Examination Paper – Project Management
1
IIBM Institute of Business Management
IIBM Institute of Business Management
Examination Paper MM.100
Project Management
Guidelines for paper
• Total No. of Questions is 100.
• The minimum passing marks is 50%.
• Each Question carries 1 mark.
• Answer all the Questions.
Multiple Choices: Total Marks: 100
1. A ________________ is a temporary endeavor undertaken to create a unique product, service, or
result.
a) Program
b) Process
c) Project
d) Portfolio
2. Which of the following is not a potential advantage of using good project management?
a) Shorter development times
b) Higher worker morale
c) Lower cost of capital
d) Higher profit margins
3. Which of the following is not an attribute of a project?
a) Projects are unique
b) Projects are developed using progressive elaboration
c) Projects have a primary customer or sponsor
d) Projects involve little uncertainty
4. Which of the following is not part of the triple constraint of project management?
a) Meeting scope goals
b) Meeting time goals
c) Meeting communications goals
d) Meeting cost goals
5. The first stage of any project is
a) Proposal
b) Conceptualization
c) Implementation
d) Management
Examination Paper – Project Management
2
IIBM Institute of Business Management
6. __________________ is the application of knowledge, skills, tools and techniques to project
activities to meet project requirements.
a) Project management
b) Program management
c) Project portfolio management
d) Requirements management
7. Project portfolio management addresses ____________________ goals of an organization, while
project management addresses _________________ goals.
a) Strategic, tactical
b) Tactical, strategic
c) Internal, external
d) External, internal
8. Several application development projects done for the same functional group might best be
managed as part of a
a) Portfolio
b) Program
c) Investment
d) Collaborative
9. Which of the following is not one of the top ten skills or competencies of an effective project
manager?
a) People skills
b) Leadership
c) Integrity
d) Technical skills
10. What is the certification program called that the Project Management Institute provides?
a) Microsoft Certified Project Manager (MCPM)
b) Project Manager Professional (PMP)
c) Project Management Expert (PME)
d) Project Management Mentor (PMM)
11. A _________________ is a series of actions directed towards a particular result.
a) Goal
b) Process
c) Plan
d) Project
Examination Paper – Project Management
3
IIBM Institute of Business Management
12. ____________________ Processes include coordinating people and other resource to carry out
the project plans and produce the products, service, or results of the project or phase.
a) Initiating
b) Planning
c) Executing
d) Monitoring & controlling
13. Which process group normally requires the most resources and time?
a) Initiating
b) Planning
c) Executing
d) Monitoring and controlling
14. A work breakdown structure, project schedule, and cost estimates are outputs of the process.
a) Initiating
b) Planning
c) Executing
d) Monitoring and controlling
15. Which process group includes activities from each of the nine knowledge areas?
a) Initiating
b) Planning
c) Executing
d) Monitoring and controlling
16. Project management as a profession is almost unique in having institutions concerned with its
development who promote what they term their
a) Body of language
b) Body of knowledge
c) Strategy
d) Work
17. Initiating involves developing a project charter and preliminary project scope statement, which
are part of the project _____________________ management knowledge.
a) Integration
b) Scope
c) Communications
d) Risk
18. A ________________ describes how things should be done, and different organizations often
have different ways of doing things.
a) Regulation
b) Process
c) Standard
d) Methodology
Examination Paper – Project Management
4
IIBM Institute of Business Management
19. ___________________ involves measuring progress toward project objectives and talking
corrective actions.
a) Initiating
b) Planning
c) Executing
d) Monitoring and controlling
20. What type of report do project teams create to reflect on what went right with the project?
a) Lessons – learned report
b) Status report
c) Final project report
d) Business case
21. Project manager is responsible for
a) Overseeing change
b) Cross functional activities
c) Ever changing set of tasks
d) All above
22. Many people use ________________ to have a standard format for preparing various project
management documents.
a) Methodologies
b) Templates
c) Project management software
d) Standards
23. What is the last step in the four – stage planning process for selecting information technology
projects?
a) Information technology strategy planning
b) Business area analysis
c) Project planning
d) Resource allocation
24. A new government law requires an organization to report data in anew way. Under which
category would a new information system project to provide this data fall?
a) Problem
b) Opportunity
c) Directive
d) Regulation
25. A __________________ is a document that formally recognizes the existence of a project and
provides direction on the project’s objectives and management.
a) Project charter
b) Preliminary scope statement
c) Business case
d) Project management plan
Examination Paper – Project Management
5
IIBM Institute of Business Management
26. ICOM model, which is one of the major roles of project manager, stand for
a) Integrated Constraint of Mechanism
b) Inputs, Outputs, Constraints & Mechanism
c) Inputs, Outputs, Constraints & Money
d) None
27. A _______________ often includes sensitive information, so it should not be part of the overall
project plan for anyone to see.
a) Business case
b) Project charter
c) Personnel chart
d) Stakeholder analysis
28. Which of the following is not a suggestion for performing integrated change control?
a) Use good configuration management
b) Minimize change
c) Establish a formal change control system
d) View project management as a process of constant communication and negotiation
29. _______________ refer(s) to all the work involved in creating the products of the projects and
processes used to create them.
a) Deliverables
b) Milestones
c) Scope
d) Product development
30. Assume you have a project with major categories called planning, analysis, design, and testing.
What level of the WBS would these items fall under?
a) 0
b) 1
c) 2
d) 3
31. Which of the following is not a best practice that can help in avoiding scope problems on
information technology projects?
a) Keep the scope realistic
b) Use off-the-shelf hardware and software whenever possible
c) Follow good project management processes
d) Don’t involve too many users in scope management
32. Having ascertains the portfolio of projects obtained objectives for each of them, we have to move
to the next stage of the strategy process to balance the objectives
a) Policy deployment
b) Strategy matrix
c) Project performance measurement
d) None
Examination Paper – Project Management
6
IIBM Institute of Business Management
33. What major restaurant chain terminated a large project after spending $170 million on it,
primarily because they realized the project scope was too much to handle?
a) Burger King
b) Pizza Hut
c) McDonalds
d) Taco Bell
34. Scope ____________________ is often achieved by a customer inspection and then sign – off on
key deliverables.
a) Verification
b) Validation
c) Completion
d) Close – out
35. Project management software helps you develop a _________________, which serves as a basis
for creating Gantt charts, assigning resources, and allocating costs.
a) Project plan
b) Schedule
c) WBS
d) Deliverable
36. WBS (Work Breakdown Structure) is also known as
a) Chunking
b) Unbundling
c) Both (a) & (b)
d) None
37. What is the first process in planning a project schedule?
a) Milestone definition
b) Activity definition
c) Activity resource estimation
d) Activity sequencing
38. Predecessors, successes, logical relationships, leads and lags, resource requirements, constraints,
imposed dates, and assumptions are all examples of ___________________.
a) Items in an activity list
b) Items on a Gantt chart
c) Milestone attributes
d) Activity attributes
Examination Paper – Project Management
7
IIBM Institute of Business Management
39. As the project manager for a software development project, you are helping to develop its
schedule. You decide that writing code for a system cannot start until sign off on the analysis
work. What type of dependency is this?
a) Technical
b) Mandatory
c) Discretionary
d) External
40. You cannot start editing a technical report until someone else completes the first draft. What type
of dependency does this represent?
a) Finish – to – start
b) Start – to – start
c) Finish – to – finish
d) Start – to – finish
41. …………………. Involves going through the cycle several times to test the effects of the changes
make on the outcomes.
a) Planning
b) Strategy
c) Iterative
d) None
42.
Above figure shows two activities A & B; B cannot start until A finished and the times for A &
B are 5 and 7 days respectively. This logic is known as
a) Dependency
b) Precedence
c) Freedom
d) None
43.
In the above figure calculate the EET (earliest event time) at 20.
a) 10
b) 20
c) 5
d) 25
10
0
20
0
A
5Days
1 2 3
A B
5Days 7Days
Examination Paper – Project Management
8
IIBM Institute of Business Management
44. What symbol on a Gantt chart represents a slipped milestone?
a) A black arrow
b) A white arrow
c) A black diamond
d) A white diamond
45. What type of diagram shows planned and actual project schedule information?
a) A network
b) A Gantt chart
c) A Tracking
d) A milestone chart
46. ____________________ is a network diagramming technique used to predict total project
duration.
a) PERT
b) A Gantt chart
c) Critical path method
d) Crashing
47. Which of the following statement is false?
a) “Growing grass” was on the critical path for a large theme park project.
b) The critical path is the series of activities that determine the earliest time by which a
project can be completed.
c) A forward pass through a project network diagram determines the early start and
early finish dates for each activity.
d) Fast tracking is a technique for marking cost and schedule trade-offs to obtain the
obtain the greatest amount of schedule comparison for the least incremental cost.
48. _____________________ is a method of scheduling that considers limited resources when
creating a project schedule and includes buffers to protect the project completion date.
a) Parkinson’s Law
b) Murphy’s Law
c) Critical path analysis
d) Critical chain scheduling
