Under inter-governmental cooperation between India and Japan since 2009, smart community development integrating energy, water, transport and other sectors has been promoted in six regions of India through the Delhi-Mumbai Industrial Corridor Development Corporation (DMICDC). Basic agreement was reached on a large seawater desalination project by Hitachi's consortium in Dahej, Gujarat, which will be the first project realized under this framework. Feasibility studies have been conducted on potential smart community projects in the areas of Neemrana and Jhajjar in Rajasthan and Haryana involving Japanese consortiums focused on industrial parks, logistics and energy management.
Mitigation in Urban Areas: creating Solutions for Innovative Cities; Transiti...Tudor Events
The document discusses sustainable urban development and energy planning in Rotterdam. It outlines Rotterdam's sustainability profile, which analyzes the city's energy potentials, including solar, wind, waste, biomass, and geothermal. Maps show Rotterdam's solar and wind energy potentials. Integrated modeling is used to map demand, supply, and balance of heat and electricity on the neighborhood and city level to transition to more sustainable sources. Preliminary results for one district analyze energy demand versus supply potentials from various renewable sources.
Light and heat from the sun is the most abundant energy source on earth.The solar energy that hits our planet’s surface in one hour is about equal to the amount of energy consumed by all human activities in a year. Moreover, electricity generated by solar power is emission-free and can help mitigate climate change as well as reduce our dependence on finite carbon-based energy sources.
ABB offers a range of solutions that not just help capture the sun’s rays in the most effective manner but also help achieve grid parity.
Feasibility of AMI and Smart Grid in Brazil - Lessons Learned - botelho chowd...John Chowdhury
Is Smart Grid and AMI Feasible for the Brazilian Utilities? Lessons learned from completing a two year project in Brazil with 5 different Distribution Companies in 4 different states.
This document discusses the power sector in India, including electricity generation, transmission, and initiatives to boost the sector. It provides figures showing that as of November 2012, India's total installed power capacity was over 210,000 MW, with coal making up 57% of capacity. The document also notes that India's per capita electricity consumption increased from 15 kWh in 1950 to 814 kWh in 2011-12. It describes the growth and development of India's electricity transmission system from isolated state grids to an integrated national grid.
Central africa & Egypt contact issue 2.2012ABBCONTACT
Light and heat from the sun is the most abundant energy source on earth.The solar energy that hits our planet’s surface in one hour is about equal to the amount of energy consumed by all human activities in a year. Moreover, electricity generated by solar power is emission-free and can help mitigate climate change as well as reduce our dependence on finite carbon-based energy sources.
ABB offers a range of solutions that not just help capture the sun’s rays in the most effective manner but also help achieve grid parity.
The document proposes a cooperation between SAIG and the Indian government to establish electric vehicle, battery, and bamboo factories in India. SAIG would invest over $6 million USD in the initial projects. The government would provide subsidies, loans, and technology transfers to support the initiatives. SAIG's projects aim to promote environment, education, and employment through developing electric transportation, battery recycling programs, and using bamboo for construction materials and power generation. The cooperation could bring jobs, technology sharing, and position India as a green automotive leader.
This document summarizes Hawaii's progress towards achieving its goal of generating 70% of the state's energy from clean, renewable sources by 2030. It outlines that Hawaii has become a leader in clean energy and has seen over $1 billion in economic growth from its clean energy industries in 2011. It also details the state's Renewable Portfolio Standard goals of achieving 10% renewable energy by 2010, 15% by 2015, 25% by 2020, and 40% by 2030 according to a mandate for each electric utility. Charts show that while progress has been made, more work remains to meet the ambitious 2030 goal.
Mitigation in Urban Areas: creating Solutions for Innovative Cities; Transiti...Tudor Events
The document discusses sustainable urban development and energy planning in Rotterdam. It outlines Rotterdam's sustainability profile, which analyzes the city's energy potentials, including solar, wind, waste, biomass, and geothermal. Maps show Rotterdam's solar and wind energy potentials. Integrated modeling is used to map demand, supply, and balance of heat and electricity on the neighborhood and city level to transition to more sustainable sources. Preliminary results for one district analyze energy demand versus supply potentials from various renewable sources.
Light and heat from the sun is the most abundant energy source on earth.The solar energy that hits our planet’s surface in one hour is about equal to the amount of energy consumed by all human activities in a year. Moreover, electricity generated by solar power is emission-free and can help mitigate climate change as well as reduce our dependence on finite carbon-based energy sources.
