Cummings Associates
Projections for the
Likely Gaming Revenues of the
Proponents in the South-Central
Gaming Zone of Kansas
Summary
DRAFT
July 16, 2008
135 Jason Street, Arlington, Massachusetts 02476
Telephone: 781.641.1215 - Fax: 641.0954 - e-mail: cummingsw@aol.com
DRAFT
Exhibit 1: Summary of Cummings Projections
Part 1: South-Central Proponents at Standard Size ($mn / 2007$)
(As if all the casinos were the same size)
# Slots Power Slot Win win/slot/day Total Win
Gaming Facility / Location: Rating ($mn) ($mn)
Harrahs Mulvane 2,000 104 $151.3 $207 $174.2
Penn Wellington 2,000 110 $117.2 $161 $134.7
Marvel Wellington 2,000 110 $111.5 $153 $128.3
Part 2: South-Central Casinos as Actually Proposed ($mn / 2007$)
# Slots Power Slot Win win/slot/day Total Win
Gaming Facility / Location: Rating ($mn) ($mn)
Harrahs Mulvane 2,000 104 $151.3 $207 $174.2
Marvel Wellington 2,000 110 $111.5 $153 $130.2
Penn Wellington 1,500 110 $107.8 $197 $123.5
Part 3: Cummings Projections versus the Proponents' ($mn / 2013)
(in then-year dollars; not including poker etc.; Cummings escalated at 2.5%/year)
# Slots Proponent Cummings
Gaming Facility / Location: ($mn) ($mn)
Harrahs Mulvane 2,000 $271.6 $202.0
Marvel Wellington 2,000 $230.4 $150.9
Penn Wellington 1,500 $214.4 $143.2
Cummings Associates
DRAFT
Cummings Associates
Exhibit 2: Harrah's Mulvane Projections vs. Cummings's (2.5% escalation)
$0
$50
$100
$150
$200
$250
$300
$350
2010 2011 2012 2013 2014 2015 2016
Note: Cummings projections are for "stabilized operations"
Slot+TableWin(notinc.poker)($mn)
Harrahs
C Low
C Base
C High
DRAFT
Cummings Associates
Exhibit 3: Marvel's Wellington Projections vs. Cummings's (2.5% escalation)
$0
$50
$100
$150
$200
$250
$300
$350
2010 2011 2012 2013 2014 2015 2016
Note: Cummings projections are for "stabilized operations." Marvel's are for FY ending Sept. 30.
Slot+TableWin(notinc.poker)($mn)
Marvel
C Low
C Base
C High
DRAFT
Cumings Associates
Exhibit 4: Penn's Wellington Projections vs. Cummings's (2.5% escalation)
$0
$50
$100
$150
$200
$250
$300
$350
2010 2011 2012 2013 2014 2015 2016
Note: Cummings projections through 2013 are for 1,500-slot facility --
for 2015, they are for a 2,000-slot facility (for 2014, intermediate)
Slot+TableWin(notinc.poker)($mn)
Penn W
C Low
C Base
C High

More Related Content

Viewers also liked

2015 LGFRB Presentation Castle Rock Casino Resort
2015 LGFRB Presentation Castle Rock Casino Resort 2015 LGFRB Presentation Castle Rock Casino Resort
2015 LGFRB Presentation Castle Rock Casino Resort krgc
 
Union gaming south central 2010
Union gaming south central 2010Union gaming south central 2010
Union gaming south central 2010krgc
 
Kansascrossingppt july2 final auto play
Kansascrossingppt july2 final auto playKansascrossingppt july2 final auto play
Kansascrossingppt july2 final auto playkrgc
 
Marvel gaming bid 7 16
Marvel gaming bid 7 16Marvel gaming bid 7 16
Marvel gaming bid 7 16krgc
 
Penn gaming cherokee market report
Penn gaming cherokee market reportPenn gaming cherokee market report
Penn gaming cherokee market reportkrgc
 
Cummings ks report 1019
Cummings ks report 1019Cummings ks report 1019
Cummings ks report 1019krgc
 
Civic economics krgc 2009
Civic economics krgc 2009Civic economics krgc 2009
Civic economics krgc 2009krgc
 
Sumner union gaming2
Sumner   union gaming2Sumner   union gaming2
Sumner union gaming2krgc
 
Meridian dodge city resort-sw
Meridian   dodge city resort-swMeridian   dodge city resort-sw
Meridian dodge city resort-swkrgc
 
Wec harrahs mulvane projns 0716
Wec harrahs mulvane projns  0716Wec harrahs mulvane projns  0716
Wec harrahs mulvane projns 0716krgc
 
Wgr ne ks_report
Wgr ne ks_reportWgr ne ks_report
Wgr ne ks_reportkrgc
 
Meridian golden heartland-ks
Meridian   golden heartland-ksMeridian   golden heartland-ks
Meridian golden heartland-kskrgc
 