49. _______________ is a resource scarified or foregone to achieve a specific objective or something
given up in exchange.
a) Money
b) Liability
c) Trade
d) Cost
Examination Paper – Project Management
9
IIBM Institute of Business Management
50. What is main goal of project cost management?
a) To complete a project for as little cost as possible
b) To complete a project within an approved budget
c) To provide truthful and accurate cost information on projects
d) To ensure that an organization’s money is used widely
51. A fundamental of ‘Theory of Constraints’ (TOC) is to manage systems by focusing on the
constraints, termed as
a) Watermark
b) Bottleneck
c) Tick-sheet
d) None
52. “An activity will expand to fill the time available”; it is
a) Newton’s Law
b) Parkinson’s Law
c) Einstein’s Law
d) None
53. Which of the following is not a key output of project cost management?
a) A cost estimate
b) A cost management plan
c) Updates to the cost management plan
d) A cost baseline
54. If a company loses $5 for every $100 in revenue for a certain product, what is profit margin for
that product?
a) -5 percent
b) 5 percent
c) -$5
d) $5
55. __________________ reserves allow for future situations that are unpredictable.
a) Contingency
b) Financial
c) Management
d) Baseline
56. You are preparing a cost estimate for a building based on its location, purpose, number of square
feet, and other characteristics. What cost estimating technique are you using?
a) Parametric
b) Analogous
c) Bottom – up
d) Top – down
Examination Paper – Project Management
10
IIBM Institute of Business Management
57. ______________ involves allocating the project cost estimate to individual work items over time.
a) Reserve analysis
b) Life cycle costing
c) Project cost budgeting
d) Earned value analysis
58. _________________ is a project performance measurement technique that integrates scope time,
and cost data.
a) Reserve analysis
b) Life cycle costing
c) Project cost budgeting
d) Earned value analysis
59. If the actual cost for a WBS item is $1500 and its earned value was $2000, what is its cost
variance, and is it under or over budget?
a) The cost variance is -$500, which is over budget
b) The cost variance is -$500, which is under budget
c) The cost variance is $500, which is over budget
d) The cost variance is $500, which is under budget
60. If a project is halfway completed and its schedule performance index is 110% and its cost
performance index is 95%, how is it progressing?
a) It is ahead of schedule and under budget
b) It is ahead of schedule and over budget
c) It is behind schedule and under budget
d) It is behind schedule and over budget
61. To determine the cost of particular element in advance of the project, which technique can be
employed?
a) Parametric estimating
b) As…………but…………s
c) Forecasts
d) All above
62. _______________ is the degree to which a set of inherent characteristics fulfills requirements.
a) Quality
b) Conformance to requirements
c) Fitness for use
d) Reliability
63. What is the purpose of project quality management?
a) To produce the highest quality products and services possible
b) To ensure that appropriate quality standards are met
c) To ensure that the project will satisfy the needs for which it was undertaken
d) All of the above
Examination Paper – Project Management
11
IIBM Institute of Business Management
64. _______________ generates ideas for quality improvements by comparing specific project
practices or product characteristics to those of other projects or products within or outside the
performing organization.
a) Quality audits
b) Design of experiments
c) Six Sigma
d) Benchmarking
65. What tool could you use to determine whether a process is in control or out of control?
a) A cause – and – effect diagram
b) A control chart
c) A run chart
d) A scatter chart
66. Complication to the critical path represents the formation of compound series of activities often
involving different paths which has been termed
a) The critical chain
b) The critical path
c) TOC
d) Resource path
67. Six Sigma’s target for perfection is the achievement of no more than ________________ defects,
errors, or mistakes per million opportunities.
a) 6
b) 9
c) 3.4
d) 1
68. The seven run rule states that if seven data points in a row on a control chart are all below the
mean, above the means, or all increasing or decreasing, then the process needs to be examined for
_________________ problems.
a) Random
b) Non – random
c) Six Sigma
d) Quality
69. What is the preferred order for performing testing on information technology projects?
a) Unit testing, integration testing, system testing, user acceptance testing
b) Unit testing, system testing, integration testing, user acceptance testing
c) Unit testing, system testing, user acceptance testing, integration testing
d) Unit testing, integration testing, user acceptance testing, system testing
Examination Paper – Project Management
12
IIBM Institute of Business Management
70. ___________________ is known for his work on quality control in Japan and developed the 14
points for Management in his text Out of the Crisis.
a) Juran
b) Deming
c) Crosby
d) Ishikawa
71. The theory of constraints (TOC) is successfully applied in
a) Planning
b) Checking
c) Manufacturing
d) Controlling
72. PMI’s OPM3 is an example of a ____________________ model or framework for helping
organization improve their processes and systems.
a) Benchmarking
b) Six Sigma
c) Maturity
d) Quality
73. Which of the following is not part of project human resource management?
a) Resource estimating
b) Acquiring the project team
c) Developing the project team
d) Managing the project team
74. _________________ causes people to participate in an activity for their own enjoyment.
a) Intrinsic motivation
b) Extrinsic motivation
c) Self motivation
d) Social motivation
75. At the bottom of Maslow’s pyramid or hierarchy of needs are _____________ needs.
a) Self – actualization
b) Esteem
c) Safety
d) Physiological
76. ________________ power is based on a person’s individual charisma.
a) Affiliation
b) Referent
c) Personality
d) Legitimate
Examination Paper – Project Management
13
IIBM Institute of Business Management
77. What technique can you use to resolve resource conflicts by delaying tasks?
a) Resource loading
b) Resource leveling
c) Critical path analysis
d) Over allocation
78. Which of the following is not a tool or technique for managing project team?
a) Observation and conversation
b) Project performance appraisals
c) Issue logs
d) Social Styles Profile
79. What do many experts agree is the greatest threat to the success of any project?
a) Lack of proper funding
b) A failure to communicate
c) Poor listening skills
d) Inadequate staffing
80. Which communication skill is most important for information technology professionals for career
advancement?
a) Writing
b) Listening
c) Speaking
d) Using communication technologies
81. Which of the following is not a process in project communication management?
a) Information planning
b) Information distribution
c) Performance reporting
d) Managing stakeholders
82. A building may not be constructed unless the planning permission for it has been obtained, this is
the
a) Legal constraint
b) Quality constraint
c) Cost constraint
d) Logic constraint
83. A ________________ report describes where the project stands at a specific point in time.
a) Status
b) Performance
c) Forecast
d) Earned value
Examination Paper – Project Management
14
IIBM Institute of Business Management
84. __________________ is an uncertainly that can have a negative or positive effect on meeting
project objectives.
a) Risk utility
b) Risk tolerance
c) Risk management
d) Risk
85. A person who is a risk - ______________ receives greater satisfaction when more payoffs is at
stake and is willing to pay a penalty to take risks.
a) Averse
b) Seeking
c) Neutral
d) Aware
86. Which risk management process involves prioritizing based on their probability and impact of
occurrence?
a) Risk management planning
b) Risk identification
c) Qualitative risk analysis
d) Quantitative risk analysis
87. The 7-S framework of project management issues was promoted by
a) McJonald and Co.
b) McKinsly and Co.
c) J & K Co.
d) None
88. Your project involves using a new release of a software application, but if that release is not
available, your team has ______________ plans to use the current release.
a) Contingency
b) Fallback
c) Reserve
d) Mitigation
89. A risk _________________ is a document that contains results of various risk management
processes, often displayed in a table or spreadsheet format.
a) Management plan
b) Register
c) Breakdown structure
d) Probability / impact matrix
Examination Paper – Project Management
15
IIBM Institute of Business Management
90. Your project team has decided not to use an upcoming release of software because it might cause
your schedule to slip. Which negative risk response strategy are you using?
a) Avoidance
b) Acceptance
c) Transference
d) Mitigation
91. For non critical activities, network diagrams build in …………………………. at the start of
activities.
a) Temporary
b) Buffer
c) Slack
d) Anywhere
92. If a project being undertaken by a particular project team, then these are referred as
a) Resource capability
b) Resource capacity
c) Resource calendar
d) Resource pool
93. The term ‘hedgehog syndrome’ means
a) Management problem
b) Solving problem
c) Repetition of problem
d) Find out a problem
94. What is the first procurement process?
a) Planning contracting
b) Planning purchasing and acquisitions
c) Requesting seller responses
d) Procurement management planning
95. The _____________ is the point at which the contractor assumes total responsibility for each
additional dollar of contract cost.
a) A breakeven point
b) Share ratio point
c) Point of reconciliation
d) Point of total assumption
96. We’re standing on this hill here. We want to be on that hill over there, this is
a) View
b) Vision
c) Mission
d) Aim
Examination Paper – Project Management
16
IIBM Institute of Business Management
97. A ______________________ is a document prepared by a seller when there are different
approaches for meeting buyer needs.
a) RFP
b) RFQ
c) Proposal
d) Quote
98. Buyers often prepare a ______________________ list when selecting a seller to make this
process more manageable.
a) Preferred
b) Short
c) Qualified suppliers
d) BAFO
99. A proposal evaluation sheet is an example of a(n) ______________________.
a) RFP
b) NPV analysis
c) Earned value analysis
d) Weighted scoring model
100. __________________ is a term used to describe various procurement functions that are
now done electronically.
a) E – procurement
b) eBay
c) E – commerce
d) EMV

