                                                                       113mm)

NEW                                                                                                   34x Zoom
                                                                                                                                                                                                                                                                                 AC24V                    Zone-12
SCC-C4237            1/4"     410K/470K        Int.         600 TV Lines   0.0001Lux       52dB        (f=3.4~     DC12V       Yes    No    Zone-12    SCC-B5331                 1/3"     410K/470K        Int.         600 TV Lines   0.0006Lux       52dB        f=3.8mm                   Yes    No
                                                                                                                                                                                                                                                                                 DC12V                     (Solid)
                                                                                                      115.6mm)

NEW                                                                                                   34x Zoom
                                                                                                                                                                                                                                                                                 AC24V                    Zone-12
SCC-C4239            1/4"     410K/470K        Int.         600 TV Lines   0.0001Lux       52dB        (f=3.4~     DC12V       Yes    Yes   Zone-12    SCC-B5333                 1/3"     410K/470K        Int.         600 TV Lines   0.0006Lux       52dB        f=3.0mm                   Yes    No
                                                                                                                                                                                                                                                                                 DC12V                     (Solid)
                                                                                                      115.6mm)

NEW                                                                                                   34x Zoom
                                                                                                                   AC24V                                                                                                                                                         AC24V                    Zone-12
SCC-C4339            1/4"     410K/470K      Int./L.L       600 TV Lines   0.0001Lux       52dB        (f=3.4~                 Yes    Yes   Zone-12    SCC-B5335                 1/3"     410K/470K        Int.         600 TV Lines   0.0006Lux       52dB        f=8.0mm                   Yes    No
                                                                                                                   DC12V                                                                                                                                                         DC12V                     (Solid)
                                                                                                      115.6mm)

NEW                                                                                                   43x Zoom
                                                                                                                                                                                                                                                                    f=2.5~       AC24V                    Zone-12
SCC-C4253            1/4"     410K/470K        Int.         600 TV Lines   0.0001Lux       52dB        (f=3.2~     DC12V       Yes    No    Zone-12    SCC-B5366                 1/3"     410K/470K        Int.         600 TV Lines   0.0002Lux       52dB                                  Yes    No
                                                                                                                                                                                                                                                                     6mm         DC12V                     (Solid)
                                                                                                      138.5mm)

NEW                                                                                                   43x Zoom                                                                                                                                                                                            Zone-12
                                                                                                                   AC24V                                                                                                                                            f=2.5~       AC24V
SCC-C4353            1/4"     410K/470K      Int./L.L       600 TV Lines   0.0001Lux       52dB        (f=3.2~                 Yes    No    Zone-12    SCC-B5367                 1/3"     410K/470K        Int.         600 TV Lines   0.00002Lux      52dB                                  Yes    Yes    (Solid)
                                                                                                                   DC12V                                                                                                                                             6mm         DC12V
                                                                                                      138.5mm)

NEW                                                                                                   43x Zoom
                                                                                                                                                                                                                                                                    f=2.8~       AC24V                    Zone-12
SCC-C4255            1/4"     410K/470K        Int.         600 TV Lines   0.0001Lux       52dB        (f=3.2~     DC12V       Yes    Yes   Zone-12    SCC-B5368                 1/3"     410K/470K        Int.         600 TV Lines   0.0002Lux       52dB                                  Yes    No     (Solid)
                                                                                                                                                                                                                                                                     11mm        DC12V
                                                                                                      138.5mm)

NEW                                                                                                   43x Zoom
                                                                                                                   AC24V                                                                                                                                            f=2.8~       AC24V                    Zone-12
SCC-C4355            1/4"     410K/470K      Int./L.L       600 TV Lines   0.0001Lux       52dB        (f=3.2~                 Yes    Yes   Zone-12    SCC-B5369                 1/3"     410K/470K        Int.         600 TV Lines   0.00002Lux      52dB                                  Yes    Yes
                                                                                                                   DC12V                                                                                                                                             11mm        DC12V                     (Solid)
                                                                                                      138.5mm)


                                                                                                                                                       SCC-B5396                                                                                                    f=2.5~       AC24V                    Zone-12
SCC-B9270            1/3"       320K           Int.         350 TV Lines      0Lux         48dB       f=4.3mm      DC12V       Yes    No      No                                 1/3"     410K/470K        Int.         600 TV Lines   0.0002Lux       52dB          6mm         DC12V       Yes    No     (Solid)


                                                                                                       f=3.8~      AC24V                                                                                                                                            f=2.8~       AC24V                    Zone-12
SCC-B9371            1/3"     410K/470K        Int.         540 TV Lines      0Lux         48dB        9.5mm       DC12V       Yes    No      No       SCC-B5398                 1/3"     410K/470K        Int.         600 TV Lines   0.0002Lux       52dB          11mm        DC12V       Yes    No     (Solid)
CCD Camera Comparison Chart by Model : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : :
             Spec   Imaging     Total     Synchronization     Horizontal   Min. Scene                              Power      Day &         Privacy                Spec   Imaging     Total     Synchronization     Horizontal   Min. Scene                              Power      Day &         Privacy
Model                Device     Pixels       Method           Resolution   Illumination   S/N Ratio    Lens      Requirment   Night   WDR    Zone      Model               Device     Pixels       Method           Resolution   Illumination   S/N Ratio    Lens      Requirment   Night   WDR    Zone

                                                                                                                                                       NEW                                                                                                  34x Zoom
                                                                                                       f=2.5~      AC24V                    Zone-12
SCC-B5397            1/3"     410K/470K        Int.         600 TV Lines   0.00002Lux      52dB                                Yes    Yes              SCC-C7437           1/4"     410K/470K      Int./L.L       600 TV Lines   0.00007Lux      52dB        (f=3.4~     AC24V       Yes    No    Zone-12
                                                                                                        6mm        DC12V                     (Solid)
                                                                                                                                                                                                                                                            115.6mm)

                                                                                                                                                       NEW                                                                                                  34x Zoom
                                                                                                       f=2.8~      AC24V                    Zone-12
SCC-B5399            1/4"     410K/470K      Int./L.L       480 TV Lines   0.0002Lux       50dB
                                                                                                        11mm       DC12V       Yes    Yes              SCC-C7439           1/4"     410K/470K      Int./L.L       600 TV Lines   0.00007Lux      52dB        (f=3.4~     AC24V       Yes    Yes   Zone-12
                                                                                                                                             (Solid)
                                                                                                                                                                                                                                                            115.6mm)

                                                                                                      22x Zoom                                         NEW                                                                                                  43x Zoom
SCC-641              1/4"     410K/470K      Int./L.L       480 TV Lines    0.005Lux       52dB        (f=3.6~     AC24V       No     No      No       SCC-C6453           1/4"     410K/470K      Int./L.L       600 TV Lines   0.00007Lux      52dB        (f=3.2~     AC24V       Yes    No    Zone-12
                                                                                                      79.2mm)                                                                                                                                               138.5mm)

                                                                                                      22x Zoom                                         NEW                                                                                                  43x Zoom
                                                                                                                                            Zone-8
SCC-643A             1/4"     410K/470K      Int./L.L       480 TV Lines   0.0005Lux       52dB        (f=3.6~     AC24V       Yes    No               SCC-C6455           1/4"     410K/470K      Int./L.L       600 TV Lines   0.00007Lux      52dB        (f=3.2~     AC24V       Yes    Yes   Zone-12
                                                                                                                                            (Solid)
                                                                                                      79.2mm)                                                                                                                                               138.5mm)

                                                                                                      32x Zoom                                         NEW                                                                                                  43x Zoom
SCC-C6403            1/4"     410K/470K      Int./L.L       480 TV Lines   0.0005Lux       50dB       (f=3.55~     AC24V       Yes    No      No       SCC-C7453           1/4"     410K/470K      Int./L.L       600 TV Lines   0.00007Lux      52dB        (f=3.2~     AC24V       Yes    No    Zone-12
                                                                                                       113mm)                                                                                                                                               138.5mm)

                                                                                                      22x Zoom                                         NEW                                                                                                  43x Zoom
                                                                                                                                             Zone-8
SCC-C6405            1/4"     410K/470K      Int./L.L       480 TV Lines   0.0002Lux       50dB        (f=3.6~     AC24V       Yes    Yes              SCC-C7455           1/4"     410K/470K      Int./L.L       600 TV Lines   0.00007Lux      52dB        (f=3.2~     AC24V       Yes    Yes   Zone-12
                                                                                                                                            (Mosaic)
                                                                                                      79.2mm)                                                                                                                                               138.5mm)

                                                                                                      32x Zoom
                                                                                                                                             Zone-8
SCC-C6407            1/4"     410K/470K      Int./L.L       480 TV Lines   0.0002Lux       50dB       (f=3.55~     AC24V       Yes    Yes   (Mosaic)
                                                                                                       113mm)

                                                                                                      32x Zoom
SCC-C6433            1/4"     410K/470K      Int./L.L       540 TV Lines   0.0002Lux       50dB       (f=3.55~     AC24V       Yes    No    Zone-16
                                                                                                       113mm)

                                                                                                      32x Zoom
SCC-C6435            1/4"     410K/470K      Int./L.L       540 TV Lines   0.0001Lux       50dB       (f=3.55~     AC24V       Yes    Yes   Zone-16
                                                                                                       113mm)

                                                                                                      32x Zoom
SCC-C7433            1/4"     410K/470K      Int./L.L       540 TV Lines   0.0002Lux       50dB       (f=3.55~     AC24V       Yes    No    Zone-16
                                                                                                       113mm)

                                                                                                      32x Zoom
SCC-C7435            1/4"     410K/470K      Int./L.L       540 TV Lines   0.0001Lux       50dB       (f=3.55~     AC24V       Yes    Yes   Zone-16
                                                                                                       113mm)

                                                                                                      36x Zoom
SCC-C7478            1/4"     410K/470K      Int./L.L       540 TV Lines   0.00066Lux      50dB        (f=3.4~     AC24V       Yes    Yes   Zone-8
                                                                                                      122.4mm)

                                                                                                      36x Zoom
SCC-C7478C           1/4"     410K/470K      Int./L.L       540 TV Lines   0.00066Lux      50dB        (f=3.4~     AC24V       Yes    Yes   Zone-8
                                                                                                      122.4mm)

                                                                                                      10x Zoom
SCC-C6323                                                                                                          AC24V
                     1/4"     410K/470K      Int./L.L       520 TV Lines   0.00047Lux      50dB        (f=3.8~                 Yes    No    Zone-4
                                                                                                                   DC12V
                                                                                                        38mm)

                                                                                                      10x Zoom
                                                                                                                   AC24V
SCC-C6325            1/4"     410K/470K      Int./L.L       520 TV Lines   0.00047Lux      50dB        (f=3.8~                 Yes    No    Zone-4
                                                                                                                   DC12V
                                                                                                        38mm)

                                                                                                      10x Zoom
SCC-C7325                                                                                                          AC24V
                     1/4"     410K/470K      Int./L.L       520 TV Lines   0.00047Lux      50dB        (f=3.8~                 Yes    No    Zone-4
                                                                                                                   DC12V
                                                                                                        38mm)

NEW                                                                                                   34x Zoom
SCC-C6437            1/4"     410K/470K      Int./L.L       600 TV Lines   0.00007Lux      52dB        (f=3.4~     AC24V       Yes    No    Zone-12
                                                                                                      115.6mm)

NEW
                                                                                                      34x Zoom
SCC-C6439            1/4"     410K/470K      Int./L.L       600 TV Lines   0.00007Lux      52dB        (f=3.4~     AC24V       Yes    Yes   Zone-12
                                                                                                      115.6mm)
Video Security System

      Camera Terms & Features                                                                                                                                      :::::::::::::::::::::::::::::::::::::::::::::::::::



         Super High-Resolution                                                                                                                                                    Motion Adaptive DNR
         A1 camera technology eliminates false colour artifacts (Moire) by utilising a special optical low pass filter and is able to resolve a horizontal resolution of 600 TV   The A1 DNR (Digital Noise Reduction) function eliminates noise thus generating a distinct and clear image. A1 technology utilises both an adaptive 2D filter
         lines, by means of 12 Bit A/D serial signal processing coupled with image element enhancement technology. Additionally, the implementation of a 3 line processing        reducing noise in the brightness of the image and an adaptive 3D Filter reducing noise caused by movement. These filters are combined with DNIe technology
         algorithm to prevent noise under low illumination applications, directional adaptive filtering and adjustment of aperture gain by luminance level combine to provide     which is applied to Samsung Electronics’ CCTV monitors. The result is that A1 camera series support Motion Adaptive DNR function that removes noise (Fixed
         a more vivid and clearer image.                                                                                                                                          Pattern, Random, etc.) and greatly reduces motion blur.




                                                                                                                                                                                  DNR OFF                                                             DNR ON
                                             conventional                                          A1 Hi-Resolution




                                                                                                                  Advanced
                                                                                                                 Digital Filter                                                   eXtended Dynamic Range (XDR)
               Source Image                           CCD Raw Data                      False colour Artifacts                    Samsung A1 Camera image                         Under strongly backlit or high contrast scenes, cameras generally produce images which reproduce detail in the brighter area of the scene.(fig1) Consequently,
                                                                                                                                                                                  detail is often lost in the darker areas of the scene. Samsung A1 cameras provide XDR technology to increase the level of visible detail in the dark areas, whilst
                                                                                                                                                                                  maintaining image clarity and detail in the brighter portions of the image. (fig2)



                                                                                                                                                                                                                                                                                                    Correction
                                                                                                                                                                                                                                                                                                    in Dark
         Virtual Progressive Scan(VPS)
                                                                                                                                                                                                                                                                                                                            Correction
         A1 camera models featuring WDR functions generate images using Double Scan CCD technology and these cameras provide VPS (Virtual Progressive Scan)                                                                                                                                                                 in Bright
         operation which can utilise either Interlace or Progressive scanning methods. This VPS is unique to Samsung Electronics and ensures the edges of moving
         objects are clearly defined. Applications for Samsung cameras utilising this technology include highway and ANPR projects. When used with LCD monitors
         offering progressive scan operation, Samsung VPS produces visibly superior images to non-VPS cameras. The problems of the blurred edges resulting from                   Fig 1 – XDR OFF                                             Fig 2 – XDR ON
         delays in even/odd field image scanning, are eliminated when VPS technology is used with a network product (encoder).




                                                                                                                                                                                  Intelligent Video Content Analysis
                                                                                                                                                                                  The Samsung Electronics A1 series of cameras, also provide built-in capability for video content analysis. Operational modes include:

                                                                                                                                                                                  • Fixed : Senses objects that appear and remain in a scene for longer than a pre-determined period of time.
                                                                                                                                                                                  • Moved : Detects objects removed from a scene
          Interlace Transmission (Delayed edge)                           VPS Transmission (Clear edge)                                                                           • Fence : Provides virtual electronic area [Area mode] and directional line [Line mode] and generates an alarm in the event of a breach
                                                                                                                                                                                            of the area or a cross of the directional line.
                                                                                                                                                                                  • Tracking : Tracks an object through a scene and generates an alarm in the event of abnormal directional changes.




                                                                                                                                                                                                                                                                                                                            Samsung Video Security System | 14 . 15
Video Security System

Camera Terms & Features                                                                                                                                ::::::::::::::::::::::::::::::::::::::::::::::::::::::



   Camera Control Via Coaxial cable                                                                                                                                      360˚ Endless, Lighting&Smooth Speed Vector Driving
                                                                                                                                                                         (Pan/Tilt moving simultaneously)
   The Samsung Electronics A1 series cameras offer CCVC (Camera Control Via Coaxial cable) via the video coaxial cable. This function provides access to the
   camera settings menu without connecting the any other control lines to the camera. This technology allows for camera set up (with the exception of lens focus)        The camera supports 360˚ endless Pan and 180˚ Tilt functions at a very high speed (max 360˚/sec). Due to the micro-stepping technology, one step angle is
   to be performed remotely, thus simplifying the installation process and offering remote adjustment in real time.                                                      divided by 256. This allows high accuracy as well as ultra low noise levels (under 60dB). Micro-stepping technology also enables ultra low speeds down to
                                                                                                                                                                         0.05˚/sec for high zooming operations. Using vector drive technology, Pan/Tilt motion is done simultaneously.
                                                                          Video Signal               Video Signal



                                                                                                                                                                                                                                                                                                360 ˚ Endless Pan
                                                                         Control Signal


       A1 Cameras


                                                                                                                                                                                                                                                                                                   180 ˚ Tilting

                                                                                          Controller(SCX-RD100)




             Full Auto Focus Function                                                                                                                                    DIS (Digital Image Stabilization)
              Cameras that adopted full auto focus function provide clear images every time.                                                                             This feature reduce the blurring effect that occurs when either the camera or the subject is in motion during image capture, providing a sharp images




              Conventional                                                    Auto Focus ON                                                                              DIS OFF                                                         DIS ON




             Auto white balance                                                                                                                                          ELC (Electronic Level Control)
              Through the perfect Auto/Manual white balance function, these cameras ensure accurate representation of colors under any environment without producing a   Cameras with ELC function can use the manual iris lens economically by automatically operate the shutter speed. By adopting ELC, output level of cameras can
              picture that is either more red or blue.                                                                                                                   be stable under any luminance level. This mechanism is designed to accommodate any C/CS lens mount adapter.

                                                                                                                                                                            Auto Iris                                                       ELC


                                                                                                                                                                                                                                                                                 Appropriate
                                                                                                                                                                                                                                                                                  amount of
                                                                                                                                                                                                                                                                                  the lights
                                                                                                                                                                                                                                                     Light         CCD

                                                                                                                                                                                                                                                                   Adjusting the lights



              Conventional                                                    Auto white balance ON


                                                                                                                                                                                                                                                                                                                    Samsung Video Security System | 16 . 17
Video Security System

Camera Terms & Features                                                                                                                     ::::::::::::::::::::::::::::::::::::::::::::::::::::::



         Privacy Zone                                                                                                                                             Day / Night
         A "privacy zone" can be set if you desire to block viewing of specific areas in the picture.                                                             The Day & Night automatically switches to color mode during the day and to B/W mode during the night depending on the level of illumination
                                                                                                                                                                  which makes it ideally suitable for 24 hours-a-day surveillance. When in B/W mode the light sensitivity is enhanced.




          Privacy zone OFF                                            Privacy zone ON
                                                                                                                                                                  Day                                                        Night




         WDR (Wide Dynamic Range)                                                                                                                                 DNR (Digital Noise Reduction)
         WDR, much more sophisticatly improved Version of BLC, shows two files in one complex image, by utilizing high shutter speed in bright areas and
                                                                                                                                                                  The digital noise reduction (DNR) removes the video noise that occurs in video signals, particularly when Automatic Gain Control is used in low light
         low speed shutter in dark areas. When the camera detects an obvious difference in luminance, rather than showing the whole viewing area at one
                                                                                                                                                                  conditions. Since the Digital Noise Reduction is performed by using the cameras memory, when an object moves, the image can be blurred.
         luminance level, it increases the range of the luminance so that there is no noticeable difference.
                                                                                                                                                                  However, the Digital Noise Reduction of the camera uses a special Samsung computer code to remove video noise and color noise, regardless of the
                                                                                                                                                                  motion of an object providing a clear image.




          WDR OFF                                                     WDR ON

                                                                                                                                                                  DNR OFF                                                    DNR ON




         Motion Detection
                                                                                                                                                                  Illumination
         After a specific area has been selected for monitoring, if movement is detected in that area, the camera will trigger the alarm. When an external
         alarm device is attached to the camera, user should pay attention to the screen for the alarm triggering. This function is useful if user must monitor   By controlling the speed of exposure entering into each picture area, an object can be detected in even low illumination. Samsung Camera utilize
         multiple screens at the same time.                                                                                                                       highly light sensitive CCDs and maximize performance through the use of Digital Signal Processor.




          Motion Detection OFF                                        Motion Detection ON                                                                         Conventional Camera                                        Samsung Camera



                                                                                                                                                                                                                                                                                                Samsung Video Security System | 18 . 19
Video Security System

Camera Terms & Features                                                                                                                               ::::::::::::::::::::::::::::::::::::::::::::::::::::::



         IP-66 (Cold Resistant, Water/Dust Resistant)                                                                                                                            3-axis Dome Design
         IP refers to Ingress Protection ratings specifying the environmental protection the enclosure provides. The IP-66 compliant rating provides the highest level of        Samsung Electronics' 3-axis dome camera can be easily installed in the restricted environment of a wall or inclined surface, while most existing surveillance
         weather and vandal resistance. Usual operating temperature of IP-66 camera is -45˚C~50˚C.                                                                               cameras are difficult to install in these circumstances, thanks to the turning lens able to move freely 355˚ left/right and 90˚ up/down.




                                                                                                                                                                                 Wall                                 Ceiling                      Inclined Surface
          Water Resistant                                                 Cold Resistant




         Anti Vandal                                                                                                                                                             Time & Day Schedule
         The cameras with the feature of Anti Vandal, are equipped with a special structure that protects against willful external shocks, water and dust.                       The camera feature a clock setting function with RTC (Real Time Clock). Using this function, you can monitor each area on a Time & Day schedule.

                                                                                                                                                                                     SCHEDULE SETUP

                                                                                                                                                                                          MASTER ENABLE                      ON
                                                                                                                                                                                           DAY      TIME        ACT          NO   ON
                                                                                                                                                                                          1 MON       01:20     HOM               ON
                                                                                                                                                                                          2 WED       07:35     PRS          12   ON                                     Camera            SUN 09:00~12:00 AM
                                                                                                                                                                                          3 THU       11:40     SCN          3    ON                                     monitoring
                                                                                                                                                                                          4 SAT       15:17     PTN          1    ON
                                                                                                                                                                                                                                                                         direction
                                                                                                                                                                                          5 WKD       23:00     HOM               ON

                                                                                                                                                                                          6 UNDEFINED
                                                                                                                                                                                          7 UNDEFINED
                                                                                                                                                                                          BACK
          Shock-resistant
                                                                                                                                                                                                                                                                                           MON 12:00~15:00 PM
                                                                                                                                                                                   (auto play set depends on time and day)




         Multi-Protocol
         This camera adopts the multi protocol function and can be controlled by the other company’s remote controller. The protocol type is set by the hardware (dip switch).


                                                                                              Protocol               Buad Rate
                                                                                              0X00 : Auto Protocol   0X00 : 2400
                                                                                              0X01 : Pelco-D         0X01 : 4800
                                                                                              0X02 : Pelco-P         0X02 : 9600
                                                                                              0X03 : SAMSUNG         0X03 : 19200
                                                                                                                     0X04 : 38400

                                                                                                                           RS-485
                                                                                                                           Terminate



                                                     RS-485 / RS-422
                                                                                           Remote Controller



                                                                                                                                                                                                                                                                                                                                      Samsung Video Security System | 20 . 21
Video Security System                                                                                                                                                            High Resolution Color Camera
Camera Terms & Features                                                                                                                                                          SCC-B1311/B1011
                                                                                                                                                         ::::::::::::::::::::::::::::::::::::::::::::::::::::::


  Lens Selection
   When using an auto iris lens, The lens selection switch next to the camera should be set according to the type of auto iris lens.                     Rb

   Select ‘DC’ if the installed lens is a DC-control type, and select ‘VIDEO’ if it is a video-control type. Adjust the illumination level       Pin3
   with the DC-IRIS VR at the back of the camera when DC-type is selected, or adjust the Illumination level by using the level VR                Pin1
   on the lens when video-type is selected.                                                                                                                               Pin4
                                                                                                                                                                                 Features                                                              Specifications
                                                                                                                                                                                 • 1/3" SONY 410K/470K pixels Super-HAD IT CCD                         Model                                   SCC-B1311N                            SCC-B1011P/B1311P
   * When using an AI lens, turn off the ELC switch at the back of the camera.                                                                                     Pin2
                                                                                                                                                                                 • High resolution : 540 TV lines                                      Camera Type          Color/BW           Color
                                                                                                                                                                                 • Min. scene illumination : 0.4 Lux (F1.2, 50IRE),                    Image                Device             1/3" Super-HAD IT CCD
                                                                                                                                                                                   0.24 Lux (F1.2, 30IRE), 0.12 Lux (F1.2, 15IRE)                                           Effective Pixels   768 x 494                             752 x 582
                                                                                                                                                                                 • Internal/line lock (phase control) function                         Horizontal Resolution                   540 TV Lines
                                                                                                                                                                                 • Auto level control (DC type only)                                   Min. Scene Illumination                 0.4 Lux (F1.2, 50 IRE), 0.24 Lux (F1.2, 30 IRE), 0.12 Lux(F1.2, 15 IRE)
                                                                                 Pin no.   DC Control Type                  VIDEO Control Type                                                                                                         Functions             Line Lock         On/Off
                                                                                                                                                                                 • Electronic level control (manual lens)
                                                                                   1          Damp (-)                         Power (+12V)                                                                                                                                  White Balance     ATW/AWC
                                                                                                                                                                                 • Back light compensation (On/Off)
                                                                                   2          Damp (+)                               N/A                                                                                                                                     ELC               On/Off(ALC)
                                                                                                                                                                                 • Auto white balance (ATW/AWC)
                                                                                                                                                                                                                                                                             BLC               On/Off
                                                                                   3          Drive (-)                         VIDEO Signal                                     • Flickerless function
                                                                                                                                                                                                                                                       Video Output                            VBS 1.0Vp-p
                                                                                   4          Drive (+)                           GROUND                                         • C/CS mount compatible                                               S/N Ratio                               50 dB
                                                                                                                                                                                 • SCC-B1311 : DC12V & AC24V 60Hz (50Hz)                               Lens                  Mount             C/CS Compatible
                                                                                                                                                                                   SCC-B1011 : AC220V (50Hz)                                                                 Lens Drive Type   ALC(DC only)/ELC
   When using a manual iris lens, Open the lens iris completely and turn on the ELC function at the back of the camera.                                                          • SCC-B1311 : 60.5(W) x 59.5(H) x 77(D) mm                            Operating Temperature                   -10˚C ~ + 50˚C
                                                                                                                                                                                   SCC-B1011 : 60.5(W) x 59.5(H) x 125.2(D) mm                         Operating Humidity                      Less than 90%
                                                                                                                                                                                                                                                       Power Requirement                       SCC-B1311 : AC24V & DC12V / SCC-B1011 : AC220V
                                                                                                                                                                                                                                                       Power Consumption                       SCC-B1311 : 3W / SCC-B1011 : 3.5W
                                                                                                                                                                                                                                                       Physical              Dimensions        SCC-B1311 : 68(W) x 55(H) x 77.6(D)mm
                                                                                                                                                                                                                                                       Specification                           SCC-B1011 : 68(W) x 55(H) x 136.3(D)mm
                                                                                                                                                                                 Dimensions (unit:mm)                                                                        Weight            SCC-B1311 : 216g / SCC-B1011 : 446g



  Camera Back Focus Adjustment                                                                                                                                                          SCC-B1311

   The back focus of the camera is set when the product is shipped from the factory. However, the back focus can be adjusted in the following manner
                                                                                                                                                                                                                                        DC

   if the focus is not properly set.                                                                                                                                                                                                    LENS




                                                                                                                                                                                                                     SCC-B1311




   For Standard Lens (non-Zoom)                                                                                                                                                               68                                 72.6
                                                                                                                                                                                              65
   1. The lens should be able to clearly recognize high-definition images such as an object with
      cross stripes from a distance of 10 meters when the focus ring of the lens is set to infinity(∞).




                                                                                                                                                                                                        55
   2. Adjust the focus by turning the control ring of the flange back until the object can be seen
                                                                                                                                                                                                                                           SCC-B1311

     clearly under the circumstances described above.
                                                                                                                                                                                                               7.6
   3. Fasten the screw of flange back control ring.                                                                                                                                                                              63.5
                                                                                                                                                                                                                                 77.6

   For Zoom Lens                                                                                                                                                                        SCC-B1011P
   1. Place a high-definition image 3-5m apart from the camera and then turn the focus of the lens
      as far as possible in the TELE (zoom in) direction so that the image can be seen vividly as possible.
   2. Turn the lens zoom as far as possible in the WIDE direction, turning the flange back control ring
      of the camera so that the object can be seen most vividly.
   3. Adjust so that the focus from the TELE side can be vividly matched with the focus from the                                             Flange Back Focusing Distance
                                                                                                                                                                                              68                                               136.3
      WIDE side by repeating above steps 1 and 2 2~3 times.                                                                                                                                   65             7.6                                120
                                                                                                                          C Mount                       17.526mm
   4. Fasten the screw of the flange back control ring. The control can be set more accurately if
                                                                                                                          CS Mount                      12.5mm
      the focus can be adjusted by attaching dark color paper or ND filter to the front lens.
                                                                                                                                                                                                        55




                                                                                                                                                                                                                                                                                                                                     Samsung Video Security System | 22 . 23
Bullet Type Camera                                                                                                         Super High-Resolution Camera

SCC-B9221                                                                                                                  SCC-B1331/B1031


Features                                                 Specifications                                                    Features                                                           Specifications
• 1/3" 410K Pixels Super HAD IT CCD                      Model                                     SCC-B9221               • 1/3" SONY 410K/470K Pixels Super-HAD IT CCD                      Model                                         SCC-B1331N                          SCC-B1031P/B1331P
• High resolution : 480 TV lines                         Image                Device               1/3” Super-HAD IT CCD   • High Resolution : 600 TV Lines                                   Camera Type Color/BW                          Color
• Min. scene illumination : 0.3 Lux (F1.2)                                    Effective Pixels     768(H) x 494(V)         • Min. illumination 0.12Lux (F1.2, 15 IRE)                         Image          Device                         1/3" Super-HAD IT CCD
• 4~9mm vari-focal fixed iris lens built-in F1.5         Scanning Method                           Interlace               • Internal/Linelock (Phase Control) Function                                      Pixels       Effective         768 x 494                       752 x 582
• Externally adjustable focal length & focus by ring     Scanning Line         Horizontal          15.734Hz                • ALC(Video/DC) / ELC                                              Scanning       System                         Interlace
• Back light compensation                                Frequency             Vertical            60Hz                    • Motion Adaptive Digital Noise Reduction (3D+2D)                                 Horizontal Internal Mode       15,734 Hz                       15,625 Hz
• Back, top and bottom side bracket mounting available   Synchronization Method                    Internal                • Back Light Compensation (Area Setting)                                          Frequency Line-lock Mode       15,750 Hz                       15,625 Hz
                                                         Horizontal Resolution                     480 TV Lines            • Advanced Motion Detection Function                                              Vertical     Internal Mode     59.94 Hz                        50 Hz
• Water resistant (IP66)
                                                         Signal Output                             VBS 1.0Vp-p                                                                                               Frequency Line-lock Mode       60 Hz                           50 Hz
                                                                                                                           • eXtended Dynamic Range (XDR)
                                                         S/N Ratio                                 48dB                                                                                       Resolution     Horizontal                     600 TV Lines
                                                                                                                           • Privacy Mask Function (Polygonal Mosaic)
                                                         Min. Scene            Color               0.3Lux                                                                                     Min. Scene     Sens-up off                    0.12Lux(15IRE), 0.2Lux(30IRE), 0.4Lux(50IRE)@F1.2
                                                                                                                           • High Shutter Speed Control by External Trigger
                                                         Illumination                                                                                                                         Illumination
                                                         Lens                  Focal Length        4 ~ 9 mm
                                                                                                                           • DIS (Digital Image Stabilization)
                                                                                                                                                                                              Functions      Number of Privacy Zone         12 (Polygonal Method)
                                                                               Aperture Ratio      F1.5                    • CCVC (Camera Control Via Coaxial cable, Controller: SCX-RD100)                  Motion Detection               Off/On
                                                                               Viewing      Tele   31.5˚(H) x 23.6˚(V)     • Multi-Language OSD support                                                      D-Zoom                         1x ~ 16x (0.1x STEP)
                                                                               Angle        Wide   68.1˚(H) x 50.5˚(V)     • C/CS Lens Mount Compatible                                                      High Speed Shutter             1/60~1/10Ksec(OSD/External Control) 1/50~1/10Ksec(OSD/External Control)
                                                         Functions             BLC                 On                      • SCC-B1331: DC12V & AC24V 60Hz(50Hz)
Dimensions (unit:mm)                                                                                                                                                                                         BLC                            Off/On
                                                                               AGC                 Auto                      SCC-B1031: AC220V(50Hz)                                                         AGC                            Off/On
                                                                               ELC                 On                                                                                                        ELC                            Off/On ( ~ 1/200Ksec)
                                                                               White Balance       ATW                                                                                                       Line Lock                      Off/On (Phase Control)
                                                         Operating Temperature                     -10˚C ~ +50˚C                                                                                             Camera ID                      Off/On (Max.54ea/2Lines)
                                                         Operating Humidity                        Less than 90%                                                                                             White Balance                  ATW1/ATW2/AWC/3200K/5600K
                                                         Power Requirment                          DC 12V ±10%                                                                                               eXtended Dynamic Range         Off/Low/Mid/High
                                                         Power Consumption                         1.7W                                                                                                      Digital Noise Reduction        Off/On
                                                         Weight                                    705g                    Dimensions (unit:mm)                                                              Digital Image Stabilization    Off/On
                                                         Dimensions                                44(ø) x 116(L)mm                                                                                          PIP                            Off/On
                                                         Color                                     Gray                                SCC-B1331                                                             Etc. Function                  Detail, Reverse(H/V), Posi/Nega
                                                                                                                                                                                              Video Output                                  VBS 1.0Vp-p
                                                                                                                                                                                              S/N Ratio      S/N Ratio                      52dB
                                                                                                                                                                                              Lens           Lens Drive Type / Mount Type   MANUAL/AI(VIDEO/DC) / CS/C
                                                                                                                                                                100                           OSD                                           Yes
                                                                                                                                                                                              Alarm          Output                         1 ea
                                                                                                                                                                                              Remote Control CCVC                           Yes (with SCX-RD100)
                                                                                                                                                                                              Environmental Operating Temperature           Absolute : -20˚C ~ +60˚C / Sustained : -10˚C ~ +50˚C
                                                                                                                                                                                              Conditions     Operating Humidity             Less than 90%
                                                                                                                                       SCC-B1031                                              Power          Power Requirement              24 VAC ±10%/12 VDC ±10%
                                                                                                                                                                                                             Power Consumption              2.3 W
                                                                                                                                                                                                             LED Indicator                  Yes
                                                                                                                                                                                              Physical       Dimensions (WxHxD)             64 x 58 x 109.2 mm                  SCC-B1331P:64x58x109.2 mm
                                                                                                                                                                120                           Specification                                                                     SCC-B1031P:64x58x129.2 mm
                                                                                                                                                                                                             Weight                         305 g                               SCC-B1331P : 305 g
                                                                                                                                                                                                                                                                                SCC-B1031P : 395 g
                                                                                                                                                                                                            Color        Body               Siver




                                                                                                                                                                                                                                                                            Samsung Video Security System | 24 . 25
Super High-Resolution DayNight Camera                                                                                                                                                    Super High-Resolution DayNight Camera

SCC-B2331/B2031                                                                                                                                                                          SCC-B2333/B2033


Features                                                            Specifications                                                                                                       Features                                                            Specifications
• 1/3" SONY 410K/470K Pixels Super-HAD IT CCD                       Model                                      SCC-B2331N                          SCC-B2031P/B2331P                     • 1/3" SONY 410K/470K Pixels Super-HAD IT CCD                       Model                                          SCC-B2333N                          SCC-B2033P/B2333P
• High Resolution : 600 TV Lines                                    Camera Type Color/BW                       Color                                                                     • High Resolution : 600 TV Lines                                    Camera Type Color/BW                           Color
• Min. illumination 0.0002Lux (F1.2, 15 IRE, Sens-Up 512x)          Image        Device                        1/3" Super-HAD IT CCD                                                     • Min. illumination                                                 Image        Device                            1/3" Super-HAD IT CCD
• Internal/Linelock (Phase Control) Function                                     Pixels       Effective        768 x 494                           752 x 582                               0.0002Lux (F1.2, 15 IRE, Sens-Up 512x, Color)                                  Pixels          Effective         768 x 494                           752 x 582
• ALC(Video/DC)/ELC                                                 Scanning     System                        Interlace                                                                   0.00002Lux (F1.2, 15 IRE, Sens-Up 512x, B/W)                      Scanning     System                            Interlace
• Day/Night Function (Soft), Sens-Up Function (512x)                             Horizontal Internal Mode      15,734 Hz                           15,625 Hz                             • Internal/Linelock (Phase Control) Function                                     Horizontal      Internal Mode     15,734 Hz                           15,625 Hz
• Motion Adaptive Digital Noise Reduction (3D+2D)                                Frequency Line-lock Mode      15,750 Hz                           15,625 Hz                             • ALC(Video/DC) / ELC                                                            Frequency       Line-lock Mode    15,750 Hz                           15,625 Hz
• Back Light Compensation (Area Setting)                                         Vertical     Internal Mode    59.94 Hz                            50 Hz                                 • Day/Night Function (ICR), Sens-Up Function (512x)                              Vertical        Internal Mode     59.94 Hz                            50 Hz
• Advanced Motion Detection Function                                             Frequency Line-lock Mode      60 Hz                               50 Hz                                                                                                                  Frequency       Line-lock Mode    60 Hz                               50 Hz
                                                                                                                                                                                         • Motion Adaptive Digital Noise Reduction (3D+2D)
                                                                    Resolution   Horizontal                    600 TV Lines                                                                                                                                  Resolution   Horizontal                        600 TV Lines
• eXtended Dynamic Range (XDR)                                                                                                                                                           • Back Light Compensation (Area Setting)
                                                                    Min. Scene   Sens-up off                   0.12Lux(15IRE), 0.2Lux(30IRE), 0.4Lux(50IRE)@F1.2                                                                                             Min. Scene   Color          Sens-up off        0.12Lux(15IRE), 0.2Lux(30IRE), 0.4Lux(50IRE)@F1.2
• Privacy Mask Function (Polygonal Mosaic)                                                                                                                                               • Advanced Motion Detection Function
                                                                    Illumination Sens-up                       0.0002Lux(15IRE), 0.0005Lux(30IRE), 0.0008Lux(50IRE)@F1.2                                                                                     Illumination                Sens-up            0.0002Lux(15IRE), 0.0005Lux(30IRE), 0.0008Lux(50IRE)@F1.2
• High Shutter Speed Control by External Trigger                                                                                                                                         • eXtended Dynamic Range (XDR)
                                                                    Functions    Number of Privacy Zone        12 (Polygonal Method)                                                                                                                                      B/W            Sens-up off        0.012Lux(15IRE), 0.02Lux(30IRE), 0.04Lux(50IRE)@F1.2
• DIS (Digital Image Stabilization)                                              Day/Night                     Day/Night/AUTO(Soft)                                                      • Privacy Mask Function (Polygonal Mosaic)                                                      Sens-up            0.00002Lux(15IRE), 0.00005Lux(30IRE), 0.00008Lux(50IRE)@F1.2
• CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100)                Motion Detection              Off/On                                                                    • High Shutter Speed Control by External Trigger                    Functions        Number of Privacy Zone        12 (Polygonal Method)
• Multi-Language OSD support                                                     D-Zoom                        1x ~ 16x (0.1x STEP)                                                      • DIS (Digital Image Stabilization)                                                  Day/Night                     Day/Night/AUTO/EXT (ICR)
• C/CS Lens Mount Compatible                                                     High Speed Shutter            1/60~1/10Ksec(OSD/External Control) 1/50~1/10Ksec(OSD/External Control)   • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100)                    Motion Detection              Off/On
• SCC-B2331 : DC12V & AC24V 60Hz(50Hz)                                           Sens Up                       2x ~ 512x                                                                 • RS-485(Half) Control (Multi-Protocol support)                                      D-Zoom                        1x ~ 16x (0.1x STEP)
  SCC-B2031 : AC220V(50Hz)                                                       BLC                           Off/On                                                                    • Multi-Language OSD support                                                         High Speed Shutter            1/60~1/10Ksec(OSD/External Control) 1/50~1/10Ksec(OSD/External Control)
                                                                                 AGC                           Off/On                                                                    • Intelligent Video (Moved / Fixed / Fence / Area / Tracking)                        Sens Up                       2x ~ 512x
                                                                                 ELC                           Off/On ( ~1/200Ksec)                                                      • C/CS Lens Mount Compatible                                                         BLC                           Off/On
                                                                                 Line Lock                     Off/On (Phase Control)                                                                                                                                         AGC                           Off/On
                                                                                                                                                                                         • SCC-B2333 : DC12V & AC24V 60Hz(50Hz)
                                                                                 Camera ID                     Off/On (Max.54ea / 2Lines)                                                                                                                                     ELC                           Off/On ( ~1/200Ksec)
                                                                                                                                                                                           SCC-B2033 : AC220V(50Hz)
                                                                                 White Balance                 ATW1/ATW2/AWC/3200K/5600K                                                                                                                                      Line Lock                     Off/On (Phase Control)
                                                                                 eXtended Dynamic Range        Off/Low/Mid/High                                                                                                                                               Camera ID                     Off/On (Max.54ea/2Line)
                                                                                 Digital Noise Reduction       Off/On                                                                                                                                                         White Balance                 ATW1/ATW2/AWC/3200K/5600K
                                                                                 Digital Image Stabilization   Off/On                                                                                                                                                         eXtended Dynamic Range        Off/Low/Mid/High
Dimensions (unit:mm)                                                                PIP                        Off/On                                                                    Dimensions (unit:mm)                                                                 Digital Noise Reduction       Off/On
                                                                                    Etc. Function              Detail, Reverse(H/V), Posi/Nega                                                                                                                                Digital Image Stabilization   Off/On
            SCC-B2331                                               Video Output                               VBS 1.0Vp-p                                                                           SCC-B2333                                                                Intelligent Video             Off/On(Moved / Fixed / Fence / Area / Tracking)
                                                                    S/N Ratio      S/N Ratio                   52 dB                                                                                                                                                          PIP                           Off/On
                                                                    Lens           Lens Drive Type             MANUAL/AI(VIDEO/DC)                                                                                                                                            Etc. Function                 Detail, Reverse(H/V), Posi/Neg
                                                                                   Mount Type                  CS/C                                                                                                                                          Video Output                                   VBS 1.0Vp-p
                                     100                                                                                                                                                                                      100
                                                                    OSD                                        Yes                                                                                                                                           S/N Ratio    S/N Ratio                         52 dB
                                                                    Alarm          Output                      1 ea                                                                                                                                          Lens         Lens Drive Type / Mount Type      MANUAL/AI(VIDEO/DC) / CS/C
                                                                    Remote Control CCVC                        Yes (with SCX-RD100)                                                                                                                          OSD                                            Yes
                                                                    Environmental Operating Temperature        Absolute : -20˚C ~ +60˚C / Sustained : -10˚C ~ +50˚C                                                                                          Alarm        Output                            1 ea
                                                                    Conditions     Operating Humidity          Less than 90%                                                                                                                                 Remote Control   CCVC                          Yes (with SCX-RD100)
            SCC-B2031                                               Power          Power Requirement           24 VAC ±10%/12 VDC ±10% SCC-B2331P:24 VAC ±10%/12 VDC ±10%                            SCC-B2033                                               Environmental    Operating Temperature         Absolute : -20˚C ~ +60˚C / Sustained : -10˚C ~ +50˚C
                                                                                                                                                   SCC-B2031P:AC220V~240V (50Hz±0.3Hz)                                                                       Conditions       Operating Humidity            Less than 90%
                                                                                    LED Indicator              Yes                                                                                                                                           Power            Power Requirement             24 VAC ±10%/12 VDC ±10% SCC-B2333P:24 VAC ±10%/12 VDC ±10%
                                                                    Physical        Dimensions (WxHxD)         64 x 58 x 109.2 mm                  SCC-B2331P:64x58x109.2 mm                                                                                                                                                                    SCC-B2033P:AC220V~240V (50Hz±0.3Hz)
                                     120                                                                                                                                                                                      120
                                                                    Specification                                                                  SCC-B2031P:64x58x129.2 mm                                                                                                  LED Indicator                 Yes
                                                                                    Weight                     305 g                               SCC-B2331P:305g / SCC-B2031P:395g                                                                         Physical         Dimensions (WxHxD)            64 x 58 x 109.2 mm                  SCC-B2333P:64x58x109.2 mm
                                                                                    Color       Body           Siver                                                                                                                                         Specification                                                                      SCC-B2033P:64x58x129.2 mm
                                                                                                                                                                                                                                                                              Weight                        305 g                               SCC-B2333P:305g / SCC-B2033P:395g
                                                                                                                                                                                                                                                                              Color       Body              Siver
                                                                                                                                                                                                                                                                                                                                           Samsung Video Security System | 26 . 27
Super High-Resolution DayNight WDR Camera                                                                                                                                                     Super High-Resolution DayNight Camera

SCC-B2335/B2035                                                                                                                                                                               SCC-B2337/B2037


Features                                                              Specifications                                                                                                          Features                                                            Specifications
• 1/3" SONY 410K/470K Pixels Super-HAD PS CCD                         Model                                         SCC-B2335N                          SCC-B2035P/B2335P                     • 1/3" SONY 410K/470K Pixels Ex-View HAD IT CCD                     Model                                          SCC-B2337N                          SCC-B2037P/B2337P
• High Resolution : 600 TV Lines                                      Camera Type Color/BW                          Color                                                                     • High Resolution : 600 TV Lines                                    Camera Type Color/BW                           Color
• Min. illumination                                                   Image        Device                           1/3" Super-HAD PS CCD                                                     • Min. illumination                                                 Image        Device                            1/3" ExView-HAD IT CCD
  0.0002Lux (F1.2, 15 IRE, Sens-Up 512x, Color)                                    Pixels         Effective         768 x 494                           752 x 582                               0.0002Lux (F1.2, 15 IRE, Sens-Up 512x, Color)                                  Pixels         Effective          768 x 494                           752 x 582
  0.00002Lux (F1.2, 15 IRE, Sens-Up 512x, B/W)                        Scanning     System                           Interlace                                                                   0.00002Lux (F1.2, 15 IRE, Sens-Up 512x, B/W)                      Scanning     System                            Interlace
• Internal/Linelock (Phase Control) Function                                       Horizontal     Internal Mode     15,734 Hz                           15,625 Hz                             • Internal/Linelock (Phase Control) Function                                     Horizontal     Internal Mode      15,734 Hz                           15,625 Hz
• ALC(Video/DC) / ELC • Wide Dynamic Range (WDR)                                   Frequency      Line-lock Mode    15,750 Hz                           15,625 Hz                             • ALC (Video/DC) / ELC                                                           Frequency      Line-lock Mode     15,750 Hz                           15,625 Hz
• Virtual Progressive Scan (VPS)                                                   Vertical       Internal Mode     59.94 Hz                            50 Hz                                 • Day/Night Function (ICR), Sens-Up Function (512x)                              Vertical       Internal Mode      59.94 Hz                            50 Hz
• Day/Night Function (ICR), Sens-Up Function (512x)                                Frequency      Line-lock Mode    60 Hz                               50 Hz                                                                                                                  Frequency      Line-lock Mode     60 Hz                               50 Hz
                                                                                                                                                                                              • Motion Adaptive Digital Noise Reduction (3D+2D)
                                                                      Resolution   Horizontal                       600 TV Lines                                                                                                                                  Resolution   Horizontal                        600 TV Lines
• Motion Adaptive Digital Noise Reduction (3D+2D)                                                                                                                                             • Back Light Compensation (Area Setting)
                                                                      Min. Scene   Color            Sens-up off     0.12Lux(15IRE), 0.2Lux(30IRE), 0.4Lux(50IRE)@F1.2                                                                                             Min. Scene   Color            Sens-up off      0.12Lux(15IRE), 0.2Lux(30IRE), 0.4Lux(50IRE)@F1.2
• Back Light Compensation (Area Setting)                                                                                                                                                      • Advanced Motion Detection Function
                                                                      Illumination                  Sens-up         0.0002Lux(15IRE), 0.0005Lux(30IRE), 0.0008Lux(50IRE)@F1.2                                                                                     Illumination                  Sens-up          0.0002Lux(15IRE), 0.0005Lux(30IRE), 0.0008Lux(50IRE)@F1.2
• Advanced Motion Detection Function • eXtended Dynamic Range (XDR)                                                                                                                           • eXtended Dynamic Range (XDR)
                                                                                   B/W              Sens-up off     0.012Lux(15IRE), 0.02Lux(30IRE), 0.04Lux(50IRE)@F1.2                                                                                                       B/W              Sens-up off      0.012Lux(15IRE), 0.02Lux(30IRE), 0.04Lux(50IRE)@F1.2
• Privacy Mask Function (Polygonal Mosaic)                                                          Sens-up         0.00002Lux(15IRE), 0.00005Lux(30IRE), 0.00008Lux(50IRE)@F1.2              • Privacy Mask Function (Polygonal Mosaic)                                                        Sens-up          0.00002Lux(15IRE), 0.00005Lux(30IRE), 0.00008Lux(50IRE)@F1.2
• High Shutter Speed Control by External Trigger                      Functions       Number of Privacy Zone        12 (Polygonal Method)                                                     • High Shutter Speed Control by External Trigger                    Functions       Number of Privacy Zone         12 (Polygonal Method)
• DIS (Digital Image Stabilization)                                                   Day/Night                     Day/Night/AUTO/EXT (ICR)                                                  • DIS (Digital Image Stabilization)                                                 Day/Night                      Day/Night/AUTO/EXT (ICR)
• CCVC (Camera Control Via Coaxial cable, Controller: SCX-RD100)                      Motion Detection              Off/On                                                                    • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100)                   Motion Detection               Off/On
• RS-485(Half) Control (Multi-Protocol support)                                       D-Zoom                        1x ~ 16x (0.1x STEP)                                                      • RS-485(Half) Control (Multi-Protocol support)                                     D-Zoom                         1x ~ 16x (0.1x STEP)
• Multi-Language OSD support                                                          High Speed Shutter            1/60~1/10Ksec(OSD/External Control) 1/50~1/10Ksec(OSD/External Control)   • Multi-Language OSD support                                                        High Speed Shutter             1/60~1/10Ksec(OSD/External Control) 1/50~1/10Ksec(OSD/External Control)
• Intelligent Video (Moved / Fixed / Fence / Area / Tracking)                         Sens Up / BLC / AGC           2x ~ 512x / Off/On / Off/On                                               • Intelligent Video (Moved / Fixed / Fence / Area / Tracking)                       Sens Up / BLC / AGC            2x ~ 512x / Off/On / Off/On
• C/CS Lens Mount Compatible                                                          ELC / Line Lock               Off/On ( ~ 1/200Ksec) / Off/On (Phase Control)                            • C/CS Lens Mount Compatible                                                        ELC / Line Lock                Off/On ( ~ 1/200Ksec) / Off/On (Phase Control)
• SCC-B2335 : DC12V & AC24V 60Hz(50Hz)                                                Camera ID / White Balance     Off/On (Max.54ea/2Lines) / ATW1/ATW2/AWC/3200K/5600K                                                                                                          Camera ID                      Off/On (Max.54ea/2Line)
                                                                                                                                                                                              • SCC-B2337 : DC12V & AC24V 60Hz(50Hz)
                                                                                      eXtended Dynamic Range        Off/Low/Mid/High                                                                                                                                              White Balance                  ATW1/ATW2/AWC/3200K/5600K
  SCC-B2035 : AC220V(50Hz)                                                                                                                                                                      SCC-B2037 : AC220V(50Hz)
                                                                                      Digital Noise Reduction       Off/On                                                                                                                                                        eXtended Dynamic Range         Off/Low/Mid/High
                                                                                      Digital Image Stabilization   Off/On                                                                                                                                                        Digital Noise Reduction        Off/On
                                                                                      Intelligent Video / PIP       Off/On(Moved / Fixed / Fence / Area / Tracking) / Off/On                                                                                                      Digital Image Stabilization    Off/On
                                                                                      Wide Dynamic Range            Off/On                                                                                                                                                        Intelligent Video / PIP        Off/On(Moved / Fixed / Fence / Area / Tracking) / Off/On
Dimensions (unit:mm)                                                                  Virtual Progressive Scan      Off/On                                                                    Dimensions (unit:mm)                                                                Etc. Function                  Detail, Reverse(H/V), Posi/Neg
                                                                                      Etc. Function                 Detail, Reverse(H/V), Posi/Nega                                                                                                               Video Output                                   VBS 1.0Vp-p
            SCC-B2335                                                 Video Output                                  VBS 1.0Vp-p                                                                          SCC-B2337                                                S/N Ratio       S/N Ratio                      50 dB
                                                                      S/N Ratio     S/N Ratio                       52 dB                                                                                                                                         Lens            Lens Drive Type / Mount Type   MANUAL/AI(VIDEO/DC) / CS/C
                                                                      Lens          Lens Drive Type                 MANUAL/AI(VIDEO/DC)                                                                                                                           OSD                                            Yes
                                                                                    Mount Type                      CS/C                                                                                                                                          Alarm           Output                         1 ea
                                      100                                                                                                                                                                                          100
                                                                      OSD                                           Yes                                                                                                                                           Remote          CCVC                           Yes (with SCX-RD100)
                                                                      Alarm         Output                          1 ea                                                                                                                                          Control         RS485                          Yes (Multi Protocol, 8ea)
                                                                      Remote        CCVC                            Yes (with SCX-RD100)                                                                                                                          Environmental   Operating Temperature          Absolute : -20˚C ~ +60˚C / Sustained : -10˚C ~ +50˚C
                                                                      Control       RS485                           Yes (Multi Protocol, 8ea)                                                                                                                     Conditions      Operating Humidity             Less than 90%
                                                                      Environmental Operating Temperature           Absolute : -20˚C ~ +60˚C / Sustained : -10˚C ~ +50˚C                                                                                          Power           Power Requirement              24 VAC ±10%/12 VDC ±10%             SCC-B2337P:24 VAC ±10%/12 VDC ±10%
            SCC-B2035                                                 Conditions    Operating Humidity              Less than 90%                                                                        SCC-B2037                                                                                                                                   SCC-B2037P:AC220V~240V(50Hz±0.3Hz)
                                                                      Power         Power Requirement               24 VAC ±10%/12 VDC ±10% SCC-B2335P:24 VAC ±10%/12 VDC ±10%                                                                                                  LED Indicator                    Yes
                                                                                                                                                        SCC-B2035P:AC220V~240V(50Hz±0.3Hz)                                                                        Physical      Dimensions (WxHxD)               64 x 58 x 109.2 mm                  SCC-B2337P:64 x 58 x 109.2 mm
                                                                                      LED Indicator                 Yes                                                                                                                                           Specification                                                                      SCC-B2037P:64 x 58 x 129.2 mm
                                      120                                                                                                                                                                                          120
                                                                      Physical        Dimensions (WxHxD)            64 x 58 x 109.2 mm                  SCC-B2335P:64x58x109.2 mm                                                                                               Weight                           305 g                               SCC-B2337P:305g/SCC-B2037P:395g
                                                                      Specification                                                                     SCC-B2035P:64x58x129.2 mm                                                                                               Color       Body                 Siver
                                                                                      Weight                        305 g                               SCC-B2335P:305g/SCC-B2035P:395g
                                                                                      Color       Body              Siver


