Some Goals Achieved Using The Avanulo Way©
                                           All Achieved with the people already in place and w/o Capital Investment
Industry           Location                                 Goal - All goals fully achieved                                          Annual Value   Time to Goal     Solution Sets
                                                                                                                                                      (ETBR1)         Employed
Consumer             Mexico        Increase daily throughput of processing area by 15%.                                              $75,000,000       63 days       Kuplo
Goods                                                                                                                                                                Plan Guard
                                                                                                                                                                     Robust
                                                                                                                                                                     1440 Mgt. System
Consumer             Mexico        Increase production on a canning line from 2.2 to 3.0 million cans per                            $47,000,000       37 days       Kuplo
Goods                              month.                                                                                                                            Zulu
                                                                                                                                                                     Robust
                                                                                                                                                                     1440 Mgt. System
Consumer              Brazil       Increase throughput of a high speed production line by 50%.                                       $32,000,000       53 days       Opportunity Tree
Goods                                                                                                                                                                Kuplo
                                                                                                                                                                     Plan Guard
                                                                                                                                                                     1440 Mgt. System
Energy                  US         Increased throughput from 100 MM to 110 MM gallons annually.                                      $22,000,000       42 days       Technical Summit
                                                                                                                                                                     1440 Mgt. System
Packaging              EU2         Implement a Relentless Achievement Organization for a European                                    $18,000,000       84 days       Opportunity Tree
                                   Division of a US company.                                                                                                         Plan Guard
Metals                 USA         Reduce 200 of 900 employees without disruption of production or                                   $11,000,000       47 days       Proximity
                                   degradation of morale.                                                                                                            Payroll Reduction
                                                                                                                                                                     Process
Packaging              USA         Pass supplier audit conducted by a food company to be able to supply                              $7,000,000       16 hours       Zulu Team
                                   corrugated containers - we had 18 hours of notice.
Various               US &         Eliminate injuries in the workplace - achieve at least one year injury                            $6,435,000     45 days (avg.)   Gestalt
                     Mexico        free (done at more than ten facilities).                                                                                          Proximity
                                                                                                                                                                     Opportunity Tree
Consumer              Brazil       Reduced operating cost by 10% without layoffs or socio-technical                                  $3,800,000        30 days       Cost Cutters
Goods                              disruption.                                                                                                                       Kuplo
                                                                                                                                                                     Plan Guard
Paper                  USA         Reduce operating cost by 3% in a large paper mill.                                                $3,100,000        89 days       Opportunity Tree
                                                                                                                                                                     Plan Guard
Consumer             Mexico        Implement a Crisis Management System that allowed a large food                                    $2,300,000        7 days        Bizcon
Goods                              facility to continue operating safety through a contamination crisis.                                                             Zulu
Plastics               USA         Reduce quarterly turnover of workforce from 80% to less than 7%.                                  $1,478,000        82 days       Proximity
Consumer               USA         Reduce Cost to package and palletize final, refrigerated product from                             $565,000          35 days       Robust
Goods                              $99 to $66 a pallet                                                                                                               Proximity
Consumer             Mexico        Pass Federal EHS audit (including boiler and pressure vessel                                      $100,000          5 days        Gestalt Safety
Goods                              inspection) without a single fine or citation.



1   ETBR means Enjoy The Business Result and it is a key principle of Avanulo’s process. For more information see our website - www.avanulo.com
2   England, Scotland, Belgium, Germany, Switzerland, France

More Related Content

Viewers also liked (13)

Kendall Coffey
Kendall CoffeyKendall Coffey
Kendall Coffey
 
Recursos
RecursosRecursos
Recursos
 
Ficha coristanco
Ficha coristancoFicha coristanco
Ficha coristanco
 
Um Olhar
Um OlharUm Olhar
Um Olhar
 
ProActive Apps
ProActive AppsProActive Apps
ProActive Apps
 
Teatro
TeatroTeatro
Teatro
 
Artes escénicas: espacios
Artes escénicas: espaciosArtes escénicas: espacios
Artes escénicas: espacios
 
Radiodifusoras de rcn
Radiodifusoras de rcnRadiodifusoras de rcn
Radiodifusoras de rcn
 
Sozialisierung durch Singen
Sozialisierung durch SingenSozialisierung durch Singen
Sozialisierung durch Singen
 