More Related Content

What's hot

Project Management - _______________ is a project performance measurement t...
Project Management -   _______________ is a project performance measurement t...Project Management -   _______________ is a project performance measurement t...
Project Management - _______________ is a project performance measurement t...Suma Kamadod
 
Project Management - Having ascertains the portfolio of projects obtained obj...
Project Management - Having ascertains the portfolio of projects obtained obj...Project Management - Having ascertains the portfolio of projects obtained obj...
Project Management - Having ascertains the portfolio of projects obtained obj...Suma Kamadod
 
Project Management - Scope __________________ is often achieved by a custom...
Project Management - Scope   __________________ is often achieved by a custom...Project Management - Scope   __________________ is often achieved by a custom...
Project Management - Scope __________________ is often achieved by a custom...Suma Kamadod
 
Project Management - A person who is a risk – ____________ receives greater...
Project Management - A person who is a risk –   ____________ receives greater...Project Management - A person who is a risk –   ____________ receives greater...
Project Management - A person who is a risk – ____________ receives greater...Suma Kamadod
 
Project Management - Earned value a ______________ report describes where t...
Project Management - Earned value a   ______________ report describes where t...Project Management - Earned value a   ______________ report describes where t...
Project Management - Earned value a ______________ report describes where t...Suma Kamadod
 
Project Management - Six sigma’s target for perfection is the achievement of ...
Project Management - Six sigma’s target for perfection is the achievement of ...Project Management - Six sigma’s target for perfection is the achievement of ...
Project Management - Six sigma’s target for perfection is the achievement of ...Suma Kamadod
 
Project Management - If a project being undertaken by a particular project te...
Project Management - If a project being undertaken by a particular project te...Project Management - If a project being undertaken by a particular project te...
Project Management - If a project being undertaken by a particular project te...Suma Kamadod
 
Project Management - A ________________ is a document that formally recogni...
Project Management - A   ________________ is a document that formally recogni...Project Management - A   ________________ is a document that formally recogni...
Project Management - A ________________ is a document that formally recogni...Suma Kamadod
 