                                                                                                                                                                                                                                                                                                                                                 Samsung Video Security System | 28 . 29
Super High-Resolution DayNight Camera                                                                                                                                                          22x Zoom Lens Camera

SCC-A2333/A2033                                                                                                                                                                                SCC-C4201/C4301


Features                                                            Specifications                                                                                                             Features                                                       Specifications
• 1/2" SONY 410K/470K Pixels Ex-View HAD IT CCD                     Model                                          SCC-A2333N                           SCC-A2033P/A2333P                      • Superior images through DSP (Digital Signal Processor)       Model                                      SCC-C4201                       SCC-C4301
• High Resolution : 600 TV Lines                                    Camera Type Color/BW                           Color                                                                       • 1/4" 410/470K Pixels Super HAD CCD                           Image                 Device               1/4" Super HAD CCD
• Min. illumination                                                 Image        Device                            1/2" Ex-View HAD IT CCD                                                     • Horizontal resolution : 480 TV Lines                                               Effective Pixels     NTSC : 768(H) x 494(V) / PAL : 752(H) x 582(V)
  0.000006Lux (F1.2, 15 IRE, Sens-Up 512x, Color)                                Pixels         Effective          768 x 494                            752 x 582                              • 10-bit A/D converter                                         Scanning Method                            2:1 Interlace
  0.0000006Lux (F1.2, 15 IRE, Sens-Up 512x, B/W)                    Scanning     System                            Interlace                                                                   • Motion detection                                             Scanning Line         Horizontal           NTSC : 15.750KHz / PAL : 15.625Hz
• Internal/Linelock (Phase Control) Function                                     Horizontal     Internal Mode      15,734 Hz                            15,625 Hz                              • Optical 22x zoom (f=3.6~79.2mm), 10x digital zoom lens       Frequency             Vertical             NTSC : 60Hz / PAL : 50Hz
• ALC(Video/DC) / ELC                                                            Frequency      Line-lock Mode     15,750 Hz                            15,625 Hz                              • Outstanding signal-to-noise (S/N) ratio : 52dB               Synchronization Method                     Internal                          Internal/Line lock
                                                                                 Vertical       Internal Mode      59.94 Hz                             50 Hz                                  • Both RS-485 communication interface & wired remote control   Horizontal Resolution                      480 TV Lines
• Day/Night Function (ICR), Sens-Up Function (512x)
                                                                                 Frequency      Line-lock Mode     60 Hz                                50 Hz                                                                                                 Min. Scene            Color                0.005 (Sens up 128x,15IRE) Lux
• Motion Adaptive Digital Noise Reduction (3D+2D)                                                                                                                                              • Min. scene illumination : 0.005(color)/0.0005(B/W) Lux
                                                                    Resolution   Horizontal                        600 TV Lines                                                                                                                               Illumination          B/W                  0.0005 (Sens up 128x,15IRE) Lux
• Back Light Compensation (Area Setting)
                                                                    Min. Scene   Color            Sens-up off      0.036Lux(15IRE), 0.072Lux(30IRE), 0.12Lux(50IRE)@F1.2                                                                                      Lens                  Zoom Ratio           220x Zoom (22x optical, 10x digital)
• Advanced Motion Detection Function                                                                                                                                                                                                                                                Focal Length         3.6~79.2mm
                                                                    Illumination                  Sens-up          0.000006Lux(15IRE), 0.000012Lux(30IRE), 0.00002Lux(50IRE)@F1.2
• eXtended Dynamic Range (XDR)                                                   B/W              Sens-up off      0.0036Lux(15IRE), 0.0072Lux(30IRE), 0.012Lux(50IRE)@F1.2                                                                                                         Aperture     Tele    F3.8
• Privacy Mask Function (Polygonal Mosaic)                                                        Sens-up          0.0000006Lux(15IRE), 0.0000012Lux(30IRE), 0.000002Lux(50IRE)@F1.2                                                                                                Ratio        Wide    F1.6
• High Shutter Speed Control by External Trigger                    Functions       Number of Privacy Zone         12 (Polygonal Method)                                                                                                                                            Viewing      Tele    2.3˚(H) x 1.7˚(V) x 9˚(V)         2.3˚(H) x 1.7˚(V)
• DIS (Digital Image Stabilization)                                                 Day/Night                      Day/Night/AUTO/EXT (ICR)                                                                                                                                         Angle        Wide    47.9˚(H) x 36˚                    47.9˚(H) x 36.9˚(V)
• CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100)                   Motion Detection               Off/On                                                                                                                                     Functions             Camera ID            Off/On(20Characters, Position Setting)
• RS-485(Half) Control (Multi-Protocol support)                                     D-Zoom                         1x ~ 16x (0.1x STEP)                                                        Dimensions (unit:mm)                                                                 Electronic Shutter   Off, 1/100 ~ 10,000 sec
• Multi-Language OSD support                                                        High Speed Shutter             1/60 ~1/10Ksec(OSD/External Control) 1/50 ~1/10Ksec(OSD/External Control)                                                                                        BLC                  Off/On(Area setting)
• Intelligent Video (Moved / Fixed / Fence / Area / Tracking)                       Sens Up                        2x ~ 512x                                                                                                                                                        AGC                  Off/On
                                                                                    BLC / AGC                      Off/On / Off/On                                                                     SCC-C4201                                                                    PIP                  Off/On
• C/CS Lens Mount Compatible
                                                                                    ELC / Line Lock                Off/On ( ~ 1/200Ksec) / Off/On (Phase Control)                                                                                                                   White Balance        ATW/AWC/Manual
• SCC-A2333 : DC12V & AC24V 60Hz(50Hz)
                                                                                    Camera ID                      Off/On (Max.54ea/2Lines)                                                                                                                                         Motion Detection     Off/On (Area/Sensitivity setting)
  SCC-A2033 : AC220V(50Hz)
                                                                                    White Balance                  ATW1/ATW2/AWC/3200K/5600K                                                                                                                                        Sens Up              Off/Auto(2x ~ 128x) / Fix(2x ~ 128x)
                                                                                    eXtended Dynamic Range         Off/Low/Mid/High                                                                                                                           Signal Output                              VBS 1.0Vp-p(75 ohm, composite)
                                                                                    Digital Noise Reduction        Off/On                                                                                                                                     S/N Ratio                                  52dB
                                                                                    Digital Image Stabilization    Off/On                                                                                                                                     Input/Output          Image Output         BNC
Dimensions (unit:mm)                                                                Intelligent Video              Off/On(Moved / Fixed / Fence / Area / Tracking)                                                                                                                  Power                Terminal Block (2-pin)
                                                                                    PIP                            Off/On                                                                                                                                     Remote Control                             RS-485 (Half Duplex)
           SCC-A2333                                                                Etc. Function                  Detail, Reverse(H/V), Posi/Nega                                                                                                            Operating Temperature                      -10˚C ~ +50˚C
                                                                    Video Output                                   VBS 1.0Vp-p                                                                                                                                Operating Humidity                         Less than 90%
                                                                    S/N Ratio       S/N Ratio                      50 dB                                                                                                                                      Power Requirment                           DC12V                             AC24V/DC12V Compatible
                                                                    Lens            Lens Drive Type / Mount Type   MANUAL/AI(VIDEO/DC) / CS/C                                                                                                                 Power Consumption                          5.0W                              5.5W
                                     100                                                                                                                                                               SCC-C4301                                              Dimensions                                 60.5(W) x 59.5(H) x 119.5(D)mm 60.5(W) x 59.5(H) x 161.5(D)mm
                                                                    OSD                                            Yes
                                                                    Alarm           Output                         1 ea                                                                                                                                       Weight                                     375g                              500g
                                                                    Remote          CCVC                           Yes (with SCX-RD100)
                                                                    Control         RS485                          Yes (Multi Protocol, 8ea)
                                                                    Environmental   Operating Temperature          Absolute : -20˚C ~ +60˚C / Sustained : -10˚C ~ +50˚C
           SCC-A2033                                                Conditions      Operating Humidity             Less than 90%
                                                                    Power           Power Requirement              24 VAC ±10%/12 VDC ±10%              SCC-A2333P:24 VAC ±10%/12 VDC ±10%
                                                                                                                                                        SCC-A2033P:AC220V~240V(50Hz±0.3Hz)
                                                                                  LED Indicator                    Yes
                                     120
                                                                    Physical      Dimensions (WxHxD)               64 x 58 x 109.2 mm                   SCC-A2333P:64 x 58 x 109.2 mm
                                                                    Specification                                                                       SCC-A2033P:64 x 58 x 129.2 mm
                                                                                  Weight                           305 g                                SCC-A2333P:305g/SCC-A2033P:395g
                                                                                  Color       Body                 Siver


                                                                                                                                                                                                                                                                                                                                      Samsung Video Security System | 30 . 31
22x Zoom DayNight Camera                                                                                                                                                  22x Zoom DayNight WDR Camera

SCC-C4203A/C4303A                                                                                                                                                         SCC-C4205/C4305


Features                                                       Specifications                                                                                             Features                                                   Specifications
• 1/4" 410K/470K Pixels Super HAD CCD                          Model                                      SCC-C4203A                      SCC-C4303A                      • 22x motorized optical zoom with 10x digital zoom         Model                                      SCC-C4205                          SCC-C4305
• Day/Night                                                    Image                Device                1/4" Super HAD CCD                                              • 1/4” 410K/470K Pixels Ex-View PS CCD                     Image                Device                1/4" Ex-View PS CCD
• DSP (Digital Signal Processor)                                                    Effective Pixels      NTSC : 768(H) x 494(V) / PAL : 752(H) x 582(V)                  • Horizontal resolution : 480 TV lines                                          Effective Pixels      NTSC : 768(H) x 494(V) / PAL : 752(H) x 582(V)
• 10-bit A/D converter                                         Scanning Method                            2:1 Interlace                                                   • DSP (Digital Signal Processor)                           Scanning Method                            2:1 Interlace
• 22x optical zoom(f=3.6-79.2mm)and10x digital Zoom            Scanning Line         Horizontal           NTSC :15.750KHz / PAL : 15.625Hz                                • WDR (Wide Dynamic Range), Day/Night                      Synchronization Method                     Internal                          Internal/Line lock
• Excellent signal-to-noise ratio(50dB)                        Frequency             Vertical             NTSC :60Hz / PAL : 50Hz                                         • External synchronization with line lock (SCC-C4305)      Horizontal Resolution                      480 TV Lines
• Motion detection                                             Synchronization Method                     Internal                           Internal/Line lock           • Motion detection with alarming output                    Min. Scene            Color                0.002(Sens-up 160x,15IRE)Lux
• Both RS-485 communication interface & wired remote control   Horizontal Resolution                      Color : 480 TV Lines / B/W : 350 TV Lines                       • On-screen menus (multi-language)                         Illumination          B/W                  0.0002(Sens-up 160x,15IRE)Lux
                                                               Min. Scene            Color                0.005 (Sens-up 128x,15IRE)Lux                                                                                              Lens                  Zoom Ratio           220x Zoom(22x optical, 10x digital)
                                                                                                                                                                          • Remote-control (zoom, focus, Iris open-close)
                                                               Illumination          B/W                  0.0005 (Sens-up 128x,15IRE)Lux                                                                                                                   Focal Length         3.6~79.2mm
                                                                                                                                                                          • Min. scene illumination : 0.002(color)/0.0002(B/W) Lux
                                                               Lens                  Zoom Ratio           220x Zoom(22x optical, 10x digital)                                                                                                              Aperture     Tele    F3.8
                                                                                                                                                                          • 1 Alarm output (motion detection)
                                                                                     Focal Length         3.6~79.2mm                                                                                                                                       Ratio        Wide    F1.6
                                                                                     Aperture     Tele    F3.8                                                                                                                                             Viewing      Tele    2.3˚(H) x 1.7˚(V)
                                                                                     Ratio        Wide    F1.6                                                                                                                                             Angle        Wide    47.9'(H) x 36.9˚(V)
                                                                                     Viewing      Tele    2.3˚(H) x 1.7˚(V)                                                                                                          Functions             Camera ID            Max 20 Character
                                                                                     Angle        Wide    47.9˚(H) x 36.9˚(V)                                                                                                                              High Speed Shutter   Off ~ 1/10Ksec
                                                               Functions             Camera ID            Off/On (20Characters, Position Setting)                                                                                                          BLC                  Off/On
Dimensions (unit:mm)                                                                 Electronic Shutter   Off, 1/100 ~ 10,000 sec                                         Dimensions (unit:mm)                                                             AGC                  Off/Low/High
                                                                                     BLC / AGC / PIP      Off/On                                                                                                                                           White Balance        ATW/AWC/Manual
                                                                                     White Balance        ATW/AWC/Manual                                                                                                                                   Motion Detection     Off/On
        SCC-C4203A                                                                   Motion Detection     Off/On (Area/Sensitivity Setting)                                       SCC-C4205                                                                Sens Up              Off ~ 160x
                                                                                     Sens Up              OFF/Auto(2x~128x) / Fix(2x~128x)                                                                                           Signal Output                              VBS 1.0Vp-p
                                                               Signal Output                              VBS 1.0Vp-p(75 ohm, Composite)                                                                                             S/N Ratio                                  50dB
                                                               S/N Ratio                                  50dB                                                                                                                       Operating Temperature                      -10˚C ~ +50˚C
                                                               Input/Output          Image Output         BNC                                                                                                                        Operating Humidity                         Less than 90%
                                                                                     Power                Terminal Block(2-pin)                                                                                                      Power Requirment                           DC12V                             AC24V/DC12V Compatible
                                                               Remote Control                             RS-485 (Half Duplex)                                                                                                       Power Consumption                          5.7W                              6W
                                                               Operating Temperature                      -10˚C ~ +50˚C                                                                                                              Dimensions                                 60.5(W) x 59.5(H) x 127.5(D)mm      60.5(W) x 59.5(H) x 161.5(D)mm
                                                               Operating Humidity                         Less than 90%                                                                                                              Weight                                     375g                                500g
                                                               Power Requirment                           DC12V                              AC24V / DC12V Compatible
                                                               Power Consumption                          5.0W                               5.5W
                                                               Dimensions                                 60.5(W) x 59.5(H) x 119.5(D)mm 60.5(W) x 59.5(H) x 161.5(D)mm
        SCC-C4303A                                             Weight                                     375g                               550g
                                                                                                                                                                                  SCC-C4305




                                                                                                                                                                                                                                                                                                                 Samsung Video Security System | 32 . 33
32x Zoom DayNight WDR Camera

SCC-C4207/C4307                                                                                                                                                                  ::::::::::::::::::::::::::::::::::::::::::::::::



                                                                                                                                                                                      Rear Parts                                                                                 Exterior

                                                                                                                                                                                                                                                                                        Day & Night External Signal Input and Alarm Signal Output
Features                                                            Specifications                                                                                                                                                                                                      Terminal
• 1/4" 410K/470K Pixels Ex-View CCD                                 Model                                      SCC-C4207                        SCC-C4307                                                                                                                        This is the terminal that allows connection to an external brightness sensor (optional) to
• DIS (Digital Image Stabilizer)                                    Image                Device                1/4" Ex-View CCD                                                                                                                                                  trigger switching between black & white or color mode. It also sends out an alarm signal
• 32x zoom Lens (digital zoom:10x)                                                       Effective Pixels      NTSC : 768(H) x 494(V) / PAL : 752(H) x 582(V)                                                                                                                    when linked to the MOTION DET function or black & white.
• Min. scene illumination : 0.002(color)/0.0002(B/W) Lux            Scanning Method                            2 : 1 Interlace
• Day/Night                                                         Scanning Line         Horizontal           NTSC : 15.750Hz / PAL : 15.625Hz                                                                                                                                                      Day & Night IN

• 128x WDR (Wide Dynamic Range)                                     Frequency             Vertical             NTSC : 60Hz / PAL : 50Hz                                                                                                                                                                               1

• Motion detection (with adjustable zones and sensitivity levels)   Synchronization Method                     Internal                          Internal/Line lock                                                                                                                                           GND
                                                                                                                                                                                                     SCC-C4207                                     SCC-C4307
                                                                    Horizontal Resolution                      480 TV Lines                                                                                                                                                                                           2
• Privacy protection that allows up to 8 privacy zones
                                                                    Min. Scene            Color                0.002 (Sens-up 160x,15IRE)Lux                                                                                                                                                          Alarm Output
• Remote control through RS485(using SSC-1000/5000)
                                                                    Illumination          B/W                  0.0002 (Sens-up 160x,15IRE)Lux
• Excellent signal-to-noise ratio(50dB)                                                                                                                                                      Camera Manipulation Switch (setup switch)
                                                                    Lens                  Zoom Ratio           320x (32x Optical, 10x Digital)
                                                                                          Focal Length         3.55 ~ 113mm                                                           The functions of these parts will differ, depending on the operation mode                         Video Output Terminal
                                                                                          Aperture     Tele    F4.17                                                                  of the camera.
                                                                                                                                                                                                                                                                                 This is the terminal that is connected to the video input terminal of a monitor. The video
                                                                                          Ratio        Wide    F1.69
                                                                                                                                                                                                                                                                                 images from the camera are sent to the monitor through this terminal.
                                                                                          Viewing      Tele    1.78˚(H) x 1.34˚(V)                                                    • When the camera is in general operation mode :
                                                                                          Angle        Wide    56.41˚(H) x 43.01˚(V)                                                        Up/Down Direction Switch : Zoom Tele or Zoom Wide switch, respectively.
                                                                    Functions             Wide Dynamic Range   Off/On (128x)
                                                                                                                                                                                            Left/Right Direction Switch : Near Focus or Far Focus switch, respectively.                 RS485 Port
Dimensions (unit:mm)                                                                      Day/Night            Color/BW/Auto/EXT (ICR)
                                                                                                                                                                                            [SET UP] Switch: This is used to enter the setup menu :                              This is the RS485 remote control port.
                                                                                          Motion Detection     Off/On (Area/Sensitivity Setting)
                                                                                          Electronic Shutter   Off, 1/100 ~10,000 sec                                                       The user can enter the setup menu by pushing the [SET UP] switch, and
        SCC-C4207                                                                         Sens Up              Off/Auto (2x ~ 160x)                                                         holding it for 3 seconds.
                                                                                                                                                                                                                                                                                        Power LED
                                                                                          BLC                  Off/On (Area Setting)
                                                                                                                                                                                                                                                                                 The LED will be on if power is being supplied to the camera.
                                                                                          AGC                  Off/Low/High
                                                                                          Camera ID            Max. 20 Characters                                                     • From the setup menu :
                                                                                          White Balance        ATW/ATW2/AWC/Manual                                                          Up/Down Direction Switch : Used to move the cursor up or down.
                                                                                                                                                                                                                                                                                        Power Input Terminal
                                                                                          IR Filter            Off/On
                                                                                                                                                                                            Left/Right Direction Switch : Used to move the cursor to the left or right.          This is the terminal that is connected to the power adaptor cable.
                                                                                          Privacy Zones        8 (Mosaic)
                                                                                                                                                                                                                          Other functions may be designated by the setup menu.
                                                                    Signal Output                              VBS 1.0Vp-p(75 Ohm, Composite)
                                                                    S/N Ratio                                  50dB(AGC Off)                                                                [ENTER] Switch : Used to select the highlighted option.
                                                                    Input/Output          Image Output         BNC
                                                                                          Remote Control       RS485
                                                                                          Alarm Output         1
                                                                                          Power                Terminal Block (2-pin)
        SCC-C4307                                                   Operating Temperature                      -10˚C ~ +50˚C
                                                                                                                                                                                             ZOOM/FOCUS REMOTE Terminal
                                                                    Operating Humidity                         Maximum 90% RH
                                                                                                                                                                                      This is the terminal used to connect an external controller for ZOOM/FOCUS and menu
                                                                    Power Requirment                           DC12V                             AC24V/DC12V compatible
                                                                                                                                                                                      control and for executing the HOME RETURN and AF functions. It can be set to one of
                                                                    Power Consumption                          5.5W                              6W
                                                                                                                                                                                      four modes (A, B, C or D) according to the input condition.
                                                                    Dimensions                                 60.5(W) x 59.5(H) x 126.7(D)mm   60.5(W) x 59.5(H) x 160.9(D)mm
                                                                    Weight                                     390g                             515g




                                                                                                                                                                                                                                                                                                                                        Samsung Video Security System | 34 . 35
High Resolution 32x Zoom Camera                                                                                                                                                                               High Resolution WDR 32x Zoom Camera
SCC-C4233/C4333                                                                                                                                                                                               SCC-C4235/C4335


Features                                                                                                   Specifications                                                                                     Features                                                                                                   Specifications
• 1/4" 410K/470K Pixels Super-HAD IT CCD                                                                   Model                                       SCC-C4233                     SCC-C4333                • 1/4" 410K/470K Pixels Ex-View HAD PS CCD                                                                 Model                                       SCC-C4235                      SCC-C4335
• 32x Optical zoom lens (16x D-zoom)                                                                       Camera Type                                 Color                                                  • 32x Optical zoom lens (16x D-zoom)                                                                       Camera Type                                 Color
• High resolution : 540(Color)/570(BW) TV Lines                                                            Image          Device                       1/4" Super-HAD IT CCD                                  • High resolution Day/Night : 540(Color)/570(BW) TV Lines                                                  Image          Device                       1/4" Ex-View HAD PS CCD
• Min. scene illumination                                                                                                 Effective       NTSC         768(H) x 494(V)                                        • Min. scene illumination                                                                                                 Effective      NTSC          768(H) x 494(V)
  Color : 0.002 Lux(15 IRE, Sens-up 256x)                                                                                 Pixels          PAL          752(H) x 582(V)                                          Color : 0.001 Lux(15 IRE, Sens-up 256x)                                                                                 Pixels         PAL           752(H) x 582(V)
  B/W : 0.0002 Lux(15 IRE, Sens-up 256x)                                                                   Horizontal Resolution                       540(Color)/570(BW) TV Lines                              B/W : 0.0001 Lux(15 IRE, Sens-up 256x)                                                                   Horizontal Resolution                       540(Color)/570(BW) TV Lines
• Full auto focus function                                                                                 Min. Scene     Color          Sens-up Off   0.6 Lux(15IRE)                                         • Full auto focus function                                                                                 Min. Scene     Color          Sens-up Off   0.3 Lux(15IRE,Sens-up Off)
• Privacy mask zone (16 area)                                                                              Illumination                  Sens-up       0.002 Lux(15IRE)                                       • Privacy mask zone (16 area)                                                                              Illumination                  Sens-up       0.001 Lux(15IRE, Sens-up x256)
• Multi-protocol (more than 8 companies), multi-OSD                                                                       B/W            Sens-up Off   0.06 Lux(15IRE)                                        • Multi-protocol (more than 8 companies), multi-OSD                                                                       B/W            Sens-up Off   0.03 Lux(15IRE,Sens-up Off)
• Remote control(RS485), power zoom/focus control                                                                                        Sens-up       0.0002 Lux(15IRE)                                      • Remote control(RS485), power zoom/focus control                                                                                        Sens-up       0.0001 Lux(15IRE, Sens-up x256)
                                                                                                           Functions      Number of Privacy Zone       16                                                                                                                                                                Functions      Number of Privacy Zone       16
                                                                                                                          Day/Night                    Color/BW/Auto/EXT (ICR)                                                                                                                                                          Day/Night                    Color/BW/Auto/EXT (ICR)
                                                                                                                          Line Lock                    N/A                           INT/Line Lock                                                                                                                                      Line Lock                    N/A                             INT/Line Lock
                                                                                                                          White Balance                ATW1/ATW2/AWC/MANUAL                                                                                                                                                             White Balance                ATW1/ATW2/AWC/MANUAL
                                                                                                                          D-Zoom                       Yes ( ~ 16x)                                                                                                                                                                     D-Zoom                       Yes (~16x)
                                                                                                                          High Speed Shutter           Yes (OFF ~ 1/10K)                                                                                                                                                                High Speed Shutter           Yes (OFF ~ 1/10K)
                                                                                                                          Motion Detection             Yes                                                                                                                                                                              Motion Detection             Yes
                                                                                                                          Sens Up                      Yes (2x ~ 256x)                                        Dimensions (unit:mm)                                                                                                      Sens Up                      Yes (2x ~ 256x)
Dimensions (unit:mm)                                                                                                      Camera ID                    Max 20 Character                                                                                                                                                                 Camera ID                    Max 20 Character
                                                                                                                          Remote Control               RS485, Power Zoom/Focus                                                                                                                                                          Remote Control               RS485, Power Zoom/Focus
                                                                                                                          Alarm          Output        1                                                                     SCC-C4235                                                                                                  Alarm          Input         Yes
               SCC-C4233
                                                                                                           Video Output                                VBS 1.0Vp-p                                                                                                                                                                                     Output        1
                                                                                                           S/N Ratio                                   50 dB                                                                                                                                                                            Wide Dynamic Range           Yes
                                                                                                                                                                                                                                                                   RS-415
                                                                                                                                                                                                                                                                             1 2 3 4 5 6 7                 SET UP




                                                     RS-415
                                                               1 2 3 4 5 6 7                 SET UP        Lens          Focal Length                  3.55 ~ 113mm                                                                                             DATA+ DATA-
                                                                                                                                                                                                                                                                                 1. ALARM OUT
                                                                                                                                                                                                                                                                                                        PWR              Video Output                                VBS 1.0Vp-p
                                                                                                                                                                                                                                                                                 2. GND
                                                                                                                                                                                                                                                                                 3. 5V OUT




                                                                                                                         Zoom Ratio                    32x Optical, 16x Digital                                                                                                                                          S/N Ratio                                   50 dB
                                                                                          PWR                                                                                                                                                                                    4. DAY/NIGHT IN
                                                                                                                                                                                                                                                                                 5. ZOOM
                                                  DATA+ DATA-                                                                                                                                                                                                                    6. COM
                                                                   1. ALARM OUT
                                                                                                                                                                                                                                                                 GND +12V        7. FOCUS
                                                                   2. GND                                                                                                                                                                                                                            VIDEO OUT
                                                                   3. 5V OUT
                                                                   4. DAY/NIGHT IN
                                                                   5. ZOOM
                                                                   6. COM



                                                                                                                         Aperture Ratio                F1.69(W)/F4.17(T)                                                                                                                                                 Lens          Focal Length                  3.55 ~ 113mm
                                                   GND +12V        7. FOCUS
                                                                                       VIDEO OUT




                                                                                                                         Viewing          Tele         1.78˚(H) x 1.34˚(V)                                                                                                                                                             Zoom Ratio                    32x Optical, 16x Digital
                                                                                                                         Angle            Wide         56.41˚(H) x 43.01˚(V)                                                                                                                                                           Aperture Ratio                F1.69(W)/F4.17(T)
                                                                                                                                                                                                                                   512x
                      512x                                                                                 Operating Temperature                       -10˚C ~ + 50˚C                                                                          Genuine Product of
                                                                                                                                                                                                                                               Samsung Electronics
                                                                                                                                                                                                                                                                                                                                       Viewing        Tele           1.78˚(H) x 1.34˚(V)
                                 Genuine Product of
                                 Samsung Electronics
                                                                                                           Operating Humidity                          Less than 90%                                                                   115.2                                            10
                                                                                                                                                                                                                                                                                                                                       Angle          Wide           56.41˚(H) x 43.01˚(V)
                         115.2                                            10                               Power         Power            NTSC         DC 12V                        AC24V/DC12V,60Hz                                                                                                                    Operating Temperature                       -10˚C ~ + 50˚C
                                                                                                                         Requirement      PAL                                        AC24V/DC12V,50Hz                                                                                                                    Operating Humidity                          Less than 90%
                                                                                                                         LED Indicator                 Yes                                                                                                                                                               Power         Power          NTSC           DC 12V                          AC24V/DC12V, 60Hz
                                                                                                           Dimensions Net(WxHxD)                       60.5 x 59.5 x 125.2 mm        60.5 x 59.5 x 159.2 mm                  SCC-C4335                                                                                                 Requirement PAL                                               AC24V/DC12V, 50Hz
               SCC-C4333
                                                                                                           Weight        Net                           444g                          595g                                                                                                                                              Power Consumption             5W                              5.5W
                                                                                                           Color         Body                          Silver                                                                                                   RS-485
                                                                                                                                                                                                                                                                         1 2 3 4 5 6 7                 SET UP
                                                                                                                                                                                                                                                                                                                                       LED Indicator                 Yes
                                                  RS-485
                                                           1 2 3 4 5 6 7                 SET UP
                                                                                                                                                                                                                                                             DATA+ DATA-
                                                                                                                                                                                                                                                                              1. ALARM OUT
                                                                                                                                                                                                                                                                              2. GND
                                                                                                                                                                                                                                                                              3. 5V OUT
                                                                                                                                                                                                                                                                                                     PWR

                                                                                                                                                                                                                                                                                                                         Dimensions Net(WxHxD)                       60.5 x 59.5 x 125.2 mm          60.5 x 59.5 x 159.2 mm
                                                                                       PWR                                                                                                                                                                                    4. DAY/NIGHT IN
                                                                                                                                                                                                                                                                              5. ZOOM



                                                                                                                                                                                                                                                                                                                         Weight        Net                           444g                            595g
                                               DATA+ DATA-                                                                                                                                                                                                                    6. COM
                                                                1. ALARM OUT
                                                                                                                                                                                                                                                             AC 24V/DC 12V    7. FOCUS
                                                                2. GND                                                                                                                                                                                                                             VIDEO OUT
                                                                3. 5V OUT
                                                                4. DAY/NIGHT IN
                                                                5. ZOOM
                                                                6. COM
                                               AC 24V/DC 12V    7. FOCUS
                                                                                     VIDEO OUT



                                                                                                                                                                                                                                                                                                                         Color         Body                          Silver


                                                                                                                                                                                                                                      512x
                         512x                                                                                                                                                                                                                                   Genuine Product of
                                                                                                                                                                                                                                                                Samsung Electronics
                                                                                                                                                                                                                                                       DIGITAL COLOR CAMERA SCC-C4335
                                                  Genuine Product of
                                                  Samsung Electronics
                                         DIGITAL COLOR CAMERA SCC-C4335                                                                                                                                                                    149.2                                                                    10
                             149.2                                                                    10




                                                                                                                                                                                                                                                                                                                                                                                                 Samsung Video Security System | 36 . 37
34x Optical Zoom Lens Camera                                                                                                                                                    34x Optical Zoom Lens Camera

SCC-C4237                                                               NEW
                                                                                                                                                                                SCC-C4239/C4339                                                                                                   NEW




Features                                                            Specifications                                                                                              Features                                                            Specifications
• 1/4" SONY 410K/470K Pixels Super HAD IT CCD                       Model                                       SCC-C4237                                                       • 1/4" SONY 410K/470K Pixels Ex-View HAD PS CCD                     Model                                        SCC-C4239                        SCC-C4339
• 34x Optical & 16x(0.1step) Digital Zoom                           Camera Type Color/BW                        Color                                                           • 34x Optical & 16x(0.1step) Digital Zoom                           Camera Type Color/BW                         Color
• High Resolution : 600 TV Lines                                    Image        Device                         1/4" Super HAD IT CCD                                           • High Resolution : 600 TV Lines                                    Image        Device                          1/4" Ex-View HAD PS CCD
• Min. illumination 0.001 Lux (F1.2, 15 IRE, Sens-up 512x, Color)                Pixels       Effective         768 x 494 (NTSC) / 752 x 582 (PAL)                              • Min. illumination 0.001 Lux (F1.2, 15 IRE, Sens-up 512x, Color)                Pixels       Effective          768 x 494 (NTSC) / 752 x 582 (PAL)
                     0.0001 Lux (F1.2, 15 IRE, Sens-up 512x, B/W)   Resolution   Horizontal                     600 (Color) TV Lines                                                                 0.0001 Lux (F1.2, 15 IRE, Sens-up 512x, B/W)   Resolution   Horizontal                      600 (Color) TV Lines
• Day Night Function (ICR), Sens-up Function (512x)                 Min. Scene   Color       Sens-up Off        0.6Lux(15IRE), 1.2Lux(30IRE), 2Lux(50IRE)                       • Wide Dynamic Range (NTSC 128x, PAL 160x)                          Min. Scene   Color        Sens-up Off        0.6Lux(15IRE), 1.2Lux(30IRE), 2Lux(50IRE)
• Adaptive Digital Noise Reduction (3D + 2D)                        Illumination             Sens up 512x       0.001Lux(15IRE) , 0.002Lux(30IRE), 0.004Lux(50IRE)              • Virtual Progressive Scan (VPS)                                    Illumination              Sens up 512x       0.001Lux(15IRE) , 0.002Lux(30IRE), 0.004Lux(50IRE)
• Back Light Compensation (Area Setting)                                         B/W         Sens-up Off        0.06Lux(15IRE), 0.12Lux(30IRE), 0.2Lux(50IRE)                   • Day Night Function (ICR), Sens-up Function (512x)                              B/W          Sens-up Off        0.06Lux(15IRE), 0.12Lux(30IRE), 0.2Lux(50IRE)
• Advanced Motion Detection Function                                                         Sens up 512x       0.0001Lux(15IRE), 0.0002Lux(30IRE), 0.0004Lux(50IRE)                                                                                                          Sens up 512x       0.0001Lux(15IRE), 0.0002Lux(30IRE), 0.0004Lux(50IRE)
                                                                                                                                                                                • Adaptive Digital Noise Reduction (3D + 2D)
                                                                    Functions    Number of Privacy Zone         12 ea                                                                                                                               Functions    Number of Privacy Zone          12 ea
• eXtended Dynamic Range (XDR)                                                                                                                                                  • Back Light Compensation (Area Setting)
                                                                                 Day/Night                      Auto / Day / Night(ICR)                                                                                                                          Day/Night                       Auto / Day / Night(ICR)
• Privacy Mask Function (12ea)                                                                                                                                                  • Advanced Motion Detection Function
                                                                                 Motion Detection               Yes, Sensitivity 1~7 Level                                                                                                                       Motion Detection                Yes, Sensitivity 1~7 Level
• DIS (Digital Image Stabilization)                                                                                                                                             • eXtended Dynamic Range (XDR)
                                                                                 D-Zoom                         Yes(~16x)                                                                                                                                        Wide Dynamic Range              Yes(NTSC : 128x, PAL : 160x)
• CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100)                High Speed Shutter             1/100~1/10K sec                                                 • Privacy Mask Function (12ea)                                                   D-Zoom                          Yes(~16x)
• RS-485 (Halfl) Control (Multi-Protocol support)                                Sens Up / PIP / BLC            Yes(2x ~ 512x) / Yes / Off/On                                   • DIS (Digital Image Stabilization)                                              High Speed Shutter              1/100~1/10K sec
• Multi-Language OSD (E, F, G, S, I, J, R, P, C, etc) support                    AGC                            Off/On (Very Low / Low / Mid / High / Very High / User / Fix)   • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100)                Sens Up / PIP / BLC             Yes(2x ~ 512x) / Yes / Off/On
• Intelligent Video (Moved/Fixed/Fence/Tracking)                                 Auto Focus                     Manual / Auto / one AF                                          • RS-485 (Halfl) Control (Multi-Protocol support)                                AGC                             Off/On (Very Low / Low / Mid / High / Very High / User / Fix)
• Preset 512 ea, Alarm Output 1ea                                                Syncronization                 Internal                                                        • Multi-Language OSD (E, F, G, S, I, J, R, P, C, etc) support                    Auto Focus                      Manual / Auto / one AF
• DC12V                                                                          Camera ID                      Max 54 Character, 2 Line                                        • Intelligent Video (Moved/Fixed/Fence/Tracking)                                 Syncronization                  Internal                          Internal/Line Lock
                                                                                 XDR(eXtended Dynamic Range)    Off/On (Low/Middle/High)                                        • Preset 512 ea, Alarm Output 1ea                                                Camera ID                       Max 54 Character, 2 Line
                                                                                 DNR(Digital Noise Reduction)   Off / On (Low / Middle / High / User(3D/2D))                    • SCC-C4239 : DC12V                                                              VPS(Virtual Progressive Scan)   Yes
                                                                                 Schedule                       Day / Time Schedule                                                                                                                              XDR(eXtended Dynamic Range)     Off/On (Low/Middle/High)
                                                                                                                                                                                  SCC-C4339 : AC24V/DC12V
                                                                                 White Balance                  ATW1 / ATW2 / AWC(Manual) / 3200 / 5600                                                                                                          DNR(Digital Noise Reduction)    Off / On (Low / Middle / High / User(3D/2D))
                                                                    Video Output VBS 1.0Vp-p                    VBS 1.0Vp-p                                                                                                                                      Schedule                        Day / Time Schedule
Dimensions (unit:mm)                                                S/N Ratio    S/N Ratio                      52 dB                                                           Dimensions (unit:mm)                                                             White Balance                   ATW1 / ATW2 / AWC(Manual) / 3200 / 5600
                                                                    Lens         Focal Length                   3.4 ~ 115.6mm                                                                                                                       Video Output VBS 1.0Vp-p                     VBS 1.0Vp-p
                                                                                 Min. Object Distance           100cm                                                                  SCC-C4239                                                    S/N Ratio    S/N Ratio                       52 dB
                                                                                 Zoom Ratio                     34x Optical (688x with 16x Digital zoom)                                                                                            Lens         Focal Length                    3.4 ~ 115.6mm
                                                                                 Aperature Ratio                F1.65(W)/F3.7(T)                                                                                                                                 Min. Object Distance            100cm




                                                                                                                                                                                                   59
                                                                                 Viewing     Tele               1.47˚(H) x 1.10˚(V)0                                                                                                                             Zoom Ratio                      34x Optical (688x with 16x Digital zoom)
                     59




                                                                                 Angle       Wide               61.22˚(H) x 47.16˚(V)                                                                                                                            Aperature Ratio                 F1.65(W)/F3.7(T)
                                                                                                                                                                                            59                    113.9
              59                    113.9                                        Lens Drive Type                DC Auto Iris                                                                                                                                     Viewing      Tele               1.47˚(H) x 1.10˚(V)0
                                                                                 Mount Type                     Board-in type                                                                                                                                    Angle        Wide               61.22˚(H) x 47.16˚(V)
                                                                    OSD          OSD                            Yes                                                                                                                                              Lens Drive Type                 DC Auto Iris
                                                                    Alarm        Output                         1ea                                                                                                                                              Mount Type                      Board-in type
                                                                    Remote Control                              RS485, CCVC                                                                                                                         OSD          OSD                             Yes
                                                                    Environmental Operating Temperature         -10˚C ~ +50˚C                                                          SCC-C4339                                                    Alarm        Output                          1ea
                                                                    Conditions     Operating Humidity           Less than 90%                                                                                                                       Remote Control                               RS485, CCVC
                                                                    Power          Power Requirement            DC12V                                                                                                                               Environmental Operating Temperature          -10˚C ~ +50˚C


                                                                                                                                                                                                   59
                                                                                   LED Indicator                Yes                                                                                                                                 Conditions     Operating Humidity            Less than 90%
                                                                    Physical       Dimensions (WxHxD)           59x 59x113.9mm                                                                                                                      Power          Power Requirement             DC12V                             DC12V, AC24V
                                                                                                                                                                                            59                       144.2
                                                                    Specification Weight                        383g                                                                                                                                               LED Indicator                 Yes
                                                                                   Color                        Silver                                                                                                                              Physical       Dimensions (WxHxD)            59x 59x113.9mm                    59x 59x144.2mm
                                                                                                                                                                                                                                                    Specification Weight                         383g                              508g
                                                                                                                                                                                                                                                                   Color                         Silver



                                                                                                                                                                                                                                                                                                                              Samsung Video Security System | 38 . 39
43x Optical Zoom Lens Camera                                                                                                                                                    43x Optical Zoom Lens Camera

SCC-C4253/C4353                                                                                                    NEW
                                                                                                                                                                                SCC-C4255/C4355                                                                                                          NEW




Features                                                            Specifications                                                                                              Features                                                            Specifications
• 1/4" SONY 410K/470K Pixels Super HAD IT CCD                       Model                                       SCC-C4253                        SCC-C4353                      • 1/4" SONY 410K/470K Pixels Ex-View HAD PS CCD                     Model                                        SCC-C4255                        SCC-C4355
• 43x(f=3.2~138.5mm) Optical & 16x(0.1step) Digital Zoom            Camera Type Color/BW                        Color                                                           • 43x(f=3.2~138.5mm) Optical & 16x(0.1step) Digital Zoom            Camera Type Color/BW                         Color
• High Resolution : 600 TV Lines                                    Image        Device                         1/4" Super HAD IT CCD                                           • High Resolution : 600 TV Lines                                    Image        Device                          1/4" Ex-View HAD PS CCD
• Min. illumination 0.001 Lux (F1.2, 15 IRE, Sens-up 512x, Color)                Pixels       Effective         768 x 494 (NTSC) / 752 x 582 (PAL)                              • Min. illumination 0.001 Lux(F1.2,15 IRE, Sens-up 512x, Color)                  Pixels       Effective          768 x 494 (NTSC) / 752 x 582 (PAL)
                     0.0001 Lux (F1.2, 15 IRE, Sens-up 512x, B/W)   Resolution   Horizontal                     600 (Color) TV Lines                                                                 0.0001 Lux(F1.2,15 IRE, Sens-up 512x, B/W)     Resolution   Horizontal                      600 (Color) TV Lines
• Day Night Function (ICR), Sens-up Function (512x)                 Min. Scene   Color       Sens-up Off        0.6Lux(15IRE), 1.2Lux(30IRE), 2Lux(50IRE)                       • Wide Dynamic Range (NTSC 128x, PAL 160x)                          Min. Scene   Color        Sens-up Off        0.6Lux(15IRE), 1.2Lux(30IRE), 2Lux(50IRE)
• Adaptive Digital Noise Reduction (3D + 2D)                        Illumination             Sens up 512x       0.001Lux(15IRE) , 0.002Lux(30IRE), 0.004Lux(50IRE)              • Virtual Progressive Scan (VPS)                                    Illumination              Sens up 512x       0.001Lux(15IRE) , 0.002Lux(30IRE), 0.004Lux(50IRE)
• Back Light Compensation (Area Setting)                                         B/W         Sens-up Off        0.06Lux(15IRE), 0.12Lux(30IRE), 0.2Lux(50IRE)                   • Day Night Function (ICR), Sens-up Function (512x)                              B/W          Sens-up Off        0.06Lux(15IRE), 0.12Lux(30IRE), 0.2Lux(50IRE)
• Advanced Motion Detection Function                                                         Sens up 512x       0.0001Lux(15IRE), 0.0002Lux(30IRE), 0.0004Lux(50IRE)                                                                                                          Sens up 512x       0.0001Lux(15IRE), 0.0002Lux(30IRE), 0.0004Lux(50IRE)
                                                                                                                                                                                • Adaptive Digital Noise Reduction (3D + 2D)
                                                                    Functions    Number of Privacy Zone         12 ea                                                                                                                               Functions    Number of Privacy Zone          12 ea
• eXtended Dynamic Range (XDR)                                                                                                                                                  • Back Light Compensation (Area Setting)
                                                                                 Day/Night                      Auto / Day / Night(ICR)                                                                                                                          Day/Night                       Auto / Day / Night(ICR)
• Privacy Mask Function (12ea)                                                                                                                                                  • Advanced Motion Detection Function
                                                                                 Motion Detection               Yes, Sensitivity 1~7 Level                                                                                                                       Motion Detection                Yes, Sensitivity 1~7 Level
• DIS (Digital Image Stabilization)                                                                                                                                             • eXtended Dynamic Range (XDR)
                                                                                 D-Zoom                         Yes(~16x)                                                                                                                                        Wide Dynamic Range              Yes(NTSC : 128x, PAL : 160x)
• CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100)                High Speed Shutter             1/100~1/10K sec                                                 • Privacy Mask Function (12ea)                                                   D-Zoom                          Yes(~16x)
• RS-485 (Halfl) Control (Multi-Protocol support)                                Sens Up / PIP / BLC            Yes(2x ~ 512x) / Yes / Off/On                                   • DIS (Digital Image Stabilization)                                              High Speed Shutter              1/100~1/10K sec
• Multi-Language OSD (E, F, G, S, I, J, R, P, C, etc) support                    AGC                            Off/On (Very Low / Low / Mid / High / Very High / User / Fix)   • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100)                Sens Up / PIP / BLC             Yes(2x ~ 512x) / Yes / Off/On
• Intelligent Video (Moved/Fixed/Fence/Tracking)                                 Auto Focus                     Manual / Auto / one AF                                          • RS-485 (Halfl) Control (Multi-Protocol support)                                AGC                             Off/On (Very Low / Low / Mid / High / Very High / User / Fix)
• Preset 512 ea, Alarm Output 1 ea                                               Syncronization                 Internal                          Internal/Line Lock            • Multi-Language OSD (E, F, G, S, I, J, R, P, C, etc) support                    Auto Focus                      Manual / Auto / one AF
• SCC-C4253 : DC12V                                                              Camera ID                      Max 54 Character, 2 Line                                        • Intelligent Video (Moved/Fixed/Fence/Tracking)                                 Syncronization                  Internal                          Internal/Line Lock
  SCC-C4353 : AC24V/DC12V                                                        XDR(eXtended Dynamic Range)    Off/On (Low/Middle/High)                                        • Preset 512 ea, Alarm Output 1 ea                                               Camera ID                       Max 54 Character, 2 Line
                                                                                 DNR(Digital Noise Reduction)   Off / On (Low / Middle / High / User(3D/2D))                    • SCC-C4255 : DC12V                                                              VPS(Virtual Progressive Scan)   Yes
                                                                                 Schedule                       Day / Time Schedule                                                                                                                              XDR(eXtended Dynamic Range)     Off/On (Low/Middle/High)
                                                                                                                                                                                  SCC-C4355 : AC24V/DC12V
                                                                                 White Balance                  ATW1 / ATW2 / AWC(Manual) / 3200 / 5600                                                                                                          DNR(Digital Noise Reduction)    Off / On (Low / Middle / High / User(3D/2D))
                                                                    Video Output VBS 1.0Vp-p                    VBS 1.0Vp-p                                                                                                                                      Schedule                        Day / Time Schedule
Dimensions (unit:mm)                                                S/N Ratio    S/N Ratio                      52 dB                                                           Dimensions (unit:mm)                                                             White Balance                   ATW1 / ATW2 / AWC(Manual) / 3200 / 5600
                                                                    Lens         Focal Length                   3.2 ~ 138.5mm                                                                                                                       Video Output VBS 1.0Vp-p                     VBS 1.0Vp-p
       SCC-C4253                                                                 Min. Object Distance           100cm                                                                  SCC-C4255                                                    S/N Ratio    S/N Ratio                       52 dB
                                                                                 Zoom Ratio                     43x Optical (688x with 16x Digital zoom)                                                                                            Lens         Focal Length                    3.2 ~ 138.5mm
                                                                                 Aperature Ratio                F1.65(W)/F3.7(T)                                                                                                                                 Min. Object Distance            100cm
                   59




                                                                                                                                                                                                   59
                                                                                 Viewing     Tele               1.47˚(H) x 1.10˚(V)0                                                                                                                             Zoom Ratio                      43x Optical (688x with 16x Digital zoom)
                                                                                 Angle       Wide               61.22˚(H) x 47.16˚(V)                                                                                                                            Aperature Ratio                 F1.65(W)/F3.7(T)
            59                    113.9                                                                                                                                                     59                    113.9
                                                                                 Lens Drive Type                DC Auto Iris                                                                                                                                     Viewing      Tele               1.47˚(H) x 1.10˚(V)0
                                                                                 Mount Type                     Board-in type                                                                                                                                    Angle        Wide               61.22˚(H) x 47.16˚(V)
                                                                    OSD          OSD                            Yes                                                                                                                                              Lens Drive Type                 DC Auto Iris
                                                                    Alarm        Output                         1ea                                                                                                                                              Mount Type                      Board-in type
                                                                    Remote Control                              RS485, CCVC                                                                                                                         OSD          OSD                             Yes
       SCC-C4353                                                    Environmental Operating Temperature         -10˚C ~ +50˚C                                                          SCC-C4355                                                    Alarm        Output                          1ea
                                                                    Conditions     Operating Humidity           Less than 90%                                                                                                                       Remote Control                               RS485, CCVC
                                                                    Power          Power Requirement            DC12V                             DC12V, AC24V                                                                                      Environmental Operating Temperature          -10˚C ~ +50˚C
                   59




                                                                                                                                                                                                   59
                                                                                   Power Consumption            4.2W                              5.6W                                                                                              Conditions     Operating Humidity            Less than 90%
                                                                                   LED Indicator                Yes                                                                                                                                 Power          Power Requirement             DC12V                             DC12V, AC24V
            59                       144.2                                                                                                                                                  59                       144.2
                                                                    Physical       Dimensions (WxHxD)           59x 59x113.9mm                    59x 59x144.2mm                                                                                                   Power Consumption             4.2W                              5.6W
                                                                    Specification Weight                        383g                              508g                                                                                                             LED Indicator                 Yes
                                                                                   Color                        Silver                                                                                                                              Physical       Dimensions (WxHxD)            59x 59x113.9mm                    59x 59x144.2mm
                                                                                                                                                                                                                                                    Specification Weight                         383g                              508g
                                                                                                                                                                                                                                                                   Color                         Silver


                                                                                                                                                                                                                                                                                                                                   Samsung Video Security System | 40 . 41
Bullet type IR LED DayNight Camera
Bullet type IR LED DayNight Camera                                                                                                           SCC-B9371/B9372
SCC-B9270                                                                                                                                    SCC-B9373


Features                                                       Specifications                                                                Features                                            Specifications
• 1/3" 320K Pixels Super-HAD IT CCD                            Model                                        SCC-B9270                        • 1/3" 410K/470K Pixels Super-HAD IT CCD            Model                               SCC-B9371                     SCC-B9372                      SCC-B9373
• 350 TV lines resolution                                      Camera Type                                  Color                            • 540(Color)/570(BW) TV lines resolution            Camera Type                         Color
• Min. scene illumination : 0 Lux with IR-LED(48pcs)           Image          Device                        1/3" Super-HAD IT CCD            • Min. scene illumination:                          Image        Device                 1/3" Super-HAD IT CCD
• 4.3mm fixed iris lens built-in F2.0                                         Pixels            Effective   500 x 582                          SCC-B9371 : 0Lux with IR-LED(36pcs)                            Pixels     Effective   NTSC : 768 x 494 / PAL : 752 x 582
                                                               Min. Scene                       Color       O Lux with IR-LED(48pcs)           SCC-B9372 : 0Lux with IR-LED(42pcs)               Min. Scene              Color       O Lux with IR-LED(36pcs)     O Lux with IR-LED(42pcs)       O Lux with IR-LED(42pcs)
• No focus shift in night time (at LED turn on)
                                                               Illumination                     B/W         Viewable length at night : 40m
                                                                                                                                               SCC-B9373 : 0Lux with IR-LED(42pcs)               Illumination            B/W         Viewable length at night:35m Viewable length at night:45m   Viewable length at night:70m
• Back light compensation
                                                               Resolution     Horizontal                    350 TV Lines                     • Focal length & focus externally adjustable        Resolution Horizontal               540(Color) / 570(BW) TV Lines
• Water resistant (IP66)
                                                                              Vertical                      350 TV Lines                     • DC iris level external adjustable                 Video Output                        VBS 1.0Vp-p
• Size: 70(ø) x 104(L)mm
                                                               Video Output                                 VBS 1.0Vp-p                      • Viewable length at night : SCC-B9371 : 35m        S/N Ratio                           48 dB
• DC12V, 110mA/450mA (IR LED On)                                                                                                                                           SCC-B9372 : 45m
                                                               S/N Ratio                                    48 dB                                                                                Function                            AGC, BLC, ATW
                                                               Function                                     AGC, BLC, ATW                                                  SCC-B9373 : 70m       Lens         Focal Length           3.8 ~ 9.5mm                                                 6~50mm
                                                               Lens           Focal Length                  4.3mm
                                                                                                                                             • Back light compensation                                        Aperture Ratio         F1.2                                                        F1.6
                                                                              Aperture Ratio                F2.0                             • Water resistant (IP66)                                         Viewing Tele           30.0˚(H) x 22.4˚(V)          30.0˚(H) x 22.4˚(V)            5.7˚(H) x 4.3˚(V)
                                                                              Viewing Angle     Tele        73.7˚(H) x 47.3˚(V)              • Size : SCC-B9371 : 73(ø) x 122(L)mm                            Angle      Wide        74.2˚(H) x 54.0˚(V)          74.2˚(H) x 54.0˚(V)            43.9˚(H) x 33.2˚(V)
                                                                              Lens Drive Type               Fixed Iris (ELC Function)                 SCC-B9372 : 77.5(ø) x 129(L)mm                          Lens Drive Type        Vari-Focal Auto Iris
                                                               Operating Temperature                        -10˚C ~ + 50˚C
                                                                                                                                                      SCC-B9373 : 98(ø) x 162.5(L))mm            Operating Temperature               -10˚C ~ + 50˚C
Dimensions (unit:mm)                                           Operating Humidity                           Less than 90%                    • AC24V/DC12V :                                     Operating Humidity                  Less than 90%
                                                               Water resistant                              IP 66
                                                                                                                                               SCC-B9371 : 210mA/600mA (IR LED On)               Water Resistant                     IP 66
                                                                                                                                               SCC-B9372 : 210mA/650mA (IR LED On)
                                                               Power Requirement                            DC 12V                                                                               Power Requirement                   AC 24V & DC 12V
                                                                                                                                               SCC-B9373 : 210mA/1.2A (IR LED On)
                                                               Power Consumption                            1.3W(Led Off) / 5.4W(Led On)                                                         Power Consumption                   2.5W(Led Off)/7.2W(Led On) 2.5W(Led Off)/7.8W(Led On)       2.5W(Led Off)/14.4W(Led On)
                                                               Dimension                                    70(ø) x 104(L)mm                                                                     Dimension                           73(ø) x 122(L)mm             77.5(ø) x 129(L)mm             98(ø) x 162.5(L)mm
                                                               Weight                                       750g                                                                                 Weight                              910g                          1010g                         2335g
                                                    110




