Materials Requirement Planning
Presented by
SAP Supply Chain Management
Materials Control Group
May 2003 YAS Confidential
Agenda
Introduction11
Enterprise Structure22
MRP Master Data33
Processes Flow44
MRP Batch Jobs55
ZMRP Requisition Approval66
May 2003 YAS Confidential
Introduction
Generic term for procedures in requirements planning which use inventory
data to plan material requirements and forecast
Tracks inventory levels
Recommends replenishment orders
Recommends rescheduling open orders
Assigns exception messages
Material Requirements Planning (MRP) Definition
MRP Functions
33
22
11
MRP Users
33
22
11 Scenario 1 (Material Control)
Scenario 2 (Workshops)
Scenario 3 (Aviation, Drilling and Projects)
44
May 2003 YAS Confidential
Material Control Department
MRP Users Location
Material Control Department in Dhahran area has the highest number of
MRP users (MRP Controllers)
A number of MRP users located in different areas cross the Kingdom i.e.
Riyadh, Jeddah and Yanboo
Manage the Saudi Aramco Inventory investment to ensure that the correct
materials are available when needed.
Material Control Department
22
11
May 2003 YAS Confidential
MRP Controller
Analyze and Reprocess Forecast Items With Errors
Analyze Material History Consumption to maintain optimized stock level
Process MRP List
Process Purchase Requisition
MRP Controller
The person responsible for a group of materials in a plant or
company
Analyze and maintain Planning Data
MRP Controller Responsibilities
55
44
33
22
11
May 2003 YAS Confidential
Agenda
Introduction11
Enterprise Structure22
MRP Master Data33
Processes Flow44
MRP Batch Jobs55
ZMRP Requisition Approval66
May 2003 YAS Confidential
Enterprise Structure
Storage
Location
Material Service
Center MSC
Storage
Location
Customer Plant
CP
Customer Plant
CP
Customer Plant
CP
Storage
Location
Storage
Location
May 2003 YAS Confidential
Enterprise Structure
RABIGH AREA
SUPPORT (M004)
Material Service
Center
Rabigh Area
poject(PS04)
Customer
Plants
Project Plant Admin Plant Material Plant Maintenance Plant
Rabigh Marine
(K03B)
Rabigh R&HE
(K02C)
Rabigh
Community
(J008)
Rabigh Admin
User (AM04)
Rabigh
Refinery (C005)
Power
Distribution
( Z02J)
Transportation
(K01H)
May 2003 YAS Confidential
Agenda
Introduction11
Enterprise Structure22
MRP Master Data33
Processes Flow44
MRP Batch Jobs55
ZMRP Requisition Approval66
May 2003 YAS Confidential
MRP Master Data
Client Level
MRP ProfileMRP Profile
Plant Level
Storage Location level
MRP View 2MRP View 2MRP View 1MRP View 1
ForecastForecast
ProfileProfile
MRP View 3MRP View 3
Storage dataStorage data
PlanningPlanning
File EntryFile EntryForecast ViewForecast ViewMRP View 4MRP View 4
May 2003 YAS Confidential
MRP Groups
The MRP group contains all the materials from
the point of view of MRP for assigning special
control parameters for the total planning run
MRP Material Master Data
MRP Types
Key that determines whether and how the
material is planned.
MRP Controller
Specifies the number of the MRP controller
or group of MRP controllers responsible for
material planning for the material.
Reorder Point
If the stock falls below this quantity, the
system flags the material for requirement
