SlideShare a Scribd company logo
1 of 10
Project Title
Student Name
Roll No.
Supervisor Name
Department of Information Technology and
Telecommunication
05/05/13 Project Title 2
Outline
 Problem Statement
 Project Objective
 Literature Review (Optional)
 System Model (Block diagram/ flow chart)
 Implementation
 Results
 Conclusion
 References
05/05/13 Project Title 3
GUIDELINES
 Total duration of the presentation should not
exceed 15 minutes and the number of slides is
restricted to 20 only.
 Use this presentation as template.
 Use the headings as listed in the outline.
05/05/13 ProjectTitle 4
Problem Statement
05/05/13 Project Title 5
Project Objective
05/05/13 Project Title 6
System Model/Flow
Chart/Block Diagram
05/05/13 Project Title 7
Implementation
05/05/13 Project Title 8
Results
05/05/13 Project Title 9
Conclusion and
Recommendations for future work
05/05/13 ProjectTitle 10
References
Example Journal Paper:
[1] Didier Le Gall, “MPEG: A video compression standard for multimedia applications,”
Communications ACM, vol. 34, no. 4, pp. 46–58, April 1991.
Example Conference Paper:
[2] Gulistan Raja and M. J. Mirza, “Performance comparison of advanced video coding
H.264 standard with baseline H.263 and H.263+ standards,” in Proc. 4th IEEE
International Symposium on Communications & Information Technologies, ISCIT
04, Sapporo, Japan, 2004, pp. 743–746.
Example Book:
[3] Iain E.G. Richardson, Video Codec Design, Great Britain, John Wiley & Sons,
2003, ISBN: xx-yyyy-zzzz.
Example Web Link:
[4] MPEG Software Simulation Group, “The MSSG homepage”, available on-line at
http://www.mpeg.org/MPEG/ MSSG, 2004.
Example Standard:
[5] ITU-T “Video Coding for low bit rate communication,” ITU-T Recommendation
H.263; version 1, Nov 1995; version 2, Jan. 1998; version 3, Nov. 2000.

More Related Content

Similar to Bs telecom final defence format

BuildingSMART Standards Summit 2015 - Technical Room - Linked Data for Constr...
BuildingSMART Standards Summit 2015 - Technical Room - Linked Data for Constr...BuildingSMART Standards Summit 2015 - Technical Room - Linked Data for Constr...
BuildingSMART Standards Summit 2015 - Technical Room - Linked Data for Constr...Pieter Pauwels
 
Modeling and Performance Analysis of Scrumban with Test-Driven Development us...
Modeling and Performance Analysis of Scrumban with Test-Driven Development us...Modeling and Performance Analysis of Scrumban with Test-Driven Development us...
Modeling and Performance Analysis of Scrumban with Test-Driven Development us...Fernando Sambinelli, MSc
 
UE20CS971+%E2%80%93++Project+Phase+%E2%80%93+1+-+END+SEMESTER+ASSESSMENT.pptx
UE20CS971+%E2%80%93++Project+Phase+%E2%80%93+1+-+END+SEMESTER+ASSESSMENT.pptxUE20CS971+%E2%80%93++Project+Phase+%E2%80%93+1+-+END+SEMESTER+ASSESSMENT.pptx
UE20CS971+%E2%80%93++Project+Phase+%E2%80%93+1+-+END+SEMESTER+ASSESSMENT.pptxBharathVaak
 
Ece 1322 programming_for_engineers_s1_201213(1)
Ece 1322 programming_for_engineers_s1_201213(1)Ece 1322 programming_for_engineers_s1_201213(1)
Ece 1322 programming_for_engineers_s1_201213(1)Minda Kronik
 
Multilayer hemispherical dielectric resonant antenna in higher order mode
Multilayer hemispherical dielectric resonant antenna in higher order modeMultilayer hemispherical dielectric resonant antenna in higher order mode
Multilayer hemispherical dielectric resonant antenna in higher order modeMoayad Al Zoghaiby
 
CSE-503 coursepack (1).doc
CSE-503 coursepack (1).docCSE-503 coursepack (1).doc
CSE-503 coursepack (1).docSZahidNabiDar
 