                    70
                   82



                                            125                                                                                              Dimensions (unit:mm)
                                                          77




                                                                                                                                                    SCC-B9371                                SCC-B9372                                                   SCC-B9373
                                                                                                                                                                                  140
                                              104




                                                                                                                                                                                                                                                                                    Samsung Video Security System | 42 . 43
Anti-Vandal Dome IR LED DayNight Camera                                                                                             Anti Vandal Dome Camera

SCC-B9374                                                                                                                           SCC-931T


Features                                               Specifications                                                               Features                                       Specifications
• 1/3" 410K/470K Pixels Super-HAD IT CCD               Model                                   SCC-B9374                            • Water resistant and dust resistant (IP66)    Model                                      SCC-931T                          SCC-931TP
• 540(Color)/570(BW) TV lines resolution               Camera Type                             Color                                • 1/4" 410K/470K Pixels Super HAD CCD          Image                Device                1/4" Super HAD CCD
• Min. scene illumination : 0 Lux with IR-LED(18pcs)   Image          Device                   1/3" Super-HAD IT CCD                • 12x optical zoom lens (10x digital zoom)                          Effective Pixels      768(H) x 494(V)                   752(H) x 582(V)
• Vari-focal(3.8~9.5mm) auto iris lens built-in F1.2                  Pixels       Effective   NTSC : 768 x 494 / PAL : 752 x 582   • Min. scene illumination : 0.005 Lux          Scanning Method                            2:1 Interlace
• Color & B/W changing time selectable                 Min. Scene                  Color       O Lux with IR-LED(18pcs)             • RS-485 remote control                        Horizontal Resolution                      480 TV Lines
• IR LED Day/Night vision camera                       Illumination                B/W         Viewable Length at Night : 20m       • AC24V / DC12V                                Synchronization Method                     Internal/Line lock
• Real 3-axis gimbals bracket (2-Pan , 2-Tilt)         Resolution     Horizontal               540(Color) / 570(BW) TV Lines        • Applicable Wall mount adaptor : SADT-101WM   Min. Scene Illumination                    0.005(Sens up 128x,15IRE)Lux
                                                       Video Output                            VBS 1.0Vp-p                                                                         Lens                  Zoom Ratio           12x Optical, 10x Digital
• Viewable length at night(20m)
                                                       S/N Ratio                               48 dB                                                                                                     Focal Length         3.6 ~ 43.2mm
• Back light compensation
                                                       Function                                AGC, BLC, ATW                                                                                             Viewing      Tele    4.7˚(H) x 3.6˚(V)
• Vandal resistant, water resistant (IP66)
                                                       Lens            Focal Length            3.8 ~ 9.5mm                                                                                               Angle        Wide    52.8˚(H) x 40.3˚(V)
• Service monitor (second video) built-in                              Aperture Ratio          F1.2                                                                                Functions             Shutter Speed        Off ~ 1/10,000 sec
• Size : 145(ø) x 100(L)mm                                             Viewing      Tele       30.0˚(H) x 22.4˚(V)                                                                                       Sens Up              Max 128x (Auto/FIX/Off)
• AC24V/DC12V, 210mA/420mA (IR LED On)                                 Angle        Wide       74.2˚(H) x 54.0˚(V)                  Dimensions (unit:mm)                                                 Motion Detection     On/Off
• Applicable Wall mount adaptor : SADT-937WM                           Lens Drive Type         Vari-focal Auto Iris                                                                                      Focus                AF/OneAF/Manual
                                                       Operating Temperature                   -10˚C ~ + 50˚C                                                                                            White Balance        ATW / AWC / Manual
                                                       Operating Humidity                      Less than 90%                                                                       Signal Output                              VBS 1.0Vp-p, 75ohm, BNC
                                                       Water resistant                         IP 66                                                                               S/N Ratio                                  52dB
                                                       Power Requirement                       AC 24V & DC 12V                                                                     Remote Control                             RS-485(Half Duplex)
                                                       Power Consumption                       2.5W(Led Off) / 5W(Led On)                                                          Power Requirment                           AC24V / DC12V Compatible
                                                       Dimension                               145(ø) x 100(L)mm                                                                   Weight                                     1,000g
Dimensions (unit:mm)                                   Weight                                  990g                                                                                Dimensions                                 132(ø) x 95.3(D)mm




                                                                                                                                    Applicable Wall Mount Adaptor                  Installation Guide (Wall Surface)

                                                                                                                                              SADT-101WM                                         SCC-931T + SADT-101WM

                                                                                                                                                                                                                Wall Mount
                                                                                                                                                                                                                  Adaptor




                                                                                                                                                                                                              Gasket Body




                                                                                                                                                                                                                Anti Vandal
                                                                                                                                                                                                             Dome Camera
                                                                                                                                                                                                              (SCC-931T)


                                                                                                                                                                                                            Screw-Machine



                                                                                                                                                                                                                                                             Samsung Video Security System | 44 . 45
Anti Vandal 3-Axis DayNight, WDR Dome Camera                                                                                                                                            DayNight Vari-Focal Dome Camera

SCC-C9302(F)                                                                                                                                                                            SCC-B5342/B5344


Features                                                                                  Specifications                                                                                Features                                                       Specifications
• Convenient installation, with its 3-axis turning design                                 Model                                      SCC-C9302(F)                       SCC-C9302(F)P   • 1/3" SONY 410K/470K Pixels Super-HAD IT CCD                  Model                                      SCC-B5342N/B5344N                   SCC-B5342P/B5344P
  (pan: 355˚, tilt: 20˚~ 90˚)                                                             Image                Device                1/4" Ex-View CCD                                   • Vari-Focal lens                                              Camera Type Color/BW                       Color
• Water resistant and dustproof (IP66)                                                                         Effective Pixels      768(H) x 494(V)                752(H) x 582(V)       SCC-B5342 : f=2.5~6mm                                        Image          Device                      1/3" Super-HAD IT CCD
• 1/4" 410K/470K Pixels Ex-View CCD
                                                                                          Scanning Method                            2:1 Interlace                                        SCC-B5344 : f=2.9~10mm                                                      Pixels      Effective       768 x 494                           752 x 582
• Horizontal resolution : 480 TV lines
                                                                                          Horizontal Resolution                      480 TV Lines                                       • Day/Night function (ICR)                                     Scanning       System                      Interlace
• Min. scene illumination : 0.002(color)/0.0002(B/W) Lux
                                                                                          Synchronization Method                     Internal/Line lock                                 • High resolution : 540 TV lines                                              Horizontal Internal Mode    15,734                              15,625
• 120x zoom lens (12x optical, 10x digital)
                                                                                          Min. Scene            Color                0.002(Sens-up 160x,15IRE)Lux                       • DNR (Digital Noise Reduction)                                               Frequency Line-lock Mode    15,750                              15,625
• 128x WDR (Wide Dynamic Range) • Day/Night
                                                                                          Illumination          B/W                  0.0002(Sens-up 160x,15IRE)Lux                                                                                                    Vertical    Internal Mode   59.94                               50
• Motion Detection (zones and sensitivity level set by user)                                                                                                                            • Min. illumination : 0.0009 Lux (F1.2, 15IRE, Sens up 128x)
                                                                                          Pan/Tilt              Pan Angle            355˚                                                                                                                             Frequency Line-lock Mode    60                                  50
• Alarm input : 1Ch / Alarm output : 1Ch                                                                                                                                                • Dynamic CCD Defect Compensation
• Privacy protection allows up to 8 privacy zones                                                               Tilt Angle           20˚~ 90˚                                                                                                          Resolution     Horizontal                  540(Color)/570(BW) TV Lines
                                                                                                                                                                                        • 3-Way Gimbals Structure
• Remote control through RS485 and RS422(using SSC-1000/5000)                             Lens                  Zoom Ratio           120x(12x Optical, 10x Digital)                                                                                    Min. Scene Illumination                    0.12 Lux(15IRE, Off) 0.0009 Lux(15IRE, Sens-up 128x)
                                                                                                                Focal Length         3.6 ~ 43.2mm
                                                                                                                                                                                        • AC24V/DC12V Dual Power (Line Lock)                           PAN/TILT       Panning                     Left 255˚ / Right 100˚ / Total 355˚(Manual)
• Applicable Wall mount adaptor : SADT-102WM
                                                                                                                Apeture Ratio        F1.8(Wide), F2.6(Tele)                                                                                                           Tilting                     0 ~ 90˚(Manual)
                                                                                                                Viewing      Tele    4.7˚(H) x 3.6˚(V)                                                                                                 Functions      Day/Night                   On/Off (ICR)
                                                                                                                Angle        Wide    52.8˚(H) x 40.3˚(V)                                                                                                              Sens Up                     On(128x) / Off
Dimensions (unit:mm)                                                                                            Focus                One/AF/Manual                                                                                                                    BLC                         On/Off
SCC-C9302(for attaching to the ceiling)   SCC-C9302F(for embedding into the ceiling)      Functions             Wide Dynamic Range   Off/On(128x)                                       Dimensions (unit:mm)                                                          AGC                         On/Off
                                                                                                               Day/Night             Color/BW/Auto                                                                                                                    Line Lock                   On/Off
                                                                                                               Digital Zoom          Off/On, PIP                                                                                                                      White Balance               ATW/AWC
                                                                                                               Motion Detection      Off/On(Area/Sensitivity Setting)                                                                                  Video Output VBS 1.0Vp-p                   VBS 1.0Vp-p
                                                                                                               Shutter Speed         Off ~ 1/10,000 sec                                                                                                S/N Ratio                                  50 dB
                                                                                                               Sens Up               Off/Auto(2x ~ 160x)                                                                                               Lens          Focal Length                 SCC-B5342 : 2.5~6mm / SCC-B5344 : 2.9~10mm
Installation Guide (Wall Surface)                                                                              BLC                   Off/On(Area Setting)                                                                                                            Viewing      Tele            SCC-B5342 : 46˚(H) x 34˚(V) / SCC-B5344 : 28.8˚(H) x 21.6˚(V)
                                                                                                               AGC                   Off/On                                                                                                                          Angle        Wide            SCC-B5342 : 108˚(H) x 80˚(V) / SCC-B5344 : 94.6˚(H) x 68.4˚(V)
                     Screw
                     (BH M4 X L22)                                                                             Line Lock             Yes                                                                                                                             Lens Drive Type              DC Auto Iris
                                                                   Wall Mount
                                                                     Adaptor                                   Camera ID             Max. 20 Characters                                                                                                              Mount Type                   Board-in type
SCC-C9302 + SADT-102WM
                                                                                                               White Balance         ATW1/ATW2/AWC/Manual                                                                                              Environmental Operating Temperature        -10˚C ~ +50˚C
                                                                                                               Privacy Zone          8                                                                                                                 Conditions    Operating Humidity           Less than 90%
                                                               Gasket-102WM               Signal Output                              VBS 1.0Vp-p, 74ohm, BNC                                                                                           Power         Power Requirement            24 VAC ±10% / 12 VDC ±10%
                                                                                          S/N Ratio                                  52dB                                                                                                                            Power Consumption            1.7W
                                                                                          Input/Output         Image Output          1 BNC                                                                                                             Physical      Dimensions                   128(ø) x 91(H)mm
                                                                                                               Alarm Input           1 (No, 5mA Sink)                                                                                                  Specification Weight                       293g
                                                                                                               Alarm Output          1 (Open Collector)                                                                                                              Color        Body            White
External Connector Pin Specification                                                                           Remote Control        RS485(Half Duplx)
CN52 : Camera power input and                   CN51 : RS485 control and                                       Power                 Terminal Bolck(2-Pin)
image signal output                             alarm output
                                                                                          Operating Temperature                      -10˚C ~ 50˚C
                                                    1                            Red
                                                                                          Operating Humidity                         90% RH
    1                                               2                            Orange
                                                                                          Power Requirment                           AC24V / DC12V Compatible
    2                                               3                Gray        Yellow
                                                                                          Power Consumption                          6W
    3                                               4                            Green
                                                                                          Weight                                     1,100g (880g)
    4                                               5                            Black
                                                                                          Dimensions                                 150(ø) x 121(D)mm
                                                    6                            Brown
                                                                                          Appearance                                 SCC-C9302 : Ceiling-mountable
    Pin no.            Pin Spec                     Pin no.             Pin Spec                                                     SCC-C9302F : Embedded into the ceiling
        1              VBS_OUT                          1               485_B(-)
        2                GND                            2              485_A(+)
        3               AC24-                           3              GND(COM)
        4               AC24+                           4              Alram Input
                                                        5                  GND
                                                        6             Alram Output
                                                                                                                                                                                                                                                                                                                               Samsung Video Security System | 46 . 47
DayNight Vari-Focal Dome Camera                                                                                                                                         Super High-Resolution Mini Dome Camera
                                                                                                                                                                        High Resolution Color Camera

SCC-B5343/B5345                                                                                                                                                         SCC-B5223
                                                                                                                                                                        SCC-B1311/B1011P


Features                                                      Specifications                                                                                            Features                                                            Specifications
• 1/3" SONY 410K/470K Pixels Super-HAD IT CCD                 Model                                    SCC-B5343N/B5345N                   SCC-B5343P/B5345P            • 1/3" SONY 410K/470K Pixels Super-HAD CCD                          Model                                        SCC-B5223N                    SCC-B5223P
• Vari-Focal lens                                             Camera Type Color/BW                     Color                                                            • High Resolution : 600 TV Lines                                    Camera Type Color/BW                         Color
  SCC-B5343 : f=2.5~6mm                                       Image        Device                      1/3" Super-HAD IT CCD                                            • Min. illumination 0.075 Lux (F2.0, 15 IRE, Sens-Up 4x, Color)     Image         Device                         1/3" Super-HAD IT CCD
  SCC-B5345 : f=2.9~10mm                                                   Pixels      Effective       768 x 494                           752 x 582                    • f=3.0 mm, Fixed Iris Lens                                                       Pixels        Effective        768 x 494                        752 x 582
• Day/Night function (ICR)                                    Scanning     System                      Interlace                                                        • Sens-Up Function (4x)                                             Scanning      System                         Interlace
• High resolution : 540 TV lines                                           Horizontal Internal Mode    15,734                              15,625                       • Motion Adaptive Digital Noise Reduction (3D+2D)                                 Horizontal Internal Mode       15,734 Hz                        15,625 Hz
• DNR (Digital Noise Reduction)                                            Frequency Line-lock Mode    15,750                              15,625                       • eXtended Dynamic Range (XDR)                                                    Frequency Line-lock Mode       15,750 Hz                        15,625 Hz
• Min. illumination :                                                      Vertical    Internal Mode   59.94                               50                                                                                                             Vertical      Internal Mode    59.94 Hz                         50 Hz
                                                                                                                                                                        • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100)
                                                                           Frequency Line-lock Mode    60                                  50                                                                                                             Frequency Line-lock Mode       60 Hz                            50 Hz
  0.0009(Color)/0.00009(BW) Lux (F1.2, 15IRE, Sens-up 128x)                                                                                                             • Electronic Level Control (Manual Lens)
                                                              Resolution   Horizontal                  540(Color)/570(BW) TV Lines                                                                                                          Resolution    Horizontal                     600 TV Lines
• Dynamic CCD Defect Compensation                                                                                                                                       • Auto White Balance (ATW/AWC)
                                                              Min. Scene   Color                       0.12 Lux(15IRE, Off) 0.0009 Lux(15IRE, Sens-up 128x)                                                                                 Min. Scene    Sens-up off                    0.3Lux(15IRE), 0.6Lux(30IRE), 1.0Lux(50IRE) @F2.0
• 3-Way Gimbals Structure                                                                                                                                               • 3-Way Gimbals Structure
                                                              Illumination BW                          0.012 Lux(15IRE, Off) 0.00009 Lux(15IRE, Sens-up 128x)                                                                               Illumination Sens-up                         0.075Lux(15IRE), 0.15Lux(30IRE), 0.25Lux(50IRE) @F2.0
• AC24V/DC12V Dual Power (Line Lock)                          PAN/TILT     Panning                     Left 255˚ / Right 100˚ / Total 355˚(Manual)                      • Mini Compact Size                                                 Functions     Sens Up                        Auto 4x
                                                                           Tilting                     0 ~ 90˚(Manual)                                                  • DC12V                                                                           BLC                            Auto
                                                              Functions    Day/Night                   On/Off (ICR)                                                                                                                                       AGC                            Auto
                                                                           Sens Up                     On(128x) / Off                                                                                                                                     ELC                            On ( ~ 1/200Ksec)
Dimensions (unit:mm)                                                       BLC                         On/Off                                                                                                                                             White Balance                  ATW/AWC
                                                                           AGC                         On/Off                                                                                                                                             Digital Noise Reduction        Auto
                                                                           Line Lock                   On/Off                                                                                                                               Video Output VBS 1.0Vp-p                     VBS 1.0Vp-p
                                                                           White Balance               ATW/AWC                                                          Dimensions (unit:mm)                                                S/N Ratio                                    52 dB
                                                              Video Output VBS 1.0Vp-p                 VBS 1.0Vp-p                                                                                                                          Lens          Focal Length                   3.0 mm
                                                              S/N Ratio                                50 dB                                                                                                                                              Aperature Ratio                F2.0
                                                              Lens          Focal Length               SCC-B5343 : 2.5~6mm / SCC-B5345 : 2.9~10mm                                                                                                         Viewing Angle Wide             92˚(H) x 72˚(V)
                                                                            Viewing      Tele          SCC-B5343 : 46˚(H) x 34˚(V) / SCC-B5345 : 28.8˚(H) x 21.6˚(V)                                                                                      Lens Drive Type / Mount Type   MANUAL / Board Type
                                                                            Angle        Wide          SCC-B5343 : 108˚(H) x 80˚(V) / SCC-B5345 : 94.6˚(H) x 68.4˚(V)                                                                       Remote        CCVC                           Yes (with SCX-RD100)
                                                                            Lens Drive Type            DC Auto Iris                                                                                                                         Environmental Operating Temperature          Absolute : -10˚C ~ +50˚C / Sustained : -20˚C ~ +60˚C
                                                                            Mount Type                 Board-in type                                                                                                                        Conditions    Operating Humidity             Less than 90%
                                                              Environmental Operating Temperature      -10˚C ~ +50˚C                                                                                                                        Power         Power Requirement              12 VDC ±10%
                                                              Conditions    Operating Humidity         Less than 90%                                                                                                                        Physical      Dimensions                     85(ø) x 54(H) mm
                                                              Power         Power Requirement          24 VAC ±10% / 12 VDC ±10%                                                                                                            Specification Weight                         120 g
                                                                            Power Consumption          1.7W                                                                                                                                               Color         Body             Silver
                                                              Physical      Dimensions                 128(ø) x 91(H)mm
                                                              Specification Weight                     293g
                                                                            Color        Body          White




                                                                                                                                                                                                                                                                                                                   Samsung Video Security System | 48 . 49
Super High-Resolution DayNight Dome Camera

  SCC-B5331/B5333                                                                                                                                                                    Super High-Resolution DayNight
                                                                                                                                                                                     High Resolution Color Camera Dome Camera

  SCC-B5335                                                                                                                                                                          SCC-B5366/B5368
                                                                                                                                                                                     SCC-B1311/B1011P


  Features                                                            Specifications                                                                                                 Features                                                           Specifications
  • 1/3" SONY 410K/470K Pixels Super-HAD IT CCD                       Model                                         SCC-B5331              SCC-B5333             SCC-B5335           • 1/3" SONY 410K/470K Pixels Super-HAD IT CCD                      Model                                        SCC-B5366                         SCC-B5368
  • High Resolution : 600 TV Lines                                    Camera Type Color/BW                          Color                                                            • High Resolution : 600 TV Lines                                   Camera Type Color/BW                         Color
  • Min. illumination 0.0006Lux (F2.0, 15 IRE, Sens-Up 512x)          Image          Device                         1/3" Super-HAD IT CCD                                            • Min . illumination 0.00023Lux (F1.2, 15 IRE, Sens-Up 512x)       Image         Device                         1/3" Super-HAD IT CCD
    SCC-B5331 : f=3.8 mm, Fixed Iris Lens                                            Pixels        Effective        768 x 494 / 752 x 582                                            • SCC-B5366 : f=2.5~6 mm, Auto Iris Lens                                         Pixels        Effective        768 x 494 / 752 x 582
    SCC-B5333 : f=3.0 mm, Fixed Iris Lens                             Scanning       System                         Interlace                                                          SCC-B5368 : f=2.8~11 mm, Auto Iris Lens                          Scanning      System                         Interlace
    SCC-B5335 : f=8.0 mm, Fixed Iris Lens                                            Horizontal Internal Mode       15,734 Hz / 15,625 Hz                                            • Internal/Linelock (Phase Control) Function                                     Horizontal Internal Mode       15,734 Hz / 15,625 Hz
  • Internal/Linelock (Phase Control) Function                                       Frequency Line-lock Mode       15,750 Hz / 15,625 Hz                                            • Day/Night Function (Soft), Sens-Up Function (512x)                             Frequency Line-lock Mode       15,750 Hz / 15,625 Hz
  • Day/Night Function (Soft), Sens-Up Function (512x)                               Vertical      Internal Mode    59.94 Hz / 50 Hz                                                 • Motion Adaptive Digital Noise Reduction (3D+2D)                                Vertical      Internal Mode    59.94 Hz / 50 Hz
  • Motion Adaptive Digital Noise Reduction (3D+2D)                                  Frequency Line-lock Mode       60 Hz / 50 Hz                                                                                                                                     Frequency Line-lock Mode       60 Hz / 50 Hz
                                                                                                                                                                                     • Back Light Compensation (Area Setting)
                                                                      Resolution     Horizontal                     600 TV Lines                                                                                                                        Resolution    Horizontal                     600 TV Lines
  • Back Light Compensation (Area Setting)                                                                                                                                           • Advanced Motion Detection Function
                                                                      Min. Scene     Sens-up off                    0.3Lux(15IRE), 0.6Lux(30IRE), 1.0Lux(50IRE) @F2.0                                                                                   Min. Scene    Sens-up off                    0.12Lux(15 IRE), 0.2Lux(30 IRE), 0.4Lux(50 IRE) @F1.2
  • Advanced Motion Detection Function                                                                                                                                               • eXtended Dynamic Range (XDR)
                                                                      Illumination Sens-up                          0.0006Lux(15IRE), 0.0012Lux(30IRE), 0.002Lux(50IRE) @F2.0                                                                           Illumination Sens-up                         0.00023Lux(15 IRE), 0.0005Lux(30 IRE), 0.0008Lux(50 IRE) @F1.2
  • eXtended Dynamic Range (XDR)                                                                                                                                                     • Privacy Mask Function (Polygonal Mosaic)
                                                                      Functions      Number of Privacy Zone         12 (Polygonal Method)                                                                                                               Functions     Number of Privacy Zone         12 (Polygonal Method)
  • Privacy Mask Function (Polygonal Mosaic)                                         Day/Night                      Color/BW/AUTO(Soft)                                              • DIS (Digital Image Stabilization)                                              Day/Night                      Color/BW/AUTO (Soft)
  • DIS (Digital Image Stabilization)                                                Motion Detection               Off/On                                                           • CCVC (Camera Control Via Coaxial cable, Controller: SCX-RD100)                 Motion Detection               Off/On
  • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100)                  D-Zoom                         1x ~ 16x (0.1x STEP)                                             • Multi-Language OSD support                                                     D-Zoom                         1x ~16x (0.1x STEP)
  • Intelligent Video (Moved / Fixed / Fence / Area / Tracking)                      Sens Up                        2x ~ 512x                                                        • Intelligent Video (Moved / Fixed / Fence / Area / Tracking)                    High Speed Shutter             1/60~1/10Ksec(OSD)               1/50~1/10Ksec(OSD)
  • Multi-Language OSD support                                                       BLC / AGC                      Off/On / Off/On                                                  • 3-Way Gimbals Structure                                                        Sens Up                        2x ~ 512x
  • 3-Way Gimbals Structure                                                          ELC                            Off/On ( ~ 1/200Ksec)                                            • DC12V & AC24V 60Hz(50Hz)                                                       BLC / AGC                      Off/On / Off/On
  • DC12V & AC24V 60Hz(50Hz)                                                         Line Lock                      Off/On (Phase Control)                                                                                                                            Line Lock                      Off/On (Phase Control)
                                                                                     Camera ID                      Off/On (Max.54ea/2Lines)                                                                                                                          Camera ID                      Off/On (Max.54ea/2Lines)
                                                                                     White Balance                  ATW1/ATW2/AWC/MANUAL                                                                                                                              White Balance                  ATW1/ATW2/AWC/MANUAL
                                                                                     eXtended Dynamic Range         Off/Low/Mid/High                                                                                                                                  eXtended Dynamic Range         Off/Low/Mid/High
                                                                                     Digital Noise Reduction        Off/On                                                                                                                                            Digital Noise Reduction        Off/On
                                                                                     Digital Image Stabilization    Off/On                                                                                                                                            Digital Image Stabilization    Off/On
Dimensions (unit:mm)                                                                 Intelligent Video              Off/On (Moved / Fixed / Fence / Area / Tracking)                 Dimensions (unit:mm)                                                             Intelligent Video              Off/On (Moved / Fixed / Fence / Area / Tracking)
                                                                                     PIP                            Off/On                                                                                                                                            PIP                            Off/On
                                                                                     Etc. Function                  Detail, Reverse(H/V), Posi/Nega                                                                                                                   Etc. Function                  Detail, Reverse(H/V), Posi/Nega
                                                                      Video Output VBS 1.0Vp-p                      VBS 1.0Vp-p                                                                                                                         Video Output VBS 1.0Vp-p                     VBS 1.0Vp-p
                                                                      S/N Ratio                                     52 dB                                                                                                                               S/N Ratio                                    52 dB
                                                                      Lens           Focal Length                   f=3.8 mm               f=3.0 mm              f=8.0 mm                                                                               Lens          Focal Length                   2.5~6mm                          2.8~11mm
                                                                                     Aperature Ratio                F2.0                                                                                                                                              Aperature Ratio                F1.2
                                                                                     Viewing       Wide             71˚(H) x 53˚(V)        92˚(H) x 72˚(V)       72˚(H) x 25.3˚(V)                                                                                    Viewing       Tele             46˚(H) x 34˚(V)                  28.8˚(H) x 21.6˚(V)
                                                                                     Angle                                                                                                                                                                            Angle         Wide             108˚(H) x 80˚(V)                  94.6˚(H) x 68.4˚(V)
                                                                                     Lens Drive Type / Mount Type   MANUAL / Board Type                                                                                                                               Lens Drive Type / Mount Type   AI(DC) / Board Type
                                                                      OSD                                           Yes                                                                                                                                 Remote        CCVC                           Yes (with SCX-RD100)
                                                                      Remote Control CCVC                           Yes (with SCX-RD100)                                                                                                                Control       RS485                          Yes (Multi Protocol, 8ea)
                                                                      Environmental Operating Temperature           Absolute : -10˚C ~ +50˚C / Sustained : -20˚C ~ +60˚C                                                                                Environmental Operating Temperature          Absolute : -10˚C ~ +50˚C / Sustained : -20˚C ~ +60˚C
                                                                      Conditions     Operating Humidity             Less than 90%                                                                                                                       Conditions    Operating Humidity             Less than 90%
                                                                      Power          Power Requirement              24 VAC ±10%/12 VDC ±10%                                                                                                             Power         Power Requirement              24 VAC ±10%/12 VDC ±10%
                                                                      Physical       Dimensions(WxHxD)              102(ø) x 78(H) mm                                                                                                                   Physical      Dimensions                     128(ø) x 78(H) mm
                                                                      Specification Weight                          220 g                                                                                                                               Specification Weight                         330 g
                                                                                     Color         Body             Silver                                                                                                                                            Color         Body             White




                                                                                                                                                                                                                                                                                                                                   Samsung Video Security System | 50 . 51
Super High-Resolution DayNight WDR Dome Camera                                                                                                                                    Super High-Resolution DayNight Anti-Vandal Dome Camera

SCC-B5367/B5369                                                                                                                                                                   SCC-B5396/B5398


Features                                                            Specifications                                                                                                Features                                                            Specifications
• 1/3" SONY 410K/470K Pixels Super-HAD PS CCD                       Model                                         SCC-B5367N/B5369N                SCC-B5367P/B5369P              • 1/3" SONY 410K/470K Pixels Super-HAD IT CCD                       Model                                        SCC-B5396N/B5398N              SCC-B5396P/B5398P
• High Resolution : 600 TV Lines                                    Camera Type Color/BW                          Color                                                           • High Resolution : 600 TV Lines                                    Camera Type Color/BW                         Color
• Min. illumination                                                 Image        Device                           1/3" Super-HAD PS CCD                                           • Min. illumination 0.00023Lux (F1.2, 15 IRE, Sens-Up 512x)         Image         Device                         1/3" Super-HAD IT CCD
  0.00023Lux (F1.2, 15 IRE, Sens-Up 512x, Color)                                 Pixels        Effective          768 x 494                       752 x 582                       • SCC-B5396 : f=2.5~6 mm, Auto Iris Lens                                          Pixels        Effective        768 x 494                         752 x 582
  0.000023Lux (F1.2, 15 IRE, Sens-Up 512x, B/W))                    Scanning     System                           Interlace                                                         SCC-B5398 : f=2.8~11 mm, Auto Iris Lens                           Scanning      System                         Interlace
• SCC-B5367 : f=2.5~6 mm, Auto Iris Lens                                         Horizontal    Internal Mode      15,734 Hz                       15,625 Hz                       • Internal/Linelock (Phase Control) Function                                      Horizontal Internal Mode       15,734 Hz                         15,625 Hz
  SCC-B5369 : f=2.8~11 mm, Auto Iris Lens                                        Frequency     Line-lock Mode     15,750 Hz                       15,625 Hz                       • Day/Night Function (Soft), Sens-Up Function (512x)                              Frequency Line-lock Mode       15,750 Hz                         15,625 Hz
• Wide Dynamic Range (WDR)                                                       Vertical      Internal Mode      59.94 Hz                        50 Hz                           • Motion Adaptive Digital Noise Reduction (3D+2D)                                 Vertical      Internal Mode    59.94 Hz                          50 Hz
• Virtual Progressive Scan (VPS)                                                 Frequency     Line-lock Mode     60 Hz                           50 Hz                                                                                                             Frequency Line-lock Mode       60 Hz                             50 Hz
                                                                                                                                                                                  • Back Light Compensation (Area Setting)
                                                                    Resolution   Horizontal                       600 TV Lines                                                                                                                        Resolution    Horizontal                     600 TV Lines
• Internal/Linelock (Phase Control) Function                                                                                                                                      • Advanced Motion Detection Function
                                                                    Min. Scene   Color           Sens-up off      0.12Lux(15IRE), 0.2Lux(30IRE), 0.4Lux(50IRE)@F1.2                                                                                   Min. Scene    Sens-up off                    0.12Lux(15 IRE), 0.2Lux(30 IRE), 0.4Lux(50 IRE)@F1.2
• Day/Night Function (ICR), Sens-Up Function (512x)                                                                                                                               • eXtended Dynamic Range (XDR)
                                                                    Illumination                 Sens-up          0.00023Lux(15IRE), 0.0005Lux(30IRE), 0.0008Lux(50IRE)@F1.2                                                                          Illumination Sens-up                         0.00023Lux(15 IRE), 0.0005Lux(30 IRE), 0.0008Lux(50 IRE)@F1.2
• Motion Adaptive Digital Noise Reduction (3D+2D)                                                                                                                                 • Privacy Mask Function (Polygonal Mosaic)
                                                                                 B/W             Sens-up off      0.012Lux(15IRE), 0.02Lux(30IRE), 0.04Lux(50IRE)@F1.2                                                                                Functions     Number of Privacy Zone         12 (Polygonal Method)
• Back Light Compensation (Area Setting)                                                         Sens-up          0.000023Lux(15IRE), 0.00005Lux(30IRE), 0.00008Lux(50IRE)@F1.2   • DIS (Digital Image Stabilization)                                               Day/Night                      Color/BW/AUTO(Soft)
• Advanced Motion Detection Function                                Functions      Number of Privacy Zone         12 (Polygonal Method)                                           • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100)                 Motion Detection               Off/On
• eXtended Dynamic Range (XDR)                                                     Day/Night                      Color/BW/AUTO/EXT (ICR)                                         • Multi-Language OSD support                                                      D-Zoom                         1x ~16x (0.1x STEP)
• Privacy Mask Function (Polygonal Mosaic)                                         Motion Detection               Off/On                                                          • Intelligent Video (Moved / Fixed / Fence / Area / Tracking)                     High Speed Shutter             1/60 ~ 1/10Ksec (OSD)             1/50 ~ 1/10Ksec (OSD)
• DIS (Digital Image Stabilization)                                                Wide Dynamic Range             Off/On                                                          • Anti Vandal type, IP-66, Surface type                                           Sens Up / BLC / AGC            2x ~ 512x / Off/On / Off/On
• CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100)                  D-Zoom                         1x ~16x (0.1x STEP)                                             • DC12V & AC24V 60Hz(50Hz)                                                        Line Lock / Anti Vandal        Off/On (Phase Control) / Yes
• Multi-Language OSD support                                                       High Speed Shutter             1/60 ~1/10Ksec(OSD)             1/50 ~ 1/10Ksec(OSD)            • 3-Way Gimbals Structure                                                         Camera ID / White Balance      Off/On (Max.54ea/2Lines) / ATW1/ATW2/AWC/MANUAL
• Intelligent Video (Moved / Fixed / Fence / Area / Tracking)                      Sens Up / BLC / AGC            2x ~ 512x / Off/On / Off/On                                     • Applicable Wall mount adaptor : SADT-102WM                                      eXtended Dynamic Range         Off/Low/Mid/High
• 3-Way Gimbals Structure                                                          Line Lock / Camera ID          Off/On (Phase Control) / Off/On (Max.54ea/2Line)                                                                                                  Digital Noise Reduction        Off/On
                                                                                   White Balance                  ATW1/ATW2/AWC/MANUAL                                                                                                                              Digital Image Stabilization    Off/On
• DC12V & AC24V 60Hz(50Hz)
                                                                                   eXtended Dynamic Range         Off/Low/Mid/High                                                                                                                                  Intelligent Video              Off/On(Moved / Fixed / Fence / Area / Tracking)
                                                                                   Digital Noise Reduction        Off/On                                                                                                                                            PIP                            Off/On
                                                                                   Digital Image Stabilization    Off/On                                                                                                                                            Etc. Function                  Detail, Reverse(H/V), Posi/Nega
                                                                                   Intelligent Video              Off/On(Moved / Fixed / Fence / Area / Tracking)                                                                                     Video Output VBS 1.0Vp-p                     VBS 1.0Vp-p
Dimensions (unit:mm)                                                               PIP                            Off/On
                                                                                                                                                                                  Dimensions (unit:mm)                                                S/N Ratio                                    52 dB
                                                                                   Virtual Progressive Scan       Off/On                                                                                                                              Lens          Focal Length                   SCC-B5396 : 2.5~6mm / SCC-B5398 : 2.8~11mm
                                                                                   Etc. Function                  Detail, Reverse(H/V), Posi/Nega                                                                                                                   Zoom ratio                     SCC-B5396 : 2.4x / SCC-B5398 : 3.4x
                                                                    Video Output VBS 1.0Vp-p                      VBS 1.0Vp-p                                                                                                                                       Aperature Ratio                F1.2
                                                                    S/N Ratio                                     52 dB                                                                                                                                             Viewing       Tele             SCC-B5396:46˚(H) x 34˚(V) / SCC-B5398:28.8˚(H) x 21.6˚(V)
                                                                    Lens           Focal Length                   SCC-B5367:2.5~6mm / SCC-B5369:2.8~11mm                                                                                                            Angle         Wide             SCC-B5396:108˚(H) x 80˚(V) / SCC-B5398:94.6˚(H) x 68.4˚(V)
                                                                                   Aperature Ratio                F1.2                                                                                                                                              Lens Drive Type / Mount Type   AI(DC) / Board Type
                                                                                   Viewing       Tele             SCC-B5367:46˚(H) x 34˚(V) / SCC-B5369:28.8˚(H) x 21.6˚(V)                                                                           OSD                                          Yes
                                                                                   Angle         Wide             SCC-B5367:108˚(H) x 80˚(V) / SCC-B5369:94.6˚(H) x 68.4˚(V)                                                                          Remote        CCVC                           Yes (with SCX-RD100)
                                                                                   Lens Drive Type / Mount Type   AI(DC) / Board Type                                                                                                                 Control       RS485                          Yes (Multi Protocol, 8ea)
                                                                    OSD                                           Yes                                                                                                                                 Environmental Operating Temperature          Absolute : -10˚C ~ +50˚C / Sustained : -20˚C ~ +60˚C
                                                                    Remote Control CCVC / RS485                   Yes (with SCX-RD100) / Yes (Multi Protocol, 8ea)                                                                                    Conditions    Operating Humidity             Less than 90%
                                                                    Environmental Operating Temperature           Absolute : -10˚C ~ +50˚C / Sustained : -20˚C ~ +60˚C                                                                                Power         Power Requirement              24 VAC ±10%/12 VDC ±10%
                                                                    Conditions     Operating Humidity             Less than 90%                                                                                                                       Physical      Dimensions                     150(ø) x 121(H) mm
                                                                    Power          Power Requirement              24 VAC ±10%/12 VDC ±10%                                                                                                             Specification Weight                         1,000g
                                                                    Physical       Dimensions                     128(ø) x 78(H) mm                                                                                                                                 Color         Body             White
                                                                    Specification Weight                          330 g
                                                                                   Color         Body             White



                                                                                                                                                                                                                                                                                                                              Samsung Video Security System | 52 . 53
Super High-Resolution WDR Anti-Vandal Dome Camera                                                                                                                                    22x Zoom SmartDome Camera

SCC-B5397/B5399                                                                                                                                                                      SCC-641/643A


Features                                                            Specifications                                                                                                   Features                                                               Specifications
• 1/3" SONY 410K/470K Pixels Super-HAD PS CCD                       Model                                         SCC-B5397N/B5399N                SCC-B5397P/B5399P                 • Accurately captures distant object with the maximum 220x zoom.       Model                                     SCC-641                             SCC-643A
• High Resolution : 600 TV Lines                                    Camera Type Color/BW                          Color                                                              • Possible to connect up to a maximum of 256 cameras using the         Image             Device                  1/4" Pixles Super HAD CCD
• Min. illumination                                                 Image        Device                           1/3" Super-HAD PS CCD                                                exclusive controller (SSC-1000) made by Samsung, which can                             Effective Pixels        NTSC : 768(H) x 494(V) / PAL : 752(H) x 582(V)
  0.0002Lux (F1.2, 15 IRE, Sens-Up 512x, Color)                                  Pixels        Effective          768 x 494                        752 x 582                           control a range of functions including pan, tilt, zoom, preset and   Scanning Method                           2:1 Interlace
  0.00002Lux (F1.2, 15 IRE, Sens-Up 512x, B/W)                      Scanning     System                           Interlace                                                            manual focus                                                         Scanning Line       Horizontal            NTSC : 15.750Hz / PAL : 15.625Hz
• SCC-B5397 : f=2.5~6 mm, Auto Iris Lens                                         Horizontal    Internal Mode      15,734 Hz                        15,625 Hz                         • Min. scene illumination : 0.005(color)/0.0005(B/W) Lux               Frequency           Vertical              NTSC : 60Hz / PAL : 50Hz
  SCC-B5399 : f=2.8~11 mm, Auto Iris Lens                                        Frequency     Line-lock Mode     15,750 Hz                        15,625 Hz                         • Day/Night (SCC-643A)                                                 Synchronization Method                    Internal/ Line Lock
• Wide Dynamic Range (WDR)                                                       Vertical      Internal Mode      59.94 Hz                         50 Hz                             • Privacy zone (SCC-643A)                                              Horizontal Resolution                     480 TV Lines
                                                                                 Frequency     Line-lock Mode     60 Hz                            50 Hz                                                                                                    Min. Scene          Color                 0.005(Sens-up 128x, 15IRE)Lux
• Virtual Progressive Scan (VPS)                                                                                                                                                     • Up to 128 preset points
                                                                    Resolution   Horizontal                       600 TV Lines                                                                                                                              Illumination        B/W                   -                                0.0005(Sens-up 128x,15IRE)Lux
• Internal/Linelock (Phase Control) Function                                                                                                                                         • 360˚ horizontal and 180˚ vertical turning while searching,
                                                                    Min. Scene   Color           Sens-up off      0.12Lux(15 IRE), 0.2Lux(30 IRE), 0.4Lux(50 IRE)@F1.2                                                                                      Pan/Tilt            Manual Pan            Pan : 0.8˚~90˚/sec (64step)
• Day/Night Function (ICR), Sens-Up Function (512x)                                                                                                                                    at a maximum speed of 240˚/sec
                                                                    Illumination                 Sens-up          0.00023Lux(15 IRE), 0.0005Lux(30 IRE), 0.0008Lux(50 IRE)@F1.2                                                                                                 Tilt Speed            Tilt : 0.8˚~45˚/sec (64step)
• Motion Adaptive Digital Noise Reduction (3D+2D)                                                                                                                                    • Motion detection                                                                       Preset Pan/Tilt Speed   Pan : Max 240˚/sec / Tilt : Max 150˚/sec
                                                                                 B/W             Sens-up off      0.012Lux(15 IRE), 0.02Lux(30 IRE), 0.04Lux(50 IRE)@F1.2
• Back Light Compensation (Area Setting)                                                         Sens-up          0.000023Lux(15 IRE), 0.00005Lux(30 IRE), 0.00008Lux(50 IRE)@F1.2
                                                                                                                                                                                     • Alarm Input: 4Ch, Alarm Output: 3Ch                                                    Pan/Tilt Range          Pan : 360˚ Endless / Tilt : 0˚~ 90˚
• Advanced Motion Detection Function                                Functions      Number of Privacy Zone         12 (Polygonal Method)                                              • Horizontal resolution : 480 TV Lines                                                   Number of Preset        128 Presets
• eXtended Dynamic Range (XDR)                                                     Day/Night                      Color/BW/AUTO/EXT (ICR)                                            • Remote control through RS-485/RS-422                                                   Number of Pattern       3 (30sec x 3)
• Privacy Mask Function (Polygonal Mosaic)                                         Motion Detection               Off/On                                                             • Pan/tilt/zoom/focus can be controlled from a PC                      Lens              Zoom Ratio              220x (22x Optical Zoom, 10x Digital Zoom)
• DIS (Digital Image Stabilization)                                                Wide Dynamic Range             Off/On                                                               (separate software required)                                                           Focal Length            3.6~79.2mm
• CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100)                  D-Zoom                         1x ~16x (0.1x STEP)                                                • Applicable Wall mount adaptor : SADT-100WM                                             Aperature Ratio         F1.6(Wide), F3.8(Tele)
• Multi-Language OSD support                                                       High Speed Shutter             1/60 ~1/10Ksec(OSD)              1/50 ~ 1/10Ksec(OSD)                                                                                                       Viewing         Tele    2.3˚(H) x 1.7˚(V)
• Intelligent Video (Moved / Fixed / Fence / Area / Tracking)                      Sens Up / BLC / AGC            2x ~ 512x / Off/On / Off/On                                                                                                                                 Angle           Wide    47.9˚(H) x 36.9˚(V)
                                                                                   Line Lock / Anti Vandal        Off/On (Phase Control) / Yes                                                                                                              Functions         Sens Up                 128x (Auto/Fix)
• Anti Vandal type, IP-66, Surface type
                                                                                   Camera ID / White Balance      Off/On (Max.54ea/2Lines) / ATW1/ATW2/AWC/MANUAL                                                                                                             Digital Effect          H-Mirror, Picture in Picture (D Zoom)
• DC12V & AC24V 60Hz(50Hz)
                                                                                   eXtended Dynamic Range         Off/Low/Mid/High                                                                                                                                            White Balance           ATW/AWC/Manual
• 3-Way Gimbals Structure
                                                                                   Digital Noise Reduction        Off/On
                                                                                                                                                                                     Dimensions (unit:mm)                                                                     BLC                     On (Zone Setting, Position Designation)/ Off
• Applicable Wall mount adaptor : SADT-102WM                                                                                                                                                                                                                                  Privacy Zone            -                                   Possible to Set 8 Zones
                                                                                   Digital Image Stabilization    Off/On
                                                                                   Intelligent Video / PIP        Off/On(Moved / Fixed / Fence / Area / Tracking) / Off/On                                                                                  Signal Output                             VBS 1.0Vp-p(75 ohm, Composite)
                                                                                   Virtual Progressive Scan       Off/On                                                                                                                                    S/N Ratio                                 52dB
Dimensions (unit:mm)                                                               Etc. Function                  Detail, Reverse(H/V), Posi/Nega                                                                                                           Input/Output       Image Output           BNC
                                                                    Video Output VBS 1.0Vp-p                      VBS 1.0Vp-p                                                                                                                                                  Remote Control         RS-485(Half Duplex) / RS-422
                                                                    S/N Ratio                                     52 dB                                                                                                                                                        Address Range          1~128
                                                                    Lens           Focal Length                   SCC-B5397 : 2.5~6mm / SCC-B5399 : 2.8~11mm                                                                                                                   Alarm Input            4 NO/NC(5mA Sink)
                                                                                   Zoom ratio                     SCC-B5397 : 2.4x / SCC-B5399 : 3.4x                                                                                                       Operating Temperature                     -10˚C ~ +50˚C
                                                                                   Aperature Ratio                F1.2                                                                                                                                      Operating Humidity                        Maximum 90% RH
                                                                                   Viewing       Tele             SCC-B5397:46˚(H) x 34˚(V) / SCC-B5399:28.8˚(H) x 21.6˚(V)                                                                                 Power Requirment                          AC24V
                                                                                   Angle         Wide             SCC-B5397:108˚(H) x 80˚(V) / SCC-B5399:94.6˚(H) x 68.4˚(V)                                                                                Power Consumption                         18W
                                                                                   Lens Drive Type / Mount Type   AI(DC) / Board Type                                                                                                                       Weight                                    2,000g
                                                                    OSD                                           Yes                                                                                                                                       Dimensions                                159.5(ø) x 177(D)mm
                                                                    Remote Control CCVC / RS485                   Yes (with SCX-RD100) / Yes (Multi Protocol, 8ea)
                                                                    Environmental Operating Temperature           Absolute : -10˚C ~ +50˚C / Sustained : -20˚C ~ +60˚C
                                                                    Conditions     Operating Humidity             Less than 90%
                                                                    Power          Power Requirement              24 VAC ±10%/12 VDC ±10%
                                                                    Physical       Dimensions                     150(ø) x 121(H) mm
                                                                    Specification Weight                          1,000g
                                                                                   Color         Body             White



                                                                                                                                                                                                                                                                                                                                       Samsung Video Security System | 54 . 55
32x Zoom DayNight SmartDome Camera                                                                                                                                               22x Zoom DayNight WDR SmartDome Camera

SCC-C6403                                                                                                                                                                        SCC-C6405


Features                                                          Specifications                                                                                                 Features                                                   Specifications
• 1/4" 410K/470K Pixels Super-HAD CCD                             Model                                       SCC-C6403                          SCC-C6403P                      • 22x motorized optical zoom with 10x digital zoom         Model                                          SCC-C6405                         SCC-C6405P
• DIS (Digital Image Stabilizer)                                  Image              Device                  1/4" Super-HAD CCD             1/4" Super-HAD CCD                   • High-speed pan/tilt (400º/sec)                           Image                  Device                  1/4" Ex-View HAD CCD
• 320x zoom, through a combination of 32x optical zoom and                           Effective Pixels        768(H) x 494(V)                752(H) x 582(V)                      • 1/4” 410K/470K Pixels Ex-View HAD CCD                                           Effective Pixels        768(H) x 494(V)               752(H) x 582(V)
  10x digital zoom                                                Scanning Method                            2:1 Interlace                                                       • Horizontal resolution : 480 TV Lines                     Scanning Method                                Interlace
• Min. scene illumination : 0.005(color)/0.0005(B/W) Lux          Synchronization Method                     Internal/Line lock                                                  • DSP (Digital Signal Processor)                           Synchronization Method                         Internal/Line lock
• Day/Night                                                       Horizontal Resolution                      480 TV Lines                                                        • WDR (Wide Dynamic Range)                                 Horizontal Resolution                          480 TV Lines
• 350˚ horizontal turning and 0~90˚ vertical turning while        Min. Scene         Color                   0.005 (Sens-up 128x,15IRE)Lux                                       • Day/Night                                                Min. Scene            Color                    0.002(Sens-up 160x,15IRE)Lux
                                                                  Illumination       B/W                     0.0005 (Sens-up 128x,15IRE)Lux                                      • External eynchronization with line lock                  Illumination          B/W                      0.0002(Sens-up 160x,15IRE)Lux
  searching, at a maximum speed of 400˚/sec (pan speed)
                                                                  Pan/Tilt           Manual Pan/Tilt Speed   Pan : 0.1˚ ~ 180˚/sec(64 Steps) / Tilt : 0.1˚ ~ 90˚/sec(64 Steps)                                                              Pan/Tilt              Manual Pan/Tilt Speed    Pan : 0.1˚/sec~180˚/sec(64step) / Tilt : 0.1˚/sec~90˚/sec(64step)
• 128 preset points                                                                                                                                                              • Motion detection with alarming output
                                                                                     Preset Pan/Tilt Speed   Pan : 400˚/sec / Tilt : 200˚/sec                                                                                                                      Preset Pan/Tilt Speed   Pan : 400˚/sec(Max) / Tilt : 200˚/sec(Max)
• Alarm input : 4Ch, Alarm output : 3Ch                                                                                                                                          • On-screen menus (multi-language)
                                                                                     Preset Pan/Tilt Rage    350˚ Non-Endless                                                                                                                                      Panning Range           360˚/sec(Endless)
• Exclusive controller (SSC-1000/5000)                                                                                                                                           • Innor rotor BLDC motor
                                                                                     Pan/Tilt Range          Pan : 350˚ / Tilt : 0˚~ 90˚                                                                                                                           Tilt Range              0˚~ 180˚
  - Remote control through RS485 and RS422                                           Number of Auto Pan      4
                                                                                                                                                                                 • Min. scene illumination : 0.002(color)/0.0002(B/W) Lux                          Number of Auto Pan      4
  - Possible to connect up to a maximum of 256 cameras,                              Number of Preset        128                                                                 • 4 alarm inputs, 3 alarm outputs                                                 Number of Preset        128
    and control a wide range of functions such as pan, tilt,                         Number of Pattern       2min x 3                                                            • Privacy zone                                                                    Number of Pattern       3
    zoom, preset and manual focus                                 Lens               Zoom Ratio              320x(32x Optical, 10x Digital)                                      • Applicable Accessories : SADT-100WM, SHG-120/220         Lens                   Zoom Ratio              22x
• Applicable Accessories : SADT-100WM, SHG-120/220                                   Focal Length            3.55 ~ 113mm                                                                                                                                          Focal Length            3.6 ~ 79.2mm
                                                                                     Apeture Ratio           Tele : F4.17, Wide : F1.69                                                                                                                            Apeture Ratio           F1.6(Wide), F3.8(Tele)
                                                                                     Viewing        Tele     1.78˚(H) x 1.34˚(V)                                                                                                                                   Viewing        Tele     2.3˚(H) x 1.7˚(V)
                                                                                     Angle          Wide     56.41˚(H) x 43.01˚(V)                                                                                                                                 Angle          Wide     47.9˚(H) x 36.9˚(V)
                                                                  Functions          Day/Night               Color/BW/Auto (ICR)                                                                                                            Functions              Wide Dynamic Range      Off/On
Dimensions (unit:mm)                                                                 Shutter Speed           Off ~ 1/10,000 sec
                                                                                                                                                                                 Dimensions (unit:mm)                                                              Day/Night               Color / BW / Auto (ICR)
                                                                                     Sens Up                 128x                                                                                                                                                  High Speed Shutter      Off ~ 1/10Ksec
                                                                                     BLC                     Off/On                                                                                                                                                Sens Up                 Off ~ 160x
                                                                                     AGC                     Off/Low/High                                                                                                                                          BLC                     Off/On
                                                                                     Line Lock               Yes                                                                                                                                                   AGC                     Off/Low/High
                                                                                     Camera ID               Max. 20 Characters                                                                                                                                    Line lock               On/Off
                                                                                     White Balance           ATW1/ATW2/AWC/Manual                                                                                                                                  Camera ID               Off/On
                                                                  Signal Output                              VBS 1.0Vp-p, 74ohm, BNC                                                                                                                               White Balance           ATW1/ATW2/AWC/Manual
                                                                  S/N Ratio                                  50dB                                                                                                                           Signal Output                                  VBS 1.0Vp-p
                                                                  Input/Output       Image Output            1 BNC                                                                                                                          S/N Ratio                                      50dB
                                                                                     Alarm Input             4 NO/NC (5mA Sink)                                                                                                             Input/Output         Alarm Input               4
                                   Power Connection Terminal
                                                                                     Alarm Output            3 (2 Open Collector, 1 Relay)                                                                                                                       Alarm Output              3
                                            Remote Controller
                                            Connection Terminal                      Remote Control          RS485(Half & Full Duplx) / RS422                                                                                                                    Remote Control            RS485 / RS422
                                                                                     Power                   Terminal Block(3-Pin)                                                                                                          Operating Temperature                          -10˚C ~ +50˚C
                                                                  Operating Temperature                      -10˚C ~ 50˚C                                                                                                                   Power Requirment                               AC24V
            Power Indication
       Image Output Terminal
                                                                  Operating Humidity                         Maximum 90% RH                                                                                                                 Power Consumption                              18W
                                                                  Power Requirment                           AC24V                                                                                                                          Weight                                         1,700g
                                                                  Power Consumption                          18W                                                                                                                            Dimensions                                     159.5(ø) x 177(D)mm
                               Alarm Output Alarm Input
                                                                  Weight                                     1,700g
                                                                  Dimensions                                 159.5(ø) x 177(D)mm