Guia argentina de tratamiento de la EPOC
Guia argentina de tratamiento de la EPOCGuia argentina de tratamiento de la EPOC
Guia argentina de tratamiento de la EPOCAlejandro Videla
 
My lx business_executive_program_v4
My lx business_executive_program_v4My lx business_executive_program_v4
My lx business_executive_program_v4Melvin Bertulfo
 
Sea residences a 315b phase 1
Sea residences a 315b phase 1Sea residences a 315b phase 1
Sea residences a 315b phase 1Melvin Bertulfo
 
Communicating With Generation Now1
Communicating With Generation Now1Communicating With Generation Now1
Communicating With Generation Now1JMMRAS
 

Viewers also liked (16)

2015 LGFRB Presentation Castle Rock Casino Resort
2015 LGFRB Presentation Castle Rock Casino Resort 2015 LGFRB Presentation Castle Rock Casino Resort
2015 LGFRB Presentation Castle Rock Casino Resort
 
Union gaming south central 2010
Union gaming south central 2010Union gaming south central 2010
Union gaming south central 2010
 
Kansascrossingppt july2 final auto play
Kansascrossingppt july2 final auto playKansascrossingppt july2 final auto play
Kansascrossingppt july2 final auto play
 
Marvel gaming bid 7 16
Marvel gaming bid 7 16Marvel gaming bid 7 16
Marvel gaming bid 7 16
 
Penn gaming cherokee market report
Penn gaming cherokee market reportPenn gaming cherokee market report
Penn gaming cherokee market report
 
Cummings ks report 1019
Cummings ks report 1019Cummings ks report 1019
Cummings ks report 1019
 
Civic economics krgc 2009
Civic economics krgc 2009Civic economics krgc 2009
Civic economics krgc 2009
 
Sumner union gaming2
Sumner   union gaming2Sumner   union gaming2
Sumner union gaming2
 
Meridian dodge city resort-sw
Meridian   dodge city resort-swMeridian   dodge city resort-sw
Meridian dodge city resort-sw
 
Wec harrahs mulvane projns 0716
Wec harrahs mulvane projns  0716Wec harrahs mulvane projns  0716
Wec harrahs mulvane projns 0716
 
Wgr ne ks_report
Wgr ne ks_reportWgr ne ks_report
Wgr ne ks_report
 
Meridian golden heartland-ks
Meridian   golden heartland-ksMeridian   golden heartland-ks
Meridian golden heartland-ks
 
Guia argentina de tratamiento de la EPOC
Guia argentina de tratamiento de la EPOCGuia argentina de tratamiento de la EPOC
Guia argentina de tratamiento de la EPOC
 
My lx business_executive_program_v4
My lx business_executive_program_v4My lx business_executive_program_v4
My lx business_executive_program_v4
 
Sea residences a 315b phase 1
Sea residences a 315b phase 1Sea residences a 315b phase 1
Sea residences a 315b phase 1
 
Communicating With Generation Now1
Communicating With Generation Now1Communicating With Generation Now1
Communicating With Generation Now1
 

Similar to Wec sumner summary 0716

Cummings ne draft 0826
Cummings ne draft 0826Cummings ne draft 0826
Cummings ne draft 0826krgc
 
Cummings sc slides 1019
Cummings sc slides 1019Cummings sc slides 1019
Cummings sc slides 1019krgc
 
Cummings sw draft 0826
Cummings sw draft 0826Cummings sw draft 0826
Cummings sw draft 0826krgc
 
Cummings ks slides 1201
Cummings ks slides 1201Cummings ks slides 1201
Cummings ks slides 1201krgc
 
Cummings ks se slides 0724
Cummings ks se slides 0724Cummings ks se slides 0724
Cummings ks se slides 0724krgc
 
Cummings ks slides 0820
Cummings ks slides 0820Cummings ks slides 0820
Cummings ks slides 0820krgc
 

Similar to Wec sumner summary 0716 (6)

Cummings ne draft 0826
Cummings ne draft 0826Cummings ne draft 0826
Cummings ne draft 0826
 
Cummings sc slides 1019
Cummings sc slides 1019Cummings sc slides 1019
Cummings sc slides 1019
 
Cummings sw draft 0826
Cummings sw draft 0826Cummings sw draft 0826
Cummings sw draft 0826
 
Cummings ks slides 1201
Cummings ks slides 1201Cummings ks slides 1201
Cummings ks slides 1201
 
Cummings ks se slides 0724
Cummings ks se slides 0724Cummings ks se slides 0724
Cummings ks se slides 0724
 
Cummings ks slides 0820
Cummings ks slides 0820Cummings ks slides 0820
Cummings ks slides 0820
 

