Additional geothermal wells were installed on the west side of the site and connected to the existing geothermal network under the plaza. The terrazzo treads on the grand stairway were installed, matching the original design. Work also continued on the ticketing desks and first floor mezzanine, with carpeting, lighting, and restrooms being added.