                                                                                                                                                                                                                                                                                                                          Samsung Video Security System | 56 . 57
32x Zoom DayNight WDR SmartDome Camera

SCC-C6407                                                                                                                                                              ::::::::::::::::::::::::::::::::::::::::::::::::::::



                                                                                                                                                                                      When Installing on the Ceiling                                                   When Installing on the Wall

                                                                                                                                                                                          For Embedding     For Indoor Use               For Outdoor Use
                                                                                                                                                                                                                                                                                          For Indoor Use                       For Outdoor Use
Features                                                             Specifications                                                                                                                                    Ceiling
                                                                                                                                                                                                                       Mount Adaptor
• 1/4" 410K/470K Pixels Ex-View CCD                                  Model                                          SCC-C6407                          SCC-C6407P                              Ceiling                 (SADT-100CM)
                                                                                                                                                                                                                                                    Ceiling                   Wall Mount                          Wall Mount
• DIS (Digital Image Stabilizer)                                                                                                                                                            Mount Bracket                                           Mount Adaptor                Adaptor                             Adaptor
                                                                     Image                  Device                  1/4" Ex-View CCD                    1/4" Ex-View CCD                   (SBR-100DCM)                                             (SADT-100CM)          (SADT-100WM)                        (SADT-100WM)
• 320x zoom, through a combination of 32x optical Zoom and                                  Effective Pixels        768(H) x 494(V)                     752(H) x 582(V)
  10x digital zoom                                                   Scanning Method                                Interlace
                                                                     Scanning Line         Horizontal               15.750KHz                           15.625Hz                                                                                                                 Indoor                             Outdoor
• Min. scene illumination : 0.002(color)/0.0002(B/W) Lux                                                                                                                                                                                                                        Housing                             Housing
• Day/Night                                                          Frequency             Vertical                 60Hz                                50Hz                                                                 Indoor                                          (SHG-120)                           (SHG-220)
                                                                                                                                                                                                                             Housing                       Outdoor
• 128x WDR (Wide Dynamic Range)                                      Synchronization Method                         Internal/Line Lock                                                                                       (SHG-120)                     Housing
                                                                     Horizontal Resolution                          480 TV Lines                                                                                                                           (SHG-220)
• Possible to connect up to a maximum of 256 cameras using
                                                                     Min. Scene            Color                    0.002(Sens-up 160x,15IRE)Lux
  the exclusive controller (SSC-1000/5000), which can control                                                                                                                                                                                                                                 Dome Camera                          Dome Camera
                                                                     Illumination          B/W                      0.0002(Sens-up 160x,15IRE)Lux                                           Dome Camera       Dome Camera                  Dome Camera                                        (SCC-C6407)                          (SCC-C6407)
  a variety of functions such as pan, tilt, zoom, preset, pattern                                                                                                                           (SCC-C6407)       (SCC-C6407)                  (SCC-C6407)
                                                                     Pan/Tilt              Manual Pan/Tilt Speed    Pan : 0.1 ~ 180˚/sec(64 steps) / Tilt : 0.1 ~ 90˚/sec(64 steps)
  and manual focus                                                                          Preset Pan/Tilt Speed   Pan : 400˚/sec / Tilt : 200˚/sec
• 360° horizontal and 180° vertical turning, at a maximum                                   Preset Pan/Tilt Rage    Pan : 360˚(endless) / Tilt : 0˚~ -183˚
  speed of 400°/sec                                                                         Pan/Tilt Range          Pan : 360˚ (endless) / Tilt : 0˚~ 180˚
• Maximum 128 preset                                                                        Number of Auto Pan      4
• Motion detection (zones and sensitivity levels set by user)                               Number of Preset        128
• Alarm Input : 8ch, Alarm Output : 3ch                                                     Number of Pattern       3 (2min x3)                                                       Installation                                                                     Accessories for SCC-C6407
• Maximum of 12 privacy zones                                        Lens                   Zoom Ratio              320x (32x Optical, 10x Digital)
• Remote control through RS485 and RS422                                                    Focal Length            3.55 ~ 113mm
                                                                                                                                                                                         SHG-120
  (using SSC-1000/5000)                                                                     Aperture Ratio          Tele : F4.17, Wide : F1.69
                                                                                            Viewing        Tele     1.78˚(H) x 1.34˚(V)
                                                                                            Angle          Wide     56.41˚(H) x 43.01˚(V)
                                                                     Functions              Wide Dynamic Range      Off/On(128x)
                                                                                            Day/Night               Color / BW / Auto / EXT (ICR)
                                                                                            Motion Detection        Off/On (Area/Sensitivity Setting)                                                                                                                            SHG-120/220                SADT-100WM                 SADT-100CM
                                                                                            High Speed Shutter      Yes (Off ~ 1/10K)                                                     SHG-220
Dimensions (unit:mm)                                                                        Sens Up                 Off/Auto (2x ~ 160x)
                                                                                            BLC / AGC               Off/On / Off/On
                                                                                            Line Lock               Yes
                                                                                            Camera ID               Max. 20 Characters
                                                                                            White Balance           ATW1/ATW2/AWC/Manual
                                                                                            Privacy Zone            12 Zones (Mosaic)                                                                                                                                             SBR-100DCM                SADT-110CM                 SADT-100PM
                                                                                                                                                                                         SADT-100WM                          SBR-100DCM
                                                                     Signal Output                                  VBS 1.0Vp-p(75 Ohm, Composite)
                                                                     S/N Ratio                                      50dB(AGC Off)
                                                                     Input/Output         Image Output              BNC
                                                                                          Alarm Input               8 NO/NC (5mA Sink)
                                                                                          Alarm Output              3 (Open Collector 1 Relay)
                                      Power Connection Terminal
                                                                                          Remote Control            RS485(Half & Full Duplex) / RS422
                                               Remote Controller
                                               Connection Terminal                        Power                     Terminal Block(3-Pin)
                                                                     Operating Temperature                          -10˚C~ +50˚C                                                         SADT-100CM             SADT-110CM                   SADT-100PM

             Power Indication                                        Operating Humidity                             Maximum 90% RH
        Image Output Terminal                                        Power Requirment                               AC24V
                                                                     Power Consumption                              22W
                                                                     Weight                                         1,700g
                                  Alarm Output Alarm Input           Dimensions                                     159.5(ø) x 177(D)mm



                                                                                                                                                                                                                                                                                                                          Samsung Video Security System | 58 . 59
High Resolution SmartDome Camera

SCC-C6433/C6435                                                                                                                                       :::::::::::::::::::::::::::::::::::::::::::::::::::



                                                                                                                                                                     Installation Guide
                                                                                                                                                                       Ceiling Installation                                                               Pole Installation
                                                                                                                                                                                                                                                                           For Indoor use                    For Outdoor use
Features                                                   Specifications                                                                                                      For Embedding
• 1/4" 410K/470K Pixels CCD                                                                                                                                                                               For Indoor use               For Outdoor use
                                                           Model                                   SCC-C6433                       SCC-C6435                                  (Indoor use only)                                                                                             SADT-100PM
• 32x optical zoom lens (16x D-zoom)                       Camera Type                             Color                                                                                                                                                                                    SADT-104WM                    SADT-103WM

• High resolution : 540(Color) / 570(BW) TV Lines          Image          Device                   1/4" Super HAD CCD                1/4" Ex-View HAD CCD
                                                                                                                                                                                                                                                                                            SCC-C6433
• Day/Night                                                               Effective   NTSC         768(H) x 494(V)                   768(H) x 494(V)                                                                                                                                        SCC-C6435

• Min. scene illumination :                                               Pixels      PAL          752(H) x 582(V)                   752(H) x 582(V)                                                                                                                                                                      SHG-222
  SCC-C6433 : 0.002 Lux (15 IRE, Sens-up 256x, Color)      Horizontal Resolution                   540(Color) / 570(BW) TV Lines
                                                                                                                                                                                         SADT-101EC
                : 0.0002 Lux (15 IRE, Sens-up 256x, B/W)   Min. Scene     Color                    0.6 Lux(15IRE,Sens-up Off)        0.3 Lux(15IRE,Sens-up Off)
                                                                                                                                                                                                                           SADT-100CM                                                                                     SCC-C6433
                                                           Illumination                            0.002 Lux(15IRE, Sens-up 256x) 0.001 Lux(15IRE, Sens-up 256x)                  SCC-C6433
  SCC-C6435 : 0.001 Lux (15 IRE, Sens-up 256x, Color)                                                                                                                             SCC-C6435
                                                                                                                                                                                                                                                                                                                          SCC-C6435
                : 0.0001 Lux (15 IRE, Sens-up 256x, B/W)                  B/W                      0.06 Lux(15IRE,Sens-up Off)       0.03 Lux(15IRE,Sens-up Off)
• 128x(NTSC)/160x(PAL) WDR function (SCC-C6435 only)                                               0.0002 Lux(15IRE, Sens-up 256x) 0.0001 Lux(15IRE, Sens-up 256x)
                                                                                                                                                                                                                            SADT-100HM
• Full auto focus function                                 PAN/TILT       Speed      Manual Pan    0.1~180˚/sec                                                                                                                                           Pole (1.5" NPT) Installation
                                                                                     Preset Pan    400˚/sec
• Privacy mask zone (16 area)                                                                                                                                                                                              SHG-222
                                                                                     Manual Tilt   0.1~90˚/sec                                                                                SCC-C6433
• Pan (max 400˚/sec), Tilt (200˚/sec)                                                                                                                                                         SCC-C6435
                                                                                     Preset Tilt   200˚/sec
• 360˚ endless pan (Slip-ring), 0~180˚ tilt                               Range      Panning       0~360˚ (Endless)                                                                                                                                                           SHG-222
• RTC function for schedule setting                                                  Tilting       0~180˚                                                                                                                  SCC-C6433
• Multi-protocol (more than 8 companies), multi-OSD                       Number of Auto PAN       4                                                                                                                       SCC-C6435                                          SCC-C6433
                                                                                                                                                                                                                                                                              SCC-C6435
                                                                          Number of Preset         128
                                                                          Number of Pattern        3
                                                           Lens           Focal Length             3.55 ~ 113mm
                                                                          Zoom Ratio               32x Optical, 16x Digital
                                                                                                                                                                       Wall Installation                                                                  Corner Installation
                                                                          Aperture Ratio           F1.69(W)/F4.17(T)
                                                                          Viewing    Tele          1.78˚(H) x 1.34˚(V)                                                                   For Indoor use                For Outdoor use                                     For Indoor use                      For Outdoor use
                                                                          Angle      Wide          56.41˚(H) x 43.01˚(V)
                                                           Functions      Number of Privacy Zone   16
Dimensions (unit:mm)                                                      Day/Night                Color/BW/Auto (ICR)                                                                                                                                                                          SADT-110CM

                                                                          Line Lock                INT/Line Lock                                                                                          SADT-104WM                         SADT-103WM                                        SADT-104WM

                                                                          White Balance            ATW1/ATW2/AWC/MANUAL                                                                                                                                                                                                          SADT-103WM
                                                                                                                                                                                                                                                                                               SCC-C6433
                                                                          D-Zoom                   Yes (~16x)                                                                                                                                                                                  SCC-C6435
                                                                                                                                                                                                          SCC-C6433
                                                                          High Speed Shutter       Yes (OFF ~ 1/10K)                                                                                      SCC-C6435

                                                                          Motion Detection         Yes                                                                                                                                        SHG-222                                                                            SHG-222

                                                                          Sens Up                  Yes (2x ~ 256x)
                                                                          Camera ID                Max 20 Character
                                                                          Remote Control           RS485(Half & Full Duplex) / RS422                                                                                                                                                                                             SCC-C6433
                                                                                                                                                                                                                                              SCC-C6433                                                                          SCC-C6435
                                                                          Alarm      Input         8                                                                                                                                          SCC-C6435

                                                                                     Output        3(Open Collector 1 relay)
                                                                          Wide Dynamic Range       N/A                               Yes
                                                           Video Output                            VBS 1.0Vp-p
                                         157.7




                                                           S/N Ratio                               50 dB
                                                           Operating Temperature                   -10˚C ~ + 50˚C
                                                 233.5




                                                           Operating Humidity                      Less than 90%
                                                           Power Requirement                       NTSC : AC24 V, 60Hz / PAL : AC24 V, 50Hz
                                                           Power Consumption                       19W                               20W
                                                           LED Indicator                           Yes
                                                           Dimensions                              177(ø) X 233.5(H)mm
                            177
                                                           Weight                                  2,400g
                                                           Color                                   Silver


                                                                                                                                                                                                                                                                                                                Samsung Video Security System | 60 . 61
High Resolution SmartDome Camera                                                                                                                                   36x Resolution Color Camera
                                                                                                                                                                   HighZoom SmartDomeCamera

SCC-C7433/C7435                                                                                                                                                    SCC-C7478/C7478C
                                                                                                                                                                   SCC-B1311/B1011P


Features                                                 Specifications                                                                                            Features                                               Specifications
• 1/4" 410K/470K Pixels Ex-View HAD PS CCD (SCC-C7435)   Model                                     SCC-C7433                       SCC-C7435                       • 1/4" 410K/470K Pixels ExView-HAD PS CCD              Model                                           SCC-C7478/C7478C
  1/4" 410K/470K Pixels Super HAD IT CCD (SCC-C7433)     Camera Type                               Color                                                           • 36x(f=3.4~122.4 mm) Optical Zoom Lens(12x D-Zoom)    Camera Type     Color/BW                        Color
• 32x optical zoom lens (16x D-zoom)                     Image          Device                     1/4" Super-HAD IT CCD             1/4" Ex-View HAD PS CCD       • High-Resolution : 540(Color)/570(BW) TV Lines        Image           Device                          1/4" ExView-HAD Progressive Scan CCD
• High resolution : 540(Color)/570(BW) TV lines                         Effective Pixels           NTSC : 768 x 494 / PAL : 752 x 582                                                                                                     Pixels            Effective     NTSC : 768 x 494 / PAL : 752 x 582
                                                                                                                                                                   • Day/Night function(ICR)
                                                                                                                                                                                                                          Resolution      Horizontal                      540(Color) / 570(BW) TV Lines
• Day/Night                                              Horizontal Resolution                     540(Color)/570(BW) TV Lines                                     • Full Auto Focus function                             Min. Scene      Color/BW                        Illumination    Sens-up        Color        B/W(S/W)
• Min. scene illumination :                              Min. Scene     Color                      0.6Lux(15IRE,Sens-up Off)         0.3Lux(15IRE,Sens-up Off)     • Privacy Mask Zone (8 Area)                           Illumination                                        50IRE           Off       1.40Lux        0.15Lux
  SCC-C7435 : 0.001 Lux (15 IRE, Sens-up 256x, Color)    Illumination                              0.002Lux(15IRE, Sens-up 256x) 0.001Lux(15IRE, Sens-up 256x)     • 360˚ Endless PAN (Slip-ring), 0~180˚ Tilt                                                                30IRE           Off       0.84Lux        0.09Lux
  SCC-C7433 : 0.002 Lux (15 IRE, Sens-up 256x, Color)                   B/W                        0.06Lux(15IRE,Sens-up Off)        0.03Lux(15IRE,Sens-up Off)                                                                                                               15IRE           Off       0.42Lux      0.0450Lux
                                                                                                                                                                   • PAN Speed(Max 360˚/sec), Tilt Speed(360˚/sec)
                                                                                                   0.0002Lux(15IRE, Sens-up 256x) 0.0001Lux(15IRE, Sens-up 256x)                                                                                                              50IRE       64times     0.0219Lux      0.0023Lux
• 128x(NTSC) / 160x(PAL) WDR function (SCC-C7435)                                                                                                                  • Multi-Protocol support(Pelco-P/D, Samsung)                                                               30IRE       64times     0.0131Lux      0.0014Lux
• Full auto focus function                               PAN/TILT       Speed        Manual Pan    0 ~180˚/sec
                                                                                                                                                                   • Remote Control : RS485/422                                                                               15IRE       64times     0.0066Lux      0.0007Lux
                                                                                     Preset Pan    400˚/sec
• Pan (max 400˚/sec), tilt (200˚/sec)                                                                                                                              • Alarm In(8ea)/Out(4ea)                               PAN/TILT        Speed             Manual Pan    0.05˚~360˚
                                                                                     Manual Tilt   0.1~90˚/sec                                                                                                                                              Preset Pan    360˚
• 360˚ endless pan(slip-ring), 0~180˚ tilt                                                                                                                         • Time & Day Scheduling function
                                                                                     Preset Tilt   200/sec                                                                                                                                                  Manual Tilt   0.05˚~360˚
• RTC function for schedule setting                                                                                                                                • Vector Driving(Pan/Tilt opreration simultaneously)                                     Preset Tilt   360˚
                                                                        Range        Panning       0~360˚/sec (Endless)
• Multi-protocol (more than 8 companies), multi-OSD                                  Tilting       0~180˚                                                          • AC24V                                                                Range             Panning       0˚~360˚(Endless)
• Remote control : RS485(half & full duplex) / RS-422                                                                                                                                                                                                       Tilting       180˚
                                                                        Number of Auto PAN         4
                                                                                                                                                                                                                                          Number of Auto PAN              8
• Operating temp : -45˚C~50˚C (with fan / heater)                       Number of Preset           128                                                                                                                                    Number of Preset                127
• Water / dust resistant (IP66)                                         Number of Pattern          3                                                                                                                                      Number of Pattern               4
• Applicable bracket : SADT-100CM, SADT-103WM            Lens           Focal Length               3.55 ~ 113mm                                                                                                           Lens            Focal Length                    3.4 ~ 122.4mm
                        SADT-100PM, SADT-110CM                          Zoom ratio                 32x Optical, 16x Digital                                                                                                               Zoom Ratio                      36x Optical, 12x D-Zoom
                                                                        Aperture Ratio             F1.69(W)/F4.2(T)                                                Dimensions (unit:mm)                                                   Aperature Ratio                 F1.6(W)/F4.5(T)
                                                                                                                                                                                                                                          Viewing Angle      Tele         1.70˚(H) x 1.27˚(V)
                                                                        Viewing      Tele          1.78˚(H) x 1.34˚(V)
                                                                                                                                                                                                                                                             Wide         57.80˚(H) x 43.35˚(V)
                                                                        Angle        Wide          56.41˚(H) x 43.01˚(V)                                                                                                                  Lens Drive Type                 DC Auto Iris
                                                                                                                                                                       SCC-C7478
Dimensions (unit:mm)                                     Functions      Number of Privacy Zone     16                                                                                                                                     Mount Type                      Board-in type
                                                                        Day/Night                  Color/BW/Auto (ICR)                                                                                                    Functions       Number of Privacy Zone          8
                                                                        Line Lock                  INT/Line Lock                                                                                                                          Day/Night                       Auto / Day / Night (ICR)
                                                                                                                                                                                                                                          Wide Dynamic Range              On / Off
                                                                        White Balance              ATW1/ATW2/AWC/MANUAL
                                                                                                                                                                                                                                          D-Zoom                          Yes(~12x)
                                                                        D-Zoom                     Yes(~16x)
                                                                                                                                                                                                                                          High Speed Shutter              1/60 ~ 1/10,000 sec
                                                                        High Speed Shutter         Yes (OFF ~ 1/10K)                                                                                                                      Sens Up                         Yes(2x~64x)
                                                                        Motion Detection           Yes                                                                                                                                    BLC                             On / Off
                                                                        Sens Up                    Yes(2x ~ 256x)                                                                                                                         AGC                             Auto/Manual(-3~28dB)
                                                                        Camera ID                  Max 20 Character                                                                                                                       Anti Vandal                     Yes
                                                                                                                                                                                                                                          Camera ID                       Dip switch adjustable
                                                                        Remote Control             RS485(Half&Full Duplex) / RS422
                                                                                                                                                                                                                                          White Balance                   Auto/Manual(Red, Blue Gain Adj.)
                                                                        Alarm        Input         8                                                                                                                      S/N Ratio                                       More than 50 dB
                                                                                     Output        3(Open Collector 1 relay)                                           SCC-C7478C                                         Video Output                                    VBS 1.0Vp-p
                                                                        Wide Dynamic Range         N/A                               Yes                                                                                  OSD             OSD                             Yes
                                                         Video Output   VBS 1.0Vp-p                VBS 1.0Vp-p                                                                                                            Alarm           Input                           8
                                                         S/N Ratio                                 50 dB                                                                                                                                  Output                          4(Relay)
                                                                                                                                                                                                                          Environmental   Operating Temperature           -45˚C ~ +50˚C
                                       411

                                             422




                                                         Operating Temperature                     -45˚C ~ + 50˚C
                                                                                                                                                                                                                          Conditions      Operating Humidity              Less than 90%
                                                         Operating Humidity                        Less than 90%                                                                                                          Power           Power Requirement               AC24V, 24W(without Fan/Heater) / 57W(with Fan/Heater)
                                                         Power Requirement                         NTSC : AC24V, 60Hz / PAL : AC24V, 50Hz                                                                                 Physical        Dimensions         Camera       259(Ø) x 265.7(H)mm
                                                         Power Consumption                         24W (Only Camera) / 55W (With Fan & Heater)                                                                            Specification   Weight             Total        11,000g
                                                         LED Indicator                             Yes                                                                                                                                    Color              Body         Light Gray
                                                         Dimensions                                258(Ø) x 422(H)mm
                          168
                                                         Weight                                    5,950g
                          258
                                                         Color                                     Silver


                                                                                                                                                                                                                                                                                               Samsung Video Security System | 62 . 63
10x Zoom Mini SmartDome Camera

SCC-C6323/C6325
SCC-C7325                                                                                                                                                                  :::::::::::::::::::::::::::::::::::::::::::::::::



                                                                                                                                                                                 Specifications
                                                                                                                                                                                 Model                                                    SCC-C6323                                 SCC-C6325                                  SCC-C7325
                                                                                                                                                                                 Camera Type      Color/BW                                Color
                                                                                                                                                                                 Image            Device                                  1/4" Super-HAD IT CCD
Features                                                                                                                                                                                          Pixels                  Effective       NTSC : 768 x 494, PAL : 752 x 582
• 1/4" 410K/470K Pixels Super-HAD IT CCD                                                        • Multi-Protocol support                                                         Scanning         System                                  Interlace
• 10x(f=3.8~38 mm) Optical Zoom Lens (10x D-Zoom)                                               • Remote Control : RS485                                                                          Horizontal Frequency    Internal Mode   NTSC : 15,734Hz, PAL : 15,625Hz
• High-Resolution : 520(Color)/570(BW) TV Lines                                                 • Time & Day Scheduling function                                                                  Vertical Frequency      Internal Mode   NTSC : 59.94Hz, PAL: 50Hz
• Min. illumination(15IRE, Sens-up 128x) : 0.0014 Lux(Color), 0.00014 Lux(B/W)                  • Vector Driving (Panning/Tilting operation simultaneously)                      Resolution       Horizontal                              Color : 520TV Lines / BW : 570TV Lines
• Day/Night function (ICR)                                                                      • SCC-C6323 : Plastic case, Indoor, 142(Ø) x126(H)mm                             Min. Scene       Sens-up Off             Color           0.60Lux(50IRE), 0.36Lux(30IRE), 0.18Lux(15IRE)
• Full Auto Focus function                                                                        SCC-C6325 : Anti-Vandal, IP-66, 165(Ø) x162(H)mm                               Illumination                             B/W             0.06Lux(50IRE), 0.036Lux(30IRE), 0.018Lux(15IRE)
• Privacy Mask Zone (4 Area)                                                                      SCC-C7325 : Anti-Vandal, IP-66, Sunshield, F/H, 200(Ø) x 206(H)mm                               Sens-up 128x            Color           0.0047Lux(50IRE), 0.0028Lux(30IRE), 0.0014Lux(15IRE)
• 360˚ Endless PAN (Slip-ring), 0~180˚ Tilt (SCC-C6323:0~90˚)                                   • AC24V/DC12V                                                                                                             B/W             0.00047Lux(50IRE), 0.00028Lux(30IRE), 0.00014Lux(15IRE)
                                                                                                                                                                                 PAN/TILT         Speed                   Manual Pan      0.05˚/sec ~ 360˚/sec
• PAN Speed (Max 360˚/sec), Tilt Speed (360˚/sec)
                                                                                                                                                                                                                          Preset Pan      360˚/sec
                                                                                                                                                                                                                          Manual Tilt     0.05˚/sec ~ 360˚/sec
                                                                                                                                                                                                                          Preset Tilt     360˚/sec
                                                                                                                                                                                                  Range                   Panning         0˚~360˚ (Endless)
Dimensions (unit:mm)
                                                                                                                                                                                                                          Tilting         90˚                                      180˚
                                                                                                                                                                                                  Number of Auto PAN                      8
          SCC-C6323                                                           SCC-C6325                                     SCC-C7325                                                             Number of Preset                        127
                                          14
                                            2                                                                                                                                                     Number of Pattern                       4
                                  40




                                                                                                                                                                                 Lens             Focal Length / Zoom ratio               3.8mm ~ 38mm / 10x Optical, 10x D-Zoom
                                  44.5




                                                                                                                                                                                                  Aperature Ratio                         F1.8(W) / F2.8(T)
                                                                                                                                                                                                  Viewing Angle         Tele / Wide       5.58˚(H) x 4.27˚(V) / 51.2˚(H) x 39.3˚(V)
                                  50.35




                                                                                                                                                                                                  Lens Drive Type / Mount Type            DC Auto Iris / Board-in type
                   100.5
                                                                                                                                                                                 Functions        Number of Privacy Zone                  4
                    139
                                                                                                                                                                                                  Day/Night                               Auto / Day / Night (ICR)
                                                                                                                                                                                                  D-Zoom                                  Yes (~10x)
                                                                                                                                                                                                  High Speed Shutter                       NTSC : Yes (1/60~ 1/120,000 sec), PAL : Yes (1/50 ~ 1/120,000 sec)
                                                                                                                                                                                                  Sens Up                                 OFF/AUTO
                                                                                                                                                                                                  BLC                                     LOW/MIDDLE/HIGH/OFF
                                                                                                                                                                                                  AGC                                     NORMAL/HIGH/OFF
Easy Installation                                                                                                                                                                                 Anti Vandal                             No                                      Yes                                         Yes
                                                                                                                                                                                                  Camera ID                               dip switch adjustable
                                                                                                                                                                                                  White Balance                           Auto/Manual (Red,Blue Gain Adj.)
       SCC-C6323                                       SCC-C6325                                SCC-C7325
                                                                                                                                                                                 Video Output                                             VBS 1.0Vp-p
                                                                                                                                                                                 S/N Ratio                                                50dB (AGC off)
                                                                                                                                                                                 OSD                                                      Yes
                                                                                                                                                                                 Alarm            Input / Output                          2 / 1 (relay)
                                                                                                                 +                                      +                        Remote Control                                           RS 485
                                                                                                                                                                                 Environmental    Operating Temperature                   -10˚C~+50˚C                          -10˚C~+50˚C                                    AC24V:-40˚C~+50˚C / DC12V:-15˚C~+50˚C
                                                                                                                  Pendant Mount                             Wall Mount           Conditions       Operating Humidity                      Less than 90%
                                                                                                                  (SADT-732CM)                              (SADT-732WM)         Power            Power Requirement                       NTSC : DC12V / AC24V 60Hz, PAL : DC12V / AC24V 50Hz
                          Surface Installation or
                          using Wall Mount Adaptor                                                                                                                                                Power Consumption                       AC24V(10W) / DC12V(8W)                                                              AC24V : Heater Off(10W) / On(21W)
                                                                                                                                                                                                                                                                                                                              DC12V : Heater Off(8W) / On(12W)
                                                                                                                                                                                 Physical         Dimensions                              142(Ø) x 126(H)mm / 142(Ø) x 4.9(H)inch   165(Ø) x 162(H)mm / 165(Ø) x 6.3(H)inch   200(Ø) x 206(H)mm / 200(Ø) x 8.1(H)inch
                                                +                                                                                   +     NPT-1.5"                               Specification    Weight                                  600g (1.3 lb)                             1,850g (4.0lb)                            2,400g (5.2lb)
                                                                                                                                           (standard)
                                                                        Wall Mount :                                                                                                              Color                   Body            White
                                                                        SADT-937WM



* SCC-C6325 IP66 Rating Indoor/Outdoor Application, SCC-C7325 IP66 Rating Outdoor Application
                                                                                                                                                                                                                                                                                                                                      Samsung Video Security System | 64 . 65
34x Optical Zoom High Speed Dome Camera

SCC-C6437/C6439                                                                                         NEW




                                                                                                                                               Specifications
                                                                                                                                               Model                                                        SCC-C6437                                                       SCC-C6439
                                                                                                                                               Camera Type      Color/BW                                    Color
                                                                                                                                               Image            Device                                      1/4" Super-HAD IT CCD                                           1/4" ExView-HAD PS CCD
Features                                                                                                                                                        Pixels                  Effective           768 x 494 (NTSC) / 752 x 582 (PAL)
• 1/4" SONY 410K/470K Pixels Super-HAD IT CCD (SCC-C6437)                  • Adaptive Digital Noise Reduction (3D + 2D)                        Resolution       Horizontal                                  600 TV Lines
  1/4" SONY 410K/470K Pixels Ex-View HAD PS CCD (SCC-C6439)                • Back Light Compensation (Area Setting)                            Min. Scene       Color                   Sens-up Off         0.6Lux(15IRE), 1.2Lux(30IRE), 2Lux(50IRE)                       0.3Lux(15IRE), 0.7Lux(30IRE), 1.2Lux(50IRE)
• 34x Optical & 16x(0.1step) Digital Zoom                                  • Advanced Motion Detection Function                                Illumination                             Sens up 512x        0.001Lux(15IRE) , 0.002Lux(30IRE), 0.004Lux(50IRE)              0.0007Lux(15IRE), 0.001Lux(30IRE), 0.002Lux(50IRE)
• High Resolution : 600 TV Lines                                           • eXtended Dynamic Range (XDR)                                                       B/W                     Sens-up Off         0.06Lux(15IRE), 0.12Lux(30IRE), 0.2Lux(50IRE)                   0.03Lux(15IRE), 0.07Lux(30IRE), 0.12Lux(50IRE)
• Min. illumination 0.0007 Lux (F1.2, 15 IRE, Sens-up 512x, Color)         • Privacy Mask Function (12ea)                                                                               Sens up 512x        0.0001Lux(15IRE), 0.0002Lux(30IRE), 0.0004Lux(50IRE)            0.00007Lux(15IRE), 0.0001Lux(30IRE), 0.0002Lux(50IRE)
                    0.00007 Lux (F1.2, 15 IRE, Sens-up 512x, B/W)          • DIS (Digital Image Stabilization) • Time & Day Scheduling         Pan/Tilt         Speed                   Manual Pan          0.01˚/sec ~ 180˚/sec
• 0~360º Endless Pan, -6~186º Tilting (D-Flip)                             • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100)                                            Preset Pan          600˚/sec
• Pan/Tilt Speed Min. 0.01º/sec, Max. 600º/sec                             • RS-485 (Half/Full)/RS-422 Control (Multi-Protocol support)                                                 Manual Tilt         0.01˚/sec ~ 180˚/sec
                                                                                                                                                                                        Preset Tilt         600˚/sec
• Preset 512 ea, Auto Pan 4 ea, Pattern 3 ea                               • Multi-Language OSD (E, F, G, S, I, J, R, P, C, etc) support
                                                                                                                                                                Range                   Panning / Tilting   0˚~360˚(Endless) / -6˚~186˚
• Wide Dynamic Range (NTSC 128x, PAL 160x) : SCC-C6439 Only                • Intelligent Video (Moved/Fixed/Fence/Tracking)
                                                                                                                                                                Number of Auto PAN                          4 ea
• Virtual Progressive Scan (VPS) : SCC-C6439 Only                          • Alarm Input 8 ea, Output 4 ea
                                                                                                                                                                Number of Preset                            512 ea
• Day Night Function (ICR), Sens-up Function (512x)                        • Operating Temp. : -10 ~ 50˚C                                                       Number of Pattern                           3 ea
                                                                                                                                               Functions        Number of Privacy Zone                      12 ea
                                                                                                                                                                Day/Night / Motion Detection                Auto / Day / Night(ICR) / Yes, Sensitivity 1~7 Level
                                                                                                                                                                Wide Dynamic Range                          -                                                               Yes (NTSC:128x, PAL:160x)
Dimensions (unit:mm)                                                                                                                                            D-Zoom / High Speed Shutter                 Yes(~16x) / 1/100~1/10K sec
                                                                                                                                                                Sens Up / BLC                               Yes(2x ~ 512x) / Off/On
                                                                     178
                                                                                                                                                                AGC                                         Off/On (Very Low / Low / Mid / High / Very High / User / Fix)
                                                                                                                                                                Auto Focus                                  Manual / Auto (pan, tilt, zoom linked) / one AF
                                                                                                                                                                Syncronization                              Internal / Line lock
                                                          140




                                                                                                                                                                Camera ID                                   Max 54 Character, 2 Line
                                                    219




                                                                                                                                                                VPS(Virtual Progressive Scan)               -                                                               Yes
                                                                                                                                                                XDR(eXtended Dynamic Range)                 Off/On(Low/Middle/High)
                                                                                                                                                                DNR(Digital Noise Reduction)                Off/On(Low/Middle/High/User(3D/2D))
                                                                                                                                                                Schedule                                    Day / Time Schedule
                                                                     171                                                                                        White Balance                               ATW1 / ATW2 / AWC(Manual) / 3200 / 5600
                                                                                                                                               Video Output     VBS 1.0Vp-p                                 VBS 1.0Vp-p
                                                                                                                                               S/N Ratio                                                    52 dB
                                                                                                                                               Lens             Focal Length / Min. Object Distance         3.4 ~ 115.6mm / 100cm
                                                                                                                                                                Zoom Ratio / Aperature Ratio                34x Optical (688x with 16x Digital zoom) / F1.65(W)/F3.7(T)
                                                                                                                                                                Viewing Angle          Tele                 1.47˚(H) x 1.10˚(V)0
                                                                                                                                                                                       Wide                 61.22˚(H) x 47.16˚(V)
                                                                                                                                                                Lens Drive Type / Mount Type                DC Auto Iris / Board-in type
                                                                                                                                               OSD                                                          Yes
                                                                                                                                               Alarm            Input / Output                              8 ea / 3 ea (2 Open Collector, 1 relay)
                                                                                                                                               Remote Control                                               RS485(Half/Full Duplex)/RS422, CCVC
                                                                                                                                               Environmental    Operating Temperature                       -10˚C ~ +50˚C
                                                                                                                                               Conditions       Operating Humidity                          Less than 90%
                                                                                                                                               Power            Power Requirement                           24 VAC
                                                                                                                                                                Power Consumption                           11W
                                                                                                                                                                LED Indicator                               Yes
                                                                                                                                               Physical         Dimensions                                  178(Ø) x 219(H)mm
                                                                                                                                               Specification    Weight                                      2.0kg
                                                                                                                                                                Color                                       Light Gray



                                                                                                                                                                                                                                                                                                        Samsung Video Security System | 66 . 67
34x Optical Zoom High Speed Dome Camera

SCC-C7437/C7439                                                                                        NEW




                                                                                                                                               Specifications
                                                                                                                                               Model                                                        SCC-C7437                                                       SCC-C7439
                                                                                                                                               Camera Type      Color/BW                                    Color
                                                                                                                                               Image            Device                                      1/4" Super-HAD IT CCD                                           1/4" ExView-HAD PS CCD
Features                                                                                                                                                        Pixels                  Effective           768 x 494 (NTSC) / 752 x 582 (PAL)
• 1/4" SONY 410K/470K Pixels Super-HAD IT CCD (SCC-C7437)                  • Adaptive Digital Noise Reduction (3D + 2D)                        Resolution       Horizontal                                  600 TV Lines
  1/4" SONY 410K/470K Pixels Ex-View HAD PS CCD (SCC-C7439)                • Back Light Compensation (Area Setting)                            Min. Scene       Color                   Sens-up Off         0.6Lux(15IRE), 1.2Lux(30IRE), 2Lux(50IRE)                       0.3Lux(15IRE), 0.7Lux(30IRE), 1.2Lux(50IRE)
• 34x Optical & 16x(0.1step) Digital Zoom                                  • Advanced Motion Detection Function                                Illumination                             Sens up 512x        0.001Lux(15IRE) , 0.002Lux(30IRE), 0.004Lux(50IRE)              0.0007Lux(15IRE), 0.001Lux(30IRE), 0.002Lux(50IRE)
• High Resolution : 600 TV Lines                                           • eXtended Dynamic Range (XDR)                                                       B/W                     Sens-up Off         0.06Lux(15IRE), 0.12Lux(30IRE), 0.2Lux(50IRE)                   0.03Lux(15IRE), 0.07Lux(30IRE), 0.12Lux(50IRE)
• Min. illumination 0.0007 Lux (F1.2, 15 IRE, Sens-up 512x, Color)         • Privacy Mask Function (12ea)                                                                               Sens up 512x        0.0001Lux(15IRE), 0.0002Lux(30IRE), 0.0004Lux(50IRE)            0.00007Lux(15IRE), 0.0001Lux(30IRE), 0.0002Lux(50IRE)
                    0.00007 Lux (F1.2, 15 IRE, Sens-up 512x, B/W)          • DIS (Digital Image Stabilization) • Time & Day Scheduling         Pan/Tilt         Speed                   Manual Pan          0.01˚/sec ~ 180˚/sec
• 0~360º Endless Pan, -6~186º Tilting (D-Flip)                             • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100)                                            Preset Pan          600˚/sec
• Pan/Tilt Speed Min. 0.01º/sec, Max. 600º/sec                             • RS-485 (Half/Full)/RS-422 Control (Multi-Protocol support)                                                 Manual Tilt         0.01˚/sec ~ 180˚/sec
• Preset 512 ea, Auto Pan 4 ea, Pattern 3 ea                               • Multi-Language OSD (E, F, G, S, I, J, R, P, C, etc) support                                                Preset Tilt         600˚/sec
• Wide Dynamic Range (NTSC 128x, PAL 160x) : SCC-C7439 Only                • Intelligent Video (Moved/Fixed/Fence/Tracking)                                     Range                   Panning / Tilting   0˚~360˚(Endless) / -6˚~186˚
• Virtual Progressive Scan (VPS) : SCC-C7439 Only                          • Alarm Input 8 ea, Output 4 ea                                                      Number of Auto PAN                          4 ea
• Day Night Function (ICR), Sens-up Function (512x)                        • Operating Temp. : -50 ~ 50˚C                                                       Number of Preset                            512 ea
                                                                                                                                                                Number of Pattern                           3 ea
                                                                                                                                               Functions        Number of Privacy Zone                      12 ea
                                                                                                                                                                Day/Night / Motion Detection                Auto / Day / Night(ICR) / Yes, Sensitivity 1~7 Level
                                                                                                                                                                Wide Dynamic Range                          -                                                               Yes (NTSC:128x, PAL:160x)
Dimensions (unit:mm)                                                                                                                                            D-Zoom / High Speed Shutter                 Yes(~16x) / 1/100~1/10K sec
                                                                                                                                                                Sens Up / BLC                               Yes(2x ~ 512x) / Off/On
                                                                                                                                                                AGC                                         Off/On (Very Low / Low / Mid / High / Very High / User / Fix)
                                                                                                                                                                Auto Focus                                  Manual / Auto (pan, tilt, zoom linked) / one AF
                                                                                                                                                                Syncronization                              Internal / Line lock
                                                     256




                                                                                                                                                                Camera ID                                   Max 54 Character, 2 Line
                                                      240




                                                                                                                                                                VPS(Virtual Progressive Scan)               -                                                               Yes
                                                                                                                                                                XDR(eXtended Dynamic Range)                 Off/On(Low/Middle/High)
                                                                                                                                                                DNR(Digital Noise Reduction)                Off/On(Low/Middle/High/User(3D/2D))
                                                                                                                                                                Schedule                                    Day / Time Schedule
                                                                     228
                                                                                                                                                                White Balance                               ATW1 / ATW2 / AWC(Manual) / 3200 / 5600
                                                                                                                                               Video Output     VBS 1.0Vp-p                                 VBS 1.0Vp-p
                                                                                                                                               S/N Ratio                                                    52 dB
                                                                                                                                               Lens             Focal Length / Min. Object Distance         3.4 ~ 115.6mm / 100cm
Easy Installation                                                                                                                                               Zoom Ratio / Aperature Ratio                34x Optical (688x with 16x Digital zoom) / F1.65(W)/F3.7(T)
                                                                                                                                                                Viewing Angle          Tele                 1.47˚(H) x 1.10˚(V)0
                                                                                                                                                                                       Wide                 61.22˚(H) x 47.16˚(V)
                                                                                                                                                                Lens Drive Type / Mount Type                DC Auto Iris / Board-in type
                                                                                                                                               OSD                                                          Yes
                                                                                                                                               Alarm            Input / Output                              8 ea / 3 ea (2 Open Collector, 1 relay)
                                                                                                                                               Remote Control                                               RS485(Half/Full Duplex) / RS422, CCVC
                                                                                                                                               Environmental    Operating Temperature                       -50˚C ~ +50˚C
                                                                                                                                               Conditions       Operating Humidity                          Less than 90%
                                                                                                                                               Power            Power Requirement                           24 VAC
                                                                                                                                                                Power Consumption                           16W / 47W(with fan/Heater)
                                                                                                                                                                LED Indicator                               Yes
                                                                                                                                               Physical         Dimensions                                  228(Ø) x 256(H)mm
                                                                                                                                               Specification    Weight                                      3.0kg
                                                                                                                                                                Color                                       Light Gray



                                                                                                                                                                                                                                                                                                        Samsung Video Security System | 68 . 69
43x Optical Zoom High Speed Dome Camera

SCC-C6453/C6455                                                                                          NEW




                                                                                                                                               Specifications
                                                                                                                                               Model                                                        SCC-C6453                                                       SCC-C6455
                                                                                                                                               Camera Type      Color/BW                                    Color
                                                                                                                                               Image            Device                                      1/4" Super-HAD IT CCD                                           1/4" ExView-HAD PS CCD
Features                                                                                                                                                        Pixels                  Effective           768 x 494 (NTSC) / 752 x 582 (PAL)
• 1/4" SONY 410K/470K Pixels Super-HAD IT CCD (SCC-C6453)                  • Adaptive Digital Noise Reduction (3D + 2D)                        Resolution       Horizontal                                  600 TV Lines
  1/4" SONY 410K/470K Pixels Ex-View HAD PS CCD (SCC-C6455)                • Back Light Compensation (Area Setting)                            Min. Scene       Color                   Sens-up Off         0.6Lux(15IRE), 1.2Lux(30IRE), 2Lux(50IRE)                       0.3Lux(15IRE), 0.7Lux(30IRE), 1.2Lux(50IRE)
• 43x Optical & 16x(0.1step) Digital Zoom                                  • Advanced Motion Detection Function                                Illumination                             Sens up 512x        0.001Lux(15IRE) , 0.002Lux(30IRE), 0.004Lux(50IRE)              0.0007Lux(15IRE), 0.001Lux(30IRE), 0.002Lux(50IRE)
• High Resolution : 600 TV Lines                                           • eXtended Dynamic Range (XDR)                                                       B/W                     Sens-up Off         0.06Lux(15IRE), 0.12Lux(30IRE), 0.2Lux(50IRE)                   0.03Lux(15IRE), 0.07Lux(30IRE), 0.12Lux(50IRE)
• Min. illumination 0.0007 Lux (F1.2, 15 IRE, Sens-up 512x, Color)         • Privacy Mask Function (12ea)                                                                               Sens up 512x        0.0001Lux(15IRE), 0.0002Lux(30IRE), 0.0004Lux(50IRE)            0.00007Lux(15IRE), 0.0001Lux(30IRE), 0.0002Lux(50IRE)
                    0.00007 Lux (F1.2, 15 IRE, Sens-up 512x, B/W)          • DIS (Digital Image Stabilization) • Time & Day Scheduling         Pan/Tilt         Speed                   Manual Pan          0.01˚/sec ~ 180˚/sec
• 0~360º Endless Pan, -6~186º Tilting (D-Flip)                             • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100)                                            Preset Pan          Max. 600o/sec
• Pan/Tilt Speed Min. 0.01º/sec, Max. 600º/sec                             • RS-485 (Half/Full)/RS-422 Control (Multi-Protocol support)                                                 Manual Tilt         0.01˚/sec ~ 180˚/sec
                                                                                                                                                                                        Preset Tilt         600˚/sec
• Preset 512 ea, Auto Pan 4 ea, Pattern 3 ea                               • Multi-Language OSD (E, F, G, S, I, J, R, P, C, etc) support
                                                                                                                                                                Range                   Panning / Tilting   0˚~360˚(Endless) / -6˚~186˚
• Wide Dynamic Range (NTSC 128x, PAL 160x) : SCC-C6455 Only                • Intelligent Video (Moved/Fixed/Fence/Tracking)
                                                                                                                                                                Number of Auto PAN                          4 ea
• Virtual Progressive Scan (VPS) : SCC-C6455 Only                          • Alarm Input 8 ea, Output 4 ea
                                                                                                                                                                Number of Preset                            512 ea
• Day Night Function (ICR), Sens-up Function (512x)                        • Operating Temp. : -10 ~ 50˚C                                                       Number of Pattern                           3 ea
                                                                                                                                               Functions        Number of Privacy Zone                      12 ea
                                                                                                                                                                Day/Night / Motion Detection                Auto / Day / Night(ICR) / Yes, Sensitivity 1~7 Level
                                                                                                                                                                Wide Dynamic Range                          -                                                               Yes (NTSC:128x, PAL:180x)
Dimensions (unit:mm)                                                                                                                                            D-Zoom / High Speed Shutter                 Yes(~16x) / 1/100~1/10K sec
                                                                                                                                                                Sens Up / BLC                               Yes(2x ~ 512x) / Off/On
                                                                     178
                                                                                                                                                                AGC                                         Off/On (Very Low / Low / Mid / High / Very High / User / Fix)
                                                                                                                                                                Auto Focus                                  Manual / Auto (pan, tilt, zoom linked) / one AF
                                                                                                                                                                Syncronization                              Internal / Line lock
                                                        140




                                                                                                                                                                Camera ID                                   Max 54 Character, 2 Line
                                                  219




                                                                                                                                                                VPS(Virtual Progressive Scan)               -                                                               Yes
                                                                                                                                                                XDR(eXtended Dynamic Range)                 Off/On(Low/Middle/High)
                                                                                                                                                                DNR(Digital Noise Reduction)                Off/On(Low/Middle/High/User(3D/2D))
                                                                                                                                                                Schedule                                    Day / Time Schedule
                                                                     171                                                                                        White Balance                               ATW1 / ATW2 / AWC(Manual) / 3200 / 5600
                                                                                                                                               Video Output     VBS 1.0Vp-p                                 VBS 1.0Vp-p
                                                                                                                                               S/N Ratio                                                    52 dB
                                                                                                                                               Lens             Focal Length / Min. Object Distance         3.2 ~ 138.5mm / 100cm
                                                                                                                                                                Zoom Ratio / Aperature Ratio                43x Optical (688x with 16x Digital zoom) / F1.65(W)/F3.7(T)
                                                                                                                                                                Viewing Angle          Tele                 1.47˚(H) x 1.10˚(V)0
                                                                                                                                                                                       Wide                 61.22˚(H) x 47.16˚(V)
                                                                                                                                                                Lens Drive Type / Mount Type                DC Auto Iris / Board-in type
                                                                                                                                               OSD                                                          Yes
                                                                                                                                               Alarm            Input / Output                              8 ea / 3 ea (2 Open Collector, 1 relay)
                                                                                                                                               Remote Control                                               RS485(Half/Full Duplex)/RS422, CCVC
                                                                                                                                               Environmental    Operating Temperature                       -10˚C ~ +50˚C
                                                                                                                                               Conditions       Operating Humidity                          Less than 90%
                                                                                                                                               Power            Power Requirement                           24 VAC
                                                                                                                                                                Power Consumption                           11W
                                                                                                                                                                LED Indicator                               Yes
                                                                                                                                               Physical         Dimensions                                  178(Ø) x 219(H)mm
                                                                                                                                               Specification    Weight                                      2.0kg
                                                                                                                                                                Color                                       Light Gray



                                                                                                                                                                                                                                                                                                        Samsung Video Security System | 70 . 71
43x Optical Zoom High Speed Dome Camera

SCC-C7453/C7455                                                                                        NEW




                                                                                                                                               Specifications
                                                                                                                                               Model                                                        SCC-C7453                                                       SCC-C7455
                                                                                                                                               Camera Type      Color/BW                                    Color
                                                                                                                                               Image            Device                                      1/4" Super-HAD IT CCD                                           1/4" ExView-HAD PS CCD
Features                                                                                                                                                        Pixels                  Effective           768 x 494 (NTSC) / 752 x 582 (PAL)
• 1/4" SONY 410K/470K Pixels Super-HAD IT CCD (SCC-C7453)                  • Adaptive Digital Noise Reduction (3D + 2D)                        Resolution       Horizontal                                  600 TV Lines
  1/4" SONY 410K/470K Pixels Ex-View HAD PS CCD (SCC-C7455)                • Back Light Compensation (Area Setting)                            Min. Scene       Color                   Sens-up Off         0.6Lux(15IRE), 1.2Lux(30IRE), 2Lux(50IRE)                       0.3Lux(15IRE), 0.7Lux(30IRE), 1.2Lux(50IRE)
• 43x Optical & 16x(0.1step) Digital Zoom                                  • Advanced Motion Detection Function                                Illumination                             Sens up 512x        0.001Lux(15IRE) , 0.002Lux(30IRE), 0.004Lux(50IRE)              0.0007Lux(15IRE), 0.001Lux(30IRE), 0.002Lux(50IRE)
• High Resolution : 600 TV Lines                                           • eXtended Dynamic Range (XDR)                                                       B/W                     Sens-up Off         0.06Lux(15IRE), 0.12Lux(30IRE), 0.2Lux(50IRE)                   0.03Lux(15IRE), 0.07Lux(30IRE), 0.12Lux(50IRE)
• Min. illumination 0.0007 Lux (F1.2, 15 IRE, Sens-up 512x, Color)         • Privacy Mask Function (12ea)                                                                               Sens up 512x        0.0001Lux(15IRE), 0.0002Lux(30IRE), 0.0004Lux(50IRE)            0.00007Lux(15IRE), 0.0001Lux(30IRE), 0.0002Lux(50IRE)
                    0.00007 Lux (F1.2, 15 IRE, Sens-up 512x, B/W)          • DIS (Digital Image Stabilization) • Time & Day Scheduling         Pan/Tilt         Speed                   Manual Pan          0.01˚/sec ~ 180˚/sec
• 0~360º Endless Pan, -6~186º Tilting (D-Flip)                             • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100)                                            Preset Pan          600˚/sec
• Pan/Tilt Speed Min. 0.01º/sec, Max. 600º/sec                             • RS-485 (Half/Full)/RS-422 Control (Multi-Protocol support)                                                 Manual Tilt         0.01˚/sec ~ 180˚/sec
• Preset 512 ea, Auto Pan 4 ea, Pattern 3 ea                               • Multi-Language OSD (E, F, G, S, I, J, R, P, C, etc) support                                                Preset Tilt         600˚/sec
• Wide Dynamic Range (NTSC 128x, PAL 160x) : SCC-C7455 Only                • Intelligent Video (Moved/Fixed/Fence/Tracking)                                     Range                   Panning / Tilting   0˚~360˚(Endless) / -6˚~186˚
• Virtual Progressive Scan (VPS) : SCC-C7455 Only                          • Alarm Input 8 ea, Output 4 ea                                                      Number of Auto PAN                          4 ea
• Day Night Function (ICR), Sens-up Function (512x)                        • Operating Temp. : -50 ~ 50˚C                                                       Number of Preset                            512 ea
                                                                                                                                                                Number of Pattern                           3 ea
                                                                                                                                               Functions        Number of Privacy Zone                      12 ea
                                                                                                                                                                Day/Night / Motion Detection                Auto / Day / Night(ICR) / Yes, Sensitivity 1~7 Level
                                                                                                                                                                Wide Dynamic Range                          -                                                               Yes (NTSC:128x, PAL:180x)
Dimensions (unit:mm)                                                                                                                                            D-Zoom / High Speed Shutter                 Yes(~16x) / 1/100~1/10K sec
                                                                                                                                                                Sens Up / BLC                               Yes(2x ~ 512x) / Off/On
                                                                                                                                                                AGC                                         Off/On (Very Low / Low / Mid / High / Very High / User / Fix)
                                                                                                                                                                Auto Focus                                  Manual / Auto (pan, tilt, zoom linked) / one AF
                                                                                                                                                                Syncronization                              Internal / Line lock
                                                      256




                                                                                                                                                                Camera ID                                   Max 54 Character, 2 Line
                                                       240