Updm Group Sar Example Brainstorm5(2010 02 24)
Updm Group Sar Example Brainstorm5(2010 02 24)Updm Group Sar Example Brainstorm5(2010 02 24)
Updm Group Sar Example Brainstorm5(2010 02 24)Leonard F Levine
 
Seminar and Project Manager and Resourceful Trainer(SMART)
Seminar and Project Manager and Resourceful Trainer(SMART)Seminar and Project Manager and Resourceful Trainer(SMART)
Seminar and Project Manager and Resourceful Trainer(SMART)IOSR Journals
 
3691 major or_minor_project_report_guidelines_and_formats
3691 major or_minor_project_report_guidelines_and_formats3691 major or_minor_project_report_guidelines_and_formats
3691 major or_minor_project_report_guidelines_and_formatsAmi Sharma
 
3691 major or minor project report guidelines and formats
3691 major or minor project report guidelines and formats3691 major or minor project report guidelines and formats
3691 major or minor project report guidelines and formatsSanjay Thapa
 
Process Modeling with IDEF 0
Process Modeling with IDEF 0Process Modeling with IDEF 0
Process Modeling with IDEF 0Mandar Trivedi
 
Feature driven development
Feature driven developmentFeature driven development
Feature driven developmentRuhaim Izmeth
 
Why is Test Driven Development for Analytics or Data Projects so Hard?
Why is Test Driven Development for Analytics or Data Projects so Hard?Why is Test Driven Development for Analytics or Data Projects so Hard?
Why is Test Driven Development for Analytics or Data Projects so Hard?Phil Watt
 
Geant4 Model Testing Framework: From PAW to ROOT
Geant4 Model Testing Framework:  From PAW to ROOTGeant4 Model Testing Framework:  From PAW to ROOT
Geant4 Model Testing Framework: From PAW to ROOTRoman Atachiants
 
Multimodal graph-based analysis over the DBLP repository: critical discoverie...
Multimodal graph-based analysis over the DBLP repository: critical discoverie...Multimodal graph-based analysis over the DBLP repository: critical discoverie...
Multimodal graph-based analysis over the DBLP repository: critical discoverie...Universidade de São Paulo
 

Similar to Bs telecom final defence format (20)

BuildingSMART Standards Summit 2015 - Technical Room - Linked Data for Constr...
BuildingSMART Standards Summit 2015 - Technical Room - Linked Data for Constr...BuildingSMART Standards Summit 2015 - Technical Room - Linked Data for Constr...
BuildingSMART Standards Summit 2015 - Technical Room - Linked Data for Constr...
 
VP9 my work
VP9 my workVP9 my work
VP9 my work
 
IT6511 Networks Laboratory
IT6511 Networks LaboratoryIT6511 Networks Laboratory
IT6511 Networks Laboratory
 
Final Review Template.pptx
Final Review Template.pptxFinal Review Template.pptx
Final Review Template.pptx
 
Modeling and Performance Analysis of Scrumban with Test-Driven Development us...
Modeling and Performance Analysis of Scrumban with Test-Driven Development us...Modeling and Performance Analysis of Scrumban with Test-Driven Development us...
Modeling and Performance Analysis of Scrumban with Test-Driven Development us...
 
UE20CS971+%E2%80%93++Project+Phase+%E2%80%93+1+-+END+SEMESTER+ASSESSMENT.pptx
UE20CS971+%E2%80%93++Project+Phase+%E2%80%93+1+-+END+SEMESTER+ASSESSMENT.pptxUE20CS971+%E2%80%93++Project+Phase+%E2%80%93+1+-+END+SEMESTER+ASSESSMENT.pptx
UE20CS971+%E2%80%93++Project+Phase+%E2%80%93+1+-+END+SEMESTER+ASSESSMENT.pptx
 
Ece 1322 programming_for_engineers_s1_201213(1)
Ece 1322 programming_for_engineers_s1_201213(1)Ece 1322 programming_for_engineers_s1_201213(1)
Ece 1322 programming_for_engineers_s1_201213(1)
 
Multilayer hemispherical dielectric resonant antenna in higher order mode
Multilayer hemispherical dielectric resonant antenna in higher order modeMultilayer hemispherical dielectric resonant antenna in higher order mode
Multilayer hemispherical dielectric resonant antenna in higher order mode
 
