This document is an as-built drawing for an optical fiber cable laying project for Bharti Airtel. It provides details of the route taken, which was 203 meters long. It ran from a primary school to a medical center, passing through houses, shops, and crossing a culvert. The route included 65 meters of horizontal directional drilling and 118 meters of additional horizontal directional drilling.