                                                                                                                                                                VPS(Virtual Progressive Scan)               -                                                               Yes
                                                                                                                                                                XDR(eXtended Dynamic Range)                 Off/On(Low/Middle/High)
                                                                                                                                                                DNR(Digital Noise Reduction)                Off/On(Low/Middle/High/User(3D/2D))
                                                                                                                                                                Schedule                                    Day / Time Schedule
                                                                     228
                                                                                                                                                                White Balance                               ATW1 / ATW2 / AWC(Manual) / 3200 / 5600
                                                                                                                                               Video Output     VBS 1.0Vp-p                                 VBS 1.0Vp-p
                                                                                                                                               S/N Ratio                                                    52 dB
                                                                                                                                               Lens             Focal Length / Min. Object Distance         3.2 ~ 138.5mm / 100cm
Easy Installation                                                                                                                                               Zoom Ratio / Aperature Ratio                43x Optical (688x with 16x Digital zoom) / F1.65(W)/F3.7(T)
                                                                                                                                                                Viewing Angle          Tele                 1.47˚(H) x 1.10˚(V)0
                                                                                                                                                                                       Wide                 61.22˚(H) x 47.16˚(V)
                                                                                                                                                                Lens Drive Type / Mount Type                DC Auto Iris / Board-in type
                                                                                                                                               OSD                                                          Yes
                                                                                                                                               Alarm            Input / Output                              8 ea / 3 ea (2 Open Collector, 1 relay)
                                                                                                                                               Remote Control                                               RS485(Half/Full Duplex) / RS422, CCVC
                                                                                                                                               Environmental    Operating Temperature                       -50˚C ~ +50˚C
                                                                                                                                               Conditions       Operating Humidity                          Less than 90%
                                                                                                                                               Power            Power Requirement                           24 VAC
                                                                                                                                                                Power Consumption                           16W / 47W(with fan/Heater)
                                                                                                                                                                LED Indicator                               Yes
                                                                                                                                               Physical         Dimensions                                  228(Ø) x 256(H)mm
                                                                                                                                               Specification    Weight                                      3.0kg
                                                                                                                                                                Color                                       Light Gray



                                                                                                                                                                                                                                                                                                        Samsung Video Security System | 72 . 73
Indoor / Outdoor Housing                                                                                                                                                        Outdoor Housing

SHG-120/220                                                                                                                                                                     SHG-222


Features                                                               Specifications                                                                                           Features                                            Specifications
SHG-120                                                                Model                            SHG-120                                 SHG-220                         • Hanging mount adaptor(included)                   Model                              SHG-222
• For indoor use                                                       Dimensions                       174(Ø) x 188(H)mm                       266(Ø) x 273(H)mm               • Outdoor use                                       Materials                          Aluminum & Plastic
• The place of installation should be able to bear up to 4 times       Weight                           1,200g                                  3,700g                          • Solid structure                                   Dimensions                         258(Ø) x 422(H)mm
  of the total product weight (about 32Kg).                            Operating Temperature            -10 ~ +50ºC                             -40 ~ +50ºC
                                                                                                                                                                                • Aluminum/plastic material
                                                                                                                                                                                                                                    Weight                             3,800g
• Aluminum material                                                                                                                                                             • Applicable camera : SCC-C6433/C6435
                                                                       Operating Humidity               0 ~ 90%                                 0 ~ 100%                                                                            Operating Temperature              -40~+50˚C
• IP 66
                                                                       Fan Operating                    -                                       Always                                                                              Operating Humidity                 0~100%
SHG-220                                                                Temperature                                                                                                                                                  Fan Operating                      Always
• For outdoor installation
                                                                       Heater Operating                 -                                       10ºC or below                                                                       Temperature
• Aluminum material
                                                                       Temperature                                                                                                                                                  Heater Operating                   Below 4˚C
• Built-in fan/heater function
                                                                       Accessories                      Screw(BH M3xL8) 2EA                     Screw(BH M3xL12) 3EA                                                                Temperature
• IP 66
                                                                                                                                                Pin 3EA
• Anti-vandal
                                                                                                                                                Silicon Grease 5g
                                                                                                                                                Teflon Tape 1EA                 Dimensions (unit:mm)                                Installation

                                                                                                                                                                                                                                                                         Camera
                                                                                                                                                                                                                                                    Screw                                                               Camera
Dimensions (unit:mm)                                                   Installation
                                                                                                                                                                                                                                                                                                                                    Screw Taptite


                                                                                  SHG-120
          SHG-120                                                                                                                                                                                                                                                                                                          Bracket Lock
                                                                                        Cover Top                                                                                                                                                         Cover Dome
                                          1/2” NPT PiPE THREAD
                                                                                                                                        Lever

                                                                                  Boss
                                  188




                                                                                                                                                                                                                                                                        Guide Hole
                                                                 185




                                                                                                                                                                                                                                                                                                                            Arrow
                                                                                                                                                                                                                                                Camera
                                                                                                       Camera                                                                                                                                   Adaptor
                                                                                                       Adaptor




                                                                                                                                                                                                                        411
                                                                                                                                                                                                                              422
                                                                                                                                                                                                                                                                                                                                                               Arrow
                  174                                                                               Lever                   Case Body                           Camera
                                                                                                                                 Boss                           Adaptor

                                                                                                                                                                                                                                                                               Guide      CAMERA ADAPTOR                  Bracket
          SHG-220                                                                 SHG-220                                                                                                                                                                                                                     GUIDE
                                                                                                                                                                                                                                                                                                                          Lock
                                                                                                                                                                                                                                                                                 Camera   CAMERA              HOLE
                                                                                            Camera
                                             1/2” NPT PiPE THREAD                           Adaptor
                                                                                                                              Camera                                                                      168                                                                                                 GUIDE
                                                                                                                              Adaptor                                                                                                                                                                                                SCREW FIXING HOLE
                                   172




                                                                                                                                                                          Pin                             258
                                 273




                                                                                                                                  Camera
                                                                                                                                                                                                                                                                                                                                                       Cover
                                                                                                                                                                                                                                                                                                                                                       home
                                                                                 Boss                                                                                                                                                           Cover                  Cover    Cover       Holder
                 168                                                                                                                                                                                                                            Front                  rear     home        Housing   Cover                                            Guide
                                                                                                                                                                                                                                                                                                      Front           Cover Cover
                                                                                               Lever                                                                                                                                                                                                                  rear Front               Cover
                 266                                                                                                                                                                                                                                                                                                                           rear
                                                                                                                                                                                                                                                                               Guide




                                                                                                                                                                                                                                                                                                                                 Samsung Video Security System | 74 . 75
Wall Mount Adaptor                                                                                                                                  Wall Mount Adaptor

SADT-100WM/101WM                                                                                                                                    SADT-103WM
SADT-102WM                                                                                                                                          SADT-104WM


Features                                 Specifications                                                                                             Features                                Specifications
• Indoor/outdoor use                     Model                    SADT-100WM                          SADT-101WM             SADT-102WM             SADT-103WM                              Model                     SADT-103WM                   SADT-104WM
• Solid structure                        Material                 Aluminum                                                                          • Wall mount adaptor                    Materials                 Aluminum                     Plastic
• Aluminum material                      Dimensions               118(Ø) x 183(H) x 241(W)mm                                                        • Indoor/outdoor use                    Dimensions                114(W) x 200(D) x 223(H)mm   114(W) x 200(D) x 242(H)mm
• Gasket provides waterproof function    Weight                   800g
                                                                                                                                                    • Solid structure                       Weight                    1,250g                       241g
• Screws included, for camera mounting                                                                                                              • Aluminum material                     Operating Temperature     -40 ~ +50˚C                  -10 ~ +50˚C
                                         Operating Temperature    -40 ~ +50˚C
                                                                                                                                                    • Applicable camera : SCC-C7433/C7435
                                         Operating Humidity       0~100% RH                                                                                                                 Operating Humidity        0~100%                       -
                                                                                                                                                    • Applicable housing : SHG-222
                                         Accessory                Gasket 1EA, Cable Grand (PG-11, PG-13.5), Back Plate 1EA
                                                                                                                                                    SADT-104WM
                                                                  Back Plate 1EA
                                                                                                                                                    • Wall mount adaptor
                                                                  Screw(FH M3xL6) 6EA
                                                                                                                                                    • Indoor use
                                                                  Screw(PH M4xL22) 2EA                Screw(PM M4xL22) 2EA   Screw(PM M4xL22) 4EA
                                                                                                                                                    • Solid structure
                                         Applicable Camera        SCC-641/643A                        SCC-931T               SCC-C9302
                                                                                                                                                    • Plastic material
                                                                  SCC-C640X                                                  SCC-B539X              • Applicable camera : SCC-C6433/C6435

Dimensions (unit:mm)                     Installation

                                                                                                                              Wall
       SADT-100WM/101WM/102WM                        SADT-100WM                                                               Mount
                                                                                                                              Adaptor


                                                                                                                              Boss
                                                                                                                                                    Dimensions (unit:mm)
                                                                                                                              Gasket
                                                                                Back
                                                                                Plate
                                                                    Gasket                                                                                       SADT-103WM                                         SADT-104WM
                                                          Wall Mount                                                          Gasket
                                                           Adaptor
                                                                                                                              Attachment After
                                                                                                SHG-220                       Separating
                                                                                                                              Dummy Plate



                                                                                                                                Wall
                                                     SADT-101WM                                                                 Mount
                                                                                                                                Adaptor




                                                                                    Back
                                                                                    Plate
                                                                       Gasket
                                                              Wall Mount
                                                               Adaptor




                                                                                                                                 Wall
                                                     SADT-102WM                                                                  Mount
                                                                                                                                 Adaptor




                                                                                        Back
                                                                                        Plate
                                                                           Gasket
                                                              Wall Mount
                                                               Adaptor



                                                                                                                                                                                                                                                        Samsung Video Security System | 76 . 77
Wall Mount / Celling Mount Adaptor                                                                                                     Wall Mount Adaptor

SADT-732WM/732CM                                                                                                                       SADT-937WM


Features                                                  Specifications                                                               Features                                           Specifications
• Material : Aluminum                                     Model                   SADT-732WM                     SADT-732CM            • Weight : 800g                                    Model                        SADT-937WM
• Operating temperature : -40˚C ~ 50˚C                    Material                Aluminum                                             • Material : Aluminum                              Material                     Aluminum
• Operating humidity : 0~100%                             Dimensions              38(Ø) x 233(H) x 163.75(W)mm   112.6(H) x 330(W)mm
                                                                                                                                       • Operating temperature : -40˚C ~ 60˚C             Dimensions                   118(Ø) x 183(H) x 241(W)mm
• Weight                                                                                                                               • Operating humidity : 0~100%
                                                          Weight                  500g                           550g                                                                     Weight                       800g
  SADT-732WM : 500g         SADT-732CM : 550g                                                                                          • Applicable camera : SCC-C6323/C6325, SNC-C6225
                                                          Operating Temperature   -40 ~ +50˚C                                                                                             Operating Temperature        -40˚C ~ 60˚C
• Applicable camera : SCC-C7325, SNC-C7225                                                                                                                    SCC-B9374
                                                          Operating Humidity      0~100% RH                                                                                               Operating Humidity           0~100% RH
                                                                                                                                                                                          Accessory                    Gasket 1EA, Cable Grand(PG-11, PG-13.5), Back Plate 1EA
                                                                                                                                                                                                                       Back Plate 1EA
                                                                                                                                                                                                                       Screw(FH M3xL6) 6EA
                                                                                                                                                                                                                       Screw(PM M4xL22) 2EA
Dimensions (unit:mm)


           SADT-732WM                                                             SADT-732CM

                 163.75                38

                                                                                                                                       Dimensions (unit:mm)                               Installation
                                            233




                                                                                                                                                                                                                                                                                        Wall
                                                                        112.6
                                                                   46




                                                                                                                                                                                                                                                                                        Mount
                                                                                                                                                                                                                                                                                        Adaptor

                                                  112.6


                                                                                                                                                                                                                           Back
                                                                                                                                                                                                                           Plate
                                                                                                                                                                                                                  Gasket
                                                                                                                                                                                                         Wall Mount
                                                                                                                                                                                                          Adaptor




                                                                                                                                                                                                                                                                 Samsung Video Security System | 78 . 79
Ceiling Mount Adaptor                                                                                                                                                                                      Hanging Mount Adaptor

SADT-100EC/101EC                                                                                                                                                                                           SADT-100HM


Features                                      Specifications                                                                                                                                               Features                                Specifications
SADT-100EC                                    Model                                   SADT-100EC                                                       SADT-101EC                                          • Hanging mount adaptor                 Model                   SADT-100HM
• Ceiling mount bracket                       Materials                               Plastic                                                                                                              • Indoor use                            Materials               Aluminum
• Plastic material                            Dimensions                              235(Ø) x 210(H)mm                                                                                                    • Solid structure                       Dimensions              117(Ø) x 68(H)mm
• Applicable camera : SCC-641/643,                                                                                                                                                                         • Aluminum material                     Weight                  259g
                                              Weight                                  765g                                                             792g
                      SCC-C6403/C6405/C6407                                                                                                                                                                • Applicable camera : SCC-C6433/C6435
                                              Operating Temperature                   -10 ~ +50ºC                                                                                                                                                  Operating Temperature   -10 ~ +50ºC
SADT-101EC
                                                                                                                                                                                                                                                   Applicable camera       SCC-C6433/C6435
• Ceiling mount bracket
• Plastic material
• Applicable camera : SCC-C6433/C6435

                                                                                                                                                                                                           Dimensions (unit:mm)

Dimensions (unit:mm)                          Installation




                                                                                                                                                                                                                                         117
     SADT-100EC                                        SADT-100EC
                                                                                                                          Hole for fixing a screw




                                                                                                                                                                                                                                                            68
                                                                                         Camera Adaptor
                               210




                                                                                                                                   Lever Rock
                         32




                                                                                                                     Turn to the clockwise
               235                                                                                                   about 15 degrees

                                                                                                                Ceiling Mount
                                                                                                                Adaptor



                                                                               Cover Body




     SADT-101EC                                        SADT-101EC
                                                                          Camera                                                   Guide Boss
                                                                                    Guide Boss                                                                                   Camera Adaptor
                                                                           Screw (M2xL8)                                                                                         Guide Hall
                                210




                                                                                                                                                                                                  Guide
                                                                                                                                                                                 Guide             Hall
                                                                                                                                                     Connector
                                                                               Braket Lock
                          32




                                                                                                                                   Braket Lock                                 Camera              Guide
                                                                                                                   Camera
               235



                                                                                                                                  Ceiling Mount
                                                                                                                                  Adaptor



                                                                                                        Cover Body



                                                  * Conditions for Installation : The installation place should be able to bear up to 4 times of the total product weight (about 16Kg).
                                                                                  This product is to be used when the thickness of the ceiling board is less than 40mm.
                                                                                  This product requires a minimum of 180mm space above the ceiling board.

                                                                                                                                                                                                                                                                                              Samsung Video Security System | 80 . 81
Ceiling Mount / Corner Mount / Pole Mount Adaptor                                                                                                                                                      Wall Mount / Ceiling Mount / Hanging Mount / Parapet Mount

SADT-100CM/110CM                                                                                                                                                                                       SCX-300WM / 300CM                                                                                                                     NEW


SADT-100PM                                                                                                                                                                                             300HM / 300LM


Features                                            Specifications                                                                                                                                     Features                                                          Specifications
SADT-100CM                                          Model                                SADT-100CM                                SADT-110CM                     SADT-100PM                           SCX-300WM, SCX-300LM                    SCX-300HM                 Model                     SCX-300WM                  SCX-300CM      SCX-300HM             SCX-300LM
• Indoor/outdoor use                                Material                            Metallic                                                                                                       • Wall mount adaptor                    • Hanging mount adaptor   Material                  Aluminum                                                        Steel
• Solid structure                                   Weight                              1,200g (including the pipe)                2,100g                         1,400g                               • Indoor/outdoor use                    • Indoor/outdoor use      Weight                    850g                       700g           500g                  3500g
• Metallic material                                 Operating Temperature               -40 ~ +50˚C                                                                                                    • Aluminium material                    • Aluminium material      Operating Temperature     -50˚C ~ 60˚C
                                                    Operating Humidity                  0 ~ 100%                                                                                                                                                                         Operating Humidity        0 ~ 100%
SADT-100PM                                                                                                                                                                                             SCX-300CM
                                                    Accessory                           1.5" NPT Pipe(300mm) 1EA                   Stainless Bolt 4EA             Stainless Steel Mounting Strap 2EA
SADT-110CM                                                                                                                                                                                             • Ceilling mount adaptor
• Indoor or outdoor applications                                                        Decoration Cover 1EA                       Spring Washer 4EA              Stainless Bolt 4EA
                                                                                                                                                                                                       • Indoor/outdoor use
• Supports up to 88 pounds(40kg) : SADT-100PM                                           Cable Grand(PG-13.5) 2EA                                                  Spring Washer 4EA
                                                                                                                                                                                                       • Aluminium material
• Supports up to 97 pounds(44kg) : SADT-110CM
• Metallic body




Dimensions (unit:mm)                                Installation                                                                                                                                       Dimensions (unit:mm)

     SADT-100CM              1/2” NPT PiPE THREAD                    SADT-100CM
                                                                                             Concreate Ceiling                                                                                                         SCX-300WM
                                                                                                                                                                                                                                                                                                 SCX-300CM
                                                                                                                                                Ceiling Board                                                                                  52
                                                                                                                                                1.5” NPT Pipe
                                                                                                                                                                                                                                  112                     276.5




                                                                                                                                                                                                                                                                                                                                                          130
                                                                                                                                                Decoration Cover
                                                                                                                                                Teflon Tape

                                                                                                                                                Housing




                                                                                                                                                                                                                                              183
                                                                                                                                                                                                                                                                                                      100                            305.5




     SADT-100PM                                                      SADT-100PM                      Cable grand




                                                                                                                                                                                                                                                                                                                                                    297
                                                                                                                                                                                                                       SCX-300HM                                                                 SCX-300LM
                                                                                                                                      Stainless Steel
                                                                                                           Back Plate                 Mounting Strap
                                                                                                                   Pole Mount Adaptor
                                                                                              Wall Mount Adaptor




                                                                                                                                                                                                                                                                  178
     SADT-110CM                                                      SADT-110CM




                                                                                                                                                                                                                                                                                                                                                    897
                                                                                                  Cable grand                                                                                                                                                                                                      11
                                                                                                                                                                                                                                                                                                              8-
                                                                                                                                                                                                                                        178                  53




                                                                                                                                                                                                                                                                                                                   80 90 80
                                                                                                           Back Plate                                                                                                                                                                                250                             668
                                                                                             Wall Mount Adaptor     Corner Mount Adaptor



                                                    * Conditions for Installation : When installing outdoors, stainless steel must be used for the connecting materials (i.e. screws).

                                                                                                                                                                                                                                                                                                                                                    Samsung Video Security System | 82 . 83
Pole Mount / Corner Mount Adaptor                                                           Dome Flush Housing

SCX-300PM / 300KM                                                             NEW
                                                                                            SCX-DF300W                                            NEW




Features                               Specifications                                       Features                                 Specifications
SCX-300PM                              Model                   SCX-300PM        SCX-300KM   • Indoor Flush Mounting                  Model                   SADT-100HM
• Pole mount adaptor for SCX-300WM     Material                Steel                        • PC (Polycarbonate, Plastic) material   Material                PC (Polycarbonate, Plastic)
• Indoor/outdoor use                   Weight                  1,400g           2,200g      • Applicable Camera: SCC-C6437/C6439,    Weight                  702g
• Steel material                                                                                                 SCC-C6453/C6455     Operating Temperature   -10 ~ +50ºC
                                       Operating Temperature   -50˚C ~ 60˚C
                                       Operating Humidity      0 ~ 100%                                                              Operating Humidity      0 ~ 90%
SCX-300KM
• Corner mount adaptor for SCX-300WM
• Indoor/outdoor use
• Steel material




Dimensions (unit:mm)                                                                        Dimensions (unit:mm)

      SCX-300PM
                                                                                                          152.2




                                                                                                                             248
                                                                                                                       168
                                                                                                           257




      SCX-300KM




                                                                                                                                                                                           Samsung Video Security System | 84 . 85
Ceiling-Mount Bracket

SBR-100DCM


Features
• Solid structure
                                  Specifications
                                  Model                                                    SBR-100DCM
                                                                                                                                                                            MONITOR
• Metallic material               Material                                                 Metallic
                                  Dimensions                                               196x160mm
                                  Weight                                                   700g
                                  Operating Temperature                                    -10 ~ +50˚C
                                  Accessory                                                Safety Wire 1EA
                                                                                           Safety Bracket 1EA
                                                                                           Template A 1EA
                                                                                           Template B 1EA
                                                                                           L-Shaped BNC Adaptor 1EA




Dimensions (unit:mm)              Installation



                                                                                            Nut
                                                                                                  Nut



                                                                                                                                                                            LCD Monitor
                            160




                                                                         Turn Clockwise                                                                                     SMT-1712/1912            SMT-1722/1922   SMT-1723/1923   SMT-3222/4022
                                                                                                                                                               Cover Body


                      196



                                                                                                                                                                            Flat Color CRT Monitor
                                                                                                                                                                            SMC-145                  SMC-215


                                  * Conditions for Installation : The installation place should be able to bear up to 4 times the total product weight (about 16Kg).
                                                                  This product is to be used when the thickness of the ceiling board is less than 40mm.
                                                                  This product requires a minimum of 180mm space above the ceiling board.