Project Management - _____________ is the degree to which a set of inherent...
Project Management -   _____________ is the degree to which a set of inherent...Project Management -   _____________ is the degree to which a set of inherent...
Project Management - _____________ is the degree to which a set of inherent...Suma Kamadod
 
Project Management - Which of the following is not part of the triple constra...
Project Management - Which of the following is not part of the triple constra...Project Management - Which of the following is not part of the triple constra...
Project Management - Which of the following is not part of the triple constra...Suma Kamadod
 
Project Management - Project management as a profession is almost unique in h...
Project Management - Project management as a profession is almost unique in h...Project Management - Project management as a profession is almost unique in h...
Project Management - Project management as a profession is almost unique in h...Suma Kamadod
 
Project Management - A ____________________ is a document prepared by a sel...
Project Management - A   ____________________ is a document prepared by a sel...Project Management - A   ____________________ is a document prepared by a sel...
Project Management - A ____________________ is a document prepared by a sel...Suma Kamadod
 
Project Management - Project portfolio management addresses _______________...
Project Management - Project portfolio management addresses   _______________...Project Management - Project portfolio management addresses   _______________...
Project Management - Project portfolio management addresses _______________...Suma Kamadod
 
Project Management - A new government law requires an organization to report ...
Project Management - A new government law requires an organization to report ...Project Management - A new government law requires an organization to report ...
Project Management - A new government law requires an organization to report ...Suma Kamadod
 
Project Management - A proposal evaluation sheet is an example of a(n) ____...
Project Management - A proposal evaluation sheet is an example of a(n)   ____...Project Management - A proposal evaluation sheet is an example of a(n)   ____...
Project Management - A proposal evaluation sheet is an example of a(n) ____...Suma Kamadod
 
A ______________ describes how things should be done, and different organiz...
A   ______________ describes how things should be done, and different organiz...A   ______________ describes how things should be done, and different organiz...
A ______________ describes how things should be done, and different organiz...Suma Kamadod
 
Project Management - “An activity will expand to fill the time available”; it...
Project Management - “An activity will expand to fill the time available”; it...Project Management - “An activity will expand to fill the time available”; it...
Project Management - “An activity will expand to fill the time available”; it...Suma Kamadod
 
Project Management - Which process group includes activities from each of the...
Project Management - Which process group includes activities from each of the...Project Management - Which process group includes activities from each of the...
Project Management - Which process group includes activities from each of the...Suma Kamadod
 
Project Management - A risk _______________ is a document that contains res...
Project Management - A risk   _______________ is a document that contains res...Project Management - A risk   _______________ is a document that contains res...
Project Management - A risk _______________ is a document that contains res...Suma Kamadod
 

What's hot (19)

Project Management - _______________ is a project performance measurement t...
Project Management -   _______________ is a project performance measurement t...Project Management -   _______________ is a project performance measurement t...
Project Management - _______________ is a project performance measurement t...
 
Project Management - Having ascertains the portfolio of projects obtained obj...
Project Management - Having ascertains the portfolio of projects obtained obj...Project Management - Having ascertains the portfolio of projects obtained obj...
Project Management - Having ascertains the portfolio of projects obtained obj...
 
Project Management - Scope __________________ is often achieved by a custom...
Project Management - Scope   __________________ is often achieved by a custom...Project Management - Scope   __________________ is often achieved by a custom...
Project Management - Scope __________________ is often achieved by a custom...
 
Project Management - A person who is a risk – ____________ receives greater...
Project Management - A person who is a risk –   ____________ receives greater...Project Management - A person who is a risk –   ____________ receives greater...
Project Management - A person who is a risk – ____________ receives greater...
 
Project Management - Earned value a ______________ report describes where t...
Project Management - Earned value a   ______________ report describes where t...Project Management - Earned value a   ______________ report describes where t...
Project Management - Earned value a ______________ report describes where t...
 
Project Management - Six sigma’s target for perfection is the achievement of ...
Project Management - Six sigma’s target for perfection is the achievement of ...Project Management - Six sigma’s target for perfection is the achievement of ...
Project Management - Six sigma’s target for perfection is the achievement of ...
 
Project Management - If a project being undertaken by a particular project te...
Project Management - If a project being undertaken by a particular project te...Project Management - If a project being undertaken by a particular project te...
Project Management - If a project being undertaken by a particular project te...
 
Project Management - A ________________ is a document that formally recogni...
Project Management - A   ________________ is a document that formally recogni...Project Management - A   ________________ is a document that formally recogni...
Project Management - A ________________ is a document that formally recogni...
 
Project Management - _____________ is the degree to which a set of inherent...
Project Management -   _____________ is the degree to which a set of inherent...Project Management -   _____________ is the degree to which a set of inherent...
Project Management - _____________ is the degree to which a set of inherent...
 
Project Management - Which of the following is not part of the triple constra...
Project Management - Which of the following is not part of the triple constra...Project Management - Which of the following is not part of the triple constra...
Project Management - Which of the following is not part of the triple constra...
 
Project Management - Project management as a profession is almost unique in h...
Project Management - Project management as a profession is almost unique in h...Project Management - Project management as a profession is almost unique in h...
Project Management - Project management as a profession is almost unique in h...
 
Project Management - A ____________________ is a document prepared by a sel...
Project Management - A   ____________________ is a document prepared by a sel...Project Management - A   ____________________ is a document prepared by a sel...
Project Management - A ____________________ is a document prepared by a sel...
 
Project Management - Project portfolio management addresses _______________...
Project Management - Project portfolio management addresses   _______________...Project Management - Project portfolio management addresses   _______________...
Project Management - Project portfolio management addresses _______________...
 
Project Management - A new government law requires an organization to report ...
Project Management - A new government law requires an organization to report ...Project Management - A new government law requires an organization to report ...
Project Management - A new government law requires an organization to report ...
 
Project Management - A proposal evaluation sheet is an example of a(n) ____...
Project Management - A proposal evaluation sheet is an example of a(n)   ____...Project Management - A proposal evaluation sheet is an example of a(n)   ____...
Project Management - A proposal evaluation sheet is an example of a(n) ____...
 
A ______________ describes how things should be done, and different organiz...
A   ______________ describes how things should be done, and different organiz...A   ______________ describes how things should be done, and different organiz...
A ______________ describes how things should be done, and different organiz...
 
Project Management - “An activity will expand to fill the time available”; it...
Project Management - “An activity will expand to fill the time available”; it...Project Management - “An activity will expand to fill the time available”; it...
Project Management - “An activity will expand to fill the time available”; it...
 
Project Management - Which process group includes activities from each of the...
Project Management - Which process group includes activities from each of the...Project Management - Which process group includes activities from each of the...
Project Management - Which process group includes activities from each of the...
 