planning by creating a planning file entry.
May 2003 YAS Confidential
Procurement Type
Indicator that defines how the material is
procured
MRP Material Master Data
Special procurement
Indicate the supplying MSC
Planned Delivery Time
Number of days needed to obtain the
material if it is procured externally
May 2003 YAS Confidential
Availability Check
Specifies whether and how the system
checks availability and generates
requirements for material planning
MRP Material Master Data
Period Indicator
Indicator specifying the periods in
which the material's consumption
values and forecast values are
managed
May 2003 YAS Confidential
Forecast Model
Indicator that defines on which
forecast model the system bases its
calculation of future requirements of
the material
Forecast Material Master
Data
Initialization
Indicator which specifies that the
system should initialize a forecast
model
History Period
The number of historical values the
system uses for the forecast
Forecast Period
Number of period splits for which a
forecast should be created
May 2003 YAS Confidential
MRP
MRP Elements
Reservation
Forecast
Reorder Point
OUT-STO Open PRs
Open POs
Inventory Balance
IN-STO
Schedule
Line
Purchase
Requisition
May 2003 YAS Confidential
Agenda
Introduction11
Enterprise Structure22
MRP Master Data33
Processes Flow44
MRP Batch Jobs55
ZMRP Requisition Approval66
May 2003 YAS Confidential
Create reservation
MB21, IW31, CN21
MRP run in CP
Purchase
Requisition CP
Process Flow
Unique Material Process
Unique Materials are planned and procured at the Customer Plant Level
Definition
Quantity Available MIGO
201,261,281
May 2003 YAS Confidential
Create reservation
MB21, IW31, CN21
MRP run in CP
Shared Material Process
Shared Materials are planned in the CP level, and supplied by MSC through
schedule line agreement if not available in CP
Definition
Schedule Line MRP run in MSC
Purchase
Requisition
Process Flow
Schedule
Line
May 2003 YAS Confidential
Create reservation
MB21, IW31, CN21 MRP run in CP
LDOR Material Process
The LDOR material are being planned and procured in the CP level
Definition
InterceptorPurchase
requisition
Process Flow
MRP
Controller
Queue List
Purchase
Requisition
released
May 2003 YAS Confidential
Agenda
Introduction11
Enterprise Structure22
MRP Master Data33
Processes Flow44
MRP Batch Jobs55
ZMRP Requisition Approval66
May 2003 YAS Confidential
MRP Batch Jobs
MRP Daily Batch Jobs
Total MRP Planning (Midnight Batch Job)
LDOR Three Times a day
MRP Weekly Batch Jobs
MRP Update x-plant Status
MRP Monthly Batch Jobs
MRP consistency Check
Forecast Update
May 2003 YAS Confidential
Agenda
Introduction11
Enterprise Structure22
MRP Master Data33
Processes Flow44
MRP Batch Jobs55
ZMRP Requisition Approval66
May 2003 YAS Confidential
ZMRP Requisitions Approval
M R P C o n t .
A d m i n i s t r a t o r
Y e s
Y e s
S e n i o r M R P C o n t .
Y e s
Y e s
S U P V .
$
$
$
P u r c h a s i n g
$
$
$
P u r c h a s i n g
$
$
$
P u r c h a s i n g
$
$
$
P u r c h a s i n g
S u p p l i e r s
S u p p l i e r s
S u p p l i e r s
M a n a g e r
$
$
$
P u r c h a s i n g
S u p p l i e r s
N O
N O
N O
N O
S u p p l i e r s
May 2003 YAS Confidential
Q & A
Thank You