Onlygolflinks.c
Onlygolflinks.cOnlygolflinks.c
Onlygolflinks.c
 
Sintesis
SintesisSintesis
Sintesis
 
San ezequiel
San ezequielSan ezequiel
San ezequiel
 
Edição #01
Edição #01Edição #01
Edição #01
 

More from mstxbusiness

Pallet Wrapz Presentation
Pallet Wrapz PresentationPallet Wrapz Presentation
Pallet Wrapz Presentationmstxbusiness
 
The Avanulo Way A Flier 2012
The Avanulo Way   A Flier 2012The Avanulo Way   A Flier 2012
The Avanulo Way A Flier 2012mstxbusiness
 
Avanulos Payroll Reduction Process
Avanulos Payroll Reduction ProcessAvanulos Payroll Reduction Process
Avanulos Payroll Reduction Processmstxbusiness
 
Cost Cutter Flier 2012
Cost Cutter Flier 2012Cost Cutter Flier 2012
Cost Cutter Flier 2012mstxbusiness
 
Summary Of The Six Tenants Of The Avanulo Way 2012
Summary Of The Six Tenants Of The Avanulo Way 2012Summary Of The Six Tenants Of The Avanulo Way 2012
Summary Of The Six Tenants Of The Avanulo Way 2012mstxbusiness
 
The Avanulo Way A Flier 2012
The Avanulo Way   A Flier 2012The Avanulo Way   A Flier 2012
The Avanulo Way A Flier 2012mstxbusiness
 
Avanulo White Paper 446 Relentless Achievement An Effective Defense Agai...
Avanulo White Paper  446   Relentless Achievement   An Effective Defense Agai...Avanulo White Paper  446   Relentless Achievement   An Effective Defense Agai...
Avanulo White Paper 446 Relentless Achievement An Effective Defense Agai...mstxbusiness
 
Cost Cutter Flier 2012
Cost Cutter Flier 2012Cost Cutter Flier 2012
Cost Cutter Flier 2012mstxbusiness
 
Avanulo White Paper Gestalt Safety 2012
Avanulo White Paper   Gestalt Safety 2012Avanulo White Paper   Gestalt Safety 2012
Avanulo White Paper Gestalt Safety 2012mstxbusiness
 
Cost Cutter Flier 2012
Cost Cutter Flier 2012Cost Cutter Flier 2012
Cost Cutter Flier 2012mstxbusiness
 
Some Goals Achieved Using The Avanulo Way
Some Goals Achieved Using The Avanulo WaySome Goals Achieved Using The Avanulo Way
Some Goals Achieved Using The Avanulo Waymstxbusiness
 
Avanulo Blue Paper Enigi User Engaged Construction (1)
Avanulo Blue Paper   Enigi   User Engaged Construction  (1)Avanulo Blue Paper   Enigi   User Engaged Construction  (1)
Avanulo Blue Paper Enigi User Engaged Construction (1)mstxbusiness
 
The Avanulo Way A Flier 2012
The Avanulo Way   A Flier 2012The Avanulo Way   A Flier 2012
The Avanulo Way A Flier 2012mstxbusiness
 
Achieving Operating Cost Leadership
Achieving Operating Cost LeadershipAchieving Operating Cost Leadership
Achieving Operating Cost Leadershipmstxbusiness
 
Business Continuation Process Flier
Business Continuation Process  FlierBusiness Continuation Process  Flier
Business Continuation Process Fliermstxbusiness
 
Gestalt Safety 2011
Gestalt Safety  2011Gestalt Safety  2011
Gestalt Safety 2011mstxbusiness
 

More from mstxbusiness (17)

Pallet Wrapz Presentation
Pallet Wrapz PresentationPallet Wrapz Presentation
Pallet Wrapz Presentation
 
The Avanulo Way A Flier 2012
The Avanulo Way   A Flier 2012The Avanulo Way   A Flier 2012
The Avanulo Way A Flier 2012
 
Avanulos Payroll Reduction Process
Avanulos Payroll Reduction ProcessAvanulos Payroll Reduction Process
Avanulos Payroll Reduction Process
 
Generations
GenerationsGenerations
Generations
 
Cost Cutter Flier 2012
Cost Cutter Flier 2012Cost Cutter Flier 2012
Cost Cutter Flier 2012
 
Summary Of The Six Tenants Of The Avanulo Way 2012
Summary Of The Six Tenants Of The Avanulo Way 2012Summary Of The Six Tenants Of The Avanulo Way 2012
Summary Of The Six Tenants Of The Avanulo Way 2012
 
The Avanulo Way A Flier 2012
The Avanulo Way   A Flier 2012The Avanulo Way   A Flier 2012
The Avanulo Way A Flier 2012
 
Avanulo White Paper 446 Relentless Achievement An Effective Defense Agai...
Avanulo White Paper  446   Relentless Achievement   An Effective Defense Agai...Avanulo White Paper  446   Relentless Achievement   An Effective Defense Agai...
Avanulo White Paper 446 Relentless Achievement An Effective Defense Agai...
 