Project Management - A risk _______________ is a document that contains res...
Project Management - A risk   _______________ is a document that contains res...Project Management - A risk   _______________ is a document that contains res...
Project Management - A risk _______________ is a document that contains res...
 

Similar to Iibm examination paper of project management

Mb0033 mb0049
Mb0033 mb0049Mb0033 mb0049
Mb0033 mb0049amitpr
 
Project Management - Which of the following is not a suggestion for performin...
Project Management - Which of the following is not a suggestion for performin...Project Management - Which of the following is not a suggestion for performin...
Project Management - Which of the following is not a suggestion for performin...Suma Kamadod
 
Project Management - __________________ is a network diagramming technique ...
Project Management -   __________________ is a network diagramming technique ...Project Management -   __________________ is a network diagramming technique ...
Project Management - __________________ is a network diagramming technique ...Suma Kamadod
 
Project Management - Project manager is responsible for a) overseeing change ...
Project Management - Project manager is responsible for a) overseeing change ...Project Management - Project manager is responsible for a) overseeing change ...
Project Management - Project manager is responsible for a) overseeing change ...Suma Kamadod
 
Project Management - _________________ is known for his work on quality con...
Project Management -   _________________ is known for his work on quality con...Project Management -   _________________ is known for his work on quality con...
Project Management - _________________ is known for his work on quality con...Suma Kamadod
 
Project Management - The theory of constraints (toc) is successfully applied ...
Project Management - The theory of constraints (toc) is successfully applied ...Project Management - The theory of constraints (toc) is successfully applied ...
Project Management - The theory of constraints (toc) is successfully applied ...Suma Kamadod
 
Project Management - Complication to the critical path represents the formati...
Project Management - Complication to the critical path represents the formati...Project Management - Complication to the critical path represents the formati...
Project Management - Complication to the critical path represents the formati...Suma Kamadod
 
Project Management - _____________ generates ideas for quality improvements...
Project Management -   _____________ generates ideas for quality improvements...Project Management -   _____________ generates ideas for quality improvements...
Project Management - _____________ generates ideas for quality improvements...Suma Kamadod
 
Project Management - Initiating involves developing a project charter and pre...
Project Management - Initiating involves developing a project charter and pre...Project Management - Initiating involves developing a project charter and pre...
Project Management - Initiating involves developing a project charter and pre...Suma Kamadod
 
Project Management - Project management software helps you develop a ______...
Project Management - Project management software helps you develop a   ______...Project Management - Project management software helps you develop a   ______...
Project Management - Project management software helps you develop a ______...Suma Kamadod
 
Project Management - ________________ is a term used to describe various pr...
Project Management -   ________________ is a term used to describe various pr...Project Management -   ________________ is a term used to describe various pr...
Project Management - ________________ is a term used to describe various pr...Suma Kamadod
 
Project Management - Which communication skill is most important for informat...
Project Management - Which communication skill is most important for informat...Project Management - Which communication skill is most important for informat...
Project Management - Which communication skill is most important for informat...Suma Kamadod
 
Project Management - _____________ refer(s) to all the work involved in cre...
Project Management -   _____________ refer(s) to all the work involved in cre...Project Management -   _____________ refer(s) to all the work involved in cre...
Project Management - _____________ refer(s) to all the work involved in cre...Suma Kamadod
 
Project Management - To determine the cost of particular element in advance o...
Project Management - To determine the cost of particular element in advance o...Project Management - To determine the cost of particular element in advance o...
Project Management - To determine the cost of particular element in advance o...Suma Kamadod
 
Project Management - In the above figure calculate the eet (earliest event ti...
Project Management - In the above figure calculate the eet (earliest event ti...Project Management - In the above figure calculate the eet (earliest event ti...
Project Management - In the above figure calculate the eet (earliest event ti...Suma Kamadod
 
Project Management - We’re standing on this hill here. we want to be on that ...
Project Management - We’re standing on this hill here. we want to be on that ...Project Management - We’re standing on this hill here. we want to be on that ...
Project Management - We’re standing on this hill here. we want to be on that ...Suma Kamadod
 
Project Management - Which of the following is not a potential advantage of u...
Project Management - Which of the following is not a potential advantage of u...Project Management - Which of the following is not a potential advantage of u...
Project Management - Which of the following is not a potential advantage of u...Suma Kamadod
 
Project Management - Icom model, which is one of the major roles of project m...
Project Management - Icom model, which is one of the major roles of project m...Project Management - Icom model, which is one of the major roles of project m...
Project Management - Icom model, which is one of the major roles of project m...Suma Kamadod
 
Project Management - The term ‘hedgehog syndrome’ means a) management problem...
Project Management - The term ‘hedgehog syndrome’ means a) management problem...Project Management - The term ‘hedgehog syndrome’ means a) management problem...
Project Management - The term ‘hedgehog syndrome’ means a) management problem...Suma Kamadod
 
Project Management - …………………. Involves going through the cycle several times...
Project Management - ………………….  Involves going through the cycle several times...Project Management - ………………….  Involves going through the cycle several times...
Project Management - …………………. Involves going through the cycle several times...Suma Kamadod
 

Similar to Iibm examination paper of project management (20)

Mb0033 mb0049
Mb0033 mb0049Mb0033 mb0049
Mb0033 mb0049
 
Project Management - Which of the following is not a suggestion for performin...
Project Management - Which of the following is not a suggestion for performin...Project Management - Which of the following is not a suggestion for performin...
Project Management - Which of the following is not a suggestion for performin...
 
Project Management - __________________ is a network diagramming technique ...
Project Management -   __________________ is a network diagramming technique ...Project Management -   __________________ is a network diagramming technique ...
Project Management - __________________ is a network diagramming technique ...
 
Project Management - Project manager is responsible for a) overseeing change ...
Project Management - Project manager is responsible for a) overseeing change ...Project Management - Project manager is responsible for a) overseeing change ...
Project Management - Project manager is responsible for a) overseeing change ...
 
Project Management - _________________ is known for his work on quality con...
Project Management -   _________________ is known for his work on quality con...Project Management -   _________________ is known for his work on quality con...
Project Management - _________________ is known for his work on quality con...
 
Project Management - The theory of constraints (toc) is successfully applied ...
Project Management - The theory of constraints (toc) is successfully applied ...Project Management - The theory of constraints (toc) is successfully applied ...
Project Management - The theory of constraints (toc) is successfully applied ...
 
Project Management - Complication to the critical path represents the formati...
Project Management - Complication to the critical path represents the formati...Project Management - Complication to the critical path represents the formati...
Project Management - Complication to the critical path represents the formati...
 
Project Management - _____________ generates ideas for quality improvements...
Project Management -   _____________ generates ideas for quality improvements...Project Management -   _____________ generates ideas for quality improvements...
Project Management - _____________ generates ideas for quality improvements...
 
