Six Sigma DMAIC Project




                         GEAE Account: Madisonville KY Site




                                       Green Belt: Douglas Shawhan
                                          Title: Customer Engineer
                                      Project Start Date: May 15, 2003

Master Black Belt: Steven Bonacorsi
Six Sigma in Action
                                                       Production Test Area Deployments
Customer Profile – 8,000 seat aircraft engines manufacturing company
                                                                                                   Process Capability – Before
Business Problem & Impact                                                                  T                USL
                                                                                     20
The Average Time to deploy Gage Area PCs in Madisonville was 37
minutes. VOC Data indicated that this was unacceptable to the                                                                        Z (LT)=-1.77
customer as it increased end user downtime and lowered




                                                                         Frequency
productivity.                                                                        10

Measure & Analyze
Data Collection: Total Cycle Time to install Gage systems was
measured across two weeks in July.
                                                                                      0
Root Causes: Manual process steps when installing and configuring
                                                                                                                    33 35 37 39 41 43 45 47 49 51 53
gage Applications as well as network band with issues were                                                           Cycle Time
determined to be the root causes.
                                                                                                    Process Capability – After
Improve & Control                                                                                          Histogram of Cycle Time                                 USL
Installation CD’s were developed to automate application installation
procedures resulting in a dramatic reduction in variation.
Cycle time to complete gage area deployments will be measured                         10
                                                                                                    Z (LT)= 3.15




                                                                        Frequency
monthly, control charts will be used to validate.
                                                                                       5
Results/Benefits
After implementation Mean cycle time to complete 1 gage PC deploy
was reduced from 37 minutes to < 28, resulting in an expected                          0

                                                                                           27.25   27.50   27.75   28.00     28.25     28.50   28.75   29.00   29.25
annual benefit of $2K
                                                                                                                           Project Y




                                A savings of US $2K In 2004!

More Related Content

More from Steven Bonacorsi

Lean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlyLean six sigma tollgate template videos only
Lean six sigma tollgate template videos only
Steven Bonacorsi
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
Steven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
Steven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
Steven Bonacorsi
 
Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate template
Steven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
Steven Bonacorsi
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
Steven Bonacorsi
 

More from Steven Bonacorsi (20)

Promapp Case Study Genesis Energy
Promapp Case Study Genesis EnergyPromapp Case Study Genesis Energy
Promapp Case Study Genesis Energy
 
Promapp Case Study Cial
Promapp Case Study CialPromapp Case Study Cial
Promapp Case Study Cial
 
Mildura Case Study Promapp
Mildura Case Study PromappMildura Case Study Promapp
Mildura Case Study Promapp
 
Colorpak Promapp Case Study
Colorpak Promapp Case StudyColorpak Promapp Case Study
Colorpak Promapp Case Study
 
Promapp Case Study Nexans Olex
Promapp Case Study Nexans OlexPromapp Case Study Nexans Olex
Promapp Case Study Nexans Olex
 
Lumo Case Study Promapp
Lumo Case Study PromappLumo Case Study Promapp
Lumo Case Study Promapp
 
Free Lean Six Sigma Templates
Free Lean Six Sigma TemplatesFree Lean Six Sigma Templates
Free Lean Six Sigma Templates
 
Business process management case studies
Business process management case studiesBusiness process management case studies
Business process management case studies
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templates
 
Lean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlyLean six sigma tollgate template videos only
Lean six sigma tollgate template videos only
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate template
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit14th Annual Asian Lean Six Sigma And Process Improvement Summit
14th Annual Asian Lean Six Sigma And Process Improvement Summit
 
Improving Your Strategic Focus &amp; Performance Dan Ryan
Improving Your Strategic Focus &amp; Performance   Dan RyanImproving Your Strategic Focus &amp; Performance   Dan Ryan
Improving Your Strategic Focus &amp; Performance Dan Ryan
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
 
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
Advanced Performance Measurement Workshop Develop Measures That Drive Perform...
 

Gage Area Deployment Six Sigma Case Study

  • 1. Six Sigma DMAIC Project GEAE Account: Madisonville KY Site Green Belt: Douglas Shawhan Title: Customer Engineer Project Start Date: May 15, 2003 Master Black Belt: Steven Bonacorsi
  • 2. Six Sigma in Action Production Test Area Deployments Customer Profile – 8,000 seat aircraft engines manufacturing company Process Capability – Before Business Problem & Impact T USL 20 The Average Time to deploy Gage Area PCs in Madisonville was 37 minutes. VOC Data indicated that this was unacceptable to the Z (LT)=-1.77 customer as it increased end user downtime and lowered Frequency productivity. 10 Measure & Analyze Data Collection: Total Cycle Time to install Gage systems was measured across two weeks in July. 0 Root Causes: Manual process steps when installing and configuring 33 35 37 39 41 43 45 47 49 51 53 gage Applications as well as network band with issues were Cycle Time determined to be the root causes. Process Capability – After Improve & Control Histogram of Cycle Time USL Installation CD’s were developed to automate application installation procedures resulting in a dramatic reduction in variation. Cycle time to complete gage area deployments will be measured 10 Z (LT)= 3.15 Frequency monthly, control charts will be used to validate. 5 Results/Benefits After implementation Mean cycle time to complete 1 gage PC deploy was reduced from 37 minutes to < 28, resulting in an expected 0 27.25 27.50 27.75 28.00 28.25 28.50 28.75 29.00 29.25 annual benefit of $2K Project Y A savings of US $2K In 2004!