09 10 vss cameras

  • 1.
    ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: Camera Box & Zoom Lens SCC-C4239/C4339 39 SCC-B5396/B5398 53 Accessories SCC-B1311/B1011 23 SCC-C4253/C4353 40 SCC-B5397/B5399 54 SHG-120/220 74 SCC-B9221 24 SCC-C4255/C4355 41 SmartDome SHG-222 75 SCC-B1331/B1031 25 IR SCC-641/643A 55 SADT-100WM/101WM/102WM 76 SCC-B2331/B2031 26 SCC-B9270 42 SCC-C6403 56 SADT-103WM/104WM 77 SCC-B2333/B2033 27 SCC-B9371/B9372/B9373 43 SCC-C6405 57 SADT-732WM/732CM 78 SCC-B2335/B2035 28 SCC-B9374 44 SCC-C6407 58 SADT-937WM 79 SCC-B2337/B2037 29 Dome SCC-C6433/C6435 60 SADT-100EC/101EC 80 SCC-A2333/A2033 30 SCC-931T 45 SCC-C7433/C7435 62 SADT-100HM 81 SCC-C4201/C4301 31 SCC-C9302(F) 46 SCC-C7478/C7478C 63 SADT-100CM/110CM/100PM 82 SCC-C4203A/C4303A 32 SCC-B5342/B5344 47 SCC-C6323/C6325/C7325 64 SCX-300WM/300CM/300LM/300HM 83 SCC-C4205/C4305 33 SCC-B5343/B5345 48 SCC-C6437/C6439 66 SCX-300PM / 300KM 84 SCC-C4207/C4307 34 SCC-B5223 49 SCC-C7437/C7439 68 SCX-DF300W 85 SCC-C4233/C4333 36 SCC-B5331/B5333/B5335 50 SCC-C6453/C6455 70 SBR-100DCM 86 SCC-C4235/C4335 37 SCC-B5366/B5368 51 SCC-C7453/C7455 72 SCC-C4237 38 SCC-B5367/B5369 52 Monitor LCD Monitor SMT-1722/1922 93 SMT-3222/4022 95 SMC-145 96 SMT-1712/1912 92 SMT-1723/1923 94 Flat Color Monitor SMC-215 97 DVR Standalone DVR SHR-6163/6164 109 SHR-8160/8162 113 Hybrid PC DVR SHR-6040/6042 106 SHR-7080/7082 110 SHR-3040 114 SNR-1162 116 SHR-6080/6082 107 SHR-7160/7162 111 PC base DVR SHR-6160/6162 108 SHR-8080/8082 112 SPR-9716/9816 115 Network VMS Network Camera SNC-M300 130 SNC-B5368 136 NET-i Viewer 119 SNC-B2315 126 SNC-B2331 132 SNC-B5399 138 NET-i Ware 120 SNC-B5395 128 SNC-B2335 134 SNC-C7478/C7478C 140 SNC-C6225/C7225 142 Controller SSC-1000 145 SSC-5000 146 SCX-RD100 147 EZ View SHR-1041K 150 * “N” stands for NTSC. “P” stands for PAL.
  • 2.
    Video Security System PRODUCTLine Up :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: : CAMERA : CAMERA Box & Zoom Lens Box & Zoom Lens Dome SmartDome NEW NEW High Resolution Color Camera 34x Optical Zoom Lens Camera Super High-Resolution Day/Night Dome Camera 34x Optical Zoom High Speed Dome Camera SCC-B1311/B1011 | 23P | 38P SCC-B5331/B5333/B5335 | 50P | 66P SCC-C4237 SCC-C6437/C6439 NEW NEW Bullet Type Camera 34x Optical Zoom Lens Camera Super High-Resolution Day/Night Dome Camera 34x Optical Zoom High Speed Dome Camera SCC-B9221 | 24P | 39P SCC-B5366/B5368 | 51P SCC-C7437/C7439 | 68P SCC-C4239/C4339 NEW NEW Super High-Resolution Camera 43x Optical Zoom Lens Camera Super High-Resolution Day/Night WDR Dome Camera 43x Optical Zoom High Speed Dome Camera SCC-B1331/B1031 | 25P SCC-C4253/C4353 | 40P SCC-B5367/B5369 | 52P | 70P SCC-C6453/C6455 NEW NEW Super High-Resolution Day/Night Camera 43x Optical Zoom Lens Camera Super High-Resolution Day/Night Anti-Vandal Dome Camera 43x Optical Zoom High Speed Dome Camera SCC-B2331/B2031 | 26P SCC-C4255/C4355 | 41P SCC-B5396/B5398 | 53P SCC-C7453/C7455 | 72P Super High-Resolution Day/Night Camera Super High-Resolution WDR Anti-Vandal Dome Camera SCC-B2333/B2033 | 27P SCC-B5397/B5399 | 54P IR Accessories Super High-Resolution Day/Night WDR Camera Bullet type IR LED Day/Night Camera Indoor / Outdoor Housing | 28P SCC-B9270 | 42P SHG-120/220 | 74P SCC-B2335/B2035 SmartDome Super High-Resolution Day/Night Camera Bullet type IR LED Day/Night Camera 22x Zoom SmartDome Camera Outdoor Housing | 29P | 43P | 55P | 75P SCC-B2337/B2037 SCC-B9371/B9372/B9373 SCC-641/643A SHG-222 Super High-Resolution Day/Night Camera Anti-Vandal Dome IR LED Day/Night Camera 32x Zoom Day/Night SmartDome Camera Wall Mount Adaptor | 30P SCC-B9374 | 44P | 56P | 76P SCC-A2333/A2033 SCC-C6403 SADT-100WM/101WM/102WM 22x Zoom Lens Camera 22x Power Zoom Day/Night WDR SmartDome Camera Wall Mount Adaptor SCC-C4201/C4301 | 31P SCC-C6405 | 57P SADT-103WM/104WM | 77P Dome 22x Zoom Day/Night Camera Anti Vandal Dome Camera 32x Zoom Day/Night WDR SmartDome Camera Wall Mount / Celling Mount Adaptor SCC-C4203A/C4303A | 32P | 45P SCC-C6407 | 58P SADT-732WM/732CM | 78P SCC-931T 22x Zoom Day/Night WDR Camera Anti Vandal 3-Axis Day/Night, WDR Dome Camera High Resolution SmartDome Camera Wall Mount Adaptor | 33P SCC-C9302(F) | 46P | 60P SADT-937WM | 79P SCC-C4205/C4305 SCC-C6433/C6435 32x Zoom Day/Night WDR Camera Day/Night Vari-Focal Dome Camera High Resolution SmartDome Camera Ceiling Mount Adaptor | 34P SCC-B5342/B5344 | 47P SCC-C7433/C7435 | 62P SADT-100EC/101EC | 80P SCC-C4207/C4307 High Resolution 32x Zoom Camera Day/Night Vari-Focal Dome Camera 36x Zoom SmartDome Camera Hanging Mount Adaptor SCC-C4233/C4333 | 36P | 48P SCC-C7478/C7478C | 63P SADT-100HM | 81P SCC-B5343/B5345 High Resolution WDR 32x Zoom Camera Super High-Resolution Mini Dome Camera 10x Zoom Mini SmartDome Camera Ceiling Mount / Corner Mount / Pole Mount Adaptor SCC-C4235/C4335 | 37P | 49P SCC-C6323/C6325/C7325 | 64P SADT-100CM/110CM/100PM | 82P SCC-B5223
  • 3.
    Video Security System PRODUCTLine Up :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: : CAMERA : DVR : NETWORK : CONTROLLER Accessories Standalone DVR Network Camera NEW Wall Mount / Ceiling Mount / Hanging Mount / Parapet Mount 4Ch Standalone DVR Dual Codec D1 Real-time Network Camera System Controller SCX-300WM / 300CM / 300HM / 300LM | 83P SHR-6040/6042 | 106P SNC-B2315 | 126P SSC-1000 | 145P NEW Pole Mount / Coner Mount Adaptor 8Ch Standalone DVR Dual Codec Anti-Vandal Dome Network Camera TFT Color LCD Touch Screen System Keyboard SCX-300PM / 300KM | 84P | 107P | 128P SSC-5000 | 146P SHR-6080/6082 SNC-B5395 NEW Dome Flush Housing 16Ch Standalone DVR 3 Mega-Pixel Network Camera System Controller SCX-DF300W | 85P SHR-6160/6162/6163/6164 | 108P SNC-M300 | 130P SCX-RD100 | 147P NEW Ceiling-Mount Bracket 8Ch CIF Resolution Real-time Standalone DVR H.264 4CIF Real-Time Network Camera SBR-100DCM | 86P SHR-7080/7082 | 110P SNC-B2331 | 132P 16Ch CIF Resolution Real-time Standalone DVR NEW H.264 4CIF Real-Time WDR Network Camera : EZ VIEW SHR-7160/7162 | 111P SNC-B2335 | 134P : MONITOR 8Ch D1 Resolution Real-time Standalone DVR NEW H.264 WDR Mini Dome Network Camera EZ View : 4Ch Real-time DVR SHR-8080/8082 | 112P | 136P SHR-1041K | 150P LCD Monitor SNC-B5368 NEW NEW 17"/19" TFT-LCD Monitor 16Ch D1 Resolution Real-time Standalone DVR H.264 Anti-vandal Dome Network Camera SMT-1712/1912 | 92P | 113P SNC-B5399 | 138P SHR-8160/8162 17"/19" TFT-LCD Monitor 4Ch Real-time Standalone DVR 36x Zoom SmartDome Network Camera SMT-1722/1922 | 93P SHR-3040 | 114P SNC-C7478/C7478C | 140P 17"/19" TFT-LCD Monitor 10x Zoom Mini SmartDome Network Camera SMT-1723/1923 | 94P SNC-C6225/C7225 | 142P PC base DVR 32"/40" TFT-LCD Monitor 16Ch PC Based DVR SMT-3222/4022 | 95P SPR-9716/9816 | 115P Hybrid PC DVR Flat Color Monitor NEW Hybrid PC DVR 14" Flat Color CRT Monitor | 116P SMT-145 | 96P SNR-1162 21" Flat Color CRT Monitor SMT-215 | 97P
  • 4.
    CCD Camera ComparisonChart by Model :::::::::::::::::::::: Spec Imaging Total Synchronization Horizontal Min. Scene Power Day & Privacy Model Device Pixels Method Resolution Illumination S/N Ratio Lens Requirment Night WDR Zone AC24V SCC-B1311 1/3" 410K/470K Int./L.L 540 TV Lines 0.4Lux 50dB DC/Video No No No DC12V SCC-B1011 1/3" 470K Int./L.L 540 TV Lines 0.4Lux 50dB DC/Video AC220V No No No SCC-B9221 1/3" 410K Int. 480 TV Lines 0.3Lux 48dB f=4.9mm DC12V No No No CAMERA SCC-B1331 1/3" 410K/470K Int./L.L 600 TV Lines 0.12Lux 52dB DC/Video AC24V DC12V No No Zone-12 AC220V Zone-12 SCC-B1031 1/3" 470K Int./L.L 600 TV Lines 0.12Lux 52dB DC/Video ~240V No No (Mosaic) AC24V Zone-12 SCC-B2331 1/3" 410K/470K Int./L.L 600 TV Lines 0.0002Lux 52dB DC/Video Yes No (Mosaic) DC12V AC220V Zone-12 SCC-B2031 1/3" 470K Int./L.L 600 TV Lines 0.0002Lux 52dB DC/Video Yes No (Mosaic) ~240V AC24V Zone-12 SCC-B2333 1/3" 410K/470K Int./L.L 600 TV Lines 0.00002Lux 52dB DC/Video Yes No (Mosaic) DC12V AC220V Zone-12 SCC-B2033 1/3" 470K Int./L.L 600 TV Lines 0.00002Lux 52dB DC/Video Yes No (Mosaic) ~240V AC24V Zone-12 SCC-B2335 1/3" 410K/470K Int./L.L 600 TV Lines 0.00002Lux 52dB DC/Video DC12V Yes Yes (Mosaic) Box & Zoom Lens SCC-B1311/B1011 SCC-B2335/B2035 SCC-C4205/C4305 SCC-C4239/C4339 AC220V Zone-12 SCC-B2035 1/3" 470K Int./L.L 600 TV Lines 0.00002Lux 52dB DC/Video Yes Yes (Mosaic) SCC-B9221 SCC-B2337/B2037 SCC-C4207/C4307 SCC-C4253/C4353 ~240V SCC-B1331/B1031 SCC-A2333/A2033 SCC-C4233/C4333 SCC-C4255/C4355 SCC-B2331/B2031 SCC-C4201/C4301 SCC-C4235/C4335 SCC-B2333/B2033 SCC-C4203A/C4303A SCC-C4237 AC24V Zone-12 SCC-B2337 1/3" 410K/470K Int./L.L 600 TV Lines 0.00002Lux 50dB DC/Video Yes No (Mosaic) DC12V IR AC220V Zone-12 SCC-B9270 SCC-B9371/B9372/B9373 SCC-B9374 SCC-B2037 1/3" 470K Int./L.L 600 TV Lines 0.00002Lux 50dB DC/Video Yes No (Mosaic) ~240V Dome AC24V Zone-12 SCC-A2333 1/2" 410K/470K Int./L.L 600 TV Lines 0.0000006Lux 50dB DC/Video Yes No (Mosaic) DC12V SCC-931T SCC-B5344/B5345 SCC-B5366/B5367 SCC-B5396/B5397 SCC-C9302(F) SCC-B5223 SCC-B5368/B5369 SCC-B5398/B5399 SCC-B5342/B5343 SCC-B5331/B5333/B5335 Zone-12 AC220V SCC-A2033 1/2" 410K Int./L.L 600 TV Lines 0.0000006Lux 50dB DC/Video Yes No (Mosaic) ~240V SmartDome 22x Zoom SCC-641/643A SCC-C6407 SCC-C7478/C7478C SCC-C7437/C7439 SCC-C4201 1/4" 410K/470K Int. 480 TV Lines 0.0005Lux 52dB (f=3.6~ DC12V No No No SCC-C6403 SCC-C6433/C6435 SCC-C6323/C6325/C7325 SCC-C6453/C6455 79.2mm) SCC-C6405 SCC-C7433/C7435 SCC-C6437/C6439 SCC-C7453/C7455 22x Zoom AC24V SCC-C4301 1/4" 410K/470K Int./L.L 480 TV Lines 0.005Lux 52dB (f=3.6~ No No No Accessories DC12V 79.2mm) SHG-120/220 SADT-732WM/732CM SADT-100CM/110CM/100PM SCX-300PM / 300KM 22x Zoom SHG-222 SADT-937WM SBR-100DCM SCX-DF300W (f=3.6~ SCC-C4203A 1/4" 410K/470K Int. 480 TV Lines 0.0005Lux 50dB DC12V Yes No No SADT-100WM/101WM/102WM SADT-100EC/101EC SCX-300WM / 300CM / 300LM / 300HM 79.2mm) SADT-103WM/104WM SADT-100HM
  • 5.
    CCD Camera ComparisonChart by Model : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : Spec Imaging Total Synchronization Horizontal Min. Scene Power Day & Privacy Spec Imaging Total Synchronization Horizontal Min. Scene Power Day & Privacy Model Device Pixels Method Resolution Illumination S/N Ratio Lens Requirment Night WDR Zone Model Device Pixels Method Resolution Illumination S/N Ratio Lens Requirment Night WDR Zone 22x Zoom AC24V f=3.8~ AC24V SCC-C4303A 1/4" 410K/470K Int./L.L 480 TV Lines 0.0005Lux 50dB (f=3.6~ DC12V Yes No No SCC-B9372 1/3" 470K Int. 540 TV Lines 0Lux 48dB 9.5mm DC12V Yes No No 79.2mm) 22x Zoom f=6~ AC24V SCC-C4205 1/4" 410K/470K Int. 480 TV Lines 0.0002Lux 50dB (f=3.6~ DC12V Yes Yes No SCC-B9373 1/3" 410K/470K Int. 540 TV Lines 0Lux 48dB 50mm DC12V Yes No No 79.2mm) 22x Zoom AC24V f=3.8~ AC24V SCC-C4305 1/4" 410K/470K Int./L.L 480 TV Lines 0.0002Lux 50dB (f=3.6~ DC12V Yes Yes No SCC-B9374 1/3" 410K/470K Int. 540 TV Lines 0Lux 48dB Yes No No 9.5mm DC12V 79.2mm) 32x Zoom 12x Zoom Zone-8 AC24V SCC-C4207 1/4" 410K/470K Int. 480 TV Lines 0.0002Lux 50dB (f=3.55~ DC12V Yes Yes SCC-931T 1/4" 410K/470K Int./L.L 480 TV Lines 0.005Lux 52dB (f=3.6~ No No No (Mosaic) DC12V 113mm) 43.2mm) 32x Zoom 12x Zoom Zone-8 AC24V Zone-8 SCC-C4307 1/4" 410K/470K Int./L.L 480 TV Lines 0.0002Lux 50dB (f=3.55~ AC24V Yes Yes SCC-C9302(F) 1/4" 410K/470K Int./L.L 480 TV Lines 0.0002Lux 52dB (f=3.6~ Yes Yes (Mosaic) DC12V (Solid) 113mm) 43.2mm) 32x Zoom Zone-16 f=2.5~6mm/ AC24V SCC-C4233 1/4" 410K/470K Int. 540 TV Lines 0.0002Lux 50dB (f=3.55~ DC12V Yes No SCC-B5342/B5344 1/3" 410K/470K Int. 540 TV Lines 0.0009Lux 50dB Yes No No (Mosaic) f=2.9~10mm DC12V 113mm) 32x Zoom Zone-16 f=2.5~ AC24V SCC-C4235 1/4" 410K/470K Int. 540 TV Lines 0.0001Lux 50dB (f=3.55~ DC12V Yes Yes SCC-B5343 1/3" 410K/470K Int. 540 TV Lines 0.00009Lux 50dB Yes No No (Mosaic) 6.0mm DC12V 113mm) 32x Zoom AC24V Zone-16 f=2.9~ AC24V SCC-C4333 1/4" 410K/470K Int./L.L 540 TV Lines 0.0002Lux 50dB (f=3.55~ Yes No SCC-B5345 1/3" 410K/470K Int. 540 TV Lines 0.00009Lux 50dB Yes No No DC12V (Mosaic) 10mm DC12V 113mm) 32x Zoom Zone-16 SCC-C4335 1/4" 410K/470K Int./L.L 540 TV Lines 0.0001Lux 50dB (f=3.55~ DC12V Yes Yes (Mosaic) SCC-B5223 1/3" 410K/470K Int. 600 TV Lines 0.075Lux 52dB f=3.0mm DC12V No No No 113mm) NEW 34x Zoom AC24V Zone-12 SCC-C4237 1/4" 410K/470K Int. 600 TV Lines 0.0001Lux 52dB (f=3.4~ DC12V Yes No Zone-12 SCC-B5331 1/3" 410K/470K Int. 600 TV Lines 0.0006Lux 52dB f=3.8mm Yes No DC12V (Solid) 115.6mm) NEW 34x Zoom AC24V Zone-12 SCC-C4239 1/4" 410K/470K Int. 600 TV Lines 0.0001Lux 52dB (f=3.4~ DC12V Yes Yes Zone-12 SCC-B5333 1/3" 410K/470K Int. 600 TV Lines 0.0006Lux 52dB f=3.0mm Yes No DC12V (Solid) 115.6mm) NEW 34x Zoom AC24V AC24V Zone-12 SCC-C4339 1/4" 410K/470K Int./L.L 600 TV Lines 0.0001Lux 52dB (f=3.4~ Yes Yes Zone-12 SCC-B5335 1/3" 410K/470K Int. 600 TV Lines 0.0006Lux 52dB f=8.0mm Yes No DC12V DC12V (Solid) 115.6mm) NEW 43x Zoom f=2.5~ AC24V Zone-12 SCC-C4253 1/4" 410K/470K Int. 600 TV Lines 0.0001Lux 52dB (f=3.2~ DC12V Yes No Zone-12 SCC-B5366 1/3" 410K/470K Int. 600 TV Lines 0.0002Lux 52dB Yes No 6mm DC12V (Solid) 138.5mm) NEW 43x Zoom Zone-12 AC24V f=2.5~ AC24V SCC-C4353 1/4" 410K/470K Int./L.L 600 TV Lines 0.0001Lux 52dB (f=3.2~ Yes No Zone-12 SCC-B5367 1/3" 410K/470K Int. 600 TV Lines 0.00002Lux 52dB Yes Yes (Solid) DC12V 6mm DC12V 138.5mm) NEW 43x Zoom f=2.8~ AC24V Zone-12 SCC-C4255 1/4" 410K/470K Int. 600 TV Lines 0.0001Lux 52dB (f=3.2~ DC12V Yes Yes Zone-12 SCC-B5368 1/3" 410K/470K Int. 600 TV Lines 0.0002Lux 52dB Yes No (Solid) 11mm DC12V 138.5mm) NEW 43x Zoom AC24V f=2.8~ AC24V Zone-12 SCC-C4355 1/4" 410K/470K Int./L.L 600 TV Lines 0.0001Lux 52dB (f=3.2~ Yes Yes Zone-12 SCC-B5369 1/3" 410K/470K Int. 600 TV Lines 0.00002Lux 52dB Yes Yes DC12V 11mm DC12V (Solid) 138.5mm) SCC-B5396 f=2.5~ AC24V Zone-12 SCC-B9270 1/3" 320K Int. 350 TV Lines 0Lux 48dB f=4.3mm DC12V Yes No No 1/3" 410K/470K Int. 600 TV Lines 0.0002Lux 52dB 6mm DC12V Yes No (Solid) f=3.8~ AC24V f=2.8~ AC24V Zone-12 SCC-B9371 1/3" 410K/470K Int. 540 TV Lines 0Lux 48dB 9.5mm DC12V Yes No No SCC-B5398 1/3" 410K/470K Int. 600 TV Lines 0.0002Lux 52dB 11mm DC12V Yes No (Solid)
  • 6.
    CCD Camera ComparisonChart by Model : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : Spec Imaging Total Synchronization Horizontal Min. Scene Power Day & Privacy Spec Imaging Total Synchronization Horizontal Min. Scene Power Day & Privacy Model Device Pixels Method Resolution Illumination S/N Ratio Lens Requirment Night WDR Zone Model Device Pixels Method Resolution Illumination S/N Ratio Lens Requirment Night WDR Zone NEW 34x Zoom f=2.5~ AC24V Zone-12 SCC-B5397 1/3" 410K/470K Int. 600 TV Lines 0.00002Lux 52dB Yes Yes SCC-C7437 1/4" 410K/470K Int./L.L 600 TV Lines 0.00007Lux 52dB (f=3.4~ AC24V Yes No Zone-12 6mm DC12V (Solid) 115.6mm) NEW 34x Zoom f=2.8~ AC24V Zone-12 SCC-B5399 1/4" 410K/470K Int./L.L 480 TV Lines 0.0002Lux 50dB 11mm DC12V Yes Yes SCC-C7439 1/4" 410K/470K Int./L.L 600 TV Lines 0.00007Lux 52dB (f=3.4~ AC24V Yes Yes Zone-12 (Solid) 115.6mm) 22x Zoom NEW 43x Zoom SCC-641 1/4" 410K/470K Int./L.L 480 TV Lines 0.005Lux 52dB (f=3.6~ AC24V No No No SCC-C6453 1/4" 410K/470K Int./L.L 600 TV Lines 0.00007Lux 52dB (f=3.2~ AC24V Yes No Zone-12 79.2mm) 138.5mm) 22x Zoom NEW 43x Zoom Zone-8 SCC-643A 1/4" 410K/470K Int./L.L 480 TV Lines 0.0005Lux 52dB (f=3.6~ AC24V Yes No SCC-C6455 1/4" 410K/470K Int./L.L 600 TV Lines 0.00007Lux 52dB (f=3.2~ AC24V Yes Yes Zone-12 (Solid) 79.2mm) 138.5mm) 32x Zoom NEW 43x Zoom SCC-C6403 1/4" 410K/470K Int./L.L 480 TV Lines 0.0005Lux 50dB (f=3.55~ AC24V Yes No No SCC-C7453 1/4" 410K/470K Int./L.L 600 TV Lines 0.00007Lux 52dB (f=3.2~ AC24V Yes No Zone-12 113mm) 138.5mm) 22x Zoom NEW 43x Zoom Zone-8 SCC-C6405 1/4" 410K/470K Int./L.L 480 TV Lines 0.0002Lux 50dB (f=3.6~ AC24V Yes Yes SCC-C7455 1/4" 410K/470K Int./L.L 600 TV Lines 0.00007Lux 52dB (f=3.2~ AC24V Yes Yes Zone-12 (Mosaic) 79.2mm) 138.5mm) 32x Zoom Zone-8 SCC-C6407 1/4" 410K/470K Int./L.L 480 TV Lines 0.0002Lux 50dB (f=3.55~ AC24V Yes Yes (Mosaic) 113mm) 32x Zoom SCC-C6433 1/4" 410K/470K Int./L.L 540 TV Lines 0.0002Lux 50dB (f=3.55~ AC24V Yes No Zone-16 113mm) 32x Zoom SCC-C6435 1/4" 410K/470K Int./L.L 540 TV Lines 0.0001Lux 50dB (f=3.55~ AC24V Yes Yes Zone-16 113mm) 32x Zoom SCC-C7433 1/4" 410K/470K Int./L.L 540 TV Lines 0.0002Lux 50dB (f=3.55~ AC24V Yes No Zone-16 113mm) 32x Zoom SCC-C7435 1/4" 410K/470K Int./L.L 540 TV Lines 0.0001Lux 50dB (f=3.55~ AC24V Yes Yes Zone-16 113mm) 36x Zoom SCC-C7478 1/4" 410K/470K Int./L.L 540 TV Lines 0.00066Lux 50dB (f=3.4~ AC24V Yes Yes Zone-8 122.4mm) 36x Zoom SCC-C7478C 1/4" 410K/470K Int./L.L 540 TV Lines 0.00066Lux 50dB (f=3.4~ AC24V Yes Yes Zone-8 122.4mm) 10x Zoom SCC-C6323 AC24V 1/4" 410K/470K Int./L.L 520 TV Lines 0.00047Lux 50dB (f=3.8~ Yes No Zone-4 DC12V 38mm) 10x Zoom AC24V SCC-C6325 1/4" 410K/470K Int./L.L 520 TV Lines 0.00047Lux 50dB (f=3.8~ Yes No Zone-4 DC12V 38mm) 10x Zoom SCC-C7325 AC24V 1/4" 410K/470K Int./L.L 520 TV Lines 0.00047Lux 50dB (f=3.8~ Yes No Zone-4 DC12V 38mm) NEW 34x Zoom SCC-C6437 1/4" 410K/470K Int./L.L 600 TV Lines 0.00007Lux 52dB (f=3.4~ AC24V Yes No Zone-12 115.6mm) NEW 34x Zoom SCC-C6439 1/4" 410K/470K Int./L.L 600 TV Lines 0.00007Lux 52dB (f=3.4~ AC24V Yes Yes Zone-12 115.6mm)
  • 7.
    Video Security System Camera Terms & Features ::::::::::::::::::::::::::::::::::::::::::::::::::: Super High-Resolution Motion Adaptive DNR A1 camera technology eliminates false colour artifacts (Moire) by utilising a special optical low pass filter and is able to resolve a horizontal resolution of 600 TV The A1 DNR (Digital Noise Reduction) function eliminates noise thus generating a distinct and clear image. A1 technology utilises both an adaptive 2D filter lines, by means of 12 Bit A/D serial signal processing coupled with image element enhancement technology. Additionally, the implementation of a 3 line processing reducing noise in the brightness of the image and an adaptive 3D Filter reducing noise caused by movement. These filters are combined with DNIe technology algorithm to prevent noise under low illumination applications, directional adaptive filtering and adjustment of aperture gain by luminance level combine to provide which is applied to Samsung Electronics’ CCTV monitors. The result is that A1 camera series support Motion Adaptive DNR function that removes noise (Fixed a more vivid and clearer image. Pattern, Random, etc.) and greatly reduces motion blur. DNR OFF DNR ON conventional A1 Hi-Resolution Advanced Digital Filter eXtended Dynamic Range (XDR) Source Image CCD Raw Data False colour Artifacts Samsung A1 Camera image Under strongly backlit or high contrast scenes, cameras generally produce images which reproduce detail in the brighter area of the scene.(fig1) Consequently, detail is often lost in the darker areas of the scene. Samsung A1 cameras provide XDR technology to increase the level of visible detail in the dark areas, whilst maintaining image clarity and detail in the brighter portions of the image. (fig2) Correction in Dark Virtual Progressive Scan(VPS) Correction A1 camera models featuring WDR functions generate images using Double Scan CCD technology and these cameras provide VPS (Virtual Progressive Scan) in Bright operation which can utilise either Interlace or Progressive scanning methods. This VPS is unique to Samsung Electronics and ensures the edges of moving objects are clearly defined. Applications for Samsung cameras utilising this technology include highway and ANPR projects. When used with LCD monitors offering progressive scan operation, Samsung VPS produces visibly superior images to non-VPS cameras. The problems of the blurred edges resulting from Fig 1 – XDR OFF Fig 2 – XDR ON delays in even/odd field image scanning, are eliminated when VPS technology is used with a network product (encoder). Intelligent Video Content Analysis The Samsung Electronics A1 series of cameras, also provide built-in capability for video content analysis. Operational modes include: • Fixed : Senses objects that appear and remain in a scene for longer than a pre-determined period of time. • Moved : Detects objects removed from a scene Interlace Transmission (Delayed edge) VPS Transmission (Clear edge) • Fence : Provides virtual electronic area [Area mode] and directional line [Line mode] and generates an alarm in the event of a breach of the area or a cross of the directional line. • Tracking : Tracks an object through a scene and generates an alarm in the event of abnormal directional changes. Samsung Video Security System | 14 . 15
  • 8.
    Video Security System CameraTerms & Features :::::::::::::::::::::::::::::::::::::::::::::::::::::: Camera Control Via Coaxial cable 360˚ Endless, Lighting&Smooth Speed Vector Driving (Pan/Tilt moving simultaneously) The Samsung Electronics A1 series cameras offer CCVC (Camera Control Via Coaxial cable) via the video coaxial cable. This function provides access to the camera settings menu without connecting the any other control lines to the camera. This technology allows for camera set up (with the exception of lens focus) The camera supports 360˚ endless Pan and 180˚ Tilt functions at a very high speed (max 360˚/sec). Due to the micro-stepping technology, one step angle is to be performed remotely, thus simplifying the installation process and offering remote adjustment in real time. divided by 256. This allows high accuracy as well as ultra low noise levels (under 60dB). Micro-stepping technology also enables ultra low speeds down to 0.05˚/sec for high zooming operations. Using vector drive technology, Pan/Tilt motion is done simultaneously. Video Signal Video Signal 360 ˚ Endless Pan Control Signal A1 Cameras 180 ˚ Tilting Controller(SCX-RD100) Full Auto Focus Function DIS (Digital Image Stabilization) Cameras that adopted full auto focus function provide clear images every time. This feature reduce the blurring effect that occurs when either the camera or the subject is in motion during image capture, providing a sharp images Conventional Auto Focus ON DIS OFF DIS ON Auto white balance ELC (Electronic Level Control) Through the perfect Auto/Manual white balance function, these cameras ensure accurate representation of colors under any environment without producing a Cameras with ELC function can use the manual iris lens economically by automatically operate the shutter speed. By adopting ELC, output level of cameras can picture that is either more red or blue. be stable under any luminance level. This mechanism is designed to accommodate any C/CS lens mount adapter. Auto Iris ELC Appropriate amount of the lights Light CCD Adjusting the lights Conventional Auto white balance ON Samsung Video Security System | 16 . 17
  • 9.
    Video Security System CameraTerms & Features :::::::::::::::::::::::::::::::::::::::::::::::::::::: Privacy Zone Day / Night A "privacy zone" can be set if you desire to block viewing of specific areas in the picture. The Day & Night automatically switches to color mode during the day and to B/W mode during the night depending on the level of illumination which makes it ideally suitable for 24 hours-a-day surveillance. When in B/W mode the light sensitivity is enhanced. Privacy zone OFF Privacy zone ON Day Night WDR (Wide Dynamic Range) DNR (Digital Noise Reduction) WDR, much more sophisticatly improved Version of BLC, shows two files in one complex image, by utilizing high shutter speed in bright areas and The digital noise reduction (DNR) removes the video noise that occurs in video signals, particularly when Automatic Gain Control is used in low light low speed shutter in dark areas. When the camera detects an obvious difference in luminance, rather than showing the whole viewing area at one conditions. Since the Digital Noise Reduction is performed by using the cameras memory, when an object moves, the image can be blurred. luminance level, it increases the range of the luminance so that there is no noticeable difference. However, the Digital Noise Reduction of the camera uses a special Samsung computer code to remove video noise and color noise, regardless of the motion of an object providing a clear image. WDR OFF WDR ON DNR OFF DNR ON Motion Detection Illumination After a specific area has been selected for monitoring, if movement is detected in that area, the camera will trigger the alarm. When an external alarm device is attached to the camera, user should pay attention to the screen for the alarm triggering. This function is useful if user must monitor By controlling the speed of exposure entering into each picture area, an object can be detected in even low illumination. Samsung Camera utilize multiple screens at the same time. highly light sensitive CCDs and maximize performance through the use of Digital Signal Processor. Motion Detection OFF Motion Detection ON Conventional Camera Samsung Camera Samsung Video Security System | 18 . 19
  • 10.
    Video Security System CameraTerms & Features :::::::::::::::::::::::::::::::::::::::::::::::::::::: IP-66 (Cold Resistant, Water/Dust Resistant) 3-axis Dome Design IP refers to Ingress Protection ratings specifying the environmental protection the enclosure provides. The IP-66 compliant rating provides the highest level of Samsung Electronics' 3-axis dome camera can be easily installed in the restricted environment of a wall or inclined surface, while most existing surveillance weather and vandal resistance. Usual operating temperature of IP-66 camera is -45˚C~50˚C. cameras are difficult to install in these circumstances, thanks to the turning lens able to move freely 355˚ left/right and 90˚ up/down. Wall Ceiling Inclined Surface Water Resistant Cold Resistant Anti Vandal Time & Day Schedule The cameras with the feature of Anti Vandal, are equipped with a special structure that protects against willful external shocks, water and dust. The camera feature a clock setting function with RTC (Real Time Clock). Using this function, you can monitor each area on a Time & Day schedule. SCHEDULE SETUP MASTER ENABLE ON DAY TIME ACT NO ON 1 MON 01:20 HOM ON 2 WED 07:35 PRS 12 ON Camera SUN 09:00~12:00 AM 3 THU 11:40 SCN 3 ON monitoring 4 SAT 15:17 PTN 1 ON direction 5 WKD 23:00 HOM ON 6 UNDEFINED 7 UNDEFINED BACK Shock-resistant MON 12:00~15:00 PM (auto play set depends on time and day) Multi-Protocol This camera adopts the multi protocol function and can be controlled by the other company’s remote controller. The protocol type is set by the hardware (dip switch). Protocol Buad Rate 0X00 : Auto Protocol 0X00 : 2400 0X01 : Pelco-D 0X01 : 4800 0X02 : Pelco-P 0X02 : 9600 0X03 : SAMSUNG 0X03 : 19200 0X04 : 38400 RS-485 Terminate RS-485 / RS-422 Remote Controller Samsung Video Security System | 20 . 21
  • 11.
    Video Security System High Resolution Color Camera Camera Terms & Features SCC-B1311/B1011 :::::::::::::::::::::::::::::::::::::::::::::::::::::: Lens Selection When using an auto iris lens, The lens selection switch next to the camera should be set according to the type of auto iris lens. Rb Select ‘DC’ if the installed lens is a DC-control type, and select ‘VIDEO’ if it is a video-control type. Adjust the illumination level Pin3 with the DC-IRIS VR at the back of the camera when DC-type is selected, or adjust the Illumination level by using the level VR Pin1 on the lens when video-type is selected. Pin4 Features Specifications • 1/3" SONY 410K/470K pixels Super-HAD IT CCD Model SCC-B1311N SCC-B1011P/B1311P * When using an AI lens, turn off the ELC switch at the back of the camera. Pin2 • High resolution : 540 TV lines Camera Type Color/BW Color • Min. scene illumination : 0.4 Lux (F1.2, 50IRE), Image Device 1/3" Super-HAD IT CCD 0.24 Lux (F1.2, 30IRE), 0.12 Lux (F1.2, 15IRE) Effective Pixels 768 x 494 752 x 582 • Internal/line lock (phase control) function Horizontal Resolution 540 TV Lines • Auto level control (DC type only) Min. Scene Illumination 0.4 Lux (F1.2, 50 IRE), 0.24 Lux (F1.2, 30 IRE), 0.12 Lux(F1.2, 15 IRE) Pin no. DC Control Type VIDEO Control Type Functions Line Lock On/Off • Electronic level control (manual lens) 1 Damp (-) Power (+12V) White Balance ATW/AWC • Back light compensation (On/Off) 2 Damp (+) N/A ELC On/Off(ALC) • Auto white balance (ATW/AWC) BLC On/Off 3 Drive (-) VIDEO Signal • Flickerless function Video Output VBS 1.0Vp-p 4 Drive (+) GROUND • C/CS mount compatible S/N Ratio 50 dB • SCC-B1311 : DC12V & AC24V 60Hz (50Hz) Lens Mount C/CS Compatible SCC-B1011 : AC220V (50Hz) Lens Drive Type ALC(DC only)/ELC When using a manual iris lens, Open the lens iris completely and turn on the ELC function at the back of the camera. • SCC-B1311 : 60.5(W) x 59.5(H) x 77(D) mm Operating Temperature -10˚C ~ + 50˚C SCC-B1011 : 60.5(W) x 59.5(H) x 125.2(D) mm Operating Humidity Less than 90% Power Requirement SCC-B1311 : AC24V & DC12V / SCC-B1011 : AC220V Power Consumption SCC-B1311 : 3W / SCC-B1011 : 3.5W Physical Dimensions SCC-B1311 : 68(W) x 55(H) x 77.6(D)mm Specification SCC-B1011 : 68(W) x 55(H) x 136.3(D)mm Dimensions (unit:mm) Weight SCC-B1311 : 216g / SCC-B1011 : 446g Camera Back Focus Adjustment SCC-B1311 The back focus of the camera is set when the product is shipped from the factory. However, the back focus can be adjusted in the following manner DC if the focus is not properly set. LENS SCC-B1311 For Standard Lens (non-Zoom) 68 72.6 65 1. The lens should be able to clearly recognize high-definition images such as an object with cross stripes from a distance of 10 meters when the focus ring of the lens is set to infinity(∞). 55 2. Adjust the focus by turning the control ring of the flange back until the object can be seen SCC-B1311 clearly under the circumstances described above. 7.6 3. Fasten the screw of flange back control ring. 63.5 77.6 For Zoom Lens SCC-B1011P 1. Place a high-definition image 3-5m apart from the camera and then turn the focus of the lens as far as possible in the TELE (zoom in) direction so that the image can be seen vividly as possible. 2. Turn the lens zoom as far as possible in the WIDE direction, turning the flange back control ring of the camera so that the object can be seen most vividly. 3. Adjust so that the focus from the TELE side can be vividly matched with the focus from the Flange Back Focusing Distance 68 136.3 WIDE side by repeating above steps 1 and 2 2~3 times. 65 7.6 120 C Mount 17.526mm 4. Fasten the screw of the flange back control ring. The control can be set more accurately if CS Mount 12.5mm the focus can be adjusted by attaching dark color paper or ND filter to the front lens. 55 Samsung Video Security System | 22 . 23
  • 12.
    Bullet Type Camera Super High-Resolution Camera SCC-B9221 SCC-B1331/B1031 Features Specifications Features Specifications • 1/3" 410K Pixels Super HAD IT CCD Model SCC-B9221 • 1/3" SONY 410K/470K Pixels Super-HAD IT CCD Model SCC-B1331N SCC-B1031P/B1331P • High resolution : 480 TV lines Image Device 1/3” Super-HAD IT CCD • High Resolution : 600 TV Lines Camera Type Color/BW Color • Min. scene illumination : 0.3 Lux (F1.2) Effective Pixels 768(H) x 494(V) • Min. illumination 0.12Lux (F1.2, 15 IRE) Image Device 1/3" Super-HAD IT CCD • 4~9mm vari-focal fixed iris lens built-in F1.5 Scanning Method Interlace • Internal/Linelock (Phase Control) Function Pixels Effective 768 x 494 752 x 582 • Externally adjustable focal length & focus by ring Scanning Line Horizontal 15.734Hz • ALC(Video/DC) / ELC Scanning System Interlace • Back light compensation Frequency Vertical 60Hz • Motion Adaptive Digital Noise Reduction (3D+2D) Horizontal Internal Mode 15,734 Hz 15,625 Hz • Back, top and bottom side bracket mounting available Synchronization Method Internal • Back Light Compensation (Area Setting) Frequency Line-lock Mode 15,750 Hz 15,625 Hz Horizontal Resolution 480 TV Lines • Advanced Motion Detection Function Vertical Internal Mode 59.94 Hz 50 Hz • Water resistant (IP66) Signal Output VBS 1.0Vp-p Frequency Line-lock Mode 60 Hz 50 Hz • eXtended Dynamic Range (XDR) S/N Ratio 48dB Resolution Horizontal 600 TV Lines • Privacy Mask Function (Polygonal Mosaic) Min. Scene Color 0.3Lux Min. Scene Sens-up off 0.12Lux(15IRE), 0.2Lux(30IRE), 0.4Lux(50IRE)@F1.2 • High Shutter Speed Control by External Trigger Illumination Illumination Lens Focal Length 4 ~ 9 mm • DIS (Digital Image Stabilization) Functions Number of Privacy Zone 12 (Polygonal Method) Aperture Ratio F1.5 • CCVC (Camera Control Via Coaxial cable, Controller: SCX-RD100) Motion Detection Off/On Viewing Tele 31.5˚(H) x 23.6˚(V) • Multi-Language OSD support D-Zoom 1x ~ 16x (0.1x STEP) Angle Wide 68.1˚(H) x 50.5˚(V) • C/CS Lens Mount Compatible High Speed Shutter 1/60~1/10Ksec(OSD/External Control) 1/50~1/10Ksec(OSD/External Control) Functions BLC On • SCC-B1331: DC12V & AC24V 60Hz(50Hz) Dimensions (unit:mm) BLC Off/On AGC Auto SCC-B1031: AC220V(50Hz) AGC Off/On ELC On ELC Off/On ( ~ 1/200Ksec) White Balance ATW Line Lock Off/On (Phase Control) Operating Temperature -10˚C ~ +50˚C Camera ID Off/On (Max.54ea/2Lines) Operating Humidity Less than 90% White Balance ATW1/ATW2/AWC/3200K/5600K Power Requirment DC 12V ±10% eXtended Dynamic Range Off/Low/Mid/High Power Consumption 1.7W Digital Noise Reduction Off/On Weight 705g Dimensions (unit:mm) Digital Image Stabilization Off/On Dimensions 44(ø) x 116(L)mm PIP Off/On Color Gray SCC-B1331 Etc. Function Detail, Reverse(H/V), Posi/Nega Video Output VBS 1.0Vp-p S/N Ratio S/N Ratio 52dB Lens Lens Drive Type / Mount Type MANUAL/AI(VIDEO/DC) / CS/C 100 OSD Yes Alarm Output 1 ea Remote Control CCVC Yes (with SCX-RD100) Environmental Operating Temperature Absolute : -20˚C ~ +60˚C / Sustained : -10˚C ~ +50˚C Conditions Operating Humidity Less than 90% SCC-B1031 Power Power Requirement 24 VAC ±10%/12 VDC ±10% Power Consumption 2.3 W LED Indicator Yes Physical Dimensions (WxHxD) 64 x 58 x 109.2 mm SCC-B1331P:64x58x109.2 mm 120 Specification SCC-B1031P:64x58x129.2 mm Weight 305 g SCC-B1331P : 305 g SCC-B1031P : 395 g Color Body Siver Samsung Video Security System | 24 . 25
  • 13.
    Super High-Resolution DayNightCamera Super High-Resolution DayNight Camera SCC-B2331/B2031 SCC-B2333/B2033 Features Specifications Features Specifications • 1/3" SONY 410K/470K Pixels Super-HAD IT CCD Model SCC-B2331N SCC-B2031P/B2331P • 1/3" SONY 410K/470K Pixels Super-HAD IT CCD Model SCC-B2333N SCC-B2033P/B2333P • High Resolution : 600 TV Lines Camera Type Color/BW Color • High Resolution : 600 TV Lines Camera Type Color/BW Color • Min. illumination 0.0002Lux (F1.2, 15 IRE, Sens-Up 512x) Image Device 1/3" Super-HAD IT CCD • Min. illumination Image Device 1/3" Super-HAD IT CCD • Internal/Linelock (Phase Control) Function Pixels Effective 768 x 494 752 x 582 0.0002Lux (F1.2, 15 IRE, Sens-Up 512x, Color) Pixels Effective 768 x 494 752 x 582 • ALC(Video/DC)/ELC Scanning System Interlace 0.00002Lux (F1.2, 15 IRE, Sens-Up 512x, B/W) Scanning System Interlace • Day/Night Function (Soft), Sens-Up Function (512x) Horizontal Internal Mode 15,734 Hz 15,625 Hz • Internal/Linelock (Phase Control) Function Horizontal Internal Mode 15,734 Hz 15,625 Hz • Motion Adaptive Digital Noise Reduction (3D+2D) Frequency Line-lock Mode 15,750 Hz 15,625 Hz • ALC(Video/DC) / ELC Frequency Line-lock Mode 15,750 Hz 15,625 Hz • Back Light Compensation (Area Setting) Vertical Internal Mode 59.94 Hz 50 Hz • Day/Night Function (ICR), Sens-Up Function (512x) Vertical Internal Mode 59.94 Hz 50 Hz • Advanced Motion Detection Function Frequency Line-lock Mode 60 Hz 50 Hz Frequency Line-lock Mode 60 Hz 50 Hz • Motion Adaptive Digital Noise Reduction (3D+2D) Resolution Horizontal 600 TV Lines Resolution Horizontal 600 TV Lines • eXtended Dynamic Range (XDR) • Back Light Compensation (Area Setting) Min. Scene Sens-up off 0.12Lux(15IRE), 0.2Lux(30IRE), 0.4Lux(50IRE)@F1.2 Min. Scene Color Sens-up off 0.12Lux(15IRE), 0.2Lux(30IRE), 0.4Lux(50IRE)@F1.2 • Privacy Mask Function (Polygonal Mosaic) • Advanced Motion Detection Function Illumination Sens-up 0.0002Lux(15IRE), 0.0005Lux(30IRE), 0.0008Lux(50IRE)@F1.2 Illumination Sens-up 0.0002Lux(15IRE), 0.0005Lux(30IRE), 0.0008Lux(50IRE)@F1.2 • High Shutter Speed Control by External Trigger • eXtended Dynamic Range (XDR) Functions Number of Privacy Zone 12 (Polygonal Method) B/W Sens-up off 0.012Lux(15IRE), 0.02Lux(30IRE), 0.04Lux(50IRE)@F1.2 • DIS (Digital Image Stabilization) Day/Night Day/Night/AUTO(Soft) • Privacy Mask Function (Polygonal Mosaic) Sens-up 0.00002Lux(15IRE), 0.00005Lux(30IRE), 0.00008Lux(50IRE)@F1.2 • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100) Motion Detection Off/On • High Shutter Speed Control by External Trigger Functions Number of Privacy Zone 12 (Polygonal Method) • Multi-Language OSD support D-Zoom 1x ~ 16x (0.1x STEP) • DIS (Digital Image Stabilization) Day/Night Day/Night/AUTO/EXT (ICR) • C/CS Lens Mount Compatible High Speed Shutter 1/60~1/10Ksec(OSD/External Control) 1/50~1/10Ksec(OSD/External Control) • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100) Motion Detection Off/On • SCC-B2331 : DC12V & AC24V 60Hz(50Hz) Sens Up 2x ~ 512x • RS-485(Half) Control (Multi-Protocol support) D-Zoom 1x ~ 16x (0.1x STEP) SCC-B2031 : AC220V(50Hz) BLC Off/On • Multi-Language OSD support High Speed Shutter 1/60~1/10Ksec(OSD/External Control) 1/50~1/10Ksec(OSD/External Control) AGC Off/On • Intelligent Video (Moved / Fixed / Fence / Area / Tracking) Sens Up 2x ~ 512x ELC Off/On ( ~1/200Ksec) • C/CS Lens Mount Compatible BLC Off/On Line Lock Off/On (Phase Control) AGC Off/On • SCC-B2333 : DC12V & AC24V 60Hz(50Hz) Camera ID Off/On (Max.54ea / 2Lines) ELC Off/On ( ~1/200Ksec) SCC-B2033 : AC220V(50Hz) White Balance ATW1/ATW2/AWC/3200K/5600K Line Lock Off/On (Phase Control) eXtended Dynamic Range Off/Low/Mid/High Camera ID Off/On (Max.54ea/2Line) Digital Noise Reduction Off/On White Balance ATW1/ATW2/AWC/3200K/5600K Digital Image Stabilization Off/On eXtended Dynamic Range Off/Low/Mid/High Dimensions (unit:mm) PIP Off/On Dimensions (unit:mm) Digital Noise Reduction Off/On Etc. Function Detail, Reverse(H/V), Posi/Nega Digital Image Stabilization Off/On SCC-B2331 Video Output VBS 1.0Vp-p SCC-B2333 Intelligent Video Off/On(Moved / Fixed / Fence / Area / Tracking) S/N Ratio S/N Ratio 52 dB PIP Off/On Lens Lens Drive Type MANUAL/AI(VIDEO/DC) Etc. Function Detail, Reverse(H/V), Posi/Neg Mount Type CS/C Video Output VBS 1.0Vp-p 100 100 OSD Yes S/N Ratio S/N Ratio 52 dB Alarm Output 1 ea Lens Lens Drive Type / Mount Type MANUAL/AI(VIDEO/DC) / CS/C Remote Control CCVC Yes (with SCX-RD100) OSD Yes Environmental Operating Temperature Absolute : -20˚C ~ +60˚C / Sustained : -10˚C ~ +50˚C Alarm Output 1 ea Conditions Operating Humidity Less than 90% Remote Control CCVC Yes (with SCX-RD100) SCC-B2031 Power Power Requirement 24 VAC ±10%/12 VDC ±10% SCC-B2331P:24 VAC ±10%/12 VDC ±10% SCC-B2033 Environmental Operating Temperature Absolute : -20˚C ~ +60˚C / Sustained : -10˚C ~ +50˚C SCC-B2031P:AC220V~240V (50Hz±0.3Hz) Conditions Operating Humidity Less than 90% LED Indicator Yes Power Power Requirement 24 VAC ±10%/12 VDC ±10% SCC-B2333P:24 VAC ±10%/12 VDC ±10% Physical Dimensions (WxHxD) 64 x 58 x 109.2 mm SCC-B2331P:64x58x109.2 mm SCC-B2033P:AC220V~240V (50Hz±0.3Hz) 120 120 Specification SCC-B2031P:64x58x129.2 mm LED Indicator Yes Weight 305 g SCC-B2331P:305g / SCC-B2031P:395g Physical Dimensions (WxHxD) 64 x 58 x 109.2 mm SCC-B2333P:64x58x109.2 mm Color Body Siver Specification SCC-B2033P:64x58x129.2 mm Weight 305 g SCC-B2333P:305g / SCC-B2033P:395g Color Body Siver Samsung Video Security System | 26 . 27
  • 14.
    Super High-Resolution DayNightWDR Camera Super High-Resolution DayNight Camera SCC-B2335/B2035 SCC-B2337/B2037 Features Specifications Features Specifications • 1/3" SONY 410K/470K Pixels Super-HAD PS CCD Model SCC-B2335N SCC-B2035P/B2335P • 1/3" SONY 410K/470K Pixels Ex-View HAD IT CCD Model SCC-B2337N SCC-B2037P/B2337P • High Resolution : 600 TV Lines Camera Type Color/BW Color • High Resolution : 600 TV Lines Camera Type Color/BW Color • Min. illumination Image Device 1/3" Super-HAD PS CCD • Min. illumination Image Device 1/3" ExView-HAD IT CCD 0.0002Lux (F1.2, 15 IRE, Sens-Up 512x, Color) Pixels Effective 768 x 494 752 x 582 0.0002Lux (F1.2, 15 IRE, Sens-Up 512x, Color) Pixels Effective 768 x 494 752 x 582 0.00002Lux (F1.2, 15 IRE, Sens-Up 512x, B/W) Scanning System Interlace 0.00002Lux (F1.2, 15 IRE, Sens-Up 512x, B/W) Scanning System Interlace • Internal/Linelock (Phase Control) Function Horizontal Internal Mode 15,734 Hz 15,625 Hz • Internal/Linelock (Phase Control) Function Horizontal Internal Mode 15,734 Hz 15,625 Hz • ALC(Video/DC) / ELC • Wide Dynamic Range (WDR) Frequency Line-lock Mode 15,750 Hz 15,625 Hz • ALC (Video/DC) / ELC Frequency Line-lock Mode 15,750 Hz 15,625 Hz • Virtual Progressive Scan (VPS) Vertical Internal Mode 59.94 Hz 50 Hz • Day/Night Function (ICR), Sens-Up Function (512x) Vertical Internal Mode 59.94 Hz 50 Hz • Day/Night Function (ICR), Sens-Up Function (512x) Frequency Line-lock Mode 60 Hz 50 Hz Frequency Line-lock Mode 60 Hz 50 Hz • Motion Adaptive Digital Noise Reduction (3D+2D) Resolution Horizontal 600 TV Lines Resolution Horizontal 600 TV Lines • Motion Adaptive Digital Noise Reduction (3D+2D) • Back Light Compensation (Area Setting) Min. Scene Color Sens-up off 0.12Lux(15IRE), 0.2Lux(30IRE), 0.4Lux(50IRE)@F1.2 Min. Scene Color Sens-up off 0.12Lux(15IRE), 0.2Lux(30IRE), 0.4Lux(50IRE)@F1.2 • Back Light Compensation (Area Setting) • Advanced Motion Detection Function Illumination Sens-up 0.0002Lux(15IRE), 0.0005Lux(30IRE), 0.0008Lux(50IRE)@F1.2 Illumination Sens-up 0.0002Lux(15IRE), 0.0005Lux(30IRE), 0.0008Lux(50IRE)@F1.2 • Advanced Motion Detection Function • eXtended Dynamic Range (XDR) • eXtended Dynamic Range (XDR) B/W Sens-up off 0.012Lux(15IRE), 0.02Lux(30IRE), 0.04Lux(50IRE)@F1.2 B/W Sens-up off 0.012Lux(15IRE), 0.02Lux(30IRE), 0.04Lux(50IRE)@F1.2 • Privacy Mask Function (Polygonal Mosaic) Sens-up 0.00002Lux(15IRE), 0.00005Lux(30IRE), 0.00008Lux(50IRE)@F1.2 • Privacy Mask Function (Polygonal Mosaic) Sens-up 0.00002Lux(15IRE), 0.00005Lux(30IRE), 0.00008Lux(50IRE)@F1.2 • High Shutter Speed Control by External Trigger Functions Number of Privacy Zone 12 (Polygonal Method) • High Shutter Speed Control by External Trigger Functions Number of Privacy Zone 12 (Polygonal Method) • DIS (Digital Image Stabilization) Day/Night Day/Night/AUTO/EXT (ICR) • DIS (Digital Image Stabilization) Day/Night Day/Night/AUTO/EXT (ICR) • CCVC (Camera Control Via Coaxial cable, Controller: SCX-RD100) Motion Detection Off/On • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100) Motion Detection Off/On • RS-485(Half) Control (Multi-Protocol support) D-Zoom 1x ~ 16x (0.1x STEP) • RS-485(Half) Control (Multi-Protocol support) D-Zoom 1x ~ 16x (0.1x STEP) • Multi-Language OSD support High Speed Shutter 1/60~1/10Ksec(OSD/External Control) 1/50~1/10Ksec(OSD/External Control) • Multi-Language OSD support High Speed Shutter 1/60~1/10Ksec(OSD/External Control) 1/50~1/10Ksec(OSD/External Control) • Intelligent Video (Moved / Fixed / Fence / Area / Tracking) Sens Up / BLC / AGC 2x ~ 512x / Off/On / Off/On • Intelligent Video (Moved / Fixed / Fence / Area / Tracking) Sens Up / BLC / AGC 2x ~ 512x / Off/On / Off/On • C/CS Lens Mount Compatible ELC / Line Lock Off/On ( ~ 1/200Ksec) / Off/On (Phase Control) • C/CS Lens Mount Compatible ELC / Line Lock Off/On ( ~ 1/200Ksec) / Off/On (Phase Control) • SCC-B2335 : DC12V & AC24V 60Hz(50Hz) Camera ID / White Balance Off/On (Max.54ea/2Lines) / ATW1/ATW2/AWC/3200K/5600K Camera ID Off/On (Max.54ea/2Line) • SCC-B2337 : DC12V & AC24V 60Hz(50Hz) eXtended Dynamic Range Off/Low/Mid/High White Balance ATW1/ATW2/AWC/3200K/5600K SCC-B2035 : AC220V(50Hz) SCC-B2037 : AC220V(50Hz) Digital Noise Reduction Off/On eXtended Dynamic Range Off/Low/Mid/High Digital Image Stabilization Off/On Digital Noise Reduction Off/On Intelligent Video / PIP Off/On(Moved / Fixed / Fence / Area / Tracking) / Off/On Digital Image Stabilization Off/On Wide Dynamic Range Off/On Intelligent Video / PIP Off/On(Moved / Fixed / Fence / Area / Tracking) / Off/On Dimensions (unit:mm) Virtual Progressive Scan Off/On Dimensions (unit:mm) Etc. Function Detail, Reverse(H/V), Posi/Neg Etc. Function Detail, Reverse(H/V), Posi/Nega Video Output VBS 1.0Vp-p SCC-B2335 Video Output VBS 1.0Vp-p SCC-B2337 S/N Ratio S/N Ratio 50 dB S/N Ratio S/N Ratio 52 dB Lens Lens Drive Type / Mount Type MANUAL/AI(VIDEO/DC) / CS/C Lens Lens Drive Type MANUAL/AI(VIDEO/DC) OSD Yes Mount Type CS/C Alarm Output 1 ea 100 100 OSD Yes Remote CCVC Yes (with SCX-RD100) Alarm Output 1 ea Control RS485 Yes (Multi Protocol, 8ea) Remote CCVC Yes (with SCX-RD100) Environmental Operating Temperature Absolute : -20˚C ~ +60˚C / Sustained : -10˚C ~ +50˚C Control RS485 Yes (Multi Protocol, 8ea) Conditions Operating Humidity Less than 90% Environmental Operating Temperature Absolute : -20˚C ~ +60˚C / Sustained : -10˚C ~ +50˚C Power Power Requirement 24 VAC ±10%/12 VDC ±10% SCC-B2337P:24 VAC ±10%/12 VDC ±10% SCC-B2035 Conditions Operating Humidity Less than 90% SCC-B2037 SCC-B2037P:AC220V~240V(50Hz±0.3Hz) Power Power Requirement 24 VAC ±10%/12 VDC ±10% SCC-B2335P:24 VAC ±10%/12 VDC ±10% LED Indicator Yes SCC-B2035P:AC220V~240V(50Hz±0.3Hz) Physical Dimensions (WxHxD) 64 x 58 x 109.2 mm SCC-B2337P:64 x 58 x 109.2 mm LED Indicator Yes Specification SCC-B2037P:64 x 58 x 129.2 mm 120 120 Physical Dimensions (WxHxD) 64 x 58 x 109.2 mm SCC-B2335P:64x58x109.2 mm Weight 305 g SCC-B2337P:305g/SCC-B2037P:395g Specification SCC-B2035P:64x58x129.2 mm Color Body Siver Weight 305 g SCC-B2335P:305g/SCC-B2035P:395g Color Body Siver Samsung Video Security System | 28 . 29
  • 15.
    Super High-Resolution DayNightCamera 22x Zoom Lens Camera SCC-A2333/A2033 SCC-C4201/C4301 Features Specifications Features Specifications • 1/2" SONY 410K/470K Pixels Ex-View HAD IT CCD Model SCC-A2333N SCC-A2033P/A2333P • Superior images through DSP (Digital Signal Processor) Model SCC-C4201 SCC-C4301 • High Resolution : 600 TV Lines Camera Type Color/BW Color • 1/4" 410/470K Pixels Super HAD CCD Image Device 1/4" Super HAD CCD • Min. illumination Image Device 1/2" Ex-View HAD IT CCD • Horizontal resolution : 480 TV Lines Effective Pixels NTSC : 768(H) x 494(V) / PAL : 752(H) x 582(V) 0.000006Lux (F1.2, 15 IRE, Sens-Up 512x, Color) Pixels Effective 768 x 494 752 x 582 • 10-bit A/D converter Scanning Method 2:1 Interlace 0.0000006Lux (F1.2, 15 IRE, Sens-Up 512x, B/W) Scanning System Interlace • Motion detection Scanning Line Horizontal NTSC : 15.750KHz / PAL : 15.625Hz • Internal/Linelock (Phase Control) Function Horizontal Internal Mode 15,734 Hz 15,625 Hz • Optical 22x zoom (f=3.6~79.2mm), 10x digital zoom lens Frequency Vertical NTSC : 60Hz / PAL : 50Hz • ALC(Video/DC) / ELC Frequency Line-lock Mode 15,750 Hz 15,625 Hz • Outstanding signal-to-noise (S/N) ratio : 52dB Synchronization Method Internal Internal/Line lock Vertical Internal Mode 59.94 Hz 50 Hz • Both RS-485 communication interface & wired remote control Horizontal Resolution 480 TV Lines • Day/Night Function (ICR), Sens-Up Function (512x) Frequency Line-lock Mode 60 Hz 50 Hz Min. Scene Color 0.005 (Sens up 128x,15IRE) Lux • Motion Adaptive Digital Noise Reduction (3D+2D) • Min. scene illumination : 0.005(color)/0.0005(B/W) Lux Resolution Horizontal 600 TV Lines Illumination B/W 0.0005 (Sens up 128x,15IRE) Lux • Back Light Compensation (Area Setting) Min. Scene Color Sens-up off 0.036Lux(15IRE), 0.072Lux(30IRE), 0.12Lux(50IRE)@F1.2 Lens Zoom Ratio 220x Zoom (22x optical, 10x digital) • Advanced Motion Detection Function Focal Length 3.6~79.2mm Illumination Sens-up 0.000006Lux(15IRE), 0.000012Lux(30IRE), 0.00002Lux(50IRE)@F1.2 • eXtended Dynamic Range (XDR) B/W Sens-up off 0.0036Lux(15IRE), 0.0072Lux(30IRE), 0.012Lux(50IRE)@F1.2 Aperture Tele F3.8 • Privacy Mask Function (Polygonal Mosaic) Sens-up 0.0000006Lux(15IRE), 0.0000012Lux(30IRE), 0.000002Lux(50IRE)@F1.2 Ratio Wide F1.6 • High Shutter Speed Control by External Trigger Functions Number of Privacy Zone 12 (Polygonal Method) Viewing Tele 2.3˚(H) x 1.7˚(V) x 9˚(V) 2.3˚(H) x 1.7˚(V) • DIS (Digital Image Stabilization) Day/Night Day/Night/AUTO/EXT (ICR) Angle Wide 47.9˚(H) x 36˚ 47.9˚(H) x 36.9˚(V) • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100) Motion Detection Off/On Functions Camera ID Off/On(20Characters, Position Setting) • RS-485(Half) Control (Multi-Protocol support) D-Zoom 1x ~ 16x (0.1x STEP) Dimensions (unit:mm) Electronic Shutter Off, 1/100 ~ 10,000 sec • Multi-Language OSD support High Speed Shutter 1/60 ~1/10Ksec(OSD/External Control) 1/50 ~1/10Ksec(OSD/External Control) BLC Off/On(Area setting) • Intelligent Video (Moved / Fixed / Fence / Area / Tracking) Sens Up 2x ~ 512x AGC Off/On BLC / AGC Off/On / Off/On SCC-C4201 PIP Off/On • C/CS Lens Mount Compatible ELC / Line Lock Off/On ( ~ 1/200Ksec) / Off/On (Phase Control) White Balance ATW/AWC/Manual • SCC-A2333 : DC12V & AC24V 60Hz(50Hz) Camera ID Off/On (Max.54ea/2Lines) Motion Detection Off/On (Area/Sensitivity setting) SCC-A2033 : AC220V(50Hz) White Balance ATW1/ATW2/AWC/3200K/5600K Sens Up Off/Auto(2x ~ 128x) / Fix(2x ~ 128x) eXtended Dynamic Range Off/Low/Mid/High Signal Output VBS 1.0Vp-p(75 ohm, composite) Digital Noise Reduction Off/On S/N Ratio 52dB Digital Image Stabilization Off/On Input/Output Image Output BNC Dimensions (unit:mm) Intelligent Video Off/On(Moved / Fixed / Fence / Area / Tracking) Power Terminal Block (2-pin) PIP Off/On Remote Control RS-485 (Half Duplex) SCC-A2333 Etc. Function Detail, Reverse(H/V), Posi/Nega Operating Temperature -10˚C ~ +50˚C Video Output VBS 1.0Vp-p Operating Humidity Less than 90% S/N Ratio S/N Ratio 50 dB Power Requirment DC12V AC24V/DC12V Compatible Lens Lens Drive Type / Mount Type MANUAL/AI(VIDEO/DC) / CS/C Power Consumption 5.0W 5.5W 100 SCC-C4301 Dimensions 60.5(W) x 59.5(H) x 119.5(D)mm 60.5(W) x 59.5(H) x 161.5(D)mm OSD Yes Alarm Output 1 ea Weight 375g 500g Remote CCVC Yes (with SCX-RD100) Control RS485 Yes (Multi Protocol, 8ea) Environmental Operating Temperature Absolute : -20˚C ~ +60˚C / Sustained : -10˚C ~ +50˚C SCC-A2033 Conditions Operating Humidity Less than 90% Power Power Requirement 24 VAC ±10%/12 VDC ±10% SCC-A2333P:24 VAC ±10%/12 VDC ±10% SCC-A2033P:AC220V~240V(50Hz±0.3Hz) LED Indicator Yes 120 Physical Dimensions (WxHxD) 64 x 58 x 109.2 mm SCC-A2333P:64 x 58 x 109.2 mm Specification SCC-A2033P:64 x 58 x 129.2 mm Weight 305 g SCC-A2333P:305g/SCC-A2033P:395g Color Body Siver Samsung Video Security System | 30 . 31
