This presentation gives a brief outline of the main contents of a construction phase plan.
So, what is a construction phase plan?
A construction phase plan (CPP) is a key document, outlining the health and safety concerns associated with a specific construction project.
A construction phase plan should cover the site rules and necessary procedures that are in place to minimise or eliminate risks on site.
A construction phase plan is required on all projects.
1. Do You Need
A Construction Phase
Plan?
https://hc-services.uk/
2. A Construction Phase Plan Outline
https://hc-services.uk/
Prepared By Len Foster
The phrase "construction phase plan" is likely to be used if you work in the construction
industry or take on your first construction project.
However, what exactly is a construction phase plan? When is it required, and who writes
it?
•A construction phase plan is a document required under CDM
•It’s required on all construction projects
•It’s produced by the principal contractor (or sole contractor if only one)
•It's used to plan and manage construction work safely (and comply with the law)
3. What Exactly Is A Construction Phase Plan?
https://hc-services.uk/
•A construction phase plan is a health and safety document required under the
Construction (Design and Management) Regulations - often referred to as CDM.
•The construction phase plan, also known as the CPP or the construction phase health
and safety plan, is a record needed by the CDM regulations on every project.
4. What Exactly Is A Construction Phase Plan?
https://hc-services.uk/
•The contents of the plan need to be specific to the project. Primarily
because every construction project is different. For example, there’s
different teams, different locations, and different types of work to be
considered.
•How you’ll handle health and safety issues on your site should be
covered in detail in your construction phase plan.
5. What Exactly Is A Construction Phase Plan?
https://hc-services.uk/
Make sure your construction phase plan is more than just a list of risk assessments and
method statements for various project-related tasks and activities.
These are separate documents that are necessary for every project contractor. The
contents of the plan The contents of the plan
6. What Exactly Is A Construction Phase Plan?
https://hc-services.uk/
A List Of Key Headings
You Will Need
7. What Exactly Is A Construction Phase Plan?
https://hc-services.uk/
Description Of The Project
•You will describe the projects details and it’s scope in the
description, along with the project management team (client,
primary designer(s), designers, principal contractor, and other
consultants).
•Who You should also list subcontractors and important suppliers.
8. What Exactly Is A Construction Phase Plan?
https://hc-services.uk/
Project Management
The project's management structure should be described in
depth, including the site manager and any individuals responsible
for health and safety.
•How do you intend to manage the project?
•Who will be in charge?
•What do people need to do?
•How is information to be shared on the site?
•What happens in an emergency?
9. What Exactly Is A Construction Phase Plan?
https://hc-services.uk/
Controlling Health Risks
This section of the construction phase plan details how you will manage health risks
throughout the project.
Take into account any risks that could endanger the health of workers, guests, or the
general public. Health hazards like asbestos, contaminated ground, radiation, and
dangerous substances might be present.
•What are the project health risks?
•How will they be managed?
10. What Exactly Is A Construction Phase Plan?
https://hc-services.uk/
Controlling Safety Risks
This section of the construction phase plan details how you will manage health risks
throughout the project.
Take into account any risks that could endanger the health of workers, guests, or the
general public. Health hazards like asbestos, contaminated ground, radiation, and
dangerous substances might be present.
•What are the project health risks?
•How will they be managed?
11. What Exactly Is A Construction Phase Plan?
https://hc-services.uk/
Controlling Safety Risks
This section of the construction phase plan details how you will manage health risks
throughout the project.
Take into account any risks that could endanger the health of workers, guests, or the
general public. Health hazards like asbestos, contaminated ground, radiation, and
dangerous substances might be present.
•What are the project health risks?
•How will they be managed?
12. What Exactly Is A Construction Phase Plan?
https://hc-services.uk/
The Health & Safety File
There is a different document required under CDM, which is the health and safety file. It is
not necessary until the end of the project, in contrast to the construction phase plan.
Nevertheless, data for the file should be gathered during the project.
Describe the procedures used to acquire data for the health and safety file in this section.
Additionally, you can provide the file's suggested structure and the required information's
format.
13. What Exactly Is A Construction Phase Plan?
https://hc-services.uk/
In Conclusion
In conclusion, all construction projects, no matter the size or duration, are
legally required to have a Construction Phase Health and Safety Plan.
Should you have any questions please use the contact information below.