Cost Cutter Flier 2012
Cost Cutter Flier 2012Cost Cutter Flier 2012
Cost Cutter Flier 2012
 
Avanulo White Paper Gestalt Safety 2012
Avanulo White Paper   Gestalt Safety 2012Avanulo White Paper   Gestalt Safety 2012
Avanulo White Paper Gestalt Safety 2012
 
Cost Cutter Flier 2012
Cost Cutter Flier 2012Cost Cutter Flier 2012
Cost Cutter Flier 2012
 
Some Goals Achieved Using The Avanulo Way
Some Goals Achieved Using The Avanulo WaySome Goals Achieved Using The Avanulo Way
Some Goals Achieved Using The Avanulo Way
 
Avanulo Blue Paper Enigi User Engaged Construction (1)
Avanulo Blue Paper   Enigi   User Engaged Construction  (1)Avanulo Blue Paper   Enigi   User Engaged Construction  (1)
Avanulo Blue Paper Enigi User Engaged Construction (1)
 
The Avanulo Way A Flier 2012
The Avanulo Way   A Flier 2012The Avanulo Way   A Flier 2012
The Avanulo Way A Flier 2012
 
Achieving Operating Cost Leadership
Achieving Operating Cost LeadershipAchieving Operating Cost Leadership
Achieving Operating Cost Leadership
 
Business Continuation Process Flier
Business Continuation Process  FlierBusiness Continuation Process  Flier
Business Continuation Process Flier
 
Gestalt Safety 2011
Gestalt Safety  2011Gestalt Safety  2011
Gestalt Safety 2011
 

Goals achieved using Avanulo Way

  • 1. Some Goals Achieved Using The Avanulo Way© All Achieved with the people already in place and w/o Capital Investment Industry Location Goal - All goals fully achieved Annual Value Time to Goal Solution Sets (ETBR1) Employed Consumer Mexico Increase daily throughput of processing area by 15%. $75,000,000 63 days Kuplo Goods Plan Guard Robust 1440 Mgt. System Consumer Mexico Increase production on a canning line from 2.2 to 3.0 million cans per $47,000,000 37 days Kuplo Goods month. Zulu Robust 1440 Mgt. System Consumer Brazil Increase throughput of a high speed production line by 50%. $32,000,000 53 days Opportunity Tree Goods Kuplo Plan Guard 1440 Mgt. System Energy US Increased throughput from 100 MM to 110 MM gallons annually. $22,000,000 42 days Technical Summit 1440 Mgt. System Packaging EU2 Implement a Relentless Achievement Organization for a European $18,000,000 84 days Opportunity Tree Division of a US company. Plan Guard Metals USA Reduce 200 of 900 employees without disruption of production or $11,000,000 47 days Proximity degradation of morale. Payroll Reduction Process Packaging USA Pass supplier audit conducted by a food company to be able to supply $7,000,000 16 hours Zulu Team corrugated containers - we had 18 hours of notice. Various US & Eliminate injuries in the workplace - achieve at least one year injury $6,435,000 45 days (avg.) Gestalt Mexico free (done at more than ten facilities). Proximity Opportunity Tree Consumer Brazil Reduced operating cost by 10% without layoffs or socio-technical $3,800,000 30 days Cost Cutters Goods disruption. Kuplo Plan Guard Paper USA Reduce operating cost by 3% in a large paper mill. $3,100,000 89 days Opportunity Tree Plan Guard Consumer Mexico Implement a Crisis Management System that allowed a large food $2,300,000 7 days Bizcon Goods facility to continue operating safety through a contamination crisis. Zulu Plastics USA Reduce quarterly turnover of workforce from 80% to less than 7%. $1,478,000 82 days Proximity Consumer USA Reduce Cost to package and palletize final, refrigerated product from $565,000 35 days Robust Goods $99 to $66 a pallet Proximity Consumer Mexico Pass Federal EHS audit (including boiler and pressure vessel $100,000 5 days Gestalt Safety Goods inspection) without a single fine or citation. 1 ETBR means Enjoy The Business Result and it is a key principle of Avanulo’s process. For more information see our website - www.avanulo.com 2 England, Scotland, Belgium, Germany, Switzerland, France