More Related Content

Similar to MRP-MCD-Presentation

Sap mrp materials requirements planning
Sap mrp   materials requirements planningSap mrp   materials requirements planning
Sap mrp materials requirements planning
madhu jetty
 
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
MBA, MSc, Alberto Castellano
 
Material Requirement and Planning
Material Requirement and PlanningMaterial Requirement and Planning
Material Requirement and Planning
Asim Irshad
 

Similar to MRP-MCD-Presentation (20)

Mrp
MrpMrp
Mrp
 
Sap mrp
Sap mrpSap mrp
Sap mrp
 
Sap mrp materials requirements planning
Sap mrp   materials requirements planningSap mrp   materials requirements planning
Sap mrp materials requirements planning
 
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
 
MRP views in Material Master
MRP views in Material MasterMRP views in Material Master
MRP views in Material Master
 
Closed loop mrp system
Closed loop mrp systemClosed loop mrp system
Closed loop mrp system
 
Supply Chain Management in ERP
Supply Chain Management in ERPSupply Chain Management in ERP
Supply Chain Management in ERP
 
Mrp
MrpMrp
Mrp
 
(Mrp 1) Prsntation Slides
(Mrp 1) Prsntation Slides(Mrp 1) Prsntation Slides
(Mrp 1) Prsntation Slides
 
Sap mrp-configuration-pp
Sap mrp-configuration-ppSap mrp-configuration-pp
Sap mrp-configuration-pp
 
Materials requirement planning
Materials requirement planningMaterials requirement planning
Materials requirement planning
 
Erp chapter 3
Erp chapter 3Erp chapter 3
Erp chapter 3
 
MATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSMATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESS
 
Availability Check in SAP SD
Availability Check in SAP SDAvailability Check in SAP SD
Availability Check in SAP SD
 
Material Requirement and Planning
Material Requirement and PlanningMaterial Requirement and Planning
Material Requirement and Planning
 
IT for Production & Manufacturing
IT for Production & ManufacturingIT for Production & Manufacturing
IT for Production & Manufacturing
 
Inventory management, loading strategy and warehouse categorization
Inventory management, loading strategy and warehouse categorizationInventory management, loading strategy and warehouse categorization
Inventory management, loading strategy and warehouse categorization
 
MRP CASE STUDY
MRP CASE STUDYMRP CASE STUDY
MRP CASE STUDY
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
MRP
MRPMRP
MRP
 