  • 16.
    22x Zoom DayNightCamera 22x Zoom DayNight WDR Camera SCC-C4203A/C4303A SCC-C4205/C4305 Features Specifications Features Specifications • 1/4" 410K/470K Pixels Super HAD CCD Model SCC-C4203A SCC-C4303A • 22x motorized optical zoom with 10x digital zoom Model SCC-C4205 SCC-C4305 • Day/Night Image Device 1/4" Super HAD CCD • 1/4” 410K/470K Pixels Ex-View PS CCD Image Device 1/4" Ex-View PS CCD • DSP (Digital Signal Processor) Effective Pixels NTSC : 768(H) x 494(V) / PAL : 752(H) x 582(V) • Horizontal resolution : 480 TV lines Effective Pixels NTSC : 768(H) x 494(V) / PAL : 752(H) x 582(V) • 10-bit A/D converter Scanning Method 2:1 Interlace • DSP (Digital Signal Processor) Scanning Method 2:1 Interlace • 22x optical zoom(f=3.6-79.2mm)and10x digital Zoom Scanning Line Horizontal NTSC :15.750KHz / PAL : 15.625Hz • WDR (Wide Dynamic Range), Day/Night Synchronization Method Internal Internal/Line lock • Excellent signal-to-noise ratio(50dB) Frequency Vertical NTSC :60Hz / PAL : 50Hz • External synchronization with line lock (SCC-C4305) Horizontal Resolution 480 TV Lines • Motion detection Synchronization Method Internal Internal/Line lock • Motion detection with alarming output Min. Scene Color 0.002(Sens-up 160x,15IRE)Lux • Both RS-485 communication interface & wired remote control Horizontal Resolution Color : 480 TV Lines / B/W : 350 TV Lines • On-screen menus (multi-language) Illumination B/W 0.0002(Sens-up 160x,15IRE)Lux Min. Scene Color 0.005 (Sens-up 128x,15IRE)Lux Lens Zoom Ratio 220x Zoom(22x optical, 10x digital) • Remote-control (zoom, focus, Iris open-close) Illumination B/W 0.0005 (Sens-up 128x,15IRE)Lux Focal Length 3.6~79.2mm • Min. scene illumination : 0.002(color)/0.0002(B/W) Lux Lens Zoom Ratio 220x Zoom(22x optical, 10x digital) Aperture Tele F3.8 • 1 Alarm output (motion detection) Focal Length 3.6~79.2mm Ratio Wide F1.6 Aperture Tele F3.8 Viewing Tele 2.3˚(H) x 1.7˚(V) Ratio Wide F1.6 Angle Wide 47.9'(H) x 36.9˚(V) Viewing Tele 2.3˚(H) x 1.7˚(V) Functions Camera ID Max 20 Character Angle Wide 47.9˚(H) x 36.9˚(V) High Speed Shutter Off ~ 1/10Ksec Functions Camera ID Off/On (20Characters, Position Setting) BLC Off/On Dimensions (unit:mm) Electronic Shutter Off, 1/100 ~ 10,000 sec Dimensions (unit:mm) AGC Off/Low/High BLC / AGC / PIP Off/On White Balance ATW/AWC/Manual White Balance ATW/AWC/Manual Motion Detection Off/On SCC-C4203A Motion Detection Off/On (Area/Sensitivity Setting) SCC-C4205 Sens Up Off ~ 160x Sens Up OFF/Auto(2x~128x) / Fix(2x~128x) Signal Output VBS 1.0Vp-p Signal Output VBS 1.0Vp-p(75 ohm, Composite) S/N Ratio 50dB S/N Ratio 50dB Operating Temperature -10˚C ~ +50˚C Input/Output Image Output BNC Operating Humidity Less than 90% Power Terminal Block(2-pin) Power Requirment DC12V AC24V/DC12V Compatible Remote Control RS-485 (Half Duplex) Power Consumption 5.7W 6W Operating Temperature -10˚C ~ +50˚C Dimensions 60.5(W) x 59.5(H) x 127.5(D)mm 60.5(W) x 59.5(H) x 161.5(D)mm Operating Humidity Less than 90% Weight 375g 500g Power Requirment DC12V AC24V / DC12V Compatible Power Consumption 5.0W 5.5W Dimensions 60.5(W) x 59.5(H) x 119.5(D)mm 60.5(W) x 59.5(H) x 161.5(D)mm SCC-C4303A Weight 375g 550g SCC-C4305 Samsung Video Security System | 32 . 33
  • 17.
    32x Zoom DayNightWDR Camera SCC-C4207/C4307 :::::::::::::::::::::::::::::::::::::::::::::::: Rear Parts Exterior Day & Night External Signal Input and Alarm Signal Output Features Specifications Terminal • 1/4" 410K/470K Pixels Ex-View CCD Model SCC-C4207 SCC-C4307 This is the terminal that allows connection to an external brightness sensor (optional) to • DIS (Digital Image Stabilizer) Image Device 1/4" Ex-View CCD trigger switching between black & white or color mode. It also sends out an alarm signal • 32x zoom Lens (digital zoom:10x) Effective Pixels NTSC : 768(H) x 494(V) / PAL : 752(H) x 582(V) when linked to the MOTION DET function or black & white. • Min. scene illumination : 0.002(color)/0.0002(B/W) Lux Scanning Method 2 : 1 Interlace • Day/Night Scanning Line Horizontal NTSC : 15.750Hz / PAL : 15.625Hz Day & Night IN • 128x WDR (Wide Dynamic Range) Frequency Vertical NTSC : 60Hz / PAL : 50Hz 1 • Motion detection (with adjustable zones and sensitivity levels) Synchronization Method Internal Internal/Line lock GND SCC-C4207 SCC-C4307 Horizontal Resolution 480 TV Lines 2 • Privacy protection that allows up to 8 privacy zones Min. Scene Color 0.002 (Sens-up 160x,15IRE)Lux Alarm Output • Remote control through RS485(using SSC-1000/5000) Illumination B/W 0.0002 (Sens-up 160x,15IRE)Lux • Excellent signal-to-noise ratio(50dB) Camera Manipulation Switch (setup switch) Lens Zoom Ratio 320x (32x Optical, 10x Digital) Focal Length 3.55 ~ 113mm The functions of these parts will differ, depending on the operation mode Video Output Terminal Aperture Tele F4.17 of the camera. This is the terminal that is connected to the video input terminal of a monitor. The video Ratio Wide F1.69 images from the camera are sent to the monitor through this terminal. Viewing Tele 1.78˚(H) x 1.34˚(V) • When the camera is in general operation mode : Angle Wide 56.41˚(H) x 43.01˚(V) Up/Down Direction Switch : Zoom Tele or Zoom Wide switch, respectively. Functions Wide Dynamic Range Off/On (128x) Left/Right Direction Switch : Near Focus or Far Focus switch, respectively. RS485 Port Dimensions (unit:mm) Day/Night Color/BW/Auto/EXT (ICR) [SET UP] Switch: This is used to enter the setup menu : This is the RS485 remote control port. Motion Detection Off/On (Area/Sensitivity Setting) Electronic Shutter Off, 1/100 ~10,000 sec The user can enter the setup menu by pushing the [SET UP] switch, and SCC-C4207 Sens Up Off/Auto (2x ~ 160x) holding it for 3 seconds. Power LED BLC Off/On (Area Setting) The LED will be on if power is being supplied to the camera. AGC Off/Low/High Camera ID Max. 20 Characters • From the setup menu : White Balance ATW/ATW2/AWC/Manual Up/Down Direction Switch : Used to move the cursor up or down. Power Input Terminal IR Filter Off/On Left/Right Direction Switch : Used to move the cursor to the left or right. This is the terminal that is connected to the power adaptor cable. Privacy Zones 8 (Mosaic) Other functions may be designated by the setup menu. Signal Output VBS 1.0Vp-p(75 Ohm, Composite) S/N Ratio 50dB(AGC Off) [ENTER] Switch : Used to select the highlighted option. Input/Output Image Output BNC Remote Control RS485 Alarm Output 1 Power Terminal Block (2-pin) SCC-C4307 Operating Temperature -10˚C ~ +50˚C ZOOM/FOCUS REMOTE Terminal Operating Humidity Maximum 90% RH This is the terminal used to connect an external controller for ZOOM/FOCUS and menu Power Requirment DC12V AC24V/DC12V compatible control and for executing the HOME RETURN and AF functions. It can be set to one of Power Consumption 5.5W 6W four modes (A, B, C or D) according to the input condition. Dimensions 60.5(W) x 59.5(H) x 126.7(D)mm 60.5(W) x 59.5(H) x 160.9(D)mm Weight 390g 515g Samsung Video Security System | 34 . 35
  • 18.
    High Resolution 32xZoom Camera High Resolution WDR 32x Zoom Camera SCC-C4233/C4333 SCC-C4235/C4335 Features Specifications Features Specifications • 1/4" 410K/470K Pixels Super-HAD IT CCD Model SCC-C4233 SCC-C4333 • 1/4" 410K/470K Pixels Ex-View HAD PS CCD Model SCC-C4235 SCC-C4335 • 32x Optical zoom lens (16x D-zoom) Camera Type Color • 32x Optical zoom lens (16x D-zoom) Camera Type Color • High resolution : 540(Color)/570(BW) TV Lines Image Device 1/4" Super-HAD IT CCD • High resolution Day/Night : 540(Color)/570(BW) TV Lines Image Device 1/4" Ex-View HAD PS CCD • Min. scene illumination Effective NTSC 768(H) x 494(V) • Min. scene illumination Effective NTSC 768(H) x 494(V) Color : 0.002 Lux(15 IRE, Sens-up 256x) Pixels PAL 752(H) x 582(V) Color : 0.001 Lux(15 IRE, Sens-up 256x) Pixels PAL 752(H) x 582(V) B/W : 0.0002 Lux(15 IRE, Sens-up 256x) Horizontal Resolution 540(Color)/570(BW) TV Lines B/W : 0.0001 Lux(15 IRE, Sens-up 256x) Horizontal Resolution 540(Color)/570(BW) TV Lines • Full auto focus function Min. Scene Color Sens-up Off 0.6 Lux(15IRE) • Full auto focus function Min. Scene Color Sens-up Off 0.3 Lux(15IRE,Sens-up Off) • Privacy mask zone (16 area) Illumination Sens-up 0.002 Lux(15IRE) • Privacy mask zone (16 area) Illumination Sens-up 0.001 Lux(15IRE, Sens-up x256) • Multi-protocol (more than 8 companies), multi-OSD B/W Sens-up Off 0.06 Lux(15IRE) • Multi-protocol (more than 8 companies), multi-OSD B/W Sens-up Off 0.03 Lux(15IRE,Sens-up Off) • Remote control(RS485), power zoom/focus control Sens-up 0.0002 Lux(15IRE) • Remote control(RS485), power zoom/focus control Sens-up 0.0001 Lux(15IRE, Sens-up x256) Functions Number of Privacy Zone 16 Functions Number of Privacy Zone 16 Day/Night Color/BW/Auto/EXT (ICR) Day/Night Color/BW/Auto/EXT (ICR) Line Lock N/A INT/Line Lock Line Lock N/A INT/Line Lock White Balance ATW1/ATW2/AWC/MANUAL White Balance ATW1/ATW2/AWC/MANUAL D-Zoom Yes ( ~ 16x) D-Zoom Yes (~16x) High Speed Shutter Yes (OFF ~ 1/10K) High Speed Shutter Yes (OFF ~ 1/10K) Motion Detection Yes Motion Detection Yes Sens Up Yes (2x ~ 256x) Dimensions (unit:mm) Sens Up Yes (2x ~ 256x) Dimensions (unit:mm) Camera ID Max 20 Character Camera ID Max 20 Character Remote Control RS485, Power Zoom/Focus Remote Control RS485, Power Zoom/Focus Alarm Output 1 SCC-C4235 Alarm Input Yes SCC-C4233 Video Output VBS 1.0Vp-p Output 1 S/N Ratio 50 dB Wide Dynamic Range Yes RS-415 1 2 3 4 5 6 7 SET UP RS-415 1 2 3 4 5 6 7 SET UP Lens Focal Length 3.55 ~ 113mm DATA+ DATA- 1. ALARM OUT PWR Video Output VBS 1.0Vp-p 2. GND 3. 5V OUT Zoom Ratio 32x Optical, 16x Digital S/N Ratio 50 dB PWR 4. DAY/NIGHT IN 5. ZOOM DATA+ DATA- 6. COM 1. ALARM OUT GND +12V 7. FOCUS 2. GND VIDEO OUT 3. 5V OUT 4. DAY/NIGHT IN 5. ZOOM 6. COM Aperture Ratio F1.69(W)/F4.17(T) Lens Focal Length 3.55 ~ 113mm GND +12V 7. FOCUS VIDEO OUT Viewing Tele 1.78˚(H) x 1.34˚(V) Zoom Ratio 32x Optical, 16x Digital Angle Wide 56.41˚(H) x 43.01˚(V) Aperture Ratio F1.69(W)/F4.17(T) 512x 512x Operating Temperature -10˚C ~ + 50˚C Genuine Product of Samsung Electronics Viewing Tele 1.78˚(H) x 1.34˚(V) Genuine Product of Samsung Electronics Operating Humidity Less than 90% 115.2 10 Angle Wide 56.41˚(H) x 43.01˚(V) 115.2 10 Power Power NTSC DC 12V AC24V/DC12V,60Hz Operating Temperature -10˚C ~ + 50˚C Requirement PAL AC24V/DC12V,50Hz Operating Humidity Less than 90% LED Indicator Yes Power Power NTSC DC 12V AC24V/DC12V, 60Hz Dimensions Net(WxHxD) 60.5 x 59.5 x 125.2 mm 60.5 x 59.5 x 159.2 mm SCC-C4335 Requirement PAL AC24V/DC12V, 50Hz SCC-C4333 Weight Net 444g 595g Power Consumption 5W 5.5W Color Body Silver RS-485 1 2 3 4 5 6 7 SET UP LED Indicator Yes RS-485 1 2 3 4 5 6 7 SET UP DATA+ DATA- 1. ALARM OUT 2. GND 3. 5V OUT PWR Dimensions Net(WxHxD) 60.5 x 59.5 x 125.2 mm 60.5 x 59.5 x 159.2 mm PWR 4. DAY/NIGHT IN 5. ZOOM Weight Net 444g 595g DATA+ DATA- 6. COM 1. ALARM OUT AC 24V/DC 12V 7. FOCUS 2. GND VIDEO OUT 3. 5V OUT 4. DAY/NIGHT IN 5. ZOOM 6. COM AC 24V/DC 12V 7. FOCUS VIDEO OUT Color Body Silver 512x 512x Genuine Product of Samsung Electronics DIGITAL COLOR CAMERA SCC-C4335 Genuine Product of Samsung Electronics DIGITAL COLOR CAMERA SCC-C4335 149.2 10 149.2 10 Samsung Video Security System | 36 . 37
  • 19.
    34x Optical ZoomLens Camera 34x Optical Zoom Lens Camera SCC-C4237 NEW SCC-C4239/C4339 NEW Features Specifications Features Specifications • 1/4" SONY 410K/470K Pixels Super HAD IT CCD Model SCC-C4237 • 1/4" SONY 410K/470K Pixels Ex-View HAD PS CCD Model SCC-C4239 SCC-C4339 • 34x Optical & 16x(0.1step) Digital Zoom Camera Type Color/BW Color • 34x Optical & 16x(0.1step) Digital Zoom Camera Type Color/BW Color • High Resolution : 600 TV Lines Image Device 1/4" Super HAD IT CCD • High Resolution : 600 TV Lines Image Device 1/4" Ex-View HAD PS CCD • Min. illumination 0.001 Lux (F1.2, 15 IRE, Sens-up 512x, Color) Pixels Effective 768 x 494 (NTSC) / 752 x 582 (PAL) • Min. illumination 0.001 Lux (F1.2, 15 IRE, Sens-up 512x, Color) Pixels Effective 768 x 494 (NTSC) / 752 x 582 (PAL) 0.0001 Lux (F1.2, 15 IRE, Sens-up 512x, B/W) Resolution Horizontal 600 (Color) TV Lines 0.0001 Lux (F1.2, 15 IRE, Sens-up 512x, B/W) Resolution Horizontal 600 (Color) TV Lines • Day Night Function (ICR), Sens-up Function (512x) Min. Scene Color Sens-up Off 0.6Lux(15IRE), 1.2Lux(30IRE), 2Lux(50IRE) • Wide Dynamic Range (NTSC 128x, PAL 160x) Min. Scene Color Sens-up Off 0.6Lux(15IRE), 1.2Lux(30IRE), 2Lux(50IRE) • Adaptive Digital Noise Reduction (3D + 2D) Illumination Sens up 512x 0.001Lux(15IRE) , 0.002Lux(30IRE), 0.004Lux(50IRE) • Virtual Progressive Scan (VPS) Illumination Sens up 512x 0.001Lux(15IRE) , 0.002Lux(30IRE), 0.004Lux(50IRE) • Back Light Compensation (Area Setting) B/W Sens-up Off 0.06Lux(15IRE), 0.12Lux(30IRE), 0.2Lux(50IRE) • Day Night Function (ICR), Sens-up Function (512x) B/W Sens-up Off 0.06Lux(15IRE), 0.12Lux(30IRE), 0.2Lux(50IRE) • Advanced Motion Detection Function Sens up 512x 0.0001Lux(15IRE), 0.0002Lux(30IRE), 0.0004Lux(50IRE) Sens up 512x 0.0001Lux(15IRE), 0.0002Lux(30IRE), 0.0004Lux(50IRE) • Adaptive Digital Noise Reduction (3D + 2D) Functions Number of Privacy Zone 12 ea Functions Number of Privacy Zone 12 ea • eXtended Dynamic Range (XDR) • Back Light Compensation (Area Setting) Day/Night Auto / Day / Night(ICR) Day/Night Auto / Day / Night(ICR) • Privacy Mask Function (12ea) • Advanced Motion Detection Function Motion Detection Yes, Sensitivity 1~7 Level Motion Detection Yes, Sensitivity 1~7 Level • DIS (Digital Image Stabilization) • eXtended Dynamic Range (XDR) D-Zoom Yes(~16x) Wide Dynamic Range Yes(NTSC : 128x, PAL : 160x) • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100) High Speed Shutter 1/100~1/10K sec • Privacy Mask Function (12ea) D-Zoom Yes(~16x) • RS-485 (Halfl) Control (Multi-Protocol support) Sens Up / PIP / BLC Yes(2x ~ 512x) / Yes / Off/On • DIS (Digital Image Stabilization) High Speed Shutter 1/100~1/10K sec • Multi-Language OSD (E, F, G, S, I, J, R, P, C, etc) support AGC Off/On (Very Low / Low / Mid / High / Very High / User / Fix) • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100) Sens Up / PIP / BLC Yes(2x ~ 512x) / Yes / Off/On • Intelligent Video (Moved/Fixed/Fence/Tracking) Auto Focus Manual / Auto / one AF • RS-485 (Halfl) Control (Multi-Protocol support) AGC Off/On (Very Low / Low / Mid / High / Very High / User / Fix) • Preset 512 ea, Alarm Output 1ea Syncronization Internal • Multi-Language OSD (E, F, G, S, I, J, R, P, C, etc) support Auto Focus Manual / Auto / one AF • DC12V Camera ID Max 54 Character, 2 Line • Intelligent Video (Moved/Fixed/Fence/Tracking) Syncronization Internal Internal/Line Lock XDR(eXtended Dynamic Range) Off/On (Low/Middle/High) • Preset 512 ea, Alarm Output 1ea Camera ID Max 54 Character, 2 Line DNR(Digital Noise Reduction) Off / On (Low / Middle / High / User(3D/2D)) • SCC-C4239 : DC12V VPS(Virtual Progressive Scan) Yes Schedule Day / Time Schedule XDR(eXtended Dynamic Range) Off/On (Low/Middle/High) SCC-C4339 : AC24V/DC12V White Balance ATW1 / ATW2 / AWC(Manual) / 3200 / 5600 DNR(Digital Noise Reduction) Off / On (Low / Middle / High / User(3D/2D)) Video Output VBS 1.0Vp-p VBS 1.0Vp-p Schedule Day / Time Schedule Dimensions (unit:mm) S/N Ratio S/N Ratio 52 dB Dimensions (unit:mm) White Balance ATW1 / ATW2 / AWC(Manual) / 3200 / 5600 Lens Focal Length 3.4 ~ 115.6mm Video Output VBS 1.0Vp-p VBS 1.0Vp-p Min. Object Distance 100cm SCC-C4239 S/N Ratio S/N Ratio 52 dB Zoom Ratio 34x Optical (688x with 16x Digital zoom) Lens Focal Length 3.4 ~ 115.6mm Aperature Ratio F1.65(W)/F3.7(T) Min. Object Distance 100cm 59 Viewing Tele 1.47˚(H) x 1.10˚(V)0 Zoom Ratio 34x Optical (688x with 16x Digital zoom) 59 Angle Wide 61.22˚(H) x 47.16˚(V) Aperature Ratio F1.65(W)/F3.7(T) 59 113.9 59 113.9 Lens Drive Type DC Auto Iris Viewing Tele 1.47˚(H) x 1.10˚(V)0 Mount Type Board-in type Angle Wide 61.22˚(H) x 47.16˚(V) OSD OSD Yes Lens Drive Type DC Auto Iris Alarm Output 1ea Mount Type Board-in type Remote Control RS485, CCVC OSD OSD Yes Environmental Operating Temperature -10˚C ~ +50˚C SCC-C4339 Alarm Output 1ea Conditions Operating Humidity Less than 90% Remote Control RS485, CCVC Power Power Requirement DC12V Environmental Operating Temperature -10˚C ~ +50˚C 59 LED Indicator Yes Conditions Operating Humidity Less than 90% Physical Dimensions (WxHxD) 59x 59x113.9mm Power Power Requirement DC12V DC12V, AC24V 59 144.2 Specification Weight 383g LED Indicator Yes Color Silver Physical Dimensions (WxHxD) 59x 59x113.9mm 59x 59x144.2mm Specification Weight 383g 508g Color Silver Samsung Video Security System | 38 . 39
  • 20.
    43x Optical ZoomLens Camera 43x Optical Zoom Lens Camera SCC-C4253/C4353 NEW SCC-C4255/C4355 NEW Features Specifications Features Specifications • 1/4" SONY 410K/470K Pixels Super HAD IT CCD Model SCC-C4253 SCC-C4353 • 1/4" SONY 410K/470K Pixels Ex-View HAD PS CCD Model SCC-C4255 SCC-C4355 • 43x(f=3.2~138.5mm) Optical & 16x(0.1step) Digital Zoom Camera Type Color/BW Color • 43x(f=3.2~138.5mm) Optical & 16x(0.1step) Digital Zoom Camera Type Color/BW Color • High Resolution : 600 TV Lines Image Device 1/4" Super HAD IT CCD • High Resolution : 600 TV Lines Image Device 1/4" Ex-View HAD PS CCD • Min. illumination 0.001 Lux (F1.2, 15 IRE, Sens-up 512x, Color) Pixels Effective 768 x 494 (NTSC) / 752 x 582 (PAL) • Min. illumination 0.001 Lux(F1.2,15 IRE, Sens-up 512x, Color) Pixels Effective 768 x 494 (NTSC) / 752 x 582 (PAL) 0.0001 Lux (F1.2, 15 IRE, Sens-up 512x, B/W) Resolution Horizontal 600 (Color) TV Lines 0.0001 Lux(F1.2,15 IRE, Sens-up 512x, B/W) Resolution Horizontal 600 (Color) TV Lines • Day Night Function (ICR), Sens-up Function (512x) Min. Scene Color Sens-up Off 0.6Lux(15IRE), 1.2Lux(30IRE), 2Lux(50IRE) • Wide Dynamic Range (NTSC 128x, PAL 160x) Min. Scene Color Sens-up Off 0.6Lux(15IRE), 1.2Lux(30IRE), 2Lux(50IRE) • Adaptive Digital Noise Reduction (3D + 2D) Illumination Sens up 512x 0.001Lux(15IRE) , 0.002Lux(30IRE), 0.004Lux(50IRE) • Virtual Progressive Scan (VPS) Illumination Sens up 512x 0.001Lux(15IRE) , 0.002Lux(30IRE), 0.004Lux(50IRE) • Back Light Compensation (Area Setting) B/W Sens-up Off 0.06Lux(15IRE), 0.12Lux(30IRE), 0.2Lux(50IRE) • Day Night Function (ICR), Sens-up Function (512x) B/W Sens-up Off 0.06Lux(15IRE), 0.12Lux(30IRE), 0.2Lux(50IRE) • Advanced Motion Detection Function Sens up 512x 0.0001Lux(15IRE), 0.0002Lux(30IRE), 0.0004Lux(50IRE) Sens up 512x 0.0001Lux(15IRE), 0.0002Lux(30IRE), 0.0004Lux(50IRE) • Adaptive Digital Noise Reduction (3D + 2D) Functions Number of Privacy Zone 12 ea Functions Number of Privacy Zone 12 ea • eXtended Dynamic Range (XDR) • Back Light Compensation (Area Setting) Day/Night Auto / Day / Night(ICR) Day/Night Auto / Day / Night(ICR) • Privacy Mask Function (12ea) • Advanced Motion Detection Function Motion Detection Yes, Sensitivity 1~7 Level Motion Detection Yes, Sensitivity 1~7 Level • DIS (Digital Image Stabilization) • eXtended Dynamic Range (XDR) D-Zoom Yes(~16x) Wide Dynamic Range Yes(NTSC : 128x, PAL : 160x) • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100) High Speed Shutter 1/100~1/10K sec • Privacy Mask Function (12ea) D-Zoom Yes(~16x) • RS-485 (Halfl) Control (Multi-Protocol support) Sens Up / PIP / BLC Yes(2x ~ 512x) / Yes / Off/On • DIS (Digital Image Stabilization) High Speed Shutter 1/100~1/10K sec • Multi-Language OSD (E, F, G, S, I, J, R, P, C, etc) support AGC Off/On (Very Low / Low / Mid / High / Very High / User / Fix) • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100) Sens Up / PIP / BLC Yes(2x ~ 512x) / Yes / Off/On • Intelligent Video (Moved/Fixed/Fence/Tracking) Auto Focus Manual / Auto / one AF • RS-485 (Halfl) Control (Multi-Protocol support) AGC Off/On (Very Low / Low / Mid / High / Very High / User / Fix) • Preset 512 ea, Alarm Output 1 ea Syncronization Internal Internal/Line Lock • Multi-Language OSD (E, F, G, S, I, J, R, P, C, etc) support Auto Focus Manual / Auto / one AF • SCC-C4253 : DC12V Camera ID Max 54 Character, 2 Line • Intelligent Video (Moved/Fixed/Fence/Tracking) Syncronization Internal Internal/Line Lock SCC-C4353 : AC24V/DC12V XDR(eXtended Dynamic Range) Off/On (Low/Middle/High) • Preset 512 ea, Alarm Output 1 ea Camera ID Max 54 Character, 2 Line DNR(Digital Noise Reduction) Off / On (Low / Middle / High / User(3D/2D)) • SCC-C4255 : DC12V VPS(Virtual Progressive Scan) Yes Schedule Day / Time Schedule XDR(eXtended Dynamic Range) Off/On (Low/Middle/High) SCC-C4355 : AC24V/DC12V White Balance ATW1 / ATW2 / AWC(Manual) / 3200 / 5600 DNR(Digital Noise Reduction) Off / On (Low / Middle / High / User(3D/2D)) Video Output VBS 1.0Vp-p VBS 1.0Vp-p Schedule Day / Time Schedule Dimensions (unit:mm) S/N Ratio S/N Ratio 52 dB Dimensions (unit:mm) White Balance ATW1 / ATW2 / AWC(Manual) / 3200 / 5600 Lens Focal Length 3.2 ~ 138.5mm Video Output VBS 1.0Vp-p VBS 1.0Vp-p SCC-C4253 Min. Object Distance 100cm SCC-C4255 S/N Ratio S/N Ratio 52 dB Zoom Ratio 43x Optical (688x with 16x Digital zoom) Lens Focal Length 3.2 ~ 138.5mm Aperature Ratio F1.65(W)/F3.7(T) Min. Object Distance 100cm 59 59 Viewing Tele 1.47˚(H) x 1.10˚(V)0 Zoom Ratio 43x Optical (688x with 16x Digital zoom) Angle Wide 61.22˚(H) x 47.16˚(V) Aperature Ratio F1.65(W)/F3.7(T) 59 113.9 59 113.9 Lens Drive Type DC Auto Iris Viewing Tele 1.47˚(H) x 1.10˚(V)0 Mount Type Board-in type Angle Wide 61.22˚(H) x 47.16˚(V) OSD OSD Yes Lens Drive Type DC Auto Iris Alarm Output 1ea Mount Type Board-in type Remote Control RS485, CCVC OSD OSD Yes SCC-C4353 Environmental Operating Temperature -10˚C ~ +50˚C SCC-C4355 Alarm Output 1ea Conditions Operating Humidity Less than 90% Remote Control RS485, CCVC Power Power Requirement DC12V DC12V, AC24V Environmental Operating Temperature -10˚C ~ +50˚C 59 59 Power Consumption 4.2W 5.6W Conditions Operating Humidity Less than 90% LED Indicator Yes Power Power Requirement DC12V DC12V, AC24V 59 144.2 59 144.2 Physical Dimensions (WxHxD) 59x 59x113.9mm 59x 59x144.2mm Power Consumption 4.2W 5.6W Specification Weight 383g 508g LED Indicator Yes Color Silver Physical Dimensions (WxHxD) 59x 59x113.9mm 59x 59x144.2mm Specification Weight 383g 508g Color Silver Samsung Video Security System | 40 . 41
  • 21.
    Bullet type IRLED DayNight Camera Bullet type IR LED DayNight Camera SCC-B9371/B9372 SCC-B9270 SCC-B9373 Features Specifications Features Specifications • 1/3" 320K Pixels Super-HAD IT CCD Model SCC-B9270 • 1/3" 410K/470K Pixels Super-HAD IT CCD Model SCC-B9371 SCC-B9372 SCC-B9373 • 350 TV lines resolution Camera Type Color • 540(Color)/570(BW) TV lines resolution Camera Type Color • Min. scene illumination : 0 Lux with IR-LED(48pcs) Image Device 1/3" Super-HAD IT CCD • Min. scene illumination: Image Device 1/3" Super-HAD IT CCD • 4.3mm fixed iris lens built-in F2.0 Pixels Effective 500 x 582 SCC-B9371 : 0Lux with IR-LED(36pcs) Pixels Effective NTSC : 768 x 494 / PAL : 752 x 582 Min. Scene Color O Lux with IR-LED(48pcs) SCC-B9372 : 0Lux with IR-LED(42pcs) Min. Scene Color O Lux with IR-LED(36pcs) O Lux with IR-LED(42pcs) O Lux with IR-LED(42pcs) • No focus shift in night time (at LED turn on) Illumination B/W Viewable length at night : 40m SCC-B9373 : 0Lux with IR-LED(42pcs) Illumination B/W Viewable length at night:35m Viewable length at night:45m Viewable length at night:70m • Back light compensation Resolution Horizontal 350 TV Lines • Focal length & focus externally adjustable Resolution Horizontal 540(Color) / 570(BW) TV Lines • Water resistant (IP66) Vertical 350 TV Lines • DC iris level external adjustable Video Output VBS 1.0Vp-p • Size: 70(ø) x 104(L)mm Video Output VBS 1.0Vp-p • Viewable length at night : SCC-B9371 : 35m S/N Ratio 48 dB • DC12V, 110mA/450mA (IR LED On) SCC-B9372 : 45m S/N Ratio 48 dB Function AGC, BLC, ATW Function AGC, BLC, ATW SCC-B9373 : 70m Lens Focal Length 3.8 ~ 9.5mm 6~50mm Lens Focal Length 4.3mm • Back light compensation Aperture Ratio F1.2 F1.6 Aperture Ratio F2.0 • Water resistant (IP66) Viewing Tele 30.0˚(H) x 22.4˚(V) 30.0˚(H) x 22.4˚(V) 5.7˚(H) x 4.3˚(V) Viewing Angle Tele 73.7˚(H) x 47.3˚(V) • Size : SCC-B9371 : 73(ø) x 122(L)mm Angle Wide 74.2˚(H) x 54.0˚(V) 74.2˚(H) x 54.0˚(V) 43.9˚(H) x 33.2˚(V) Lens Drive Type Fixed Iris (ELC Function) SCC-B9372 : 77.5(ø) x 129(L)mm Lens Drive Type Vari-Focal Auto Iris Operating Temperature -10˚C ~ + 50˚C SCC-B9373 : 98(ø) x 162.5(L))mm Operating Temperature -10˚C ~ + 50˚C Dimensions (unit:mm) Operating Humidity Less than 90% • AC24V/DC12V : Operating Humidity Less than 90% Water resistant IP 66 SCC-B9371 : 210mA/600mA (IR LED On) Water Resistant IP 66 SCC-B9372 : 210mA/650mA (IR LED On) Power Requirement DC 12V Power Requirement AC 24V & DC 12V SCC-B9373 : 210mA/1.2A (IR LED On) Power Consumption 1.3W(Led Off) / 5.4W(Led On) Power Consumption 2.5W(Led Off)/7.2W(Led On) 2.5W(Led Off)/7.8W(Led On) 2.5W(Led Off)/14.4W(Led On) Dimension 70(ø) x 104(L)mm Dimension 73(ø) x 122(L)mm 77.5(ø) x 129(L)mm 98(ø) x 162.5(L)mm Weight 750g Weight 910g 1010g 2335g 110 70 82 125 Dimensions (unit:mm) 77 SCC-B9371 SCC-B9372 SCC-B9373 140 104 Samsung Video Security System | 42 . 43
  • 22.
    Anti-Vandal Dome IRLED DayNight Camera Anti Vandal Dome Camera SCC-B9374 SCC-931T Features Specifications Features Specifications • 1/3" 410K/470K Pixels Super-HAD IT CCD Model SCC-B9374 • Water resistant and dust resistant (IP66) Model SCC-931T SCC-931TP • 540(Color)/570(BW) TV lines resolution Camera Type Color • 1/4" 410K/470K Pixels Super HAD CCD Image Device 1/4" Super HAD CCD • Min. scene illumination : 0 Lux with IR-LED(18pcs) Image Device 1/3" Super-HAD IT CCD • 12x optical zoom lens (10x digital zoom) Effective Pixels 768(H) x 494(V) 752(H) x 582(V) • Vari-focal(3.8~9.5mm) auto iris lens built-in F1.2 Pixels Effective NTSC : 768 x 494 / PAL : 752 x 582 • Min. scene illumination : 0.005 Lux Scanning Method 2:1 Interlace • Color & B/W changing time selectable Min. Scene Color O Lux with IR-LED(18pcs) • RS-485 remote control Horizontal Resolution 480 TV Lines • IR LED Day/Night vision camera Illumination B/W Viewable Length at Night : 20m • AC24V / DC12V Synchronization Method Internal/Line lock • Real 3-axis gimbals bracket (2-Pan , 2-Tilt) Resolution Horizontal 540(Color) / 570(BW) TV Lines • Applicable Wall mount adaptor : SADT-101WM Min. Scene Illumination 0.005(Sens up 128x,15IRE)Lux Video Output VBS 1.0Vp-p Lens Zoom Ratio 12x Optical, 10x Digital • Viewable length at night(20m) S/N Ratio 48 dB Focal Length 3.6 ~ 43.2mm • Back light compensation Function AGC, BLC, ATW Viewing Tele 4.7˚(H) x 3.6˚(V) • Vandal resistant, water resistant (IP66) Lens Focal Length 3.8 ~ 9.5mm Angle Wide 52.8˚(H) x 40.3˚(V) • Service monitor (second video) built-in Aperture Ratio F1.2 Functions Shutter Speed Off ~ 1/10,000 sec • Size : 145(ø) x 100(L)mm Viewing Tele 30.0˚(H) x 22.4˚(V) Sens Up Max 128x (Auto/FIX/Off) • AC24V/DC12V, 210mA/420mA (IR LED On) Angle Wide 74.2˚(H) x 54.0˚(V) Dimensions (unit:mm) Motion Detection On/Off • Applicable Wall mount adaptor : SADT-937WM Lens Drive Type Vari-focal Auto Iris Focus AF/OneAF/Manual Operating Temperature -10˚C ~ + 50˚C White Balance ATW / AWC / Manual Operating Humidity Less than 90% Signal Output VBS 1.0Vp-p, 75ohm, BNC Water resistant IP 66 S/N Ratio 52dB Power Requirement AC 24V & DC 12V Remote Control RS-485(Half Duplex) Power Consumption 2.5W(Led Off) / 5W(Led On) Power Requirment AC24V / DC12V Compatible Dimension 145(ø) x 100(L)mm Weight 1,000g Dimensions (unit:mm) Weight 990g Dimensions 132(ø) x 95.3(D)mm Applicable Wall Mount Adaptor Installation Guide (Wall Surface) SADT-101WM SCC-931T + SADT-101WM Wall Mount Adaptor Gasket Body Anti Vandal Dome Camera (SCC-931T) Screw-Machine Samsung Video Security System | 44 . 45
  • 23.
    Anti Vandal 3-AxisDayNight, WDR Dome Camera DayNight Vari-Focal Dome Camera SCC-C9302(F) SCC-B5342/B5344 Features Specifications Features Specifications • Convenient installation, with its 3-axis turning design Model SCC-C9302(F) SCC-C9302(F)P • 1/3" SONY 410K/470K Pixels Super-HAD IT CCD Model SCC-B5342N/B5344N SCC-B5342P/B5344P (pan: 355˚, tilt: 20˚~ 90˚) Image Device 1/4" Ex-View CCD • Vari-Focal lens Camera Type Color/BW Color • Water resistant and dustproof (IP66) Effective Pixels 768(H) x 494(V) 752(H) x 582(V) SCC-B5342 : f=2.5~6mm Image Device 1/3" Super-HAD IT CCD • 1/4" 410K/470K Pixels Ex-View CCD Scanning Method 2:1 Interlace SCC-B5344 : f=2.9~10mm Pixels Effective 768 x 494 752 x 582 • Horizontal resolution : 480 TV lines Horizontal Resolution 480 TV Lines • Day/Night function (ICR) Scanning System Interlace • Min. scene illumination : 0.002(color)/0.0002(B/W) Lux Synchronization Method Internal/Line lock • High resolution : 540 TV lines Horizontal Internal Mode 15,734 15,625 • 120x zoom lens (12x optical, 10x digital) Min. Scene Color 0.002(Sens-up 160x,15IRE)Lux • DNR (Digital Noise Reduction) Frequency Line-lock Mode 15,750 15,625 • 128x WDR (Wide Dynamic Range) • Day/Night Illumination B/W 0.0002(Sens-up 160x,15IRE)Lux Vertical Internal Mode 59.94 50 • Motion Detection (zones and sensitivity level set by user) • Min. illumination : 0.0009 Lux (F1.2, 15IRE, Sens up 128x) Pan/Tilt Pan Angle 355˚ Frequency Line-lock Mode 60 50 • Alarm input : 1Ch / Alarm output : 1Ch • Dynamic CCD Defect Compensation • Privacy protection allows up to 8 privacy zones Tilt Angle 20˚~ 90˚ Resolution Horizontal 540(Color)/570(BW) TV Lines • 3-Way Gimbals Structure • Remote control through RS485 and RS422(using SSC-1000/5000) Lens Zoom Ratio 120x(12x Optical, 10x Digital) Min. Scene Illumination 0.12 Lux(15IRE, Off) 0.0009 Lux(15IRE, Sens-up 128x) Focal Length 3.6 ~ 43.2mm • AC24V/DC12V Dual Power (Line Lock) PAN/TILT Panning Left 255˚ / Right 100˚ / Total 355˚(Manual) • Applicable Wall mount adaptor : SADT-102WM Apeture Ratio F1.8(Wide), F2.6(Tele) Tilting 0 ~ 90˚(Manual) Viewing Tele 4.7˚(H) x 3.6˚(V) Functions Day/Night On/Off (ICR) Angle Wide 52.8˚(H) x 40.3˚(V) Sens Up On(128x) / Off Dimensions (unit:mm) Focus One/AF/Manual BLC On/Off SCC-C9302(for attaching to the ceiling) SCC-C9302F(for embedding into the ceiling) Functions Wide Dynamic Range Off/On(128x) Dimensions (unit:mm) AGC On/Off Day/Night Color/BW/Auto Line Lock On/Off Digital Zoom Off/On, PIP White Balance ATW/AWC Motion Detection Off/On(Area/Sensitivity Setting) Video Output VBS 1.0Vp-p VBS 1.0Vp-p Shutter Speed Off ~ 1/10,000 sec S/N Ratio 50 dB Sens Up Off/Auto(2x ~ 160x) Lens Focal Length SCC-B5342 : 2.5~6mm / SCC-B5344 : 2.9~10mm Installation Guide (Wall Surface) BLC Off/On(Area Setting) Viewing Tele SCC-B5342 : 46˚(H) x 34˚(V) / SCC-B5344 : 28.8˚(H) x 21.6˚(V) AGC Off/On Angle Wide SCC-B5342 : 108˚(H) x 80˚(V) / SCC-B5344 : 94.6˚(H) x 68.4˚(V) Screw (BH M4 X L22) Line Lock Yes Lens Drive Type DC Auto Iris Wall Mount Adaptor Camera ID Max. 20 Characters Mount Type Board-in type SCC-C9302 + SADT-102WM White Balance ATW1/ATW2/AWC/Manual Environmental Operating Temperature -10˚C ~ +50˚C Privacy Zone 8 Conditions Operating Humidity Less than 90% Gasket-102WM Signal Output VBS 1.0Vp-p, 74ohm, BNC Power Power Requirement 24 VAC ±10% / 12 VDC ±10% S/N Ratio 52dB Power Consumption 1.7W Input/Output Image Output 1 BNC Physical Dimensions 128(ø) x 91(H)mm Alarm Input 1 (No, 5mA Sink) Specification Weight 293g Alarm Output 1 (Open Collector) Color Body White External Connector Pin Specification Remote Control RS485(Half Duplx) CN52 : Camera power input and CN51 : RS485 control and Power Terminal Bolck(2-Pin) image signal output alarm output Operating Temperature -10˚C ~ 50˚C 1 Red Operating Humidity 90% RH 1 2 Orange Power Requirment AC24V / DC12V Compatible 2 3 Gray Yellow Power Consumption 6W 3 4 Green Weight 1,100g (880g) 4 5 Black Dimensions 150(ø) x 121(D)mm 6 Brown Appearance SCC-C9302 : Ceiling-mountable Pin no. Pin Spec Pin no. Pin Spec SCC-C9302F : Embedded into the ceiling 1 VBS_OUT 1 485_B(-) 2 GND 2 485_A(+) 3 AC24- 3 GND(COM) 4 AC24+ 4 Alram Input 5 GND 6 Alram Output Samsung Video Security System | 46 . 47
  • 24.
    DayNight Vari-Focal DomeCamera Super High-Resolution Mini Dome Camera High Resolution Color Camera SCC-B5343/B5345 SCC-B5223 SCC-B1311/B1011P Features Specifications Features Specifications • 1/3" SONY 410K/470K Pixels Super-HAD IT CCD Model SCC-B5343N/B5345N SCC-B5343P/B5345P • 1/3" SONY 410K/470K Pixels Super-HAD CCD Model SCC-B5223N SCC-B5223P • Vari-Focal lens Camera Type Color/BW Color • High Resolution : 600 TV Lines Camera Type Color/BW Color SCC-B5343 : f=2.5~6mm Image Device 1/3" Super-HAD IT CCD • Min. illumination 0.075 Lux (F2.0, 15 IRE, Sens-Up 4x, Color) Image Device 1/3" Super-HAD IT CCD SCC-B5345 : f=2.9~10mm Pixels Effective 768 x 494 752 x 582 • f=3.0 mm, Fixed Iris Lens Pixels Effective 768 x 494 752 x 582 • Day/Night function (ICR) Scanning System Interlace • Sens-Up Function (4x) Scanning System Interlace • High resolution : 540 TV lines Horizontal Internal Mode 15,734 15,625 • Motion Adaptive Digital Noise Reduction (3D+2D) Horizontal Internal Mode 15,734 Hz 15,625 Hz • DNR (Digital Noise Reduction) Frequency Line-lock Mode 15,750 15,625 • eXtended Dynamic Range (XDR) Frequency Line-lock Mode 15,750 Hz 15,625 Hz • Min. illumination : Vertical Internal Mode 59.94 50 Vertical Internal Mode 59.94 Hz 50 Hz • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100) Frequency Line-lock Mode 60 50 Frequency Line-lock Mode 60 Hz 50 Hz 0.0009(Color)/0.00009(BW) Lux (F1.2, 15IRE, Sens-up 128x) • Electronic Level Control (Manual Lens) Resolution Horizontal 540(Color)/570(BW) TV Lines Resolution Horizontal 600 TV Lines • Dynamic CCD Defect Compensation • Auto White Balance (ATW/AWC) Min. Scene Color 0.12 Lux(15IRE, Off) 0.0009 Lux(15IRE, Sens-up 128x) Min. Scene Sens-up off 0.3Lux(15IRE), 0.6Lux(30IRE), 1.0Lux(50IRE) @F2.0 • 3-Way Gimbals Structure • 3-Way Gimbals Structure Illumination BW 0.012 Lux(15IRE, Off) 0.00009 Lux(15IRE, Sens-up 128x) Illumination Sens-up 0.075Lux(15IRE), 0.15Lux(30IRE), 0.25Lux(50IRE) @F2.0 • AC24V/DC12V Dual Power (Line Lock) PAN/TILT Panning Left 255˚ / Right 100˚ / Total 355˚(Manual) • Mini Compact Size Functions Sens Up Auto 4x Tilting 0 ~ 90˚(Manual) • DC12V BLC Auto Functions Day/Night On/Off (ICR) AGC Auto Sens Up On(128x) / Off ELC On ( ~ 1/200Ksec) Dimensions (unit:mm) BLC On/Off White Balance ATW/AWC AGC On/Off Digital Noise Reduction Auto Line Lock On/Off Video Output VBS 1.0Vp-p VBS 1.0Vp-p White Balance ATW/AWC Dimensions (unit:mm) S/N Ratio 52 dB Video Output VBS 1.0Vp-p VBS 1.0Vp-p Lens Focal Length 3.0 mm S/N Ratio 50 dB Aperature Ratio F2.0 Lens Focal Length SCC-B5343 : 2.5~6mm / SCC-B5345 : 2.9~10mm Viewing Angle Wide 92˚(H) x 72˚(V) Viewing Tele SCC-B5343 : 46˚(H) x 34˚(V) / SCC-B5345 : 28.8˚(H) x 21.6˚(V) Lens Drive Type / Mount Type MANUAL / Board Type Angle Wide SCC-B5343 : 108˚(H) x 80˚(V) / SCC-B5345 : 94.6˚(H) x 68.4˚(V) Remote CCVC Yes (with SCX-RD100) Lens Drive Type DC Auto Iris Environmental Operating Temperature Absolute : -10˚C ~ +50˚C / Sustained : -20˚C ~ +60˚C Mount Type Board-in type Conditions Operating Humidity Less than 90% Environmental Operating Temperature -10˚C ~ +50˚C Power Power Requirement 12 VDC ±10% Conditions Operating Humidity Less than 90% Physical Dimensions 85(ø) x 54(H) mm Power Power Requirement 24 VAC ±10% / 12 VDC ±10% Specification Weight 120 g Power Consumption 1.7W Color Body Silver Physical Dimensions 128(ø) x 91(H)mm Specification Weight 293g Color Body White Samsung Video Security System | 48 . 49
  • 25.
    Super High-Resolution DayNightDome Camera SCC-B5331/B5333 Super High-Resolution DayNight High Resolution Color Camera Dome Camera SCC-B5335 SCC-B5366/B5368 SCC-B1311/B1011P Features Specifications Features Specifications • 1/3" SONY 410K/470K Pixels Super-HAD IT CCD Model SCC-B5331 SCC-B5333 SCC-B5335 • 1/3" SONY 410K/470K Pixels Super-HAD IT CCD Model SCC-B5366 SCC-B5368 • High Resolution : 600 TV Lines Camera Type Color/BW Color • High Resolution : 600 TV Lines Camera Type Color/BW Color • Min. illumination 0.0006Lux (F2.0, 15 IRE, Sens-Up 512x) Image Device 1/3" Super-HAD IT CCD • Min . illumination 0.00023Lux (F1.2, 15 IRE, Sens-Up 512x) Image Device 1/3" Super-HAD IT CCD SCC-B5331 : f=3.8 mm, Fixed Iris Lens Pixels Effective 768 x 494 / 752 x 582 • SCC-B5366 : f=2.5~6 mm, Auto Iris Lens Pixels Effective 768 x 494 / 752 x 582 SCC-B5333 : f=3.0 mm, Fixed Iris Lens Scanning System Interlace SCC-B5368 : f=2.8~11 mm, Auto Iris Lens Scanning System Interlace SCC-B5335 : f=8.0 mm, Fixed Iris Lens Horizontal Internal Mode 15,734 Hz / 15,625 Hz • Internal/Linelock (Phase Control) Function Horizontal Internal Mode 15,734 Hz / 15,625 Hz • Internal/Linelock (Phase Control) Function Frequency Line-lock Mode 15,750 Hz / 15,625 Hz • Day/Night Function (Soft), Sens-Up Function (512x) Frequency Line-lock Mode 15,750 Hz / 15,625 Hz • Day/Night Function (Soft), Sens-Up Function (512x) Vertical Internal Mode 59.94 Hz / 50 Hz • Motion Adaptive Digital Noise Reduction (3D+2D) Vertical Internal Mode 59.94 Hz / 50 Hz • Motion Adaptive Digital Noise Reduction (3D+2D) Frequency Line-lock Mode 60 Hz / 50 Hz Frequency Line-lock Mode 60 Hz / 50 Hz • Back Light Compensation (Area Setting) Resolution Horizontal 600 TV Lines Resolution Horizontal 600 TV Lines • Back Light Compensation (Area Setting) • Advanced Motion Detection Function Min. Scene Sens-up off 0.3Lux(15IRE), 0.6Lux(30IRE), 1.0Lux(50IRE) @F2.0 Min. Scene Sens-up off 0.12Lux(15 IRE), 0.2Lux(30 IRE), 0.4Lux(50 IRE) @F1.2 • Advanced Motion Detection Function • eXtended Dynamic Range (XDR) Illumination Sens-up 0.0006Lux(15IRE), 0.0012Lux(30IRE), 0.002Lux(50IRE) @F2.0 Illumination Sens-up 0.00023Lux(15 IRE), 0.0005Lux(30 IRE), 0.0008Lux(50 IRE) @F1.2 • eXtended Dynamic Range (XDR) • Privacy Mask Function (Polygonal Mosaic) Functions Number of Privacy Zone 12 (Polygonal Method) Functions Number of Privacy Zone 12 (Polygonal Method) • Privacy Mask Function (Polygonal Mosaic) Day/Night Color/BW/AUTO(Soft) • DIS (Digital Image Stabilization) Day/Night Color/BW/AUTO (Soft) • DIS (Digital Image Stabilization) Motion Detection Off/On • CCVC (Camera Control Via Coaxial cable, Controller: SCX-RD100) Motion Detection Off/On • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100) D-Zoom 1x ~ 16x (0.1x STEP) • Multi-Language OSD support D-Zoom 1x ~16x (0.1x STEP) • Intelligent Video (Moved / Fixed / Fence / Area / Tracking) Sens Up 2x ~ 512x • Intelligent Video (Moved / Fixed / Fence / Area / Tracking) High Speed Shutter 1/60~1/10Ksec(OSD) 1/50~1/10Ksec(OSD) • Multi-Language OSD support BLC / AGC Off/On / Off/On • 3-Way Gimbals Structure Sens Up 2x ~ 512x • 3-Way Gimbals Structure ELC Off/On ( ~ 1/200Ksec) • DC12V & AC24V 60Hz(50Hz) BLC / AGC Off/On / Off/On • DC12V & AC24V 60Hz(50Hz) Line Lock Off/On (Phase Control) Line Lock Off/On (Phase Control) Camera ID Off/On (Max.54ea/2Lines) Camera ID Off/On (Max.54ea/2Lines) White Balance ATW1/ATW2/AWC/MANUAL White Balance ATW1/ATW2/AWC/MANUAL eXtended Dynamic Range Off/Low/Mid/High eXtended Dynamic Range Off/Low/Mid/High Digital Noise Reduction Off/On Digital Noise Reduction Off/On Digital Image Stabilization Off/On Digital Image Stabilization Off/On Dimensions (unit:mm) Intelligent Video Off/On (Moved / Fixed / Fence / Area / Tracking) Dimensions (unit:mm) Intelligent Video Off/On (Moved / Fixed / Fence / Area / Tracking) PIP Off/On PIP Off/On Etc. Function Detail, Reverse(H/V), Posi/Nega Etc. Function Detail, Reverse(H/V), Posi/Nega Video Output VBS 1.0Vp-p VBS 1.0Vp-p Video Output VBS 1.0Vp-p VBS 1.0Vp-p S/N Ratio 52 dB S/N Ratio 52 dB Lens Focal Length f=3.8 mm f=3.0 mm f=8.0 mm Lens Focal Length 2.5~6mm 2.8~11mm Aperature Ratio F2.0 Aperature Ratio F1.2 Viewing Wide 71˚(H) x 53˚(V) 92˚(H) x 72˚(V) 72˚(H) x 25.3˚(V) Viewing Tele 46˚(H) x 34˚(V) 28.8˚(H) x 21.6˚(V) Angle Angle Wide 108˚(H) x 80˚(V) 94.6˚(H) x 68.4˚(V) Lens Drive Type / Mount Type MANUAL / Board Type Lens Drive Type / Mount Type AI(DC) / Board Type OSD Yes Remote CCVC Yes (with SCX-RD100) Remote Control CCVC Yes (with SCX-RD100) Control RS485 Yes (Multi Protocol, 8ea) Environmental Operating Temperature Absolute : -10˚C ~ +50˚C / Sustained : -20˚C ~ +60˚C Environmental Operating Temperature Absolute : -10˚C ~ +50˚C / Sustained : -20˚C ~ +60˚C Conditions Operating Humidity Less than 90% Conditions Operating Humidity Less than 90% Power Power Requirement 24 VAC ±10%/12 VDC ±10% Power Power Requirement 24 VAC ±10%/12 VDC ±10% Physical Dimensions(WxHxD) 102(ø) x 78(H) mm Physical Dimensions 128(ø) x 78(H) mm Specification Weight 220 g Specification Weight 330 g Color Body Silver Color Body White Samsung Video Security System | 50 . 51
  • 26.
    Super High-Resolution DayNightWDR Dome Camera Super High-Resolution DayNight Anti-Vandal Dome Camera SCC-B5367/B5369 SCC-B5396/B5398 Features Specifications Features Specifications • 1/3" SONY 410K/470K Pixels Super-HAD PS CCD Model SCC-B5367N/B5369N SCC-B5367P/B5369P • 1/3" SONY 410K/470K Pixels Super-HAD IT CCD Model SCC-B5396N/B5398N SCC-B5396P/B5398P • High Resolution : 600 TV Lines Camera Type Color/BW Color • High Resolution : 600 TV Lines Camera Type Color/BW Color • Min. illumination Image Device 1/3" Super-HAD PS CCD • Min. illumination 0.00023Lux (F1.2, 15 IRE, Sens-Up 512x) Image Device 1/3" Super-HAD IT CCD 0.00023Lux (F1.2, 15 IRE, Sens-Up 512x, Color) Pixels Effective 768 x 494 752 x 582 • SCC-B5396 : f=2.5~6 mm, Auto Iris Lens Pixels Effective 768 x 494 752 x 582 0.000023Lux (F1.2, 15 IRE, Sens-Up 512x, B/W)) Scanning System Interlace SCC-B5398 : f=2.8~11 mm, Auto Iris Lens Scanning System Interlace • SCC-B5367 : f=2.5~6 mm, Auto Iris Lens Horizontal Internal Mode 15,734 Hz 15,625 Hz • Internal/Linelock (Phase Control) Function Horizontal Internal Mode 15,734 Hz 15,625 Hz SCC-B5369 : f=2.8~11 mm, Auto Iris Lens Frequency Line-lock Mode 15,750 Hz 15,625 Hz • Day/Night Function (Soft), Sens-Up Function (512x) Frequency Line-lock Mode 15,750 Hz 15,625 Hz • Wide Dynamic Range (WDR) Vertical Internal Mode 59.94 Hz 50 Hz • Motion Adaptive Digital Noise Reduction (3D+2D) Vertical Internal Mode 59.94 Hz 50 Hz • Virtual Progressive Scan (VPS) Frequency Line-lock Mode 60 Hz 50 Hz Frequency Line-lock Mode 60 Hz 50 Hz • Back Light Compensation (Area Setting) Resolution Horizontal 600 TV Lines Resolution Horizontal 600 TV Lines • Internal/Linelock (Phase Control) Function • Advanced Motion Detection Function Min. Scene Color Sens-up off 0.12Lux(15IRE), 0.2Lux(30IRE), 0.4Lux(50IRE)@F1.2 Min. Scene Sens-up off 0.12Lux(15 IRE), 0.2Lux(30 IRE), 0.4Lux(50 IRE)@F1.2 • Day/Night Function (ICR), Sens-Up Function (512x) • eXtended Dynamic Range (XDR) Illumination Sens-up 0.00023Lux(15IRE), 0.0005Lux(30IRE), 0.0008Lux(50IRE)@F1.2 Illumination Sens-up 0.00023Lux(15 IRE), 0.0005Lux(30 IRE), 0.0008Lux(50 IRE)@F1.2 • Motion Adaptive Digital Noise Reduction (3D+2D) • Privacy Mask Function (Polygonal Mosaic) B/W Sens-up off 0.012Lux(15IRE), 0.02Lux(30IRE), 0.04Lux(50IRE)@F1.2 Functions Number of Privacy Zone 12 (Polygonal Method) • Back Light Compensation (Area Setting) Sens-up 0.000023Lux(15IRE), 0.00005Lux(30IRE), 0.00008Lux(50IRE)@F1.2 • DIS (Digital Image Stabilization) Day/Night Color/BW/AUTO(Soft) • Advanced Motion Detection Function Functions Number of Privacy Zone 12 (Polygonal Method) • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100) Motion Detection Off/On • eXtended Dynamic Range (XDR) Day/Night Color/BW/AUTO/EXT (ICR) • Multi-Language OSD support D-Zoom 1x ~16x (0.1x STEP) • Privacy Mask Function (Polygonal Mosaic) Motion Detection Off/On • Intelligent Video (Moved / Fixed / Fence / Area / Tracking) High Speed Shutter 1/60 ~ 1/10Ksec (OSD) 1/50 ~ 1/10Ksec (OSD) • DIS (Digital Image Stabilization) Wide Dynamic Range Off/On • Anti Vandal type, IP-66, Surface type Sens Up / BLC / AGC 2x ~ 512x / Off/On / Off/On • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100) D-Zoom 1x ~16x (0.1x STEP) • DC12V & AC24V 60Hz(50Hz) Line Lock / Anti Vandal Off/On (Phase Control) / Yes • Multi-Language OSD support High Speed Shutter 1/60 ~1/10Ksec(OSD) 1/50 ~ 1/10Ksec(OSD) • 3-Way Gimbals Structure Camera ID / White Balance Off/On (Max.54ea/2Lines) / ATW1/ATW2/AWC/MANUAL • Intelligent Video (Moved / Fixed / Fence / Area / Tracking) Sens Up / BLC / AGC 2x ~ 512x / Off/On / Off/On • Applicable Wall mount adaptor : SADT-102WM eXtended Dynamic Range Off/Low/Mid/High • 3-Way Gimbals Structure Line Lock / Camera ID Off/On (Phase Control) / Off/On (Max.54ea/2Line) Digital Noise Reduction Off/On White Balance ATW1/ATW2/AWC/MANUAL Digital Image Stabilization Off/On • DC12V & AC24V 60Hz(50Hz) eXtended Dynamic Range Off/Low/Mid/High Intelligent Video Off/On(Moved / Fixed / Fence / Area / Tracking) Digital Noise Reduction Off/On PIP Off/On Digital Image Stabilization Off/On Etc. Function Detail, Reverse(H/V), Posi/Nega Intelligent Video Off/On(Moved / Fixed / Fence / Area / Tracking) Video Output VBS 1.0Vp-p VBS 1.0Vp-p Dimensions (unit:mm) PIP Off/On Dimensions (unit:mm) S/N Ratio 52 dB Virtual Progressive Scan Off/On Lens Focal Length SCC-B5396 : 2.5~6mm / SCC-B5398 : 2.8~11mm Etc. Function Detail, Reverse(H/V), Posi/Nega Zoom ratio SCC-B5396 : 2.4x / SCC-B5398 : 3.4x Video Output VBS 1.0Vp-p VBS 1.0Vp-p Aperature Ratio F1.2 S/N Ratio 52 dB Viewing Tele SCC-B5396:46˚(H) x 34˚(V) / SCC-B5398:28.8˚(H) x 21.6˚(V) Lens Focal Length SCC-B5367:2.5~6mm / SCC-B5369:2.8~11mm Angle Wide SCC-B5396:108˚(H) x 80˚(V) / SCC-B5398:94.6˚(H) x 68.4˚(V) Aperature Ratio F1.2 Lens Drive Type / Mount Type AI(DC) / Board Type Viewing Tele SCC-B5367:46˚(H) x 34˚(V) / SCC-B5369:28.8˚(H) x 21.6˚(V) OSD Yes Angle Wide SCC-B5367:108˚(H) x 80˚(V) / SCC-B5369:94.6˚(H) x 68.4˚(V) Remote CCVC Yes (with SCX-RD100) Lens Drive Type / Mount Type AI(DC) / Board Type Control RS485 Yes (Multi Protocol, 8ea) OSD Yes Environmental Operating Temperature Absolute : -10˚C ~ +50˚C / Sustained : -20˚C ~ +60˚C Remote Control CCVC / RS485 Yes (with SCX-RD100) / Yes (Multi Protocol, 8ea) Conditions Operating Humidity Less than 90% Environmental Operating Temperature Absolute : -10˚C ~ +50˚C / Sustained : -20˚C ~ +60˚C Power Power Requirement 24 VAC ±10%/12 VDC ±10% Conditions Operating Humidity Less than 90% Physical Dimensions 150(ø) x 121(H) mm Power Power Requirement 24 VAC ±10%/12 VDC ±10% Specification Weight 1,000g Physical Dimensions 128(ø) x 78(H) mm Color Body White Specification Weight 330 g Color Body White Samsung Video Security System | 52 . 53