More from krgc

Ekay Economic Consultants (Eugenia Larmore)
Ekay Economic Consultants (Eugenia Larmore)Ekay Economic Consultants (Eugenia Larmore)
Ekay Economic Consultants (Eugenia Larmore)krgc
 
Civic Economics (Dan Houston, Matt Cunningham)
Civic Economics (Dan Houston, Matt Cunningham)Civic Economics (Dan Houston, Matt Cunningham)
Civic Economics (Dan Houston, Matt Cunningham)krgc
 
Cummings Associates (Will Cummings)
Cummings Associates (Will Cummings)Cummings Associates (Will Cummings)
Cummings Associates (Will Cummings)krgc
 
global gaming 15-december2010_(final)
global gaming 15-december2010_(final)global gaming 15-december2010_(final)
global gaming 15-december2010_(final)krgc
 
Peninsula dec 15 final
Peninsula dec 15 finalPeninsula dec 15 final
Peninsula dec 15 finalkrgc
 
Public comments 2
Public comments 2Public comments 2
Public comments 2krgc
 
cbre letter to review board
cbre letter to review boardcbre letter to review board
cbre letter to review boardkrgc
 
cbre letter to review board
cbre letter to review boardcbre letter to review board
cbre letter to review boardkrgc
 
Macomber memo
Macomber memoMacomber memo
Macomber memokrgc
 
peninsula plans meet or exceed drainage standards
peninsula plans meet or exceed drainage standardspeninsula plans meet or exceed drainage standards
peninsula plans meet or exceed drainage standardskrgc
 
Cummings response to global gaming
Cummings response to global gamingCummings response to global gaming
Cummings response to global gamingkrgc
 
Sumner co. memo to lgfrb 12-10-10
Sumner co. memo to lgfrb 12-10-10Sumner co. memo to lgfrb 12-10-10
Sumner co. memo to lgfrb 12-10-10krgc
 
Global gaming responses to 12-7 meeting
Global gaming responses to 12-7 meetingGlobal gaming responses to 12-7 meeting
Global gaming responses to 12-7 meetingkrgc
 
Peninsula responses to 12-7 meeting
Peninsula responses to 12-7 meetingPeninsula responses to 12-7 meeting
Peninsula responses to 12-7 meetingkrgc
 
Public comments
Public commentsPublic comments
Public commentskrgc
 
lottery response re question from review board re peninsula's timelines exh...
lottery response re question from review board re peninsula's  timelines  exh...lottery response re question from review board re peninsula's  timelines  exh...
lottery response re question from review board re peninsula's timelines exh...krgc
 
global response to board 1201 questions
 global response to board 1201 questions global response to board 1201 questions
global response to board 1201 questionskrgc
 
20101204 peninsula response to board 1201 questions - description of ad astr...
20101204 peninsula response to board 1201 questions  - description of ad astr...20101204 peninsula response to board 1201 questions  - description of ad astr...
20101204 peninsula response to board 1201 questions - description of ad astr...krgc
 
Global gaming ks -01december2010
Global gaming ks -01december2010Global gaming ks -01december2010
Global gaming ks -01december2010krgc
 
Peninsula crossroads dec 1 2010 powerpoint presentation
Peninsula crossroads dec 1 2010 powerpoint presentationPeninsula crossroads dec 1 2010 powerpoint presentation
Peninsula crossroads dec 1 2010 powerpoint presentationkrgc
 

More from krgc (20)

Ekay Economic Consultants (Eugenia Larmore)
Ekay Economic Consultants (Eugenia Larmore)Ekay Economic Consultants (Eugenia Larmore)
Ekay Economic Consultants (Eugenia Larmore)
 
Civic Economics (Dan Houston, Matt Cunningham)
Civic Economics (Dan Houston, Matt Cunningham)Civic Economics (Dan Houston, Matt Cunningham)
Civic Economics (Dan Houston, Matt Cunningham)
 
Cummings Associates (Will Cummings)
Cummings Associates (Will Cummings)Cummings Associates (Will Cummings)
Cummings Associates (Will Cummings)
 
global gaming 15-december2010_(final)
global gaming 15-december2010_(final)global gaming 15-december2010_(final)
global gaming 15-december2010_(final)
 
Peninsula dec 15 final
Peninsula dec 15 finalPeninsula dec 15 final
Peninsula dec 15 final
 
Public comments 2
Public comments 2Public comments 2
Public comments 2
 
cbre letter to review board
cbre letter to review boardcbre letter to review board
cbre letter to review board
 
cbre letter to review board
cbre letter to review boardcbre letter to review board
cbre letter to review board
 
Macomber memo
Macomber memoMacomber memo
Macomber memo
 
peninsula plans meet or exceed drainage standards
peninsula plans meet or exceed drainage standardspeninsula plans meet or exceed drainage standards
peninsula plans meet or exceed drainage standards
 