ABB offers a range of solutions that not just help capture the sun’s rays in the most effective manner but also help achieve grid parity.
Feasibility of AMI and Smart Grid in Brazil - Lessons Learned - botelho chowd...John Chowdhury
Is Smart Grid and AMI Feasible for the Brazilian Utilities? Lessons learned from completing a two year project in Brazil with 5 different Distribution Companies in 4 different states.
This document discusses the power sector in India, including electricity generation, transmission, and initiatives to boost the sector. It provides figures showing that as of November 2012, India's total installed power capacity was over 210,000 MW, with coal making up 57% of capacity. The document also notes that India's per capita electricity consumption increased from 15 kWh in 1950 to 814 kWh in 2011-12. It describes the growth and development of India's electricity transmission system from isolated state grids to an integrated national grid.
Central africa & Egypt contact issue 2.2012ABBCONTACT
Light and heat from the sun is the most abundant energy source on earth.The solar energy that hits our planet’s surface in one hour is about equal to the amount of energy consumed by all human activities in a year. Moreover, electricity generated by solar power is emission-free and can help mitigate climate change as well as reduce our dependence on finite carbon-based energy sources.
ABB offers a range of solutions that not just help capture the sun’s rays in the most effective manner but also help achieve grid parity.
The document proposes a cooperation between SAIG and the Indian government to establish electric vehicle, battery, and bamboo factories in India. SAIG would invest over $6 million USD in the initial projects. The government would provide subsidies, loans, and technology transfers to support the initiatives. SAIG's projects aim to promote environment, education, and employment through developing electric transportation, battery recycling programs, and using bamboo for construction materials and power generation. The cooperation could bring jobs, technology sharing, and position India as a green automotive leader.
This document summarizes Hawaii's progress towards achieving its goal of generating 70% of the state's energy from clean, renewable sources by 2030. It outlines that Hawaii has become a leader in clean energy and has seen over $1 billion in economic growth from its clean energy industries in 2011. It also details the state's Renewable Portfolio Standard goals of achieving 10% renewable energy by 2010, 15% by 2015, 25% by 2020, and 40% by 2030 according to a mandate for each electric utility. Charts show that while progress has been made, more work remains to meet the ambitious 2030 goal.
1. The document describes a SCADA system implemented by Jamshedpur Utilities and Services Company (JUSCO) to monitor and control their electrical distribution network.
2. The SCADA system collects real-time data from substations and switch houses through GPRS or fiber optic communication and displays it at the Network Monitoring and Control Centre.
3. Field data such as breaker status, transformer temperatures and energy meter readings are collected through potential free auxiliary contacts attached to breakers and transmitted to servers at the control center.
Industrial Model Township, Manesar- Buy Industrial Plots in Manesar Gurgaon. Industrial Plot For Sale In Manesar. Manesar is part of the Delhi–Mumbai ..
The Massachusetts Clean Energy Center (MassCEC) provides incentives and financing for renewable energy and clean technology projects. It focuses on solar, wind, and other renewable energy sources. MassCEC offers rebates, grants, and loans to support projects at various stages from research to installation. Eligible customers include those of participating utilities. The document provides examples of public solar and wind projects MassCEC has supported and outlines the various programs and financing options available.
India's top Ten Infrastructure Companies is based on various criteria including research & analysis,financial results for the general market perception.
Complete Report Of Nelum Jehlum Hydro Electric ProjectEngr_Emad Khan
This 3-sentence summary provides an overview of the key information from the document:
The document is an internship report that describes a visit to the Neelum-Jhelum Hydropower Project site in Pakistan. It includes basic information about the project such as the client, contractors, design details, and an overview of the dam, tunnel, and power station components. The report also provides summaries of the intern's observations and learnings during the site visit, including construction of the dam, tunnel lining and grouting, and concrete works.
The document provides an analysis of the IPO of Ashoka Buildcon, an infrastructure company involved in engineering, procurement and construction contracts for roads, bridges, buildings, and power transmission projects in India. Some key points:
1) Ashoka has an integrated business model undertaking all activities related to build-operate-transfer road projects, from bidding to toll collection.
2) As an early entrant in the road BOT segment in 1997, Ashoka has a portfolio of 23 road projects totaling 3,500 lane km across several states in India.