  • 27.
    Super High-Resolution WDRAnti-Vandal Dome Camera 22x Zoom SmartDome Camera SCC-B5397/B5399 SCC-641/643A Features Specifications Features Specifications • 1/3" SONY 410K/470K Pixels Super-HAD PS CCD Model SCC-B5397N/B5399N SCC-B5397P/B5399P • Accurately captures distant object with the maximum 220x zoom. Model SCC-641 SCC-643A • High Resolution : 600 TV Lines Camera Type Color/BW Color • Possible to connect up to a maximum of 256 cameras using the Image Device 1/4" Pixles Super HAD CCD • Min. illumination Image Device 1/3" Super-HAD PS CCD exclusive controller (SSC-1000) made by Samsung, which can Effective Pixels NTSC : 768(H) x 494(V) / PAL : 752(H) x 582(V) 0.0002Lux (F1.2, 15 IRE, Sens-Up 512x, Color) Pixels Effective 768 x 494 752 x 582 control a range of functions including pan, tilt, zoom, preset and Scanning Method 2:1 Interlace 0.00002Lux (F1.2, 15 IRE, Sens-Up 512x, B/W) Scanning System Interlace manual focus Scanning Line Horizontal NTSC : 15.750Hz / PAL : 15.625Hz • SCC-B5397 : f=2.5~6 mm, Auto Iris Lens Horizontal Internal Mode 15,734 Hz 15,625 Hz • Min. scene illumination : 0.005(color)/0.0005(B/W) Lux Frequency Vertical NTSC : 60Hz / PAL : 50Hz SCC-B5399 : f=2.8~11 mm, Auto Iris Lens Frequency Line-lock Mode 15,750 Hz 15,625 Hz • Day/Night (SCC-643A) Synchronization Method Internal/ Line Lock • Wide Dynamic Range (WDR) Vertical Internal Mode 59.94 Hz 50 Hz • Privacy zone (SCC-643A) Horizontal Resolution 480 TV Lines Frequency Line-lock Mode 60 Hz 50 Hz Min. Scene Color 0.005(Sens-up 128x, 15IRE)Lux • Virtual Progressive Scan (VPS) • Up to 128 preset points Resolution Horizontal 600 TV Lines Illumination B/W - 0.0005(Sens-up 128x,15IRE)Lux • Internal/Linelock (Phase Control) Function • 360˚ horizontal and 180˚ vertical turning while searching, Min. Scene Color Sens-up off 0.12Lux(15 IRE), 0.2Lux(30 IRE), 0.4Lux(50 IRE)@F1.2 Pan/Tilt Manual Pan Pan : 0.8˚~90˚/sec (64step) • Day/Night Function (ICR), Sens-Up Function (512x) at a maximum speed of 240˚/sec Illumination Sens-up 0.00023Lux(15 IRE), 0.0005Lux(30 IRE), 0.0008Lux(50 IRE)@F1.2 Tilt Speed Tilt : 0.8˚~45˚/sec (64step) • Motion Adaptive Digital Noise Reduction (3D+2D) • Motion detection Preset Pan/Tilt Speed Pan : Max 240˚/sec / Tilt : Max 150˚/sec B/W Sens-up off 0.012Lux(15 IRE), 0.02Lux(30 IRE), 0.04Lux(50 IRE)@F1.2 • Back Light Compensation (Area Setting) Sens-up 0.000023Lux(15 IRE), 0.00005Lux(30 IRE), 0.00008Lux(50 IRE)@F1.2 • Alarm Input: 4Ch, Alarm Output: 3Ch Pan/Tilt Range Pan : 360˚ Endless / Tilt : 0˚~ 90˚ • Advanced Motion Detection Function Functions Number of Privacy Zone 12 (Polygonal Method) • Horizontal resolution : 480 TV Lines Number of Preset 128 Presets • eXtended Dynamic Range (XDR) Day/Night Color/BW/AUTO/EXT (ICR) • Remote control through RS-485/RS-422 Number of Pattern 3 (30sec x 3) • Privacy Mask Function (Polygonal Mosaic) Motion Detection Off/On • Pan/tilt/zoom/focus can be controlled from a PC Lens Zoom Ratio 220x (22x Optical Zoom, 10x Digital Zoom) • DIS (Digital Image Stabilization) Wide Dynamic Range Off/On (separate software required) Focal Length 3.6~79.2mm • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100) D-Zoom 1x ~16x (0.1x STEP) • Applicable Wall mount adaptor : SADT-100WM Aperature Ratio F1.6(Wide), F3.8(Tele) • Multi-Language OSD support High Speed Shutter 1/60 ~1/10Ksec(OSD) 1/50 ~ 1/10Ksec(OSD) Viewing Tele 2.3˚(H) x 1.7˚(V) • Intelligent Video (Moved / Fixed / Fence / Area / Tracking) Sens Up / BLC / AGC 2x ~ 512x / Off/On / Off/On Angle Wide 47.9˚(H) x 36.9˚(V) Line Lock / Anti Vandal Off/On (Phase Control) / Yes Functions Sens Up 128x (Auto/Fix) • Anti Vandal type, IP-66, Surface type Camera ID / White Balance Off/On (Max.54ea/2Lines) / ATW1/ATW2/AWC/MANUAL Digital Effect H-Mirror, Picture in Picture (D Zoom) • DC12V & AC24V 60Hz(50Hz) eXtended Dynamic Range Off/Low/Mid/High White Balance ATW/AWC/Manual • 3-Way Gimbals Structure Digital Noise Reduction Off/On Dimensions (unit:mm) BLC On (Zone Setting, Position Designation)/ Off • Applicable Wall mount adaptor : SADT-102WM Privacy Zone - Possible to Set 8 Zones Digital Image Stabilization Off/On Intelligent Video / PIP Off/On(Moved / Fixed / Fence / Area / Tracking) / Off/On Signal Output VBS 1.0Vp-p(75 ohm, Composite) Virtual Progressive Scan Off/On S/N Ratio 52dB Dimensions (unit:mm) Etc. Function Detail, Reverse(H/V), Posi/Nega Input/Output Image Output BNC Video Output VBS 1.0Vp-p VBS 1.0Vp-p Remote Control RS-485(Half Duplex) / RS-422 S/N Ratio 52 dB Address Range 1~128 Lens Focal Length SCC-B5397 : 2.5~6mm / SCC-B5399 : 2.8~11mm Alarm Input 4 NO/NC(5mA Sink) Zoom ratio SCC-B5397 : 2.4x / SCC-B5399 : 3.4x Operating Temperature -10˚C ~ +50˚C Aperature Ratio F1.2 Operating Humidity Maximum 90% RH Viewing Tele SCC-B5397:46˚(H) x 34˚(V) / SCC-B5399:28.8˚(H) x 21.6˚(V) Power Requirment AC24V Angle Wide SCC-B5397:108˚(H) x 80˚(V) / SCC-B5399:94.6˚(H) x 68.4˚(V) Power Consumption 18W Lens Drive Type / Mount Type AI(DC) / Board Type Weight 2,000g OSD Yes Dimensions 159.5(ø) x 177(D)mm Remote Control CCVC / RS485 Yes (with SCX-RD100) / Yes (Multi Protocol, 8ea) Environmental Operating Temperature Absolute : -10˚C ~ +50˚C / Sustained : -20˚C ~ +60˚C Conditions Operating Humidity Less than 90% Power Power Requirement 24 VAC ±10%/12 VDC ±10% Physical Dimensions 150(ø) x 121(H) mm Specification Weight 1,000g Color Body White Samsung Video Security System | 54 . 55
  • 28.
    32x Zoom DayNightSmartDome Camera 22x Zoom DayNight WDR SmartDome Camera SCC-C6403 SCC-C6405 Features Specifications Features Specifications • 1/4" 410K/470K Pixels Super-HAD CCD Model SCC-C6403 SCC-C6403P • 22x motorized optical zoom with 10x digital zoom Model SCC-C6405 SCC-C6405P • DIS (Digital Image Stabilizer) Image Device 1/4" Super-HAD CCD 1/4" Super-HAD CCD • High-speed pan/tilt (400º/sec) Image Device 1/4" Ex-View HAD CCD • 320x zoom, through a combination of 32x optical zoom and Effective Pixels 768(H) x 494(V) 752(H) x 582(V) • 1/4” 410K/470K Pixels Ex-View HAD CCD Effective Pixels 768(H) x 494(V) 752(H) x 582(V) 10x digital zoom Scanning Method 2:1 Interlace • Horizontal resolution : 480 TV Lines Scanning Method Interlace • Min. scene illumination : 0.005(color)/0.0005(B/W) Lux Synchronization Method Internal/Line lock • DSP (Digital Signal Processor) Synchronization Method Internal/Line lock • Day/Night Horizontal Resolution 480 TV Lines • WDR (Wide Dynamic Range) Horizontal Resolution 480 TV Lines • 350˚ horizontal turning and 0~90˚ vertical turning while Min. Scene Color 0.005 (Sens-up 128x,15IRE)Lux • Day/Night Min. Scene Color 0.002(Sens-up 160x,15IRE)Lux Illumination B/W 0.0005 (Sens-up 128x,15IRE)Lux • External eynchronization with line lock Illumination B/W 0.0002(Sens-up 160x,15IRE)Lux searching, at a maximum speed of 400˚/sec (pan speed) Pan/Tilt Manual Pan/Tilt Speed Pan : 0.1˚ ~ 180˚/sec(64 Steps) / Tilt : 0.1˚ ~ 90˚/sec(64 Steps) Pan/Tilt Manual Pan/Tilt Speed Pan : 0.1˚/sec~180˚/sec(64step) / Tilt : 0.1˚/sec~90˚/sec(64step) • 128 preset points • Motion detection with alarming output Preset Pan/Tilt Speed Pan : 400˚/sec / Tilt : 200˚/sec Preset Pan/Tilt Speed Pan : 400˚/sec(Max) / Tilt : 200˚/sec(Max) • Alarm input : 4Ch, Alarm output : 3Ch • On-screen menus (multi-language) Preset Pan/Tilt Rage 350˚ Non-Endless Panning Range 360˚/sec(Endless) • Exclusive controller (SSC-1000/5000) • Innor rotor BLDC motor Pan/Tilt Range Pan : 350˚ / Tilt : 0˚~ 90˚ Tilt Range 0˚~ 180˚ - Remote control through RS485 and RS422 Number of Auto Pan 4 • Min. scene illumination : 0.002(color)/0.0002(B/W) Lux Number of Auto Pan 4 - Possible to connect up to a maximum of 256 cameras, Number of Preset 128 • 4 alarm inputs, 3 alarm outputs Number of Preset 128 and control a wide range of functions such as pan, tilt, Number of Pattern 2min x 3 • Privacy zone Number of Pattern 3 zoom, preset and manual focus Lens Zoom Ratio 320x(32x Optical, 10x Digital) • Applicable Accessories : SADT-100WM, SHG-120/220 Lens Zoom Ratio 22x • Applicable Accessories : SADT-100WM, SHG-120/220 Focal Length 3.55 ~ 113mm Focal Length 3.6 ~ 79.2mm Apeture Ratio Tele : F4.17, Wide : F1.69 Apeture Ratio F1.6(Wide), F3.8(Tele) Viewing Tele 1.78˚(H) x 1.34˚(V) Viewing Tele 2.3˚(H) x 1.7˚(V) Angle Wide 56.41˚(H) x 43.01˚(V) Angle Wide 47.9˚(H) x 36.9˚(V) Functions Day/Night Color/BW/Auto (ICR) Functions Wide Dynamic Range Off/On Dimensions (unit:mm) Shutter Speed Off ~ 1/10,000 sec Dimensions (unit:mm) Day/Night Color / BW / Auto (ICR) Sens Up 128x High Speed Shutter Off ~ 1/10Ksec BLC Off/On Sens Up Off ~ 160x AGC Off/Low/High BLC Off/On Line Lock Yes AGC Off/Low/High Camera ID Max. 20 Characters Line lock On/Off White Balance ATW1/ATW2/AWC/Manual Camera ID Off/On Signal Output VBS 1.0Vp-p, 74ohm, BNC White Balance ATW1/ATW2/AWC/Manual S/N Ratio 50dB Signal Output VBS 1.0Vp-p Input/Output Image Output 1 BNC S/N Ratio 50dB Alarm Input 4 NO/NC (5mA Sink) Input/Output Alarm Input 4 Power Connection Terminal Alarm Output 3 (2 Open Collector, 1 Relay) Alarm Output 3 Remote Controller Connection Terminal Remote Control RS485(Half & Full Duplx) / RS422 Remote Control RS485 / RS422 Power Terminal Block(3-Pin) Operating Temperature -10˚C ~ +50˚C Operating Temperature -10˚C ~ 50˚C Power Requirment AC24V Power Indication Image Output Terminal Operating Humidity Maximum 90% RH Power Consumption 18W Power Requirment AC24V Weight 1,700g Power Consumption 18W Dimensions 159.5(ø) x 177(D)mm Alarm Output Alarm Input Weight 1,700g Dimensions 159.5(ø) x 177(D)mm Samsung Video Security System | 56 . 57
  • 29.
    32x Zoom DayNightWDR SmartDome Camera SCC-C6407 :::::::::::::::::::::::::::::::::::::::::::::::::::: When Installing on the Ceiling When Installing on the Wall For Embedding For Indoor Use For Outdoor Use For Indoor Use For Outdoor Use Features Specifications Ceiling Mount Adaptor • 1/4" 410K/470K Pixels Ex-View CCD Model SCC-C6407 SCC-C6407P Ceiling (SADT-100CM) Ceiling Wall Mount Wall Mount • DIS (Digital Image Stabilizer) Mount Bracket Mount Adaptor Adaptor Adaptor Image Device 1/4" Ex-View CCD 1/4" Ex-View CCD (SBR-100DCM) (SADT-100CM) (SADT-100WM) (SADT-100WM) • 320x zoom, through a combination of 32x optical Zoom and Effective Pixels 768(H) x 494(V) 752(H) x 582(V) 10x digital zoom Scanning Method Interlace Scanning Line Horizontal 15.750KHz 15.625Hz Indoor Outdoor • Min. scene illumination : 0.002(color)/0.0002(B/W) Lux Housing Housing • Day/Night Frequency Vertical 60Hz 50Hz Indoor (SHG-120) (SHG-220) Housing Outdoor • 128x WDR (Wide Dynamic Range) Synchronization Method Internal/Line Lock (SHG-120) Housing Horizontal Resolution 480 TV Lines (SHG-220) • Possible to connect up to a maximum of 256 cameras using Min. Scene Color 0.002(Sens-up 160x,15IRE)Lux the exclusive controller (SSC-1000/5000), which can control Dome Camera Dome Camera Illumination B/W 0.0002(Sens-up 160x,15IRE)Lux Dome Camera Dome Camera Dome Camera (SCC-C6407) (SCC-C6407) a variety of functions such as pan, tilt, zoom, preset, pattern (SCC-C6407) (SCC-C6407) (SCC-C6407) Pan/Tilt Manual Pan/Tilt Speed Pan : 0.1 ~ 180˚/sec(64 steps) / Tilt : 0.1 ~ 90˚/sec(64 steps) and manual focus Preset Pan/Tilt Speed Pan : 400˚/sec / Tilt : 200˚/sec • 360° horizontal and 180° vertical turning, at a maximum Preset Pan/Tilt Rage Pan : 360˚(endless) / Tilt : 0˚~ -183˚ speed of 400°/sec Pan/Tilt Range Pan : 360˚ (endless) / Tilt : 0˚~ 180˚ • Maximum 128 preset Number of Auto Pan 4 • Motion detection (zones and sensitivity levels set by user) Number of Preset 128 • Alarm Input : 8ch, Alarm Output : 3ch Number of Pattern 3 (2min x3) Installation Accessories for SCC-C6407 • Maximum of 12 privacy zones Lens Zoom Ratio 320x (32x Optical, 10x Digital) • Remote control through RS485 and RS422 Focal Length 3.55 ~ 113mm SHG-120 (using SSC-1000/5000) Aperture Ratio Tele : F4.17, Wide : F1.69 Viewing Tele 1.78˚(H) x 1.34˚(V) Angle Wide 56.41˚(H) x 43.01˚(V) Functions Wide Dynamic Range Off/On(128x) Day/Night Color / BW / Auto / EXT (ICR) Motion Detection Off/On (Area/Sensitivity Setting) SHG-120/220 SADT-100WM SADT-100CM High Speed Shutter Yes (Off ~ 1/10K) SHG-220 Dimensions (unit:mm) Sens Up Off/Auto (2x ~ 160x) BLC / AGC Off/On / Off/On Line Lock Yes Camera ID Max. 20 Characters White Balance ATW1/ATW2/AWC/Manual Privacy Zone 12 Zones (Mosaic) SBR-100DCM SADT-110CM SADT-100PM SADT-100WM SBR-100DCM Signal Output VBS 1.0Vp-p(75 Ohm, Composite) S/N Ratio 50dB(AGC Off) Input/Output Image Output BNC Alarm Input 8 NO/NC (5mA Sink) Alarm Output 3 (Open Collector 1 Relay) Power Connection Terminal Remote Control RS485(Half & Full Duplex) / RS422 Remote Controller Connection Terminal Power Terminal Block(3-Pin) Operating Temperature -10˚C~ +50˚C SADT-100CM SADT-110CM SADT-100PM Power Indication Operating Humidity Maximum 90% RH Image Output Terminal Power Requirment AC24V Power Consumption 22W Weight 1,700g Alarm Output Alarm Input Dimensions 159.5(ø) x 177(D)mm Samsung Video Security System | 58 . 59
  • 30.
    High Resolution SmartDomeCamera SCC-C6433/C6435 ::::::::::::::::::::::::::::::::::::::::::::::::::: Installation Guide Ceiling Installation Pole Installation For Indoor use For Outdoor use Features Specifications For Embedding • 1/4" 410K/470K Pixels CCD For Indoor use For Outdoor use Model SCC-C6433 SCC-C6435 (Indoor use only) SADT-100PM • 32x optical zoom lens (16x D-zoom) Camera Type Color SADT-104WM SADT-103WM • High resolution : 540(Color) / 570(BW) TV Lines Image Device 1/4" Super HAD CCD 1/4" Ex-View HAD CCD SCC-C6433 • Day/Night Effective NTSC 768(H) x 494(V) 768(H) x 494(V) SCC-C6435 • Min. scene illumination : Pixels PAL 752(H) x 582(V) 752(H) x 582(V) SHG-222 SCC-C6433 : 0.002 Lux (15 IRE, Sens-up 256x, Color) Horizontal Resolution 540(Color) / 570(BW) TV Lines SADT-101EC : 0.0002 Lux (15 IRE, Sens-up 256x, B/W) Min. Scene Color 0.6 Lux(15IRE,Sens-up Off) 0.3 Lux(15IRE,Sens-up Off) SADT-100CM SCC-C6433 Illumination 0.002 Lux(15IRE, Sens-up 256x) 0.001 Lux(15IRE, Sens-up 256x) SCC-C6433 SCC-C6435 : 0.001 Lux (15 IRE, Sens-up 256x, Color) SCC-C6435 SCC-C6435 : 0.0001 Lux (15 IRE, Sens-up 256x, B/W) B/W 0.06 Lux(15IRE,Sens-up Off) 0.03 Lux(15IRE,Sens-up Off) • 128x(NTSC)/160x(PAL) WDR function (SCC-C6435 only) 0.0002 Lux(15IRE, Sens-up 256x) 0.0001 Lux(15IRE, Sens-up 256x) SADT-100HM • Full auto focus function PAN/TILT Speed Manual Pan 0.1~180˚/sec Pole (1.5" NPT) Installation Preset Pan 400˚/sec • Privacy mask zone (16 area) SHG-222 Manual Tilt 0.1~90˚/sec SCC-C6433 • Pan (max 400˚/sec), Tilt (200˚/sec) SCC-C6435 Preset Tilt 200˚/sec • 360˚ endless pan (Slip-ring), 0~180˚ tilt Range Panning 0~360˚ (Endless) SHG-222 • RTC function for schedule setting Tilting 0~180˚ SCC-C6433 • Multi-protocol (more than 8 companies), multi-OSD Number of Auto PAN 4 SCC-C6435 SCC-C6433 SCC-C6435 Number of Preset 128 Number of Pattern 3 Lens Focal Length 3.55 ~ 113mm Zoom Ratio 32x Optical, 16x Digital Wall Installation Corner Installation Aperture Ratio F1.69(W)/F4.17(T) Viewing Tele 1.78˚(H) x 1.34˚(V) For Indoor use For Outdoor use For Indoor use For Outdoor use Angle Wide 56.41˚(H) x 43.01˚(V) Functions Number of Privacy Zone 16 Dimensions (unit:mm) Day/Night Color/BW/Auto (ICR) SADT-110CM Line Lock INT/Line Lock SADT-104WM SADT-103WM SADT-104WM White Balance ATW1/ATW2/AWC/MANUAL SADT-103WM SCC-C6433 D-Zoom Yes (~16x) SCC-C6435 SCC-C6433 High Speed Shutter Yes (OFF ~ 1/10K) SCC-C6435 Motion Detection Yes SHG-222 SHG-222 Sens Up Yes (2x ~ 256x) Camera ID Max 20 Character Remote Control RS485(Half & Full Duplex) / RS422 SCC-C6433 SCC-C6433 SCC-C6435 Alarm Input 8 SCC-C6435 Output 3(Open Collector 1 relay) Wide Dynamic Range N/A Yes Video Output VBS 1.0Vp-p 157.7 S/N Ratio 50 dB Operating Temperature -10˚C ~ + 50˚C 233.5 Operating Humidity Less than 90% Power Requirement NTSC : AC24 V, 60Hz / PAL : AC24 V, 50Hz Power Consumption 19W 20W LED Indicator Yes Dimensions 177(ø) X 233.5(H)mm 177 Weight 2,400g Color Silver Samsung Video Security System | 60 . 61
  • 31.
    High Resolution SmartDomeCamera 36x Resolution Color Camera HighZoom SmartDomeCamera SCC-C7433/C7435 SCC-C7478/C7478C SCC-B1311/B1011P Features Specifications Features Specifications • 1/4" 410K/470K Pixels Ex-View HAD PS CCD (SCC-C7435) Model SCC-C7433 SCC-C7435 • 1/4" 410K/470K Pixels ExView-HAD PS CCD Model SCC-C7478/C7478C 1/4" 410K/470K Pixels Super HAD IT CCD (SCC-C7433) Camera Type Color • 36x(f=3.4~122.4 mm) Optical Zoom Lens(12x D-Zoom) Camera Type Color/BW Color • 32x optical zoom lens (16x D-zoom) Image Device 1/4" Super-HAD IT CCD 1/4" Ex-View HAD PS CCD • High-Resolution : 540(Color)/570(BW) TV Lines Image Device 1/4" ExView-HAD Progressive Scan CCD • High resolution : 540(Color)/570(BW) TV lines Effective Pixels NTSC : 768 x 494 / PAL : 752 x 582 Pixels Effective NTSC : 768 x 494 / PAL : 752 x 582 • Day/Night function(ICR) Resolution Horizontal 540(Color) / 570(BW) TV Lines • Day/Night Horizontal Resolution 540(Color)/570(BW) TV Lines • Full Auto Focus function Min. Scene Color/BW Illumination Sens-up Color B/W(S/W) • Min. scene illumination : Min. Scene Color 0.6Lux(15IRE,Sens-up Off) 0.3Lux(15IRE,Sens-up Off) • Privacy Mask Zone (8 Area) Illumination 50IRE Off 1.40Lux 0.15Lux SCC-C7435 : 0.001 Lux (15 IRE, Sens-up 256x, Color) Illumination 0.002Lux(15IRE, Sens-up 256x) 0.001Lux(15IRE, Sens-up 256x) • 360˚ Endless PAN (Slip-ring), 0~180˚ Tilt 30IRE Off 0.84Lux 0.09Lux SCC-C7433 : 0.002 Lux (15 IRE, Sens-up 256x, Color) B/W 0.06Lux(15IRE,Sens-up Off) 0.03Lux(15IRE,Sens-up Off) 15IRE Off 0.42Lux 0.0450Lux • PAN Speed(Max 360˚/sec), Tilt Speed(360˚/sec) 0.0002Lux(15IRE, Sens-up 256x) 0.0001Lux(15IRE, Sens-up 256x) 50IRE 64times 0.0219Lux 0.0023Lux • 128x(NTSC) / 160x(PAL) WDR function (SCC-C7435) • Multi-Protocol support(Pelco-P/D, Samsung) 30IRE 64times 0.0131Lux 0.0014Lux • Full auto focus function PAN/TILT Speed Manual Pan 0 ~180˚/sec • Remote Control : RS485/422 15IRE 64times 0.0066Lux 0.0007Lux Preset Pan 400˚/sec • Pan (max 400˚/sec), tilt (200˚/sec) • Alarm In(8ea)/Out(4ea) PAN/TILT Speed Manual Pan 0.05˚~360˚ Manual Tilt 0.1~90˚/sec Preset Pan 360˚ • 360˚ endless pan(slip-ring), 0~180˚ tilt • Time & Day Scheduling function Preset Tilt 200/sec Manual Tilt 0.05˚~360˚ • RTC function for schedule setting • Vector Driving(Pan/Tilt opreration simultaneously) Preset Tilt 360˚ Range Panning 0~360˚/sec (Endless) • Multi-protocol (more than 8 companies), multi-OSD Tilting 0~180˚ • AC24V Range Panning 0˚~360˚(Endless) • Remote control : RS485(half & full duplex) / RS-422 Tilting 180˚ Number of Auto PAN 4 Number of Auto PAN 8 • Operating temp : -45˚C~50˚C (with fan / heater) Number of Preset 128 Number of Preset 127 • Water / dust resistant (IP66) Number of Pattern 3 Number of Pattern 4 • Applicable bracket : SADT-100CM, SADT-103WM Lens Focal Length 3.55 ~ 113mm Lens Focal Length 3.4 ~ 122.4mm SADT-100PM, SADT-110CM Zoom ratio 32x Optical, 16x Digital Zoom Ratio 36x Optical, 12x D-Zoom Aperture Ratio F1.69(W)/F4.2(T) Dimensions (unit:mm) Aperature Ratio F1.6(W)/F4.5(T) Viewing Angle Tele 1.70˚(H) x 1.27˚(V) Viewing Tele 1.78˚(H) x 1.34˚(V) Wide 57.80˚(H) x 43.35˚(V) Angle Wide 56.41˚(H) x 43.01˚(V) Lens Drive Type DC Auto Iris SCC-C7478 Dimensions (unit:mm) Functions Number of Privacy Zone 16 Mount Type Board-in type Day/Night Color/BW/Auto (ICR) Functions Number of Privacy Zone 8 Line Lock INT/Line Lock Day/Night Auto / Day / Night (ICR) Wide Dynamic Range On / Off White Balance ATW1/ATW2/AWC/MANUAL D-Zoom Yes(~12x) D-Zoom Yes(~16x) High Speed Shutter 1/60 ~ 1/10,000 sec High Speed Shutter Yes (OFF ~ 1/10K) Sens Up Yes(2x~64x) Motion Detection Yes BLC On / Off Sens Up Yes(2x ~ 256x) AGC Auto/Manual(-3~28dB) Camera ID Max 20 Character Anti Vandal Yes Camera ID Dip switch adjustable Remote Control RS485(Half&Full Duplex) / RS422 White Balance Auto/Manual(Red, Blue Gain Adj.) Alarm Input 8 S/N Ratio More than 50 dB Output 3(Open Collector 1 relay) SCC-C7478C Video Output VBS 1.0Vp-p Wide Dynamic Range N/A Yes OSD OSD Yes Video Output VBS 1.0Vp-p VBS 1.0Vp-p Alarm Input 8 S/N Ratio 50 dB Output 4(Relay) Environmental Operating Temperature -45˚C ~ +50˚C 411 422 Operating Temperature -45˚C ~ + 50˚C Conditions Operating Humidity Less than 90% Operating Humidity Less than 90% Power Power Requirement AC24V, 24W(without Fan/Heater) / 57W(with Fan/Heater) Power Requirement NTSC : AC24V, 60Hz / PAL : AC24V, 50Hz Physical Dimensions Camera 259(Ø) x 265.7(H)mm Power Consumption 24W (Only Camera) / 55W (With Fan & Heater) Specification Weight Total 11,000g LED Indicator Yes Color Body Light Gray Dimensions 258(Ø) x 422(H)mm 168 Weight 5,950g 258 Color Silver Samsung Video Security System | 62 . 63
  • 32.
    10x Zoom MiniSmartDome Camera SCC-C6323/C6325 SCC-C7325 ::::::::::::::::::::::::::::::::::::::::::::::::: Specifications Model SCC-C6323 SCC-C6325 SCC-C7325 Camera Type Color/BW Color Image Device 1/4" Super-HAD IT CCD Features Pixels Effective NTSC : 768 x 494, PAL : 752 x 582 • 1/4" 410K/470K Pixels Super-HAD IT CCD • Multi-Protocol support Scanning System Interlace • 10x(f=3.8~38 mm) Optical Zoom Lens (10x D-Zoom) • Remote Control : RS485 Horizontal Frequency Internal Mode NTSC : 15,734Hz, PAL : 15,625Hz • High-Resolution : 520(Color)/570(BW) TV Lines • Time & Day Scheduling function Vertical Frequency Internal Mode NTSC : 59.94Hz, PAL: 50Hz • Min. illumination(15IRE, Sens-up 128x) : 0.0014 Lux(Color), 0.00014 Lux(B/W) • Vector Driving (Panning/Tilting operation simultaneously) Resolution Horizontal Color : 520TV Lines / BW : 570TV Lines • Day/Night function (ICR) • SCC-C6323 : Plastic case, Indoor, 142(Ø) x126(H)mm Min. Scene Sens-up Off Color 0.60Lux(50IRE), 0.36Lux(30IRE), 0.18Lux(15IRE) • Full Auto Focus function SCC-C6325 : Anti-Vandal, IP-66, 165(Ø) x162(H)mm Illumination B/W 0.06Lux(50IRE), 0.036Lux(30IRE), 0.018Lux(15IRE) • Privacy Mask Zone (4 Area) SCC-C7325 : Anti-Vandal, IP-66, Sunshield, F/H, 200(Ø) x 206(H)mm Sens-up 128x Color 0.0047Lux(50IRE), 0.0028Lux(30IRE), 0.0014Lux(15IRE) • 360˚ Endless PAN (Slip-ring), 0~180˚ Tilt (SCC-C6323:0~90˚) • AC24V/DC12V B/W 0.00047Lux(50IRE), 0.00028Lux(30IRE), 0.00014Lux(15IRE) PAN/TILT Speed Manual Pan 0.05˚/sec ~ 360˚/sec • PAN Speed (Max 360˚/sec), Tilt Speed (360˚/sec) Preset Pan 360˚/sec Manual Tilt 0.05˚/sec ~ 360˚/sec Preset Tilt 360˚/sec Range Panning 0˚~360˚ (Endless) Dimensions (unit:mm) Tilting 90˚ 180˚ Number of Auto PAN 8 SCC-C6323 SCC-C6325 SCC-C7325 Number of Preset 127 14 2 Number of Pattern 4 40 Lens Focal Length / Zoom ratio 3.8mm ~ 38mm / 10x Optical, 10x D-Zoom 44.5 Aperature Ratio F1.8(W) / F2.8(T) Viewing Angle Tele / Wide 5.58˚(H) x 4.27˚(V) / 51.2˚(H) x 39.3˚(V) 50.35 Lens Drive Type / Mount Type DC Auto Iris / Board-in type 100.5 Functions Number of Privacy Zone 4 139 Day/Night Auto / Day / Night (ICR) D-Zoom Yes (~10x) High Speed Shutter NTSC : Yes (1/60~ 1/120,000 sec), PAL : Yes (1/50 ~ 1/120,000 sec) Sens Up OFF/AUTO BLC LOW/MIDDLE/HIGH/OFF AGC NORMAL/HIGH/OFF Easy Installation Anti Vandal No Yes Yes Camera ID dip switch adjustable White Balance Auto/Manual (Red,Blue Gain Adj.) SCC-C6323 SCC-C6325 SCC-C7325 Video Output VBS 1.0Vp-p S/N Ratio 50dB (AGC off) OSD Yes Alarm Input / Output 2 / 1 (relay) + + Remote Control RS 485 Environmental Operating Temperature -10˚C~+50˚C -10˚C~+50˚C AC24V:-40˚C~+50˚C / DC12V:-15˚C~+50˚C Pendant Mount Wall Mount Conditions Operating Humidity Less than 90% (SADT-732CM) (SADT-732WM) Power Power Requirement NTSC : DC12V / AC24V 60Hz, PAL : DC12V / AC24V 50Hz Surface Installation or using Wall Mount Adaptor Power Consumption AC24V(10W) / DC12V(8W) AC24V : Heater Off(10W) / On(21W) DC12V : Heater Off(8W) / On(12W) Physical Dimensions 142(Ø) x 126(H)mm / 142(Ø) x 4.9(H)inch 165(Ø) x 162(H)mm / 165(Ø) x 6.3(H)inch 200(Ø) x 206(H)mm / 200(Ø) x 8.1(H)inch + + NPT-1.5" Specification Weight 600g (1.3 lb) 1,850g (4.0lb) 2,400g (5.2lb) (standard) Wall Mount : Color Body White SADT-937WM * SCC-C6325 IP66 Rating Indoor/Outdoor Application, SCC-C7325 IP66 Rating Outdoor Application Samsung Video Security System | 64 . 65
  • 33.
    34x Optical ZoomHigh Speed Dome Camera SCC-C6437/C6439 NEW Specifications Model SCC-C6437 SCC-C6439 Camera Type Color/BW Color Image Device 1/4" Super-HAD IT CCD 1/4" ExView-HAD PS CCD Features Pixels Effective 768 x 494 (NTSC) / 752 x 582 (PAL) • 1/4" SONY 410K/470K Pixels Super-HAD IT CCD (SCC-C6437) • Adaptive Digital Noise Reduction (3D + 2D) Resolution Horizontal 600 TV Lines 1/4" SONY 410K/470K Pixels Ex-View HAD PS CCD (SCC-C6439) • Back Light Compensation (Area Setting) Min. Scene Color Sens-up Off 0.6Lux(15IRE), 1.2Lux(30IRE), 2Lux(50IRE) 0.3Lux(15IRE), 0.7Lux(30IRE), 1.2Lux(50IRE) • 34x Optical & 16x(0.1step) Digital Zoom • Advanced Motion Detection Function Illumination Sens up 512x 0.001Lux(15IRE) , 0.002Lux(30IRE), 0.004Lux(50IRE) 0.0007Lux(15IRE), 0.001Lux(30IRE), 0.002Lux(50IRE) • High Resolution : 600 TV Lines • eXtended Dynamic Range (XDR) B/W Sens-up Off 0.06Lux(15IRE), 0.12Lux(30IRE), 0.2Lux(50IRE) 0.03Lux(15IRE), 0.07Lux(30IRE), 0.12Lux(50IRE) • Min. illumination 0.0007 Lux (F1.2, 15 IRE, Sens-up 512x, Color) • Privacy Mask Function (12ea) Sens up 512x 0.0001Lux(15IRE), 0.0002Lux(30IRE), 0.0004Lux(50IRE) 0.00007Lux(15IRE), 0.0001Lux(30IRE), 0.0002Lux(50IRE) 0.00007 Lux (F1.2, 15 IRE, Sens-up 512x, B/W) • DIS (Digital Image Stabilization) • Time & Day Scheduling Pan/Tilt Speed Manual Pan 0.01˚/sec ~ 180˚/sec • 0~360º Endless Pan, -6~186º Tilting (D-Flip) • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100) Preset Pan 600˚/sec • Pan/Tilt Speed Min. 0.01º/sec, Max. 600º/sec • RS-485 (Half/Full)/RS-422 Control (Multi-Protocol support) Manual Tilt 0.01˚/sec ~ 180˚/sec Preset Tilt 600˚/sec • Preset 512 ea, Auto Pan 4 ea, Pattern 3 ea • Multi-Language OSD (E, F, G, S, I, J, R, P, C, etc) support Range Panning / Tilting 0˚~360˚(Endless) / -6˚~186˚ • Wide Dynamic Range (NTSC 128x, PAL 160x) : SCC-C6439 Only • Intelligent Video (Moved/Fixed/Fence/Tracking) Number of Auto PAN 4 ea • Virtual Progressive Scan (VPS) : SCC-C6439 Only • Alarm Input 8 ea, Output 4 ea Number of Preset 512 ea • Day Night Function (ICR), Sens-up Function (512x) • Operating Temp. : -10 ~ 50˚C Number of Pattern 3 ea Functions Number of Privacy Zone 12 ea Day/Night / Motion Detection Auto / Day / Night(ICR) / Yes, Sensitivity 1~7 Level Wide Dynamic Range - Yes (NTSC:128x, PAL:160x) Dimensions (unit:mm) D-Zoom / High Speed Shutter Yes(~16x) / 1/100~1/10K sec Sens Up / BLC Yes(2x ~ 512x) / Off/On 178 AGC Off/On (Very Low / Low / Mid / High / Very High / User / Fix) Auto Focus Manual / Auto (pan, tilt, zoom linked) / one AF Syncronization Internal / Line lock 140 Camera ID Max 54 Character, 2 Line 219 VPS(Virtual Progressive Scan) - Yes XDR(eXtended Dynamic Range) Off/On(Low/Middle/High) DNR(Digital Noise Reduction) Off/On(Low/Middle/High/User(3D/2D)) Schedule Day / Time Schedule 171 White Balance ATW1 / ATW2 / AWC(Manual) / 3200 / 5600 Video Output VBS 1.0Vp-p VBS 1.0Vp-p S/N Ratio 52 dB Lens Focal Length / Min. Object Distance 3.4 ~ 115.6mm / 100cm Zoom Ratio / Aperature Ratio 34x Optical (688x with 16x Digital zoom) / F1.65(W)/F3.7(T) Viewing Angle Tele 1.47˚(H) x 1.10˚(V)0 Wide 61.22˚(H) x 47.16˚(V) Lens Drive Type / Mount Type DC Auto Iris / Board-in type OSD Yes Alarm Input / Output 8 ea / 3 ea (2 Open Collector, 1 relay) Remote Control RS485(Half/Full Duplex)/RS422, CCVC Environmental Operating Temperature -10˚C ~ +50˚C Conditions Operating Humidity Less than 90% Power Power Requirement 24 VAC Power Consumption 11W LED Indicator Yes Physical Dimensions 178(Ø) x 219(H)mm Specification Weight 2.0kg Color Light Gray Samsung Video Security System | 66 . 67
  • 34.
    34x Optical ZoomHigh Speed Dome Camera SCC-C7437/C7439 NEW Specifications Model SCC-C7437 SCC-C7439 Camera Type Color/BW Color Image Device 1/4" Super-HAD IT CCD 1/4" ExView-HAD PS CCD Features Pixels Effective 768 x 494 (NTSC) / 752 x 582 (PAL) • 1/4" SONY 410K/470K Pixels Super-HAD IT CCD (SCC-C7437) • Adaptive Digital Noise Reduction (3D + 2D) Resolution Horizontal 600 TV Lines 1/4" SONY 410K/470K Pixels Ex-View HAD PS CCD (SCC-C7439) • Back Light Compensation (Area Setting) Min. Scene Color Sens-up Off 0.6Lux(15IRE), 1.2Lux(30IRE), 2Lux(50IRE) 0.3Lux(15IRE), 0.7Lux(30IRE), 1.2Lux(50IRE) • 34x Optical & 16x(0.1step) Digital Zoom • Advanced Motion Detection Function Illumination Sens up 512x 0.001Lux(15IRE) , 0.002Lux(30IRE), 0.004Lux(50IRE) 0.0007Lux(15IRE), 0.001Lux(30IRE), 0.002Lux(50IRE) • High Resolution : 600 TV Lines • eXtended Dynamic Range (XDR) B/W Sens-up Off 0.06Lux(15IRE), 0.12Lux(30IRE), 0.2Lux(50IRE) 0.03Lux(15IRE), 0.07Lux(30IRE), 0.12Lux(50IRE) • Min. illumination 0.0007 Lux (F1.2, 15 IRE, Sens-up 512x, Color) • Privacy Mask Function (12ea) Sens up 512x 0.0001Lux(15IRE), 0.0002Lux(30IRE), 0.0004Lux(50IRE) 0.00007Lux(15IRE), 0.0001Lux(30IRE), 0.0002Lux(50IRE) 0.00007 Lux (F1.2, 15 IRE, Sens-up 512x, B/W) • DIS (Digital Image Stabilization) • Time & Day Scheduling Pan/Tilt Speed Manual Pan 0.01˚/sec ~ 180˚/sec • 0~360º Endless Pan, -6~186º Tilting (D-Flip) • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100) Preset Pan 600˚/sec • Pan/Tilt Speed Min. 0.01º/sec, Max. 600º/sec • RS-485 (Half/Full)/RS-422 Control (Multi-Protocol support) Manual Tilt 0.01˚/sec ~ 180˚/sec • Preset 512 ea, Auto Pan 4 ea, Pattern 3 ea • Multi-Language OSD (E, F, G, S, I, J, R, P, C, etc) support Preset Tilt 600˚/sec • Wide Dynamic Range (NTSC 128x, PAL 160x) : SCC-C7439 Only • Intelligent Video (Moved/Fixed/Fence/Tracking) Range Panning / Tilting 0˚~360˚(Endless) / -6˚~186˚ • Virtual Progressive Scan (VPS) : SCC-C7439 Only • Alarm Input 8 ea, Output 4 ea Number of Auto PAN 4 ea • Day Night Function (ICR), Sens-up Function (512x) • Operating Temp. : -50 ~ 50˚C Number of Preset 512 ea Number of Pattern 3 ea Functions Number of Privacy Zone 12 ea Day/Night / Motion Detection Auto / Day / Night(ICR) / Yes, Sensitivity 1~7 Level Wide Dynamic Range - Yes (NTSC:128x, PAL:160x) Dimensions (unit:mm) D-Zoom / High Speed Shutter Yes(~16x) / 1/100~1/10K sec Sens Up / BLC Yes(2x ~ 512x) / Off/On AGC Off/On (Very Low / Low / Mid / High / Very High / User / Fix) Auto Focus Manual / Auto (pan, tilt, zoom linked) / one AF Syncronization Internal / Line lock 256 Camera ID Max 54 Character, 2 Line 240 VPS(Virtual Progressive Scan) - Yes XDR(eXtended Dynamic Range) Off/On(Low/Middle/High) DNR(Digital Noise Reduction) Off/On(Low/Middle/High/User(3D/2D)) Schedule Day / Time Schedule 228 White Balance ATW1 / ATW2 / AWC(Manual) / 3200 / 5600 Video Output VBS 1.0Vp-p VBS 1.0Vp-p S/N Ratio 52 dB Lens Focal Length / Min. Object Distance 3.4 ~ 115.6mm / 100cm Easy Installation Zoom Ratio / Aperature Ratio 34x Optical (688x with 16x Digital zoom) / F1.65(W)/F3.7(T) Viewing Angle Tele 1.47˚(H) x 1.10˚(V)0 Wide 61.22˚(H) x 47.16˚(V) Lens Drive Type / Mount Type DC Auto Iris / Board-in type OSD Yes Alarm Input / Output 8 ea / 3 ea (2 Open Collector, 1 relay) Remote Control RS485(Half/Full Duplex) / RS422, CCVC Environmental Operating Temperature -50˚C ~ +50˚C Conditions Operating Humidity Less than 90% Power Power Requirement 24 VAC Power Consumption 16W / 47W(with fan/Heater) LED Indicator Yes Physical Dimensions 228(Ø) x 256(H)mm Specification Weight 3.0kg Color Light Gray Samsung Video Security System | 68 . 69
  • 35.
    43x Optical ZoomHigh Speed Dome Camera SCC-C6453/C6455 NEW Specifications Model SCC-C6453 SCC-C6455 Camera Type Color/BW Color Image Device 1/4" Super-HAD IT CCD 1/4" ExView-HAD PS CCD Features Pixels Effective 768 x 494 (NTSC) / 752 x 582 (PAL) • 1/4" SONY 410K/470K Pixels Super-HAD IT CCD (SCC-C6453) • Adaptive Digital Noise Reduction (3D + 2D) Resolution Horizontal 600 TV Lines 1/4" SONY 410K/470K Pixels Ex-View HAD PS CCD (SCC-C6455) • Back Light Compensation (Area Setting) Min. Scene Color Sens-up Off 0.6Lux(15IRE), 1.2Lux(30IRE), 2Lux(50IRE) 0.3Lux(15IRE), 0.7Lux(30IRE), 1.2Lux(50IRE) • 43x Optical & 16x(0.1step) Digital Zoom • Advanced Motion Detection Function Illumination Sens up 512x 0.001Lux(15IRE) , 0.002Lux(30IRE), 0.004Lux(50IRE) 0.0007Lux(15IRE), 0.001Lux(30IRE), 0.002Lux(50IRE) • High Resolution : 600 TV Lines • eXtended Dynamic Range (XDR) B/W Sens-up Off 0.06Lux(15IRE), 0.12Lux(30IRE), 0.2Lux(50IRE) 0.03Lux(15IRE), 0.07Lux(30IRE), 0.12Lux(50IRE) • Min. illumination 0.0007 Lux (F1.2, 15 IRE, Sens-up 512x, Color) • Privacy Mask Function (12ea) Sens up 512x 0.0001Lux(15IRE), 0.0002Lux(30IRE), 0.0004Lux(50IRE) 0.00007Lux(15IRE), 0.0001Lux(30IRE), 0.0002Lux(50IRE) 0.00007 Lux (F1.2, 15 IRE, Sens-up 512x, B/W) • DIS (Digital Image Stabilization) • Time & Day Scheduling Pan/Tilt Speed Manual Pan 0.01˚/sec ~ 180˚/sec • 0~360º Endless Pan, -6~186º Tilting (D-Flip) • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100) Preset Pan Max. 600o/sec • Pan/Tilt Speed Min. 0.01º/sec, Max. 600º/sec • RS-485 (Half/Full)/RS-422 Control (Multi-Protocol support) Manual Tilt 0.01˚/sec ~ 180˚/sec Preset Tilt 600˚/sec • Preset 512 ea, Auto Pan 4 ea, Pattern 3 ea • Multi-Language OSD (E, F, G, S, I, J, R, P, C, etc) support Range Panning / Tilting 0˚~360˚(Endless) / -6˚~186˚ • Wide Dynamic Range (NTSC 128x, PAL 160x) : SCC-C6455 Only • Intelligent Video (Moved/Fixed/Fence/Tracking) Number of Auto PAN 4 ea • Virtual Progressive Scan (VPS) : SCC-C6455 Only • Alarm Input 8 ea, Output 4 ea Number of Preset 512 ea • Day Night Function (ICR), Sens-up Function (512x) • Operating Temp. : -10 ~ 50˚C Number of Pattern 3 ea Functions Number of Privacy Zone 12 ea Day/Night / Motion Detection Auto / Day / Night(ICR) / Yes, Sensitivity 1~7 Level Wide Dynamic Range - Yes (NTSC:128x, PAL:180x) Dimensions (unit:mm) D-Zoom / High Speed Shutter Yes(~16x) / 1/100~1/10K sec Sens Up / BLC Yes(2x ~ 512x) / Off/On 178 AGC Off/On (Very Low / Low / Mid / High / Very High / User / Fix) Auto Focus Manual / Auto (pan, tilt, zoom linked) / one AF Syncronization Internal / Line lock 140 Camera ID Max 54 Character, 2 Line 219 VPS(Virtual Progressive Scan) - Yes XDR(eXtended Dynamic Range) Off/On(Low/Middle/High) DNR(Digital Noise Reduction) Off/On(Low/Middle/High/User(3D/2D)) Schedule Day / Time Schedule 171 White Balance ATW1 / ATW2 / AWC(Manual) / 3200 / 5600 Video Output VBS 1.0Vp-p VBS 1.0Vp-p S/N Ratio 52 dB Lens Focal Length / Min. Object Distance 3.2 ~ 138.5mm / 100cm Zoom Ratio / Aperature Ratio 43x Optical (688x with 16x Digital zoom) / F1.65(W)/F3.7(T) Viewing Angle Tele 1.47˚(H) x 1.10˚(V)0 Wide 61.22˚(H) x 47.16˚(V) Lens Drive Type / Mount Type DC Auto Iris / Board-in type OSD Yes Alarm Input / Output 8 ea / 3 ea (2 Open Collector, 1 relay) Remote Control RS485(Half/Full Duplex)/RS422, CCVC Environmental Operating Temperature -10˚C ~ +50˚C Conditions Operating Humidity Less than 90% Power Power Requirement 24 VAC Power Consumption 11W LED Indicator Yes Physical Dimensions 178(Ø) x 219(H)mm Specification Weight 2.0kg Color Light Gray Samsung Video Security System | 70 . 71
  • 36.
    43x Optical ZoomHigh Speed Dome Camera SCC-C7453/C7455 NEW Specifications Model SCC-C7453 SCC-C7455 Camera Type Color/BW Color Image Device 1/4" Super-HAD IT CCD 1/4" ExView-HAD PS CCD Features Pixels Effective 768 x 494 (NTSC) / 752 x 582 (PAL) • 1/4" SONY 410K/470K Pixels Super-HAD IT CCD (SCC-C7453) • Adaptive Digital Noise Reduction (3D + 2D) Resolution Horizontal 600 TV Lines 1/4" SONY 410K/470K Pixels Ex-View HAD PS CCD (SCC-C7455) • Back Light Compensation (Area Setting) Min. Scene Color Sens-up Off 0.6Lux(15IRE), 1.2Lux(30IRE), 2Lux(50IRE) 0.3Lux(15IRE), 0.7Lux(30IRE), 1.2Lux(50IRE) • 43x Optical & 16x(0.1step) Digital Zoom • Advanced Motion Detection Function Illumination Sens up 512x 0.001Lux(15IRE) , 0.002Lux(30IRE), 0.004Lux(50IRE) 0.0007Lux(15IRE), 0.001Lux(30IRE), 0.002Lux(50IRE) • High Resolution : 600 TV Lines • eXtended Dynamic Range (XDR) B/W Sens-up Off 0.06Lux(15IRE), 0.12Lux(30IRE), 0.2Lux(50IRE) 0.03Lux(15IRE), 0.07Lux(30IRE), 0.12Lux(50IRE) • Min. illumination 0.0007 Lux (F1.2, 15 IRE, Sens-up 512x, Color) • Privacy Mask Function (12ea) Sens up 512x 0.0001Lux(15IRE), 0.0002Lux(30IRE), 0.0004Lux(50IRE) 0.00007Lux(15IRE), 0.0001Lux(30IRE), 0.0002Lux(50IRE) 0.00007 Lux (F1.2, 15 IRE, Sens-up 512x, B/W) • DIS (Digital Image Stabilization) • Time & Day Scheduling Pan/Tilt Speed Manual Pan 0.01˚/sec ~ 180˚/sec • 0~360º Endless Pan, -6~186º Tilting (D-Flip) • CCVC (Camera Control Via Coaxial cable, Controller : SCX-RD100) Preset Pan 600˚/sec • Pan/Tilt Speed Min. 0.01º/sec, Max. 600º/sec • RS-485 (Half/Full)/RS-422 Control (Multi-Protocol support) Manual Tilt 0.01˚/sec ~ 180˚/sec • Preset 512 ea, Auto Pan 4 ea, Pattern 3 ea • Multi-Language OSD (E, F, G, S, I, J, R, P, C, etc) support Preset Tilt 600˚/sec • Wide Dynamic Range (NTSC 128x, PAL 160x) : SCC-C7455 Only • Intelligent Video (Moved/Fixed/Fence/Tracking) Range Panning / Tilting 0˚~360˚(Endless) / -6˚~186˚ • Virtual Progressive Scan (VPS) : SCC-C7455 Only • Alarm Input 8 ea, Output 4 ea Number of Auto PAN 4 ea • Day Night Function (ICR), Sens-up Function (512x) • Operating Temp. : -50 ~ 50˚C Number of Preset 512 ea Number of Pattern 3 ea Functions Number of Privacy Zone 12 ea Day/Night / Motion Detection Auto / Day / Night(ICR) / Yes, Sensitivity 1~7 Level Wide Dynamic Range - Yes (NTSC:128x, PAL:180x) Dimensions (unit:mm) D-Zoom / High Speed Shutter Yes(~16x) / 1/100~1/10K sec Sens Up / BLC Yes(2x ~ 512x) / Off/On AGC Off/On (Very Low / Low / Mid / High / Very High / User / Fix) Auto Focus Manual / Auto (pan, tilt, zoom linked) / one AF Syncronization Internal / Line lock 256 Camera ID Max 54 Character, 2 Line 240 VPS(Virtual Progressive Scan) - Yes XDR(eXtended Dynamic Range) Off/On(Low/Middle/High) DNR(Digital Noise Reduction) Off/On(Low/Middle/High/User(3D/2D)) Schedule Day / Time Schedule 228 White Balance ATW1 / ATW2 / AWC(Manual) / 3200 / 5600 Video Output VBS 1.0Vp-p VBS 1.0Vp-p S/N Ratio 52 dB Lens Focal Length / Min. Object Distance 3.2 ~ 138.5mm / 100cm Easy Installation Zoom Ratio / Aperature Ratio 43x Optical (688x with 16x Digital zoom) / F1.65(W)/F3.7(T) Viewing Angle Tele 1.47˚(H) x 1.10˚(V)0 Wide 61.22˚(H) x 47.16˚(V) Lens Drive Type / Mount Type DC Auto Iris / Board-in type OSD Yes Alarm Input / Output 8 ea / 3 ea (2 Open Collector, 1 relay) Remote Control RS485(Half/Full Duplex) / RS422, CCVC Environmental Operating Temperature -50˚C ~ +50˚C Conditions Operating Humidity Less than 90% Power Power Requirement 24 VAC Power Consumption 16W / 47W(with fan/Heater) LED Indicator Yes Physical Dimensions 228(Ø) x 256(H)mm Specification Weight 3.0kg Color Light Gray Samsung Video Security System | 72 . 73
  • 37.
    Indoor / OutdoorHousing Outdoor Housing SHG-120/220 SHG-222 Features Specifications Features Specifications SHG-120 Model SHG-120 SHG-220 • Hanging mount adaptor(included) Model SHG-222 • For indoor use Dimensions 174(Ø) x 188(H)mm 266(Ø) x 273(H)mm • Outdoor use Materials Aluminum & Plastic • The place of installation should be able to bear up to 4 times Weight 1,200g 3,700g • Solid structure Dimensions 258(Ø) x 422(H)mm of the total product weight (about 32Kg). Operating Temperature -10 ~ +50ºC -40 ~ +50ºC • Aluminum/plastic material Weight 3,800g • Aluminum material • Applicable camera : SCC-C6433/C6435 Operating Humidity 0 ~ 90% 0 ~ 100% Operating Temperature -40~+50˚C • IP 66 Fan Operating - Always Operating Humidity 0~100% SHG-220 Temperature Fan Operating Always • For outdoor installation Heater Operating - 10ºC or below Temperature • Aluminum material Temperature Heater Operating Below 4˚C • Built-in fan/heater function Accessories Screw(BH M3xL8) 2EA Screw(BH M3xL12) 3EA Temperature • IP 66 Pin 3EA • Anti-vandal Silicon Grease 5g Teflon Tape 1EA Dimensions (unit:mm) Installation Camera Screw Camera Dimensions (unit:mm) Installation Screw Taptite SHG-120 SHG-120 Bracket Lock Cover Top Cover Dome 1/2” NPT PiPE THREAD Lever Boss 188 Guide Hole 185 Arrow Camera Camera Adaptor Adaptor 411 422 Arrow 174 Lever Case Body Camera Boss Adaptor Guide CAMERA ADAPTOR Bracket SHG-220 SHG-220 GUIDE Lock Camera CAMERA HOLE Camera 1/2” NPT PiPE THREAD Adaptor Camera 168 GUIDE Adaptor SCREW FIXING HOLE 172 Pin 258 273 Camera Cover home Boss Cover Cover Cover Holder 168 Front rear home Housing Cover Guide Front Cover Cover Lever rear Front Cover 266 rear Guide Samsung Video Security System | 74 . 75
  • 38.
    Wall Mount Adaptor Wall Mount Adaptor SADT-100WM/101WM SADT-103WM SADT-102WM SADT-104WM Features Specifications Features Specifications • Indoor/outdoor use Model SADT-100WM SADT-101WM SADT-102WM SADT-103WM Model SADT-103WM SADT-104WM • Solid structure Material Aluminum • Wall mount adaptor Materials Aluminum Plastic • Aluminum material Dimensions 118(Ø) x 183(H) x 241(W)mm • Indoor/outdoor use Dimensions 114(W) x 200(D) x 223(H)mm 114(W) x 200(D) x 242(H)mm • Gasket provides waterproof function Weight 800g • Solid structure Weight 1,250g 241g • Screws included, for camera mounting • Aluminum material Operating Temperature -40 ~ +50˚C -10 ~ +50˚C Operating Temperature -40 ~ +50˚C • Applicable camera : SCC-C7433/C7435 Operating Humidity 0~100% RH Operating Humidity 0~100% - • Applicable housing : SHG-222 Accessory Gasket 1EA, Cable Grand (PG-11, PG-13.5), Back Plate 1EA SADT-104WM Back Plate 1EA • Wall mount adaptor Screw(FH M3xL6) 6EA • Indoor use Screw(PH M4xL22) 2EA Screw(PM M4xL22) 2EA Screw(PM M4xL22) 4EA • Solid structure Applicable Camera SCC-641/643A SCC-931T SCC-C9302 • Plastic material SCC-C640X SCC-B539X • Applicable camera : SCC-C6433/C6435 Dimensions (unit:mm) Installation Wall SADT-100WM/101WM/102WM SADT-100WM Mount Adaptor Boss Dimensions (unit:mm) Gasket Back Plate Gasket SADT-103WM SADT-104WM Wall Mount Gasket Adaptor Attachment After SHG-220 Separating Dummy Plate Wall SADT-101WM Mount Adaptor Back Plate Gasket Wall Mount Adaptor Wall SADT-102WM Mount Adaptor Back Plate Gasket Wall Mount Adaptor Samsung Video Security System | 76 . 77
  • 39.
    Wall Mount /Celling Mount Adaptor Wall Mount Adaptor SADT-732WM/732CM SADT-937WM Features Specifications Features Specifications • Material : Aluminum Model SADT-732WM SADT-732CM • Weight : 800g Model SADT-937WM • Operating temperature : -40˚C ~ 50˚C Material Aluminum • Material : Aluminum Material Aluminum • Operating humidity : 0~100% Dimensions 38(Ø) x 233(H) x 163.75(W)mm 112.6(H) x 330(W)mm • Operating temperature : -40˚C ~ 60˚C Dimensions 118(Ø) x 183(H) x 241(W)mm • Weight • Operating humidity : 0~100% Weight 500g 550g Weight 800g SADT-732WM : 500g SADT-732CM : 550g • Applicable camera : SCC-C6323/C6325, SNC-C6225 Operating Temperature -40 ~ +50˚C Operating Temperature -40˚C ~ 60˚C • Applicable camera : SCC-C7325, SNC-C7225 SCC-B9374 Operating Humidity 0~100% RH Operating Humidity 0~100% RH Accessory Gasket 1EA, Cable Grand(PG-11, PG-13.5), Back Plate 1EA Back Plate 1EA Screw(FH M3xL6) 6EA Screw(PM M4xL22) 2EA Dimensions (unit:mm) SADT-732WM SADT-732CM 163.75 38 Dimensions (unit:mm) Installation 233 Wall 112.6 46 Mount Adaptor 112.6 Back Plate Gasket Wall Mount Adaptor Samsung Video Security System | 78 . 79
  • 40.
    Ceiling Mount Adaptor Hanging Mount Adaptor SADT-100EC/101EC SADT-100HM Features Specifications Features Specifications SADT-100EC Model SADT-100EC SADT-101EC • Hanging mount adaptor Model SADT-100HM • Ceiling mount bracket Materials Plastic • Indoor use Materials Aluminum • Plastic material Dimensions 235(Ø) x 210(H)mm • Solid structure Dimensions 117(Ø) x 68(H)mm • Applicable camera : SCC-641/643, • Aluminum material Weight 259g Weight 765g 792g SCC-C6403/C6405/C6407 • Applicable camera : SCC-C6433/C6435 Operating Temperature -10 ~ +50ºC Operating Temperature -10 ~ +50ºC SADT-101EC Applicable camera SCC-C6433/C6435 • Ceiling mount bracket • Plastic material • Applicable camera : SCC-C6433/C6435 Dimensions (unit:mm) Dimensions (unit:mm) Installation 117 SADT-100EC SADT-100EC Hole for fixing a screw 68 Camera Adaptor 210 Lever Rock 32 Turn to the clockwise 235 about 15 degrees Ceiling Mount Adaptor Cover Body SADT-101EC SADT-101EC Camera Guide Boss Guide Boss Camera Adaptor Screw (M2xL8) Guide Hall 210 Guide Guide Hall Connector Braket Lock 32 Braket Lock Camera Guide Camera 235 Ceiling Mount Adaptor Cover Body * Conditions for Installation : The installation place should be able to bear up to 4 times of the total product weight (about 16Kg). This product is to be used when the thickness of the ceiling board is less than 40mm. This product requires a minimum of 180mm space above the ceiling board. Samsung Video Security System | 80 . 81
  • 41.
    Ceiling Mount /Corner Mount / Pole Mount Adaptor Wall Mount / Ceiling Mount / Hanging Mount / Parapet Mount SADT-100CM/110CM SCX-300WM / 300CM NEW SADT-100PM 300HM / 300LM Features Specifications Features Specifications SADT-100CM Model SADT-100CM SADT-110CM SADT-100PM SCX-300WM, SCX-300LM SCX-300HM Model SCX-300WM SCX-300CM SCX-300HM SCX-300LM • Indoor/outdoor use Material Metallic • Wall mount adaptor • Hanging mount adaptor Material Aluminum Steel • Solid structure Weight 1,200g (including the pipe) 2,100g 1,400g • Indoor/outdoor use • Indoor/outdoor use Weight 850g 700g 500g 3500g • Metallic material Operating Temperature -40 ~ +50˚C • Aluminium material • Aluminium material Operating Temperature -50˚C ~ 60˚C Operating Humidity 0 ~ 100% Operating Humidity 0 ~ 100% SADT-100PM SCX-300CM Accessory 1.5" NPT Pipe(300mm) 1EA Stainless Bolt 4EA Stainless Steel Mounting Strap 2EA SADT-110CM • Ceilling mount adaptor • Indoor or outdoor applications Decoration Cover 1EA Spring Washer 4EA Stainless Bolt 4EA • Indoor/outdoor use • Supports up to 88 pounds(40kg) : SADT-100PM Cable Grand(PG-13.5) 2EA Spring Washer 4EA • Aluminium material • Supports up to 97 pounds(44kg) : SADT-110CM • Metallic body Dimensions (unit:mm) Installation Dimensions (unit:mm) SADT-100CM 1/2” NPT PiPE THREAD SADT-100CM Concreate Ceiling SCX-300WM SCX-300CM Ceiling Board 52 1.5” NPT Pipe 112 276.5 130 Decoration Cover Teflon Tape Housing 183 100 305.5 SADT-100PM SADT-100PM Cable grand 297 SCX-300HM SCX-300LM Stainless Steel Back Plate Mounting Strap Pole Mount Adaptor Wall Mount Adaptor 178 SADT-110CM SADT-110CM 897 Cable grand 11 8- 178 53 80 90 80 Back Plate 250 668 Wall Mount Adaptor Corner Mount Adaptor * Conditions for Installation : When installing outdoors, stainless steel must be used for the connecting materials (i.e. screws). Samsung Video Security System | 82 . 83
  • 42.
    Pole Mount /Corner Mount Adaptor Dome Flush Housing SCX-300PM / 300KM NEW SCX-DF300W NEW Features Specifications Features Specifications SCX-300PM Model SCX-300PM SCX-300KM • Indoor Flush Mounting Model SADT-100HM • Pole mount adaptor for SCX-300WM Material Steel • PC (Polycarbonate, Plastic) material Material PC (Polycarbonate, Plastic) • Indoor/outdoor use Weight 1,400g 2,200g • Applicable Camera: SCC-C6437/C6439, Weight 702g • Steel material SCC-C6453/C6455 Operating Temperature -10 ~ +50ºC Operating Temperature -50˚C ~ 60˚C Operating Humidity 0 ~ 100% Operating Humidity 0 ~ 90% SCX-300KM • Corner mount adaptor for SCX-300WM • Indoor/outdoor use • Steel material Dimensions (unit:mm) Dimensions (unit:mm) SCX-300PM 152.2 248 168 257 SCX-300KM Samsung Video Security System | 84 . 85
  • 43.
    Ceiling-Mount Bracket SBR-100DCM Features • Solidstructure Specifications Model SBR-100DCM MONITOR • Metallic material Material Metallic Dimensions 196x160mm Weight 700g Operating Temperature -10 ~ +50˚C Accessory Safety Wire 1EA Safety Bracket 1EA Template A 1EA Template B 1EA L-Shaped BNC Adaptor 1EA Dimensions (unit:mm) Installation Nut Nut LCD Monitor 160 Turn Clockwise SMT-1712/1912 SMT-1722/1922 SMT-1723/1923 SMT-3222/4022 Cover Body 196 Flat Color CRT Monitor SMC-145 SMC-215 * Conditions for Installation : The installation place should be able to bear up to 4 times the total product weight (about 16Kg). This product is to be used when the thickness of the ceiling board is less than 40mm. This product requires a minimum of 180mm space above the ceiling board.