Cummings response to global gaming
Cummings response to global gamingCummings response to global gaming
Cummings response to global gaming
 
Sumner co. memo to lgfrb 12-10-10
Sumner co. memo to lgfrb 12-10-10Sumner co. memo to lgfrb 12-10-10
Sumner co. memo to lgfrb 12-10-10
 
Global gaming responses to 12-7 meeting
Global gaming responses to 12-7 meetingGlobal gaming responses to 12-7 meeting
Global gaming responses to 12-7 meeting
 
Peninsula responses to 12-7 meeting
Peninsula responses to 12-7 meetingPeninsula responses to 12-7 meeting
Peninsula responses to 12-7 meeting
 
Public comments
Public commentsPublic comments
Public comments
 
lottery response re question from review board re peninsula's timelines exh...
lottery response re question from review board re peninsula's  timelines  exh...lottery response re question from review board re peninsula's  timelines  exh...
lottery response re question from review board re peninsula's timelines exh...
 
global response to board 1201 questions
 global response to board 1201 questions global response to board 1201 questions
global response to board 1201 questions
 
20101204 peninsula response to board 1201 questions - description of ad astr...
20101204 peninsula response to board 1201 questions  - description of ad astr...20101204 peninsula response to board 1201 questions  - description of ad astr...
20101204 peninsula response to board 1201 questions - description of ad astr...
 
Global gaming ks -01december2010
Global gaming ks -01december2010Global gaming ks -01december2010
Global gaming ks -01december2010
 
Peninsula crossroads dec 1 2010 powerpoint presentation
Peninsula crossroads dec 1 2010 powerpoint presentationPeninsula crossroads dec 1 2010 powerpoint presentation
Peninsula crossroads dec 1 2010 powerpoint presentation
 

Wec sumner summary 0716

  • 1. Cummings Associates Projections for the Likely Gaming Revenues of the Proponents in the South-Central Gaming Zone of Kansas Summary DRAFT July 16, 2008 135 Jason Street, Arlington, Massachusetts 02476 Telephone: 781.641.1215 - Fax: 641.0954 - e-mail: cummingsw@aol.com
  • 2. DRAFT Exhibit 1: Summary of Cummings Projections Part 1: South-Central Proponents at Standard Size ($mn / 2007$) (As if all the casinos were the same size) # Slots Power Slot Win win/slot/day Total Win Gaming Facility / Location: Rating ($mn) ($mn) Harrahs Mulvane 2,000 104 $151.3 $207 $174.2 Penn Wellington 2,000 110 $117.2 $161 $134.7 Marvel Wellington 2,000 110 $111.5 $153 $128.3 Part 2: South-Central Casinos as Actually Proposed ($mn / 2007$) # Slots Power Slot Win win/slot/day Total Win Gaming Facility / Location: Rating ($mn) ($mn) Harrahs Mulvane 2,000 104 $151.3 $207 $174.2 Marvel Wellington 2,000 110 $111.5 $153 $130.2 Penn Wellington 1,500 110 $107.8 $197 $123.5 Part 3: Cummings Projections versus the Proponents' ($mn / 2013) (in then-year dollars; not including poker etc.; Cummings escalated at 2.5%/year) # Slots Proponent Cummings Gaming Facility / Location: ($mn) ($mn) Harrahs Mulvane 2,000 $271.6 $202.0 Marvel Wellington 2,000 $230.4 $150.9 Penn Wellington 1,500 $214.4 $143.2 Cummings Associates
  • 3. DRAFT Cummings Associates Exhibit 2: Harrah's Mulvane Projections vs. Cummings's (2.5% escalation) $0 $50 $100 $150 $200 $250 $300 $350 2010 2011 2012 2013 2014 2015 2016 Note: Cummings projections are for "stabilized operations" Slot+TableWin(notinc.poker)($mn) Harrahs C Low C Base C High
  • 4. DRAFT Cummings Associates Exhibit 3: Marvel's Wellington Projections vs. Cummings's (2.5% escalation) $0 $50 $100 $150 $200 $250 $300 $350 2010 2011 2012 2013 2014 2015 2016 Note: Cummings projections are for "stabilized operations." Marvel's are for FY ending Sept. 30. Slot+TableWin(notinc.poker)($mn) Marvel C Low C Base C High
  • 5. DRAFT Cumings Associates Exhibit 4: Penn's Wellington Projections vs. Cummings's (2.5% escalation) $0 $50 $100 $150 $200 $250 $300 $350 2010 2011 2012 2013 2014 2015 2016 Note: Cummings projections through 2013 are for 1,500-slot facility -- for 2015, they are for a 2,000-slot facility (for 2014, intermediate) Slot+TableWin(notinc.poker)($mn) Penn W C Low C Base C High