3) The company has a sizeable order backlog of Rs. 1,615 crore as of May 2010 ensuring revenue visibility, though its order
GC energy & environmental newsletter April 2012generalcarbon
The Perform-Achieve-Trade (PAT) scheme was launched by the Bureau of Energy Efficiency to improve energy efficiency in large industries, with 478 companies designated to reduce energy consumption by certain percentages between 2012-2015; accelerated depreciation benefits for wind power projects were removed, which could impact investment; and lower emissions in the EU may reduce demand and prices for carbon credits if no market interventions occur.
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTIONVed Jangid
This document provides a summer internship report for a civil engineering student's internship at the Public Works Department in Ajmer, Rajasthan, India from May 10th to July 10th, 2018. The internship involved working on the construction of a 10-room and 2-store building at the Revenue Research and Training Institute campus in Ajmer. The report details the project overview, building components, construction materials used, construction processes and the intern's weekly progress and conclusions.
Tata Power is India's largest integrated private power company. It generates, transmits, and distributes electricity. The document discusses Tata Power's industry analysis, company background, supply chain, financial review, SWOT analysis, and sustainability initiatives. It notes that Tata Power has a long history in India dating back to its first power plant in 1915. The financial review shows net revenues of Rs. 18,854 crore in 2009 and Rs. 19,348 crore in 2010. The SWOT analysis identifies strengths in its brand and renewable initiatives, and weaknesses in coal dependence and skills gaps.
Green solutions for_telecom_towers_part_1joseorsanchez
This document provides an overview of green energy initiatives in the Indian telecom industry. It discusses the industry's reliance on diesel generators and rising fuel costs. It outlines initiatives by telecom companies to reduce energy consumption and improve efficiency. It also describes the growth of renewable energy service companies and various renewable technology pilot projects using solar, wind, biomass and fuel cells. The document aims to analyze the suitability of different renewable energy technologies for powering telecom towers in India.
The document outlines several consulting projects undertaken by SSAEL (Sustainable Solar Advisory and Engineering LLP) in the fields of energy efficiency and renewable energy from 2003-2013. The projects involved conducting energy audits, developing energy strategies, analyzing success of CDM projects, building institutional capacity for energy service providers, and providing consultancy services for solar power projects in India and other countries. SSAEL worked with various clients including government agencies, private companies, and international organizations like the World Bank and ADB.
1. The document describes a SCADA system implemented by Jamshedpur Utilities and Services Company (JUSCO) to monitor and control their electrical distribution network.
2. The SCADA system collects real-time data from substations and switch houses through GPRS or fiber optic communication and displays it at the Network Monitoring and Control Centre.
3. Field data such as breaker status, transformer temperatures and energy meter readings are collected through potential free auxiliary contacts attached to breakers and transmitted to servers at the control center.
Industrial Model Township, Manesar- Buy Industrial Plots in Manesar Gurgaon. Industrial Plot For Sale In Manesar. Manesar is part of the Delhi–Mumbai ..
The Massachusetts Clean Energy Center (MassCEC) provides incentives and financing for renewable energy and clean technology projects. It focuses on solar, wind, and other renewable energy sources. MassCEC offers rebates, grants, and loans to support projects at various stages from research to installation. Eligible customers include those of participating utilities. The document provides examples of public solar and wind projects MassCEC has supported and outlines the various programs and financing options available.
India's top Ten Infrastructure Companies is based on various criteria including research & analysis,financial results for the general market perception.
Complete Report Of Nelum Jehlum Hydro Electric ProjectEngr_Emad Khan
This 3-sentence summary provides an overview of the key information from the document:
The document is an internship report that describes a visit to the Neelum-Jhelum Hydropower Project site in Pakistan. It includes basic information about the project such as the client, contractors, design details, and an overview of the dam, tunnel, and power station components. The report also provides summaries of the intern's observations and learnings during the site visit, including construction of the dam, tunnel lining and grouting, and concrete works.
The document provides an analysis of the IPO of Ashoka Buildcon, an infrastructure company involved in engineering, procurement and construction contracts for roads, bridges, buildings, and power transmission projects in India. Some key points:
1) Ashoka has an integrated business model undertaking all activities related to build-operate-transfer road projects, from bidding to toll collection.
2) As an early entrant in the road BOT segment in 1997, Ashoka has a portfolio of 23 road projects totaling 3,500 lane km across several states in India.
