RE Capital's Visionary Leadership under Newman Leech
Emporium, Chengdu
1. CHENGDU NEW CBD
Project
NIELS NOEL LUIS CHRISTENSEN
Senior Chief Architect
YUANDAO ARCHITECTS
to
CHENGDU MUNICIPALITY
Client
CBD, CHENGDU
Location
560.000 m2
Master plan
GFA
180.000 m2
PROJECT DATE
April 2014
CONSTRUCTION DATE
Schedule to June 2016
CONSULTANTS
Yuandao LLtd.
NIELS NOEL LUIS CHRISTENSEN
Responsibilities
concept design
facing client
presenting to client & CEO
leading team
3D
hand sketches
EMPORIUM
CHENGDU
PROJECT DESCRIPTION
Emporium shopping mall, offices, con-
ference and hotel is part of the 560.000
m2 master plan for the new develop-
ment zone in Chengdu.
Program for development zone, 50.000
m2 shopping mall, tower one 35.000 m2
hotel and conference.Tower two 35.000
m2 5 *luxurious hotel.
Main entrance leading people into the
heart of the shopping mall, from the
boulevard strip connecting to the mas-
ter plans high rise residential and offices
area.
The photovoltaic curved facade is de-
sign for collecting rain water for reuse,
green surface on the shopping mall roof,
designed as filter to absorb and clean
rain water, reused for toilets and parks.
Each tower got a roof garden space over
see the city a “get a way” from the city
for entertainment and relaxation.
The hotel tower got outdoor swimming
pool and spa, below is the restaurant
located, getting sun light and reflecting
lights from the above pool, creating a
dramatic effect into the restaurant.