MRP-MCD-Presentation

  • 1. May 2003 YAS Confidential Materials Requirement Planning Presented by SAP Supply Chain Management Materials Control Group
  • 2. May 2003 YAS Confidential Agenda Introduction11 Enterprise Structure22 MRP Master Data33 Processes Flow44 MRP Batch Jobs55 ZMRP Requisition Approval66
  • 3. May 2003 YAS Confidential Introduction Generic term for procedures in requirements planning which use inventory data to plan material requirements and forecast Tracks inventory levels Recommends replenishment orders Recommends rescheduling open orders Assigns exception messages Material Requirements Planning (MRP) Definition MRP Functions 33 22 11 MRP Users 33 22 11 Scenario 1 (Material Control) Scenario 2 (Workshops) Scenario 3 (Aviation, Drilling and Projects) 44
  • 4. May 2003 YAS Confidential Material Control Department MRP Users Location Material Control Department in Dhahran area has the highest number of MRP users (MRP Controllers) A number of MRP users located in different areas cross the Kingdom i.e. Riyadh, Jeddah and Yanboo Manage the Saudi Aramco Inventory investment to ensure that the correct materials are available when needed. Material Control Department 22 11
  • 5. May 2003 YAS Confidential MRP Controller Analyze and Reprocess Forecast Items With Errors Analyze Material History Consumption to maintain optimized stock level Process MRP List Process Purchase Requisition MRP Controller The person responsible for a group of materials in a plant or company Analyze and maintain Planning Data MRP Controller Responsibilities 55 44 33 22 11
  • 6. May 2003 YAS Confidential Agenda Introduction11 Enterprise Structure22 MRP Master Data33 Processes Flow44 MRP Batch Jobs55 ZMRP Requisition Approval66
  • 7. May 2003 YAS Confidential Enterprise Structure Storage Location Material Service Center MSC Storage Location Customer Plant CP Customer Plant CP Customer Plant CP Storage Location Storage Location
  • 8. May 2003 YAS Confidential Enterprise Structure RABIGH AREA SUPPORT (M004) Material Service Center Rabigh Area poject(PS04) Customer Plants Project Plant Admin Plant Material Plant Maintenance Plant Rabigh Marine (K03B) Rabigh R&HE (K02C) Rabigh Community (J008) Rabigh Admin User (AM04) Rabigh Refinery (C005) Power Distribution ( Z02J) Transportation (K01H)
  • 9. May 2003 YAS Confidential Agenda Introduction11 Enterprise Structure22 MRP Master Data33 Processes Flow44 MRP Batch Jobs55 ZMRP Requisition Approval66
  • 10. May 2003 YAS Confidential MRP Master Data Client Level MRP ProfileMRP Profile Plant Level Storage Location level MRP View 2MRP View 2MRP View 1MRP View 1 ForecastForecast ProfileProfile MRP View 3MRP View 3 Storage dataStorage data PlanningPlanning File EntryFile EntryForecast ViewForecast ViewMRP View 4MRP View 4
  • 11. May 2003 YAS Confidential MRP Groups The MRP group contains all the materials from the point of view of MRP for assigning special control parameters for the total planning run MRP Material Master Data MRP Types Key that determines whether and how the material is planned. MRP Controller Specifies the number of the MRP controller or group of MRP controllers responsible for material planning for the material. Reorder Point If the stock falls below this quantity, the system flags the material for requirement planning by creating a planning file entry.
  • 12. May 2003 YAS Confidential Procurement Type Indicator that defines how the material is procured MRP Material Master Data Special procurement Indicate the supplying MSC Planned Delivery Time Number of days needed to obtain the material if it is procured externally
  • 13. May 2003 YAS Confidential Availability Check Specifies whether and how the system checks availability and generates requirements for material planning MRP Material Master Data Period Indicator Indicator specifying the periods in which the material's consumption values and forecast values are managed
  • 14. May 2003 YAS Confidential Forecast Model Indicator that defines on which forecast model the system bases its calculation of future requirements of the material Forecast Material Master Data Initialization Indicator which specifies that the system should initialize a forecast model History Period The number of historical values the system uses for the forecast Forecast Period Number of period splits for which a forecast should be created
  • 15. May 2003 YAS Confidential MRP MRP Elements Reservation Forecast Reorder Point OUT-STO Open PRs Open POs Inventory Balance IN-STO Schedule Line Purchase Requisition
  • 16. May 2003 YAS Confidential Agenda Introduction11 Enterprise Structure22 MRP Master Data33 Processes Flow44 MRP Batch Jobs55 ZMRP Requisition Approval66
  • 17. May 2003 YAS Confidential Create reservation MB21, IW31, CN21 MRP run in CP Purchase Requisition CP Process Flow Unique Material Process Unique Materials are planned and procured at the Customer Plant Level Definition Quantity Available MIGO 201,261,281
  • 18. May 2003 YAS Confidential Create reservation MB21, IW31, CN21 MRP run in CP Shared Material Process Shared Materials are planned in the CP level, and supplied by MSC through schedule line agreement if not available in CP Definition Schedule Line MRP run in MSC Purchase Requisition Process Flow Schedule Line
  • 19. May 2003 YAS Confidential Create reservation MB21, IW31, CN21 MRP run in CP LDOR Material Process The LDOR material are being planned and procured in the CP level Definition InterceptorPurchase requisition Process Flow MRP Controller Queue List Purchase Requisition released
  • 20. May 2003 YAS Confidential Agenda Introduction11 Enterprise Structure22 MRP Master Data33 Processes Flow44 MRP Batch Jobs55 ZMRP Requisition Approval66
  • 21. May 2003 YAS Confidential MRP Batch Jobs MRP Daily Batch Jobs Total MRP Planning (Midnight Batch Job) LDOR Three Times a day MRP Weekly Batch Jobs MRP Update x-plant Status MRP Monthly Batch Jobs MRP consistency Check Forecast Update
  • 22. May 2003 YAS Confidential Agenda Introduction11 Enterprise Structure22 MRP Master Data33 Processes Flow44 MRP Batch Jobs55 ZMRP Requisition Approval66
  • 23. May 2003 YAS Confidential ZMRP Requisitions Approval M R P C o n t . A d m i n i s t r a t o r Y e s Y e s S e n i o r M R P C o n t . Y e s Y e s S U P V . $ $ $ P u r c h a s i n g $ $ $ P u r c h a s i n g $ $ $ P u r c h a s i n g $ $ $ P u r c h a s i n g S u p p l i e r s S u p p l i e r s S u p p l i e r s M a n a g e r $ $ $ P u r c h a s i n g S u p p l i e r s N O N O N O N O S u p p l i e r s
  • 24. May 2003 YAS Confidential Q & A Thank You