3) The company has a sizeable order backlog of Rs. 1,615 crore as of May 2010 ensuring revenue visibility, though its order
GC energy & environmental newsletter April 2012generalcarbon
The Perform-Achieve-Trade (PAT) scheme was launched by the Bureau of Energy Efficiency to improve energy efficiency in large industries, with 478 companies designated to reduce energy consumption by certain percentages between 2012-2015; accelerated depreciation benefits for wind power projects were removed, which could impact investment; and lower emissions in the EU may reduce demand and prices for carbon credits if no market interventions occur.
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTIONVed Jangid
This document provides a summer internship report for a civil engineering student's internship at the Public Works Department in Ajmer, Rajasthan, India from May 10th to July 10th, 2018. The internship involved working on the construction of a 10-room and 2-store building at the Revenue Research and Training Institute campus in Ajmer. The report details the project overview, building components, construction materials used, construction processes and the intern's weekly progress and conclusions.
Tata Power is India's largest integrated private power company. It generates, transmits, and distributes electricity. The document discusses Tata Power's industry analysis, company background, supply chain, financial review, SWOT analysis, and sustainability initiatives. It notes that Tata Power has a long history in India dating back to its first power plant in 1915. The financial review shows net revenues of Rs. 18,854 crore in 2009 and Rs. 19,348 crore in 2010. The SWOT analysis identifies strengths in its brand and renewable initiatives, and weaknesses in coal dependence and skills gaps.
Green solutions for_telecom_towers_part_1joseorsanchez
This document provides an overview of green energy initiatives in the Indian telecom industry. It discusses the industry's reliance on diesel generators and rising fuel costs. It outlines initiatives by telecom companies to reduce energy consumption and improve efficiency. It also describes the growth of renewable energy service companies and various renewable technology pilot projects using solar, wind, biomass and fuel cells. The document aims to analyze the suitability of different renewable energy technologies for powering telecom towers in India.
The document outlines several consulting projects undertaken by SSAEL (Sustainable Solar Advisory and Engineering LLP) in the fields of energy efficiency and renewable energy from 2003-2013. The projects involved conducting energy audits, developing energy strategies, analyzing success of CDM projects, building institutional capacity for energy service providers, and providing consultancy services for solar power projects in India and other countries. SSAEL worked with various clients including government agencies, private companies, and international organizations like the World Bank and ADB.
1. Smart Community Development under India’s DMIC
Confidentiality 3 (incl. corporate info)
> Since 2009, smart community development that integrates energy, water, transport, etc. has been promoted in six regions in India through
inter-governmental cooperation.
- Dec. 2009: PM Hatoyama visited India; both PMs agreed on smart community development; JETRO-DMICDC MOU on cooperation concluded.
- Apr. 2010: METI Minister Naoshima visited India; MOU on cooperation concluded between the state government and consortiums of Japanese companies in the presence of
Commerce and Industry Minister Sharma.
- Since May 2011: Target expanded to six regions, including Neemrana as requested to Minister Kaieda, and feasibility studies conducted.
- Dec. 2011: Further support for particular three projects (seawater desalination in Gujarat, IPP in Maharashtra, solar thermal energy in Rajasthan) expressed during summit
meeting between PM Noda and PM Singh.
> Basic agreement was reached (and signed on March 22) on water supply in Asia’s largest seawater desalination project planned by
Hitachi’s consortium in Dahej, Gujarat, as the first project to be realized in the framework.
Rajasthan State Haryana
[Description] Efficient and stable supply
of high-quality electricity and [Description] Grand design development
the establishment of a smart mainly for energy management
logistics system in a Japanese- at a new industrial park
affiliated industrial park [Place] Jhajjar
[Place] Neemrana Delhi [Operator] Mitsui & Co.’s consortium
[Operator] Mitsui-KEPCO consortium
[Description] Establishment of a
Gujarat State compound microgrid
Kolkata (electricity and heat) including
Detailed survey (Phase II)
[Description] Smart community platform industrial water treatment in an
(e.g. waste treatment), solar existing industrial park, and a
thermal energy, lithium-ion logistics system
battery infrastructure in Mumbai [Place] Manesar
industrial parks [Operator] Toshiba’s consortium
[Place] Sanand and Changodar
[Operator] Mitsubishi Heavy Industries’
consortium
Maharashtra State
[Description] Grand design development [Description] Urban development
focusing on water supply to an centering on a smart water
industrial park through treatment system, including
seawater desalination, and on water supply, water reuse, and
photovoltaic power generation sewage
[Place] Dahej [Place] Shendra
[Operator] Hitachi’s consortium Freight railway line 1
[Operator] JGC’s consortium