Project Management - Initiating involves developing a project charter and pre...
Project Management - Initiating involves developing a project charter and pre...Project Management - Initiating involves developing a project charter and pre...
Project Management - Initiating involves developing a project charter and pre...
 
Project Management - Project management software helps you develop a ______...
Project Management - Project management software helps you develop a   ______...Project Management - Project management software helps you develop a   ______...
Project Management - Project management software helps you develop a ______...
 
Project Management - ________________ is a term used to describe various pr...
Project Management -   ________________ is a term used to describe various pr...Project Management -   ________________ is a term used to describe various pr...
Project Management - ________________ is a term used to describe various pr...
 
Project Management - Which communication skill is most important for informat...
Project Management - Which communication skill is most important for informat...Project Management - Which communication skill is most important for informat...
Project Management - Which communication skill is most important for informat...
 
Project Management - _____________ refer(s) to all the work involved in cre...
Project Management -   _____________ refer(s) to all the work involved in cre...Project Management -   _____________ refer(s) to all the work involved in cre...
Project Management - _____________ refer(s) to all the work involved in cre...
 
Project Management - To determine the cost of particular element in advance o...
Project Management - To determine the cost of particular element in advance o...Project Management - To determine the cost of particular element in advance o...
Project Management - To determine the cost of particular element in advance o...
 
Project Management - In the above figure calculate the eet (earliest event ti...
Project Management - In the above figure calculate the eet (earliest event ti...Project Management - In the above figure calculate the eet (earliest event ti...
Project Management - In the above figure calculate the eet (earliest event ti...
 
Project Management - We’re standing on this hill here. we want to be on that ...
Project Management - We’re standing on this hill here. we want to be on that ...Project Management - We’re standing on this hill here. we want to be on that ...
Project Management - We’re standing on this hill here. we want to be on that ...
 
Project Management - Which of the following is not a potential advantage of u...
Project Management - Which of the following is not a potential advantage of u...Project Management - Which of the following is not a potential advantage of u...
Project Management - Which of the following is not a potential advantage of u...
 
Project Management - Icom model, which is one of the major roles of project m...
Project Management - Icom model, which is one of the major roles of project m...Project Management - Icom model, which is one of the major roles of project m...
Project Management - Icom model, which is one of the major roles of project m...
 
Project Management - The term ‘hedgehog syndrome’ means a) management problem...
Project Management - The term ‘hedgehog syndrome’ means a) management problem...Project Management - The term ‘hedgehog syndrome’ means a) management problem...
Project Management - The term ‘hedgehog syndrome’ means a) management problem...
 
Project Management - …………………. Involves going through the cycle several times...
Project Management - ………………….  Involves going through the cycle several times...Project Management - ………………….  Involves going through the cycle several times...
Project Management - …………………. Involves going through the cycle several times...
 

Recently uploaded

BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 

Recently uploaded (20)

BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 

Iibm examination paper of project management

  • 1. Examination Paper – Project Management 1 IIBM Institute of Business Management IIBM Institute of Business Management Examination Paper MM.100 Project Management Guidelines for paper • Total No. of Questions is 100. • The minimum passing marks is 50%. • Each Question carries 1 mark. • Answer all the Questions. Multiple Choices: Total Marks: 100 1. A ________________ is a temporary endeavor undertaken to create a unique product, service, or result. a) Program b) Process c) Project d) Portfolio 2. Which of the following is not a potential advantage of using good project management? a) Shorter development times b) Higher worker morale c) Lower cost of capital d) Higher profit margins 3. Which of the following is not an attribute of a project? a) Projects are unique b) Projects are developed using progressive elaboration c) Projects have a primary customer or sponsor d) Projects involve little uncertainty 4. Which of the following is not part of the triple constraint of project management? a) Meeting scope goals b) Meeting time goals c) Meeting communications goals d) Meeting cost goals 5. The first stage of any project is a) Proposal b) Conceptualization c) Implementation d) Management
  • 2. Examination Paper – Project Management 2 IIBM Institute of Business Management 6. __________________ is the application of knowledge, skills, tools and techniques to project activities to meet project requirements. a) Project management b) Program management c) Project portfolio management d) Requirements management 7. Project portfolio management addresses ____________________ goals of an organization, while project management addresses _________________ goals. a) Strategic, tactical b) Tactical, strategic c) Internal, external d) External, internal 8. Several application development projects done for the same functional group might best be managed as part of a a) Portfolio b) Program c) Investment d) Collaborative 9. Which of the following is not one of the top ten skills or competencies of an effective project manager? a) People skills b) Leadership c) Integrity d) Technical skills 10. What is the certification program called that the Project Management Institute provides? a) Microsoft Certified Project Manager (MCPM) b) Project Manager Professional (PMP) c) Project Management Expert (PME) d) Project Management Mentor (PMM) 11. A _________________ is a series of actions directed towards a particular result. a) Goal b) Process c) Plan d) Project
  • 3. Examination Paper – Project Management 3 IIBM Institute of Business Management 12. ____________________ Processes include coordinating people and other resource to carry out the project plans and produce the products, service, or results of the project or phase. a) Initiating b) Planning c) Executing d) Monitoring & controlling 13. Which process group normally requires the most resources and time? a) Initiating b) Planning c) Executing d) Monitoring and controlling 14. A work breakdown structure, project schedule, and cost estimates are outputs of the process. a) Initiating b) Planning c) Executing d) Monitoring and controlling 15. Which process group includes activities from each of the nine knowledge areas? a) Initiating b) Planning c) Executing d) Monitoring and controlling 16. Project management as a profession is almost unique in having institutions concerned with its development who promote what they term their a) Body of language b) Body of knowledge c) Strategy d) Work 17. Initiating involves developing a project charter and preliminary project scope statement, which are part of the project _____________________ management knowledge. a) Integration b) Scope c) Communications d) Risk 18. A ________________ describes how things should be done, and different organizations often have different ways of doing things. a) Regulation b) Process c) Standard d) Methodology
  • 4. Examination Paper – Project Management 4 IIBM Institute of Business Management 19. ___________________ involves measuring progress toward project objectives and talking corrective actions. a) Initiating b) Planning c) Executing d) Monitoring and controlling 20. What type of report do project teams create to reflect on what went right with the project? a) Lessons – learned report b) Status report c) Final project report d) Business case 21. Project manager is responsible for a) Overseeing change b) Cross functional activities c) Ever changing set of tasks d) All above 22. Many people use ________________ to have a standard format for preparing various project management documents. a) Methodologies b) Templates c) Project management software d) Standards 23. What is the last step in the four – stage planning process for selecting information technology projects? a) Information technology strategy planning b) Business area analysis c) Project planning d) Resource allocation 24. A new government law requires an organization to report data in anew way. Under which category would a new information system project to provide this data fall? a) Problem b) Opportunity c) Directive d) Regulation 25. A __________________ is a document that formally recognizes the existence of a project and provides direction on the project’s objectives and management. a) Project charter b) Preliminary scope statement c) Business case d) Project management plan
  • 5. Examination Paper – Project Management 5 IIBM Institute of Business Management 26. ICOM model, which is one of the major roles of project manager, stand for a) Integrated Constraint of Mechanism b) Inputs, Outputs, Constraints & Mechanism c) Inputs, Outputs, Constraints & Money d) None 27. A _______________ often includes sensitive information, so it should not be part of the overall project plan for anyone to see. a) Business case b) Project charter c) Personnel chart d) Stakeholder analysis 28. Which of the following is not a suggestion for performing integrated change control? a) Use good configuration management b) Minimize change c) Establish a formal change control system d) View project management as a process of constant communication and negotiation 29. _______________ refer(s) to all the work involved in creating the products of the projects and processes used to create them. a) Deliverables b) Milestones c) Scope d) Product development 30. Assume you have a project with major categories called planning, analysis, design, and testing. What level of the WBS would these items fall under? a) 0 b) 1 c) 2 d) 3 31. Which of the following is not a best practice that can help in avoiding scope problems on information technology projects? a) Keep the scope realistic b) Use off-the-shelf hardware and software whenever possible c) Follow good project management processes d) Don’t involve too many users in scope management 32. Having ascertains the portfolio of projects obtained objectives for each of them, we have to move to the next stage of the strategy process to balance the objectives a) Policy deployment b) Strategy matrix c) Project performance measurement d) None
  • 6. Examination Paper – Project Management 6 IIBM Institute of Business Management 33. What major restaurant chain terminated a large project after spending $170 million on it, primarily because they realized the project scope was too much to handle? a) Burger King b) Pizza Hut c) McDonalds d) Taco Bell 34. Scope ____________________ is often achieved by a customer inspection and then sign – off on key deliverables. a) Verification b) Validation c) Completion d) Close – out 35. Project management software helps you develop a _________________, which serves as a basis for creating Gantt charts, assigning resources, and allocating costs. a) Project plan b) Schedule c) WBS d) Deliverable 36. WBS (Work Breakdown Structure) is also known as a) Chunking b) Unbundling c) Both (a) & (b) d) None 37. What is the first process in planning a project schedule? a) Milestone definition b) Activity definition c) Activity resource estimation d) Activity sequencing 38. Predecessors, successes, logical relationships, leads and lags, resource requirements, constraints, imposed dates, and assumptions are all examples of ___________________. a) Items in an activity list b) Items on a Gantt chart c) Milestone attributes d) Activity attributes
  • 7. Examination Paper – Project Management 7 IIBM Institute of Business Management 39. As the project manager for a software development project, you are helping to develop its schedule. You decide that writing code for a system cannot start until sign off on the analysis work. What type of dependency is this? a) Technical b) Mandatory c) Discretionary d) External 40. You cannot start editing a technical report until someone else completes the first draft. What type of dependency does this represent? a) Finish – to – start b) Start – to – start c) Finish – to – finish d) Start – to – finish 41. …………………. Involves going through the cycle several times to test the effects of the changes make on the outcomes. a) Planning b) Strategy c) Iterative d) None 42. Above figure shows two activities A & B; B cannot start until A finished and the times for A & B are 5 and 7 days respectively. This logic is known as a) Dependency b) Precedence c) Freedom d) None 43. In the above figure calculate the EET (earliest event time) at 20. a) 10 b) 20 c) 5 d) 25 10 0 20 0 A 5Days 1 2 3 A B 5Days 7Days
  • 8. Examination Paper – Project Management 8 IIBM Institute of Business Management 44. What symbol on a Gantt chart represents a slipped milestone? a) A black arrow b) A white arrow c) A black diamond d) A white diamond 45. What type of diagram shows planned and actual project schedule information? a) A network b) A Gantt chart c) A Tracking d) A milestone chart 46. ____________________ is a network diagramming technique used to predict total project duration. a) PERT b) A Gantt chart c) Critical path method d) Crashing 47. Which of the following statement is false? a) “Growing grass” was on the critical path for a large theme park project. b) The critical path is the series of activities that determine the earliest time by which a project can be completed. c) A forward pass through a project network diagram determines the early start and early finish dates for each activity. d) Fast tracking is a technique for marking cost and schedule trade-offs to obtain the obtain the greatest amount of schedule comparison for the least incremental cost. 48. _____________________ is a method of scheduling that considers limited resources when creating a project schedule and includes buffers to protect the project completion date. a) Parkinson’s Law b) Murphy’s Law c) Critical path analysis d) Critical chain scheduling 49. _______________ is a resource scarified or foregone to achieve a specific objective or something given up in exchange. a) Money b) Liability c) Trade d) Cost