CSE-503 coursepack (1).doc
CSE-503 coursepack (1).docCSE-503 coursepack (1).doc
CSE-503 coursepack (1).doc
 
STID
STIDSTID
STID
 
Roadmap Composite Simulation - Summary 2015
Roadmap Composite Simulation - Summary 2015Roadmap Composite Simulation - Summary 2015
Roadmap Composite Simulation - Summary 2015
 
Updm Group Sar Example Brainstorm5(2010 02 24)
Updm Group Sar Example Brainstorm5(2010 02 24)Updm Group Sar Example Brainstorm5(2010 02 24)
Updm Group Sar Example Brainstorm5(2010 02 24)
 
Seminar and Project Manager and Resourceful Trainer(SMART)
Seminar and Project Manager and Resourceful Trainer(SMART)Seminar and Project Manager and Resourceful Trainer(SMART)
Seminar and Project Manager and Resourceful Trainer(SMART)
 
3691 major or_minor_project_report_guidelines_and_formats
3691 major or_minor_project_report_guidelines_and_formats3691 major or_minor_project_report_guidelines_and_formats
3691 major or_minor_project_report_guidelines_and_formats
 
3691 major or minor project report guidelines and formats
3691 major or minor project report guidelines and formats3691 major or minor project report guidelines and formats
3691 major or minor project report guidelines and formats
 
Process Modeling with IDEF 0
Process Modeling with IDEF 0Process Modeling with IDEF 0
Process Modeling with IDEF 0
 
Feature driven development
Feature driven developmentFeature driven development
Feature driven development
 
Why is Test Driven Development for Analytics or Data Projects so Hard?
Why is Test Driven Development for Analytics or Data Projects so Hard?Why is Test Driven Development for Analytics or Data Projects so Hard?
Why is Test Driven Development for Analytics or Data Projects so Hard?
 
Geant4 Model Testing Framework: From PAW to ROOT
Geant4 Model Testing Framework:  From PAW to ROOTGeant4 Model Testing Framework:  From PAW to ROOT
Geant4 Model Testing Framework: From PAW to ROOT
 
Multimodal graph-based analysis over the DBLP repository: critical discoverie...
Multimodal graph-based analysis over the DBLP repository: critical discoverie...Multimodal graph-based analysis over the DBLP repository: critical discoverie...
Multimodal graph-based analysis over the DBLP repository: critical discoverie...
 

Bs telecom final defence format

  • 1. Project Title Student Name Roll No. Supervisor Name Department of Information Technology and Telecommunication
  • 2. 05/05/13 Project Title 2 Outline  Problem Statement  Project Objective  Literature Review (Optional)  System Model (Block diagram/ flow chart)  Implementation  Results  Conclusion  References
  • 3. 05/05/13 Project Title 3 GUIDELINES  Total duration of the presentation should not exceed 15 minutes and the number of slides is restricted to 20 only.  Use this presentation as template.  Use the headings as listed in the outline.
  • 5. 05/05/13 Project Title 5 Project Objective
  • 6. 05/05/13 Project Title 6 System Model/Flow Chart/Block Diagram
  • 7. 05/05/13 Project Title 7 Implementation
  • 9. 05/05/13 Project Title 9 Conclusion and Recommendations for future work
  • 10. 05/05/13 ProjectTitle 10 References Example Journal Paper: [1] Didier Le Gall, “MPEG: A video compression standard for multimedia applications,” Communications ACM, vol. 34, no. 4, pp. 46–58, April 1991. Example Conference Paper: [2] Gulistan Raja and M. J. Mirza, “Performance comparison of advanced video coding H.264 standard with baseline H.263 and H.263+ standards,” in Proc. 4th IEEE International Symposium on Communications & Information Technologies, ISCIT 04, Sapporo, Japan, 2004, pp. 743–746. Example Book: [3] Iain E.G. Richardson, Video Codec Design, Great Britain, John Wiley & Sons, 2003, ISBN: xx-yyyy-zzzz. Example Web Link: [4] MPEG Software Simulation Group, “The MSSG homepage”, available on-line at http://www.mpeg.org/MPEG/ MSSG, 2004. Example Standard: [5] ITU-T “Video Coding for low bit rate communication,” ITU-T Recommendation H.263; version 1, Nov 1995; version 2, Jan. 1998; version 3, Nov. 2000.