  • 9. Examination Paper – Project Management 9 IIBM Institute of Business Management 50. What is main goal of project cost management? a) To complete a project for as little cost as possible b) To complete a project within an approved budget c) To provide truthful and accurate cost information on projects d) To ensure that an organization’s money is used widely 51. A fundamental of ‘Theory of Constraints’ (TOC) is to manage systems by focusing on the constraints, termed as a) Watermark b) Bottleneck c) Tick-sheet d) None 52. “An activity will expand to fill the time available”; it is a) Newton’s Law b) Parkinson’s Law c) Einstein’s Law d) None 53. Which of the following is not a key output of project cost management? a) A cost estimate b) A cost management plan c) Updates to the cost management plan d) A cost baseline 54. If a company loses $5 for every $100 in revenue for a certain product, what is profit margin for that product? a) -5 percent b) 5 percent c) -$5 d) $5 55. __________________ reserves allow for future situations that are unpredictable. a) Contingency b) Financial c) Management d) Baseline 56. You are preparing a cost estimate for a building based on its location, purpose, number of square feet, and other characteristics. What cost estimating technique are you using? a) Parametric b) Analogous c) Bottom – up d) Top – down
  • 10. Examination Paper – Project Management 10 IIBM Institute of Business Management 57. ______________ involves allocating the project cost estimate to individual work items over time. a) Reserve analysis b) Life cycle costing c) Project cost budgeting d) Earned value analysis 58. _________________ is a project performance measurement technique that integrates scope time, and cost data. a) Reserve analysis b) Life cycle costing c) Project cost budgeting d) Earned value analysis 59. If the actual cost for a WBS item is $1500 and its earned value was $2000, what is its cost variance, and is it under or over budget? a) The cost variance is -$500, which is over budget b) The cost variance is -$500, which is under budget c) The cost variance is $500, which is over budget d) The cost variance is $500, which is under budget 60. If a project is halfway completed and its schedule performance index is 110% and its cost performance index is 95%, how is it progressing? a) It is ahead of schedule and under budget b) It is ahead of schedule and over budget c) It is behind schedule and under budget d) It is behind schedule and over budget 61. To determine the cost of particular element in advance of the project, which technique can be employed? a) Parametric estimating b) As…………but…………s c) Forecasts d) All above 62. _______________ is the degree to which a set of inherent characteristics fulfills requirements. a) Quality b) Conformance to requirements c) Fitness for use d) Reliability 63. What is the purpose of project quality management? a) To produce the highest quality products and services possible b) To ensure that appropriate quality standards are met c) To ensure that the project will satisfy the needs for which it was undertaken d) All of the above
  • 11. Examination Paper – Project Management 11 IIBM Institute of Business Management 64. _______________ generates ideas for quality improvements by comparing specific project practices or product characteristics to those of other projects or products within or outside the performing organization. a) Quality audits b) Design of experiments c) Six Sigma d) Benchmarking 65. What tool could you use to determine whether a process is in control or out of control? a) A cause – and – effect diagram b) A control chart c) A run chart d) A scatter chart 66. Complication to the critical path represents the formation of compound series of activities often involving different paths which has been termed a) The critical chain b) The critical path c) TOC d) Resource path 67. Six Sigma’s target for perfection is the achievement of no more than ________________ defects, errors, or mistakes per million opportunities. a) 6 b) 9 c) 3.4 d) 1 68. The seven run rule states that if seven data points in a row on a control chart are all below the mean, above the means, or all increasing or decreasing, then the process needs to be examined for _________________ problems. a) Random b) Non – random c) Six Sigma d) Quality 69. What is the preferred order for performing testing on information technology projects? a) Unit testing, integration testing, system testing, user acceptance testing b) Unit testing, system testing, integration testing, user acceptance testing c) Unit testing, system testing, user acceptance testing, integration testing d) Unit testing, integration testing, user acceptance testing, system testing
  • 12. Examination Paper – Project Management 12 IIBM Institute of Business Management 70. ___________________ is known for his work on quality control in Japan and developed the 14 points for Management in his text Out of the Crisis. a) Juran b) Deming c) Crosby d) Ishikawa 71. The theory of constraints (TOC) is successfully applied in a) Planning b) Checking c) Manufacturing d) Controlling 72. PMI’s OPM3 is an example of a ____________________ model or framework for helping organization improve their processes and systems. a) Benchmarking b) Six Sigma c) Maturity d) Quality 73. Which of the following is not part of project human resource management? a) Resource estimating b) Acquiring the project team c) Developing the project team d) Managing the project team 74. _________________ causes people to participate in an activity for their own enjoyment. a) Intrinsic motivation b) Extrinsic motivation c) Self motivation d) Social motivation 75. At the bottom of Maslow’s pyramid or hierarchy of needs are _____________ needs. a) Self – actualization b) Esteem c) Safety d) Physiological 76. ________________ power is based on a person’s individual charisma. a) Affiliation b) Referent c) Personality d) Legitimate
  • 13. Examination Paper – Project Management 13 IIBM Institute of Business Management 77. What technique can you use to resolve resource conflicts by delaying tasks? a) Resource loading b) Resource leveling c) Critical path analysis d) Over allocation 78. Which of the following is not a tool or technique for managing project team? a) Observation and conversation b) Project performance appraisals c) Issue logs d) Social Styles Profile 79. What do many experts agree is the greatest threat to the success of any project? a) Lack of proper funding b) A failure to communicate c) Poor listening skills d) Inadequate staffing 80. Which communication skill is most important for information technology professionals for career advancement? a) Writing b) Listening c) Speaking d) Using communication technologies 81. Which of the following is not a process in project communication management? a) Information planning b) Information distribution c) Performance reporting d) Managing stakeholders 82. A building may not be constructed unless the planning permission for it has been obtained, this is the a) Legal constraint b) Quality constraint c) Cost constraint d) Logic constraint 83. A ________________ report describes where the project stands at a specific point in time. a) Status b) Performance c) Forecast d) Earned value
  • 14. Examination Paper – Project Management 14 IIBM Institute of Business Management 84. __________________ is an uncertainly that can have a negative or positive effect on meeting project objectives. a) Risk utility b) Risk tolerance c) Risk management d) Risk 85. A person who is a risk - ______________ receives greater satisfaction when more payoffs is at stake and is willing to pay a penalty to take risks. a) Averse b) Seeking c) Neutral d) Aware 86. Which risk management process involves prioritizing based on their probability and impact of occurrence? a) Risk management planning b) Risk identification c) Qualitative risk analysis d) Quantitative risk analysis 87. The 7-S framework of project management issues was promoted by a) McJonald and Co. b) McKinsly and Co. c) J & K Co. d) None 88. Your project involves using a new release of a software application, but if that release is not available, your team has ______________ plans to use the current release. a) Contingency b) Fallback c) Reserve d) Mitigation 89. A risk _________________ is a document that contains results of various risk management processes, often displayed in a table or spreadsheet format. a) Management plan b) Register c) Breakdown structure d) Probability / impact matrix
  • 15. Examination Paper – Project Management 15 IIBM Institute of Business Management 90. Your project team has decided not to use an upcoming release of software because it might cause your schedule to slip. Which negative risk response strategy are you using? a) Avoidance b) Acceptance c) Transference d) Mitigation 91. For non critical activities, network diagrams build in …………………………. at the start of activities. a) Temporary b) Buffer c) Slack d) Anywhere 92. If a project being undertaken by a particular project team, then these are referred as a) Resource capability b) Resource capacity c) Resource calendar d) Resource pool 93. The term ‘hedgehog syndrome’ means a) Management problem b) Solving problem c) Repetition of problem d) Find out a problem 94. What is the first procurement process? a) Planning contracting b) Planning purchasing and acquisitions c) Requesting seller responses d) Procurement management planning 95. The _____________ is the point at which the contractor assumes total responsibility for each additional dollar of contract cost. a) A breakeven point b) Share ratio point c) Point of reconciliation d) Point of total assumption 96. We’re standing on this hill here. We want to be on that hill over there, this is a) View b) Vision c) Mission d) Aim
  • 16. Examination Paper – Project Management 16 IIBM Institute of Business Management 97. A ______________________ is a document prepared by a seller when there are different approaches for meeting buyer needs. a) RFP b) RFQ c) Proposal d) Quote 98. Buyers often prepare a ______________________ list when selecting a seller to make this process more manageable. a) Preferred b) Short c) Qualified suppliers d) BAFO 99. A proposal evaluation sheet is an example of a(n) ______________________. a) RFP b) NPV analysis c) Earned value analysis d) Weighted scoring model 100. __________________ is a term used to describe various procurement functions that are now done electronically. a) E – procurement b) eBay c) E – commerce d) EMV